Pages that link to "Deboer D"
← Deboer D
Jump to navigation
Jump to search
The following pages link to Deboer D:
Displayed 47 items.
- L-2020-066, Submittal of WCAP-18452-P, Revision 1, Core Support Barrel and Core Shroud Flaw Analysis (← links)
- L-2020-094, Supplemental Response to Request for Additional Information Regarding License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements (← links)
- L-2020-165, Supplement to Updated Final Response to NRC Generic Letter 2004-02 (← links)
- L-2021-064, Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C) (← links)
- L-2021-137, GL 2004-02 Debris Transport Calculation Non-Conservatism (← links)
- ML21215A314 (← links)
- ML20268A114 (← links)
- ML21265A284 (← links)
- ML21350A426 (← links)
- L-2021-196, Request for Rescission of Confirmatory Order EA-07-321 (← links)
- ML21265A285 (← links)
- ML21215A315 (← links)
- L-2022-014, Supplement to License Amendment to Allow Risk Informed Completion Times for the 120-Volt AC Instrument Bus Requirements (← links)
- ML20141L672 (← links)
- ML21315A007 (← links)
- ML22013A681 (← links)
- ML22227A119 (← links)
- ML22111A137 (← links)
- ML22063B120 (← links)
- ML20268A115 (← links)
- ML20125A151 (← links)
- L-2021-105, Response to Request for Additional Information for St. Lucie License Amendment Request to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements (← links)
- L-2020-164, License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements (← links)
- ML24040A190 (← links)
- 05000389/LER-2022-001, Reactor Shutdown Required by Technical Specifications Due to a Misaligned Control Element Assembly (← links)
- 05000335/LER-2021-001, Manual Reactor Trip Due to Insufficient Feed Flow to Steam Generators (← links)
- 05000389/LER-2021-002, Foreign Material Exclusion Device Found in Containment Spray System (← links)
- 05000389/LER-2021-001, Automatic Reactor Trip Due to a Breaker Failure on the 2B2 480V Motor Control Center (← links)
- 05000389/LER-2020-001, Turbine Loss of Load Trip Found Outside Technical Specification Allowable Range Due to Unspecified Legacy M&TE or Calibration Deficiencies (← links)
- 05000335/LER-2019-002, Reactor Coolant Pump Motor Ground Results in Reactor Coolant Pump Trip and Subsequent Automatic Reactor Trip (← links)
- 05000335/LER-2019-003, Inoperability of Emergency Diesel Generator Due to Cracked Crankshaft (← links)
- 05000335/LER-2019-001-01, 1 for St. Lucie Unit 1, Regarding Automatic Reactor Trip Caused by Main Generator Ground Resulting in Generator Lockout/Loss of Load (← links)
- ML19273A908 (← links)
- 05000335/LER-2019-001, Automatic Reactor Trip Caused by Main Generator Ground Resulting in Generator Lockout/Loss of Load (← links)
- 05000335/LER-2018-001, Feedwater Heater Level Control Malfunctions Resulted in Lowering Steam Generator Water Level and Manual Reactor Trip (← links)
- 05000389/LER-2018-001-01, Pressurizer Instrument Nozzle Leak Due to Primary Water Stress Corrosion Cracking (← links)
- 05000389/LER-2018-002, Automatic Reactor Trip Due to a Breaker Failure on the 2A1 6.9kV Bus (← links)
- 05000389/LER-2018-001, Pressurizer Instrument Nozzle Leak Due to Primary Water Stress Corrosion Cracking (← links)
- L-2018-150, Third Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- 05000389/LER-1917-004, Regarding Automatic Reactor Trip Due to Turbine Control System Malfunction (← links)
- 05000389/LER-1917-003, Regarding Improper System Realignment Resulted in Loss of Steam Driven Auxiliary Feedwater Pump Flow Indication (← links)
- 05000335/LER-1917-003, Regarding Inadequate Reactor Protection System Trip Process for Inoperable Channel Results in Operation in a Condition Prohibited by Technical Specifications (← links)
- 05000335/LER-1917-002, Regarding Inadequate Hot Leg Injection Procedure Results in Unanalyzed Condition (← links)
- 05000389/LER-1917-002, Regarding 2A3 4.16 Kv Bus De-Energization Due to Voltage Meter Failure (← links)
- 05000389/LER-1917-001, Regarding Delay in Initiating Immediate Technical Specification Required Action During Fuel Movements (← links)
- L-2017-080, Preparation and Scheduling of Operator Licensing Examinations (← links)
- 05000335/LER-2017-001, Regarding Reactor Coolant Pressure Boundary Leak on the 1B2 Reactor Coolant Pump Lower Seal Heat Exchanger (← links)