ML15328A084: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:APPENDIX DGround Photographs Wetland Delineation ReportDiscovery Ridge
{{#Wiki_filter:APPENDIX D Ground Photographs Wetland Delineation Report Discovery Ridge
* Columbia, Boone County, MissouriMarch 14, 2011
* Columbia, Boone County, Missouri March 14, 2011
* Terracon Project:
* Terracon Project: 09117701 1. View of Wetland Area A, facing northeast.
091177011. View of Wetland Area A, facing northeast.
: 2. View of Wetland Area A, facing southwest.
: 2. View of Wetland Area A, facing southwest.
1 Frrecon Wetland Delineation ReportDiscovery Ridge u Columbia, Boone County, MissouriMarch 14, 2011
1 Frrecon Wetland Delineation Report Discovery Ridge u Columbia, Boone County, Missouri March 14, 2011
* Terracon Project:
* Terracon Project: 09117701 3. View of Wetland Area B, facing east.4. View of Wetland Area B, facing west.1 Ferracon Wetland Delineation Report Discovery Ridge u Columbia, Boone County, Missouri March 14, 2011 u Terracon Project: 09117701 5. View of suspect drainageway, facing north.6. View of suspect drainageway, facing south.1 rerra can Wetland Delineation Report Discovery Ridge
091177013. View of Wetland Area B, facing east.4. View of Wetland Area B, facing west.1 Ferracon Wetland Delineation ReportDiscovery Ridge u Columbia, Boone County, MissouriMarch 14, 2011 u Terracon Project:
* Columbia, Boone County, Missouri March 14, 2011
091177015. View of suspect drainageway, facing north.6. View of suspect drainageway, facing south.1 rerra can Wetland Delineation ReportDiscovery Ridge
* Terracon Project: 09117701 7. View of suspect upland depression, facing west.8. View of suspect upland depression, facing east.1 rerracan Federal Emergency Management Agency Community Status Book Report MISSOURI Communities Participating in th(ClD 2901801*2901 811#2902751*2907831*2907911#290311 290035 290409 2902701*2900731*2907431*290231#*2908961*2902 16#290847#*290792#290630#2903401*2902891*2901261*2900861*2900891*2903411#290600 2907931*2901 551*2906011#2901 07#2900361*2904101*290745 2903421*2907941*290603 2901 591*290898#*290746#*290604 2901 60#2904301*2907951*290063#*2903431*2903441*2901891*2903451*2907961*2904641*2908991*2952631*2905041*2903461*Community Name CARTERVILLE, CITY OF CARTHAGE, CITY OF CARUTHERSVILLE, CITY OF CASS COUNTY *CEDAR COUNTY *CENTERVILLE, VILLAGE OF CENTRALIA, CITY OF CHAFFEE, CITY OF CHAMOIS, CITY OF CHARITON COUNTY*CHARLACK, CITY OF CHARLESTON, CITY OF CHESTERFIELD, CITY OF CHILLICOTHE, CITY OF CHRISTIAN COUNTY*CLARK COUNTY *CLARKSDALE, CITY OF CLARKSON VALLEY, CITY OF CLARKSVILLE, CITY OF CLARKTON, CITY OF CLAY COUNTY *CLAYCOMO, VILLAGE OF CLAYTON, CITY OF CLEVER, CITY OF CLINTON COUNTY*CLINTON, CITY OF COBALT VILLAGE,VILLAGE OF COLE COUNTY*COLUMBIA, CITY OF COMMERCE, CITY OF CONCORDIA, CITY OF COOL VALLEY, CITY OF COOPER COUNTY *COOTER, TOWN OF CORNING, TOWN OF COTTLEVILLE, CITY OF COUNTRY CLUB HILLS, CITY OF COUNTRY CLUB, VILLAGE OF CRAIG, CITY OF CRANE, CITY OF CRAWFORD COUNTY*CREIGHTON, CITY OF CRESTWOOD, CITY OF CREVE COEUR, CITY OF CRYSTAL CITYCITY OF CRYSTAL LAKE PARK, CITY OF DADE COUNTY *DALTON, VILLAGE OF DARDENNE PRAIRIE, CITY OF DE SOTO, CITY OF DEARBORN, CITY OF DELLWOOD, CITY OF County JASPER COUNTY JASPER COUNTY PEMISCOT COUNTY CASS COUNTY CEDAR COUNTY REYNOLDS COUNTY BOONE COUNTY SCOTT COUNTY OSAGE COUNTY CHARITON COUNTY ST. LOUIS COUNTY MISSISSIPPI COUNTY ST. LOUIS COUNTY LIVINGSTON COUNTY CHRISTIAN COUNTY CLARK COUNTY DEKALB COUNTY ST. LOUIS COUNTY PIKE COUNTY DUNKLIN COUNTY CLAY COUNTY CLAY COUNTY ST. LOUIS COUNTY CHRISTIAN COUNTY CLINTON COUNTY HENRY COUNTY MADISON COUNTY COLE COUNTY BOONE COUNTY SCOTT COUNTY LAFAYETTE COUNTY ST. LOUIS COUNTY COOPER COUNTY PEMISCOT COUNTY HOLT COUNTY ST. CHARLES COUNTY ST. LOUIS COUNTY ANDREW COUNTY HOLT COUNTY STONE COUNTY CRAWFORD COUNTY CASS COUNTY ST. LOUIS COUNTY ST. LOUIS COUNTY JEFFERSON COUNTY ST. LOUIS COUNTY DADE COUNTY CHARITON COUNTY ST. CHARLES COUNTY JEFFERSON COUNTY PLATTE COUNTY ST. LOUIS COUNTY Ini Id In Id eNational Flood Program it FHBM Init FIRM Curr Eff entitled Identified Map Date 12/28/73 07/16/84 05102/07 03/15/74 06/15/83 05/02/07 02/20/76 01/16/81 01/16/81 03/14/78 04/15/82 03/16/06 07/17/02 07/17/02 11t/22/74 08/01/86 08/01/86(L) 06/07/74 04/15/77 04/15/77(M) 03/15/74 09/27/85 09/27/85(M) 03/29/74 11/15/84 09/02/05 04/19/83 12/03/87 12/03/87 02/14/75 11/23/84 08/23/00 03/29/74 01/04/85 01/18/89 09/15/78 08/23/00 01/09/74 08/05/85 08/05/85 04/19/83 04/01/04 04/01/04(L) 09/15/81 02/01/97 01/19/00 02/21/75 11/19/03 11/19/03(M) 07/26/74 04/08/77 08/23/00 05/24/74 04/19/10 04/19/1 0(>)12/21/73 01/29/80 04/17/95 09/06/74 03/18/80 04/16/03 01/23/74 08/01/77 12/02/80 04/05/74 02/14/76 08/23/00 07/18/75 (NSFHA)07/05/84 06/18/87 06/18/87(M) 04/15/74 07/04/88 07/04/88 03/26/76 07/02/87 12/06/02(M) 12/16/80 12/15/81 12/02/05 08/28/71 08/28/71 08/16/95 11/08/74 06/01/78 09/02/88 02/07/75 (NSFHA)05/03/74 05/16/77 08/23/00 11/16/83 09/01/89 09/01/89(L)(NSFHA)02/06/76 02/06/76 01/06/88 09/15/78 03/17/03 05/07/76 (NSFHA)08/22/75 (NSFHA)12/06/74 12/06/74 01/06/88 06/07/74 07/16/80 07/16/80 04/19/83 05/01/87 05/01/87(L) 05/13/77 03/16/06 03/16/06 05/03/74 05/02/77 08/23/00 02/01/74 08/01/78 08/23/00 03/15/74 09/01/77 04/05/06 05/13/77 08/02/95 (NSFHA)07/17/02 07/17/02 12/13/74 03/17/03 03/17/03 12/15/92 03/17/03 05/26/72 04/05/06 09/19/75 06/15/79 06/15/79 08/13/76 06/27/78 (NSFHA)Reg-Emer Date 07/16/84 06/15/83 01/116/81 04/15/82 04/11/06 08/01/86 04/15/77 09/27/85 11/15/84 12/03/87 11/23/84 01/04/85 09/15/78 08/05/85 04/01/04 02/01/97 11/19/03 04/08/77 04/01/77 01/29/80 03/18/80 08/01/77 02/14/76 03/30/81 06/18/87 07/04/88 07/02/87 01/21/82 08/27/71 06/01/78 02/09/79 05/16/77 09/01/89 06/30/76 01/06/88 02/01/90 05/25/78 08/24/84 01/06/88 07/16/80 05/01/87 06/30/80 05/02/77 08/01/78 09/01/77 08/01/86 1 2/22/03 10/10/03 03/13/95 05/26/72 06/15/79 06/27/78 Tribal No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No Page 3 of 17 01/11/2010 Page 3 of 17 01/1112010 Polcy Coordination Unit Missouri Department of Conservation P.0. Box 180 Heriage eviw Re ortJefferson City, MO 65102......Heritage Reviewrnd Report March 15, 2011 -- Page 1 of 2 573-522-4115X 3367 S Project type: Site Assessment Laura Murray Location/Scope:
* Columbia, Boone County, MissouriMarch 14, 2011
Portions of Section 32 and 33 of T48N RI12W__________northeast of Highway 63 County: Boone Query reference: -Discovery Ridge Property ________Query received:
* Terracon Project:
091177017. View of suspect upland depression, facing west.8. View of suspect upland depression, facing east.1 rerracan Federal Emergency Management AgencyCommunity Status Book ReportMISSOURICommunities Participating in th(ClD2901801*2901 811#2902751*2907831*2907911#2903112900352904092902701*2900731*2907431*290231#*2908961*2902 16#290847#*290792#290630#2903401*2902891*2901261*2900861*2900891*2903411#2906002907931*2901 551*2906011#2901 07#2900361*2904101*2907452903421*2907941*2906032901 591*290898#*290746#*2906042901 60#2904301*2907951*290063#*2903431*2903441*2901891*2903451*2907961*2904641*2908991*2952631*2905041*2903461*Community NameCARTERVILLE, CITY OFCARTHAGE, CITY OFCARUTHERSVILLE, CITY OFCASS COUNTY *CEDAR COUNTY *CENTERVILLE, VILLAGE OFCENTRALIA, CITY OFCHAFFEE, CITY OFCHAMOIS, CITY OFCHARITON COUNTY*CHARLACK, CITY OFCHARLESTON, CITY OFCHESTERFIELD, CITY OFCHILLICOTHE, CITY OFCHRISTIAN COUNTY*CLARK COUNTY *CLARKSDALE, CITY OFCLARKSON VALLEY, CITY OFCLARKSVILLE, CITY OFCLARKTON, CITY OFCLAY COUNTY *CLAYCOMO, VILLAGE OFCLAYTON, CITY OFCLEVER, CITY OFCLINTON COUNTY*CLINTON, CITY OFCOBALT VILLAGE,VILLAGE OFCOLE COUNTY*COLUMBIA, CITY OFCOMMERCE, CITY OFCONCORDIA, CITY OFCOOL VALLEY, CITY OFCOOPER COUNTY *COOTER, TOWN OFCORNING, TOWN OFCOTTLEVILLE, CITY OFCOUNTRY CLUB HILLS, CITY OFCOUNTRY CLUB, VILLAGE OFCRAIG, CITY OFCRANE, CITY OFCRAWFORD COUNTY*CREIGHTON, CITY OFCRESTWOOD, CITY OFCREVE COEUR, CITY OFCRYSTAL CITYCITY OFCRYSTAL LAKE PARK, CITY OFDADE COUNTY *DALTON, VILLAGE OFDARDENNE
: PRAIRIE, CITY OFDE SOTO, CITY OFDEARBORN, CITY OFDELLWOOD, CITY OFCountyJASPER COUNTYJASPER COUNTYPEMISCOT COUNTYCASS COUNTYCEDAR COUNTYREYNOLDS COUNTYBOONE COUNTYSCOTT COUNTYOSAGE COUNTYCHARITON COUNTYST. LOUIS COUNTYMISSISSIPPI COUNTYST. LOUIS COUNTYLIVINGSTON COUNTYCHRISTIAN COUNTYCLARK COUNTYDEKALB COUNTYST. LOUIS COUNTYPIKE COUNTYDUNKLIN COUNTYCLAY COUNTYCLAY COUNTYST. LOUIS COUNTYCHRISTIAN COUNTYCLINTON COUNTYHENRY COUNTYMADISON COUNTYCOLE COUNTYBOONE COUNTYSCOTT COUNTYLAFAYETTE COUNTYST. LOUIS COUNTYCOOPER COUNTYPEMISCOT COUNTYHOLT COUNTYST. CHARLES COUNTYST. LOUIS COUNTYANDREW COUNTYHOLT COUNTYSTONE COUNTYCRAWFORD COUNTYCASS COUNTYST. LOUIS COUNTYST. LOUIS COUNTYJEFFERSON COUNTYST. LOUIS COUNTYDADE COUNTYCHARITON COUNTYST. CHARLES COUNTYJEFFERSON COUNTYPLATTE COUNTYST. LOUIS COUNTYIniIdInIdeNational Flood Programit FHBM Init FIRM Curr Effentitled Identified Map Date12/28/73 07/16/84 05102/0703/15/74 06/15/83 05/02/0702/20/76 01/16/81 01/16/8103/14/78 04/15/82 03/16/0607/17/02 07/17/0211t/22/74 08/01/86 08/01/86(L) 06/07/74 04/15/77 04/15/77(M) 03/15/74 09/27/85 09/27/85(M) 03/29/74 11/15/84 09/02/0504/19/83 12/03/87 12/03/8702/14/75 11/23/84 08/23/0003/29/74 01/04/85 01/18/8909/15/78 08/23/0001/09/74 08/05/85 08/05/8504/19/83 04/01/04 04/01/04(L) 09/15/81 02/01/97 01/19/0002/21/75 11/19/03 11/19/03(M) 07/26/74 04/08/77 08/23/0005/24/74 04/19/10 04/19/1 0(>)12/21/73 01/29/80 04/17/9509/06/74 03/18/80 04/16/0301/23/74 08/01/77 12/02/8004/05/74 02/14/76 08/23/0007/18/75 (NSFHA)07/05/84 06/18/87 06/18/87(M) 04/15/74 07/04/88 07/04/8803/26/76 07/02/87 12/06/02(M) 12/16/80 12/15/81 12/02/0508/28/71 08/28/71 08/16/9511/08/74 06/01/78 09/02/8802/07/75 (NSFHA)05/03/74 05/16/77 08/23/0011/16/83 09/01/89 09/01/89(L)
(NSFHA)02/06/76 02/06/76 01/06/8809/15/78 03/17/0305/07/76 (NSFHA)08/22/75 (NSFHA)12/06/74 12/06/74 01/06/8806/07/74 07/16/80 07/16/8004/19/83 05/01/87 05/01/87(L) 05/13/77 03/16/06 03/16/0605/03/74 05/02/77 08/23/0002/01/74 08/01/78 08/23/0003/15/74 09/01/77 04/05/0605/13/77 08/02/95 (NSFHA)07/17/02 07/17/0212/13/74 03/17/03 03/17/0312/15/92 03/17/0305/26/72 04/05/0609/19/75 06/15/79 06/15/7908/13/76 06/27/78 (NSFHA)Reg-EmerDate07/16/8406/15/8301/116/81 04/15/8204/11/0608/01/8604/15/7709/27/8511/15/8412/03/8711/23/8401/04/8509/15/7808/05/8504/01/0402/01/9711/19/0304/08/7704/01/7701/29/8003/18/8008/01/7702/14/7603/30/8106/18/8707/04/8807/02/8701/21/8208/27/7106/01/7802/09/7905/16/7709/01/8906/30/7601/06/8802/01/9005/25/7808/24/8401/06/8807/16/8005/01/8706/30/8005/02/7708/01/7809/01/7708/01/861 2/22/0310/10/0303/13/9505/26/7206/15/7906/27/78TribalNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoPage 3 of 17 01/11/2010 Page 3 of 1701/1112010 Polcy Coordination UnitMissouri Department of Conservation P.0. Box 180Heriage eviw Re ortJefferson City, MO 65102......Heritage Reviewrnd ReportMarch 15, 2011 -- Page 1 of 2 573-522-4115X 3367S Project type: Site Assessment Laura Murray Location/Scope:
Portions of Section 32 and 33 of T48N RI12W__________northeast of Highway 63County: BooneQuery reference:  
-Discovery Ridge Property
________Query received:
March 8, 2011 Prearu b: S,.ano cave______________________________________  
March 8, 2011 Prearu b: S,.ano cave______________________________________  
[Authenticity may be con firmed by Policy Coordination Unit, Missouri Department of Consenration, 573-522-4115.
[Authenticity may be con firmed by Policy Coordination Unit, Missouri Department of Consenration, 573-522-4115.
This NATURAL HERITAGE REVIEW is not a site clearance letter. Rather, it identifies public lands and sensitive resources known to have beenlocated close to and/or potentially affected by the proposed project On-site verification is the responsibility of the project.
This NATURAL HERITAGE REVIEW is not a site clearance letter. Rather, it identifies public lands and sensitive resources known to have been located close to and/or potentially affected by the proposed project On-site verification is the responsibility of the project. Heritage records were identified at some date and location.
Heritage records wereidentified at some date and location.
This report considers records near but not necessarily at the project site. Animals move and, over time, so do plant communities.
This report considers records near but not necessarily at the project site. Animals move and, over time, so do plantcommunities.
To say "there is a record" does not mean the species/habitat is still there. To say that "there is no record" does not mean a protected species will not be encountered.
To say "there is a record" does not mean the species/habitat is still there. To say that "there is no record" does not mean a protected specieswill not be encountered.
These records only provide one reference and other information (e.g. wetland or soils maps, on-site inspections or sulveys) should be considered.
These records only provide one reference and other information (e.g. wetland or soils maps, on-site inspections or sulveys) shouldbe considered.
Look for additional information about the biological and habitat needs of records listed in order to avoid or minimize impacts. More information is at http://mdc.mo,,gov/discover-nature/places-, o/natural-areas and mdc4.mdc.mo.gov/applications/mofwis/mofwis searchl1.aspx.
Look for additional information about the biological and habitat needs of records listed in order to avoid or minimize impacts.
Contact information for the department's Natural History Biologist is online at httlx//mdc.mo.qov/contact -us.Level 3 (federal-listed) and Leve 2 (state listed) isues: Records of listed species or habitats: Heritage records identify no. wildlif preserves, no designated wildeness areas or critical habitats, no.state or federal endangered-listspecies records within the public land survey sections listed above and northeast of highway 63> The site does drain to Gans Creek, which downstream of Highway6 is one of 138 state-designated spawning strem segments.
Moreinformation is at http://mdc.mo,,gov/discover-nature/places-,
Activities that alter, destablie or destroy stream bottoms or banks should be avidd from March 15 to June 15 in order not to dsrupt spawning (laying and fertilizing fish eggs!,-At all times, avoid habitat destruction or introducingheavy sediment loads, chemical or organi po:!llutants.
o/natural-areas and mdc4.mdc.mo.gov/applications/mofwis/mofwis searchl1.aspx.
Spawning stream segments were designaed because they are important to maintining, restoring, or avoiding future listing of species of coservation concern.~'Rock Bridge Ste Park col be affected by construction activities.
Contact information for the department's Natural History Biologist is online at httlx//mdc.mo.qov/contact  
Within its premises are records of of conseration concern, including bot ray (2002 and (2007) bat records. *..Gray bats (Myotis federally and state listed "endangered")
-us.Level 3 (federal-listed) and Leve 2 (state listed) isues:Records of listed species or habitats:
are likely to occur in the project area, as thy oag ver streams, rivers, and in thi part of Missouri.
Heritage records identify no. wildlif preserves, no designated wildeness areas or critical  
Avoid entry or disturbac of any cave inhabited by gray bats an he osible retain forest vegetation along the stream and from the gray bat cave opening to the stream. See http://mdc.mo..qov/1 04 for best management recommendations.
: habitats, no.state or federal endangered-listspecies records within the public land survey sections listed aboveand northeast of highway 63> The site does drain to Gans Creek, which downstream of Highway6 is one of 138 state-designated spawning strem segments.
Activities that alter, destablie or destroy stream bottomsor banks should be avidd from March 15 to June 15 in order not to dsrupt spawning (laying andfertilizing fish eggs!,-At all times, avoid habitat destruction or introducingheavy sediment loads,chemical or organi po:!llutants.
Spawning stream segments were designaed because they areimportant to maintining, restoring, or avoiding future listing of species of coservation concern.~'Rock Bridge Ste Park col be affected by construction activities.
Within its premises arerecords of of conseration  
: concern, including bot ray (2002 and (2007) batrecords.  
*..Gray bats (Myotis federally and state listed "endangered")
are likely to occur in theproject area, as thy oag ver streams, rivers, and in thi part of Missouri.
Avoidentry or disturbac of any cave inhabited by gray bats an he osible retain forest vegetation along the stream and from the gray bat cave opening to the stream. See http://mdc.mo..qov/1 04for best management recommendations.
>' Indiana bats (Myotis sodalis, federally ad s tat e lite 'endangered")
>' Indiana bats (Myotis sodalis, federally ad s tat e lite 'endangered")
may occur in this area.These mammals hibernate durin wntermothsincavesl in issouri primarily in the southern halfof the state. They are found in summer months, primarily north of the Missouri River, roosting andraising young under the bark of trees in riparian forests and upland forests near perennial streams.During project activities, avoid degrading stream quality and where possible leave snags standingand preserve mature forest canopy. If large trees with nesting cavities or loose bark need to beremoved by your project, that should be done between November and March. Additional information to incorporate in planning documents is available at http://mdc.mo..qov/1 10.> Topeka shiners (Notropis Topeka, federal-and state-listed "endangered")
may occur in this area.These mammals hibernate durin wntermothsincavesl in issouri primarily in the southern half of the state. They are found in summer months, primarily north of the Missouri River, roosting and raising young under the bark of trees in riparian forests and upland forests near perennial streams.During project activities, avoid degrading stream quality and where possible leave snags standing and preserve mature forest canopy. If large trees with nesting cavities or loose bark need to be removed by your project, that should be done between November and March. Additional information to incorporate in planning documents is available at http://mdc.mo..qov/1 10.> Topeka shiners (Notropis Topeka, federal- and state-listed "endangered")
are recorded (1997) omBonne Femme Creek to the south. Historically, they probably used Gans Creek as well. Thesefish typically occupy permanent pools of small, clear, high quality streams draining upland areas,usually on substrates of gravel, rubble, sand or bedrock.
are recorded (1997) om Bonne Femme Creek to the south. Historically, they probably used Gans Creek as well. These fish typically occupy permanent pools of small, clear, high quality streams draining upland areas, usually on substrates of gravel, rubble, sand or bedrock. Best manaciement practices for Topeka Prepared by Shannon Cave, March 15, 2011, MurrayBoone assessment.
Best manaciement practices for TopekaPrepared by Shannon Cave, March 15, 2011, MurrayBoone assessment.
doc, page 1 of 2 shiners may be found at http://mdc.mo.qiov/1 37*General recommendations related to this project or site, or based on information about the historic range of species (unrelated to any specific heritage records):
doc, page 1 of 2 shiners may be found at http://mdc.mo.qiov/1 37*General recommendations related to this project or site, or based on information aboutthe historic range of species (unrelated to any specific heritage records):
in the area should be protected from soil erosion, water pollution and in-stream activities that modify or diminish aquatic habitats*
in the area should be protected from soil erosion, water pollution and in-stream activities that modify or diminish aquatic habitats*
Best management recommendations relating to streamsand rivers may be found at http://mdc.mo.qov/79.
Best management recommendations relating to streams and rivers may be found at http://mdc.mo.qov/79.
Minimize erosion and sedimentation/runoff tonearby streams and lakes, including adherence to any "Clean Water Permit" conditions.
Minimize erosion and sedimentation/runoff to nearby streams and lakes, including adherence to any "Clean Water Permit" conditions.
Revegetate areas in which the natural cover is disturbed to minimize erosion using native plantspecies compatible with the local landscape and wildlife needs. Pollutants, including  
Revegetate areas in which the natural cover is disturbed to minimize erosion using native plant species compatible with the local landscape and wildlife needs. Pollutants, including sediment, can have significant impacts far downstream.
: sediment, can have significant impacts far downstream.
Use silt fences and/or vegetative filter strips to buffer streams and drainages, and monitor those after rain events and until a well-rooted ground cover is reestablished.This county has known karst geologic eatures (e.g. caves, springs, and sinkholes, all characterized by subterranean watermovement).
Use silt fences and/or vegetative filter strips tobuffer streams and drainages, and monitor those after rain events and until a well-rooted groundcover is reestablished.This county has known karst geologic eatures (e.g. caves, springs, and sinkholes, allcharacterized by subterranean watermovement).
Few karst features are recorded in heritage records, and ones not noted her my be encountered atteproject site or affected by the project. Cave fauna (many of wchare species of conserain concern) are influenced by changes to water quality, so check your project site for any as features and make every effort to protect groundwater in the project area. See http://mdc.
Few karst features are recorded in heritagerecords, and ones not noted her my be encountered atteproject site or affected by theproject.
Cave fauna (many of wchare species of conserain concern) are influenced bychanges to water quality, so check your project site for any as features and make every effort toprotect groundwater in the project area. See http://mdc.
mo..ciovfnathis/caves/manaa construc.
mo..ciovfnathis/caves/manaa construc.
htmfor best management inoratonThe proposed project occur in the historic range of greater prairi cickens (tympanuchus cupido),
htm for best management inoratonThe proposed project occur in the historic range of greater prairi cickens (tympanuchus cupido), a bird on the stae' list of endangered species. Populations§ have been in serious decline for decades, and have reched a point where greater prairie chickens could be gone from Missouri within a few yers. The dominant.
a bird on the stae' list of endangered species.
factor in their decline is of. native prairie habitats to other uses. Other praire dependent species are also in seriu decline for the same reason. Prairie chikns range over a broad territory perhaps nesting, breeinganfogign grasslands sevel miles aparFt. Even if prairie chickens are not present, it isimPortant to conserve as muhas possibl any grasslands dominated by native plant cove in the project area.See http://mdc best management reomnations.
Populations§ have been in serious declinefor decades, and have reched a point where greater prairie chickens could be gone fromMissouri within a few yers. The dominant.
~'Invasive exoi species, are significant issue for fish, wllife an agrcutrinMsoi.Se, eggs, and larvae ma bemoed to new sites on boats or cntuto qimns npc n clean equipmentrthroughly befor moving between projec sitesupeto npcn*Remove any mud, soil, trash, plants or animals from equLm~t efor leaving any water body or work area.*Drain water from boats and machinery that have operated in water, checking motor cavities, live-well, bilge and transom wltrcsbuks adny other water reservoirs.
factor in their decline is of. native prairiehabitats to other uses. Other praire dependent species are also in seriu decline for the samereason. Prairie chikns range over a broad territory perhaps nesting, breeinganfogign grasslands sevel miles aparFt. Even if prairie chickens are not present, it isimPortant toconserve as muhas possibl any grasslands dominated by native plant cove in the project area.See http://mdc best management reomnations.
* When possible, wash and rinse equipment thorugh~ly itard spray or HOT water F, typically available at do-it-yourself carwash sites), and dry in the hot sun before using again.Pre-screen heritaqe data requests at httD:I/tnvurl.comleritaoerevie.
~'Invasive exoi species, are significant issue for fish, wllife an agrcutrinMsoi.Se, eggs, and larvae ma bemoed to new sites on boats or cntuto qimns npc nclean equipmentrthroughly befor moving between projec sitesupeto npcn*Remove any mud, soil, trash, plants or animals from equLm~t efor leaving any water bodyor work area.*Drain water from boats and machinery that have operated in water, checking motor cavities, live-well, bilge and transom wltrcsbuks adny other water reservoirs.
* When possible, wash and rinse equipment thorugh~ly itard spray or HOT water F,typically available at do-it-yourself carwash sites), and dry in the hot sun before using again.Pre-screen heritaqe data requests at httD:I/tnvurl.comleritaoerevie.
A "Level I response" makes further submission to MDC or UJSFWS unnecessary.
A "Level I response" makes further submission to MDC or UJSFWS unnecessary.
Prepared by Shannon Cave, March 15, 2011, MurrayBoone~assessment.doc, page 2 of 2 CULTURAL RESOURCE ASSESSMENT Section 106 ReviewCONTACT PERSONIADDRESS C:ITerracon 3601 Mojave Court, Suite A IColumbia.
Prepared by Shannon Cave, March 15, 2011, MurrayBoone~assessment.doc, page 2 of 2 CULTURAL RESOURCE ASSESSMENT Section 106 Review CONTACT PERSONIADDRESS C: ITerracon 3601 Mojave Court, Suite A I Columbia.
Missouri 65203 _________________
Missouri 65203 _________________
PROJECT:IDiscover Ride Lots 2 5r 6 7v 9 10a 11! 12r 131 14r 15r 161 17 &18r ColumbiaFEDERAL AGENCYCOUNTY:I UNKNOWNI I BOONEIII -i i IIII --wThe State Historic Preservation Office has reviewed the Information submitted on the above referenced project.
PROJECT: IDiscover Ride Lots 2 5r 6 7v 9 10a 11! 12r 131 14r 15r 161 17 &18r Columbia FEDERAL AGENCY COUNTY: I UNKNOWN I I BOONE I II -i i II II --w The State Historic Preservation Office has reviewed the Information submitted on the above referenced project. Based on this review, we have made the following determination:
Based on this review, we have made the following determination:
] After review of initial submission, the project area has a low potential for the occurrence of cultural resources.
] After review of initial submission, the project area has a low potential for the occurrence of culturalresources.
A cultural resource survey, therefore, is not warranted.
A cultural resource survey, therefore, is not warranted.
[] Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historicproperties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.
[] Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historic properties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.
It hasE~] been determined that for the proposed undertaking there will be "no historic properties affected".
It has E~] been determined that for the proposed undertaking there will be "no historic properties affected".
For the above checked reason, the State Historic Preservation Office has no objection to the initiation of projectactivities.
For the above checked reason, the State Historic Preservation Office has no objection to the initiation of project activities.
PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARECHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS AREENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO ThiSOFFICE FOR FURTHER REVIEW AND COMMENT.
PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARE CHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO ThiS OFFICE FOR FURTHER REVIEW AND COMMENT. Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: §March 7.2011 Mark A. Miles, Deputy State Historic Preservation Officer Date MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE P.O. Box 176, Jefferson City, Missouri 65102 For additional information, please contact Judith D~eel, (573) 751-7862.
Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: §March 7.2011Mark A. Miles, Deputy State Historic Preservation OfficerDateMISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICEP.O. Box 176, Jefferson City, Missouri 65102For additional information, please contact Judith D~eel, (573) 751-7862.
Please be sure to refer to the project number: 015-BO-1 1 February 21, 2011 MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE Attn: Section 106 Review P.O. Box 176 Jefferson City, Missouri 65102-0176 RE: Request for Additional Review MDNR SHPO project number: 015-B0-11 Section 106 Review Discovery Ridge Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, and 18 Discovery Drive and Discovery Ridge Parkway Columbia, Boone County, Missouri T 48N N, R 12W, Sec 33, NY2 Terracon Project No.: 09117701 Terracon Consultants, Inc. (Terracon), on behalf of the Trabue, Hansen & Hinshaw, Inc and the University of Missouri Research Parks -University of Missouri Systems, is assisting with a preconstruction Phase 1 Environmental Site Assessment for a proposed expansion of the current scientific research park, Discovery Ridge, located on a portion of a historic University of Missouri research farm at Discovery Drive Discovery Ridge Parkway, east of U.S. Highway 63 in the vicinity of the southern limits of Columbia, Missouri.We are enclosing a Section 106 Project Information Form, A section of the topographic map which includes the subject site, a developmental phasing plan, and photographs of the on-site metal machine shed type buildings located on Lot 17 and the quacent hut building located on Lot 5. Additionally, photos have been included of structures located on properties adjacent to the site. Please review your records and files to determine if historic features are located on the site.The site has historically been agricultural land associated with a University of Missouri research farm. Portions of the site, which are located within Phase I of the project, have been graded to construct vacant lots suitable for development.
Please be sure to refer to the project number:015-BO-1 1
We would appreciate a response within 30 days following receipt of this information.
February 21, 2011MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICEAttn: Section 106 ReviewP.O. Box 176Jefferson City, Missouri 65102-0176 RE: Request for Additional ReviewMDNR SHPO project number: 015-B0-11 Section 106 ReviewDiscovery RidgeLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, and 18Discovery Drive and Discovery Ridge ParkwayColumbia, Boone County, MissouriT 48N N, R 12W, Sec 33, NY2Terracon Project No.: 09117701Terracon Consultants, Inc. (Terracon),
If you have any questions or wish to discuss this submittal, please contact me.Sincerely, Staff Environmental Scientist Enclosure WMISSOURI DEPARTMENT OF NATURAL RESOURCES ,~STATE HISTORIC PRESERVATION OFFICE 41SECTION 108 PROJECT INFORMATION FORM Submission of a completed Project Information Form with adequate information and attachments constitutes a request for a review pursuant to Section 106 of the National Historic Preservation Act of 1966 (as amended).
on behalf of the Trabue, Hansen & Hinshaw, Inc and theUniversity of Missouri Research Parks -University of Missouri  
We reserve the right to request more information.
: Systems, is assisting with apreconstruction Phase 1 Environmental Site Assessment for a proposed expansion of thecurrent scientific research park, Discovery Ridge, located on a portion of a historic University ofMissouri research farm at Discovery Drive Discovery Ridge Parkway, east of U.S. Highway63 in the vicinity of the southern limits of Columbia, Missouri.
Please refer to the CHECKLUST on Page 2 to ensure that all basic information relevant to the project has been Included.
We are enclosing a Section 106 Project Information Form, A section of the topographic mapwhich includes the subject site, a developmental phasing plan, and photographs of the on-sitemetal machine shed type buildings located on Lot 17 and the quacent hut building located onLot 5. Additionally, photos have been included of structures located on properties adjacent tothe site. Please review your records and files to determine if historic features are located onthe site.The site has historically been agricultural land associated with a University of Missouriresearch farm. Portions of the site, which are located within Phase I of the project, have beengraded to construct vacant lots suitable for development.
For further information, refer to our website at: htto:l/dnr.mo.aov/shoo and follow the links to Section 106 Review.NOTE: Section 106 regulations provide for a 30-day response time by the Missouri State Historic Preservation Office from the date of receipt.PROJECT NAME Discovery Ridge Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13. 14, 15, 16, 17, and 18 FEDERAL. AGENCY PROVDNG FUNDS. UCENSE. OR PERMIT ADDRESS FOR RESPONSE Terracon 3601 Mojave Court, Suite A Columbia, MO 65203 LOCATION OF PROJECT COUNTY Boone LEGAL DESCRIPTION OF PROJECT AREA (TOWNSHIP, RANGE, SECTION, 1/44 SECTION)USGS TOPOGRAPHIC MAP QUADRANGLE NAME (SEE MAP REQUIREMENTS ON PAGE 2)Columbia, Missouri 1981 l148 North 12 West 3 PROJECT DESCRIPTION DESCRIBE THE OVERALL PROJECT IN DETAIL. IF rr INVOLVES EXCAVATION.
We would appreciate a responsewithin 30 days following receipt of this information.
INDICATE HOW WIDE, HOW DEEP, ETC. IF THE PROJECT INVOLVES DEMOLITION OF EXISTING BUILDI.S MAKE THAT CLEAR. IF THE PROJECT INVOLVES REHABILITATION, DESCRIBE T~l PROPOSED WO)RK IN DETAIL.USE ADDITIONAL PAGES IF NECESSARY.
If you have any questions or wish todiscuss this submittal, please contact me.Sincerely, Staff Environmental Scientist Enclosure WMISSOURI DEPARTMENT OF NATURAL RESOURCES
The site consist of 15 lots. Eight of the lots (Lots 2, 5, 6, 7, 8, 9, 10, and 11) are located within Phase I of the research park development plan. Of the lots located within Phase I of the developmental plan, Lots 2, 6, 7, and 8 have been graded to construct vacant lots suitable for development, additional, Lot 9 is currently In the process of being graded to facility a lot suitable for development.
,~STATE HISTORIC PRESERVATION OFFICE41SECTION 108 PROJECT INFORMATION FORMSubmission of a completed Project Information Form with adequate information and attachments constitutes a request for a reviewpursuant to Section 106 of the National Historic Preservation Act of 1966 (as amended).
We reserve the right to request moreinformation.
Please refer to the CHECKLUST on Page 2 to ensure that all basic information relevant to the project has beenIncluded.
For further information, refer to our website at: htto:l/dnr.mo.aov/shoo and follow the links to Section 106 Review.NOTE: Section 106 regulations provide for a 30-day response time by the Missouri State Historic Preservation Office from thedate of receipt.PROJECT NAMEDiscovery Ridge Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13. 14, 15, 16, 17, and 18FEDERAL.
AGENCY PROVDNG FUNDS. UCENSE. OR PERMITADDRESS FOR RESPONSETerracon3601 Mojave Court, Suite AColumbia, MO 65203LOCATION OF PROJECTCOUNTYBooneLEGAL DESCRIPTION OF PROJECT AREA (TOWNSHIP, RANGE, SECTION, 1/44 SECTION)USGS TOPOGRAPHIC MAP QUADRANGLE NAME (SEE MAP REQUIREMENTS ON PAGE 2)Columbia, Missouri1981 l148 North 12 West 3PROJECT DESCRIPTION DESCRIBE THE OVERALL PROJECT IN DETAIL. IF rr INVOLVES EXCAVATION.
INDICATE HOW WIDE, HOW DEEP, ETC. IF THE PROJECT INVOLVESDEMOLITION OF EXISTING BUILDI.S MAKE THAT CLEAR. IF THE PROJECT INVOLVES REHABILITATION, DESCRIBE T~l PROPOSED WO)RK IN DETAIL.USE ADDITIONAL PAGES IF NECESSARY.
The site consist of 15 lots. Eight of the lots (Lots 2, 5, 6, 7, 8, 9, 10, and 11) are located within Phase I of the research parkdevelopment plan. Of the lots located within Phase I of the developmental plan, Lots 2, 6, 7, and 8 have been graded to construct vacant lots suitable for development, additional, Lot 9 is currently In the process of being graded to facility a lot suitable fordevelopment.
Currently lot 5 is the location of a quacent hut type building.
Currently lot 5 is the location of a quacent hut type building.
Seven of the lots that comprse the site (Lots 12, 13,14, 15, 16, 17, and 18) are located within Phase II of the developmental plan and consist of vacant grass covered farm land utilizedas grazing pasture for livestock and row crop research.
Seven of the lots that comprse the site (Lots 12, 13, 14, 15, 16, 17, and 18) are located within Phase II of the developmental plan and consist of vacant grass covered farm land utilized as grazing pasture for livestock and row crop research.
Currently Lot 17 is the location of two small metal machine sheds and onelarge machine shed type buildings.
Currently Lot 17 is the location of two small metal machine sheds and one large machine shed type buildings.
Historically a residential structure, and four small mea machine sheds were located at the sitestarting between 1939-1968 with the residence being removed in 2001 and two of the machine sheds being removed in 2007.Historically the site has been utilized as farm land associated with a Uniersity of Missouri research farm (South Farms). Beginning in the early 2000s the area surrounding the site has been utilized as Discovery Ridge, a scientilic research park. The applicant isinvestigating the site for expanded use as a scientific research park.
Historically a residential structure, and four small mea machine sheds were located at the site starting between 1939-1968 with the residence being removed in 2001 and two of the machine sheds being removed in 2007.Historically the site has been utilized as farm land associated with a Uniersity of Missouri research farm (South Farms). Beginning in the early 2000s the area surrounding the site has been utilized as Discovery Ridge, a scientilic research park. The applicant is investigating the site for expanded use as a scientific research park.
ARCHAEOLOGY IEARTHMOVING ACTIVITIESI HAS THE GROUND INVOLVED BEEN GRADED. BUILT ON, BORROWED, OR OTHERWISE DISTURBED?
ARCHAEOLOGY IEARTHMOVING ACTIVITIESI HAS THE GROUND INVOLVED BEEN GRADED. BUILT ON, BORROWED, OR OTHERWISE DISTURBED?
PLEASE DESCRIBE IN DETAIL(USE ADDITIONAL PAGES, IF NECESSARY)
PLEASE DESCRIBE IN DETAIL (USE ADDITIONAL PAGES, IF NECESSARY)
PHOTOGRAPHS ARE HELPFUL:The site has hitrcfy been farmed associated with a University of Missouri research farm. During the early 2000s portions of thelots that comprise Phase I of the site were graded to construct multiple vacant building lots suitable for deeomn. Currently lotslocated within Phase II of the developmental plan are vacant grass covered land with portion utilized for row crop research.
PHOTOGRAPHS ARE HELPFUL: The site has hitrcfy been farmed associated with a University of Missouri research farm. During the early 2000s portions of the lots that comprise Phase I of the site were graded to construct multiple vacant building lots suitable for deeomn. Currently lots located within Phase II of the developmental plan are vacant grass covered land with portion utilized for row crop research.WILL THE PROJECT REQUIRE FILL MATERIAL?
WILL THE PROJECT REQUIRE FILL MATERIAL?
0] YES [] NO IF YES, INDICATE PROPOSED BORROW AREAS (SOURCE OF FILL MATERIAL)
0] YES [] NOIF YES, INDICATE PROPOSED BORROW AREAS (SOURCE OF FILL MATERIAL)
ON TOPOGRAPHIC MAP ARE YOU AWARE OF ARCHAEOLOGICAL SITES ON OR ADJACENT TO PROJECT AREA? [J YES NO IF YES8, IDENTIFY THEM ON THE TOPOGRAPHIC MAP STRUCTURES (REH LIATION, DEMOLOTION.
ON TOPOGRAPHIC MAPARE YOU AWARE OF ARCHAEOLOGICAL SITES ON OR ADJACENT TO PROJECT AREA? [J YES NOIF YES8, IDENTIFY THEM ON THE TOPOGRAPHIC MAPSTRUCTURES (REH LIATION, DEMOLOTION.
ADDITIONS TO, OR CONTRUCTION NEAR EXISTING STRUCTURES)
ADDITIONS TO, OR CONTRUCTION NEAR EXISTING STRUCTURES)
TO THE BEST OF YOUR KNWLDGE, IS THE STRUCTURE LOCATED IN ANY OF THE FOLLOWING?
TO THE BEST OF YOUR KNWLDGE, IS THE STRUCTURE LOCATED IN ANY OF THE FOLLOWING?
U] AN AREA PREVIOUSLY SURVEYED F] A NATIONAL REGISTER DISTRICT El A LOCAL HISTORIC DISTRICTFOR HISTORIC PROPERTIES.
U] AN AREA PREVIOUSLY SURVEYED F] A NATIONAL REGISTER DISTRICT El A LOCAL HISTORIC DISTRICT FOR HISTORIC PROPERTIES.
IF YES. PLEASE PROVIDE ThE NAME OF IF YES. PLEASE PROVIDE THE NAME OF IF YES, PLEASE PROVIDE THE NAME OFTHE SURVEY OR DISTRICT:
IF YES. PLEASE PROVIDE ThE NAME OF IF YES. PLEASE PROVIDE THE NAME OF IF YES, PLEASE PROVIDE THE NAME OF THE SURVEY OR DISTRICT:
THE SURVEY OR DISTRICT:
THE SURVEY OR DISTRICT:
Th SURVEY OR DISTRICT:
Th SURVEY OR DISTRICT:* PLEASE PROVIDE PHOTOGRAPHS OF ALL STRUCTURJES.
* PLEASE PROVIDE PHOTOGRAPHS OF ALL STRUCTURJES.
SEE PHOTOGRAPHY REQUIREMENTS
SEE PHOTOGRAPHY REQUIREMENTS
* NOTE: ALL PHOTOGRAPHS SHOULD BE LABELED AND KEYED TO ONE MAP OF THE PROJECT AREA* PLEASE PROVIDE A BRIEF HISTORY OF THE BUILDING(S),
* NOTE: ALL PHOTOGRAPHS SHOULD BE LABELED AND KEYED TO ONE MAP OF THE PROJECT AREA* PLEASE PROVIDE A BRIEF HISTORY OF THE BUILDING(S), INCLUDING CONSTRUCTION DATES AND BUILDING USES. (USE ADDITONAL PAGES, IF NECESSARY.)
INCLUDING CONSTRUCTION DATES AND BUILDING USES. (USEADDITONAL PAGES, IF NECESSARY.)
ADDITONAL REQUIREMENTS Map Requirements:
ADDITONAL REQUIREMENTS Map Requirements:
Attach a copy of the relevant portion (8 'A x 11) of the curn USGS 7.5 min. topographic map and, If necessary, a largescala project map. Please do not send an Individual map with each structure or site. Wlean orIginal mapIs preferable, a good copy Isacceptable.
Attach a copy of the relevant portion (8 'A x 11) of the curn USGS 7.5 min. topographic map and, If necessary, a large scala project map. Please do not send an Individual map with each structure or site. Wlean orIginal mapIs preferable, a good copy Is acceptable.
For a list of sites from wh'ich to order, download or print the required USGS 7.5 min. topographic map at litl or no cot coslhtto'J/dnr.mo.oovlshoo/sectionrev.htm.
For a list of sites from wh'ich to order, download or print the required USGS 7.5 min. topographic map at litl or no cot cosl htto'J/dnr.mo.oovlshoo/sectionrev.htm.
Photography Requlrements:
Photography Requlrements:
Clear black and white or color photographs (minimum 3" x 5") are acceptable.
Clear black and white or color photographs (minimum 3" x 5") are acceptable.
Poladiods, photocopies, emalaed orfaxed photographs are not acceptable.
Poladiods, photocopies, emalaed or faxed photographs are not acceptable.
Good quality photographs are Important for expedltlous project review. Photographs of neighboring or nearby buildings are also helpful.
Good quality photographs are Important for expedltlous project review. Photographs of neighboring or nearby buildings are also helpful. All photographs should be labeled and keyed to one map of the project area.CHECKLIST-DID YOU PROVIDE THE FOLLOWING INFORMATION?
All photographs should be labeled and keyed to one map of the project area.CHECKLIST-DID YOU PROVIDE THE FOLLOWING INFORMATION?
0] Topographic map 7.5 min. (per project, not stutr) 0] Other sup~porting documents (If necessary to explain the project)[] Thorough description (aln projects)
0] Topographic map 7.5 min. (per project, not stutr) 0] Other sup~porting documents (If necessary to explain the project)[] Thorough description (aln projects)
El For new construction, rehabilitations, etc., attach work write-ups, plans, drawings, etc.0] Photographs (all structures) 0] Is topographic map Identified by quadrangle and year?Return this Form and Attachments to:MISSOUR DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICEAttn: Section 106 ReviewP.O. BOX 176JEFFERSON CITY, MISSOURI 65102-0176 Quacent hut building located on the southern portion of Lot 5. Quacent hutsouth adjoining property.
El For new construction, rehabilitations, etc., attach work write-ups, plans, drawings, etc.0] Photographs (all structures) 0] Is topographic map Identified by quadrangle and year?Return this Form and Attachments to: MISSOUR DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE Attn: Section 106 Review P.O. BOX 176 JEFFERSON CITY, MISSOURI 65102-0176 Quacent hut building located on the southern portion of Lot 5. Quacent hut south adjoining property.
Quacent hut constructed between 1980 and 1992.!from theQuacent hut building located on the southern portion of Lot 5. Quacent hut viewed from thewest portion of Lot 5. Quacent hut constructed between 1980 and 1992.
Quacent hut constructed between 1980 and 1992.!from the Quacent hut building located on the southern portion of Lot 5. Quacent hut viewed from the west portion of Lot 5. Quacent hut constructed between 1980 and 1992.
Trailer park located west of Lots 5, and 16. Trailer park est=Trailer park viewed from the western portion of Lot 5.and 1968.Trailer park located west of Lots 5, and 16. Trailer park established betweenTrailer park viewed from the western portion of Lot 5.;6 and 1968.
Trailer park located west of Lots 5, and 16. Trailer park est=Trailer park viewed from the western portion of Lot 5.and 1968.Trailer park located west of Lots 5, and 16. Trailer park established between Trailer park viewed from the western portion of Lot 5.;6 and 1968.
University of Missouri Civil Engineering research building located east of Lot 5.constructed between 1956 and 1968.dingMetal sided USDA building located within the vicinity of the University of Missouri CivilEngineering research building and east of Lot 5. Building constructed between 1995 and 2002.
University of Missouri Civil Engineering research building located east of Lot 5.constructed between 1956 and 1968.ding Metal sided USDA building located within the vicinity of the University of Missouri Civil Engineering research building and east of Lot 5. Building constructed between 1995 and 2002.
ABC Lab building located west of Lot 2.viewed from Discovery Drive.and 2007. BuildingRadii building located east of Lot 2. Building constructed between 2002viewed from the intersection of Discovery Drive and Discovery Parkway.*Building Residence located south of Lot 11. Residence constructed betweenResidence viewed from US Highway 63, southwest of the structure.
ABC Lab building located west of Lot 2.viewed from Discovery Drive.and 2007. Building Radii building located east of Lot 2. Building constructed between 2002 viewed from the intersection of Discovery Drive and Discovery Parkway.*Building Residence located south of Lot 11. Residence constructed between Residence viewed from US Highway 63, southwest of the structure.
Residence located south of Lot 11. Residence constructed betweenResidence viewed from US Highway 63, southwest of the structure.
Residence located south of Lot 11. Residence constructed between Residence viewed from US Highway 63, southwest of the structure.
Residence located south of Lot 11. Residence constructed between 1Residence viewed from Lot 11, north of the structure.
Residence located south of Lot 11. Residence constructed between 1 Residence viewed from Lot 11, north of the structure.
Barn located south of the residence south of Lot I1. Barn constructed betwveen 1939 and 1956.Barn viewed from US Highway 63, southwest of the structure.
Barn located south of the residence south of Lot I1. Barn constructed betwveen 1939 and 1956.Barn viewed from US Highway 63, southwest of the structure.
Residence located south of Lot 11. Residence coiResidence viewed from Lot 11 looking southwest.
Residence located south of Lot 11. Residence coi Residence viewed from Lot 11 looking southwest.
Barn located south of Lot 11. Barn constructed between11 looking southwest.
Barn located south of Lot 11. Barn constructed between 11 looking southwest.
arn viewed from Lot  
arn viewed from Lot  


