Pages that link to "CNL-22-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32"
Jump to navigation
Jump to search
The following pages link to CNL-22-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32:
Displayed 50 items.
- CNL-14-049, CNL-14-049, TVA Guarantee of Payment of Deferred Premiums - 2013 Annual Report (← links)
- CNL-14-038, Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc (← links)
- CNL-14-008, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2014 Status Report (← links)
- CNL-13-134, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A (← links)
- CNL-13-123, Tennessee Valley Authority - Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Browns Ferry Nuclear Plant Seismic Walkdown Results of Recommendation 2.3 of the Near-Term (← links)
- CNL-13-114, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2013 Status Report (← links)
- CNL-18-131, Extended Power - Uprate Replacement Steam Dryer Core Flow Sweep Report - Supplemental Information (← links)
- CNL-18-125, Extended Power Uprate - Replacement Steam Dryer Revised Analysis and Limit Curves Report (← links)
- CNL-18-124, Extended Power Uprate - Replacement Steam Dryer Final Load Definition and Stress Reports (← links)
- CNL-18-112, Extended Power Uprate - Flow Induced Vibration Summary Report (← links)
- CNL-18-106, Extended Power Uprate Replacement Steam Dryer Core Flow Sweep Test Report (← links)
- CNL-18-084, Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- CNL-18-060, Completion of Required Action for NRC Order EA-13-109, Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- CNL-18-026, Third Update on Progress of Facility Modifications for MSIV Leak Rate (← links)
- CNL-18-062, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to Unit 1 License Condition 2.C(18)(a)3, Supplement 1 (← links)
- CNL-18-052, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions; NP-REP, Revision 109 (← links)
- CNL-18-041, Request for Proposed Technical Specification (TS) Change TS-519 License Amendment Request - Change to License Condition 2.C(18)(a)3 (← links)
- CNL-18-038, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado. (← links)
- CNL-18-042, Proposed Technical Specifications Change TS-510 - Request for License Amendments - Maximum Extended Load Line Limit Analysis Plus, Supplement 1 (← links)
- CNL-18-017, Tenth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- CNL-18-008, Anchor Darling Double Disc Gate Valve Commitment Revision (← links)
- CNL-17-130, Update to Response to NRC Request for Additional Information for License Amendment Request to Revise Modifications and an Implementation Item Related to NFPA 805 Performance-Based Standard for Fire Protection For.. (← links)
- CNL-17-124, Description of Changes in Revision 1 of the Browns Ferry Nuclear Plant Cyber Security Plan (← links)
- CNL-17-122, Update to the Request for Enforcement Discretion for Technical Specification 3.0.3, Limiting Condition for Operation Applicability (← links)
- CNL-17-121, Request for Enforcement Discretion for Technical Specification 3.0.3, Limiting Condition for Operation Applicability (← links)
- CNL-17-107, Ninth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Order No. EA-12-049) (← links)
- CNL-17-056, Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497) (← links)
- CNL-17-077, Sixth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order EA-13-109) (← links)
- CNL-17-067, Administrative Changes to Proposed Revised Technical Specification Pages Related to Application to Revise Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, to Request an Alternative.. (← links)
- CNL-17-079, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Corrected Pages for the Final Environmental Assessment and Finding of No Significant Impact (← links)
- CNL-17-024, Update to License Amendment Request to Revise NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor - Revision to Tables S-2 and S-3 (← links)
- CNL-17-052, Second Update on Progress of Facility Modifications for MSIV Leak Rate (← links)
- CNL-17-054, Withdrawal of License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) (← links)
- CNL-17-009, Revision to Commitment to Develop Technical Specification Requirements for the Emergency High Pressure Makeup Pump System in Technical Specifications (← links)
- CNL-17-035, Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate(Epu) - Supplement 38, Spent Fuel Pool Criticality Safety Analysis - Updated Information (← links)
- CNL-17-016, Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- CNL-17-017, Proposed Technical Specifications (TS) Change TS-505 Request for License Amendments - Extended Power Uprate (EPU) - Supplement 37, Transmission System Update - Environmental Aspects (← links)
- CNL-17-015, Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 36, Transmission System Update -Safety Aspects (← links)
- CNL-16-182, Fifth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (← links)
- CNL-16-193, Response to NRC Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Spent Fuel Pool Evaluation Supplemental Report (← links)
- CNL-16-165, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 34, Revised Proposed License Conditions and Technical Specification Change (← links)
- CNL-16-166, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 15 (← links)
- CNL-16-161, Transmittal of Response to Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 33, Revised Response to Request for Additional.. (← links)
- CNL-16-150, Revised Response to Requests for Additional Information Proposed Technical Specifications Change TS-505 - Request for License Amendment - Extended Power Uprate - Supplement 31 (← links)
- CNL-16-152, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Uprate (EPU) - Supplement 32, Revised Responses to Requests for Additional Information (← links)
- CNL-16-132, Seventh Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- CNL-16-010, Application to Modify Technical Specification 4.3.1.2, Fuel Storage Criticality (TS-508) (← links)
- CNL-16-129, Response to Request for Additional Information Regarding Proposed Technical Specifications (TS) Change TS-505 License Amendments - Extended Power Uprate (EPU) - Supplement 29 (← links)
- CNL-16-127, Proposed Technical Specifications (TS) Change TS-505 - Request for License Amendments - Extended Power Upgrade (EPU) - Supplement 28, Responses to Requests for Additional Information (← links)
- CNL-16-114, Responses to Requests for Additional Information and Containment Accident Pressure Credit Elimination Updates on Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate . (← links)