Pages that link to "CNL-22-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32"
Jump to navigation
Jump to search
The following pages link to CNL-22-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32:
Displayed 50 items.
- CNL-18-100, TVA Request for Revision of Modifications 85, 102, and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Table (← links)
- CNL-18-114, Withdraw of Modification Request for NRC Confirmatory Orders EA-09-009, 203 and EA-17-022 Issued to Tennessee Valley Authority (← links)
- CNL-18-107, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions (← links)
- CNL-18-096, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions (← links)
- CNL-18-081, Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 1 (← links)
- CNL-18-069, Tennessee Valley Authority - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revisions 35 and 36 (← links)
- CNL-18-001, TVA Request for Revision to Item Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Attachment a, Table B-1 (← links)
- CNL-18-063, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes EPIP-23, Revision 25, Radioactive Material Transportation Incidents. (← links)
- CNL-18-035, Modification Request for NRC Confirmatory Orders EA-09-009, 203 and EA-17-022 Issued to TVA (← links)
- CNL-18-047, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions (← links)
- CNL-18-014, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions (← links)
- CNL-18-011, Tennessee Valley Authority Response to NRC Request for Additional Information Related to BFN Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497) (← links)
- CNL-17-141, Tennessee Valley Authority - Anchor Darling Double Disc Gate Valve Information and Status (← links)
- CNL-17-154, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 34 (← links)
- CNL-17-153, Results of the Review of Previous TVA Confirmatory Orders as Required by NRC Confirmatory Order EA-17-022 (← links)
- CNL-17-034, Application to Modify the Technical Specifications for Browns Ferry (TS-512), Sequoyah (TS-17-03), and Watts Bar (TS-17-20) to Resolve the Open Phase Issue Identified in NRC Bulletin 2012-01, Design Vulnerability in Electrical Power Syste (← links)
- CNL-17-109, Response to NRC Request for Additional Information for License Amendment Request to Revise Modifications and an Implementation Item Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Genera (← links)
- CNL-17-105, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions (← links)
- CNL-17-059, Notification of Changes to Emergency Response Data System (← links)
- CNL-17-014, Application to Revise Technical Specifications to Adopt Technical Specification Task Force (TSTF)-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement Pro (← links)
- CNL-17-021, Decommissioning Funding Status Report (← links)
- CNL-16-204, Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 33 (← links)
- CNL-16-188, Withdrawal of Browns Ferry Unit 2 Fifth Ten Year Interval Request for Relief 2-ISI-30 and Response to NRC Request for Additional Information Related to Browns Ferry Unit 3 Fourth Ten Year Interval Request for Relief 3-ISI-27 for the Use o (← links)
- CNL-16-163, Tennessee Valley Authority Response to NRC Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (← links)
- CNL-16-133, Response to NRC Request for Additional Information Related to License Amendment Request for Adding New Specifications to Technical Specification 3.3.8.3 (BFN-TS-486) (CAC Nos. MF6738, MF6739, and MF6740) - Letter 7 (← links)
- CNL-16-119, Brown Ferry Nuclear Plant, Unit 1, 2 and 3 - Proposed Technical Specifications Change TS-505 - Request for License Amendments - Extended Power Uprate - Supplemental Information Related to Replacement Steam Dryers (← links)
- CNL-16-091, Brown Ferry, Units 1, 2 & 3, Responses to Requests for Additional Information and Updates Associated with Interconnection System Impact Study Modifications on Proposed Technical Specifications Change TS-505 - Request for License Amendment (← links)
- CNL-16-083, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System (HEC-RAS) Project Milestones (← links)
- CNL-16-085, Bellefonte, Browns Ferry, Sequoyah, and Watts Bar - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A (← links)
- CNL-15-253, Brown Ferry, Units 1, 2, and 3 - Change in Commitment Related to Interim Compensatory Measures to Reduce Fire Risk (← links)
- CNL-15-247, Brown Ferry Unit 1, Submittal of Response to NRC Request for Additional Information Re Application to Modify Technical Specification 2.1.1.2, Reactor Core Minimum Critical Power Ratio Safety Limits (TS-506). Enclosure 2 ANP-3458NP Enclose (← links)
- CNL-15-191, Update to License Amendment Request to Adopt NFPA 805 Performance- Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2, and 3 (TAC Nos. MF1185, MF1186, and M (← links)
- CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report (← links)
- CNL-14-039, Tennessee Valley Authority - Submittal of Radiological Emergency Plan Revision (← links)
- CNL-13-143, TVA Submittal of Revisions to Central Emergency Control Center - Emergency Plan Implementing Procedures (← links)
- CNL-13-145, TVA Submittal of Revisions to Central Emergency Control Center Emergency Plan Implementing Procedures (← links)
- CNL-13-146, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision (← links)
- CNL-13-140, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revision (← links)
- CNL-15-082, Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2015 Status Report (← links)
- CNL-14-226, Organization Topical Report, TVA-NPOD89-A (← links)
- CNL-14-208, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Pl (← links)
- CNL-14-223, TVA - Seventh Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request (← links)
- CNL-14-160, Update to the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Plant, Units 1, 2 and 3 (← links)
- CNL-14-132, Third Six-Month Status Report and Revised Overall Integrated Plan in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events for Bro (← links)
- CNL-14-129, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Browns Ferry Nuclear Plant (← links)
- CNL-14-162, Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 & 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A (← links)
- CNL-14-119, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - July 2014 Status Report (← links)
- CNL-14-090, Response to NRC Request for Additional Information on the Proposed License Amendment for Browns Ferry Nuclear Plant, Unit 1 (← links)
- CNL-14-074, Redacted Version of License Amendment Request (TS-488) to Change the Completion Date of Cyber Security Plan Implementation Milestone 8 (← links)
- CNL-14-063, the Tennessee Valley Authority Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2014 Status Report (← links)