Pages that link to "RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds"
Jump to navigation
Jump to search
The following pages link to RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds:
Displayed 50 items.
- RC-17-0098, Completion of Expedited Seismic Evaluation Process Report Modifications (← links)
- RC-17-0093, License Amendment Request - LAR-15-01424 Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times, Response To. (← links)
- RC-17-0089, Focused Evaluation for External Flooding (← links)
- RC-17-0088, Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times - Response to Request for Additional Information (← links)
- RC-17-0085, Special Report (Spr) 2017-005 (← links)
- RC-17-0072, Special Report (Spr) 2017-003 Regarding Electrical Fire Barrier Assembly Not Being Restored to Operability within Seven Days After Declaration of Inoperability (← links)
- RC-17-0067, Regulatory Commitment Change Related to Best Estimate Large Break Loss of Coolant Accident Analysis That Explicitly Accounts for Thermal Conductivity Degradation (← links)
- RC-17-0068, Core Operating Limits Report for Cycle 24 (← links)
- RC-17-0057, Emergency Core Cooling System Evaluation Model Revisions Annual Report (← links)
- RC-17-0062, Special Report (Spr) 2017-001 Regarding a Fire Barrier Assembly Not Being Restored to Operability within Seven Days After Declaration of Inoperability (← links)
- RC-17-0047, Annual Radiological Environmental Operating Report (← links)
- RC-17-0049, Change of the Commitment Date of DRIB/105A&B Door Submittal (← links)
- RC-17-0032, Spent Fuel Evaluation Supplemental Report, Response to NRC for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident (← links)
- RC-17-0007, Relief Request RR-4-11, Temporary Non-Code Condition of Class 3 Service Water System Flange (← links)
- RC-16-0097, Technical Specification Bases Revision Updated Through September 2016 (← links)
- RC-16-0170, Mitigating Strategies Assessment (MSA) Report Submittal (← links)
- RC-16-0092, License Amendment Request LAR-12-02439, Technical Specification 3.5.4, Limiting Condition for Operation Refueling Water Storage Tank (← links)
- RC-16-0086, Special Report 2016-003 Regarding Fire Barrier Not Restored to Operability Status within 7 Days of Inoperability (← links)
- RC-16-0077, Relief Request RR-III-12, Proposed Alternative Inspection Requirements for Piping Welds - Response to Request for Additional Information (← links)
- RC-16-0078, Special Report (Spr) 2016-001 Regarding Reactor Building Purge Exhaust Effluent High Range Radiation Monitor (RM-A 14) Being Declared Inoperable Due to Erratic Spiking Indications (← links)
- RC-16-0067, ISFSI Registration and Use of Casks to Store Spent Fuel (← links)
- RC-16-0069, Submittal of Property Insurance Annual 10CFR50.54(w)(3) Report (← links)
- RC-16-0070, Guarantee of Payment of Deferred Premiums Annual 10CFR140.21(e) Report (← links)
- RC-16-0046, Response to Request for Additional Information on Relief Request RR-III-2, Proposed Alternative Inspection Requirements for Piping Welds (← links)
- RC-16-0036, License Amendment Request - LAR-15-01424 - Implementation of WCAP-15376-P-A, Revision 1, Response to Request for Supplemental Information (← links)
- RC-16-0031, License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis Supplement Response (← links)
- RC-16-0034, Inservice Inspection (ISI) Owner'S Activity Report )OAR) for Refueling Outage 22 (← links)
- RC-16-0033, NRC Regulatory Issue Summary (RIS 2015-16, Revision 1) Planned Licensing Action Submittals for All Power Reactor Licensees (← links)
- RC-16-0028, Notification of an Intended Changed to a Commitment Date for Response to Request for Additional Information Regarding Phase 2 Staffing Submittals Associated with Near-Term Task Force Recommendation 9.3 Related to the Fukushima.. (← links)
- RC-16-0003, Revision 14 to the Physical Security Plan (← links)
- RC-16-0020, Submittal of Personnel Changes (← links)
- RC-16-0008, Transmittal of Expedited Seismic Evaluation Process Report, Revision 1 (← links)
- RC-16-0006, Response to Request for Additional Information to License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis (← links)
- RC-15-0195, Notification of Compliance to NRC Security Order EA-13-228 (← links)
- RC-15-0171, License Amendment Request - LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times. (← links)
- RC-15-0190, Special Report (Spr) 2014-005-01, Loss or Theft of License Material (← links)
- RC-15-0182, Transmittal of the Quality Assurance Program Description (QAPD) (← links)
- RC-15-0161, Relief Request RR-III-12, Proposed Alternative Inspection Requirements for Piping Welds (← links)
- RC-15-0177, Submits LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis Response to Response for Additional Information (← links)
- RC-15-0179, Special Report (Spr) 2015-002 Regarding One or More Required Meteorological Monitoring Channels Being Inoperable for More than Seven (7) Days (← links)
- RC-15-0153, Submittal of 10 CFR 50.59 Biennial Report (← links)
- RC-15-0113, License Amendment Request LAR-08-001, 62Request to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF)-523, Generic Letter 2008-01, Managing Gas Accumulation (← links)
- RC-15-0142, License Amendment Request, LAR 12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis, Response to Request for Additional Information (← links)
- RC-15-0125, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RC-15-0139, Submittal of Special Report (Spr) 2015-001 Regarding the Loose-Part Monitoring System (Lpms) Channel Number 8 Being Inoperable in Excess of 30 Days (← links)
- RC-15-0126, Fifth 6-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) (← links)
- RC-15-0117, Request for Schedule Relaxation from NRC Order EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. (← links)
- RC-15-0133, Transmittal of Updated Expedited Seismic Evaluation Process Pages (← links)
- RC-15-0109, License Amendment Request - LAR 14-02981, Proposed Revision to Technical Specification 6.0, Administrative Controls. (← links)
- RC-15-0120, Withdrawal of License Amendment Request LAR-13-02396, Request for NRC Approval of Changes to the Radiation Emergency Plan (← links)