ML18019A143
ML18019A143 | |
Person / Time | |
---|---|
Site: | Turkey Point ![]() |
Issue date: | 01/19/2018 |
From: | Leidich A Florida Power & Light Co, Pillsbury, Winthrop, Shaw, Pittman, LLP |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
52-040 -COL, 52-041 -COL, ASLBP 10-903-02-COL-BD01, RAS 54190 | |
Download: ML18019A143 (2) | |
Text
4846-1687-3818.v1 January 19, 2018 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of
)
)
Docket Nos. 52-040-COL Florida Power & Light Company
)
52-041-COL
)
Turkey Point Units 6 and 7
)
ASLBP No.
10-903-02-COL (Combined License Application)
)
NOTICE OF WITHDRAWAL Notice is hereby given that William S. Blair withdraws his appearance in the captioned proceeding, effective January 19, 2018. All mail and service lists in this proceeding should be amended appropriately.
Respectfully submitted,
/signed electronically by Anne R. Leidich/
Anne R. Leidich PILLSBURY WINTHROP SHAW PITTMAN LLP 1200 Seventeenth Street, NW Washington, DC 20036-3006 Telephone: (202) 663-8707 Facsimile: (202) 663-8007 e-mail: anne.leidich@pillsburylaw.com
4846-1687-3818.v1 January 19, 2018 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of
)
)
Docket Nos. 52-040-COL Florida Power & Light Company
)
52-041-COL
)
Turkey Point Units 6 and 7
)
ASLBP No.
10-903-02-COL (Combined License Application)
)
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Notice of Withdrawal of William S. Blair dated January 19, 2018 have been served through the EFiling system on the participants in the above-captioned proceeding, this 19th day of January, 2018.
/Signed electronically by Anne R. Leidich/
Anne R. Leidich