ML15292A564: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 69: Line 69:
Any document CASE referenced or excerpted without properly offering into the record as an exhibit should be stricken from the record in this matter. Tabl e 1 contains a listing of CASE's improperly submitted documents.
Any document CASE referenced or excerpted without properly offering into the record as an exhibit should be stricken from the record in this matter. Tabl e 1 contains a listing of CASE's improperly submitted documents.
Table 1 Documents Improperly Referenced or Reproduced in the CASE's Submission Page # Document Identified in Mandatory Disclosures?
Table 1 Documents Improperly Referenced or Reproduced in the CASE's Submission Page # Document Identified in Mandatory Disclosures?
CASE Statement  
CASE Statement (CS) at 8-9 Email from Dr. Christopher Kelble No CS at 12-14 "Origins and Delineation of Saltwater Intrusion in the Biscayne Aquifer and Changes in the Distribution of Saltwater in Miami-Dade County, Florida" Yes CS at 15 "Water, Water, Everywhere: Sea Level Rise in MiamiUniversity of Miami Rosenstiel School Of Marine and Atmospheric Science, Miami, http://www.rsmas.miami.edu/blog/2014/10/03/sea-level-rise-in-miami/"
 
(CS) at 8-9 Email from Dr. Christopher Kelble No CS at 12-14 "Origins and Delineation of Saltwater Intrusion in the Biscayne Aquifer and Changes in the Distribution of Saltwater in Miami-Dade County, Florida" Yes CS at 15 "Water, Water, Everywhere: Sea Level Rise in MiamiUniversity of Miami Rosenstiel School Of Marine and Atmospheric Science, Miami, http://www.rsmas.miami.edu/blog/2014/10/03/sea-level-rise-in-miami/"
No 20  See 10 C.F.R. § 2.337.
No 20  See 10 C.F.R. § 2.337.
6  Page # Document Identified in Mandatory Disclosures? CS at 17-18,  
6  Page # Document Identified in Mandatory Disclosures? CS at 17-18, 51, 77; Attachment  
 
51, 77; Attachment  


1 (AT1) at  
1 (AT1) at  


21 USGS Ground Water Atlas Of The United States Alabama, Florida, Georgia, South Carolina No CS at 28-30 Letter from C. Espinosa to M. Harris, "Application to Renew Turkey Point Industrial Wastewater Facility Permit number Fzl0001582 No CS at 32, 33 Florida Power and Light Company Docket No. 50-251 Facility Operating License, License No. DPR-41 April; 10.
21 USGS Ground Water Atlas Of The United States Alabama, Florida, Georgia, South Carolina No CS at 28-30 Letter from C. Espinosa to M. Harris, "Application to Renew Turkey Point Industrial Wastewater Facility Permit number Fzl0001582 No CS at 32, 33 Florida Power and Light Company Docket No. 50-251 Facility Operating License, License No. DPR-41 April; 10.
1973 ML013400438 ADAMS CS at 33; AT1 at 20,  
1973 ML013400438 ADAMS CS at 33; AT1 at 20, 26-28 Knowledge Of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances Sydney T. Bacchus Applied Environmental Services, P. O. Box 174, Athens, GA 30603; appliedenvirserv@mindspring.com https://www.nirs.org/nukere lapse/levy/exhf2bacchus.pd No CS at 37 Email from G. Burzycki, Subject "RE: FPL Cooling Canals" No CS at 38 Email from E. Alvear, Subject "Cormorant colony closest to FPL cooling canals undergoing severe decline" No CS at 38-40 Email from L. Otero, Subject " Uprate monitoring issues" Yes CS at 41 Email from L. Otero, Subject "CCS Surface Water TKN" Yes CS at 41 Email from C. Grossenbacher, Subject "FW:FPL Annual Crocodile Report" Yes CS at 42 Email from L. Otero, Subject "RE: Turkey Point Units 3&4 Uprate Addendum - Tritium Attachments: 2014 Post Uprate Report MDC Draft Comments" Yes CS at 42 Memorandum from L. Hefty L. to P. Coram Yes CS at 47 Message from F. Mazzoti to J. Wrublik Yes CS at 47 Ecology and Conservation of the American Crocodile (Crocodylus acutus) in Florida No CS at 47-48 Message from M. Pearce to S. Scroggs Yes CS at 48 Statement of P. Stoddard No CS at 48-50 Comments of Miami-Dade County on Draft Environmental Impact Statement for Turkey Point Units 6&7 ADAMS 7  Page # Document Identified in Mandatory Disclosures? CS at 56-57 Meeting Minutes of the South Florida Water Management District No CS at 63 July 25, 2014 NRC letter to the FWS the NRC requested consultation on the subject EA (ADAMS Accession No.  
 
26-28 Knowledge Of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances Sydney T. Bacchus Applied Environmental Services, P. O. Box 174, Athens, GA 30603; appliedenvirserv@mindspring.com https://www.nirs.org/nukere lapse/levy/exhf2bacchus.pd No CS at 37 Email from G. Burzycki, Subject "RE: FPL Cooling Canals" No CS at 38 Email from E. Alvear, Subject "Cormorant colony closest to FPL cooling canals undergoing severe decline" No CS at 38-40 Email from L. Otero, Subject " Uprate monitoring issues" Yes CS at 41 Email from L. Otero, Subject "CCS Surface Water TKN" Yes CS at 41 Email from C. Grossenbacher, Subject "FW:FPL Annual Crocodile Report" Yes CS at 42 Email from L. Otero, Subject "RE: Turkey Point Units 3&4 Uprate Addendum - Tritium Attachments: 2014 Post Uprate Report MDC Draft Comments" Yes CS at 42 Memorandum from L. Hefty L. to P. Coram Yes CS at 47 Message from F. Mazzoti to J. Wrublik Yes CS at 47 Ecology and Conservation of the American Crocodile (Crocodylus acutus) in Florida No CS at 47-48 Message from M. Pearce to S. Scroggs Yes CS at 48 Statement of P. Stoddard No CS at 48-50 Comments of Miami-Dade County on Draft Environmental Impact Statement for Turkey Point Units 6&7 ADAMS 7  Page # Document Identified in Mandatory Disclosures? CS at 56-57 Meeting Minutes of the South Florida Water Management District No CS at 63 July 25, 2014 NRC letter to the FWS the NRC requested consultation on the subject EA (ADAMS Accession No.  


ML14206A800) ADAMS CS at 67-68 Email from A. Gunderson  No CS at 68-69 Email to T. Hoeg; Email from T. Hoeg No CS at 75 Environmental Review Guidance for Licensing Actions Associated with NMSS Programs Division of Waste Management Office of Nuclear Material Safety and  
ML14206A800) ADAMS CS at 67-68 Email from A. Gunderson  No CS at 68-69 Email to T. Hoeg; Email from T. Hoeg No CS at 75 Environmental Review Guidance for Licensing Actions Associated with NMSS Programs Division of Waste Management Office of Nuclear Material Safety and  
Line 112: Line 106:
25  CASE Petition at 13 (emphasis added).
25  CASE Petition at 13 (emphasis added).
26  CASE Statement at 35-43.
26  CASE Statement at 35-43.
27  Id. at 43.
27  Id. at 43. 28  See Pet. at 15; LBP-15-13 (slip op. at 26-27).
28  See Pet. at 15; LBP-15-13 (slip op. at 26-27).
10  D. Bacchus Paper CASE excerpts the Abstract from a paper by Dr. Sydney Bacchus, entitled "Knowledge of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances."
10  D. Bacchus Paper CASE excerpts the Abstract from a paper by Dr. Sydney Bacchus, entitled "Knowledge of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances."
29  This paper discusses impacts to marine resources from activities such as the underground injection of wa stewater, aquife r storage and recovery, and mining and impacts related to disease, pathogens, antagonistic evolution and endocrine disruptors. CASE raised none of these issues in its Petition and none  was admitted by the Board as part of Contention 1.  
29  This paper discusses impacts to marine resources from activities such as the underground injection of wa stewater, aquife r storage and recovery, and mining and impacts related to disease, pathogens, antagonistic evolution and endocrine disruptors. CASE raised none of these issues in its Petition and none  was admitted by the Board as part of Contention 1.  
Line 142: Line 135:
monitored-") Alvear email regarding cormorants  Beginning of Page 41 End of Page 41 Otero email regarding TKN (Total Kjeldahl Nitrogen);
monitored-") Alvear email regarding cormorants  Beginning of Page 41 End of Page 41 Otero email regarding TKN (Total Kjeldahl Nitrogen);
Grossenbacher email regarding crocodiles Bottom of Page 42  
Grossenbacher email regarding crocodiles Bottom of Page 42  
("November 26,  
("November 26, 2014-) Top of page 43 ("emphasis added") Hefty memorandum to Coram regarding sampling for trace metals and nutrients Top of page 43  
 
