Pages that link to "ES-D1"
← ES-D1
Jump to navigation
Jump to search
The following pages link to ES-D1:
Displayed 45 items.
- L-2018-215, Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- CNL-14-208, Response to NRC Request for Additional Information Regarding the License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants for the Browns Ferry Nuclear Pl (← links)
- CNL-17-056, Application to Revise Technical Specification 5.5.12 Primary Containment Leakage Rate Testing Program (BFN-TS-497) (← links)
- RS-16-222, Response to Request for Additional Information Related to License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- RS-16-197, License Amendment Request for a One-Time Extension of the Essential Service Water (SX) Train Completion Time to Support 2A SX Pump Repair (← links)
- HNP-16-011, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications by Relocating Specific Surveillance Frequency Requirements to a Licensee Controlled Program (← links)
- LIC-11-0099, Table B-2 Nuclear Safety Capability Assessment Methodology Review (← links)
- CNS-17-014, License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time (← links)
- L-18-085, Response to Request for Additional Information and Supplemental Information Regarding License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 (← links)
- L-2014-369, License Amendment Request No. 236 Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B. (← links)
- NL-12-1344, License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0, Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (Rmts) Guidelines. (← links)
- NL-12-0932, Pilot 10 CFR 50.69 License Amendment Request (← links)
- L-2012-092, License Amendment Request No. 216, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition). Part 1 of 4 (← links)
- HNP-08-119, Non-Security Sensitive Version of Supplement to Request for License Amendment to Adopt NFPA 805 Performance-Based Standards for Fire Protection for Light Water Reactor Generating Plants (2001) Edition (← links)
- L-2018-201, Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- L-2018-150, Third Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. (← links)
- L-2017-155, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (← links)
- L-MT-17-016, Risk-Informed Request for Exemption from 10 CFR 50, Appendix R, III.G.2 Requirements for Multiple Spurious Operations of Drywell Spray Motor-Operated Valves (← links)
- LR-N16-0156, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- L-2016-006, Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 4 (← links)
- L-2013-193, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Acceptance Review Clarification Response (← links)
- L-2013-099, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (← links)
- NG-11-0267, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128) (← links)
- BSEP 12-0106, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) (← links)
- BSEP 12-0050, Request for License Amendments - Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, AC Sources - Operating (← links)
- ML17212B149 (← links)
- L-19-189, 54010-CALC-01, Davis-Besse Nuclear Power Station: Evaluation of Risk Significance of Permanent ILRT Extension. (← links)
- ML17355A640 (← links)
- ML051260439 (← links)
- L-19-233, License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b (← links)
- ML20010D223 (← links)
- ML20307A046 (← links)
- ML21246A216 (← links)
- ML22041A234 (← links)
- ML21235A008 (← links)
- ML22143B009 (← links)
- ML20276A152 (← links)
- ML21013A545 (← links)
- LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (← links)
- ML23248A343 (← links)
- ML23194A194 (← links)
- ML23283A103 (← links)
- ML22236A020 (← links)
- ML21256A293 (← links)
- L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut (← links)