Pages that link to "RA-23-0021, Unit 2 Cycle 26 Core Operating Limits Report (COLR)"
Jump to navigation
Jump to search
The following pages link to RA-23-0021, Unit 2 Cycle 26 Core Operating Limits Report (COLR):
Displayed 50 items.
- RA-18-0101, Unit 1 Cycle 22 and Unit 2 Cycle 23 Reload Safety Analysis Reports (← links)
- RA-18-0067, Inservice Inspection Program Owner'S Activity Report for Unit 1 Refueling Outage 22 (← links)
- RA-15-0036, Annual Report of Changes Pursuant to 10 CFR 50.46 (← links)
- RA-12-015, Carolina Power & Light Company'S Answer to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) (← links)
- RA-11-009, Independent Spent Fuel Storage Installation, Crystal River, Shearon Harris, Unit 1 and H. B. Robinson, Unit 2, Independent Spent Fuel Storage Installation - NRC Correspondence Distribution List Update (← links)
- RA-09-016, Request for Exemptions from Physical Security Requirements (← links)
- RA-09-020, NRC Correspondence Distribution List Update (← links)
- BSEP-06-0061, Core Operating Limits Report (Colr), Revision 2 for Plant Cycle 17 (← links)
- RA-19-2019, Brunswick 2019-301 Post-Exam Comments (← links)
- RA-19-0083, Reactor Operator and Senior Reactor Operator License Post-Examination Documentation (← links)
- RA-19-0029, Revision to Radiological Emergency Response Plan Implementing Procedure (← links)
- RA-18-0246, Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature .. (← links)
- RA-18-0241, Update to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies (← links)
- RA-19-0015, Request for License Amendment: Surveillance Requirements for Safety Relief Valves (← links)
- RA-18-0148, License Amendment Request to Revise Units 1 and 2 Technical Specification 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- RA-19-0010, Response to NRC RAI Re Application to Adapt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (← links)
- RA-19-0089, Response to Request for Additional Information - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure... (← links)
- RA-18-0258, (Bsep), Unit Nos. 1 and 2 - Ninth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... (← links)
- RA-18-0234, (Bsep), Unit Nos. 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-269, Allow Administrative Means of Position Verification for Locked or Sealed Valves. (← links)
- RA-18-0132, Report of 10 CFR 50.59 Evaluations, 10 CFR 72.48 Evaluations, and Commitment Changes (← links)
- RA-18-0041, (Bsep), Unit Nos. 1 and 2 - Eighth Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... (← links)
- RA-18-0052, (Bsep), Unit Nos. 1 and 2, Registration for Use of General License Spent Fuel Casks (← links)
- RA-18-0017, (Bsep), Unit No. 1, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- RA-17-0021, Transmittal of Emergency Plan Implementing Procedures: AD-EP-ALL-0501, Revision 1 and SR/O/A/2000/004, Revision 8 (← links)
- RA-16-0018, Independent Spent Fuel Storage Installation, H.B. Robinson, Unit 2 and Independent Spent Fuel Storage, and Shearon, Unit 1 - Transmittal of Physical Security Plan, Revision 8 (← links)
- RA-15-0044, Indemnity Agreements for Proof of Acceptance (← links)
- RA-15-0033, Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Direct Transfer Action (← links)
- RA-19-0157, Supplement to Request for License Amendment Technical Specification 3.8.3, Diesel Fuel Oil, One-Time Extension of Main Fuel Oil Storage Tank Completion Time (← links)
- RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-10 (← links)
- RA-16-0037, Indemnity Agreements for Proof of Acceptance (← links)
- RA-15-0040, License Amendment Request, Change in Corporate Form of Duke Energy Progress (← links)
- RA-16-0001, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation. (← links)
- RA-15-0055, Transmittal of Duke Energy Progress Physical Security Plan, Revision 7 (← links)
- RA-15-0039, Submits Documentary Evidence of Required Insurance (← links)
- RA-15-0026, Supplement to Application for Order Approving Transfer of Control of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 (← links)
- RA-15-0025, Supplement to Application for Order Approving Transfer of Control of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 (← links)
- RA-15-0009, Supplement to Application for Order Approving Transfer of Control of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 (← links)
- RA-14-0029, Application for Order Approving Transfer of Control of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 (← links)
- RA-14-0005, Redacted Version of License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 (← links)
- RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 (← links)
- RA-13-019, Transmittal of Emergency Plan Implementing Procedures, EMG-NGGC-0002, Revisions 5 and 6, EMG-NGGC-0004, Revisions 3 and 4 and EMG-NGGC-0005, Revisions 3 and 4 (← links)
- RA-13-012, Capability to Perform Multi-Unit Dose Assessment (← links)
- RA-13-006, Biennial Decommissioning Financial Assurance Report (← links)
- RA-12-033, Independent Spent Fuel Storage Installations - NRC Correspondence Distribution List Update (← links)
- RA-12-030, ISFSI - Notification of Closing of Corporate Merger of Duke Energy Corp. and Progress Energy, Inc (← links)
- RA-12-023, Day Response to the March 12, 2012, Request for Information Regarding Enclosure 5, Recommendation 9.3: Emergency Preparedness (← links)
- RA-12-025, 90-Day Response to the March 12, 2012, Request for Information Regarding Enclosure 1, Recommendation 2.1: Seismic (← links)
- RA-12-024, 90-Day Response to the March 12, 2012, Request for Information Regarding Enclosures 2 and 4, Recommendations 2.1 and 2.3: Flooding (← links)
- RA-12-009, Evidence of Guarantee of Payment of Deferred Premiums (← links)