2014-) Top of page 43 ("emphasis added") Hefty memorandum to Coram regarding sampling for trace metals and nutrients Top of page 43  
("As the citations  
("As the citations  


Line 206: Line 197:


31  With the exception of CASE Attachments 4, 5, and 6, as noted above.
31  With the exception of CASE Attachments 4, 5, and 6, as noted above.
13  V. CERTIFICATION  I certify that I have made a sincere effort to contact the other parties in this proceeding, to explain to them the factual and legal issues raised in this motion, and to resolve those issues, and I certify that my efforts have been unsuccessful
13  V. CERTIFICATION  I certify that I have made a sincere effort to contact the other parties in this proceeding, to explain to them the factual and legal issues raised in this motion, and to resolve those issues, and I certify that my efforts have been unsuccessful. Counsel for the NRC Staff does not oppose the motion.
. Counsel for the NRC Staff does not oppose the motion.
Respectfully Submitted, Signed (electronically) by Steven Hamrick Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220  
Respectfully Submitted,  
 
Signed (electronically) by Steven Hamrick Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220  


Washington, DC 20004 steven.hamrick@fpl.com  
Washington, DC 20004 steven.hamrick@fpl.com  
Line 246: Line 234:
2     
2     


Signed (electronically) by,
Signed (electronically) by,       ________________________________        Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220  
________________________________        Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220  


Washington, DC 20004 steven.hamrick@fpl.com  
Washington, DC 20004 steven.hamrick@fpl.com  
Line 308: Line 295:
Any document CASE referenced or excerpted without properly offering into the record as an exhibit should be stricken from the record in this matter. Tabl e 1 contains a listing of CASE's improperly submitted documents.
Any document CASE referenced or excerpted without properly offering into the record as an exhibit should be stricken from the record in this matter. Tabl e 1 contains a listing of CASE's improperly submitted documents.
Table 1 Documents Improperly Referenced or Reproduced in the CASE's Submission Page # Document Identified in Mandatory Disclosures?
Table 1 Documents Improperly Referenced or Reproduced in the CASE's Submission Page # Document Identified in Mandatory Disclosures?
CASE Statement  
CASE Statement (CS) at 8-9 Email from Dr. Christopher Kelble No CS at 12-14 "Origins and Delineation of Saltwater Intrusion in the Biscayne Aquifer and Changes in the Distribution of Saltwater in Miami-Dade County, Florida" Yes CS at 15 "Water, Water, Everywhere: Sea Level Rise in MiamiUniversity of Miami Rosenstiel School Of Marine and Atmospheric Science, Miami, http://www.rsmas.miami.edu/blog/2014/10/03/sea-level-rise-in-miami/"
 
(CS) at 8-9 Email from Dr. Christopher Kelble No CS at 12-14 "Origins and Delineation of Saltwater Intrusion in the Biscayne Aquifer and Changes in the Distribution of Saltwater in Miami-Dade County, Florida" Yes CS at 15 "Water, Water, Everywhere: Sea Level Rise in MiamiUniversity of Miami Rosenstiel School Of Marine and Atmospheric Science, Miami, http://www.rsmas.miami.edu/blog/2014/10/03/sea-level-rise-in-miami/"
No 20  See 10 C.F.R. § 2.337.
No 20  See 10 C.F.R. § 2.337.
6  Page # Document Identified in Mandatory Disclosures? CS at 17-18,  
6  Page # Document Identified in Mandatory Disclosures? CS at 17-18, 51, 77; Attachment  
 
51, 77; Attachment  


1 (AT1) at  
1 (AT1) at  


21 USGS Ground Water Atlas Of The United States Alabama, Florida, Georgia, South Carolina No CS at 28-30 Letter from C. Espinosa to M. Harris, "Application to Renew Turkey Point Industrial Wastewater Facility Permit number Fzl0001582 No CS at 32, 33 Florida Power and Light Company Docket No. 50-251 Facility Operating License, License No. DPR-41 April; 10.
21 USGS Ground Water Atlas Of The United States Alabama, Florida, Georgia, South Carolina No CS at 28-30 Letter from C. Espinosa to M. Harris, "Application to Renew Turkey Point Industrial Wastewater Facility Permit number Fzl0001582 No CS at 32, 33 Florida Power and Light Company Docket No. 50-251 Facility Operating License, License No. DPR-41 April; 10.
1973 ML013400438 ADAMS CS at 33; AT1 at 20,  
1973 ML013400438 ADAMS CS at 33; AT1 at 20, 26-28 Knowledge Of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances Sydney T. Bacchus Applied Environmental Services, P. O. Box 174, Athens, GA 30603; appliedenvirserv@mindspring.com https://www.nirs.org/nukere lapse/levy/exhf2bacchus.pd No CS at 37 Email from G. Burzycki, Subject "RE: FPL Cooling Canals" No CS at 38 Email from E. Alvear, Subject "Cormorant colony closest to FPL cooling canals undergoing severe decline" No CS at 38-40 Email from L. Otero, Subject " Uprate monitoring issues" Yes CS at 41 Email from L. Otero, Subject "CCS Surface Water TKN" Yes CS at 41 Email from C. Grossenbacher, Subject "FW:FPL Annual Crocodile Report" Yes CS at 42 Email from L. Otero, Subject "RE: Turkey Point Units 3&4 Uprate Addendum - Tritium Attachments: 2014 Post Uprate Report MDC Draft Comments" Yes CS at 42 Memorandum from L. Hefty L. to P. Coram Yes CS at 47 Message from F. Mazzoti to J. Wrublik Yes CS at 47 Ecology and Conservation of the American Crocodile (Crocodylus acutus) in Florida No CS at 47-48 Message from M. Pearce to S. Scroggs Yes CS at 48 Statement of P. Stoddard No CS at 48-50 Comments of Miami-Dade County on Draft Environmental Impact Statement for Turkey Point Units 6&7 ADAMS 7  Page # Document Identified in Mandatory Disclosures? CS at 56-57 Meeting Minutes of the South Florida Water Management District No CS at 63 July 25, 2014 NRC letter to the FWS the NRC requested consultation on the subject EA (ADAMS Accession No.  
 
26-28 Knowledge Of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances Sydney T. Bacchus Applied Environmental Services, P. O. Box 174, Athens, GA 30603; appliedenvirserv@mindspring.com https://www.nirs.org/nukere lapse/levy/exhf2bacchus.pd No CS at 37 Email from G. Burzycki, Subject "RE: FPL Cooling Canals" No CS at 38 Email from E. Alvear, Subject "Cormorant colony closest to FPL cooling canals undergoing severe decline" No CS at 38-40 Email from L. Otero, Subject " Uprate monitoring issues" Yes CS at 41 Email from L. Otero, Subject "CCS Surface Water TKN" Yes CS at 41 Email from C. Grossenbacher, Subject "FW:FPL Annual Crocodile Report" Yes CS at 42 Email from L. Otero, Subject "RE: Turkey Point Units 3&4 Uprate Addendum - Tritium Attachments: 2014 Post Uprate Report MDC Draft Comments" Yes CS at 42 Memorandum from L. Hefty L. to P. Coram Yes CS at 47 Message from F. Mazzoti to J. Wrublik Yes CS at 47 Ecology and Conservation of the American Crocodile (Crocodylus acutus) in Florida No CS at 47-48 Message from M. Pearce to S. Scroggs Yes CS at 48 Statement of P. Stoddard No CS at 48-50 Comments of Miami-Dade County on Draft Environmental Impact Statement for Turkey Point Units 6&7 ADAMS 7  Page # Document Identified in Mandatory Disclosures? CS at 56-57 Meeting Minutes of the South Florida Water Management District No CS at 63 July 25, 2014 NRC letter to the FWS the NRC requested consultation on the subject EA (ADAMS Accession No.  