Two small metal machine sheds located on Lot 17. Small metal machine sheds constructed between 1939 and 1968.Eastern small metal machine1939 and 1968.ichine shed constructed between Western small n1939 and 1968.ne sheds located on Lot 17. Machine shed constructed between CULTURAL RESOURCE ASSESSMENT Section 106 ReviewCONTACT PERSON/ADDRESS  
Two small metal machine sheds located on Lot 17. Small metal machine sheds constructed between 1939 and 1968.Eastern small metal machine 1939 and 1968.ichine shed constructed between Western small n 1939 and 1968.ne sheds located on Lot 17. Machine shed constructed between CULTURAL RESOURCE ASSESSMENT Section 106 Review CONTACT PERSON/ADDRESS ,C: IAdam J. whitei Terracon 3601 Mojave Court, Suite A I Columbia, Missouri 65203 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PROJECT: IDis.cover Ride Lots 2 5a 8r 9 101 11r 12r 13T 141 15 &16r Columbia FEDERAL AGENCY COUNTY: I UNKNOWN! I BOONE I" II I II ...... III I fl The State Historic Preservation Office has reviewed the Information submitted on the above referenced project. Based on this review, we have made the following determination:
,C:IAdam J. whiteiTerracon3601 Mojave Court, Suite A IColumbia, Missouri 65203 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PROJECT:IDis.cover Ride Lots 2 5a 8r 9 101 11r 12r 13T 141 15 &16r ColumbiaFEDERAL AGENCYCOUNTY:I UNKNOWN! I BOONEI" IIIII ...... III I flThe State Historic Preservation Office has reviewed the Information submitted on the above referenced project.
[] After review of initial submission, the project area has a low potential for the occurrence of cultural resources.
Based on this review, we have made the following determination:
A cultural resource survey, therefore, is not warranted.Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historic properties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.
[] After review of initial submission, the project area has a low potential for the occurrence of culturalresources.
A cultural resource survey, therefore, is not warranted.Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historicproperties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.
It has[~] been determined that for the proposed undertaking there will be "no historic properties affected".
It has[~] been determined that for the proposed undertaking there will be "no historic properties affected".
For the above checked reason, the State Hitoric Prmsrvation Off ice has no objection to the Initiation of projectactiviis PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARECHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS AREENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO THISOFFICE FOR FURTHER REVIEW AND COMMENT.
For the above checked reason, the State Hitoric Prmsrvation Off ice has no objection to the Initiation of project activiis PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARE CHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO THIS OFFICE FOR FURTHER REVIEW AND COMMENT. Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: £ February 9. 2011 Mark A. Miles, Deputy State Historic Preservation Officer Date MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE P.O. Box 176, Jefferson City, Missouri165102 For additional Information, please contact Judith Dsel, (573) 751-7862.
Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: £ February  
Please be sure to refer to the project number: 015-BO-11 Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 Columbia, Missouri February 17,2011 Terracon Project No. 09105094.1 Prepared for: Trabue, Hansen & Hinshaw, Inc.Columbia, Missouri Prepared by: Terracon Consultants, Inc.Columbia, Missouri llti[' U ll Feray1721r erracon Trabue, Hansen & Hinshaw, Inc.1901 Pennsylvania Columbia, Missouri 65202 Attn: Mr. John Huss, R.E.P: [573] 814-1568 F: [573] 814-1128 Re: Preliminary Geotec~hnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6,7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 Columbia, Missouri Terracon Project Number: 09105094.1
: 9. 2011Mark A. Miles, Deputy State Historic Preservation OfficerDateMISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICEP.O. Box 176, Jefferson City, Missouri165102 For additional Information, please contact Judith Dsel, (573) 751-7862.
 
