- 05000265/LER-1997-003, Forwards LER 97-003-01 Re Core Spray Room Cooler 2B That Fouled Due to Hydrolyzing Debris.Commitment Listed (← links)
- 05000265/LER-1997-005, Forwards LER 97-005-01 Re Unit 2 Reactor Placed in Mode 2 W/O Required Number of Emergency Diesel Generators Operable. Commitment Listed (← links)
- 05000265/LER-1998-005, Forwards LER 98-005-00,per 10CFR50.73(a)(2)(vii)B. Commitments Made by Util,Listed (← links)
- 05000265/LER-1988-062, Advises That Cover Ltr to LER 88-062 Inadvertently Refers to LER 88-028 & Requests That Ltr Be Be Attached to Rept (← links)
- 05000265/LER-1998-003, Forwards LER 98-003-00,submitted IAW 10CFR50.73(a)(2)(iv). Commitments Made within Ltr Listed (← links)
- 05000265/LER-1998-002, Forwards LER 98-002-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed (← links)
- 05000265/LER-1997-006, Forwards LER 97-006-00 Re Cable in Unit 2 Being in Same Fire Area as Fire of Concern Due to Ineffective Implementation of Original Safe Shutdown Analysis.List of Commitments Provided (← links)
- 05000265/LER-1997-012, Informs of Change of Committed Due Date Re Rev to Procedure Contained in LER 97-012,dtd 971218.Due Date Is Now 980828 Due to Work Prioritization & Backlog for Resources for Completion of Engineering Request (← links)
- 05000265/LER-1998-001, Forwards LER 98-001-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitments Made by Ltr (← links)
- 05000265/LER-1997-010, Forwards LER 97-010-00 IAW Requirements of 10CFR50.73(a)(2)(i)(B).No Commitments Made (← links)
- 05000265/LER-1993-022, Informs of Cancellation of Commitment Contained in LER 93-022.RCIC Bed Plate Drain Lines Do Not Need to Be Rerouted Based on Check Valve Insp Frequency & Addition of Ball Valves (← links)
- 05000265/LER-1997-015, Informs NRC of Change to Committed Due Date Contained in Ltr Re LER 97-015 (← links)
- 05000265/LER-1985-007, Responds to NRC Re Violations Noted in Insp Rept 50-265/85-18.Corrective Actions:Four Pressure Transmitters Will Be Returned to Original Configuration by 851031 & Work Request Sys Revised.Rev 1 to LER 85-007 Encl (← links)
- 05000265/LER-1997-004, Forwards LER 97-004-00,IAW 10CFR50.73(a)(2)(ii)(B).Unit 1 DWEDS & DWFDS Will Be Examined to Verify Video Tape Determination During Next Refueling Shutdown to Ensure Covers on Unit Installed Per Applicable Design Drawings (← links)
- 05000265/LER-1982-010, Forwards LER 82-010/03L-0 (← links)