ML14206A800) ADAMS CS at 67-68 Email from A. Gunderson  No CS at 68-69 Email to T. Hoeg; Email from T. Hoeg No CS at 75 Environmental Review Guidance for Licensing Actions Associated with NMSS Programs Division of Waste Management Office of Nuclear Material Safety and  
ML14206A800) ADAMS CS at 67-68 Email from A. Gunderson  No CS at 68-69 Email to T. Hoeg; Email from T. Hoeg No CS at 75 Environmental Review Guidance for Licensing Actions Associated with NMSS Programs Division of Waste Management Office of Nuclear Material Safety and  
Line 351: Line 332:
25  CASE Petition at 13 (emphasis added).
25  CASE Petition at 13 (emphasis added).
26  CASE Statement at 35-43.
26  CASE Statement at 35-43.
27  Id. at 43.
27  Id. at 43. 28  See Pet. at 15; LBP-15-13 (slip op. at 26-27).
28  See Pet. at 15; LBP-15-13 (slip op. at 26-27).
10  D. Bacchus Paper CASE excerpts the Abstract from a paper by Dr. Sydney Bacchus, entitled "Knowledge of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances."
10  D. Bacchus Paper CASE excerpts the Abstract from a paper by Dr. Sydney Bacchus, entitled "Knowledge of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances."
29  This paper discusses impacts to marine resources from activities such as the underground injection of wa stewater, aquife r storage and recovery, and mining and impacts related to disease, pathogens, antagonistic evolution and endocrine disruptors. CASE raised none of these issues in its Petition and none  was admitted by the Board as part of Contention 1.  
29  This paper discusses impacts to marine resources from activities such as the underground injection of wa stewater, aquife r storage and recovery, and mining and impacts related to disease, pathogens, antagonistic evolution and endocrine disruptors. CASE raised none of these issues in its Petition and none  was admitted by the Board as part of Contention 1.  
Line 381: Line 361:
monitored-") Alvear email regarding cormorants  Beginning of Page 41 End of Page 41 Otero email regarding TKN (Total Kjeldahl Nitrogen);
monitored-") Alvear email regarding cormorants  Beginning of Page 41 End of Page 41 Otero email regarding TKN (Total Kjeldahl Nitrogen);
Grossenbacher email regarding crocodiles Bottom of Page 42  
Grossenbacher email regarding crocodiles Bottom of Page 42  
("November 26,  
("November 26, 2014-) Top of page 43 ("emphasis added") Hefty memorandum to Coram regarding sampling for trace metals and nutrients Top of page 43  
 
2014-) Top of page 43 ("emphasis added") Hefty memorandum to Coram regarding sampling for trace metals and nutrients Top of page 43  
("As the citations  
("As the citations  


Line 445: Line 423:


31  With the exception of CASE Attachments 4, 5, and 6, as noted above.
31  With the exception of CASE Attachments 4, 5, and 6, as noted above.
13  V. CERTIFICATION  I certify that I have made a sincere effort to contact the other parties in this proceeding, to explain to them the factual and legal issues raised in this motion, and to resolve those issues, and I certify that my efforts have been unsuccessful
13  V. CERTIFICATION  I certify that I have made a sincere effort to contact the other parties in this proceeding, to explain to them the factual and legal issues raised in this motion, and to resolve those issues, and I certify that my efforts have been unsuccessful. Counsel for the NRC Staff does not oppose the motion.
. Counsel for the NRC Staff does not oppose the motion.
Respectfully Submitted, Signed (electronically) by Steven Hamrick Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220  
Respectfully Submitted,  
 
Signed (electronically) by Steven Hamrick Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220  


Washington, DC 20004 steven.hamrick@fpl.com  
Washington, DC 20004 steven.hamrick@fpl.com  
Line 485: Line 460:
2     
2     


Signed (electronically) by,
Signed (electronically) by,       ________________________________        Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220  
________________________________        Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220  


Washington, DC 20004 steven.hamrick@fpl.com  
Washington, DC 20004 steven.hamrick@fpl.com  

Revision as of 21:18, 8 July 2018

FPL Motion to Strike Portions of Case'S Initial Statement
ML15292A564
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/19/2015
From: Hamrick S C
Florida Power & Light Co
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-250-LA, 50-251-LA, ASLBP 15-935-02-LA-BD01, RAS 28401
Download: ML15292A564 (15)


Text

1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

Florida Power & Light Company ) Docket No. 50-250-LA

) 50-251-LA (Turkey Point Units 3 and 4) )

) ASLBP No. 15-935-02-LA-BD01

FLORIDA POWER & LIGHT COMPANY'S MO TION TO STRIKE PORTIONS OF CASE'S "INITIAL STATEMENT OF POSITION, TESTIMONY, AFFIDAVITS AND EXHIBITS" OR, IN THE ALTERNATIVE, MOTION IN LIMINE TO EXCLUDE IT AND ITS CITED DOCUMENTS FROM EVIDENCE Pursuant to 10 C.F.R. §§ 2.319, 2.323, and 2.337, and in accordance with the Licensing Board's ("Board") Scheduling Order of May 8, 2015, Florida Power & Light Company ("FPL") files this motion to strike portions of the "Citizens Allied For Safe Energy ['CASE'] Initial Statement of Position, Testimony, Affidavits and Exhibits" (the "CASE Statement") and attached documents because they raise issues beyond the scope of Contention 1, include opinions and exhibits not properly sponsored by an expert, and include exhibits no t properly disclosed or introduced into the record. In the alternative, FPL also files this motion in limine to exclude these materials from evidence.

Although captioned as including "testimony [and] affidavits," the CASE filing is simply a statement of position and does not contain any sworn expert testimony. The CASE Statement and the documents referenced in and attached thereto are technical in nature and are not supported by a qualified witness and thus, should not be considered evidence. In addition, significant portions of the CASE Statement and its cited documents raise issues beyond the limited scope of Contention 1 as admitted by the Board in this proceeding. Because the 2 Commission's rules makes clear that arguments and exhibits that address matters beyond the scope of an admitted Contention or are unsupported by a qualified witness are inadmissible, or in the alternative should be excluded from the record, the Board should grant FPL's motion.

I. NRC EVIDENCE ADMISSIBILITY STANDARDS A. The Board's Authority to Regulate Arguments and Evidence Commission rules allow "[o]nly relevant, material, and reliable evidence" to be admitted into evidence."

1 Thus, the Board may "strike any portion of a written presentation or a response to a written question that is irrelevant, immaterial, unreliable, duplicative or cumulative."

2 And, in the alternative, the Board may restrict evidence or arguments for the same reasons.

3 B. Rules Governing Arguments and Evidence Technical opinion testimony must be sponsored by a qualified expert with the "knowledge, skill, experience, training, or education to testify."

4 Non-expert testimony on a technical issue is accorded no weight.

5 Further, a non-expert cannot sponsor techni cal analyses for admission as evidence.

6 Finally, exhibits submitted to support testimony should be either an original or a copy, not cut and pasted into another document.

7 These procedural standards are fully applicable to CASE, despite the fact the organization has chosen to proceed without an attorney. The Commission has previously held in another proceeding involving a pro se intervenor that parties in NRC proceedings must include as exhibits all documents that a party

1 10 C.F.R. § 2.337(a).

2 10 C.F.R. § 2.319(d).

3 10 C.F.R. § 2.319(e).

4 Duke Energy Corporation (Catawba Nuclear Station, Units 1 and 2), CLI-04-21, 60 NRC 21, 27 (2004) (citations omitted), citing Duke Power Co. (William B. McGuire Nuclear Station, Units 1 and 2), ALAB-669, 15 NRC 453, 475 (1982).

5 Texas Utilities Electric Co. (Comanche Peak Steam Electric Station, Units 1 and 2), LBP-84-55, 20 NRC 1646, 1651 (1984).

6 Southern California Edison Co. (San Onofre Nuclear Generating Station, Units 2 and 3), ALAB-717, 17 NRC 346, 367 (1983).

7 See 10 C.F.R. § 2.337(d).

3 relies upon.

8 There, the Commission specifically provided guidance "[f]or future proceedings," such as the one currently before the Board, to "make clear that documents or other evidence referenced in parties' briefs must be available in the case record [because] Boards and the Commission should not be expected to consider items ne ver provided on the record."

9 C. Rules Governing the Scope of Issues Addressed in Arguments and Evidence There are also significant limitations on the scope of the subject matter that a party may address at hearing. Intervenors cannot expand the scope of an admitted contention beyond the specific bases proffered and accepted by the Board.

10 As the Commission has explained, "[t]he scope of a contention is limited to issues of law and fact pled with particularity in the intervention petition, including its stated bases, unless the contention is satisfactorily amended in accordance with [its] rules. Otherwise, NRC adjudications quickly would lose order."

11 This standard allows both the parties and the Board to be on notice of the issues being litigated and ensures focused and fair proceedings.

12 In Pilgrim, the Commission reiterated that longstanding precedent requires a Board to examine a contention's bases to determine the scope of a contention because the "reach of a contention necessarily hinges upon its terms coupled with its stated bases."

13 Intervenors "may not freely change the focus of an admitted contention at will to add a host of new issues and objections that could have been raised at the outset. . . . [The Commission does] not allow distinctly new complaints to be added at will as litigation progresses."

14 8 Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287 (slip op. at 25 n.97) (2010).

