Pages that link to "RA-23-0015, Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2"
Jump to navigation
Jump to search
The following pages link to RA-23-0015, Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2:
Displayed 50 items.
- RA-12-033, Independent Spent Fuel Storage Installations - NRC Correspondence Distribution List Update (← links)
- RA-12-030, ISFSI - Notification of Closing of Corporate Merger of Duke Energy Corp. and Progress Energy, Inc (← links)
- RA-12-023, Day Response to the March 12, 2012, Request for Information Regarding Enclosure 5, Recommendation 9.3: Emergency Preparedness (← links)
- RA-12-025, 90-Day Response to the March 12, 2012, Request for Information Regarding Enclosure 1, Recommendation 2.1: Seismic (← links)
- RA-12-024, 90-Day Response to the March 12, 2012, Request for Information Regarding Enclosures 2 and 4, Recommendations 2.1 and 2.3: Flooding (← links)
- RA-12-009, Evidence of Guarantee of Payment of Deferred Premiums (← links)
- RA-12-020, ISFSI; Crystal River, Unit 3; Shearon Harris, Unit 1 and H. B. Robinson, Unit 2 and ISFSI - NRC Correspondence Distribution List Update (← links)
- RA-12-012, Answer to March 12, 2012, Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design Basis External Events (← links)
- RA-12-011, Onsite Property Insurance Coverage (← links)
- RA-11-031, ISFSI, Crystal River, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2 and ISFSI - NRC Correspondence Distribution List Update (← links)
- RA-11-018, Response to Request for Additional Information - 2011 Biennial Decommissioning Funding Status Report (← links)
- RA-11-019, Request for Extension of Enforcement Discretion and Commitment to Submittal Dates for 10 CFR 50.48(c) License Amendment Requests (← links)
- RA-11-006, Onsite Property Insurance Coverage (← links)
- RA-10-025, Notification Letter Designing Balance of Plant Systems within the Cyber Security Rule Scope (← links)
- RA-10-011, Request for Approval of the Carolina Power & Light Company and Florida Power Corporation Cyber Security Plan (← links)
- RA-10-006, Onsite Property Insurance Coverage (← links)
- RA-10-004, Notification of Intent to Implement the Emergency Response Data System Transition from Existing Modem to Virtual Private Network Technology (← links)
- RA-09-004, Submittal of Evidence of Guarantee of Payment of Deferred Premiums (← links)
- RA-09-002, Biennial Decommissioning Funding Status Report (← links)
- RA-09-003, Onsite Property Insurance Coverage (← links)
- RA-08-0029, Additional Extension to Complete Corrective Actions for NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. (← links)
- RA-17-0039, Response to Request for Additional Information (RAI) Regarding 10 CFR 50.55a(z)(1)Proposed Alternative to ASME Section XI Threads in Flange Examination (17-GO-001) (← links)
- RNP-RA/16-0072, Response to Request for Additional Information Regarding Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Rev. 2 (← links)
- RA-17-007, Summary of Changes to Quality Assurance Topical Report NO-AA-10 (← links)
- RA-16-007, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, Revision 88, 89 and 90 (← links)
- RA-15-0004, Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermalhydraulic Statistical Core Design Methodology (← links)
- RA-10-021, Exemptions Request from Physical Security Requirements (← links)
- RA-19-0175, Submittal of 2018 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 36 (← links)
- RA-19-0154, Response to NRC Request for Additional Information (RAI) Regarding Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors (← links)
- RA-19-0145, Revision to Reactor Vessel Surveillance Capsule Removal Schedule (← links)
- RA-18-0245, License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.1 (← links)
- RA-12-038, Florida Power Corp.'S Response to Request for Information Pursuant to Title 10 of Code of Federal Regulations 50.54 (F) Recommendations 2.1, 2.3, & 9.3 of Near Term Force Review of Insights from Fukushima Dai-Ichi... (← links)
- RA-19-0106, Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head (← links)
- RA-19-0084, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report (← links)
- RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 (← links)
- RA-19-0138, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections (← links)
- RA-19-0308, Clean Technical Specifications Pages Regarding Application to Adopt TSTF-425, Revision 3 (← links)
- RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) (← links)
- RA-19-0404, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal (← links)
- RA-19-0384, LER 20190-001-00 for H.B. Robinson Steam Electric Plant, Unit 2, Turbine Trip/Reactor Trip Due to Main Generator Lockout (← links)
- RA-19-0386, Response to Request for Additional Information (RAI) Regarding License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.1 (← links)
- RA-05-0104, Transmittal of Core Operating Limits Report (← links)
- RA-05-0089, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks (← links)
- RA-05-0091, Voluntary Response to Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations. (← links)
- RA-05-0093, Independent Spent Fuel Storage Installation, Nuhoms - 24PTH System - Thermal Performance Measurements (← links)
- RA-05-0088, Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors (← links)
- RA-19-0427, Emergency Plan PLP-007, Rev. 92 (← links)
- RA-19-0421, Response to Request for Additional Information (RAI) Regarding Reactor Pressure Vessel (RPV) Surveillance Capsule Removal (RA-19-0145) (← links)
- RA-19-0460, Revised Response to Request for Additional Information (RAI) Regarding Reactor Pressure Vessel (RPV) Surveillance Capsule Removal (← links)
- RA-20-0007, Request to Correct Administrative Renewed Facility Operating License Error (← links)