| | {{#Wiki_filter:Monticello Nuclear Generating Plant XcelEnergy 2807 W County Road 75 Monticello, MN 55362 December 13, 2012 L-MT-12-112 10 CFR 50, Appendix E U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 -0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 10 CFR 50 Appendix E Evacuation Time Estimate Analysis for the Monticello Nuclear Generatinq Plant Pursuant to Part 50.4 of Title 10 of the Code of Federal Regulations (10 CFR Part 50.4), Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, hereby submits the evacuation time estimate analysis (ETE) for the Monticello Nuclear Generating Plant (MNGP). This analysis is submitted in accordance with the requirements of Appendix E IV 4 to Part 50 of Title 10 of the Code of Federal Regulations. |
| | The regulation requires the licensee to submit an updated analysis "within 365 days of the later of the date of the availability of the most recent decennial census data from the U.S. Census Bureau or December 23, 2011." The MNGP ETE was developed in accordance with the federal guidance in NUREG/CR-7002 (SAND2010-0016P), "Criteria for Development of Evacuation Time Estimate Studies" published November 2011.The enclosed ETE analysis provides the methods used to derive, for planning purposes, the time for public evacuation. |
| | The analysis provides an important part of the bases for development of protective action recommendations in coordination with the applicable offsite state/local emergency response agencies.Enclosure 1 contains a copy of the MNGP ETE analysis. |
| | Enclosure 2 contains recommendations as a result of the MNGP ETE analysis. |
| | Document Control Desk L-MT-12-112 Page 2 Should you have any questions or if additional information is needed regarding this submittal, please contact Ms. Carrie Fosaaen, Licensing Engineer, at 763-295-1357. |
| | Summary of Commitments This letter contains no new Regulatory Commitments and no revision to existing Regulatory Commitments. |
| | Mark A. Schimmel Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company -Minnesota Enclosurel |
| | -2012 Monticello Nuclear Generating Plant EPZ ETE Analysis Enclosure 2 -Monticello Nuclear Generating Plant ETE Recommendations cc: Administrator, Region III, USNRC Director, Office of Nuclear Reactor Regulation (NRR)NRR Project Manager, MNGP, USNRC Senior Resident Inspector, MNGP, USNRC}} |
Latest revision as of 16:31, 1 August 2018
|
---|
Category:Letter
MONTHYEARML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2922024-04-25025 April 2024 Sec106 Tribal, Jensvold, Kevin-Upper Sioux Community ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe 05000263/LER-2024-001, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A2982024-04-25025 April 2024 Sec106 Tribal, Reider, Anthony-Flandreau Santee Sioux Tribe ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A3012024-04-25025 April 2024 Sec106 Tribal, Seki, Darrell-Red Lake Nation ML24115A2882024-04-25025 April 2024 Sec106 Tribal, Fairbanks, Michael-White Earth Nation.Docx ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation 2024-09-26
[Table view] |
Text
Monticello Nuclear Generating Plant XcelEnergy 2807 W County Road 75 Monticello, MN 55362 December 13, 2012 L-MT-12-112 10 CFR 50, Appendix E U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 -0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 10 CFR 50 Appendix E Evacuation Time Estimate Analysis for the Monticello Nuclear Generatinq Plant Pursuant to Part 50.4 of Title 10 of the Code of Federal Regulations (10 CFR Part 50.4), Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, hereby submits the evacuation time estimate analysis (ETE) for the Monticello Nuclear Generating Plant (MNGP). This analysis is submitted in accordance with the requirements of Appendix E IV 4 to Part 50 of Title 10 of the Code of Federal Regulations.
The regulation requires the licensee to submit an updated analysis "within 365 days of the later of the date of the availability of the most recent decennial census data from the U.S. Census Bureau or December 23, 2011." The MNGP ETE was developed in accordance with the federal guidance in NUREG/CR-7002 (SAND2010-0016P), "Criteria for Development of Evacuation Time Estimate Studies" published November 2011.The enclosed ETE analysis provides the methods used to derive, for planning purposes, the time for public evacuation.
The analysis provides an important part of the bases for development of protective action recommendations in coordination with the applicable offsite state/local emergency response agencies.Enclosure 1 contains a copy of the MNGP ETE analysis.
Enclosure 2 contains recommendations as a result of the MNGP ETE analysis.
Document Control Desk L-MT-12-112 Page 2 Should you have any questions or if additional information is needed regarding this submittal, please contact Ms. Carrie Fosaaen, Licensing Engineer, at 763-295-1357.
Summary of Commitments This letter contains no new Regulatory Commitments and no revision to existing Regulatory Commitments.
Mark A. Schimmel Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company -Minnesota Enclosurel
-2012 Monticello Nuclear Generating Plant EPZ ETE Analysis Enclosure 2 -Monticello Nuclear Generating Plant ETE Recommendations cc: Administrator, Region III, USNRC Director, Office of Nuclear Reactor Regulation (NRR)NRR Project Manager, MNGP, USNRC Senior Resident Inspector, MNGP, USNRC