9 Id. 10 Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), CLI-10-5, 71 NRC 90, 100-01 (2010).

11 Id (emphasis added).

12 Id. 13 Pilgrim, CLI-10-11 (slip op. at 28) (emphasis added).

14 Id.

4 II. PORTIONS OF THE CASE STATEMENT AND ACCOMPANYING DOCUMENTS SHOULD BE STRICKEN The CASE Statement, despite being labeled by CASE as containing the Statement of Position, testimony, and exhibits, should not be considered pre-filed testimony or evidence of any kind because it consists entirely of unsupported argument and technical references not appropriately sponsored by a qualified expert with the "knowledge, skill, experience, training, or education to testify."

15 CASE has provided no evidence that Mr. White is an expert in the technical areas that form the bases of the arguments advanced in the CASE Statement. Indeed, CASE readily admitted that it had provided absolutely no expert testimony whatsoever in support of its proffered opinions.

16 Accordingly, the entirety of the CASE Statement is merely CASE's summation of its position and, because it does not meet established Commission standards, FPL objects to the admission of the CASE Statement or any of the documents excerpted therein as evidence in this proceeding.

17 For similar reasons, the Board should strike CASE Attachment 1 (ostensibly Exhibit INT-001), which appears to be a report prepared by Mr. White, as evidence in this proceeding, because it was not sponsored into evidence by an expert. CASE Attachments 2 and 3 (Exhibits INT-002 and INT-003) suffer from this same defect.

18 Many of the documents CASE includes in its Statement were also not properly introduced as exhibits into the record.

19 Both the CASE Statement and its Attachment 1 reference numerous documents not contained in the record nor provided by CASE in its mandatory disclosures. Instead, the CASE Statement impermissibly cites by reference to multiple external, non-record documents, cutting and pasting from them liberally, often with no

15 See Catawba, CLI-04-21, 60 NRC at 27.

16 CASE Statement at 5.

17 See 10 C.F.R. § 2.319(d).

18 FPL does not object to CASE Attachments 4 (Florida Department of Environmental Protection Administrative Order), 5 (Miami-Dade County Notice of Violation), and 6 (Consent Agreement Between Miami-Dade County and FPL), which are public records.

19 See Pilgrim, CLI-10-11 (slip op. at 25 n.97).

5 clear indication where one excerpted passage ends and another begins. Similarly, the CASE Statement includes cut and pasted information from various emails and memoranda without providing the whole document to provide context for the parties and Board to determine their veracity and relevance. Admissible exhibits should either be an original or a copy, and cannot be simple cut and paste portions of other documents.

20 In its Scheduling Order, the Board provided specific, detailed instruction regarding the presentation of exhibits at hearing, and CASE has ignored both the Board's instructions and the Commission's rules. Further, as shown in more detail Table 1 below, CASE also failed to identify all of these external, non-record documents in its mandatory disclosures, forcing FPL to seek complete, original versions of some of the documents from alternative sources.

Any document CASE referenced or excerpted without properly offering into the record as an exhibit should be stricken from the record in this matter. Tabl e 1 contains a listing of CASE's improperly submitted documents.

Table 1 Documents Improperly Referenced or Reproduced in the CASE's Submission Page # Document Identified in Mandatory Disclosures?

CASE Statement (CS) at 8-9 Email from Dr. Christopher Kelble No CS at 12-14 "Origins and Delineation of Saltwater Intrusion in the Biscayne Aquifer and Changes in the Distribution of Saltwater in Miami-Dade County, Florida" Yes CS at 15 "Water, Water, Everywhere: Sea Level Rise in MiamiUniversity of Miami Rosenstiel School Of Marine and Atmospheric Science, Miami, http://www.rsmas.miami.edu/blog/2014/10/03/sea-level-rise-in-miami/"

No 20 See 10 C.F.R. § 2.337.

6 Page # Document Identified in Mandatory Disclosures? CS at 17-18, 51, 77; Attachment

1 (AT1) at

21 USGS Ground Water Atlas Of The United States Alabama, Florida, Georgia, South Carolina No CS at 28-30 Letter from C. Espinosa to M. Harris, "Application to Renew Turkey Point Industrial Wastewater Facility Permit number Fzl0001582 No CS at 32, 33 Florida Power and Light Company Docket No. 50-251 Facility Operating License, License No. DPR-41 April; 10.

1973 ML013400438 ADAMS CS at 33; AT1 at 20, 26-28 Knowledge Of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances Sydney T. Bacchus Applied Environmental Services, P. O. Box 174, Athens, GA 30603; appliedenvirserv@mindspring.com https://www.nirs.org/nukere lapse/levy/exhf2bacchus.pd No CS at 37 Email from G. Burzycki, Subject "RE: FPL Cooling Canals" No CS at 38 Email from E. Alvear, Subject "Cormorant colony closest to FPL cooling canals undergoing severe decline" No CS at 38-40 Email from L. Otero, Subject " Uprate monitoring issues" Yes CS at 41 Email from L. Otero, Subject "CCS Surface Water TKN" Yes CS at 41 Email from C. Grossenbacher, Subject "FW:FPL Annual Crocodile Report" Yes CS at 42 Email from L. Otero, Subject "RE: Turkey Point Units 3&4 Uprate Addendum - Tritium Attachments: 2014 Post Uprate Report MDC Draft Comments" Yes CS at 42 Memorandum from L. Hefty L. to P. Coram Yes CS at 47 Message from F. Mazzoti to J. Wrublik Yes CS at 47 Ecology and Conservation of the American Crocodile (Crocodylus acutus) in Florida No CS at 47-48 Message from M. Pearce to S. Scroggs Yes CS at 48 Statement of P. Stoddard No CS at 48-50 Comments of Miami-Dade County on Draft Environmental Impact Statement for Turkey Point Units 6&7 ADAMS 7 Page # Document Identified in Mandatory Disclosures? CS at 56-57 Meeting Minutes of the South Florida Water Management District No CS at 63 July 25, 2014 NRC letter to the FWS the NRC requested consultation on the subject EA (ADAMS Accession No.

ML14206A800) ADAMS CS at 67-68 Email from A. Gunderson No CS at 68-69 Email to T. Hoeg; Email from T. Hoeg No CS at 75 Environmental Review Guidance for Licensing Actions Associated with NMSS Programs Division of Waste Management Office of Nuclear Material Safety and

Safeguards (ML032450279) ADAMS CS at 79-80; AT1 at 25 Statement from National Park Service website No AT1 at 1-8 What Is Saltwater Intrusion? Saltwater Intrusion of Coastal Aquifers in the U.S. James Spatafo Johnson State College Senior Seminar May 6, 2008T

http://kanat.jsc.vsc.edu/student/spatafora/setup.htm Yes AT1 at 8 http://www.rsmas.miam i.edu/blog/2014/10/03/sea-level-rise-in-miami/

No AT1 at 8 Emergency Order No. 2015-034-DAO-WU [PDF] -South- www.sfwmd.gov/...sfwmd.../f Yes AT1 at 9, 28 Dolan Study No AT1 at 9-10 Borehole geophysical loggi ng for the Florida Power & Light Turkey Point Plant groundwater, surface water, and ecological monitoring plan No AT1 at 10-12 Origins and Delineation of Saltwater Intrusion in the Biscayne Aquifer and Changes in the Distribution of Saltwater in Miami-Dade County, Florida Yes AT1 at 14-18 usgs summary and conclusions No AT1 at 18-20 McNeill, Donald F., 2000. A Review of Upward Migration of Effluent Related to Subsurface Injection at Miami-Dade Water and Sewer South District Plant.

No AT1 at 21-24 Biological Assessment on the American Crocodile (Crocodylus acutus) Turkey Po int Nuclear Generating Unit Nos. 3 and 4 Proposed License Amendment to Increase the ADAMS 8 Page # Document Identified in Mandatory Disclosures? Ultimate Heat Sink Temperature Limit July 2014 AT1 at 24 Hughes, J.D., Langevin, C.D., and Brakefield-Goswami, Linzy, 2010, Effect of hypersal ine cooling canals on aquifer salinization: Hydrogeol ogy Journal, v. 18, p. 25-38.

