Pages that link to "CNL-16-121, Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days"
Jump to navigation
Jump to search
The following pages link to CNL-16-121, Supplemental Information Regarding Proposed Technical Specification Change to Extend the Allowed Completion Time to Restore Essential Raw Cooling Water System Train to Operable Status from 72 Hours to 7 Days:
Displayed 45 items.
- CNL-19-066, Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) (← links)
- CNL-20-010, Application to Revise Sequoyah Nuclear Plant (SQN) Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency (SQN-TS-20-01) (← links)
- ML043490647 (← links)
- ML043490599 (← links)
- ML043200167 (← links)
- ML043010253 (← links)
- ML042860054 (← links)
- ML042430467 (← links)
- ML042430463 (← links)
- ML041330394 (← links)
- ML040910259 (← links)
- ML040760886 (← links)
- ML040760878 (← links)
- ML040760873 (← links)
- ML040760204 (← links)
- CNL-16-086, Response to Request for Additional Information Technical Specifications 3.7.8 Change - Essential Raw Cooling Water System (← links)
- ML033040406 (← links)
- ML031611027 (← links)
- ML031610859 (← links)
- ML031490506 (← links)
- ML030710355 (← links)
- ML030710347 (← links)
- ML030650980 (← links)
- ML030160157 (← links)
- ML023290477 (← links)
- ML023290410 (← links)
- ML023230321 (← links)
- ML023220122 (← links)
- ML022000554 (← links)
- ML022000546 (← links)
- ML021430310 (← links)
- ML021020324 (← links)
- ML020730167 (← links)
- ML020730160 (← links)
- ML020450255 (← links)
- CNL-20-042, Exigent License Amendment Request to Revise Technical Specification 4.2.2, Control Rod Assemblies (SQN-TS-20-05) (← links)
- CNL-20-014, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) (← links)
- CNL-21-026, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) (← links)
- CNL-21-091, Exigent License Amendment Request to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System (SQN-TS-21-06) (← links)
- CNL-21-001, Application to Modify the Technical Specification Table 3.3.1-1, Reactor Trip System Instrumentation (SQN-TS-21-01) (← links)
- CNL-21-085, License Amendment Request to Modify Approved 10 CFR 50.69 Categorization Process (SQN-TS-21-07) (← links)
- ML22125A127 (← links)
- CNL-22-034, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) (← links)
- ML22115A002 (← links)
- ML22165A105 (← links)