Pages that link to "TS-3.7.17"
Jump to navigation
Jump to search
The following pages link to TS-3.7.17:
Displayed 50 items.
- ML072550304 (← links)
- ML072550183 (← links)
- ML072550175 (← links)
- ML071220323 (← links)
- ML070390019 (← links)
- ML063200252 (← links)
- ML063120261 (← links)
- ML062840180 (← links)
- ML062830459 (← links)
- ML062830424 (← links)
- ML062830417 (← links)
- ML062190458 (← links)
- ML061380651 (← links)
- ML060940411 (← links)
- ML060760241 (← links)
- ML060390109 (← links)
- ML060250208 (← links)
- ML050190130 (← links)
- RA-15-0003, License Amendment Request - Adoption of TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Lune Item Improvement Process (← links)
- AEP-NRC-2014-65, Donald C. Cook, Units 1 and 2 - License Amendment Request to Adopt TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specification, and Implement Full-Scope Alternative (← links)
- ONS-2017-019, Technical Specification Bases Change 2015-09 (← links)
- CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 (← links)
- CNL-15-170, Responses to NRC Audit Review Questions for Essential Raw Cooling Water and Component Cooling Water System License Amendment Request (← links)
- CNL-15-147, Responses to NRC Acceptance Review Questions Regarding Essential Raw Cooling Water and Component Cooling System License Amendment Request (← links)
- CNL-15-088, Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13) (← links)
- CNL-15-121, Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation (← links)
- CP-201400619, License Amendment Request (LAR) 13.01, Spent Fuel Pool Criticality Analysis, Supplemental Information to Requests for Additional Information (← links)
- CP-201201258, Spent Fuel Pool Criticality Analysis (← links)
- CP-201201212, Spent Fuel Pool Criticality Analysis (← links)
- CP-201000144, Revision to License Amendment Request 09-001, Administrative Revision to Operating Licenses and Technical Specifications (← links)
- ULNRC-05608, ULNRC-05608, Revision of Technical Specification 3.3.2 and 3.7.3 (License Amendment Request OL-1289) (← links)
- ULNRC-05566, Amplification for Amendment, Revision of Technical Specification 3.3.2 and 3.7.2 and Addition of New Technical Specification 3.7.19 (License Amendment Request OL-1277 Revised) (← links)
- CP-200900283, Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request (← links)
- ULNRC-05463, Revision to Technical Specification Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (License Amendment Request OL-1287) (← links)
- L-2005-247, License Amendment Request No. 178 Spent Fuel Pool Boraflex Remedy (← links)
- NRC-2009-0401, Withdrawal of License Amendment Request to Revise Technical Specification 3.7.17, Spent Fuel Assembly Storage, Based on Revised SFP Criticality Safety Analysis (TACs MD8417 and ME8418) (← links)
- ML18270A325 (← links)
- ML18270A324 (← links)
- CNL-19-014, Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07) (← links)
- CP-201400503, Response to Requests for Additional Information on License Amendment Request 13-01 Spent Fuel Pool Criticality Analysis (← links)
- CP-201301162, License Amendment Request 12-06 Spent Fuel Pool Criticality Analysis Removal (← links)
- CP-201300827, Withdrawl of License Amendment Request (LAR) 12-006 Spent Fuel Pool Criticality Analysis.Comanche Peak Nuclear Power Plant, Withdrawal of License Amendment Request (LAR) 12-006 Spent Fuel Pool Criticality Analysis (← links)
- CP-200901204, Request for Withdrawal of License Amendment Request Revision to the Technical Specification 3.7.17, Spent Fuel Assembly Storage (← links)
- CP-200901038, Response to NRC Staff Evaluation and Basis for Denial of License Amendment Request Revision to the Technical Specification 3.7.17, Spent Fuel Assembly Storage (← links)
- CP-200900006, Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request (← links)
- CP-200801686, Response to Request for Additional Information Regarding Spent Fuel Pool Criticality License Amendment Request (← links)
- ULNRC-05494, Application for Amendment to Facility Operating License NPF-30 OL1283 - Revision of Technical Specifications 3.3, 3.7, and 3.8 (← links)
- ULNRC-05445, One-Time Completion Time Extension for Essential Service Water (ESW) System (← links)
- L-PI-11-075, Letter from Xcel Energy License Amendment Request for Spent Fuel Pool Criticality Changes (← links)
- HNP-09-087, Second Response to Request for Additional Information Regarding Amendment to Remove Credit for Boraflex in the Boiling Water Reactor Spent Fuel Pool Storage Racks (← links)