No AT1 at 24 Turkey Point Unit 1 Eco System By Russ Finley On Mar 3, 2015 with 14 Responses Yes III. SIGNIFICANT PORTIONS OF THE CASE STATEMENT AN D ITS EXHIBITS ARE BEYOND THE SCOPE OF CONTENTION 1 AND SHOULD BE STRICKEN Because the Board is empowered to "[r]estrict irrelevant, immaterial, unreliable, duplicative or cumulative evidence and/or arguments,"

21 those portions of the CASE Statement and attachments that go beyond the limited scope of Contention 1, as admitted, should also, in

addition to the reasons set forth above, be stricken as irrelevant and immaterial arguments. CASE Contention 1, as reformulated and subsequently admitted by the Board, alleges that the NRC's Environmental Assesment ("EA") "does not adequately address the impact of increased temperature and salinity in the [cooling canal system ("CCS")] on saltwater intrusion arising from: (1) migration out of the CCS; and (2) the withdrawal of fresh water from surrounding aquifers to mitigate conditions within the CCS."

22 Essentially, the contention alleges that the increase in ultimate heat sink temperature allowed by the license amendment will lead to an increase in average temperature in the CCS and a resultant increase in CCS salinity. According to the contention, this heightened CCS salinity, in turn, will exacerbate saltwater intrusion both by direct migration out of the CCS and by operation of FPL's CCS mitigation measures.

21 10 C.F.R. § 2.319(e).

22 LBP-15-13 (slip op. at 24) (emphasis added).

9 A. Biscayne Bay The CASE Statement argues, for the first time, that CCS water may impact the water of Biscayne Bay, as opposed to the Biscayne Aquifer, which underlies both Biscayne Bay and the Turkey Point site.

23 Neither CASE's Petition nor its Reply ever asserted that hypersaline water from the CCS would intrude into Biscayne Bay.

24 In its Petition, CASE cited a document discussing the "high salinity groundwater plume from the cooling canals as it moves to the east under the Bay

."25 CASE certainly never argued that CCS water would affect Biscayne Bay.

Thus, the scope of the CASE contention should exclude impacts to Biscayne Bay. B. Need for Monitoring The CASE Statement also devotes a considerable amount of attention to the alleged failure of the EA to properly address monitoring, including several pages of emails from Miami-Dade County representatives.

26 The CASE Petition and the admitted contention do not include consideration of this issue.

C. Impact of Algae Remediation on Crocodiles The CASE Statement alleges that the EA failed to properly consider the impacts of copper sulfate on crocodiles.

27 Although this claim was raised in CASE's original petition, the Board expressly rejected this allegation because the EA does, in fact, discuss this issue.

28 23 See, e.g., CASE Statement at 8-9, 81.

24 At the prehearing conference, Mr. White engaged in a lengthy discussion with Judge Kennedy regarding the results of FPL monitoring wells at location TPGW-10, shown in slide 8 to CASE Petition Exhibit 1.

See Tr. at 109-115, discussing CASE Pet. Ex. 1 at 8. As demonstrated in that slide and in Mr. White's discussion, the slide represents three wells at various depths in the ground near the Biscayne Bay shoreline, with the higher values of the dense hypersaline water in the deepest part of the aquifer as would be expected. None of these groundwater readings involved measurements in the Bay itself. See also Pet. Ex. 1 at 7 and 9 (providing "contours based on deep well tritium results") (emphasis added).

25 CASE Petition at 13 (emphasis added).

26 CASE Statement at 35-43.

27 Id. at 43. 28 See Pet. at 15; LBP-15-13 (slip op. at 26-27).

10 D. Bacchus Paper CASE excerpts the Abstract from a paper by Dr. Sydney Bacchus, entitled "Knowledge of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances."

29 This paper discusses impacts to marine resources from activities such as the underground injection of wa stewater, aquife r storage and recovery, and mining and impacts related to disease, pathogens, antagonistic evolution and endocrine disruptors. CASE raised none of these issues in its Petition and none was admitted by the Board as part of Contention 1.

E. General NEPA Considerations Finally, CASE devotes a large section of its Statement to a discussion of general NEPA principles not presented in its Petition.

30 Among other out-of-scope issues, CASE discusses the NRC's considerations of alternatives, evaluation of unresolved conflicts, consultation with other agencies, and the speed with which the NRC completed its review. None of these issues were raised by CASE or admitted by the Board. F. Identification of Beyond-Scope Arguments Table 2 provides a page-by-page identification of these beyond-scope arguments. Because these arguments were not included in Contention 1 as admitted, the Board should strike them as irrelevant.

29 CASE Statement at 33-35; Attachment 1 at 26-28.

30 CASE Statement at 58-82.

11 Table 2 CASE Arguments and Exhibits Addressing Matters Beyond the Scope of Contention 1 Beginning Location Ending Location Description of Beyond-Scope Argument CASE Statement Top of page 8

("In one email-") Top of Page 9 ("...temperature of

35C") Email regarding fish habitat in Biscayne Bay Bottom of page 33 ("Perhaps the

strongest-")

Middle of Page 35 ("Industrial Waste

Facility (IWF).") Bacchus Report on impact on endangered species due to groundwater alterations with respect to pathogens, underground injection, endocrine disruptors, and microbes. Bottom of Page 35

("Monitoring")

Middle of Page 37

("-could be

monitored.") Discussion of need for NRC to require additional monitoring Beginning of Page

38 Middle of Page 38 ("-regularly

monitored-") Alvear email regarding cormorants Beginning of Page 41 End of Page 41 Otero email regarding TKN (Total Kjeldahl Nitrogen);

Grossenbacher email regarding crocodiles Bottom of Page 42

("November 26, 2014-) Top of page 43 ("emphasis added") Hefty memorandum to Coram regarding sampling for trace metals and nutrients Top of page 43

("As the citations

-" Bottom of page 43 ("-specifically that it

does.") Allegation that the NRC fails to discuss impacts of copper su lfate on crocodiles Top of Page 46

("Crocodiles and wildlife in the CCS")

Middle of Page 50 ("as a regulatory action?") Discussion of crocodiles and wildlife, including emails Bottom of Page 61

("NEPA:

Consultation with

Other Agencies")

Middle of Page 64 ("FPL statements accepted as fact.") Discussion of NRC consultation with other agencies, including US Fish and Wildlife

Service Bottom of Page 64 "NEPA: Health and

Welfare of Man")

Middle of Page 65 ("- did not consider these concerns.") Discussion of whether the EA addressed health and welfare Middle of Page 65 (NEPA: Consider Alterative Actions") End of Page 69; continuing at beginning of Page 71 to the middle of Page 72

("-be asked.") Discussion of alternatives and grid reliability/shutting down reactors, including Gunderson and Hoeg emails. Bottom of Page 73

("NEPA: Unresolved Conflicts Over

Resources")

Middle of Page 75

("-resource like

freshwater.")

Discussion of conflicts over resources 12 Beginning Location Ending Location Description of Beyond-Scope Argument Middle of Page 75

("NEPA: Major

Federal Actions") End of page 76 Argument that the administration of the Cooling Canals is a major federal action Beginning of page

81 Middle of page 81

("-.2014 EA.") Discussion of impact on Biscayne Bay Bottom of Page 81 ("Speed of the 2014

EA") Middle of page 82

("-18 day EA") Discussion of the speed of the NRC Staff's review Attachment 1 Bottom of Page 18

("Dr. Donald McNeil") Top of Page 20

("-Sierra Club -

Miami Group. 30 p.)

McNeil Report on underground injection of effluents into the Boulder Zone of the Lower

Floridan Aquifer Bottom of Page 24

("Turkey Point Unit 1 Eco System")

Middle of Page 25

("-see the real n")

Blog post discussing impact on crocodiles Bottom of page 25 ("The National Park

website states-" End of page 25 Discussion of Biscayne Bay estuary Beginning of page 26 Bottom of page 28

("Endeditableow_

ThesespageEndedita

bleow_ThesespageGrid Reliability") Bacchus Report on impacts to marine species from underground effluent injection, aquifer storage and recovery, and mining Bottom of Page 28

("Tara Dolan study") End of Page 28 Thesis addressing impacts to mangroves and habitats IV. CONCLUSION For the foregoing reasons, significant portions of the cited references in the CASE Statement and Attachment 1 should be stricken because they were not properly included in the record as exhibits. Further, no portion of the CASE Statement or any of its technical attachments should be considered as evidence because they were not sponsored by an expert.

31 Finally, any argument or exhibit that addresses issues beyond the scope of CASE Contention 1 as pled and admitted, should be stricken. In the alternative, FPL moves the Board to limit these materials by excluding them from evidence.

31 With the exception of CASE Attachments 4, 5, and 6, as noted above.

13 V. CERTIFICATION I certify that I have made a sincere effort to contact the other parties in this proceeding, to explain to them the factual and legal issues raised in this motion, and to resolve those issues, and I certify that my efforts have been unsuccessful. Counsel for the NRC Staff does not oppose the motion.