Please be sure to refer to the project number:015-BO-11 Preliminary Geotechnical Engineering ReportDiscovery Ridge -Certified Site ProgramLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18Columbia, MissouriFebruary 17,2011Terracon Project No. 09105094.1 Prepared for:Trabue, Hansen & Hinshaw, Inc.Columbia, MissouriPrepared by:Terracon Consultants, Inc.Columbia, Missouri llti[' U ll Feray1721r erraconTrabue, Hansen & Hinshaw, Inc.1901 Pennsylvania
==Dear Mr. Huss Terracon Consultants,==
: Columbia, Missouri 65202Attn: Mr. John Huss, R.E.P: [573] 814-1568F: [573] 814-1128Re: Preliminary Geotec~hnical Engineering ReportDiscovery Ridge -Certified Site ProgramLots 2, 5, 6,7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18Columbia, MissouriTerracon Project Number: 09105094.1 Dear Mr. HussTerracon Consultants, Inc. (Terracon) has completed the preliminary geotechnical engineering services for the above referenced project.
Inc. (Terracon) has completed the preliminary geotechnical engineering services for the above referenced project. This study was performed in general accordance with our proposal number D091 0226 dated December 15, 2010 and our Supplemental Change Order dated February 2, 2011. This report presents the findings of the subsurface exploration and provides preliminary geotechnical recommendations concerning earthwork and the design and construction of foundations, floor slabs and pavements for the proposed project.We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us.Sincerely, Terracon Consultants, Inc.Staff Geotechnical Engineer t"Senior Principal Missouri:
This study was performed in general accordance with our proposal number D091 0226 dated December 15, 2010 and our Supplemental ChangeOrder dated February 2, 2011. This report presents the findings of the subsurface exploration and provides preliminary geotechnical recommendations concerning earthwork and the designand construction of foundations, floor slabs and pavements for the proposed project.We appreciate the opportunity to be of service to you on this project.
PE 2009001099 7S UMBER Office Manager Enclosures 2- cc: 3- Client 1 -File Terracon Consultants, Inc. 3601 Molave court, Ste. A Columbia, Missouri 65202 P [573J 214 2817 F [5731 214 2714 terracon.com i
If you have any questions concerning this report, or if we may be of further service, please contact us.Sincerely, Terracon Consultants, Inc.Staff Geotechnical Engineer t"Senior Principal Missouri:
TABLE OF CONTENTS Page EXECUTIVE
PE 2009001099 7S UMBER Office ManagerEnclosures 2- cc: 3- Client1 -FileTerracon Consultants, Inc. 3601 Molave court, Ste. A Columbia, Missouri 65202P [573J 214 2817 F [5731 214 2714 terracon.com i
 
TABLE OF CONTENTSPageEXECUTIVE SUMMARY.................................................................................I
==SUMMARY==
.................................................................................I


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==
.................................................................................I 2.0 PROJECT INFORMATION  
.................................................................................I 2.0 PROJECT INFORMATION  
.....................................................................
.....................................................................
I2.1 Project Description...................................................................I..
I 2.1 Project Description...................................................................I..
2.2 Site Location and Description  
2.2 Site Location and Description  
.........................................................
.........................................................
23.0 SUBSURFACE CONDITIONS  
2 3.0 SUBSURFACE CONDITIONS  
................................................................
................................................................
23.1 Geology .................................................................................
2 3.1 Geology .................................................................................
23.2 Typical Profile...........................................................................
2 3.2 Typical Profile...........................................................................
33.3 Groundwater............................................................................
3 3.3 Groundwater............................................................................
44.0 SITE SUITABILITY AND PRELIMINARY FINDINGS AND RECOMMENDATIONS  
4 4.0 SITE SUITABILITY AND PRELIMINARY FINDINGS AND RECOMMENDATIONS  
.....54.1 Geotechnical Considerations..........................................................
.....5 4.1 Geotechnical Considerations..........................................................
54.2 Earthwork...............................................................................
5 4.2 Earthwork...............................................................................
64.3 Foundations.............................................................................
6 4.3 Foundations.............................................................................
64.4 Seismic Considerations  
6 4.4 Seismic Considerations  
................................................................
................................................................
74.5 Floor Slabs ..............................................................................
7 4.5 Floor Slabs ..............................................................................
84.6 Pavements  
8 4.6 Pavements  
..............................................................................
..............................................................................
85.0  
8 5.0  


==GENERAL COMMENT==
==GENERAL COMMENT==
S.......................................................................
S.......................................................................
9APPENDIX A -FIELD EXPLORATION Exhibit A-I Site Location MapExhibit A-2 USGS MapExhibit A-3 Geologic MapExhibit A-4 Boring Location DiagramExhibit A-5 to A-I13 Boring LogsExhibit A-14 Field Exploration Description APPENDIX B -SUPPORTING INFORMATION Exhibit B-I Laboratory TestingAPPENDIX C -SUPPORTING DOCUMENTS Exhibit C-I General NotesExhibit C-2 Unified Soil Classification SystemExhibit C-3 General Notes -Description of Rock Properties Exhibit C-4 Projected Earthquake Intensities (Modified Mercalli Scale)Reliable u Responsive u Convenient.*
9 APPENDIX A -FIELD EXPLORATION Exhibit A-I Site Location Map Exhibit A-2 USGS Map Exhibit A-3 Geologic Map Exhibit A-4 Boring Location Diagram Exhibit A-5 to A-I13 Boring Logs Exhibit A-14 Field Exploration Description APPENDIX B -SUPPORTING INFORMATION Exhibit B-I Laboratory Testing APPENDIX C -SUPPORTING DOCUMENTS Exhibit C-I General Notes Exhibit C-2 Unified Soil Classification System Exhibit C-3 General Notes -Description of Rock Properties Exhibit C-4 Projected Earthquake Intensities (Modified Mercalli Scale)Reliable u Responsive u Convenient.*
Innovative Preliminary Geotechnical Engineering Report__l raDiscovery Ridge -Certified Site Program oLots 2, 5, 6,7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, MissouriFebruary 17, 2011 .Terracon Project No. 09105094.1.1 EXECUTIVE SUMMARYA preliminary geotechnical investigation has been performed for the proposed certified site whichconsists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of the Discovery RidgeResearch Park in southeastern  
Innovative Preliminary Geotechnical Engineering Report__l ra Discovery Ridge -Certified Site Program o Lots 2, 5, 6,7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 EXECUTIVE  
: Columbia, Missouri.
 
Nine (9) borings, designated B-I through B-9,were performed to depths of approximately 13 to 20 feet below the existing ground surface at thesubject site.Based on the information obtained from our subsurface exploration, the site can be developed forfuture construction.
==SUMMARY==
A preliminary geotechnical investigation has been performed for the proposed certified site which consists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of the Discovery Ridge Research Park in southeastern Columbia, Missouri.
Nine (9) borings, designated B-I through B-9, were performed to depths of approximately 13 to 20 feet below the existing ground surface at the subject site.Based on the information obtained from our subsurface exploration, the site can be developed for future construction.
The following geotechnical considerations were identified:
The following geotechnical considerations were identified:
* Typical lightly loaded commercial buildings may be supported on shallow footingsbearing on stiff to very stiff native clay or on compacted structural fill.* Assuming proper site preparation and any necessary subgrade repair, total anddifferential settlement should be within anticipated client/owner specifications.
* Typical lightly loaded commercial buildings may be supported on shallow footings bearing on stiff to very stiff native clay or on compacted structural fill.* Assuming proper site preparation and any necessary subgrade repair, total and differential settlement should be within anticipated client/owner specifications.
* Existing fill was encountered in Borings B-3 and B-4, however we understand that thismaterial was placed as part of mass grading during mid to late 2008. At that time,Terracon was onsite to observe and test the density and moisture during placement ofengineered fill material.
* Existing fill was encountered in Borings B-3 and B-4, however we understand that this material was placed as part of mass grading during mid to late 2008. At that time, Terracon was onsite to observe and test the density and moisture during placement of engineered fill material.* Based on the USGS map, it appears that a pond may have been located in the vicinity of lot 16 and that the existing pond located north of the Radii Facility previously extended west onto a portion of Lot 2. We recommend these areas be thoroughly investigated during the final geotechnical investigation for each respective lot.* The near-surface soils are active and prone to volume change with variations in moisture content. For this reason, a low volume change zone (LVC) is typically constructed beneath at-grade, grade-supported floor slabs. Depending on final grading plans, construction of the LVC may require overexcavation within future building pads.* On-site soils appear suitable for use as compacted structural fill; however, if they do not meet the low plasticity fill criteria, they should not be utilized for LVC material.* The 2006/2009 International Building Code (IBC), Table 1613.5.2 seismic site classification for this site is C* The Modified Mercalli Intensity Scale for seismic events for Boone County is VII.Reliable m Responsive
* Based on the USGS map, it appears that a pond may have been located in the vicinity oflot 16 and that the existing pond located north of the Radii Facility previously extended westonto a portion of Lot 2. We recommend these areas be thoroughly investigated during thefinal geotechnical investigation for each respective lot.* The near-surface soils are active and prone to volume change with variations in moisturecontent.
For this reason, a low volume change zone (LVC) is typically constructed beneathat-grade, grade-supported floor slabs. Depending on final grading plans, construction ofthe LVC may require overexcavation within future building pads.* On-site soils appear suitable for use as compacted structural fill; however, if they do notmeet the low plasticity fill criteria, they should not be utilized for LVC material.
* The 2006/2009 International Building Code (IBC), Table 1613.5.2 seismic siteclassification for this site is C* The Modified Mercalli Intensity Scale for seismic events for Boone County is VII.Reliable m Responsive
* Convenient.*
* Convenient.*
Innovative i
Innovative i
Preliminary Geotechnical Engineering Report"l ra nDiscovery Ridge -Certified Site Program 1rra oLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
Preliminary Geotechnical Engineering Report"l ra n Discovery Ridge -Certified Site Program 1rra o Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
* Columbia, MissouriFebruary 17, 2011 m Terracon Project No. 09105094.1.1 EXECUTIVE SUMMARY (continued)
* Columbia, Missouri February 17, 2011 m Terracon Project No. 09105094.1.1 EXECUTIVE  
* Close monitoring of the construction operations discussed herein will be critical inachieving the design subgrade support.
 
We recommend that Terracon be retained tomonitor this portion of the work.This summary should be used in conjunction with the entire report for design purposes.
==SUMMARY==
Itshould be recognized that details were not included or fully developed in this section, and thereport must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled  
(continued)
* Close monitoring of the construction operations discussed herein will be critical in achieving the design subgrade support. We recommend that Terracon be retained to monitor this portion of the work.This summary should be used in conjunction with the entire report for design purposes.
It should be recognized that details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled  


==GENERAL COMMENT==
==GENERAL COMMENT==
S should be read for an understanding of thereport limitations.
S should be read for an understanding of the report limitations.
Although this report discusses design parameters, these parameters arepreliminary.
Although this report discusses design parameters, these parameters are preliminary.
This preliminary report is not intended to be relied upon for final design.Reliable
This preliminary report is not intended to be relied upon for final design.Reliable
* Responsive u Convenient
* Responsive u Convenient
* Innovative iii PRELIMINARY GEOTECHNICAL ENGINEERING REPORTDISCOVERY RIDGE -CERTIFIED SITE PROGRAMLOTS 2, 5, 6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18COLUMBIA, MISSOURITerracon Project No. 09105094.1 February 17, 201
* Innovative i ii PRELIMINARY GEOTECHNICAL ENGINEERING REPORT DISCOVERY RIDGE -CERTIFIED SITE PROGRAM LOTS 2, 5, 6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 COLUMBIA, MISSOURI Terracon Project No. 09105094.1 February 17, 2011


==11.0 INTRODUCTION==
==1.0 INTRODUCTION==


A preliminary geotechnical engineering report has been completed for the proposed certified whichconsists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of Discovery Ridge ResearchPark in Columbia, Missouri.
A preliminary geotechnical engineering report has been completed for the proposed certified which consists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of Discovery Ridge Research Park in Columbia, Missouri.
Nine (9) borings, designated B-i through B-9, were performed todepths of approximately 13 to 20 feet below the existing ground surface at the subject site. Logs ofthe borings along with a site location map, USGS map, geologic map and boring location diagramare included in Appendix A of this report.The purpose of these services is to provide information and preliminary geotechnical engineering recommendations relative to:UUUUsubsurface soil conditions groundwater conditions earthwork pavements
Nine (9) borings, designated B-i through B-9, were performed to depths of approximately 13 to 20 feet below the existing ground surface at the subject site. Logs of the borings along with a site location map, USGS map, geologic map and boring location diagram are included in Appendix A of this report.The purpose of these services is to provide information and preliminary geotechnical engineering recommendations relative to: U U U U subsurface soil conditions groundwater conditions earthwork pavements* foundation design and construction
* foundation design and construction
* floor slab design and construction
* floor slab design and construction
* seismic considerations It is important to note that this preliminary geotechnical engineering report is not meant toprovide final design recommendations.
* seismic considerations It is important to note that this preliminary geotechnical engineering report is not meant to provide final design recommendations.
Once final development plans are available, a finalgeotechnical investigation should be performed for site and structure-specific geotechnical recommendations.
Once final development plans are available, a final geotechnical investigation should be performed for site and structure-specific geotechnical recommendations.
2.0 PROJECT INFORMATION 2.1 Project Description ITEM DESCRIPTION Site layout See Appendix A, Exhibit A-4: Boring Location DiagramThe project will include future development of approximately 90Structures acres of vacant land. Finalized specific building or site layout detailswere unknown at the time this report was prepared.
2.0 PROJECT INFORMATION 2.1 Project Description ITEM DESCRIPTION Site layout See Appendix A, Exhibit A-4: Boring Location Diagram The project will include future development of approximately 90 Structures acres of vacant land. Finalized specific building or site layout details were unknown at the time this report was prepared.Reliable
Reliable
* Responsive m Convenient m Innovative1 1
* Responsive m Convenient m Innovative1 1
Preliminary Geotechnical Engineering ReportDiscovery Ridge -Certified Site ProgramLots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
* Columbia, MissouriFebruary 17, 2011 m Terracon Project No. 09105094.1.1 irerracon ITEM DESCRIPTION Site grading information was not available at the time that this reportwas prepared.
* Columbia, Missouri February 17, 2011 m Terracon Project No. 09105094.1.1 irerracon ITEM DESCRIPTION Site grading information was not available at the time that this report was prepared.
However for the purpose and scope of this report,we have assumed that local cuts and/or fills required forGrading development will be limited to approximately 10 feet.Additionally, we understand that mass grading was performed in midto late 2008 in the vicinity of the existing Radii Facility and ABCLaboratories building.
However for the purpose and scope of this report, we have assumed that local cuts and/or fills required for Grading development will be limited to approximately 10 feet.Additionally, we understand that mass grading was performed in mid to late 2008 in the vicinity of the existing Radii Facility and ABC Laboratories building.
At that time, Terracon was onsite to observeand test the placement of engineered fill material.
At that time, Terracon was onsite to observe and test the placement of engineered fill material.Cut and fill slopes No steeper than 3H:IV (Horizontal to Vertical) (assumed)2.2 Site Location and Description ITEM DESCRIPTION The proposed project site consists of Lots 2, 5, 6, 7 8, 9, 10, 11, 12, Location 13, 14, 15, 16, 17 and 18 of Discovery Ridge Research Park in______________________
Cut and fill slopes No steeper than 3H:IV (Horizontal to Vertical)  
Columbia, Missoudi.The lots are vacant with the exception of Lot 5 which is developed Exisingimprvemntswith a storage building.Generally grass covered, however portions of the site in the vicinity Curret grund overof Lot 16 were cultivated fields.In general, slightly to moderately sloped downward towards the Existing topography south and west.3.0 SUBSURFACE CONDITIONS 3.1 Geology Most of the upland area is covered by a thin loess blanket and glacial drift. Highly plastic clays that exhibit volume change with variations in moisture are commonly encountered near the ground surface.Based on the 2003 Geologic Map of Missouri, Missouri Department of Natural Resources, bedrock at this site consists primarily of the Pennsylvanian aged Cherokee Group (Pc), the Pennsylvanian aged Marmaton Group (Pm), and the Mississippian aged Burlington formation (Mo). The Cherokee Group is predominantly shale with minor amounts of carbonates and sandstone.
(assumed) 2.2 Site Location and Description ITEM DESCRIPTION The proposed project site consists of Lots 2, 5, 6, 7 8, 9, 10, 11, 12,Location 13, 14, 15, 16, 17 and 18 of Discovery Ridge Research Park in______________________  
: Columbia, Missoudi.
The lots are vacant with the exception of Lot 5 which is developed Exisingimprvemntswith a storage building.
Generally grass covered, however portions of the site in the vicinityCurret grund overof Lot 16 were cultivated fields.In general, slightly to moderately sloped downward towards theExisting topography south and west.3.0 SUBSURFACE CONDITIONS 3.1 GeologyMost of the upland area is covered by a thin loess blanket and glacial drift. Highly plastic claysthat exhibit volume change with variations in moisture are commonly encountered near theground surface.Based on the 2003 Geologic Map of Missouri, Missouri Department of Natural Resources, bedrock at this site consists primarily of the Pennsylvanian aged Cherokee Group (Pc), thePennsylvanian aged Marmaton Group (Pm), and the Mississippian aged Burlington formation (Mo). The Cherokee Group is predominantly shale with minor amounts of carbonates andsandstone.
This group contains most of the mineable coal beds in Missouri.
This group contains most of the mineable coal beds in Missouri.
The MarmatonGroup consists of a succession of shale, limestone, clay, and coal beds.Reliable
The Marmaton Group consists of a succession of shale, limestone, clay, and coal beds.Reliable
* Responsive
* Responsive
* Convenient
* Convenient
* Innovative2 2
* Innovative2 2
Preliminary Geotechnical Engineering ReportDiscovery Ridge -Certified Site ProgramLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
* Columbia, MissouriFebruary 17, 2011
* Columbia, Missouri February 17, 2011
* Terracon Project No. 09105094.1  
* Terracon Project No. 09105094.1  
.1irerracon The Burlington formation is characteristically a white to gray, medium to coarsely crystalline, medium to coarsely crinoidal, chert free to sparsely cherty limestone.
.1 irerracon The Burlington formation is characteristically a white to gray, medium to coarsely crystalline, medium to coarsely crinoidal, chert free to sparsely cherty limestone.
Solution  
Solution features, including caves and sinkholes, are commonly present in this formation.
: features, including caves and sinkholes, are commonly present in this formation.
No caves or sinkholes are known to exist, or are published to exist, within approximately 1 mile of this project site.However several areas of known karst activity are present west and southwest of the project site.It is difficult to predict future sinkhole activity.
No caves or sinkholes are known to exist, or are published to exist, within approximately 1 mile of this project site.However several areas of known karst activity are present west and southwest of the projectsite.It is difficult to predict future sinkhole activity.
Sinkholes and caves in this area are in various stages of development and can appear at any time. Site grading and drainage may alter site conditions and could possibly cause sinkholes in areas that have no history of this activity.3.2 Typical Profile Based on the results of the borings, as follows: subsurface conditions on the project site can be generalized Stratum Approximate Depth to Mtra ecito ossec/est Stratum Bottom of Stratum (feet) Mtra ecito ossec/est Surface 0.2 to 0.5 Topsoil: brown, friable and contained N/A significant organic matter 3 to 12 Existing Fill ' consisting of lean clay 1 and lean to fat clay with Very stiff to hard (Borings B-3 & B-4 only) varying amounts of sand and gravel 2 3 to 12 Lean clay, lean to fat clay and fat clay Stiff to very stiff Undeermned BorngsB-i Lean to fat clay and fat clay with through B-5, B-B and B-9 varying amounts of sand, gravel andStftohr 3 teminaed wthi thi strtum possible cobbles (visually classified as at the planned depth of glacial drift)approximately 20 feet __________________________
Sinkholes and caves in this area are in variousstages of development and can appear at any time. Site grading and drainage may alter siteconditions and could possibly cause sinkholes in areas that have no history of this activity.
3.2 Typical ProfileBased on the results of the borings,as follows:subsurface conditions on the project site can be generalized Stratum Approximate Depth to Mtra ecito ossec/est Stratum Bottom of Stratum (feet) Mtra ecito ossec/est Surface 0.2 to 0.5 Topsoil:
brown, friable and contained N/Asignificant organic matter3 to 12 Existing Fill ' consisting of lean clay1 and lean to fat clay with Very stiff to hard(Borings B-3 & B-4 only) varying amounts of sand and gravel2 3 to 12 Lean clay, lean to fat clay and fat clay Stiff to very stiffUndeermned BorngsB-i Lean to fat clay and fat clay withthrough B-5, B-B and B-9 varying amounts of sand, gravel andStftohr 3 teminaed wthi thi strtum possible cobbles (visually classified asat the planned depth of glacial drift)approximately 20 feet __________________________
Undetermined:
Undetermined:
Borings B-6 Caused split spoon4 and B-7 terminated within Limestone sampler refusal andthis stratum.,________________
Borings B-6 Caused split spoon 4 and B-7 terminated within Limestone sampler refusal and this stratum.,________________
auger refusalNote 1: The existing fill material was placed in mid to late 2008. Terracon provided onsite observation and moisture/density testing during the placement of fill material.
auger refusal Note 1: The existing fill material was placed in mid to late 2008. Terracon provided onsite observation and moisture/density testing during the placement of fill material.The upper soil encountered in the borings generally consisted of lean to fat clay and fat clay which was of moderate to high plasticity, and had the following measured liquid limits, plastic limits, and plasticity indices: Reliable.*
The upper soil encountered in the borings generally consisted of lean to fat clay and fat claywhich was of moderate to high plasticity, and had the following measured liquid limits, plasticlimits, and plasticity indices:Reliable.*
Responsive u Convenient.*
Responsive u Convenient.*
Innovative3 3
Innovative3 3
Preliminary Geotechnical Engineering Report 1rDiscovery Ridge -Certified Site Program 1rrraconLots 2, 5,6, 7,8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, MissouriFebruary 17, 2011 .Terracon Project No. 09105094.1.1 Sample Location Depth (feet) Liquid Limit (%) Plastic Limit (%) Plasticity Index (%)Boring B-1 3 -5 43 15 28Boring B-3 1 -3 41 16 25Boring B-5 1 -3 31 21 10Boring B-9 1 -3 44 21 23Conditions encountered at each boring location are indicated on the individual boring logs.Stratification boundaries on the boring logs represent the approximate location of changes insoil types; in situ, the transition between materials may be gradual.
Preliminary Geotechnical Engineering Report 1r Discovery Ridge -Certified Site Program 1rrracon Lots 2, 5,6, 7,8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 Sample Location Depth (feet) Liquid Limit (%) Plastic Limit (%) Plasticity Index (%)Boring B-1 3 -5 43 15 28 Boring B-3 1 -3 41 16 25 Boring B-5 1 -3 31 21 10 Boring B-9 1 -3 44 21 23 Conditions encountered at each boring location are indicated on the individual boring logs.Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in situ, the transition between materials may be gradual. Details for each of the borings can be found on the boring logs in Appendix A of this report.3.3 Groundwater The boreholes were observed while drilling and after completion for the presence and level of groundwater.
Details for each of theborings can be found on the boring logs in Appendix A of this report.3.3 Groundwater The boreholes were observed while drilling and after completion for the presence and level ofgroundwater.
Groundwater was observed at in Borings B-5 and B-6 at depths of approximately 12 to 18.5 feet. Groundwater was not observed in the remaining borings during drilling or for the short amount of time the borings were allowed to remain open following drilling completion.
Groundwater was observed at in Borings B-5 and B-6 at depths of approximately 12 to 18.5 feet. Groundwater was not observed in the remaining borings during drilling or for theshort amount of time the borings were allowed to remain open following drilling completion.
However, this does not necessarily mean that stable groundwater levels were observed in Borings B-5 and B-6, or that the remaining borings were terminated above groundwater.
: However, this does not necessarily mean that stable groundwater levels were observed in BoringsB-5 and B-6, or that the remaining borings were terminated above groundwater.
Due to the low permeability of the soils encountered in the borings, a relatively long period of time may be necessary for a groundwater level to develop and stabilize in a borehole in these materials.
Due to the low permeability of the soils encountered in the borings, a relatively long period of timemay be necessary for a groundwater level to develop and stabilize in a borehole in these materials.
Long term observations in piezometers or observation wells sealed from the influence of surface water are often required to define groundwater levels in materials of this type.Pockets, lenses, and stringers of sand are sometimes encountered in the glacial soils found in the vicinity of the referenced project. These sand pockets are normally discontinuous and often contain water of variable quality and quantity.
Long term observations in piezometers or observation wells sealed from the influence of surfacewater are often required to define groundwater levels in materials of this type.Pockets, lenses, and stringers of sand are sometimes encountered in the glacial soils found inthe vicinity of the referenced project.
These sand pockets may be encountered during foundation excavation.
These sand pockets are normally discontinuous and oftencontain water of variable quality and quantity.
This possibility should be considered when developing design and construction plans and specifications for the project.Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff, proximity to existing ponds, and other factors not evident at the time the borings were performed.
These sand pockets may be encountered duringfoundation excavation.
In addition, perched water can develop over low permeability soil strata. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project.Reliable u Responsive
This possibility should be considered when developing design andconstruction plans and specifications for the project.Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff,proximity to existing ponds, and other factors not evident at the time the borings wereperformed.
In addition, perched water can develop over low permeability soil strata. Therefore, groundwater levels during construction or at other times in the life of the structure may be higheror lower than the levels indicated on the boring logs. The possibility of groundwater levelfluctuations should be considered when developing the design and construction plans for theproject.Reliable u Responsive
* Convenient m Innovative4 4
* Convenient m Innovative4 4
Preliminary Geotechnical Engineering Report 1rDiscovery Ridge -Certified Site Program ra aLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 u Columbia, MissouriFebruary 17, 2011
Preliminary Geotechnical Engineering Report 1r Discovery Ridge -Certified Site Program ra a Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 u Columbia, Missouri February 17, 2011
* Terracon Project No. 09105094.1.1 4.0 SITE SUITABILITY AND PRELIMINARY FINDINGS ANDRECOMMENDATIONS 4.1 Geotechnical Considerations The borings performed for this project generally encountered native lean to fat clay and fat clayunderlain by glacial drift. Existing fill was encountered in Borings B-3 and B-4 to depths of 3 to 12feet, and limestone bedrock was encountered in Borings B-6 and B-7 at depths of approximately 17 and 12.5 feet, respectively.
* Terracon Project No. 09105094.1.1 4.0 SITE SUITABILITY AND PRELIMINARY FINDINGS AND RECOMMENDATIONS 4.1 Geotechnical Considerations The borings performed for this project generally encountered native lean to fat clay and fat clay underlain by glacial drift. Existing fill was encountered in Borings B-3 and B-4 to depths of 3 to 12 feet, and limestone bedrock was encountered in Borings B-6 and B-7 at depths of approximately 17 and 12.5 feet, respectively.
Depending on final site grading plans, we anticipate that either thenative clay or compacted structural fill will form the subgrade for future building foundations andfloor slabs.Based on the USGS map, it appears that a pond may have been located in the vicinity of lot 16.Further, based on aerial photography the existing pond located north of the Radii Facility previously extended southwest onto a portion of Lot 2. We recommend these areas be thoroughly investigated during the final geotechnical investigation for each respective lot.Performance of foundations depends on many factors including, but not limited to, the depth offootings, amounts of cuts or fill, bearing material, and foundation loads. Structural loads, finalgrades, and other design details should be provided when available.
Depending on final site grading plans, we anticipate that either the native clay or compacted structural fill will form the subgrade for future building foundations and floor slabs.Based on the USGS map, it appears that a pond may have been located in the vicinity of lot 16.Further, based on aerial photography the existing pond located north of the Radii Facility previously extended southwest onto a portion of Lot 2. We recommend these areas be thoroughly investigated during the final geotechnical investigation for each respective lot.Performance of foundations depends on many factors including, but not limited to, the depth of footings, amounts of cuts or fill, bearing material, and foundation loads. Structural loads, final grades, and other design details should be provided when available.
Although this reportdiscusses design parameters, these parameters are preliminary.
Although this report discusses design parameters, these parameters are preliminary.
This preliminary report is notintended to be relied upon for final design. We recommend a more detailed study be performed when specific project details are known, and/or possibly following completion of general sitegrading.Examination of the boring logs indicates a range of soil-moisture conditions are present at thissite. At the time of drilling, some of the soils at various depths are at moisture levels above theirmeasured plastic limit. Typically, soil with moisture levels above their measured plastic limit maybe prone to rutting,  
This preliminary report is not intended to be relied upon for final design. We recommend a more detailed study be performed when specific project details are known, and/or possibly following completion of general site grading.Examination of the boring logs indicates a range of soil-moisture conditions are present at this site. At the time of drilling, some of the soils at various depths are at moisture levels above their measured plastic limit. Typically, soil with moisture levels above their measured plastic limit may be prone to rutting, pumping, and can develop into unstable subgrade conditions during general construction operations.
: pumping, and can develop into unstable subgrade conditions during generalconstruction operations.
Moderately to highly plastic, lean to fat clay and fat clay soils were present on site. Such soils are commonly referred to as "expansive" or "swelling" soils because they expand or swell as their moisture contents increase.
Moderately to highly plastic, lean to fat clay and fat clay soils were present on site. Such soils arecommonly referred to as "expansive" or "swelling" soils because they expand or swell as theirmoisture contents increase.  
However, these soils also "contract" or "shrink" as their moisture levels decrease.
: However, these soils also "contract" or "shrink" as their moisturelevels decrease.  
Footings, floor slabs, and pavements supported on expansive soils will move upward and downward and such movements will result in distortion, possibly causing cracking or structural damage to structures.
: Footings, floor slabs, and pavements supported on expansive soils will moveupward and downward and such movements will result in distortion, possibly causing cracking orstructural damage to structures.
For this reason, a low volume change zone will likely be required beneath at-grade floor slabs. We recommend that additional laboratory testing be performed during the final geotechnical exploration to better evaluate the expansive nature of these soils.Reliable
For this reason, a low volume change zone will likely berequired beneath at-grade floor slabs. We recommend that additional laboratory testing beperformed during the final geotechnical exploration to better evaluate the expansive nature ofthese soils.Reliable
* Responsive
* Responsive
* Convenient
* Convenient
* Innovative 5
* Innovative 5
Preliminary Geotechnical Engineering ReportDiscovery Ridge -Certified Site Program ra oLots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, MissouriFebruary 17, 2011
Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program ra o Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011
* Terracon Project No. 09105094.1.1 We recommend that the exposed subgrade be thoroughly evaluated after stripping of anytopsoil and creation of all cut areas, but prior to the start of any fill operations.
* Terracon Project No. 09105094.1.1 We recommend that the exposed subgrade be thoroughly evaluated after stripping of any topsoil and creation of all cut areas, but prior to the start of any fill operations.
We recommend that the geotechnical engineer be retained to evaluate the bearing material for the foundations and floor slab subgrade soils. Subsurface conditions, as identified by the field and laboratory testing programs, have been reviewed and evaluated with respect to the proposed development plans known to us at this time.4.2 Earthwork The widely spaced preliminary borings typically encountered stiff to hard lean to fat clay and fatclay. Shallow bedrock, karst features, or extensive pervious deposits of water-bearing sand thatcould impact site development did not appear to be present based on the preliminary site andsubsurface information gathered at this time.Based on the subsurface conditions encountered in the widely spaced borings, the site soils aresuitable for future development.
We recommend that the geotechnical engineer be retained to evaluate the bearing material for the foundations and floor slab subgrade soils. Subsurface conditions, as identified by the field and laboratory testing programs, have been reviewed and evaluated with respect to the proposed development plans known to us at this time.4.2 Earthwork The widely spaced preliminary borings typically encountered stiff to hard lean to fat clay and fat clay. Shallow bedrock, karst features, or extensive pervious deposits of water-bearing sand that could impact site development did not appear to be present based on the preliminary site and subsurface information gathered at this time.Based on the subsurface conditions encountered in the widely spaced borings, the site soils are suitable for future development.
Additional borings should be completed so that each site can beadequately characterized and recommendations can be more fully developed to assist and guidefuture mass grading.Recommendations will need to be developed for site preparation and proof-rolling operations aswell as construction of cut and structural fill operations.
Additional borings should be completed so that each site can be adequately characterized and recommendations can be more fully developed to assist and guide future mass grading.Recommendations will need to be developed for site preparation and proof-rolling operations as well as construction of cut and structural fill operations.
In our opinion, full-time testing andobservation should be employed during mass grading to evaluate compliance with projectearthwork recommendations and requirements.
In our opinion, full-time testing and observation should be employed during mass grading to evaluate compliance with project earthwork recommendations and requirements.
If site grading results in relatively thick structural fills, settlement and cut/fill slope stability may need to be evaluated.
If site grading results in relatively thick structural fills, settlement and cut/fill slope stability may need to be evaluated.


