Pages that link to "05000461/LER-2014-001"
Jump to navigation
Jump to search
The following pages link to 05000461/LER-2014-001:
Displayed 50 items.
- 05000461/LER-1998-035, Forwards LER 98-035-00 Re Failure to Comply with Tech Specs Action Requirements to Immediately Restore Alternating Current & Direct Current Electrical Power Sources,Due to Inadequate Communications.Rept Contains Listed Commitme (← links)
- 05000461/LER-1999-007, Forwards LER 99-007-00,re Design Error Causing Main Steam Isolation Valve Leakage Control Sys to Be Outside Design Basis.Commitment Made by Util,Listed (← links)
- 05000461/LER-1999-008, Forwards LER 99-008-00,re Failure of Motor Driven Reactor FW Pump Regulating Valve.Commitment Made by Util,Listed (← links)
- 05000461/LER-1998-033, Forwards LER 98-033-00 Re Inappropriate Clearing of Caution Tagout Results in Improved TS LCO 3.4.10 Action A.1 Not Being Met.Encl Rept Contains Listed Commitments (← links)
- 05000461/LER-1998-034, Forwards LER 98-034-00 Re Inattention to Detail During Performance of Design Change Which Caused One Train of SPC Mode of RHR Sys to Be Outside Design Basis.Commitment Made by Util,Listed (← links)
- 05000461/LER-1997-030, Forwards LER 97-030-00 Re Failure to Verify Reactor Water Cleanup Sys as Available Alternate Means of Shutdown Cooling Due to Improper Valve Lineup.Commitment Made in LER, Listed (← links)
- 05000461/LER-1998-037, Forwards LER 98-037-00 Re Failure to Properly Verify & Validate Surveillance Procedure Leads to Failure to Properly Implement Channel Calibr Surveillance Requirements.Rept Contains Listed Commitment (← links)
- 05000461/LER-1997-026, Forwards LER 97-026-00 Re Inadequate Procedure for Insp of Shutdown Svc Water Pumps for Excess Slit Results in Shutdown Svc Water Pump Inoperability.Util Committing to Take Listed Actions as Documented in LER (← links)
- 05000461/LER-1998-028, Forwards LER 98-028-00,re Thermal Induced Pressure Locking of Safety Related Power Operated Gate Valves Due to Inadequate Initial Design.Commitment Made by Util,Listed (← links)
- 05000461/LER-1997-033, Forwards LER 97-033-00 Re Misinterpretation of Tech Specs Bases Results in Failure to Meet Required Tech Specs for Two Inoperable ECC Subsystems.Ler Contains Listed Commitments (← links)
- 05000461/LER-1997-036, Forwards LER 97-036-00 & 10CFR21 Rept 21-98-002 Re Failure of Cooling Unit Mfg to Install Motor Shaft Key Leads to Inoperability of Shutdown Svc Water Pump Room Cooling Unit. Rept Submitted in Accordance W/Requirements of 10CFR (← links)
- 05000461/LER-1998-026, Forwards LER 98-026-00 Re Incorrect Supplier Design,Iaw 10CFR50.73.Commitment Made by Util Listed (← links)
- 05000461/LER-1997-032, Forwards LER 97-032-00,plant Was Outside Design Basis Due to Inadequate Tornado Missile Protection Caused by Design Error,Iaw 10CFR50.73 & 10CFR21.21.Commitments Made in Rept, Listed (← links)
- 05000461/LER-1997-028, Forwards LER 97-028-00 Re Failure of Abb to Supply Properly Qualified Components.Ler Also Contains 10CFR21.21 Rept. Commitments Made by Util,Listed (← links)
- 05000461/LER-1997-031, Forwards LER 97-031-00,re Inadequate Testing of SR Logic Circuits Which Resulted in Failure to Meet TS Sr.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1999-005, Forwards LER 99-005-00,re Inoperability of Standby Gas Treatment Sys Train a Caused by Inadequate Design of Control Circuit.Commitments Listed (← links)
- 05000461/LER-1998-006, Forwards LER 98-006-00 & 10CFR21 Rept 21-98-014 Re Incorrect Calculation in DG Control Circuitry Which Resulted in Insufficient Voltage & Inoperability of Div I Dg. Commitments,Listed (← links)
- 05000461/LER-1997-029, Forwards LER 97-029-00 Re Failure to Follow Plant Procedure When Erecting Scaffold Resulted in safety-related Area Cooler Becoming Inoperable Due to Seismic Qualification Concerns.Commitments Contained in Ler,Listed (← links)
- 05000461/LER-1998-002, Forwards LER 98-002-00 Re Unplanned ESF Actuation & Manual Scram Due to Loss of Svc Air.Commitments Made by Util, Listed (← links)
- 05000461/LER-1998-036, Forwards LER 98-036-01,re Opening Incorrect Electrical Cubicle,Causing Loss of SD Cooling & Leading to Failure to Meet TS Required Action in Required Time.Encl Rept Contains Listed Commitments (← links)
- 05000461/LER-1998-001, Forwards LER 98-001-00,re Failure of Division 2 Safety Related Battery Charger Due to Deficient Supplier Soldered Connections.Ler Also Contains 10CFR21 Rept.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1997-023, Forwards LER 97-023-00,re Inadequate Work Instruction Which Led to Potential Overgreasing of Motor Bearings Causing Potential Failure of Various Motors.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1997-027, Forwards LER 97-027-00 Re Misinterpretation of 10CFR50.59 Which Resulted in Installation of Mod of RHR That Is Outside Design Basis,Per 10CFR50.73.Commitment Made within Ltr, Listed (← links)
- 05000461/LER-1988-016, Forwards LER 88-016-00 Re Failure to Recognize Location & Extent of Penetration Seal Repair Results in Violation of Secondary Containment Integrity (← links)