Respectfully Submitted, Signed (electronically) by Steven Hamrick Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220

Washington, DC 20004 steven.hamrick@fpl.com

202-349-3496

William S. Blair Erin Walkowiak Florida Power & Light Company

700 Universe Blvd.

Juno Beach, Florida 33408 william.blair@fpl.com erin.walkowiak@fpl.com

561-304-5238

October 19, 2015 COUNSEL FOR FLORIDA POWER & LIGHT COMPANY

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

Florida Power & Light Company ) Docket No. 50-250-LA

) 50-251-LA (Turkey Point Units 3 and 4) )

) ASLBP No. 15-935-02-LA-BD01

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing "Florida Power & Light Company's Motion to Strike Portions of CASE's "Initial Statement of Position, Testimony, Affidavits and Exhibits" or, in the Alternative, Motion in Limine to Exclude it and its Cited Documents from Evidence," were provided to the Electronic Information Exchange for service to those individuals listed below and others on the service list in this proceeding, and via e-mail to those marked with an asterisk.

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Office of the General Counsel Mail Stop: T-3F23 Mail Stop: O-15D21 Washington, DC 20555-0001 Washington, DC 20555-0001 Michael M. Gibson, Chair Brian Harris, Esq.

Dr. William W. Sager David Roth, Esq.

Dr. Michael F. Kennedy Catherine Kanatas, Esq.

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-16C1 Mail Stop: O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 OCAA Mail Center Hearing Docket

Barry White*

Citizens Allied for Safe Energy, Inc.

1001 SW 129 Terrace Miami, FL 33176

2

Signed (electronically) by, ________________________________ Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220

Washington, DC 20004 steven.hamrick@fpl.com

202-349-3496 Dated at Washington, DC

this 19th day of October, 2015

1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

Florida Power & Light Company ) Docket No. 50-250-LA

) 50-251-LA (Turkey Point Units 3 and 4) )

) ASLBP No. 15-935-02-LA-BD01

FLORIDA POWER & LIGHT COMPANY'S MO TION TO STRIKE PORTIONS OF CASE'S "INITIAL STATEMENT OF POSITION, TESTIMONY, AFFIDAVITS AND EXHIBITS" OR, IN THE ALTERNATIVE, MOTION IN LIMINE TO EXCLUDE IT AND ITS CITED DOCUMENTS FROM EVIDENCE Pursuant to 10 C.F.R. §§ 2.319, 2.323, and 2.337, and in accordance with the Licensing Board's ("Board") Scheduling Order of May 8, 2015, Florida Power & Light Company ("FPL") files this motion to strike portions of the "Citizens Allied For Safe Energy ['CASE'] Initial Statement of Position, Testimony, Affidavits and Exhibits" (the "CASE Statement") and attached documents because they raise issues beyond the scope of Contention 1, include opinions and exhibits not properly sponsored by an expert, and include exhibits no t properly disclosed or introduced into the record. In the alternative, FPL also files this motion in limine to exclude these materials from evidence.

Although captioned as including "testimony [and] affidavits," the CASE filing is simply a statement of position and does not contain any sworn expert testimony. The CASE Statement and the documents referenced in and attached thereto are technical in nature and are not supported by a qualified witness and thus, should not be considered evidence. In addition, significant portions of the CASE Statement and its cited documents raise issues beyond the limited scope of Contention 1 as admitted by the Board in this proceeding. Because the 2 Commission's rules makes clear that arguments and exhibits that address matters beyond the scope of an admitted Contention or are unsupported by a qualified witness are inadmissible, or in the alternative should be excluded from the record, the Board should grant FPL's motion.

I. NRC EVIDENCE ADMISSIBILITY STANDARDS A. The Board's Authority to Regulate Arguments and Evidence Commission rules allow "[o]nly relevant, material, and reliable evidence" to be admitted into evidence."

1 Thus, the Board may "strike any portion of a written presentation or a response to a written question that is irrelevant, immaterial, unreliable, duplicative or cumulative."

2 And, in the alternative, the Board may restrict evidence or arguments for the same reasons.

3 B. Rules Governing Arguments and Evidence Technical opinion testimony must be sponsored by a qualified expert with the "knowledge, skill, experience, training, or education to testify."

4 Non-expert testimony on a technical issue is accorded no weight.

5 Further, a non-expert cannot sponsor techni cal analyses for admission as evidence.

6 Finally, exhibits submitted to support testimony should be either an original or a copy, not cut and pasted into another document.

7 These procedural standards are fully applicable to CASE, despite the fact the organization has chosen to proceed without an attorney. The Commission has previously held in another proceeding involving a pro se intervenor that parties in NRC proceedings must include as exhibits all documents that a party

1 10 C.F.R. § 2.337(a).

2 10 C.F.R. § 2.319(d).

3 10 C.F.R. § 2.319(e).

4 Duke Energy Corporation (Catawba Nuclear Station, Units 1 and 2), CLI-04-21, 60 NRC 21, 27 (2004) (citations omitted), citing Duke Power Co. (William B. McGuire Nuclear Station, Units 1 and 2), ALAB-669, 15 NRC 453, 475 (1982).

5 Texas Utilities Electric Co. (Comanche Peak Steam Electric Station, Units 1 and 2), LBP-84-55, 20 NRC 1646, 1651 (1984).

6 Southern California Edison Co. (San Onofre Nuclear Generating Station, Units 2 and 3), ALAB-717, 17 NRC 346, 367 (1983).

7 See 10 C.F.R. § 2.337(d).

3 relies upon.

8 There, the Commission specifically provided guidance "[f]or future proceedings," such as the one currently before the Board, to "make clear that documents or other evidence referenced in parties' briefs must be available in the case record [because] Boards and the Commission should not be expected to consider items ne ver provided on the record."

9 C. Rules Governing the Scope of Issues Addressed in Arguments and Evidence There are also significant limitations on the scope of the subject matter that a party may address at hearing. Intervenors cannot expand the scope of an admitted contention beyond the specific bases proffered and accepted by the Board.

10 As the Commission has explained, "[t]he scope of a contention is limited to issues of law and fact pled with particularity in the intervention petition, including its stated bases, unless the contention is satisfactorily amended in accordance with [its] rules. Otherwise, NRC adjudications quickly would lose order."

11 This standard allows both the parties and the Board to be on notice of the issues being litigated and ensures focused and fair proceedings.

12 In Pilgrim, the Commission reiterated that longstanding precedent requires a Board to examine a contention's bases to determine the scope of a contention because the "reach of a contention necessarily hinges upon its terms coupled with its stated bases."

13 Intervenors "may not freely change the focus of an admitted contention at will to add a host of new issues and objections that could have been raised at the outset. . . . [The Commission does] not allow distinctly new complaints to be added at will as litigation progresses."

14 8 Entergy Nuclear Generation Co. and Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287 (slip op. at 25 n.97) (2010).

9 Id. 10 Southern Nuclear Operating Co. (Early Site Permit for Vogtle ESP Site), CLI-10-5, 71 NRC 90, 100-01 (2010).

11 Id (emphasis added).

12 Id. 13 Pilgrim, CLI-10-11 (slip op. at 28) (emphasis added).

14 Id.

4 II. PORTIONS OF THE CASE STATEMENT AND ACCOMPANYING DOCUMENTS SHOULD BE STRICKEN The CASE Statement, despite being labeled by CASE as containing the Statement of Position, testimony, and exhibits, should not be considered pre-filed testimony or evidence of any kind because it consists entirely of unsupported argument and technical references not appropriately sponsored by a qualified expert with the "knowledge, skill, experience, training, or education to testify."

15 CASE has provided no evidence that Mr. White is an expert in the technical areas that form the bases of the arguments advanced in the CASE Statement. Indeed, CASE readily admitted that it had provided absolutely no expert testimony whatsoever in support of its proffered opinions.

16 Accordingly, the entirety of the CASE Statement is merely CASE's summation of its position and, because it does not meet established Commission standards, FPL objects to the admission of the CASE Statement or any of the documents excerpted therein as evidence in this proceeding.

17 For similar reasons, the Board should strike CASE Attachment 1 (ostensibly Exhibit INT-001), which appears to be a report prepared by Mr. White, as evidence in this proceeding, because it was not sponsored into evidence by an expert. CASE Attachments 2 and 3 (Exhibits INT-002 and INT-003) suffer from this same defect.

18 Many of the documents CASE includes in its Statement were also not properly introduced as exhibits into the record.

19 Both the CASE Statement and its Attachment 1 reference numerous documents not contained in the record nor provided by CASE in its mandatory disclosures. Instead, the CASE Statement impermissibly cites by reference to multiple external, non-record documents, cutting and pasting from them liberally, often with no

15 See Catawba, CLI-04-21, 60 NRC at 27.

16 CASE Statement at 5.

17 See 10 C.F.R. § 2.319(d).

18 FPL does not object to CASE Attachments 4 (Florida Department of Environmental Protection Administrative Order), 5 (Miami-Dade County Notice of Violation), and 6 (Consent Agreement Between Miami-Dade County and FPL), which are public records.

