Pages that link to "B13352, Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl"
Jump to navigation
Jump to search
The following pages link to B13352, Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl:
Displayed 50 items.
- B12511, Forwards Temporary Change to Physical Security Plan, Reflecting Temporary Mod to Protected Area Boundary.Change Withheld (Ref 10CFR73.21 & 2.790) (← links)
- B12191, Forwards Reviews for Isap Topic 1.22, Emergency Response Facilities Info & Isap Topic 1.30, Reactor Protection Sys Isolation, Per Hl Thompson 850731 Request (← links)
- A05914, Forwards Comments on NRC Contractor Draft Rept Re Probabilistic Safety Study,Per NRC 860716 Request (← links)
- B12226, Requests That Due Dates to Discuss Results of Steam Generator Tube End Study Be Revised to Wk of 861020 & Submittal of Corrective Actions for Undefined Signals to 861114,due to Diversion of Resources for Unplanned Outage (← links)
- B12212, Forwards Summary of Qualification Analysis for Pipe Breaks Outside Containment,In Response to 860707 Request.Commits to Modify Equipment Outside Containment to Eliminate Reliance on feed-&-bleed in Compliance w/10CFR50.49 (← links)
- B12127, Forwards Response to SALP Rept for Mar 1985 - Feb 1986 W/ Particular Emphasis on Recommendations for Individual Evaluation Categories (← links)
- B12346, Forwards Info on Fire Protection Re Wall Between Control Room & Computer Room.Wall Works in Conjunction W/Computer Room Halon Sys to Prevent Fires Which May Occur in Computer Room from Spreading to Control Room (← links)
- B12293, Forwards Reviews for Isap Topics 1.06, Wind & Tornado Loadings/Tornado Missiles & 1.31, Pipe Break Outside Containment, Per 850517 Commitment (← links)
- A06508, Remits Fee Re 870401 Submittal of Updated Bimonthly Progress Rept & Design Info for New Switchgear Bldg,Per 870422 Request.Fee Required Since NRC Review Requested (← links)
- B12311, Forwards Review for Isap Topic 1.10, Torque Switch Mods, Per SEP Topic III-10.A.Torque Switch & Thermal Overload Protection Issues Adequately Addressed.Further Evaluation Ongoing (← links)
- B12292, Forwards Reviews for Isap Topics 1.23, Post-Accident Hydrogen Monitors & 1.63, Hydrogen Control, Per 850517 Commitment (← links)
- B12324, Submits Addl Info Re Use of Northeast Utils Fuel Rod Analysis Program Fuel Performance Code.Program Will Be Used to Perform steady-state Fuel Performance Analysis,Including Small Break LOCA ECCS Performance Evaluations (← links)
- B12524, Forwards Revs to Nusco 151 Rept Re Reanalysis of non-LOCA Dbas,In Support of Design of Cycle 15 Reload.Major Changes in Analyses Include,Uncontrolled Rod Withdrawal from Subcritical,Steam Line Break & Boron Dilution (← links)
- B12294, Forwards Reviews of Isap 2.13, Fire Detection Sys Upgrade, Isap 2.15, Long-Term Small Break LOCA & ECCS & Isap 2.16, Variable Overpower Trip Mods, Per 850731 Request (← links)
- B12296, Forwards Reviews of Isap Topics 2.08, Loss of DC Power Study, Isap 2.14, Radiation Monitoring Sys Updrade, Isap 2.18, Nuclear Instrumentation Replacement & Isap 2.19, Pcb Oil-Filled Transformer, Per 850731 Request (← links)
- B12221, Forwards Addl Info Re Action Items Resulting from App R Insp on 860616-20 for Listed Topics & Brief Summary & Status Update of All Other Open Audit Issues.Response to Violations & Deviation Will Be Provided by 860903 (← links)
- B12454, Forwards Addl Info Re Rev 13 to Physical Security Plan.Info Withheld (Ref 10CFR73.21(b) & 2.790(a)) (← links)
- A05679, Forwards Rev to non-LOCA DBA Analysis on Loss of Normal Feedwater Flow,Per Util 861024 Commitment.Conclusions for Loss of Normal Feedwater Flow Remain Unchanged from 860630 Reanalysis of non-LOCA DBA (← links)
- A05034, Forwards Addl Info Re Manual Trip of Reactor Coolant Pumps, Per NRC Request.Westinghouse Owners Group Methodology Being Used on Interim Basis Until Revised Small Break LOCA Analysis Approved by NRC (← links)
- B12385, Forwards Comments on NRC Final Draft Review of Northeast Utils Svc Co Probabilistic Safety Study,Submitted on 860331, as Part of Plant Isap Effort (← links)
- B12423, Forwards Rev 13 to Physical Security Plan Re Physical Protection,Per 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21(b) & 2.790(a)) (← links)
- B12130, Forwards Listed Summaries to Isap Topics,Including Isap 1.04, Seismic Qualification of Safety-Related Piping, in Response to 850731 Request.Public Safety Impact Scores Preliminary Since Analysis of Isap Not Completed (← links)
- B12121, Forwards Reviews for Isap Topic 1.05, Seismic Structural Mods, Topic 1.09, Design Codes,Design Criteria,Load Combinations & Topic 1.57, Flooding of Compartments by Backflow, Per 850517 Commitment (← links)
- B12162, Forwards Planned Mod of Containment Penetrations During 1987 Refueling Outage,Per 10CFR50,App J & Addl Info Supporting Permanent Exemption for Penetration P-80 (Fire Water to Containment Spray) (← links)
