Pages that link to "CNL-21-089, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update"
Jump to navigation
Jump to search
The following pages link to CNL-21-089, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update:
Displayed 50 items.
- CNL-16-030, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) (TAC No. MF6050) - Supplement to Response to NRC Request for Additional Information - Radiation Protection and Consequence Branch (← links)
- CNL-16-020, Exceptions to Completion of Preoperational Test Instructions Prior to Fuel Load - Revised Mode of Applicability for 2-PTI-002-01 and 2-PTI-003A-03 (← links)
- CNL-15-263, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory (← links)
- CNL-15-239, Application to Revise License Condition 2.C(4) PAD4TCD (← links)
- CNL-15-060, Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F (← links)
- CNL-15-257, Exceptions to Completion of Preoperational Test Instructions Prior to Fuel Load - Revised Mode of Applicability for 2-PTI-043-04 (← links)
- CNL-15-246, Revision to Commitment on Foxboro Spec 200 Hardware (← links)
- CNL-15-233, Submittal of the American Society of Mechanical Engineers (Asme)Section Ill Form N-3 Owner'S Data Report for Nuclear Power Plant Components (← links)
- CNL-15-057, Request for Relief for Reactor Pressure Vessel Flange Seal Leak-Off Piping (← links)
- CNL-15-223, Proof of Financial Protection, Nuclear Liability and Property Insurance and Indemnity Agreement (← links)
- CNL-15-217, Reply to Notice of Violation (EA-15-112) (← links)
- CNL-15-193, Distributed Control System (DCS) Data Storm Test Results (← links)
- CNL-15-221, Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq (Z)), Revision 0 License Condition and Margin Assessment (← links)
- CNL-15-206, Response to Follow-Up Question Regarding Submittal of Electromagnetic Interference (EMI) Survey Results (← links)
- CNL-15-220, Response to Request for Additional Information - Developmental Revision I Technical Specification Section 3.8 - Diesel Generator Batteries (← links)
- CNL-15-213, Compliance with Three Mile Island (TMI) Action Plan Requirements for an Operating License (← links)
- CNL-15-208, Technical and Regulatory Basis for Technical Specification 3.2.1, Heat Flux Hot Channel Factor (Fq (Z)), Revision 0 (← links)
- CNL-15-211, Financial Protection Requirements and Indemnity Agreements - Insurance Status Second Supplement (← links)
- CNL-15-179, Response to Request for Additional Information Regarding Request for Relief WBN-2/PSI-3 for Inaccessible Steam Generator Lower Shell-to-Cone Weld SG-4B-5-2 (← links)
- CNL-15-192, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Response to NRC Request for Additional Information - Radiation Protection and Consequence Branch (← links)
- CNL-15-207, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. (← links)
- CNL-15-196, Response to Request for Additional Information Regarding Relief Request IST-RR-2 (← links)
- CNL-15-202, Financial Protection Requirements and Indemnity Agreements - Insurance Status Supplement (← links)
- CNL-15-205, Response to Additional Question Regarding Request for Relief WBN-2/PSI-3 for Inaccessible Steam Generator Lower Shell-to-Cone Weld SG-4B-5-2 (← links)
- CNL-15-204, Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit (← links)
- CNL-15-172, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Response to NRC Request for Additional Information - Reactor Systems Branch (← links)
- CNL-15-126, Notification of Revised Westinghouse Containment Integrity Analysis (← links)
- CNL-15-189, Decommissioning Funding Update (← links)
- CNL-15-177, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Manual. (← links)
- CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 (← links)
- CNL-15-170, Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request (← links)
- CNL-15-185, Supplement to Application to Update to License Condition 2.F to Allow Two-Unit Operation and Add License Condition (WBN-TS-15-01) (← links)
- CNL-15-094, Responses to Requests for Additional Information - Developmental Revision I Technical Specification Section 3.8 (← links)
- CNL-15-176, Financial Protection Requirements and Indemnity Agreements, Insurance Status (← links)
- CNL-15-165, Submittal of Electromagnetic Interference (EMI) Survey Results (← links)
- CNL-15-127, Provides Revised FSAR Section 6.2.1 Containment Functional Design (← links)
- CNL-15-168, Notification of Construction Substantially Complete and Request for Operating License (← links)
- CNL-15-167, Response to Request for Flowserve Technical Report on Run-out Flow Operation for a Diesel Generator Frequency Above 60 Hertz (← links)
- CNL-15-150, Pressurizer PORV Block Valves - Dynamic Testing Alternative (← links)
- CNL-15-151, Diesel Generator Frequency - Response to NUREG 0847 Supplemental Safety Evaluation Report (Sser) 22, Open Item 32 - Correction (← links)
- CNL-15-046, Submittal of Revision 106X to Appendix C of the Radiological Emergency Plan (← links)
- CNL-15-147, Responses to NRC Acceptance Review Questions Regarding Essential Raw Cooling Water and Component Cooling System License Amendment Request (← links)
- CNL-15-133, Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) (← links)
- CNL-15-131, Individual Plant Examination of External Events (IPEEE) Report, Revision 3 (← links)
- CNL-15-130, Distributed Control System (DCS) Data Storm Test Plan (← links)
- CNL-15-119, Request for Relief WBN-2/PSI-3 for Inaccessible Steam Generator Lower Shell-to-Cone Weld SG-4B-5-2 (← links)
- CNL-15-078, Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02) (← links)
- CNL-15-109, Cyber Security Plan (← links)
- CNL-15-088, Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13) (← links)
- CNL-15-121, Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation (← links)