19 See Pilgrim, CLI-10-11 (slip op. at 25 n.97).

5 clear indication where one excerpted passage ends and another begins. Similarly, the CASE Statement includes cut and pasted information from various emails and memoranda without providing the whole document to provide context for the parties and Board to determine their veracity and relevance. Admissible exhibits should either be an original or a copy, and cannot be simple cut and paste portions of other documents.

20 In its Scheduling Order, the Board provided specific, detailed instruction regarding the presentation of exhibits at hearing, and CASE has ignored both the Board's instructions and the Commission's rules. Further, as shown in more detail Table 1 below, CASE also failed to identify all of these external, non-record documents in its mandatory disclosures, forcing FPL to seek complete, original versions of some of the documents from alternative sources.

Any document CASE referenced or excerpted without properly offering into the record as an exhibit should be stricken from the record in this matter. Tabl e 1 contains a listing of CASE's improperly submitted documents.

Table 1 Documents Improperly Referenced or Reproduced in the CASE's Submission Page # Document Identified in Mandatory Disclosures?

CASE Statement (CS) at 8-9 Email from Dr. Christopher Kelble No CS at 12-14 "Origins and Delineation of Saltwater Intrusion in the Biscayne Aquifer and Changes in the Distribution of Saltwater in Miami-Dade County, Florida" Yes CS at 15 "Water, Water, Everywhere: Sea Level Rise in MiamiUniversity of Miami Rosenstiel School Of Marine and Atmospheric Science, Miami, http://www.rsmas.miami.edu/blog/2014/10/03/sea-level-rise-in-miami/"

No 20 See 10 C.F.R. § 2.337.

6 Page # Document Identified in Mandatory Disclosures? CS at 17-18, 51, 77; Attachment

1 (AT1) at

21 USGS Ground Water Atlas Of The United States Alabama, Florida, Georgia, South Carolina No CS at 28-30 Letter from C. Espinosa to M. Harris, "Application to Renew Turkey Point Industrial Wastewater Facility Permit number Fzl0001582 No CS at 32, 33 Florida Power and Light Company Docket No. 50-251 Facility Operating License, License No. DPR-41 April; 10.

1973 ML013400438 ADAMS CS at 33; AT1 at 20, 26-28 Knowledge Of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances Sydney T. Bacchus Applied Environmental Services, P. O. Box 174, Athens, GA 30603; appliedenvirserv@mindspring.com https://www.nirs.org/nukere lapse/levy/exhf2bacchus.pd No CS at 37 Email from G. Burzycki, Subject "RE: FPL Cooling Canals" No CS at 38 Email from E. Alvear, Subject "Cormorant colony closest to FPL cooling canals undergoing severe decline" No CS at 38-40 Email from L. Otero, Subject " Uprate monitoring issues" Yes CS at 41 Email from L. Otero, Subject "CCS Surface Water TKN" Yes CS at 41 Email from C. Grossenbacher, Subject "FW:FPL Annual Crocodile Report" Yes CS at 42 Email from L. Otero, Subject "RE: Turkey Point Units 3&4 Uprate Addendum - Tritium Attachments: 2014 Post Uprate Report MDC Draft Comments" Yes CS at 42 Memorandum from L. Hefty L. to P. Coram Yes CS at 47 Message from F. Mazzoti to J. Wrublik Yes CS at 47 Ecology and Conservation of the American Crocodile (Crocodylus acutus) in Florida No CS at 47-48 Message from M. Pearce to S. Scroggs Yes CS at 48 Statement of P. Stoddard No CS at 48-50 Comments of Miami-Dade County on Draft Environmental Impact Statement for Turkey Point Units 6&7 ADAMS 7 Page # Document Identified in Mandatory Disclosures? CS at 56-57 Meeting Minutes of the South Florida Water Management District No CS at 63 July 25, 2014 NRC letter to the FWS the NRC requested consultation on the subject EA (ADAMS Accession No.

ML14206A800) ADAMS CS at 67-68 Email from A. Gunderson No CS at 68-69 Email to T. Hoeg; Email from T. Hoeg No CS at 75 Environmental Review Guidance for Licensing Actions Associated with NMSS Programs Division of Waste Management Office of Nuclear Material Safety and

Safeguards (ML032450279) ADAMS CS at 79-80; AT1 at 25 Statement from National Park Service website No AT1 at 1-8 What Is Saltwater Intrusion? Saltwater Intrusion of Coastal Aquifers in the U.S. James Spatafo Johnson State College Senior Seminar May 6, 2008T

http://kanat.jsc.vsc.edu/student/spatafora/setup.htm Yes AT1 at 8 http://www.rsmas.miam i.edu/blog/2014/10/03/sea-level-rise-in-miami/

No AT1 at 8 Emergency Order No. 2015-034-DAO-WU [PDF] -South- www.sfwmd.gov/...sfwmd.../f Yes AT1 at 9, 28 Dolan Study No AT1 at 9-10 Borehole geophysical loggi ng for the Florida Power & Light Turkey Point Plant groundwater, surface water, and ecological monitoring plan No AT1 at 10-12 Origins and Delineation of Saltwater Intrusion in the Biscayne Aquifer and Changes in the Distribution of Saltwater in Miami-Dade County, Florida Yes AT1 at 14-18 usgs summary and conclusions No AT1 at 18-20 McNeill, Donald F., 2000. A Review of Upward Migration of Effluent Related to Subsurface Injection at Miami-Dade Water and Sewer South District Plant.

No AT1 at 21-24 Biological Assessment on the American Crocodile (Crocodylus acutus) Turkey Po int Nuclear Generating Unit Nos. 3 and 4 Proposed License Amendment to Increase the ADAMS 8 Page # Document Identified in Mandatory Disclosures? Ultimate Heat Sink Temperature Limit July 2014 AT1 at 24 Hughes, J.D., Langevin, C.D., and Brakefield-Goswami, Linzy, 2010, Effect of hypersal ine cooling canals on aquifer salinization: Hydrogeol ogy Journal, v. 18, p. 25-38.

No AT1 at 24 Turkey Point Unit 1 Eco System By Russ Finley On Mar 3, 2015 with 14 Responses Yes III. SIGNIFICANT PORTIONS OF THE CASE STATEMENT AN D ITS EXHIBITS ARE BEYOND THE SCOPE OF CONTENTION 1 AND SHOULD BE STRICKEN Because the Board is empowered to "[r]estrict irrelevant, immaterial, unreliable, duplicative or cumulative evidence and/or arguments,"

21 those portions of the CASE Statement and attachments that go beyond the limited scope of Contention 1, as admitted, should also, in

addition to the reasons set forth above, be stricken as irrelevant and immaterial arguments. CASE Contention 1, as reformulated and subsequently admitted by the Board, alleges that the NRC's Environmental Assesment ("EA") "does not adequately address the impact of increased temperature and salinity in the [cooling canal system ("CCS")] on saltwater intrusion arising from: (1) migration out of the CCS; and (2) the withdrawal of fresh water from surrounding aquifers to mitigate conditions within the CCS."

22 Essentially, the contention alleges that the increase in ultimate heat sink temperature allowed by the license amendment will lead to an increase in average temperature in the CCS and a resultant increase in CCS salinity. According to the contention, this heightened CCS salinity, in turn, will exacerbate saltwater intrusion both by direct migration out of the CCS and by operation of FPL's CCS mitigation measures.

21 10 C.F.R. § 2.319(e).

22 LBP-15-13 (slip op. at 24) (emphasis added).

9 A. Biscayne Bay The CASE Statement argues, for the first time, that CCS water may impact the water of Biscayne Bay, as opposed to the Biscayne Aquifer, which underlies both Biscayne Bay and the Turkey Point site.

23 Neither CASE's Petition nor its Reply ever asserted that hypersaline water from the CCS would intrude into Biscayne Bay.

24 In its Petition, CASE cited a document discussing the "high salinity groundwater plume from the cooling canals as it moves to the east under the Bay

."25 CASE certainly never argued that CCS water would affect Biscayne Bay.

Thus, the scope of the CASE contention should exclude impacts to Biscayne Bay. B. Need for Monitoring The CASE Statement also devotes a considerable amount of attention to the alleged failure of the EA to properly address monitoring, including several pages of emails from Miami-Dade County representatives.

