Pages that link to "L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b"
Jump to navigation
Jump to search
The following pages link to L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b:
Displayed 50 items.
- L-PI-12-013, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology (← links)
- L-PI-12-007, Response to Requests for Additional Information for License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8, Cooling Water System & 3.8.3, Diesel Fuel Oil. (← links)
- L-PI-12-010, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term Methodology (← links)
- L-PI-12-006, Notification of Changes to the Emergency Response Data System (ERDS) Data Point Library (Dpl) (← links)
- L-PI-12-005, Readiness for Supplemental 95001 Inspection (← links)
- L-PI-11-096, Response to NRC Bulletin 2011-01, Mitigating Strategies, Request for Additional Information (RAI) (TAC Nos. ME6471 and ME64720) (← links)
- L-PI-11-100, License Renewal Commitment Change (← links)
- L-PI-11-098, Submittal of 50.59 Evaluation Summary Report (← links)
- L-PI-11-099, Response to Requests for Additional Information Regarding Regulatory Guide 1.97 Instrumentation Associated with Adoption of the Alternative Source Term (AST) Methodology (← links)
- L-PI-11-044, Lnservice Testing Program Fourth Ten-Year Interval Relief Request 12 - Proposed Alternative for Pump Vibration Testing (← links)
- L-PI-11-087, Lnservice Inspection Summary Report, Interval 4, Period 2, Outage 2 Refueling Outage Dates: 04-29-2011 to 06-11-2011 Unit 1, Fuel Cycle 26: 11-23-2009 to 06-11-2011 (← links)
- L-PI-11-075, Letter from Xcel Energy License Amendment Request for Spent Fuel Pool Criticality Changes (← links)
- L-PI-11-037, License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil (← links)
- L-PI-11-070, Supplement to License Amendment Request to Exclude Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to RAI (← links)
- L-PI-11-080, Reactor Internals Inspection Commitment Change (← links)
- L-PI-11-069, Day Response to NRC Bulletin 2011-01, Mitigating Strategies. (← links)
- L-PI-11-043, Corrections to Emergency Core Cooling System (ECCS) Evaluation Models (← links)
- L-PI-11-063, Core Operating Limits Report (Colr), Cycle 27, Revision 1 (← links)
- L-PI-11-057, Request for Extension of Enforcement Discretion and Commitment to Submittal Date for 10 CFR 50.48(c) License Amendment Request (← links)
- L-PI-11-060, Response to Requests for Additional Lnformation (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology (← links)
- L-PI-11-055, Day Response to NRC Bulletin 2011-01, Mitigating Strategies. (← links)
- L-PI-11-053, Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant Unit 1, Cycle 27, Revision 0 (← links)
- L-PI-11-040, Independent Spent - 2010 Annual Radiological Environmental Monitoring Program (REMP) Report (← links)
- L-PI-11-036, 2010 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual (ODCM) (← links)
- L-PI-11-034, Annual Update of the Application for Renewed Operating Licenses (← links)
- L-PI-11-035, Annual Report of Personnel Radiation Exposure for the Prairie Lsland Nuclear Generating Plant (PINGP) (← links)
- L-PI-11-038, Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology (← links)
- L-PI-11-023, Reinstatement of Licensee Event Reports Associated with Flooding Scenarios (← links)
- L-PI-11-020, License Amendment Request to Revise the Physical Security Plan (← links)
- L-PI-11-024, Supplement to License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating. (← links)
- L-PI-11-009, Independent Spent Fuel Storage Installation Annual Effluent Report, January Through December 2010 (← links)
- L-PI-11-019, Supplement to License Amendment Request to Exclude Dynamic Effects Associated with Certain Postulated Pipe Ruptures from Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to Requests for Clarification (← links)
- L-PI-11-008, License Amendment Request (LAR) to Revise Technical Specification (TS) 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications. (← links)
- L-PI-11-016, License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating. (← links)
- L-PI-11-006, Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to RAI (← links)
- L-PI-11-004, Core Operating Limits Report (Colr), Cycle 26, Revision 3 (← links)
- L-PI-11-001, Withdrawal of Request for Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule (← links)
- L-PI-10-120, Prairie Lsland Nuclear Generating Plant Units 1 and 2, License Renewal Application, Response to Requests for Additional Information (TAC MD8528 and MD8529) (← links)
- L-PI-10-112, Prairie Lsland Nuclear Generating Plant Units 1 and 2, Response to Request for Additional Information License Amendment Request to Adopt the Alternative Source Term Methodology (TAC Nos. ME2609 and ME26102) (← links)
- L-PI-10-099, Unit 2 180-Day Steam Generator Tube Inspection Report (← links)
- L-PI-10-109, Supplemental Information Regarding Inaccessible Medium Voltage Cable Program, Buried Piping and Tanks Inspection Program, Inspection of Steam Generator Divider Plates and Class 1 Small-Bore Piping Program (← links)
- L-PI-10-096, Core Operating Limits Report (COLR) for Prairie Island, Unit 1, Cycle 26, Revision 2, and Unit 2, Cycle 26, Revision 2 (← links)
- L-PI-10-104, Supplement to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.10 (← links)
- L-PI-10-102, Prairie Lsland, Unit 1 - Response to NRC Request for Additional Information Received October 17, 2010 Related to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.10 (← links)
- L-PI-10-101, Prairie Lsland, Unit 1, Second Response to NRC Request for Additional Information Received October 15, 2010 Related to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.10 (← links)
- L-PI-10-100, Prairie Lsland, Unit 1 - Response to NRC Request for Additional Information Received October 15, 2010 Related to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.10 (← links)
- L-PI-10-098, Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.10 (← links)
- L-PI-10-094, Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology - Response to RAI (← links)
- L-PI-10-091, Core Operating Limits Report, Cycle 26, Revision 1 (← links)
- L-PI-10-069, Submittal of Revised Archaeological Document (← links)