===4.3 Foundations===
===4.3 Foundations===
Shallow foundations could be used to support lightly loaded commercial structures provided thefootings are supported by suitable material (stiff to hard native clay or compacted structural fill).Depending on the design footing elevation and bearing material (native clay or newly placedcompacted structural fill), allowable bearing pressures would likely be in the range of 1,000 psf to3,000 psf. Due to the presence of clay soils, shallow foundations are typically soil-formed in thegeneral vicinity of this site. Further testing at the individual structure locations should beperformed to determine the appropriate bearing capacity for structural support.Heavier loads, which could cause excessive settlement, are normally supported by shallowfoundations which are supported, in turn, by aggregate-pier intermediate foundations or by drilledpiers. Pier drilling through the native soils is not expected to become difficult based upon thematerial encountered within the borings;  
Shallow foundations could be used to support lightly loaded commercial structures provided the footings are supported by suitable material (stiff to hard native clay or compacted structural fill).Depending on the design footing elevation and bearing material (native clay or newly placed compacted structural fill), allowable bearing pressures would likely be in the range of 1,000 psf to 3,000 psf. Due to the presence of clay soils, shallow foundations are typically soil-formed in the general vicinity of this site. Further testing at the individual structure locations should be performed to determine the appropriate bearing capacity for structural support.Heavier loads, which could cause excessive settlement, are normally supported by shallow foundations which are supported, in turn, by aggregate-pier intermediate foundations or by drilled piers. Pier drilling through the native soils is not expected to become difficult based upon the material encountered within the borings; however, the drilled pier contractor should be prepared should sandy zones or large boulders be encountered.
: however, the drilled pier contractor should be preparedshould sandy zones or large boulders be encountered.
These materials, although not Reliable
These materials, although notReliable
* Responsive.*
* Responsive.*
Convenient.*
Convenient.*
Innovative6 6
Innovative6 6
Preliminary Geotechnical Engineering ReportDiscovery Ridge -Certified Site ProgramLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
* Columbia, MissouriFebruary 17, 2011 .Terracon Project No. 09105094.1.1 rerraconencountered in our borings, can sometimes be encountered in the glacial soils that are present inthe vicinity of this site when drilling pier holes which are much larger in diameter than the boreholes.Footln0 LevelExcavalonLee Lean Concrete Backfill Overexcavation  
* Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 rerracon encountered in our borings, can sometimes be encountered in the glacial soils that are present in the vicinity of this site when drilling pier holes which are much larger in diameter than the bore holes.Footln0 Level ExcavalonLee Lean Concrete Backfill Overexcavation  
/ BackfillNOTE" IExcavations in sketches Shown vetia for convenience.
/ Backfill NOTE" IExcavations in sketches Shown vetia for convenience.
Excavations should be sloped as necessary for 4.4 Seismic Considerations
Excavations should be sloped as necessary for 4.4 Seismic Considerations
: 1. Missouri State Emergency Management Agency;,
: 1. Missouri State Emergency Management Agency;, P.O. Box 116; Jefferson City, MO 65102 2. See Appendix C, Exhibit C-4 for Projected Earthquake Intensities (Modified Mercalli Scale)Code Used Site Classification 2006/2009 Intemational Building Code (IBC) 1 C 2 1.2.In general accordance with the 2006/2009 International Building Code, Table 1613.5.2.The 2006/2009 Intemational Building Code requires a site soil profile determination extending a depth of 100 feet for seismic site classification.
P.O. Box 116; Jefferson City, MO 651022. See Appendix C, Exhibit C-4 for Projected Earthquake Intensities (Modified Mercalli Scale)Code Used Site Classification 2006/2009 Intemational Building Code (IBC) 1C 21.2.In general accordance with the 2006/2009 International Building Code, Table 1613.5.2.
The current scope requested does not include the required 100 foot soil profile determination.
The 2006/2009 Intemational Building Code requires a site soil profile determination extending adepth of 100 feet for seismic site classification.
Borings for this report extended to a maximum depth of approximately 20 feet and this seismic site class assignment considers that shale or limestone bedrock is present within approximately 30 feet of the ground surface and continues below the maximum depth of the subsurface exploration.
The current scope requested does not include therequired 100 foot soil profile determination.
Additional exploration to greater depths could be considered to confirm the conditions below the current depth of exploration.
Borings for this report extended to a maximum depth ofapproximately 20 feet and this seismic site class assignment considers that shale or limestone bedrock is present within approximately 30 feet of the ground surface and continues below themaximum depth of the subsurface exploration.
Altematively, a geophysical exploration could be utilized in order to attempt to justify a more favorable seismic site class.Reliable
Additional exploration to greater depths could beconsidered to confirm the conditions below the current depth of exploration.
Altematively, ageophysical exploration could be utilized in order to attempt to justify a more favorable seismic siteclass.Reliable
* Responsive
* Responsive
* Convenient.*
* Convenient.*
Innovative7 7
Innovative7 7
Preliminary Geotechnical Engineering Report 1e rDiscovery Ridge -Certified Site Program nLots 2, 5, 6, 7, 8, 9, 10, II, 12, 13, 14, 15, 16, 17 and 18 .Columbia, MissouriFebruary 17, 2011 .Terracon Project No. 09105094.1.1 4.5 Floor SlabsMany of the clay soils in this locale have the potential to increase or decrease in volume withvariations in moisture content.
Preliminary Geotechnical Engineering Report 1e r Discovery Ridge -Certified Site Program n Lots 2, 5, 6, 7, 8, 9, 10, II, 12, 13, 14, 15, 16, 17 and 18 .Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 4.5 Floor Slabs Many of the clay soils in this locale have the potential to increase or decrease in volume with variations in moisture content. Soil having high plasticity characteristics (i.e., fat clay) generally has a greater potential for moisture related volume change than less plastic materials such as lean clay. In addition, swell potential is generally greater in material with a high dry unit weight and low initial moisture content. However, even low plasticity soils can swell significantly if their moisture levels are initially low.Because of the moderate to high shrink-swell potential of the lean to fat clay and fat clay soil encountered in the borings, a low volume change layer will likely be required below at-grade floor slabs. This layer typically varies from 12 to 36 inches in thickness.
Soil having high plasticity characteristics (i.e., fat clay) generally has a greater potential for moisture related volume change than less plastic materials such aslean clay. In addition, swell potential is generally greater in material with a high dry unit weightand low initial moisture content.  
The on-site lean to fat clay and fat clay soils encountered in the borings performed for this report are typically not suitable for use as low volume change material; however, on-site materials may exist which would meet the low volume change material criteria.
: However, even low plasticity soils can swell significantly if theirmoisture levels are initially low.Because of the moderate to high shrink-swell potential of the lean to fat clay and fat clay soilencountered in the borings, a low volume change layer will likely be required below at-gradefloor slabs. This layer typically varies from 12 to 36 inches in thickness.
The on-site lean to fatclay and fat clay soils encountered in the borings performed for this report are typically notsuitable for use as low volume change material;  
: however, on-site materials may exist whichwould meet the low volume change material criteria.
Further testing at the individual structure locations should be performed to determine the required low volume change layer thickness.
Further testing at the individual structure locations should be performed to determine the required low volume change layer thickness.
 
4.6 Pavements On most project sites, the site grading is accomplished relatively early in the construction phase.Fills are placed and compacted in a uniform manner. However, as construction proceeds, excavations are made into these areas, rainfall and surface water saturates some areas, heavy traffic from concrete trucks and other delivery vehicles disturbs the subgrade and many surface irregularities are filled in with loose soils to improve trafficability temporarily.
===4.6 Pavements===
As a result, the pavement subgrades, initially prepared early in the project, should be carefully evaluated as the time for pavement construction approaches.
On most project sites, the site grading is accomplished relatively early in the construction phase.Fills are placed and compacted in a uniform manner. However, as construction  
Pavement thickness can be determined using AASHTO, Asphalt Institute and/or other methods if specific wheel loads, axle configurations, frequencies, and desired pavement life are provided.Pavement design methods are intended to provide structural sections with adequate thickness over a particular subgrade such that wheel loads are reduced to a level the subgrade can support.The support characteristics of the subgrade for pavement design do not account for shrink/swell movements of an expansive clay subgrade such as the soils encountered on this project. Thus, the pavement may be adequate from a structural standpoint, yet still experience cracking and deformation due to shrink/swell related movement of the subgrade.Expansive soils are present at this site. It is important to minimize moisture changes in the subgrade both during construction and during the life of the pavement to reduce shrink/swell movements.
: proceeds, excavations are made into these areas, rainfall and surface water saturates some areas, heavytraffic from concrete trucks and other delivery vehicles disturbs the subgrade and many surfaceirregularities are filled in with loose soils to improve trafficability temporarily.
As a result, thepavement subgrades, initially prepared early in the project, should be carefully evaluated as thetime for pavement construction approaches.
Pavement thickness can be determined using AASHTO, Asphalt Institute and/or other methods ifspecific wheel loads, axle configurations, frequencies, and desired pavement life are provided.
Pavement design methods are intended to provide structural sections with adequate thickness over a particular subgrade such that wheel loads are reduced to a level the subgrade can support.The support characteristics of the subgrade for pavement design do not account for shrink/swell movements of an expansive clay subgrade such as the soils encountered on this project.
Thus,the pavement may be adequate from a structural standpoint, yet still experience cracking anddeformation due to shrink/swell related movement of the subgrade.
Expansive soils are present at this site. It is important to minimize moisture changes in thesubgrade both during construction and during the life of the pavement to reduce shrink/swell movements.
Reliable
Reliable
* Responsive.*
* Responsive.*
Convenient.*
Convenient.*
Innovative8 8
Innovative8 8
Preliminary Geotechnical Engineering Reporto~scov oe ,o1 terraconLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 .Columbia, MissouriFebruary 17, 2011 .Terracon Project No. 09105094.1.1 5.0  
Preliminary Geotechnical Engineering Report o~scov oe ,o1 terracon Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 .Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 5.0  