26 The CASE Petition and the admitted contention do not include consideration of this issue.

C. Impact of Algae Remediation on Crocodiles The CASE Statement alleges that the EA failed to properly consider the impacts of copper sulfate on crocodiles.

27 Although this claim was raised in CASE's original petition, the Board expressly rejected this allegation because the EA does, in fact, discuss this issue.

28 23 See, e.g., CASE Statement at 8-9, 81.

24 At the prehearing conference, Mr. White engaged in a lengthy discussion with Judge Kennedy regarding the results of FPL monitoring wells at location TPGW-10, shown in slide 8 to CASE Petition Exhibit 1.

See Tr. at 109-115, discussing CASE Pet. Ex. 1 at 8. As demonstrated in that slide and in Mr. White's discussion, the slide represents three wells at various depths in the ground near the Biscayne Bay shoreline, with the higher values of the dense hypersaline water in the deepest part of the aquifer as would be expected. None of these groundwater readings involved measurements in the Bay itself. See also Pet. Ex. 1 at 7 and 9 (providing "contours based on deep well tritium results") (emphasis added).

25 CASE Petition at 13 (emphasis added).

26 CASE Statement at 35-43.

27 Id. at 43. 28 See Pet. at 15; LBP-15-13 (slip op. at 26-27).

10 D. Bacchus Paper CASE excerpts the Abstract from a paper by Dr. Sydney Bacchus, entitled "Knowledge of Ground Water Responses - Critical Factor in Saving Florida's Threatened and Endangered Species Part I: Marine Ecological Disturbances."

29 This paper discusses impacts to marine resources from activities such as the underground injection of wa stewater, aquife r storage and recovery, and mining and impacts related to disease, pathogens, antagonistic evolution and endocrine disruptors. CASE raised none of these issues in its Petition and none was admitted by the Board as part of Contention 1.

E. General NEPA Considerations Finally, CASE devotes a large section of its Statement to a discussion of general NEPA principles not presented in its Petition.

30 Among other out-of-scope issues, CASE discusses the NRC's considerations of alternatives, evaluation of unresolved conflicts, consultation with other agencies, and the speed with which the NRC completed its review. None of these issues were raised by CASE or admitted by the Board. F. Identification of Beyond-Scope Arguments Table 2 provides a page-by-page identification of these beyond-scope arguments. Because these arguments were not included in Contention 1 as admitted, the Board should strike them as irrelevant.

29 CASE Statement at 33-35; Attachment 1 at 26-28.

30 CASE Statement at 58-82.

11 Table 2 CASE Arguments and Exhibits Addressing Matters Beyond the Scope of Contention 1 Beginning Location Ending Location Description of Beyond-Scope Argument CASE Statement Top of page 8

("In one email-") Top of Page 9 ("...temperature of

35C") Email regarding fish habitat in Biscayne Bay Bottom of page 33 ("Perhaps the

strongest-")

Middle of Page 35 ("Industrial Waste

Facility (IWF).") Bacchus Report on impact on endangered species due to groundwater alterations with respect to pathogens, underground injection, endocrine disruptors, and microbes. Bottom of Page 35

("Monitoring")

Middle of Page 37

("-could be

monitored.") Discussion of need for NRC to require additional monitoring Beginning of Page

38 Middle of Page 38 ("-regularly

monitored-") Alvear email regarding cormorants Beginning of Page 41 End of Page 41 Otero email regarding TKN (Total Kjeldahl Nitrogen);

Grossenbacher email regarding crocodiles Bottom of Page 42

("November 26, 2014-) Top of page 43 ("emphasis added") Hefty memorandum to Coram regarding sampling for trace metals and nutrients Top of page 43

("As the citations

-" Bottom of page 43 ("-specifically that it

does.") Allegation that the NRC fails to discuss impacts of copper su lfate on crocodiles Top of Page 46

("Crocodiles and wildlife in the CCS")

Middle of Page 50 ("as a regulatory action?") Discussion of crocodiles and wildlife, including emails Bottom of Page 61

("NEPA:

Consultation with

Other Agencies")

Middle of Page 64 ("FPL statements accepted as fact.") Discussion of NRC consultation with other agencies, including US Fish and Wildlife

Service Bottom of Page 64 "NEPA: Health and

Welfare of Man")

Middle of Page 65 ("- did not consider these concerns.") Discussion of whether the EA addressed health and welfare Middle of Page 65 (NEPA: Consider Alterative Actions") End of Page 69; continuing at beginning of Page 71 to the middle of Page 72

("-be asked.") Discussion of alternatives and grid reliability/shutting down reactors, including Gunderson and Hoeg emails. Bottom of Page 73

("NEPA: Unresolved Conflicts Over

Resources")

Middle of Page 75

("-resource like

freshwater.")

Discussion of conflicts over resources 12 Beginning Location Ending Location Description of Beyond-Scope Argument Middle of Page 75

("NEPA: Major

Federal Actions") End of page 76 Argument that the administration of the Cooling Canals is a major federal action Beginning of page

81 Middle of page 81

("-.2014 EA.") Discussion of impact on Biscayne Bay Bottom of Page 81 ("Speed of the 2014

EA") Middle of page 82

("-18 day EA") Discussion of the speed of the NRC Staff's review Attachment 1 Bottom of Page 18

("Dr. Donald McNeil") Top of Page 20

("-Sierra Club -

Miami Group. 30 p.)

McNeil Report on underground injection of effluents into the Boulder Zone of the Lower

Floridan Aquifer Bottom of Page 24

("Turkey Point Unit 1 Eco System")

Middle of Page 25

("-see the real n")

Blog post discussing impact on crocodiles Bottom of page 25 ("The National Park

website states-" End of page 25 Discussion of Biscayne Bay estuary Beginning of page 26 Bottom of page 28

("Endeditableow_

ThesespageEndedita

bleow_ThesespageGrid Reliability") Bacchus Report on impacts to marine species from underground effluent injection, aquifer storage and recovery, and mining Bottom of Page 28

("Tara Dolan study") End of Page 28 Thesis addressing impacts to mangroves and habitats IV. CONCLUSION For the foregoing reasons, significant portions of the cited references in the CASE Statement and Attachment 1 should be stricken because they were not properly included in the record as exhibits. Further, no portion of the CASE Statement or any of its technical attachments should be considered as evidence because they were not sponsored by an expert.

31 Finally, any argument or exhibit that addresses issues beyond the scope of CASE Contention 1 as pled and admitted, should be stricken. In the alternative, FPL moves the Board to limit these materials by excluding them from evidence.

31 With the exception of CASE Attachments 4, 5, and 6, as noted above.

13 V. CERTIFICATION I certify that I have made a sincere effort to contact the other parties in this proceeding, to explain to them the factual and legal issues raised in this motion, and to resolve those issues, and I certify that my efforts have been unsuccessful. Counsel for the NRC Staff does not oppose the motion.

Respectfully Submitted, Signed (electronically) by Steven Hamrick Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220

Washington, DC 20004 steven.hamrick@fpl.com

202-349-3496

William S. Blair Erin Walkowiak Florida Power & Light Company

700 Universe Blvd.

Juno Beach, Florida 33408 william.blair@fpl.com erin.walkowiak@fpl.com

561-304-5238

October 19, 2015 COUNSEL FOR FLORIDA POWER & LIGHT COMPANY

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

Florida Power & Light Company ) Docket No. 50-250-LA

) 50-251-LA (Turkey Point Units 3 and 4) )

) ASLBP No. 15-935-02-LA-BD01

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing "Florida Power & Light Company's Motion to Strike Portions of CASE's "Initial Statement of Position, Testimony, Affidavits and Exhibits" or, in the Alternative, Motion in Limine to Exclude it and its Cited Documents from Evidence," were provided to the Electronic Information Exchange for service to those individuals listed below and others on the service list in this proceeding, and via e-mail to those marked with an asterisk.

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Office of the General Counsel Mail Stop: T-3F23 Mail Stop: O-15D21 Washington, DC 20555-0001 Washington, DC 20555-0001 Michael M. Gibson, Chair Brian Harris, Esq.

Dr. William W. Sager David Roth, Esq.

Dr. Michael F. Kennedy Catherine Kanatas, Esq.

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-16C1 Mail Stop: O-16C1 Washington, DC 20555-0001 Washington, DC 20555-0001 OCAA Mail Center Hearing Docket

Barry White*

Citizens Allied for Safe Energy, Inc.

1001 SW 129 Terrace Miami, FL 33176

2

Signed (electronically) by, ________________________________ Steven C. Hamrick Florida Power & Light Company 801 Pennsylvania Avenue, N.W. Suite 220

Washington, DC 20004 steven.hamrick@fpl.com

202-349-3496 Dated at Washington, DC

this 19th day of October, 2015