- A06113, Forwards Addl Info Re Spds,In Response to NRC 860924 Request on Isap Topic 1.20 (← links)
- A05775, Forwards Updated List of Completed Isap Topics & List of New Topics to Be Evaluated in Isap Program,Per 860509 Request.Deterministic Reviews of Each Topic Will Be Forwarded (← links)
- B12136, Forwards Revised Pages to Attachments 2 & 3 of Re 10CFR50,App J Exemption Request Concerning Testing of Containment Isolation Valve in Reverse Direction & Addition of Penetration Requiring Schedular Exemption (← links)
- A04547, Informs of Status of Commitments in Response to Facility Proposed Design Change Task Group Final Rept,Per . All Commitments Fulfilled.Original Intent of Improvement Plans Unaltered (← links)
- B12318, Discusses NRC Concerns Re Reliance on feed-&-bleed to Address Issues Associated W/Environ Qualification & High Energy Line Breaks.Viewgraphs from 860917 Meeting Encl (← links)
- A06347, Forwards Fee for 861124 Request for Deferrment of Completion of Switchgear Room Halon Sys Mods to 1987 Refueling Outage or First Outage of Last 8 Wk Duration Commencing After 870101 (← links)
- B12424, Informs That Rev 17 to Emergency Plan Implemented,Reflecting Changes in Emergency Action Level Tables & Editorial Corrections.Plan Continues to Meet Stds of 10CFR50.47(b) & Requirements of 10CFR50,App E (← links)
- A05988, Advises That Revised Inservice Testing Program & Associated Relief Requests Will Be Submitted by 870228 for Review. Testing Currently Being Performed Should Be Continued Until Code Required Testing Can Be Performed (← links)
- B12288, Forwards Summary of Safety Impact Model Project Analysis for Isap Topic 1.21, Reg Guide 1.97 Instrumentation (← links)
- ML20211C217 (← links)
- A05884, Suppls 860729 Response to Violations Noted in Insp Rept 50-213/86-15.Nuclear Review Board Audits Conducted Annually Per Tech Spec 6.5.2.8.Tech Specs Implemented on 860101 & Audited in May & June of 1986 (← links)
- A05996, Remits Class III Fee for 820723 Application,Per (← links)
- B12199, Forwards Reviews of Isap Topics 2.09,2.11 & 2.12 Re Reactor Coolant Pump Vibration Monitoring Sys Upgrade, Main Steam Sys Evaluation & Turbine Generator Trip Logic, Respectively,Per 850731 Request (← links)
- B12195, Forwards Reviews for Isap Topic 1.27, Compliance W/10CFR50.46 & Isap Topic 1.28, Reactor Coolant Pump Trip. Review Includes Discussion of Safety Objective & Evaluation of Plant Design for Issue Addressed (← links)
- B12251, Forwards Addl Info Re Thermal Hydraulic Analyses in Plant Probabilistic Safety Study,In Response to Requests Made During 860812-15 Meetings.Core Exposure Prevented for Single Tube Rupture,But Not for Rupture of Five Tubes (← links)
- A06006, Provides Clarification of Issues Raised During 860904 Enforcement Conference & Insp 50-213/86-22 Re Radiation Worker Overexposure Incident.Health Physics Technician Failed to Perform Satisfactorily Due to Inadequate Training (← links)
- B12202, Forwards Reviews of Isap Topics 1.14 App R Mods, 1.14.3, App R Related Control Circuit Mods & 1.20, Spds (← links)
- B12189, Forwards Reviews for Isap Topics 1.01, Switchgear Room Cooling Mods, 1.14.5, Fire Protection Improvements to Area S-1 & 1.14.6, Installation of Fire Pumps to Separate Charging Pumps (← links)
- A05434, Forwards Util Implementation Ltr Rept Re Inadequate Core Cooling (ICC) Instrumentation Sys,As Committed in Util 850201 Submittal.Spds ICC Display Will Be Confirmed in Informational Ltr After Implementation of SPDS (← links)
- A05983, Responds to NRC Re Violations Noted in Insp Rept 50-213/86-19.Corrective Actions:Requirement to Follow Procedures Will Be Emphasized W/All Employees in Dept Meetings Planned for Sept/Oct (← links)
- A05946, Forwards Response to Open Items Identified During 860508 Meeting Re Proposed Rev to Pump & Valve Inservice Testing Program.Rev IWV-1 Table for Valve Testing Program, Description of ECCS Full Flow Test & Insp Procedure Encl (← links)
- B12512, Forwards Relief Request 2.0,requesting Relief from Performing Inservice Surface Exam of Eight nozzle-to-safe End Butt Welds for Inservice Insp Program,Code Category B-F, Item B5.10.Relief Requested by 870615.Fee Paid (← links)
- A06207, Forwards Responses to 861106 Request for Addl Info Re Util Request for Relief from Certain Code Category B-J Weld Inservice Insp Requirements.Isometric Drawings Encl (← links)
- B12349, Forwards Nonproprietary Vols 1 & 2 & Proprietary Vol 3 to Isap,Haddam Neck Plant,Final Rept. Proprietary Vol Withheld (Ref 10CFR2.790).Affidavit Encl (← links)
- B12415, Provides Status of 860703 & 0819 Commitments Which Resulted from 860616-20 Fire Protection Insp & Audit.Util Made Mods to Control Room HVAC Sys Such That Exhaust Fan Will Automatically Shut Down in Event of Fire (← links)
- B12411, Forwards Bimonthly Progress Rept 2 Re New Switchgear Bldg Const,Per 860930 Commitment (← links)