==GENERAL COMMENT==
==GENERAL COMMENT==
STerracon should be retained to review the final design plans and specifications so commentscan be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications.
S Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications.
Terracon also should be retained to provide observation andtesting services during grading, excavation, foundation construction and other earth-related construction phases of the project.The preliminary analysis and preliminary recommendations presented in this report are basedupon the data obtained from the borings performed at the indicated locations and from otherinformation discussed in this preliminary report. This preliminary report does not reflectvariations that may occur between borings, across the site, or due to the modifying effects ofconstruction or weather.
Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth-related construction phases of the project.The preliminary analysis and preliminary recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this preliminary report. This preliminary report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction.
The nature and extent of such variations may not become evident untilduring or after construction.
If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided.The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions.
If variations appear, we should be immediately notified so thatfurther evaluation and supplemental recommendations can be provided.
If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken.
The scope of services for this project does not include either specifically or by implication anyenvironmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification orprevention of pollutants, hazardous materials or conditions.
This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices.
If the owner is concerned about thepotential for such contamination or pollution, other studies should be undertaken.
No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this preliminary report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing.Reliable.*
This report has been prepared for the exclusive use of our client for specific application to theproject discussed and has been prepared in accordance with generally accepted geotechnical engineering practices.
No warranties, either express or implied, are intended or made. Sitesafety, excavation  
: support, and dewatering requirements are the responsibility of others. In theevent that changes in the nature, design, or location of the project as outlined in this report areplanned, the conclusions and recommendations contained in this preliminary report shall not beconsidered valid unless Terracon reviews the changes and either verifies or modifies theconclusions of this report in writing.Reliable.*
Responsive a Convenient
Responsive a Convenient
* Innovative9 9
* Innovative9 9
APPENDIX DGround Photographs Wetland Delineation ReportDiscovery Ridge
APPENDIX D Ground Photographs Wetland Delineation Report Discovery Ridge
* Columbia, Boone County, MissouriMarch 14, 2011
* Columbia, Boone County, Missouri March 14, 2011
* Terracon Project:
* Terracon Project: 09117701 1. View of Wetland Area A, facing northeast.
091177011. View of Wetland Area A, facing northeast.
: 2. View of Wetland Area A, facing southwest.
: 2. View of Wetland Area A, facing southwest.
1 Frrecon Wetland Delineation ReportDiscovery Ridge u Columbia, Boone County, MissouriMarch 14, 2011
1 Frrecon Wetland Delineation Report Discovery Ridge u Columbia, Boone County, Missouri March 14, 2011
* Terracon Project:
* Terracon Project: 09117701 3. View of Wetland Area B, facing east.4. View of Wetland Area B, facing west.1 Ferracon Wetland Delineation Report Discovery Ridge u Columbia, Boone County, Missouri March 14, 2011 u Terracon Project: 09117701 5. View of suspect drainageway, facing north.6. View of suspect drainageway, facing south.1 rerra can Wetland Delineation Report Discovery Ridge
091177013. View of Wetland Area B, facing east.4. View of Wetland Area B, facing west.1 Ferracon Wetland Delineation ReportDiscovery Ridge u Columbia, Boone County, MissouriMarch 14, 2011 u Terracon Project:
* Columbia, Boone County, Missouri March 14, 2011
091177015. View of suspect drainageway, facing north.6. View of suspect drainageway, facing south.1 rerra can Wetland Delineation ReportDiscovery Ridge
* Terracon Project: 09117701 7. View of suspect upland depression, facing west.8. View of suspect upland depression, facing east.1 rerracan Federal Emergency Management Agency Community Status Book Report MISSOURI Communities Participating in th(ClD 2901801*2901 811#2902751*2907831*2907911#290311 290035 290409 2902701*2900731*2907431*290231#*2908961*2902 16#290847#*290792#290630#2903401*2902891*2901261*2900861*2900891*2903411#290600 2907931*2901 551*2906011#2901 07#2900361*2904101*290745 2903421*2907941*290603 2901 591*290898#*290746#*290604 2901 60#2904301*2907951*290063#*2903431*2903441*2901891*2903451*2907961*2904641*2908991*2952631*2905041*2903461*Community Name CARTERVILLE, CITY OF CARTHAGE, CITY OF CARUTHERSVILLE, CITY OF CASS COUNTY *CEDAR COUNTY *CENTERVILLE, VILLAGE OF CENTRALIA, CITY OF CHAFFEE, CITY OF CHAMOIS, CITY OF CHARITON COUNTY*CHARLACK, CITY OF CHARLESTON, CITY OF CHESTERFIELD, CITY OF CHILLICOTHE, CITY OF CHRISTIAN COUNTY*CLARK COUNTY *CLARKSDALE, CITY OF CLARKSON VALLEY, CITY OF CLARKSVILLE, CITY OF CLARKTON, CITY OF CLAY COUNTY *CLAYCOMO, VILLAGE OF CLAYTON, CITY OF CLEVER, CITY OF CLINTON COUNTY*CLINTON, CITY OF COBALT VILLAGE,VILLAGE OF COLE COUNTY*COLUMBIA, CITY OF COMMERCE, CITY OF CONCORDIA, CITY OF COOL VALLEY, CITY OF COOPER COUNTY *COOTER, TOWN OF CORNING, TOWN OF COTTLEVILLE, CITY OF COUNTRY CLUB HILLS, CITY OF COUNTRY CLUB, VILLAGE OF CRAIG, CITY OF CRANE, CITY OF CRAWFORD COUNTY*CREIGHTON, CITY OF CRESTWOOD, CITY OF CREVE COEUR, CITY OF CRYSTAL CITYCITY OF CRYSTAL LAKE PARK, CITY OF DADE COUNTY *DALTON, VILLAGE OF DARDENNE PRAIRIE, CITY OF DE SOTO, CITY OF DEARBORN, CITY OF DELLWOOD, CITY OF County JASPER COUNTY JASPER COUNTY PEMISCOT COUNTY CASS COUNTY CEDAR COUNTY REYNOLDS COUNTY BOONE COUNTY SCOTT COUNTY OSAGE COUNTY CHARITON COUNTY ST. LOUIS COUNTY MISSISSIPPI COUNTY ST. LOUIS COUNTY LIVINGSTON COUNTY CHRISTIAN COUNTY CLARK COUNTY DEKALB COUNTY ST. LOUIS COUNTY PIKE COUNTY DUNKLIN COUNTY CLAY COUNTY CLAY COUNTY ST. LOUIS COUNTY CHRISTIAN COUNTY CLINTON COUNTY HENRY COUNTY MADISON COUNTY COLE COUNTY BOONE COUNTY SCOTT COUNTY LAFAYETTE COUNTY ST. LOUIS COUNTY COOPER COUNTY PEMISCOT COUNTY HOLT COUNTY ST. CHARLES COUNTY ST. LOUIS COUNTY ANDREW COUNTY HOLT COUNTY STONE COUNTY CRAWFORD COUNTY CASS COUNTY ST. LOUIS COUNTY ST. LOUIS COUNTY JEFFERSON COUNTY ST. LOUIS COUNTY DADE COUNTY CHARITON COUNTY ST. CHARLES COUNTY JEFFERSON COUNTY PLATTE COUNTY ST. LOUIS COUNTY Ini Id In Id eNational Flood Program it FHBM Init FIRM Curr Eff entitled Identified Map Date 12/28/73 07/16/84 05102/07 03/15/74 06/15/83 05/02/07 02/20/76 01/16/81 01/16/81 03/14/78 04/15/82 03/16/06 07/17/02 07/17/02 11t/22/74 08/01/86 08/01/86(L) 06/07/74 04/15/77 04/15/77(M) 03/15/74 09/27/85 09/27/85(M) 03/29/74 11/15/84 09/02/05 04/19/83 12/03/87 12/03/87 02/14/75 11/23/84 08/23/00 03/29/74 01/04/85 01/18/89 09/15/78 08/23/00 01/09/74 08/05/85 08/05/85 04/19/83 04/01/04 04/01/04(L) 09/15/81 02/01/97 01/19/00 02/21/75 11/19/03 11/19/03(M) 07/26/74 04/08/77 08/23/00 05/24/74 04/19/10 04/19/1 0(>)12/21/73 01/29/80 04/17/95 09/06/74 03/18/80 04/16/03 01/23/74 08/01/77 12/02/80 04/05/74 02/14/76 08/23/00 07/18/75 (NSFHA)07/05/84 06/18/87 06/18/87(M) 04/15/74 07/04/88 07/04/88 03/26/76 07/02/87 12/06/02(M) 12/16/80 12/15/81 12/02/05 08/28/71 08/28/71 08/16/95 11/08/74 06/01/78 09/02/88 02/07/75 (NSFHA)05/03/74 05/16/77 08/23/00 11/16/83 09/01/89 09/01/89(L)(NSFHA)02/06/76 02/06/76 01/06/88 09/15/78 03/17/03 05/07/76 (NSFHA)08/22/75 (NSFHA)12/06/74 12/06/74 01/06/88 06/07/74 07/16/80 07/16/80 04/19/83 05/01/87 05/01/87(L) 05/13/77 03/16/06 03/16/06 05/03/74 05/02/77 08/23/00 02/01/74 08/01/78 08/23/00 03/15/74 09/01/77 04/05/06 05/13/77 08/02/95 (NSFHA)07/17/02 07/17/02 12/13/74 03/17/03 03/17/03 12/15/92 03/17/03 05/26/72 04/05/06 09/19/75 06/15/79 06/15/79 08/13/76 06/27/78 (NSFHA)Reg-Emer Date 07/16/84 06/15/83 01/116/81 04/15/82 04/11/06 08/01/86 04/15/77 09/27/85 11/15/84 12/03/87 11/23/84 01/04/85 09/15/78 08/05/85 04/01/04 02/01/97 11/19/03 04/08/77 04/01/77 01/29/80 03/18/80 08/01/77 02/14/76 03/30/81 06/18/87 07/04/88 07/02/87 01/21/82 08/27/71 06/01/78 02/09/79 05/16/77 09/01/89 06/30/76 01/06/88 02/01/90 05/25/78 08/24/84 01/06/88 07/16/80 05/01/87 06/30/80 05/02/77 08/01/78 09/01/77 08/01/86 1 2/22/03 10/10/03 03/13/95 05/26/72 06/15/79 06/27/78 Tribal No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No Page 3 of 17 01/11/2010 Page 3 of 17 01/1112010 Polcy Coordination Unit Missouri Department of Conservation P.0. Box 180 Heriage eviw Re ortJefferson City, MO 65102......Heritage Reviewrnd Report March 15, 2011 -- Page 1 of 2 573-522-4115X 3367 S Project type: Site Assessment Laura Murray Location/Scope:
* Columbia, Boone County, MissouriMarch 14, 2011
Portions of Section 32 and 33 of T48N RI12W__________northeast of Highway 63 County: Boone Query reference: -Discovery Ridge Property ________Query received:
* Terracon Project:
091177017. View of suspect upland depression, facing west.8. View of suspect upland depression, facing east.1 rerracan Federal Emergency Management AgencyCommunity Status Book ReportMISSOURICommunities Participating in th(ClD2901801*2901 811#2902751*2907831*2907911#2903112900352904092902701*2900731*2907431*290231#*2908961*2902 16#290847#*290792#290630#2903401*2902891*2901261*2900861*2900891*2903411#2906002907931*2901 551*2906011#2901 07#2900361*2904101*2907452903421*2907941*2906032901 591*290898#*290746#*2906042901 60#2904301*2907951*290063#*2903431*2903441*2901891*2903451*2907961*2904641*2908991*2952631*2905041*2903461*Community NameCARTERVILLE, CITY OFCARTHAGE, CITY OFCARUTHERSVILLE, CITY OFCASS COUNTY *CEDAR COUNTY *CENTERVILLE, VILLAGE OFCENTRALIA, CITY OFCHAFFEE, CITY OFCHAMOIS, CITY OFCHARITON COUNTY*CHARLACK, CITY OFCHARLESTON, CITY OFCHESTERFIELD, CITY OFCHILLICOTHE, CITY OFCHRISTIAN COUNTY*CLARK COUNTY *CLARKSDALE, CITY OFCLARKSON VALLEY, CITY OFCLARKSVILLE, CITY OFCLARKTON, CITY OFCLAY COUNTY *CLAYCOMO, VILLAGE OFCLAYTON, CITY OFCLEVER, CITY OFCLINTON COUNTY*CLINTON, CITY OFCOBALT VILLAGE,VILLAGE OFCOLE COUNTY*COLUMBIA, CITY OFCOMMERCE, CITY OFCONCORDIA, CITY OFCOOL VALLEY, CITY OFCOOPER COUNTY *COOTER, TOWN OFCORNING, TOWN OFCOTTLEVILLE, CITY OFCOUNTRY CLUB HILLS, CITY OFCOUNTRY CLUB, VILLAGE OFCRAIG, CITY OFCRANE, CITY OFCRAWFORD COUNTY*CREIGHTON, CITY OFCRESTWOOD, CITY OFCREVE COEUR, CITY OFCRYSTAL CITYCITY OFCRYSTAL LAKE PARK, CITY OFDADE COUNTY *DALTON, VILLAGE OFDARDENNE
: PRAIRIE, CITY OFDE SOTO, CITY OFDEARBORN, CITY OFDELLWOOD, CITY OFCountyJASPER COUNTYJASPER COUNTYPEMISCOT COUNTYCASS COUNTYCEDAR COUNTYREYNOLDS COUNTYBOONE COUNTYSCOTT COUNTYOSAGE COUNTYCHARITON COUNTYST. LOUIS COUNTYMISSISSIPPI COUNTYST. LOUIS COUNTYLIVINGSTON COUNTYCHRISTIAN COUNTYCLARK COUNTYDEKALB COUNTYST. LOUIS COUNTYPIKE COUNTYDUNKLIN COUNTYCLAY COUNTYCLAY COUNTYST. LOUIS COUNTYCHRISTIAN COUNTYCLINTON COUNTYHENRY COUNTYMADISON COUNTYCOLE COUNTYBOONE COUNTYSCOTT COUNTYLAFAYETTE COUNTYST. LOUIS COUNTYCOOPER COUNTYPEMISCOT COUNTYHOLT COUNTYST. CHARLES COUNTYST. LOUIS COUNTYANDREW COUNTYHOLT COUNTYSTONE COUNTYCRAWFORD COUNTYCASS COUNTYST. LOUIS COUNTYST. LOUIS COUNTYJEFFERSON COUNTYST. LOUIS COUNTYDADE COUNTYCHARITON COUNTYST. CHARLES COUNTYJEFFERSON COUNTYPLATTE COUNTYST. LOUIS COUNTYIniIdInIdeNational Flood Programit FHBM Init FIRM Curr Effentitled Identified Map Date12/28/73 07/16/84 05102/0703/15/74 06/15/83 05/02/0702/20/76 01/16/81 01/16/8103/14/78 04/15/82 03/16/0607/17/02 07/17/0211t/22/74 08/01/86 08/01/86(L) 06/07/74 04/15/77 04/15/77(M) 03/15/74 09/27/85 09/27/85(M) 03/29/74 11/15/84 09/02/0504/19/83 12/03/87 12/03/8702/14/75 11/23/84 08/23/0003/29/74 01/04/85 01/18/8909/15/78 08/23/0001/09/74 08/05/85 08/05/8504/19/83 04/01/04 04/01/04(L) 09/15/81 02/01/97 01/19/0002/21/75 11/19/03 11/19/03(M) 07/26/74 04/08/77 08/23/0005/24/74 04/19/10 04/19/1 0(>)12/21/73 01/29/80 04/17/9509/06/74 03/18/80 04/16/0301/23/74 08/01/77 12/02/8004/05/74 02/14/76 08/23/0007/18/75 (NSFHA)07/05/84 06/18/87 06/18/87(M) 04/15/74 07/04/88 07/04/8803/26/76 07/02/87 12/06/02(M) 12/16/80 12/15/81 12/02/0508/28/71 08/28/71 08/16/9511/08/74 06/01/78 09/02/8802/07/75 (NSFHA)05/03/74 05/16/77 08/23/0011/16/83 09/01/89 09/01/89(L)
(NSFHA)02/06/76 02/06/76 01/06/8809/15/78 03/17/0305/07/76 (NSFHA)08/22/75 (NSFHA)12/06/74 12/06/74 01/06/8806/07/74 07/16/80 07/16/8004/19/83 05/01/87 05/01/87(L) 05/13/77 03/16/06 03/16/0605/03/74 05/02/77 08/23/0002/01/74 08/01/78 08/23/0003/15/74 09/01/77 04/05/0605/13/77 08/02/95 (NSFHA)07/17/02 07/17/0212/13/74 03/17/03 03/17/0312/15/92 03/17/0305/26/72 04/05/0609/19/75 06/15/79 06/15/7908/13/76 06/27/78 (NSFHA)Reg-EmerDate07/16/8406/15/8301/116/81 04/15/8204/11/0608/01/8604/15/7709/27/8511/15/8412/03/8711/23/8401/04/8509/15/7808/05/8504/01/0402/01/9711/19/0304/08/7704/01/7701/29/8003/18/8008/01/7702/14/7603/30/8106/18/8707/04/8807/02/8701/21/8208/27/7106/01/7802/09/7905/16/7709/01/8906/30/7601/06/8802/01/9005/25/7808/24/8401/06/8807/16/8005/01/8706/30/8005/02/7708/01/7809/01/7708/01/861 2/22/0310/10/0303/13/9505/26/7206/15/7906/27/78TribalNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoNoPage 3 of 17 01/11/2010 Page 3 of 1701/1112010 Polcy Coordination UnitMissouri Department of Conservation P.0. Box 180Heriage eviw Re ortJefferson City, MO 65102......Heritage Reviewrnd ReportMarch 15, 2011 -- Page 1 of 2 573-522-4115X 3367S Project type: Site Assessment Laura Murray Location/Scope:
Portions of Section 32 and 33 of T48N RI12W__________northeast of Highway 63County: BooneQuery reference:  
-Discovery Ridge Property
________Query received:
March 8, 2011 Prearu b: S,.ano cave______________________________________  
March 8, 2011 Prearu b: S,.ano cave______________________________________  
[Authenticity may be con firmed by Policy Coordination Unit, Missouri Department of Consenration, 573-522-4115.
[Authenticity may be con firmed by Policy Coordination Unit, Missouri Department of Consenration, 573-522-4115.
This NATURAL HERITAGE REVIEW is not a site clearance letter. Rather, it identifies public lands and sensitive resources known to have beenlocated close to and/or potentially affected by the proposed project On-site verification is the responsibility of the project.
This NATURAL HERITAGE REVIEW is not a site clearance letter. Rather, it identifies public lands and sensitive resources known to have been located close to and/or potentially affected by the proposed project On-site verification is the responsibility of the project. Heritage records were identified at some date and location.
Heritage records wereidentified at some date and location.
This report considers records near but not necessarily at the project site. Animals move and, over time, so do plant communities.
This report considers records near but not necessarily at the project site. Animals move and, over time, so do plantcommunities.
To say "there is a record" does not mean the species/habitat is still there. To say that "there is no record" does not mean a protected species will not be encountered.
To say "there is a record" does not mean the species/habitat is still there. To say that "there is no record" does not mean a protected specieswill not be encountered.
These records only provide one reference and other information (e.g. wetland or soils maps, on-site inspections or sulveys) should be considered.
These records only provide one reference and other information (e.g. wetland or soils maps, on-site inspections or sulveys) shouldbe considered.
Look for additional information about the biological and habitat needs of records listed in order to avoid or minimize impacts. More information is at http://mdc.mo,,gov/discover-nature/places-, o/natural-areas and mdc4.mdc.mo.gov/applications/mofwis/mofwis searchl1.aspx.
Look for additional information about the biological and habitat needs of records listed in order to avoid or minimize impacts.
Contact information for the department's Natural History Biologist is online at httlx//mdc.mo.qov/contact -us.Level 3 (federal-listed) and Leve 2 (state listed) isues: Records of listed species or habitats: Heritage records identify no. wildlif preserves, no designated wildeness areas or critical habitats, no.state or federal endangered-listspecies records within the public land survey sections listed above and northeast of highway 63> The site does drain to Gans Creek, which downstream of Highway6 is one of 138 state-designated spawning strem segments.
Moreinformation is at http://mdc.mo,,gov/discover-nature/places-,
Activities that alter, destablie or destroy stream bottoms or banks should be avidd from March 15 to June 15 in order not to dsrupt spawning (laying and fertilizing fish eggs!,-At all times, avoid habitat destruction or introducingheavy sediment loads, chemical or organi po:!llutants.
o/natural-areas and mdc4.mdc.mo.gov/applications/mofwis/mofwis searchl1.aspx.
Spawning stream segments were designaed because they are important to maintining, restoring, or avoiding future listing of species of coservation concern.~'Rock Bridge Ste Park col be affected by construction activities.
Contact information for the department's Natural History Biologist is online at httlx//mdc.mo.qov/contact  
Within its premises are records of of conseration concern, including bot ray (2002 and (2007) bat records. *..Gray bats (Myotis federally and state listed "endangered")
-us.Level 3 (federal-listed) and Leve 2 (state listed) isues:Records of listed species or habitats:
are likely to occur in the project area, as thy oag ver streams, rivers, and in thi part of Missouri.
Heritage records identify no. wildlif preserves, no designated wildeness areas or critical  
Avoid entry or disturbac of any cave inhabited by gray bats an he osible retain forest vegetation along the stream and from the gray bat cave opening to the stream. See http://mdc.mo..qov/1 04 for best management recommendations.
: habitats, no.state or federal endangered-listspecies records within the public land survey sections listed aboveand northeast of highway 63> The site does drain to Gans Creek, which downstream of Highway6 is one of 138 state-designated spawning strem segments.
Activities that alter, destablie or destroy stream bottomsor banks should be avidd from March 15 to June 15 in order not to dsrupt spawning (laying andfertilizing fish eggs!,-At all times, avoid habitat destruction or introducingheavy sediment loads,chemical or organi po:!llutants.
Spawning stream segments were designaed because they areimportant to maintining, restoring, or avoiding future listing of species of coservation concern.~'Rock Bridge Ste Park col be affected by construction activities.
Within its premises arerecords of of conseration  
: concern, including bot ray (2002 and (2007) batrecords.  
*..Gray bats (Myotis federally and state listed "endangered")
are likely to occur in theproject area, as thy oag ver streams, rivers, and in thi part of Missouri.
Avoidentry or disturbac of any cave inhabited by gray bats an he osible retain forest vegetation along the stream and from the gray bat cave opening to the stream. See http://mdc.mo..qov/1 04for best management recommendations.
>' Indiana bats (Myotis sodalis, federally ad s tat e lite 'endangered")
>' Indiana bats (Myotis sodalis, federally ad s tat e lite 'endangered")
may occur in this area.These mammals hibernate durin wntermothsincavesl in issouri primarily in the southern halfof the state. They are found in summer months, primarily north of the Missouri River, roosting andraising young under the bark of trees in riparian forests and upland forests near perennial streams.During project activities, avoid degrading stream quality and where possible leave snags standingand preserve mature forest canopy. If large trees with nesting cavities or loose bark need to beremoved by your project, that should be done between November and March. Additional information to incorporate in planning documents is available at http://mdc.mo..qov/1 10.> Topeka shiners (Notropis Topeka, federal-and state-listed "endangered")
may occur in this area.These mammals hibernate durin wntermothsincavesl in issouri primarily in the southern half of the state. They are found in summer months, primarily north of the Missouri River, roosting and raising young under the bark of trees in riparian forests and upland forests near perennial streams.During project activities, avoid degrading stream quality and where possible leave snags standing and preserve mature forest canopy. If large trees with nesting cavities or loose bark need to be removed by your project, that should be done between November and March. Additional information to incorporate in planning documents is available at http://mdc.mo..qov/1 10.> Topeka shiners (Notropis Topeka, federal- and state-listed "endangered")
are recorded (1997) omBonne Femme Creek to the south. Historically, they probably used Gans Creek as well. Thesefish typically occupy permanent pools of small, clear, high quality streams draining upland areas,usually on substrates of gravel, rubble, sand or bedrock.
are recorded (1997) om Bonne Femme Creek to the south. Historically, they probably used Gans Creek as well. These fish typically occupy permanent pools of small, clear, high quality streams draining upland areas, usually on substrates of gravel, rubble, sand or bedrock. Best manaciement practices for Topeka Prepared by Shannon Cave, March 15, 2011, MurrayBoone assessment.
Best manaciement practices for TopekaPrepared by Shannon Cave, March 15, 2011, MurrayBoone assessment.
doc, page 1 of 2 shiners may be found at http://mdc.mo.qiov/1 37*General recommendations related to this project or site, or based on information about the historic range of species (unrelated to any specific heritage records):
doc, page 1 of 2 shiners may be found at http://mdc.mo.qiov/1 37*General recommendations related to this project or site, or based on information aboutthe historic range of species (unrelated to any specific heritage records):
in the area should be protected from soil erosion, water pollution and in-stream activities that modify or diminish aquatic habitats*
in the area should be protected from soil erosion, water pollution and in-stream activities that modify or diminish aquatic habitats*
Best management recommendations relating to streamsand rivers may be found at http://mdc.mo.qov/79.
Best management recommendations relating to streams and rivers may be found at http://mdc.mo.qov/79.
Minimize erosion and sedimentation/runoff tonearby streams and lakes, including adherence to any "Clean Water Permit" conditions.
Minimize erosion and sedimentation/runoff to nearby streams and lakes, including adherence to any "Clean Water Permit" conditions.
Revegetate areas in which the natural cover is disturbed to minimize erosion using native plantspecies compatible with the local landscape and wildlife needs. Pollutants, including  
Revegetate areas in which the natural cover is disturbed to minimize erosion using native plant species compatible with the local landscape and wildlife needs. Pollutants, including sediment, can have significant impacts far downstream.
: sediment, can have significant impacts far downstream.
Use silt fences and/or vegetative filter strips to buffer streams and drainages, and monitor those after rain events and until a well-rooted ground cover is reestablished.This county has known karst geologic eatures (e.g. caves, springs, and sinkholes, all characterized by subterranean watermovement).
Use silt fences and/or vegetative filter strips tobuffer streams and drainages, and monitor those after rain events and until a well-rooted groundcover is reestablished.This county has known karst geologic eatures (e.g. caves, springs, and sinkholes, allcharacterized by subterranean watermovement).
Few karst features are recorded in heritage records, and ones not noted her my be encountered atteproject site or affected by the project. Cave fauna (many of wchare species of conserain concern) are influenced by changes to water quality, so check your project site for any as features and make every effort to protect groundwater in the project area. See http://mdc.
Few karst features are recorded in heritagerecords, and ones not noted her my be encountered atteproject site or affected by theproject.
Cave fauna (many of wchare species of conserain concern) are influenced bychanges to water quality, so check your project site for any as features and make every effort toprotect groundwater in the project area. See http://mdc.
mo..ciovfnathis/caves/manaa construc.
mo..ciovfnathis/caves/manaa construc.
htmfor best management inoratonThe proposed project occur in the historic range of greater prairi cickens (tympanuchus cupido),
htm for best management inoratonThe proposed project occur in the historic range of greater prairi cickens (tympanuchus cupido), a bird on the stae' list of endangered species. Populations§ have been in serious decline for decades, and have reched a point where greater prairie chickens could be gone from Missouri within a few yers. The dominant.
a bird on the stae' list of endangered species.
factor in their decline is of. native prairie habitats to other uses. Other praire dependent species are also in seriu decline for the same reason. Prairie chikns range over a broad territory perhaps nesting, breeinganfogign grasslands sevel miles aparFt. Even if prairie chickens are not present, it isimPortant to conserve as muhas possibl any grasslands dominated by native plant cove in the project area.See http://mdc best management reomnations.
Populations§ have been in serious declinefor decades, and have reched a point where greater prairie chickens could be gone fromMissouri within a few yers. The dominant.
~'Invasive exoi species, are significant issue for fish, wllife an agrcutrinMsoi.Se, eggs, and larvae ma bemoed to new sites on boats or cntuto qimns npc n clean equipmentrthroughly befor moving between projec sitesupeto npcn*Remove any mud, soil, trash, plants or animals from equLm~t efor leaving any water body or work area.*Drain water from boats and machinery that have operated in water, checking motor cavities, live-well, bilge and transom wltrcsbuks adny other water reservoirs.
factor in their decline is of. native prairiehabitats to other uses. Other praire dependent species are also in seriu decline for the samereason. Prairie chikns range over a broad territory perhaps nesting, breeinganfogign grasslands sevel miles aparFt. Even if prairie chickens are not present, it isimPortant toconserve as muhas possibl any grasslands dominated by native plant cove in the project area.See http://mdc best management reomnations.
* When possible, wash and rinse equipment thorugh~ly itard spray or HOT water F, typically available at do-it-yourself carwash sites), and dry in the hot sun before using again.Pre-screen heritaqe data requests at httD:I/tnvurl.comleritaoerevie.
~'Invasive exoi species, are significant issue for fish, wllife an agrcutrinMsoi.Se, eggs, and larvae ma bemoed to new sites on boats or cntuto qimns npc nclean equipmentrthroughly befor moving between projec sitesupeto npcn*Remove any mud, soil, trash, plants or animals from equLm~t efor leaving any water bodyor work area.*Drain water from boats and machinery that have operated in water, checking motor cavities, live-well, bilge and transom wltrcsbuks adny other water reservoirs.
* When possible, wash and rinse equipment thorugh~ly itard spray or HOT water F,typically available at do-it-yourself carwash sites), and dry in the hot sun before using again.Pre-screen heritaqe data requests at httD:I/tnvurl.comleritaoerevie.
A "Level I response" makes further submission to MDC or UJSFWS unnecessary.
A "Level I response" makes further submission to MDC or UJSFWS unnecessary.
Prepared by Shannon Cave, March 15, 2011, MurrayBoone~assessment.doc, page 2 of 2 CULTURAL RESOURCE ASSESSMENT Section 106 ReviewCONTACT PERSONIADDRESS C:ITerracon 3601 Mojave Court, Suite A IColumbia.
Prepared by Shannon Cave, March 15, 2011, MurrayBoone~assessment.doc, page 2 of 2 CULTURAL RESOURCE ASSESSMENT Section 106 Review CONTACT PERSONIADDRESS C: ITerracon 3601 Mojave Court, Suite A I Columbia.
Missouri 65203 _________________
Missouri 65203 _________________
PROJECT:IDiscover Ride Lots 2 5r 6 7v 9 10a 11! 12r 131 14r 15r 161 17 &18r ColumbiaFEDERAL AGENCYCOUNTY:I UNKNOWNI I BOONEIII -i i IIII --wThe State Historic Preservation Office has reviewed the Information submitted on the above referenced project.
PROJECT: IDiscover Ride Lots 2 5r 6 7v 9 10a 11! 12r 131 14r 15r 161 17 &18r Columbia FEDERAL AGENCY COUNTY: I UNKNOWN I I BOONE I II -i i II II --w The State Historic Preservation Office has reviewed the Information submitted on the above referenced project. Based on this review, we have made the following determination:
Based on this review, we have made the following determination:
] After review of initial submission, the project area has a low potential for the occurrence of cultural resources.
] After review of initial submission, the project area has a low potential for the occurrence of culturalresources.
A cultural resource survey, therefore, is not warranted.
A cultural resource survey, therefore, is not warranted.
[] Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historicproperties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.
[] Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historic properties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.
It hasE~] been determined that for the proposed undertaking there will be "no historic properties affected".
It has E~] been determined that for the proposed undertaking there will be "no historic properties affected".
For the above checked reason, the State Historic Preservation Office has no objection to the initiation of projectactivities.
For the above checked reason, the State Historic Preservation Office has no objection to the initiation of project activities.
PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARECHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS AREENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO ThiSOFFICE FOR FURTHER REVIEW AND COMMENT.
PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARE CHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO ThiS OFFICE FOR FURTHER REVIEW AND COMMENT. Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: §March 7.2011 Mark A. Miles, Deputy State Historic Preservation Officer Date MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE P.O. Box 176, Jefferson City, Missouri 65102 For additional information, please contact Judith D~eel, (573) 751-7862.
Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: §March 7.2011Mark A. Miles, Deputy State Historic Preservation OfficerDateMISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICEP.O. Box 176, Jefferson City, Missouri 65102For additional information, please contact Judith D~eel, (573) 751-7862.
Please be sure to refer to the project number: 015-BO-1 1 February 21, 2011 MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE Attn: Section 106 Review P.O. Box 176 Jefferson City, Missouri 65102-0176 RE: Request for Additional Review MDNR SHPO project number: 015-B0-11 Section 106 Review Discovery Ridge Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, and 18 Discovery Drive and Discovery Ridge Parkway Columbia, Boone County, Missouri T 48N N, R 12W, Sec 33, NY2 Terracon Project No.: 09117701 Terracon Consultants, Inc. (Terracon), on behalf of the Trabue, Hansen & Hinshaw, Inc and the University of Missouri Research Parks -University of Missouri Systems, is assisting with a preconstruction Phase 1 Environmental Site Assessment for a proposed expansion of the current scientific research park, Discovery Ridge, located on a portion of a historic University of Missouri research farm at Discovery Drive Discovery Ridge Parkway, east of U.S. Highway 63 in the vicinity of the southern limits of Columbia, Missouri.We are enclosing a Section 106 Project Information Form, A section of the topographic map which includes the subject site, a developmental phasing plan, and photographs of the on-site metal machine shed type buildings located on Lot 17 and the quacent hut building located on Lot 5. Additionally, photos have been included of structures located on properties adjacent to the site. Please review your records and files to determine if historic features are located on the site.The site has historically been agricultural land associated with a University of Missouri research farm. Portions of the site, which are located within Phase I of the project, have been graded to construct vacant lots suitable for development.
Please be sure to refer to the project number:015-BO-1 1
We would appreciate a response within 30 days following receipt of this information.
February 21, 2011MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICEAttn: Section 106 ReviewP.O. Box 176Jefferson City, Missouri 65102-0176 RE: Request for Additional ReviewMDNR SHPO project number: 015-B0-11 Section 106 ReviewDiscovery RidgeLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, and 18Discovery Drive and Discovery Ridge ParkwayColumbia, Boone County, MissouriT 48N N, R 12W, Sec 33, NY2Terracon Project No.: 09117701Terracon Consultants, Inc. (Terracon),
If you have any questions or wish to discuss this submittal, please contact me.Sincerely, Staff Environmental Scientist Enclosure WMISSOURI DEPARTMENT OF NATURAL RESOURCES ,~STATE HISTORIC PRESERVATION OFFICE 41SECTION 108 PROJECT INFORMATION FORM Submission of a completed Project Information Form with adequate information and attachments constitutes a request for a review pursuant to Section 106 of the National Historic Preservation Act of 1966 (as amended).
on behalf of the Trabue, Hansen & Hinshaw, Inc and theUniversity of Missouri Research Parks -University of Missouri  
We reserve the right to request more information.
: Systems, is assisting with apreconstruction Phase 1 Environmental Site Assessment for a proposed expansion of thecurrent scientific research park, Discovery Ridge, located on a portion of a historic University ofMissouri research farm at Discovery Drive Discovery Ridge Parkway, east of U.S. Highway63 in the vicinity of the southern limits of Columbia, Missouri.
Please refer to the CHECKLUST on Page 2 to ensure that all basic information relevant to the project has been Included.
We are enclosing a Section 106 Project Information Form, A section of the topographic mapwhich includes the subject site, a developmental phasing plan, and photographs of the on-sitemetal machine shed type buildings located on Lot 17 and the quacent hut building located onLot 5. Additionally, photos have been included of structures located on properties adjacent tothe site. Please review your records and files to determine if historic features are located onthe site.The site has historically been agricultural land associated with a University of Missouriresearch farm. Portions of the site, which are located within Phase I of the project, have beengraded to construct vacant lots suitable for development.
For further information, refer to our website at: htto:l/dnr.mo.aov/shoo and follow the links to Section 106 Review.NOTE: Section 106 regulations provide for a 30-day response time by the Missouri State Historic Preservation Office from the date of receipt.PROJECT NAME Discovery Ridge Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13. 14, 15, 16, 17, and 18 FEDERAL. AGENCY PROVDNG FUNDS. UCENSE. OR PERMIT ADDRESS FOR RESPONSE Terracon 3601 Mojave Court, Suite A Columbia, MO 65203 LOCATION OF PROJECT COUNTY Boone LEGAL DESCRIPTION OF PROJECT AREA (TOWNSHIP, RANGE, SECTION, 1/44 SECTION)USGS TOPOGRAPHIC MAP QUADRANGLE NAME (SEE MAP REQUIREMENTS ON PAGE 2)Columbia, Missouri 1981 l148 North 12 West 3 PROJECT DESCRIPTION DESCRIBE THE OVERALL PROJECT IN DETAIL. IF rr INVOLVES EXCAVATION.
We would appreciate a responsewithin 30 days following receipt of this information.
INDICATE HOW WIDE, HOW DEEP, ETC. IF THE PROJECT INVOLVES DEMOLITION OF EXISTING BUILDI.S MAKE THAT CLEAR. IF THE PROJECT INVOLVES REHABILITATION, DESCRIBE T~l PROPOSED WO)RK IN DETAIL.USE ADDITIONAL PAGES IF NECESSARY.
If you have any questions or wish todiscuss this submittal, please contact me.Sincerely, Staff Environmental Scientist Enclosure WMISSOURI DEPARTMENT OF NATURAL RESOURCES
The site consist of 15 lots. Eight of the lots (Lots 2, 5, 6, 7, 8, 9, 10, and 11) are located within Phase I of the research park development plan. Of the lots located within Phase I of the developmental plan, Lots 2, 6, 7, and 8 have been graded to construct vacant lots suitable for development, additional, Lot 9 is currently In the process of being graded to facility a lot suitable for development.
,~STATE HISTORIC PRESERVATION OFFICE41SECTION 108 PROJECT INFORMATION FORMSubmission of a completed Project Information Form with adequate information and attachments constitutes a request for a reviewpursuant to Section 106 of the National Historic Preservation Act of 1966 (as amended).
We reserve the right to request moreinformation.
Please refer to the CHECKLUST on Page 2 to ensure that all basic information relevant to the project has beenIncluded.
For further information, refer to our website at: htto:l/dnr.mo.aov/shoo and follow the links to Section 106 Review.NOTE: Section 106 regulations provide for a 30-day response time by the Missouri State Historic Preservation Office from thedate of receipt.PROJECT NAMEDiscovery Ridge Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13. 14, 15, 16, 17, and 18FEDERAL.
AGENCY PROVDNG FUNDS. UCENSE. OR PERMITADDRESS FOR RESPONSETerracon3601 Mojave Court, Suite AColumbia, MO 65203LOCATION OF PROJECTCOUNTYBooneLEGAL DESCRIPTION OF PROJECT AREA (TOWNSHIP, RANGE, SECTION, 1/44 SECTION)USGS TOPOGRAPHIC MAP QUADRANGLE NAME (SEE MAP REQUIREMENTS ON PAGE 2)Columbia, Missouri1981 l148 North 12 West 3PROJECT DESCRIPTION DESCRIBE THE OVERALL PROJECT IN DETAIL. IF rr INVOLVES EXCAVATION.
INDICATE HOW WIDE, HOW DEEP, ETC. IF THE PROJECT INVOLVESDEMOLITION OF EXISTING BUILDI.S MAKE THAT CLEAR. IF THE PROJECT INVOLVES REHABILITATION, DESCRIBE T~l PROPOSED WO)RK IN DETAIL.USE ADDITIONAL PAGES IF NECESSARY.
The site consist of 15 lots. Eight of the lots (Lots 2, 5, 6, 7, 8, 9, 10, and 11) are located within Phase I of the research parkdevelopment plan. Of the lots located within Phase I of the developmental plan, Lots 2, 6, 7, and 8 have been graded to construct vacant lots suitable for development, additional, Lot 9 is currently In the process of being graded to facility a lot suitable fordevelopment.
Currently lot 5 is the location of a quacent hut type building.
Currently lot 5 is the location of a quacent hut type building.
Seven of the lots that comprse the site (Lots 12, 13,14, 15, 16, 17, and 18) are located within Phase II of the developmental plan and consist of vacant grass covered farm land utilizedas grazing pasture for livestock and row crop research.
Seven of the lots that comprse the site (Lots 12, 13, 14, 15, 16, 17, and 18) are located within Phase II of the developmental plan and consist of vacant grass covered farm land utilized as grazing pasture for livestock and row crop research.
Currently Lot 17 is the location of two small metal machine sheds and onelarge machine shed type buildings.
Currently Lot 17 is the location of two small metal machine sheds and one large machine shed type buildings.
Historically a residential structure, and four small mea machine sheds were located at the sitestarting between 1939-1968 with the residence being removed in 2001 and two of the machine sheds being removed in 2007.Historically the site has been utilized as farm land associated with a Uniersity of Missouri research farm (South Farms). Beginning in the early 2000s the area surrounding the site has been utilized as Discovery Ridge, a scientilic research park. The applicant isinvestigating the site for expanded use as a scientific research park.
Historically a residential structure, and four small mea machine sheds were located at the site starting between 1939-1968 with the residence being removed in 2001 and two of the machine sheds being removed in 2007.Historically the site has been utilized as farm land associated with a Uniersity of Missouri research farm (South Farms). Beginning in the early 2000s the area surrounding the site has been utilized as Discovery Ridge, a scientilic research park. The applicant is investigating the site for expanded use as a scientific research park.
ARCHAEOLOGY IEARTHMOVING ACTIVITIESI HAS THE GROUND INVOLVED BEEN GRADED. BUILT ON, BORROWED, OR OTHERWISE DISTURBED?
ARCHAEOLOGY IEARTHMOVING ACTIVITIESI HAS THE GROUND INVOLVED BEEN GRADED. BUILT ON, BORROWED, OR OTHERWISE DISTURBED?
PLEASE DESCRIBE IN DETAIL(USE ADDITIONAL PAGES, IF NECESSARY)
PLEASE DESCRIBE IN DETAIL (USE ADDITIONAL PAGES, IF NECESSARY)
PHOTOGRAPHS ARE HELPFUL:The site has hitrcfy been farmed associated with a University of Missouri research farm. During the early 2000s portions of thelots that comprise Phase I of the site were graded to construct multiple vacant building lots suitable for deeomn. Currently lotslocated within Phase II of the developmental plan are vacant grass covered land with portion utilized for row crop research.
PHOTOGRAPHS ARE HELPFUL: The site has hitrcfy been farmed associated with a University of Missouri research farm. During the early 2000s portions of the lots that comprise Phase I of the site were graded to construct multiple vacant building lots suitable for deeomn. Currently lots located within Phase II of the developmental plan are vacant grass covered land with portion utilized for row crop research.WILL THE PROJECT REQUIRE FILL MATERIAL?
WILL THE PROJECT REQUIRE FILL MATERIAL?
0] YES [] NO IF YES, INDICATE PROPOSED BORROW AREAS (SOURCE OF FILL MATERIAL)
0] YES [] NOIF YES, INDICATE PROPOSED BORROW AREAS (SOURCE OF FILL MATERIAL)
ON TOPOGRAPHIC MAP ARE YOU AWARE OF ARCHAEOLOGICAL SITES ON OR ADJACENT TO PROJECT AREA? [J YES NO IF YES8, IDENTIFY THEM ON THE TOPOGRAPHIC MAP STRUCTURES (REH LIATION, DEMOLOTION.
ON TOPOGRAPHIC MAPARE YOU AWARE OF ARCHAEOLOGICAL SITES ON OR ADJACENT TO PROJECT AREA? [J YES NOIF YES8, IDENTIFY THEM ON THE TOPOGRAPHIC MAPSTRUCTURES (REH LIATION, DEMOLOTION.
ADDITIONS TO, OR CONTRUCTION NEAR EXISTING STRUCTURES)
ADDITIONS TO, OR CONTRUCTION NEAR EXISTING STRUCTURES)
TO THE BEST OF YOUR KNWLDGE, IS THE STRUCTURE LOCATED IN ANY OF THE FOLLOWING?
TO THE BEST OF YOUR KNWLDGE, IS THE STRUCTURE LOCATED IN ANY OF THE FOLLOWING?
U] AN AREA PREVIOUSLY SURVEYED F] A NATIONAL REGISTER DISTRICT El A LOCAL HISTORIC DISTRICTFOR HISTORIC PROPERTIES.
U] AN AREA PREVIOUSLY SURVEYED F] A NATIONAL REGISTER DISTRICT El A LOCAL HISTORIC DISTRICT FOR HISTORIC PROPERTIES.
IF YES. PLEASE PROVIDE ThE NAME OF IF YES. PLEASE PROVIDE THE NAME OF IF YES, PLEASE PROVIDE THE NAME OFTHE SURVEY OR DISTRICT:
IF YES. PLEASE PROVIDE ThE NAME OF IF YES. PLEASE PROVIDE THE NAME OF IF YES, PLEASE PROVIDE THE NAME OF THE SURVEY OR DISTRICT:
THE SURVEY OR DISTRICT:
THE SURVEY OR DISTRICT:
Th SURVEY OR DISTRICT:
Th SURVEY OR DISTRICT:* PLEASE PROVIDE PHOTOGRAPHS OF ALL STRUCTURJES.
* PLEASE PROVIDE PHOTOGRAPHS OF ALL STRUCTURJES.
SEE PHOTOGRAPHY REQUIREMENTS
SEE PHOTOGRAPHY REQUIREMENTS
* NOTE: ALL PHOTOGRAPHS SHOULD BE LABELED AND KEYED TO ONE MAP OF THE PROJECT AREA* PLEASE PROVIDE A BRIEF HISTORY OF THE BUILDING(S),
* NOTE: ALL PHOTOGRAPHS SHOULD BE LABELED AND KEYED TO ONE MAP OF THE PROJECT AREA* PLEASE PROVIDE A BRIEF HISTORY OF THE BUILDING(S), INCLUDING CONSTRUCTION DATES AND BUILDING USES. (USE ADDITONAL PAGES, IF NECESSARY.)
INCLUDING CONSTRUCTION DATES AND BUILDING USES. (USEADDITONAL PAGES, IF NECESSARY.)
ADDITONAL REQUIREMENTS Map Requirements:
ADDITONAL REQUIREMENTS Map Requirements:
Attach a copy of the relevant portion (8 'A x 11) of the curn USGS 7.5 min. topographic map and, If necessary, a largescala project map. Please do not send an Individual map with each structure or site. Wlean orIginal mapIs preferable, a good copy Isacceptable.
Attach a copy of the relevant portion (8 'A x 11) of the curn USGS 7.5 min. topographic map and, If necessary, a large scala project map. Please do not send an Individual map with each structure or site. Wlean orIginal mapIs preferable, a good copy Is acceptable.
For a list of sites from wh'ich to order, download or print the required USGS 7.5 min. topographic map at litl or no cot coslhtto'J/dnr.mo.oovlshoo/sectionrev.htm.
For a list of sites from wh'ich to order, download or print the required USGS 7.5 min. topographic map at litl or no cot cosl htto'J/dnr.mo.oovlshoo/sectionrev.htm.
Photography Requlrements:
Photography Requlrements:
Clear black and white or color photographs (minimum 3" x 5") are acceptable.
Clear black and white or color photographs (minimum 3" x 5") are acceptable.
Poladiods, photocopies, emalaed orfaxed photographs are not acceptable.
Poladiods, photocopies, emalaed or faxed photographs are not acceptable.
Good quality photographs are Important for expedltlous project review. Photographs of neighboring or nearby buildings are also helpful.
Good quality photographs are Important for expedltlous project review. Photographs of neighboring or nearby buildings are also helpful. All photographs should be labeled and keyed to one map of the project area.CHECKLIST-DID YOU PROVIDE THE FOLLOWING INFORMATION?
All photographs should be labeled and keyed to one map of the project area.CHECKLIST-DID YOU PROVIDE THE FOLLOWING INFORMATION?
0] Topographic map 7.5 min. (per project, not stutr) 0] Other sup~porting documents (If necessary to explain the project)[] Thorough description (aln projects)
0] Topographic map 7.5 min. (per project, not stutr) 0] Other sup~porting documents (If necessary to explain the project)[] Thorough description (aln projects)
El For new construction, rehabilitations, etc., attach work write-ups, plans, drawings, etc.0] Photographs (all structures) 0] Is topographic map Identified by quadrangle and year?Return this Form and Attachments to:MISSOUR DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICEAttn: Section 106 ReviewP.O. BOX 176JEFFERSON CITY, MISSOURI 65102-0176 Quacent hut building located on the southern portion of Lot 5. Quacent hutsouth adjoining property.
El For new construction, rehabilitations, etc., attach work write-ups, plans, drawings, etc.0] Photographs (all structures) 0] Is topographic map Identified by quadrangle and year?Return this Form and Attachments to: MISSOUR DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE Attn: Section 106 Review P.O. BOX 176 JEFFERSON CITY, MISSOURI 65102-0176 Quacent hut building located on the southern portion of Lot 5. Quacent hut south adjoining property.
Quacent hut constructed between 1980 and 1992.!from theQuacent hut building located on the southern portion of Lot 5. Quacent hut viewed from thewest portion of Lot 5. Quacent hut constructed between 1980 and 1992.
Quacent hut constructed between 1980 and 1992.!from the Quacent hut building located on the southern portion of Lot 5. Quacent hut viewed from the west portion of Lot 5. Quacent hut constructed between 1980 and 1992.
Trailer park located west of Lots 5, and 16. Trailer park est=Trailer park viewed from the western portion of Lot 5.and 1968.Trailer park located west of Lots 5, and 16. Trailer park established betweenTrailer park viewed from the western portion of Lot 5.;6 and 1968.
Trailer park located west of Lots 5, and 16. Trailer park est=Trailer park viewed from the western portion of Lot 5.and 1968.Trailer park located west of Lots 5, and 16. Trailer park established between Trailer park viewed from the western portion of Lot 5.;6 and 1968.
University of Missouri Civil Engineering research building located east of Lot 5.constructed between 1956 and 1968.dingMetal sided USDA building located within the vicinity of the University of Missouri CivilEngineering research building and east of Lot 5. Building constructed between 1995 and 2002.
University of Missouri Civil Engineering research building located east of Lot 5.constructed between 1956 and 1968.ding Metal sided USDA building located within the vicinity of the University of Missouri Civil Engineering research building and east of Lot 5. Building constructed between 1995 and 2002.
ABC Lab building located west of Lot 2.viewed from Discovery Drive.and 2007. BuildingRadii building located east of Lot 2. Building constructed between 2002viewed from the intersection of Discovery Drive and Discovery Parkway.*Building Residence located south of Lot 11. Residence constructed betweenResidence viewed from US Highway 63, southwest of the structure.
ABC Lab building located west of Lot 2.viewed from Discovery Drive.and 2007. Building Radii building located east of Lot 2. Building constructed between 2002 viewed from the intersection of Discovery Drive and Discovery Parkway.*Building Residence located south of Lot 11. Residence constructed between Residence viewed from US Highway 63, southwest of the structure.
Residence located south of Lot 11. Residence constructed betweenResidence viewed from US Highway 63, southwest of the structure.
Residence located south of Lot 11. Residence constructed between Residence viewed from US Highway 63, southwest of the structure.
Residence located south of Lot 11. Residence constructed between 1Residence viewed from Lot 11, north of the structure.
Residence located south of Lot 11. Residence constructed between 1 Residence viewed from Lot 11, north of the structure.
Barn located south of the residence south of Lot I1. Barn constructed betwveen 1939 and 1956.Barn viewed from US Highway 63, southwest of the structure.
Barn located south of the residence south of Lot I1. Barn constructed betwveen 1939 and 1956.Barn viewed from US Highway 63, southwest of the structure.
Residence located south of Lot 11. Residence coiResidence viewed from Lot 11 looking southwest.
Residence located south of Lot 11. Residence coi Residence viewed from Lot 11 looking southwest.
Barn located south of Lot 11. Barn constructed between11 looking southwest.
Barn located south of Lot 11. Barn constructed between 11 looking southwest.
arn viewed from Lot  
arn viewed from Lot  


