Pages that link to "NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations"
Jump to navigation
Jump to search
The following pages link to NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations:
Displayed 50 items.
- NRC 2015-0072, Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan (← links)
- NRC 2015-0061, Transmittal of 10 CFR 71.95 Report on the TN-RAM Package (← links)
- NRC 2015-0056, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- NRC 2015-0052, Response to Request for Supplemental Information for License Amendment Request 277, Revision to Staff Augmentation Times in the Emergency Plan (← links)
- NRC 2015-0045, Submits Technical Requirements Manual Change Summary (← links)
- NRC 2015-0044, Submits Technical Specification Bases Change Summary (← links)
- NRC 2015-0053, Request for Extension of LIC-109, Acceptance Review Opportunity to Supplement for License Amendment Request 277, Revision to Staff Augmentation Times in the Emergency Plan (← links)
- NRC 2015-0039, Response to Request for Information Related to Full Compliance Report for the March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (← links)
- NRC 2015-0043, Spent Fuel Storage Five-Year Inspection Report Ventilated Spent Fuel Storage Cask WVSC-24-01 Certificate of Compliance 1007 (← links)
- NRC 2015-0015, License Amendment Request 277, Revision to Staff Augmentation Times in the Emergency Plan (← links)
- NRC 2017-0010, Response to Final Request for Additional Information Steam Generator License Amendment Request for H* Alternate Repair Criteria for Steam Generator Tube Sheet Expansion Region (← links)
- NRC 2015-0033, Response to Request for NFPA 805 License Amendment Request 271 Supplement Schedule (← links)
- NRC 2015-0027, Response to Request for Additional Information for Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee.. (← links)
- NRC 2015-0024, 2014 Annual Monitoring Report for the Period January 1 Through December 31, 2014 (← links)
- NRC 2015-0021, 10 CFR 50.46 Annual Report for 2014 (← links)
- NRC 2015-0004, LAR 266 to Revise Technical Specifications to Adopt TSTF-51 0, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process (← links)
- NRC 2015-0018, Response to Request for Additional Information for Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee.. (← links)
- NRC 2015-0017, Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.1, Flooding - Submittal of Flooding Hazards Revaluation Report (← links)
- NRC 2015-0010, Filing of Owner'S Inservice Inspection Summary Report for Tendon Surveillance and Concrete Containment Examinations (← links)
- NRC 2015-0003, Reactor Vessel Internals Inspection Plan Response to Request for Additional Information (← links)
- NRC 2014-0088, Expedited Seismic Evaluation Process Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 of the Near-Term Task Force Review Of. (← links)
- NRC 2014-0078, Response to Request for Additional Information (Fire Protection Engineering/Fire Modeling) License Amendment Request 271 Associated with NFPA 805 (← links)
- NRC 2014-0077, NextEra Energy Point Beach, Llc'S Full Compliance Report for the March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- NRC 2014-0083, Readiness for 95002 Supplemental Inspection (← links)
- NRC 2014-0086, 10 CFR 50.46 30-Day Report (← links)
- NRC 2014-0081, Response to Request for Additional Information Regarding 10 CFR 50.55a Request. Relief Request RR-9 Fifth Ten-Year Lnservice Inspection Program Interval (← links)
- NRC 2014-0075, Supplement to License Amendment Request 273 Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Prog (← links)
- NRC 2014-0073, Response to Request for Additional Information (Radiation Release) License Amendment Request 271 Associated with NFPA 805 (← links)
- NRC 2014-0056, Response (120 Day) to Request for Additional Information and Revision to 60 Day Response License Amendment Request 271 Associated with NFPA 805 (← links)
- NRC 2014-0051, Final Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) (← links)
- NRC 2014-0054, Response (90 Day) to Request for Additional Information License Amendment Request Associated with NFPA 805 (← links)
- NRC 2014-0041, 10 CFR 50.59 Summary Report for 2013 (← links)
- NRC 2014-0040, License Amendment Request 276, Cyber Security Plan Milestone 8 Date Change Request (← links)
- NRC 2014-0003, License Amendment Request 273 Re Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to Licensee Controlled Program (← links)
- NRC 2014-0022, 10 CFR 50.55a Requests Relief Requests RR-8 and RR-9 Fifth Ten-Year Lnservice Inspection Program Interval (← links)
- NRC 2014-0016, Submittal of License Amendment Request 252 Technical Specification 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)- Response to Request for Additional Information (← links)
- NRC 2014-0017, Date Changes Related to Recommendation 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident (← links)
- NRC 2014-0013, NextEra Energy Point Beach. Llc'S Second Six-Month Status Report in Response to March 12 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event (← links)
- NRC 2014-0014, Second Six Month Status Report in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- NRC 2014-0012, Large Break Loss-of-Coolant Accident Margin Summary Sheet - 30-Day Report (← links)
- NRC 2014-0007, Response to Request for Additional Information Regarding NRC Bulletin 2012-01, Design Vulnerability in Electric Power System (← links)
- NRC 2014-0005, NextEra Energy Point Beach, LLC, Update to Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3. Flooding- Review of Available Physical Margin (APM) Assessments (← links)
- NRC 2014-0008, Official Service List Changes (← links)
- NRC 2013-0108, Response to 10 CFR 50.54(f) Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns (← links)
- NRC 2013-0105, 10 CFR 50.55a Request, Relief Request RR-5 Examination of the Pressurizer Surge Nozzle Inner Corner Region Fifth Ten-Year Lnservice Inspection Program Interval (← links)
- NRC 2013-0102, Completion of the Calculation Project Implementation Commitment (← links)
- NRC 2013-0101, 10 CFR 71.95 Report on the 8-120B Cask (← links)
- NRC 2013-0092, License Amendment Request 271 Supplement 1 Transition to 10 CFR 50.48(c)- NFPA 805 (← links)
- NRC 2013-0080, License Amendment Request 252 Technical Specification 5.6.5. Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) Response to Request for Additional Information (← links)
- NRC 2013-0074, Request for Approval of Risk-Informed/Safety Based Lnservice Inspection Alternative for Class 1 and 2 Piping in Accordance with 10 CFR 50.55a(a)(3)(i) Response to Request for Additional Information (← links)