- 05000461/LER-1999-001, Forwards LER 99-001-00 Re Improper Assembly of Motor That Caused Degradation of Bearings in Two Divisions of Shutdown Sws.Commitments Made by Util,Listed (← links)
- 05000461/LER-1997-025, Forwards LER 97-025-00 Re Design Deficiency Which Caused Plant to Be Outside Design Basis for Fire in Main CR Potentially Damaging Valves Required for Safe Shutdown of of Plant.Commitments Made in Ler,Listed (← links)
- 05000461/LER-1999-011, Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments (← links)
- 05000461/LER-1998-025, Forwards LER 98-025-00 Re Repeated Failures of Switchgear Heat Condenser Gasket.Rept Contains Commitment to Develop & Install Mod to Add Vacuum Breakers to Div 3 Shutdown Svc Water Sys to Mitigate Pressure Transient (← links)
- 05000461/LER-1998-022, Forwards LER 98-022-00 Re Failure to Perform Surveillance Testing within Specified Frequency Due to Data Input Error. Commitments Made by Util,Listed (← links)
- 05000461/LER-1998-021, Forwards LER 98-021-00,re Cracks in Medium & High Density Silicone Penetration Seals Not Per Design Basis.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1998-024, Forwards LER 98-024-00,re Failure to Perform Surveillance Testing on Divsion II Degraded Voltage Relays within Specified Frequency.Event Still Under Investigation.Rev to LER Expected to Be Submitted by 980907 (← links)
- 05000461/LER-1998-012, Forwards LER 98-012-00, High Differential Pressure Required to Close Excess Flow Check Valves Results in Valves Being Outside of Design Basis of Plant, IAW Requirements of 10CFR50.73 (← links)
- 05000461/LER-1997-034, Forwards 930414 S&L Electrical Engineering Std ESA-102 W/Copyright Statement Removed.Encl Originally Submitted w/980205 Info Re CPS Combined LER 97-034-00 & Part 21 Rept Contained Copyright Statement (← links)
- 05000461/LER-1998-016, Forwards LER 98-016-00,re Failure to Test Valves 1SX013D/E/F IAW in-service Testing Program.Commitments Made within Ltr, Listed (← links)
- 05000461/LER-1998-003, Forwards LER 98-003-00, Loss of Nuclear Sys Protection Sys Bus Due to Unknown Cause Results in Inadvertent Isolation of Shutdown Cooling. Listed Commitments Contained in LER (← links)
- 05000461/LER-1998-004, Forwards LER 98-004-01 & 10CFR21 Rept 21-98-004/015, Division 2 Nuclear Systems Protection Sys Inverter Not IAW Plant'S Design Basis Due to Various Deficiencies. Commitments Made by Util,Listed (← links)
- 05000461/LER-1998-018, Forwards LER 98-018-00,re Esfa Caused by Deficiencies in Method Used to Perform Nuclear Sys Protection Sys Power Supply Adjustment.Commitments Listed (← links)
- 05000461/LER-1998-019, Forwards LER 98-019-00 Re Failure to Satisfy TS for Ensuring That Electrical Loads Properly Sequence Onto safety-related Buses.Commitments Made by Util,Listed (← links)
- 05000461/LER-1998-015, Forwards LER 98-015-00 Re ESF Actuation.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1998-023, Forwards LER 98-023-00 Re Failure to Adequately Satisfy TS SR for Division 3 Dg.Event Is Still Under Investigation & Revised LER Will Be Submitted by 980930 (← links)
- 05000461/LER-1998-013, Responds to J Carter Telephone Request for GE to Review Clinton LER 98-013-00 (← links)
- 05000461/LER-1998-020, Forwards LER 98-020-00 Re Inadequate Flow Balancing of Shutdown SWS Which Resulted in Less than Required Flow to SWS Loads.Commitment Made by Util,Listed (← links)
- 05000461/LER-1996-015, Forwards LER 96-015-02 Re Lack of Attention to Detail During Procedure Performance.Ler Has Been Revised to Remove Contributing Cause of Event & Corrective Action Associated W/Contributing Cause (← links)
- 05000461/LER-1997-021, Forwards LER 97-021-00 & 10CFR21 Rept 21-97-040,re Control Circuit for Division 1 EDG Feed Breaker Which Did Not Meet Basis Due to Design Error (← links)
- 05000461/LER-1998-005, Forwards LER 98-005-01 Re Failure to Verify Closed Pcivs,Per TS Sr.Commitments Made in Rept,Listed (← links)
- 05000461/LER-1998-007, Forwards LER 98-007-00,inadequate Engineering Evaluation Leads to Installation of Temporary Mod on DC Electrical Power Sys Which Caused Sys to Be Inoperable When Required to Be Operable by Ts.Ler Contains Listed Commitment (← links)
- 05000461/LER-1997-035, Forwards LER 97-035-01,re Divisions 1 & 2 Battery Chargers Incapable of Supplying Full Rated Voltage & Current Flow at Degraded Voltage Trip Setpoint IAW Plant TS & Design Basis.Commitments Made within Ltr,Listed (← links)
- 05000461/LER-1998-010, Forwards LER 98-010-00 & 10CFR21 Rept 21-97-060 Re Inoperable Divisions 1 & 2 Hydrogen & Oxygen Analyzers Due to Inadequate Commercial Grade Dedication of safety-related Replacement Parts.Commitments,Listed (← links)
- 05000461/LER-1996-010, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events (← links)
- 05000461/LER-1998-008, Forwards LER 98-008-00,re Division I Hydrogen & Oxygen Analyzer Incapable of Meeting Design Basis Due to an Excessive Vibration Condition on Air Compressor.Caused by Personnel Error.Commitments Made within Ltr,Listed (← links)