Pages that link to "ML20149L522"
Jump to navigation
Jump to search
The following pages link to ML20149L522:
Displayed 37 items.
- B13314, Proposed Tech Specs 1.37,3/4.3.1,3.3.3.9,3/4 9.2,Bases 2.2.1,3/4.3.3.9 & 3/4.3.4 & Tables 2.2-1,3.3-1,3.3-1a,4.3-1, 3.3-2,4.3-2,3.3-7 & 4.3-6 Re Reactor Protection Sys & Nuclear Instrumentation Sys (← links)
- B13284, Proposed Tech Spec 3.6 Re ECCS (← links)
- B13327, Proposed Tech Specs Incorporating Proposed Changes Agreed to During 890330 NRC Meeting & Subsequent Conference Calls, Proposed Changes Necessitated by New Switchgear Bldg Mods & Clarification of Level 1 Undervoltage Surveillance Tests (← links)
- B13295, Proposed Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements & RCS Operational Leakage (← links)
- A07433, Proposed Tech Specs Re Leakage Detection Sys (← links)
- B13269, Proposed Tech Specs Sections 2.0 & 3/4.3 Re Safety Limits & Limiting Safety Sys Settings & Instrumentation (← links)
- B13292, Proposed Tech Specs,Supporting Cycle 16 (← links)
- B13169, Proposed Tech Specs,Revising Sections 3.6, Core Cooling Sys, 3.7, Min Water Vol & Boron Concentration in Refueling Water Storage Tank & 4.3, Core Cooling Sys-Periodic Testing, to Combine Into New Section 3.6, Eccs (← links)
- B13208, Proposed Tech Specs Supporting Operation of Cycle 15 (← links)
- B13181, Proposed Tech Spec Sections 3/4.4,3/4.6 & 3/4.7 Re RCS (← links)
- B12601, Proposed Tech Spec 5.4, Containment, Deleting General Statements Made About Containment Penetrations & Associated Basis (← links)
- B12727, Proposed Tech Spec 3.12 Adding Operability Requirements on Offsite & Onsite Power Sources W/Limiting Conditions for Operation & Time Requirements for Corrective Actions (← links)
- B12605, Proposed Tech Specs,Modifying Calibr Requirements for Power Range Nuclear Instrumentation When Plant Operated at steady- State Reduced Power & Channels Adjusted to Provide Enhanced Overpower Protection (← links)
- B12611, Comments on NRC Evaluation of Util Program for Training & Qualifying Individuals for dual-role,senior Reactor Operator/Shift Technical Advisor Positions W/Specific Emphasis on Whether Program Meets NRC Requirements (← links)
- B12560, Proposed Tech Specs,Adding New Section Re Main Feedwater Isolation Valves (← links)
- B12604, Proposed Tech Spec Changes Supporting Cycle 15 Operation (← links)
- B13151, Proposed Tech Specs 3/4.1, Reactivity Control Sys (← links)
- B13127, Proposed Tech Specs,Revising Info on Core Exit Thermocouples,Main Stack wide-range Noble Gas Monitor, Reactor Vessel Water Level & RCS Subcooling Margin Monitor, Per Generic Ltr 83-37 (← links)
- B12542, Proposed Tech Specs,Incorporating long-term Acceptance Criteria for Steam Generator Tubes W/Defects in Rolled Region (← links)
- B12544, Proposed Tech Specs,Incorporating Guarantee That New motor-operated Valves Scheduled for Installation During 1987 Refueling Outage Remain in Respective Positions,Causing No Adverse Effects to ECCS (← links)
- B12543, Proposed Tech Specs 3.19 & 4.13 Re Snubber Testing & Surveillance (← links)
- B12537, Proposed Tech Specs Supporting Cycle 15 Operation & Reflecting Upgraded Methods for Analysis of non-LOCA Events (← links)
- A05610, Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering Encl (← links)
- B11829, Proposed Tech Spec Change,Allowing Testing of Normally Closed Isolation Valves in post-accident Sampling Sys During Operation Modes 1-4 (← links)
- ML20209F037 (← links)
- B12389, Proposed Tech Spec,Modifying Tech Spec 3.20, RCS Flow,Temp & Pressure to Include Three Loop Operation Flow Requirement & Tech Spec Figure2.2-2,reflecting Results of Three Loop Flow Measurement (← links)
- B12067, Proposed Tech Specs Allowing Implementation of Measures Approved by NRC as One Element of Response to Previously Addressed Small Break LOCA Issue (← links)
- B13056, Proposed Tech Specs Amending Sections 1.0,3/4.2,3/4.9, 3/4.10,3/4.11,5.0 & 6.0 (← links)
- B12828, Proposed Tech Specs,Renumbering Manual High Pressure Safety Injection Throttle Valves for Consistency W/Plant Loop Numbering Scheme (← links)
- B12967, Proposed Tech Spec Changes Incorporating New Section of Sprinkler Protection in Turbine Bldg & Reduction in Number of Smoke Detectors Available in Containment from 23 to 22 (← links)
- B11987, Proposed Tech Specs,Allowing Installation of Directional Spray Water Suppression Sys in Cable Spreading Area Hallway & Water curtain-type Automatic Directional Spray Sys Around Four Svc Water Pumps to Protect Safe Shutdown Equipment (← links)
- B12979, Proposed Tech Specs 3.12 & 4.2 Re Addition of Operability Requirements for Offsite & Onsite Power Sources W/Limiting Conditions for Operations & Time Requirements for Corrective Actions to Station Service Power,Respectively (← links)
- A06214, Proposed Tech Specs,Providing Limiting Conditions for Operation Per Generic Ltr 83-37 (← links)
- B12813, Proposed Tech Specs Re Halon 1301 Sys & Fire Detection Equipment (← links)
- B14087, Proposed Tech Specs Re Steam Generator Repair Criteria (← links)
- B11911, Proposed Tech Specs for Cycle 14 Reload (← links)
- ML20054F873 (← links)