Two small metal machine sheds located on Lot 17. Small metal machine sheds constructed between 1939 and 1968.Eastern small metal machine1939 and 1968.ichine shed constructed between Western small n1939 and 1968.ne sheds located on Lot 17. Machine shed constructed between CULTURAL RESOURCE ASSESSMENT Section 106 ReviewCONTACT PERSON/ADDRESS  
Two small metal machine sheds located on Lot 17. Small metal machine sheds constructed between 1939 and 1968.Eastern small metal machine 1939 and 1968.ichine shed constructed between Western small n 1939 and 1968.ne sheds located on Lot 17. Machine shed constructed between CULTURAL RESOURCE ASSESSMENT Section 106 Review CONTACT PERSON/ADDRESS ,C: IAdam J. whitei Terracon 3601 Mojave Court, Suite A I Columbia, Missouri 65203 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PROJECT: IDis.cover Ride Lots 2 5a 8r 9 101 11r 12r 13T 141 15 &16r Columbia FEDERAL AGENCY COUNTY: I UNKNOWN! I BOONE I" II I II ...... III I fl The State Historic Preservation Office has reviewed the Information submitted on the above referenced project. Based on this review, we have made the following determination:
,C:IAdam J. whiteiTerracon3601 Mojave Court, Suite A IColumbia, Missouri 65203 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PROJECT:IDis.cover Ride Lots 2 5a 8r 9 101 11r 12r 13T 141 15 &16r ColumbiaFEDERAL AGENCYCOUNTY:I UNKNOWN! I BOONEI" IIIII ...... III I flThe State Historic Preservation Office has reviewed the Information submitted on the above referenced project.
[] After review of initial submission, the project area has a low potential for the occurrence of cultural resources.
Based on this review, we have made the following determination:
A cultural resource survey, therefore, is not warranted.Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historic properties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.
[] After review of initial submission, the project area has a low potential for the occurrence of culturalresources.
A cultural resource survey, therefore, is not warranted.Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historicproperties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.
It has[~] been determined that for the proposed undertaking there will be "no historic properties affected".
It has[~] been determined that for the proposed undertaking there will be "no historic properties affected".
For the above checked reason, the State Hitoric Prmsrvation Off ice has no objection to the Initiation of projectactiviis PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARECHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS AREENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO THISOFFICE FOR FURTHER REVIEW AND COMMENT.
For the above checked reason, the State Hitoric Prmsrvation Off ice has no objection to the Initiation of project activiis PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARE CHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO THIS OFFICE FOR FURTHER REVIEW AND COMMENT. Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: £ February 9. 2011 Mark A. Miles, Deputy State Historic Preservation Officer Date MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE P.O. Box 176, Jefferson City, Missouri165102 For additional Information, please contact Judith Dsel, (573) 751-7862.
Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: £ February  
Please be sure to refer to the project number: 015-BO-11 Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 Columbia, Missouri February 17,2011 Terracon Project No. 09105094.1 Prepared for: Trabue, Hansen & Hinshaw, Inc.Columbia, Missouri Prepared by: Terracon Consultants, Inc.Columbia, Missouri llti[' U ll Feray1721r erracon Trabue, Hansen & Hinshaw, Inc.1901 Pennsylvania Columbia, Missouri 65202 Attn: Mr. John Huss, R.E.P: [573] 814-1568 F: [573] 814-1128 Re: Preliminary Geotec~hnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6,7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 Columbia, Missouri Terracon Project Number: 09105094.1
: 9. 2011Mark A. Miles, Deputy State Historic Preservation OfficerDateMISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICEP.O. Box 176, Jefferson City, Missouri165102 For additional Information, please contact Judith Dsel, (573) 751-7862.
 
Please be sure to refer to the project number:015-BO-11 Preliminary Geotechnical Engineering ReportDiscovery Ridge -Certified Site ProgramLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18Columbia, MissouriFebruary 17,2011Terracon Project No. 09105094.1 Prepared for:Trabue, Hansen & Hinshaw, Inc.Columbia, MissouriPrepared by:Terracon Consultants, Inc.Columbia, Missouri llti[' U ll Feray1721r erraconTrabue, Hansen & Hinshaw, Inc.1901 Pennsylvania
==Dear Mr. Huss Terracon Consultants,==
: Columbia, Missouri 65202Attn: Mr. John Huss, R.E.P: [573] 814-1568F: [573] 814-1128Re: Preliminary Geotec~hnical Engineering ReportDiscovery Ridge -Certified Site ProgramLots 2, 5, 6,7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18Columbia, MissouriTerracon Project Number: 09105094.1 Dear Mr. HussTerracon Consultants, Inc. (Terracon) has completed the preliminary geotechnical engineering services for the above referenced project.
Inc. (Terracon) has completed the preliminary geotechnical engineering services for the above referenced project. This study was performed in general accordance with our proposal number D091 0226 dated December 15, 2010 and our Supplemental Change Order dated February 2, 2011. This report presents the findings of the subsurface exploration and provides preliminary geotechnical recommendations concerning earthwork and the design and construction of foundations, floor slabs and pavements for the proposed project.We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us.Sincerely, Terracon Consultants, Inc.Staff Geotechnical Engineer t"Senior Principal Missouri:
This study was performed in general accordance with our proposal number D091 0226 dated December 15, 2010 and our Supplemental ChangeOrder dated February 2, 2011. This report presents the findings of the subsurface exploration and provides preliminary geotechnical recommendations concerning earthwork and the designand construction of foundations, floor slabs and pavements for the proposed project.We appreciate the opportunity to be of service to you on this project.
PE 2009001099 7S UMBER Office Manager Enclosures 2- cc: 3- Client 1 -File Terracon Consultants, Inc. 3601 Molave court, Ste. A Columbia, Missouri 65202 P [573J 214 2817 F [5731 214 2714 terracon.com i
If you have any questions concerning this report, or if we may be of further service, please contact us.Sincerely, Terracon Consultants, Inc.Staff Geotechnical Engineer t"Senior Principal Missouri:
TABLE OF CONTENTS Page EXECUTIVE
PE 2009001099 7S UMBER Office ManagerEnclosures 2- cc: 3- Client1 -FileTerracon Consultants, Inc. 3601 Molave court, Ste. A Columbia, Missouri 65202P [573J 214 2817 F [5731 214 2714 terracon.com i
 
TABLE OF CONTENTSPageEXECUTIVE SUMMARY.................................................................................I
==SUMMARY==
.................................................................................I


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==
.................................................................................I 2.0 PROJECT INFORMATION  
.................................................................................I 2.0 PROJECT INFORMATION  
.....................................................................
.....................................................................
I2.1 Project Description...................................................................I..
I 2.1 Project Description...................................................................I..
2.2 Site Location and Description  
2.2 Site Location and Description  
.........................................................
.........................................................
23.0 SUBSURFACE CONDITIONS  
2 3.0 SUBSURFACE CONDITIONS  
................................................................
................................................................
23.1 Geology .................................................................................
2 3.1 Geology .................................................................................
23.2 Typical Profile...........................................................................
2 3.2 Typical Profile...........................................................................
33.3 Groundwater............................................................................
3 3.3 Groundwater............................................................................
44.0 SITE SUITABILITY AND PRELIMINARY FINDINGS AND RECOMMENDATIONS  
4 4.0 SITE SUITABILITY AND PRELIMINARY FINDINGS AND RECOMMENDATIONS  
.....54.1 Geotechnical Considerations..........................................................
.....5 4.1 Geotechnical Considerations..........................................................
54.2 Earthwork...............................................................................
5 4.2 Earthwork...............................................................................
64.3 Foundations.............................................................................
6 4.3 Foundations.............................................................................
64.4 Seismic Considerations  
6 4.4 Seismic Considerations  
................................................................
................................................................
74.5 Floor Slabs ..............................................................................
7 4.5 Floor Slabs ..............................................................................
84.6 Pavements  
8 4.6 Pavements  
..............................................................................
..............................................................................
85.0  
8 5.0  


==GENERAL COMMENT==
==GENERAL COMMENT==
S.......................................................................
S.......................................................................
9APPENDIX A -FIELD EXPLORATION Exhibit A-I Site Location MapExhibit A-2 USGS MapExhibit A-3 Geologic MapExhibit A-4 Boring Location DiagramExhibit A-5 to A-I13 Boring LogsExhibit A-14 Field Exploration Description APPENDIX B -SUPPORTING INFORMATION Exhibit B-I Laboratory TestingAPPENDIX C -SUPPORTING DOCUMENTS Exhibit C-I General NotesExhibit C-2 Unified Soil Classification SystemExhibit C-3 General Notes -Description of Rock Properties Exhibit C-4 Projected Earthquake Intensities (Modified Mercalli Scale)Reliable u Responsive u Convenient.*
9 APPENDIX A -FIELD EXPLORATION Exhibit A-I Site Location Map Exhibit A-2 USGS Map Exhibit A-3 Geologic Map Exhibit A-4 Boring Location Diagram Exhibit A-5 to A-I13 Boring Logs Exhibit A-14 Field Exploration Description APPENDIX B -SUPPORTING INFORMATION Exhibit B-I Laboratory Testing APPENDIX C -SUPPORTING DOCUMENTS Exhibit C-I General Notes Exhibit C-2 Unified Soil Classification System Exhibit C-3 General Notes -Description of Rock Properties Exhibit C-4 Projected Earthquake Intensities (Modified Mercalli Scale)Reliable u Responsive u Convenient.*
Innovative Preliminary Geotechnical Engineering Report__l raDiscovery Ridge -Certified Site Program oLots 2, 5, 6,7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, MissouriFebruary 17, 2011 .Terracon Project No. 09105094.1.1 EXECUTIVE SUMMARYA preliminary geotechnical investigation has been performed for the proposed certified site whichconsists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of the Discovery RidgeResearch Park in southeastern  
Innovative Preliminary Geotechnical Engineering Report__l ra Discovery Ridge -Certified Site Program o Lots 2, 5, 6,7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 EXECUTIVE  
: Columbia, Missouri.
 
