Pages that link to "NL-20-1417, Vogltle, Units 1 and 2, Response to Request for Additional Information Regarding Risk-Informed Resolution to GSI-191"
Jump to navigation
Jump to search
The following pages link to NL-20-1417, Vogltle, Units 1 and 2, Response to Request for Additional Information Regarding Risk-Informed Resolution to GSI-191:
Displayed 49 items.
- ND-19-0289, Enclosure 1 - Revised Response to Request for Additional Information Question 1b Related to Request for Exemption from Operator Written Examination and Operating Test (← links)
- ND-19-0178, Supplement to Request for Exemption: 10 CFR Part 26 Visitor Access Requirements (Supplement 1) (← links)
- ND-19-0216, Response to Request for Additional Information Related to Request for Exemption from Operator Written Examination and Operating Test (← links)
- ND-19-0007, Supplement to Request for Alternative: Preservice and Inservice Inspection Requirements for Specific Valve-to-Pipe Welds (VEGP 3&4-PSI/ISI-ALT-06S1) (← links)
- ND-18-1439, Revised Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017R1) (← links)
- ND-18-1058, Supplement to Request for License Amendment and Exemption: Containment Pressure Analysis (LAR-17-043S1) (← links)
- ND-18-0635, Response to Request for Additional Information Regarding Application of VT-1 Visual Examination Methodology for Preservice Inspection of the Reactor Vessel Nozzle Inner Radius Sections (VEGP 3&4-PSI-ALT-07S3) (← links)
- ND-18-1040, Supplement to the Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1) (← links)
- ND-18-1049, Supplement to Request for License Amendment: Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes (LAR-17-024S4) (← links)
- ND-18-0646, Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S3) (← links)
- ND-18-0643, Supplement to Request for License Amendment and Exemption Regarding Ventilation System Changes (LAR-16-030R1S2) (← links)
- ND-18-0608, Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S2) (← links)
- ND-18-0610, Supplement to Request for License Amendment: Technical Specification Applicability Changes to Support Pressurizer Safety Valve Operability (LAR-18-004S1) (← links)
- ND-18-0571, Supplement to Request for License Amendment: Change to Battery Charger Output Amp Value in Technical Specification SR 3.8.1.2 and the Surveillance Frequency for SR 3.8.7.6 (LAR-18-003S1) (← links)
- ND-18-0425, Supplement to Request for License Amendment and Exemption: Consistency and Clarification Changes to Annex Building, Auxiliary Building and Basemat ITAAC (LAR-17-040S1) (← links)
- ND-18-0364, Supplement to Request for License Amendment: Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes (LAR-17-024S2) (← links)
- ND-18-0097, Supplement to Request for License Amendment and Exemption Regarding Ventilation System Charges (LAR-16-030R1S1) (← links)
- ND-18-0279, Response to Request for Additional Information Regarding Application of VT-1 Visual Examination Methodology for Preservice Inspection of the Reactor Vessel Nozzle Inner Radius Sections (PSI-ALT-07S2) (← links)
- ND-18-0111, Supplement to Request for License Amendment Regarding: Passive Residual Heat Removal Heat Transfer and In-containment Refueling Water Storage Tank Heat Up Test Acceptance Criteria Change (LAR-17-033S1) (← links)
- ND-18-0096, Supplement to Request for License Amendment and Exemption Regarding Improvements to Main Control Room (MCR) Post-Accident Radiological Consequences (LAR-17-023S1) (← links)
- ND-18-0090, Response to Request for Additional Information Regarding Counterboring of Class 1 Piping, Components, and Fittings with Weld End Transitions (PSI-ALT-08S1) (← links)
- ND-18-0071, Supplement to Response to NRC Request for Additional Information on Request for License Amendment Regarding: Use of ASME NB-3200 for Piping Component Analysis (LAR-17-035S1) (← links)
- NL-20-0640, Response to Request for Additional Information for Exemption Request (← links)
- ND-20-1005, Supplement to Request for License Amendment: Vacuum Relief Valve Technical Specification Changes (LAR-20-005S1) (← links)
- NL-20-1312, Response to Request for Additional Information Related to Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.0 (← links)
- NL-20-1417 (redirect page) (← links)
- ML20352A228 (redirect page) (← links)
- ML21070A317 (← links)
- ML21070A310 (← links)
- ML21203A297 (← links)
- ML21071A055 (← links)
- ML21071A053 (← links)
- ML21071A051 (← links)
- ML21068A082 (← links)
- ML20268A070 (← links)
- ML21046A094 (← links)
- NL-21-0208, Response to Request for Additional Information Related to Refueling Outage 1R22 Steam Generator Tube Inspection Report (← links)
- EPID:L-2020-LLE-0134 (← links)
- ML21070A317 (← links)
- ML21070A310 (← links)
- ND-21-0618, Response to Request for Additional Information Regarding Request for Alternative: Alternative Requirements for ASME Section Ill Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16) (← links)
- ML21071A055 (← links)
- ML21071A053 (← links)
- ML21071A051 (← links)
- NL-20-1273, Response to NRC Requests for Information License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for (← links)
- NL-21-1015, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System (← links)
- NL-22-0055, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System (← links)
- ND-22-0328, Enclosuvogtle Electric Generating Plant, Units 3 & 4 - Fukushima Response NEI 12-01 On-Shift Staffing Analysis Phase 2 Report, Revision 3.0, Standard Emergency Plan Annex, Revision 6.0 (← links)
- NL-22-0549, Responses to NRC Request for Additional Information for Refueling Outage 1R23 Steam Generator Tube Inspection Report (← links)
- NL-22-0609, Response to NRC Requests for Information License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel (← links)
- NL-23-0068, Responses to NRC Request for Additional Information Related to the Refueling Outage 2R22 Steam Generator Tube Inspection Report (← links)
- NL-23-0012, Post-Audit Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel (← links)
- NL-23-0010, Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 (← links)
- NL-23-0196, Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 (← links)
- NL-23-0339, Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1) (← links)
- NL-23-0467, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1) (← links)
- NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 (← links)