Nine (9) borings, designated B-I through B-9,were performed to depths of approximately 13 to 20 feet below the existing ground surface at thesubject site.Based on the information obtained from our subsurface exploration, the site can be developed forfuture construction.
==SUMMARY==
A preliminary geotechnical investigation has been performed for the proposed certified site which consists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of the Discovery Ridge Research Park in southeastern Columbia, Missouri.
Nine (9) borings, designated B-I through B-9, were performed to depths of approximately 13 to 20 feet below the existing ground surface at the subject site.Based on the information obtained from our subsurface exploration, the site can be developed for future construction.
The following geotechnical considerations were identified:
The following geotechnical considerations were identified:
* Typical lightly loaded commercial buildings may be supported on shallow footingsbearing on stiff to very stiff native clay or on compacted structural fill.* Assuming proper site preparation and any necessary subgrade repair, total anddifferential settlement should be within anticipated client/owner specifications.
* Typical lightly loaded commercial buildings may be supported on shallow footings bearing on stiff to very stiff native clay or on compacted structural fill.* Assuming proper site preparation and any necessary subgrade repair, total and differential settlement should be within anticipated client/owner specifications.
* Existing fill was encountered in Borings B-3 and B-4, however we understand that thismaterial was placed as part of mass grading during mid to late 2008. At that time,Terracon was onsite to observe and test the density and moisture during placement ofengineered fill material.
* Existing fill was encountered in Borings B-3 and B-4, however we understand that this material was placed as part of mass grading during mid to late 2008. At that time, Terracon was onsite to observe and test the density and moisture during placement of engineered fill material.* Based on the USGS map, it appears that a pond may have been located in the vicinity of lot 16 and that the existing pond located north of the Radii Facility previously extended west onto a portion of Lot 2. We recommend these areas be thoroughly investigated during the final geotechnical investigation for each respective lot.* The near-surface soils are active and prone to volume change with variations in moisture content. For this reason, a low volume change zone (LVC) is typically constructed beneath at-grade, grade-supported floor slabs. Depending on final grading plans, construction of the LVC may require overexcavation within future building pads.* On-site soils appear suitable for use as compacted structural fill; however, if they do not meet the low plasticity fill criteria, they should not be utilized for LVC material.* The 2006/2009 International Building Code (IBC), Table 1613.5.2 seismic site classification for this site is C* The Modified Mercalli Intensity Scale for seismic events for Boone County is VII.Reliable m Responsive
* Based on the USGS map, it appears that a pond may have been located in the vicinity oflot 16 and that the existing pond located north of the Radii Facility previously extended westonto a portion of Lot 2. We recommend these areas be thoroughly investigated during thefinal geotechnical investigation for each respective lot.* The near-surface soils are active and prone to volume change with variations in moisturecontent.
For this reason, a low volume change zone (LVC) is typically constructed beneathat-grade, grade-supported floor slabs. Depending on final grading plans, construction ofthe LVC may require overexcavation within future building pads.* On-site soils appear suitable for use as compacted structural fill; however, if they do notmeet the low plasticity fill criteria, they should not be utilized for LVC material.
* The 2006/2009 International Building Code (IBC), Table 1613.5.2 seismic siteclassification for this site is C* The Modified Mercalli Intensity Scale for seismic events for Boone County is VII.Reliable m Responsive
* Convenient.*
* Convenient.*
Innovative i
Innovative i
Preliminary Geotechnical Engineering Report"l ra nDiscovery Ridge -Certified Site Program 1rra oLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
Preliminary Geotechnical Engineering Report"l ra n Discovery Ridge -Certified Site Program 1rra o Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
* Columbia, MissouriFebruary 17, 2011 m Terracon Project No. 09105094.1.1 EXECUTIVE SUMMARY (continued)
* Columbia, Missouri February 17, 2011 m Terracon Project No. 09105094.1.1 EXECUTIVE  
* Close monitoring of the construction operations discussed herein will be critical inachieving the design subgrade support.
 
We recommend that Terracon be retained tomonitor this portion of the work.This summary should be used in conjunction with the entire report for design purposes.
==SUMMARY==
Itshould be recognized that details were not included or fully developed in this section, and thereport must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled  
(continued)
* Close monitoring of the construction operations discussed herein will be critical in achieving the design subgrade support. We recommend that Terracon be retained to monitor this portion of the work.This summary should be used in conjunction with the entire report for design purposes.
It should be recognized that details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled  


==GENERAL COMMENT==
==GENERAL COMMENT==
S should be read for an understanding of thereport limitations.
S should be read for an understanding of the report limitations.
Although this report discusses design parameters, these parameters arepreliminary.
Although this report discusses design parameters, these parameters are preliminary.
This preliminary report is not intended to be relied upon for final design.Reliable
This preliminary report is not intended to be relied upon for final design.Reliable
* Responsive u Convenient
* Responsive u Convenient
* Innovative iii PRELIMINARY GEOTECHNICAL ENGINEERING REPORTDISCOVERY RIDGE -CERTIFIED SITE PROGRAMLOTS 2, 5, 6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18COLUMBIA, MISSOURITerracon Project No. 09105094.1 February 17, 201
* Innovative i ii PRELIMINARY GEOTECHNICAL ENGINEERING REPORT DISCOVERY RIDGE -CERTIFIED SITE PROGRAM LOTS 2, 5, 6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 COLUMBIA, MISSOURI Terracon Project No. 09105094.1 February 17, 2011


==11.0 INTRODUCTION==
==1.0 INTRODUCTION==


A preliminary geotechnical engineering report has been completed for the proposed certified whichconsists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of Discovery Ridge ResearchPark in Columbia, Missouri.
A preliminary geotechnical engineering report has been completed for the proposed certified which consists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of Discovery Ridge Research Park in Columbia, Missouri.
Nine (9) borings, designated B-i through B-9, were performed todepths of approximately 13 to 20 feet below the existing ground surface at the subject site. Logs ofthe borings along with a site location map, USGS map, geologic map and boring location diagramare included in Appendix A of this report.The purpose of these services is to provide information and preliminary geotechnical engineering recommendations relative to:UUUUsubsurface soil conditions groundwater conditions earthwork pavements
Nine (9) borings, designated B-i through B-9, were performed to depths of approximately 13 to 20 feet below the existing ground surface at the subject site. Logs of the borings along with a site location map, USGS map, geologic map and boring location diagram are included in Appendix A of this report.The purpose of these services is to provide information and preliminary geotechnical engineering recommendations relative to: U U U U subsurface soil conditions groundwater conditions earthwork pavements* foundation design and construction
* foundation design and construction
* floor slab design and construction
* floor slab design and construction
* seismic considerations It is important to note that this preliminary geotechnical engineering report is not meant toprovide final design recommendations.
* seismic considerations It is important to note that this preliminary geotechnical engineering report is not meant to provide final design recommendations.
Once final development plans are available, a finalgeotechnical investigation should be performed for site and structure-specific geotechnical recommendations.
Once final development plans are available, a final geotechnical investigation should be performed for site and structure-specific geotechnical recommendations.
2.0 PROJECT INFORMATION 2.1 Project Description ITEM DESCRIPTION Site layout See Appendix A, Exhibit A-4: Boring Location DiagramThe project will include future development of approximately 90Structures acres of vacant land. Finalized specific building or site layout detailswere unknown at the time this report was prepared.
2.0 PROJECT INFORMATION 2.1 Project Description ITEM DESCRIPTION Site layout See Appendix A, Exhibit A-4: Boring Location Diagram The project will include future development of approximately 90 Structures acres of vacant land. Finalized specific building or site layout details were unknown at the time this report was prepared.Reliable
Reliable
* Responsive m Convenient m Innovative1 1
* Responsive m Convenient m Innovative1 1
Preliminary Geotechnical Engineering ReportDiscovery Ridge -Certified Site ProgramLots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
* Columbia, MissouriFebruary 17, 2011 m Terracon Project No. 09105094.1.1 irerracon ITEM DESCRIPTION Site grading information was not available at the time that this reportwas prepared.
* Columbia, Missouri February 17, 2011 m Terracon Project No. 09105094.1.1 irerracon ITEM DESCRIPTION Site grading information was not available at the time that this report was prepared.
However for the purpose and scope of this report,we have assumed that local cuts and/or fills required forGrading development will be limited to approximately 10 feet.Additionally, we understand that mass grading was performed in midto late 2008 in the vicinity of the existing Radii Facility and ABCLaboratories building.
However for the purpose and scope of this report, we have assumed that local cuts and/or fills required for Grading development will be limited to approximately 10 feet.Additionally, we understand that mass grading was performed in mid to late 2008 in the vicinity of the existing Radii Facility and ABC Laboratories building.
At that time, Terracon was onsite to observeand test the placement of engineered fill material.
At that time, Terracon was onsite to observe and test the placement of engineered fill material.Cut and fill slopes No steeper than 3H:IV (Horizontal to Vertical) (assumed)2.2 Site Location and Description ITEM DESCRIPTION The proposed project site consists of Lots 2, 5, 6, 7 8, 9, 10, 11, 12, Location 13, 14, 15, 16, 17 and 18 of Discovery Ridge Research Park in______________________
Cut and fill slopes No steeper than 3H:IV (Horizontal to Vertical)  
Columbia, Missoudi.The lots are vacant with the exception of Lot 5 which is developed Exisingimprvemntswith a storage building.Generally grass covered, however portions of the site in the vicinity Curret grund overof Lot 16 were cultivated fields.In general, slightly to moderately sloped downward towards the Existing topography south and west.3.0 SUBSURFACE CONDITIONS 3.1 Geology Most of the upland area is covered by a thin loess blanket and glacial drift. Highly plastic clays that exhibit volume change with variations in moisture are commonly encountered near the ground surface.Based on the 2003 Geologic Map of Missouri, Missouri Department of Natural Resources, bedrock at this site consists primarily of the Pennsylvanian aged Cherokee Group (Pc), the Pennsylvanian aged Marmaton Group (Pm), and the Mississippian aged Burlington formation (Mo). The Cherokee Group is predominantly shale with minor amounts of carbonates and sandstone.
(assumed) 2.2 Site Location and Description ITEM DESCRIPTION The proposed project site consists of Lots 2, 5, 6, 7 8, 9, 10, 11, 12,Location 13, 14, 15, 16, 17 and 18 of Discovery Ridge Research Park in______________________  
: Columbia, Missoudi.
The lots are vacant with the exception of Lot 5 which is developed Exisingimprvemntswith a storage building.
Generally grass covered, however portions of the site in the vicinityCurret grund overof Lot 16 were cultivated fields.In general, slightly to moderately sloped downward towards theExisting topography south and west.3.0 SUBSURFACE CONDITIONS 3.1 GeologyMost of the upland area is covered by a thin loess blanket and glacial drift. Highly plastic claysthat exhibit volume change with variations in moisture are commonly encountered near theground surface.Based on the 2003 Geologic Map of Missouri, Missouri Department of Natural Resources, bedrock at this site consists primarily of the Pennsylvanian aged Cherokee Group (Pc), thePennsylvanian aged Marmaton Group (Pm), and the Mississippian aged Burlington formation (Mo). The Cherokee Group is predominantly shale with minor amounts of carbonates andsandstone.
This group contains most of the mineable coal beds in Missouri.
This group contains most of the mineable coal beds in Missouri.
The MarmatonGroup consists of a succession of shale, limestone, clay, and coal beds.Reliable
The Marmaton Group consists of a succession of shale, limestone, clay, and coal beds.Reliable
* Responsive
* Responsive
* Convenient
* Convenient
* Innovative2 2
* Innovative2 2
Preliminary Geotechnical Engineering ReportDiscovery Ridge -Certified Site ProgramLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
* Columbia, MissouriFebruary 17, 2011
* Columbia, Missouri February 17, 2011
* Terracon Project No. 09105094.1  
* Terracon Project No. 09105094.1  
.1irerracon The Burlington formation is characteristically a white to gray, medium to coarsely crystalline, medium to coarsely crinoidal, chert free to sparsely cherty limestone.
.1 irerracon The Burlington formation is characteristically a white to gray, medium to coarsely crystalline, medium to coarsely crinoidal, chert free to sparsely cherty limestone.
Solution  
Solution features, including caves and sinkholes, are commonly present in this formation.
: features, including caves and sinkholes, are commonly present in this formation.
No caves or sinkholes are known to exist, or are published to exist, within approximately 1 mile of this project site.However several areas of known karst activity are present west and southwest of the project site.It is difficult to predict future sinkhole activity.
No caves or sinkholes are known to exist, or are published to exist, within approximately 1 mile of this project site.However several areas of known karst activity are present west and southwest of the projectsite.It is difficult to predict future sinkhole activity.
Sinkholes and caves in this area are in various stages of development and can appear at any time. Site grading and drainage may alter site conditions and could possibly cause sinkholes in areas that have no history of this activity.3.2 Typical Profile Based on the results of the borings, as follows: subsurface conditions on the project site can be generalized Stratum Approximate Depth to Mtra ecito ossec/est Stratum Bottom of Stratum (feet) Mtra ecito ossec/est Surface 0.2 to 0.5 Topsoil: brown, friable and contained N/A significant organic matter 3 to 12 Existing Fill ' consisting of lean clay 1 and lean to fat clay with Very stiff to hard (Borings B-3 & B-4 only) varying amounts of sand and gravel 2 3 to 12 Lean clay, lean to fat clay and fat clay Stiff to very stiff Undeermned BorngsB-i Lean to fat clay and fat clay with through B-5, B-B and B-9 varying amounts of sand, gravel andStftohr 3 teminaed wthi thi strtum possible cobbles (visually classified as at the planned depth of glacial drift)approximately 20 feet __________________________
Sinkholes and caves in this area are in variousstages of development and can appear at any time. Site grading and drainage may alter siteconditions and could possibly cause sinkholes in areas that have no history of this activity.
3.2 Typical ProfileBased on the results of the borings,as follows:subsurface conditions on the project site can be generalized Stratum Approximate Depth to Mtra ecito ossec/est Stratum Bottom of Stratum (feet) Mtra ecito ossec/est Surface 0.2 to 0.5 Topsoil:
brown, friable and contained N/Asignificant organic matter3 to 12 Existing Fill ' consisting of lean clay1 and lean to fat clay with Very stiff to hard(Borings B-3 & B-4 only) varying amounts of sand and gravel2 3 to 12 Lean clay, lean to fat clay and fat clay Stiff to very stiffUndeermned BorngsB-i Lean to fat clay and fat clay withthrough B-5, B-B and B-9 varying amounts of sand, gravel andStftohr 3 teminaed wthi thi strtum possible cobbles (visually classified asat the planned depth of glacial drift)approximately 20 feet __________________________
Undetermined:
Undetermined:
Borings B-6 Caused split spoon4 and B-7 terminated within Limestone sampler refusal andthis stratum.,________________
Borings B-6 Caused split spoon 4 and B-7 terminated within Limestone sampler refusal and this stratum.,________________
auger refusalNote 1: The existing fill material was placed in mid to late 2008. Terracon provided onsite observation and moisture/density testing during the placement of fill material.
auger refusal Note 1: The existing fill material was placed in mid to late 2008. Terracon provided onsite observation and moisture/density testing during the placement of fill material.The upper soil encountered in the borings generally consisted of lean to fat clay and fat clay which was of moderate to high plasticity, and had the following measured liquid limits, plastic limits, and plasticity indices: Reliable.*
The upper soil encountered in the borings generally consisted of lean to fat clay and fat claywhich was of moderate to high plasticity, and had the following measured liquid limits, plasticlimits, and plasticity indices:Reliable.*
Responsive u Convenient.*
Responsive u Convenient.*
Innovative3 3
Innovative3 3
Preliminary Geotechnical Engineering Report 1rDiscovery Ridge -Certified Site Program 1rrraconLots 2, 5,6, 7,8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, MissouriFebruary 17, 2011 .Terracon Project No. 09105094.1.1 Sample Location Depth (feet) Liquid Limit (%) Plastic Limit (%) Plasticity Index (%)Boring B-1 3 -5 43 15 28Boring B-3 1 -3 41 16 25Boring B-5 1 -3 31 21 10Boring B-9 1 -3 44 21 23Conditions encountered at each boring location are indicated on the individual boring logs.Stratification boundaries on the boring logs represent the approximate location of changes insoil types; in situ, the transition between materials may be gradual.
Preliminary Geotechnical Engineering Report 1r Discovery Ridge -Certified Site Program 1rrracon Lots 2, 5,6, 7,8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 Sample Location Depth (feet) Liquid Limit (%) Plastic Limit (%) Plasticity Index (%)Boring B-1 3 -5 43 15 28 Boring B-3 1 -3 41 16 25 Boring B-5 1 -3 31 21 10 Boring B-9 1 -3 44 21 23 Conditions encountered at each boring location are indicated on the individual boring logs.Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in situ, the transition between materials may be gradual. Details for each of the borings can be found on the boring logs in Appendix A of this report.3.3 Groundwater The boreholes were observed while drilling and after completion for the presence and level of groundwater.
Details for each of theborings can be found on the boring logs in Appendix A of this report.3.3 Groundwater The boreholes were observed while drilling and after completion for the presence and level ofgroundwater.
Groundwater was observed at in Borings B-5 and B-6 at depths of approximately 12 to 18.5 feet. Groundwater was not observed in the remaining borings during drilling or for the short amount of time the borings were allowed to remain open following drilling completion.
Groundwater was observed at in Borings B-5 and B-6 at depths of approximately 12 to 18.5 feet. Groundwater was not observed in the remaining borings during drilling or for theshort amount of time the borings were allowed to remain open following drilling completion.
However, this does not necessarily mean that stable groundwater levels were observed in Borings B-5 and B-6, or that the remaining borings were terminated above groundwater.
: However, this does not necessarily mean that stable groundwater levels were observed in BoringsB-5 and B-6, or that the remaining borings were terminated above groundwater.
Due to the low permeability of the soils encountered in the borings, a relatively long period of time may be necessary for a groundwater level to develop and stabilize in a borehole in these materials.
Due to the low permeability of the soils encountered in the borings, a relatively long period of timemay be necessary for a groundwater level to develop and stabilize in a borehole in these materials.
Long term observations in piezometers or observation wells sealed from the influence of surface water are often required to define groundwater levels in materials of this type.Pockets, lenses, and stringers of sand are sometimes encountered in the glacial soils found in the vicinity of the referenced project. These sand pockets are normally discontinuous and often contain water of variable quality and quantity.
Long term observations in piezometers or observation wells sealed from the influence of surfacewater are often required to define groundwater levels in materials of this type.Pockets, lenses, and stringers of sand are sometimes encountered in the glacial soils found inthe vicinity of the referenced project.
These sand pockets may be encountered during foundation excavation.
These sand pockets are normally discontinuous and oftencontain water of variable quality and quantity.
This possibility should be considered when developing design and construction plans and specifications for the project.Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff, proximity to existing ponds, and other factors not evident at the time the borings were performed.
These sand pockets may be encountered duringfoundation excavation.
In addition, perched water can develop over low permeability soil strata. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project.Reliable u Responsive
This possibility should be considered when developing design andconstruction plans and specifications for the project.Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff,proximity to existing ponds, and other factors not evident at the time the borings wereperformed.
In addition, perched water can develop over low permeability soil strata. Therefore, groundwater levels during construction or at other times in the life of the structure may be higheror lower than the levels indicated on the boring logs. The possibility of groundwater levelfluctuations should be considered when developing the design and construction plans for theproject.Reliable u Responsive
* Convenient m Innovative4 4
* Convenient m Innovative4 4
Preliminary Geotechnical Engineering Report 1rDiscovery Ridge -Certified Site Program ra aLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 u Columbia, MissouriFebruary 17, 2011
Preliminary Geotechnical Engineering Report 1r Discovery Ridge -Certified Site Program ra a Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 u Columbia, Missouri February 17, 2011
* Terracon Project No. 09105094.1.1 4.0 SITE SUITABILITY AND PRELIMINARY FINDINGS ANDRECOMMENDATIONS 4.1 Geotechnical Considerations The borings performed for this project generally encountered native lean to fat clay and fat clayunderlain by glacial drift. Existing fill was encountered in Borings B-3 and B-4 to depths of 3 to 12feet, and limestone bedrock was encountered in Borings B-6 and B-7 at depths of approximately 17 and 12.5 feet, respectively.
* Terracon Project No. 09105094.1.1 4.0 SITE SUITABILITY AND PRELIMINARY FINDINGS AND RECOMMENDATIONS 4.1 Geotechnical Considerations The borings performed for this project generally encountered native lean to fat clay and fat clay underlain by glacial drift. Existing fill was encountered in Borings B-3 and B-4 to depths of 3 to 12 feet, and limestone bedrock was encountered in Borings B-6 and B-7 at depths of approximately 17 and 12.5 feet, respectively.
Depending on final site grading plans, we anticipate that either thenative clay or compacted structural fill will form the subgrade for future building foundations andfloor slabs.Based on the USGS map, it appears that a pond may have been located in the vicinity of lot 16.Further, based on aerial photography the existing pond located north of the Radii Facility previously extended southwest onto a portion of Lot 2. We recommend these areas be thoroughly investigated during the final geotechnical investigation for each respective lot.Performance of foundations depends on many factors including, but not limited to, the depth offootings, amounts of cuts or fill, bearing material, and foundation loads. Structural loads, finalgrades, and other design details should be provided when available.
Depending on final site grading plans, we anticipate that either the native clay or compacted structural fill will form the subgrade for future building foundations and floor slabs.Based on the USGS map, it appears that a pond may have been located in the vicinity of lot 16.Further, based on aerial photography the existing pond located north of the Radii Facility previously extended southwest onto a portion of Lot 2. We recommend these areas be thoroughly investigated during the final geotechnical investigation for each respective lot.Performance of foundations depends on many factors including, but not limited to, the depth of footings, amounts of cuts or fill, bearing material, and foundation loads. Structural loads, final grades, and other design details should be provided when available.
Although this reportdiscusses design parameters, these parameters are preliminary.
Although this report discusses design parameters, these parameters are preliminary.
This preliminary report is notintended to be relied upon for final design. We recommend a more detailed study be performed when specific project details are known, and/or possibly following completion of general sitegrading.Examination of the boring logs indicates a range of soil-moisture conditions are present at thissite. At the time of drilling, some of the soils at various depths are at moisture levels above theirmeasured plastic limit. Typically, soil with moisture levels above their measured plastic limit maybe prone to rutting,  
This preliminary report is not intended to be relied upon for final design. We recommend a more detailed study be performed when specific project details are known, and/or possibly following completion of general site grading.Examination of the boring logs indicates a range of soil-moisture conditions are present at this site. At the time of drilling, some of the soils at various depths are at moisture levels above their measured plastic limit. Typically, soil with moisture levels above their measured plastic limit may be prone to rutting, pumping, and can develop into unstable subgrade conditions during general construction operations.
: pumping, and can develop into unstable subgrade conditions during generalconstruction operations.
Moderately to highly plastic, lean to fat clay and fat clay soils were present on site. Such soils are commonly referred to as "expansive" or "swelling" soils because they expand or swell as their moisture contents increase.
Moderately to highly plastic, lean to fat clay and fat clay soils were present on site. Such soils arecommonly referred to as "expansive" or "swelling" soils because they expand or swell as theirmoisture contents increase.  
However, these soils also "contract" or "shrink" as their moisture levels decrease.
: However, these soils also "contract" or "shrink" as their moisturelevels decrease.  
Footings, floor slabs, and pavements supported on expansive soils will move upward and downward and such movements will result in distortion, possibly causing cracking or structural damage to structures.
: Footings, floor slabs, and pavements supported on expansive soils will moveupward and downward and such movements will result in distortion, possibly causing cracking orstructural damage to structures.
For this reason, a low volume change zone will likely be required beneath at-grade floor slabs. We recommend that additional laboratory testing be performed during the final geotechnical exploration to better evaluate the expansive nature of these soils.Reliable
For this reason, a low volume change zone will likely berequired beneath at-grade floor slabs. We recommend that additional laboratory testing beperformed during the final geotechnical exploration to better evaluate the expansive nature ofthese soils.Reliable
* Responsive
* Responsive
* Convenient
* Convenient
* Innovative 5
* Innovative 5
Preliminary Geotechnical Engineering ReportDiscovery Ridge -Certified Site Program ra oLots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, MissouriFebruary 17, 2011
Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program ra o Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011
* Terracon Project No. 09105094.1.1 We recommend that the exposed subgrade be thoroughly evaluated after stripping of anytopsoil and creation of all cut areas, but prior to the start of any fill operations.
* Terracon Project No. 09105094.1.1 We recommend that the exposed subgrade be thoroughly evaluated after stripping of any topsoil and creation of all cut areas, but prior to the start of any fill operations.
We recommend that the geotechnical engineer be retained to evaluate the bearing material for the foundations and floor slab subgrade soils. Subsurface conditions, as identified by the field and laboratory testing programs, have been reviewed and evaluated with respect to the proposed development plans known to us at this time.4.2 Earthwork The widely spaced preliminary borings typically encountered stiff to hard lean to fat clay and fatclay. Shallow bedrock, karst features, or extensive pervious deposits of water-bearing sand thatcould impact site development did not appear to be present based on the preliminary site andsubsurface information gathered at this time.Based on the subsurface conditions encountered in the widely spaced borings, the site soils aresuitable for future development.
We recommend that the geotechnical engineer be retained to evaluate the bearing material for the foundations and floor slab subgrade soils. Subsurface conditions, as identified by the field and laboratory testing programs, have been reviewed and evaluated with respect to the proposed development plans known to us at this time.4.2 Earthwork The widely spaced preliminary borings typically encountered stiff to hard lean to fat clay and fat clay. Shallow bedrock, karst features, or extensive pervious deposits of water-bearing sand that could impact site development did not appear to be present based on the preliminary site and subsurface information gathered at this time.Based on the subsurface conditions encountered in the widely spaced borings, the site soils are suitable for future development.
Additional borings should be completed so that each site can beadequately characterized and recommendations can be more fully developed to assist and guidefuture mass grading.Recommendations will need to be developed for site preparation and proof-rolling operations aswell as construction of cut and structural fill operations.
Additional borings should be completed so that each site can be adequately characterized and recommendations can be more fully developed to assist and guide future mass grading.Recommendations will need to be developed for site preparation and proof-rolling operations as well as construction of cut and structural fill operations.
In our opinion, full-time testing andobservation should be employed during mass grading to evaluate compliance with projectearthwork recommendations and requirements.
In our opinion, full-time testing and observation should be employed during mass grading to evaluate compliance with project earthwork recommendations and requirements.
If site grading results in relatively thick structural fills, settlement and cut/fill slope stability may need to be evaluated.
If site grading results in relatively thick structural fills, settlement and cut/fill slope stability may need to be evaluated.


===4.3 Foundations===
===4.3 Foundations===
Shallow foundations could be used to support lightly loaded commercial structures provided thefootings are supported by suitable material (stiff to hard native clay or compacted structural fill).Depending on the design footing elevation and bearing material (native clay or newly placedcompacted structural fill), allowable bearing pressures would likely be in the range of 1,000 psf to3,000 psf. Due to the presence of clay soils, shallow foundations are typically soil-formed in thegeneral vicinity of this site. Further testing at the individual structure locations should beperformed to determine the appropriate bearing capacity for structural support.Heavier loads, which could cause excessive settlement, are normally supported by shallowfoundations which are supported, in turn, by aggregate-pier intermediate foundations or by drilledpiers. Pier drilling through the native soils is not expected to become difficult based upon thematerial encountered within the borings;  
Shallow foundations could be used to support lightly loaded commercial structures provided the footings are supported by suitable material (stiff to hard native clay or compacted structural fill).Depending on the design footing elevation and bearing material (native clay or newly placed compacted structural fill), allowable bearing pressures would likely be in the range of 1,000 psf to 3,000 psf. Due to the presence of clay soils, shallow foundations are typically soil-formed in the general vicinity of this site. Further testing at the individual structure locations should be performed to determine the appropriate bearing capacity for structural support.Heavier loads, which could cause excessive settlement, are normally supported by shallow foundations which are supported, in turn, by aggregate-pier intermediate foundations or by drilled piers. Pier drilling through the native soils is not expected to become difficult based upon the material encountered within the borings; however, the drilled pier contractor should be prepared should sandy zones or large boulders be encountered.
: however, the drilled pier contractor should be preparedshould sandy zones or large boulders be encountered.
These materials, although not Reliable
These materials, although notReliable
* Responsive.*
* Responsive.*
Convenient.*
Convenient.*
Innovative6 6
Innovative6 6
Preliminary Geotechnical Engineering ReportDiscovery Ridge -Certified Site ProgramLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18
* Columbia, MissouriFebruary 17, 2011 .Terracon Project No. 09105094.1.1 rerraconencountered in our borings, can sometimes be encountered in the glacial soils that are present inthe vicinity of this site when drilling pier holes which are much larger in diameter than the boreholes.Footln0 LevelExcavalonLee Lean Concrete Backfill Overexcavation  
* Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 rerracon encountered in our borings, can sometimes be encountered in the glacial soils that are present in the vicinity of this site when drilling pier holes which are much larger in diameter than the bore holes.Footln0 Level ExcavalonLee Lean Concrete Backfill Overexcavation  
/ BackfillNOTE" IExcavations in sketches Shown vetia for convenience.
/ Backfill NOTE" IExcavations in sketches Shown vetia for convenience.
Excavations should be sloped as necessary for 4.4 Seismic Considerations
Excavations should be sloped as necessary for 4.4 Seismic Considerations
: 1. Missouri State Emergency Management Agency;,
: 1. Missouri State Emergency Management Agency;, P.O. Box 116; Jefferson City, MO 65102 2. See Appendix C, Exhibit C-4 for Projected Earthquake Intensities (Modified Mercalli Scale)Code Used Site Classification 2006/2009 Intemational Building Code (IBC) 1 C 2 1.2.In general accordance with the 2006/2009 International Building Code, Table 1613.5.2.The 2006/2009 Intemational Building Code requires a site soil profile determination extending a depth of 100 feet for seismic site classification.
P.O. Box 116; Jefferson City, MO 651022. See Appendix C, Exhibit C-4 for Projected Earthquake Intensities (Modified Mercalli Scale)Code Used Site Classification 2006/2009 Intemational Building Code (IBC) 1C 21.2.In general accordance with the 2006/2009 International Building Code, Table 1613.5.2.
The current scope requested does not include the required 100 foot soil profile determination.
The 2006/2009 Intemational Building Code requires a site soil profile determination extending adepth of 100 feet for seismic site classification.
Borings for this report extended to a maximum depth of approximately 20 feet and this seismic site class assignment considers that shale or limestone bedrock is present within approximately 30 feet of the ground surface and continues below the maximum depth of the subsurface exploration.
The current scope requested does not include therequired 100 foot soil profile determination.
Additional exploration to greater depths could be considered to confirm the conditions below the current depth of exploration.
Borings for this report extended to a maximum depth ofapproximately 20 feet and this seismic site class assignment considers that shale or limestone bedrock is present within approximately 30 feet of the ground surface and continues below themaximum depth of the subsurface exploration.
Altematively, a geophysical exploration could be utilized in order to attempt to justify a more favorable seismic site class.Reliable
Additional exploration to greater depths could beconsidered to confirm the conditions below the current depth of exploration.
Altematively, ageophysical exploration could be utilized in order to attempt to justify a more favorable seismic siteclass.Reliable
* Responsive
* Responsive
* Convenient.*
* Convenient.*
Innovative7 7
Innovative7 7
Preliminary Geotechnical Engineering Report 1e rDiscovery Ridge -Certified Site Program nLots 2, 5, 6, 7, 8, 9, 10, II, 12, 13, 14, 15, 16, 17 and 18 .Columbia, MissouriFebruary 17, 2011 .Terracon Project No. 09105094.1.1 4.5 Floor SlabsMany of the clay soils in this locale have the potential to increase or decrease in volume withvariations in moisture content.
Preliminary Geotechnical Engineering Report 1e r Discovery Ridge -Certified Site Program n Lots 2, 5, 6, 7, 8, 9, 10, II, 12, 13, 14, 15, 16, 17 and 18 .Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 4.5 Floor Slabs Many of the clay soils in this locale have the potential to increase or decrease in volume with variations in moisture content. Soil having high plasticity characteristics (i.e., fat clay) generally has a greater potential for moisture related volume change than less plastic materials such as lean clay. In addition, swell potential is generally greater in material with a high dry unit weight and low initial moisture content. However, even low plasticity soils can swell significantly if their moisture levels are initially low.Because of the moderate to high shrink-swell potential of the lean to fat clay and fat clay soil encountered in the borings, a low volume change layer will likely be required below at-grade floor slabs. This layer typically varies from 12 to 36 inches in thickness.
Soil having high plasticity characteristics (i.e., fat clay) generally has a greater potential for moisture related volume change than less plastic materials such aslean clay. In addition, swell potential is generally greater in material with a high dry unit weightand low initial moisture content.  
The on-site lean to fat clay and fat clay soils encountered in the borings performed for this report are typically not suitable for use as low volume change material; however, on-site materials may exist which would meet the low volume change material criteria.
: However, even low plasticity soils can swell significantly if theirmoisture levels are initially low.Because of the moderate to high shrink-swell potential of the lean to fat clay and fat clay soilencountered in the borings, a low volume change layer will likely be required below at-gradefloor slabs. This layer typically varies from 12 to 36 inches in thickness.
The on-site lean to fatclay and fat clay soils encountered in the borings performed for this report are typically notsuitable for use as low volume change material;  
: however, on-site materials may exist whichwould meet the low volume change material criteria.
Further testing at the individual structure locations should be performed to determine the required low volume change layer thickness.
Further testing at the individual structure locations should be performed to determine the required low volume change layer thickness.
 
4.6 Pavements On most project sites, the site grading is accomplished relatively early in the construction phase.Fills are placed and compacted in a uniform manner. However, as construction proceeds, excavations are made into these areas, rainfall and surface water saturates some areas, heavy traffic from concrete trucks and other delivery vehicles disturbs the subgrade and many surface irregularities are filled in with loose soils to improve trafficability temporarily.
===4.6 Pavements===
As a result, the pavement subgrades, initially prepared early in the project, should be carefully evaluated as the time for pavement construction approaches.
On most project sites, the site grading is accomplished relatively early in the construction phase.Fills are placed and compacted in a uniform manner. However, as construction  
Pavement thickness can be determined using AASHTO, Asphalt Institute and/or other methods if specific wheel loads, axle configurations, frequencies, and desired pavement life are provided.Pavement design methods are intended to provide structural sections with adequate thickness over a particular subgrade such that wheel loads are reduced to a level the subgrade can support.The support characteristics of the subgrade for pavement design do not account for shrink/swell movements of an expansive clay subgrade such as the soils encountered on this project. Thus, the pavement may be adequate from a structural standpoint, yet still experience cracking and deformation due to shrink/swell related movement of the subgrade.Expansive soils are present at this site. It is important to minimize moisture changes in the subgrade both during construction and during the life of the pavement to reduce shrink/swell movements.
: proceeds, excavations are made into these areas, rainfall and surface water saturates some areas, heavytraffic from concrete trucks and other delivery vehicles disturbs the subgrade and many surfaceirregularities are filled in with loose soils to improve trafficability temporarily.
As a result, thepavement subgrades, initially prepared early in the project, should be carefully evaluated as thetime for pavement construction approaches.
Pavement thickness can be determined using AASHTO, Asphalt Institute and/or other methods ifspecific wheel loads, axle configurations, frequencies, and desired pavement life are provided.
Pavement design methods are intended to provide structural sections with adequate thickness over a particular subgrade such that wheel loads are reduced to a level the subgrade can support.The support characteristics of the subgrade for pavement design do not account for shrink/swell movements of an expansive clay subgrade such as the soils encountered on this project.
Thus,the pavement may be adequate from a structural standpoint, yet still experience cracking anddeformation due to shrink/swell related movement of the subgrade.
Expansive soils are present at this site. It is important to minimize moisture changes in thesubgrade both during construction and during the life of the pavement to reduce shrink/swell movements.
Reliable
Reliable
* Responsive.*
* Responsive.*
Convenient.*
Convenient.*
Innovative8 8
Innovative8 8
Preliminary Geotechnical Engineering Reporto~scov oe ,o1 terraconLots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 .Columbia, MissouriFebruary 17, 2011 .Terracon Project No. 09105094.1.1 5.0  
Preliminary Geotechnical Engineering Report o~scov oe ,o1 terracon Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 .Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 5.0  


==GENERAL COMMENT==
==GENERAL COMMENT==
STerracon should be retained to review the final design plans and specifications so commentscan be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications.
S Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications.
Terracon also should be retained to provide observation andtesting services during grading, excavation, foundation construction and other earth-related construction phases of the project.The preliminary analysis and preliminary recommendations presented in this report are basedupon the data obtained from the borings performed at the indicated locations and from otherinformation discussed in this preliminary report. This preliminary report does not reflectvariations that may occur between borings, across the site, or due to the modifying effects ofconstruction or weather.
Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth-related construction phases of the project.The preliminary analysis and preliminary recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this preliminary report. This preliminary report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction.
The nature and extent of such variations may not become evident untilduring or after construction.
If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided.The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions.
If variations appear, we should be immediately notified so thatfurther evaluation and supplemental recommendations can be provided.
If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken.
The scope of services for this project does not include either specifically or by implication anyenvironmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification orprevention of pollutants, hazardous materials or conditions.
This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices.
If the owner is concerned about thepotential for such contamination or pollution, other studies should be undertaken.
No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this preliminary report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing.Reliable.*
This report has been prepared for the exclusive use of our client for specific application to theproject discussed and has been prepared in accordance with generally accepted geotechnical engineering practices.
No warranties, either express or implied, are intended or made. Sitesafety, excavation  
: support, and dewatering requirements are the responsibility of others. In theevent that changes in the nature, design, or location of the project as outlined in this report areplanned, the conclusions and recommendations contained in this preliminary report shall not beconsidered valid unless Terracon reviews the changes and either verifies or modifies theconclusions of this report in writing.Reliable.*
Responsive a Convenient
Responsive a Convenient
* Innovative9 9}}
* Innovative9 9}}

Revision as of 20:32, 8 July 2018

Northwest Medical Isotopes, LLC - Document No. NWMI-2015-RAI-001, Revision 0, Appendix K. Part 13 of 14
ML15328A084
Person / Time
Site: Northwest Medical Isotopes
Issue date: 11/20/2015
From:
Northwest Medical Isotopes, Terracon Consultants
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15328A010 List:
References
NWMI-LTR-2015-005 NWMI-2015-RAI-001, Rev. 0
Download: ML15328A084 (37)


Text

APPENDIX D Ground Photographs Wetland Delineation Report Discovery Ridge

  • Columbia, Boone County, Missouri March 14, 2011
  • Terracon Project: 09117701 1. View of Wetland Area A, facing northeast.
2. View of Wetland Area A, facing southwest.

1 Frrecon Wetland Delineation Report Discovery Ridge u Columbia, Boone County, Missouri March 14, 2011

  • Terracon Project: 09117701 3. View of Wetland Area B, facing east.4. View of Wetland Area B, facing west.1 Ferracon Wetland Delineation Report Discovery Ridge u Columbia, Boone County, Missouri March 14, 2011 u Terracon Project: 09117701 5. View of suspect drainageway, facing north.6. View of suspect drainageway, facing south.1 rerra can Wetland Delineation Report Discovery Ridge
  • Columbia, Boone County, Missouri March 14, 2011
  • Terracon Project: 09117701 7. View of suspect upland depression, facing west.8. View of suspect upland depression, facing east.1 rerracan Federal Emergency Management Agency Community Status Book Report MISSOURI Communities Participating in th(ClD 2901801*2901 811#2902751*2907831*2907911#290311 290035 290409 2902701*2900731*2907431*290231#*2908961*2902 16#290847#*290792#290630#2903401*2902891*2901261*2900861*2900891*2903411#290600 2907931*2901 551*2906011#2901 07#2900361*2904101*290745 2903421*2907941*290603 2901 591*290898#*290746#*290604 2901 60#2904301*2907951*290063#*2903431*2903441*2901891*2903451*2907961*2904641*2908991*2952631*2905041*2903461*Community Name CARTERVILLE, CITY OF CARTHAGE, CITY OF CARUTHERSVILLE, CITY OF CASS COUNTY *CEDAR COUNTY *CENTERVILLE, VILLAGE OF CENTRALIA, CITY OF CHAFFEE, CITY OF CHAMOIS, CITY OF CHARITON COUNTY*CHARLACK, CITY OF CHARLESTON, CITY OF CHESTERFIELD, CITY OF CHILLICOTHE, CITY OF CHRISTIAN COUNTY*CLARK COUNTY *CLARKSDALE, CITY OF CLARKSON VALLEY, CITY OF CLARKSVILLE, CITY OF CLARKTON, CITY OF CLAY COUNTY *CLAYCOMO, VILLAGE OF CLAYTON, CITY OF CLEVER, CITY OF CLINTON COUNTY*CLINTON, CITY OF COBALT VILLAGE,VILLAGE OF COLE COUNTY*COLUMBIA, CITY OF COMMERCE, CITY OF CONCORDIA, CITY OF COOL VALLEY, CITY OF COOPER COUNTY *COOTER, TOWN OF CORNING, TOWN OF COTTLEVILLE, CITY OF COUNTRY CLUB HILLS, CITY OF COUNTRY CLUB, VILLAGE OF CRAIG, CITY OF CRANE, CITY OF CRAWFORD COUNTY*CREIGHTON, CITY OF CRESTWOOD, CITY OF CREVE COEUR, CITY OF CRYSTAL CITYCITY OF CRYSTAL LAKE PARK, CITY OF DADE COUNTY *DALTON, VILLAGE OF DARDENNE PRAIRIE, CITY OF DE SOTO, CITY OF DEARBORN, CITY OF DELLWOOD, CITY OF County JASPER COUNTY JASPER COUNTY PEMISCOT COUNTY CASS COUNTY CEDAR COUNTY REYNOLDS COUNTY BOONE COUNTY SCOTT COUNTY OSAGE COUNTY CHARITON COUNTY ST. LOUIS COUNTY MISSISSIPPI COUNTY ST. LOUIS COUNTY LIVINGSTON COUNTY CHRISTIAN COUNTY CLARK COUNTY DEKALB COUNTY ST. LOUIS COUNTY PIKE COUNTY DUNKLIN COUNTY CLAY COUNTY CLAY COUNTY ST. LOUIS COUNTY CHRISTIAN COUNTY CLINTON COUNTY HENRY COUNTY MADISON COUNTY COLE COUNTY BOONE COUNTY SCOTT COUNTY LAFAYETTE COUNTY ST. LOUIS COUNTY COOPER COUNTY PEMISCOT COUNTY HOLT COUNTY ST. CHARLES COUNTY ST. LOUIS COUNTY ANDREW COUNTY HOLT COUNTY STONE COUNTY CRAWFORD COUNTY CASS COUNTY ST. LOUIS COUNTY ST. LOUIS COUNTY JEFFERSON COUNTY ST. LOUIS COUNTY DADE COUNTY CHARITON COUNTY ST. CHARLES COUNTY JEFFERSON COUNTY PLATTE COUNTY ST. LOUIS COUNTY Ini Id In Id eNational Flood Program it FHBM Init FIRM Curr Eff entitled Identified Map Date 12/28/73 07/16/84 05102/07 03/15/74 06/15/83 05/02/07 02/20/76 01/16/81 01/16/81 03/14/78 04/15/82 03/16/06 07/17/02 07/17/02 11t/22/74 08/01/86 08/01/86(L) 06/07/74 04/15/77 04/15/77(M) 03/15/74 09/27/85 09/27/85(M) 03/29/74 11/15/84 09/02/05 04/19/83 12/03/87 12/03/87 02/14/75 11/23/84 08/23/00 03/29/74 01/04/85 01/18/89 09/15/78 08/23/00 01/09/74 08/05/85 08/05/85 04/19/83 04/01/04 04/01/04(L) 09/15/81 02/01/97 01/19/00 02/21/75 11/19/03 11/19/03(M) 07/26/74 04/08/77 08/23/00 05/24/74 04/19/10 04/19/1 0(>)12/21/73 01/29/80 04/17/95 09/06/74 03/18/80 04/16/03 01/23/74 08/01/77 12/02/80 04/05/74 02/14/76 08/23/00 07/18/75 (NSFHA)07/05/84 06/18/87 06/18/87(M) 04/15/74 07/04/88 07/04/88 03/26/76 07/02/87 12/06/02(M) 12/16/80 12/15/81 12/02/05 08/28/71 08/28/71 08/16/95 11/08/74 06/01/78 09/02/88 02/07/75 (NSFHA)05/03/74 05/16/77 08/23/00 11/16/83 09/01/89 09/01/89(L)(NSFHA)02/06/76 02/06/76 01/06/88 09/15/78 03/17/03 05/07/76 (NSFHA)08/22/75 (NSFHA)12/06/74 12/06/74 01/06/88 06/07/74 07/16/80 07/16/80 04/19/83 05/01/87 05/01/87(L) 05/13/77 03/16/06 03/16/06 05/03/74 05/02/77 08/23/00 02/01/74 08/01/78 08/23/00 03/15/74 09/01/77 04/05/06 05/13/77 08/02/95 (NSFHA)07/17/02 07/17/02 12/13/74 03/17/03 03/17/03 12/15/92 03/17/03 05/26/72 04/05/06 09/19/75 06/15/79 06/15/79 08/13/76 06/27/78 (NSFHA)Reg-Emer Date 07/16/84 06/15/83 01/116/81 04/15/82 04/11/06 08/01/86 04/15/77 09/27/85 11/15/84 12/03/87 11/23/84 01/04/85 09/15/78 08/05/85 04/01/04 02/01/97 11/19/03 04/08/77 04/01/77 01/29/80 03/18/80 08/01/77 02/14/76 03/30/81 06/18/87 07/04/88 07/02/87 01/21/82 08/27/71 06/01/78 02/09/79 05/16/77 09/01/89 06/30/76 01/06/88 02/01/90 05/25/78 08/24/84 01/06/88 07/16/80 05/01/87 06/30/80 05/02/77 08/01/78 09/01/77 08/01/86 1 2/22/03 10/10/03 03/13/95 05/26/72 06/15/79 06/27/78 Tribal No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No Page 3 of 17 01/11/2010 Page 3 of 17 01/1112010 Polcy Coordination Unit Missouri Department of Conservation P.0. Box 180 Heriage eviw Re ortJefferson City, MO 65102......Heritage Reviewrnd Report March 15, 2011 -- Page 1 of 2 573-522-4115X 3367 S Project type: Site Assessment Laura Murray Location/Scope:

Portions of Section 32 and 33 of T48N RI12W__________northeast of Highway 63 County: Boone Query reference: -Discovery Ridge Property ________Query received:

March 8, 2011 Prearu b: S,.ano cave______________________________________

[Authenticity may be con firmed by Policy Coordination Unit, Missouri Department of Consenration, 573-522-4115.

This NATURAL HERITAGE REVIEW is not a site clearance letter. Rather, it identifies public lands and sensitive resources known to have been located close to and/or potentially affected by the proposed project On-site verification is the responsibility of the project. Heritage records were identified at some date and location.

This report considers records near but not necessarily at the project site. Animals move and, over time, so do plant communities.

To say "there is a record" does not mean the species/habitat is still there. To say that "there is no record" does not mean a protected species will not be encountered.

These records only provide one reference and other information (e.g. wetland or soils maps, on-site inspections or sulveys) should be considered.

Look for additional information about the biological and habitat needs of records listed in order to avoid or minimize impacts. More information is at http://mdc.mo,,gov/discover-nature/places-, o/natural-areas and mdc4.mdc.mo.gov/applications/mofwis/mofwis searchl1.aspx.

Contact information for the department's Natural History Biologist is online at httlx//mdc.mo.qov/contact -us.Level 3 (federal-listed) and Leve 2 (state listed) isues: Records of listed species or habitats: Heritage records identify no. wildlif preserves, no designated wildeness areas or critical habitats, no.state or federal endangered-listspecies records within the public land survey sections listed above and northeast of highway 63> The site does drain to Gans Creek, which downstream of Highway6 is one of 138 state-designated spawning strem segments.

Activities that alter, destablie or destroy stream bottoms or banks should be avidd from March 15 to June 15 in order not to dsrupt spawning (laying and fertilizing fish eggs!,-At all times, avoid habitat destruction or introducingheavy sediment loads, chemical or organi po:!llutants.

Spawning stream segments were designaed because they are important to maintining, restoring, or avoiding future listing of species of coservation concern.~'Rock Bridge Ste Park col be affected by construction activities.

Within its premises are records of of conseration concern, including bot ray (2002 and (2007) bat records. *..Gray bats (Myotis federally and state listed "endangered")

are likely to occur in the project area, as thy oag ver streams, rivers, and in thi part of Missouri.

Avoid entry or disturbac of any cave inhabited by gray bats an he osible retain forest vegetation along the stream and from the gray bat cave opening to the stream. See http://mdc.mo..qov/1 04 for best management recommendations.

>' Indiana bats (Myotis sodalis, federally ad s tat e lite 'endangered")

may occur in this area.These mammals hibernate durin wntermothsincavesl in issouri primarily in the southern half of the state. They are found in summer months, primarily north of the Missouri River, roosting and raising young under the bark of trees in riparian forests and upland forests near perennial streams.During project activities, avoid degrading stream quality and where possible leave snags standing and preserve mature forest canopy. If large trees with nesting cavities or loose bark need to be removed by your project, that should be done between November and March. Additional information to incorporate in planning documents is available at http://mdc.mo..qov/1 10.> Topeka shiners (Notropis Topeka, federal- and state-listed "endangered")

are recorded (1997) om Bonne Femme Creek to the south. Historically, they probably used Gans Creek as well. These fish typically occupy permanent pools of small, clear, high quality streams draining upland areas, usually on substrates of gravel, rubble, sand or bedrock. Best manaciement practices for Topeka Prepared by Shannon Cave, March 15, 2011, MurrayBoone assessment.

doc, page 1 of 2 shiners may be found at http://mdc.mo.qiov/1 37*General recommendations related to this project or site, or based on information about the historic range of species (unrelated to any specific heritage records):

in the area should be protected from soil erosion, water pollution and in-stream activities that modify or diminish aquatic habitats*

Best management recommendations relating to streams and rivers may be found at http://mdc.mo.qov/79.

Minimize erosion and sedimentation/runoff to nearby streams and lakes, including adherence to any "Clean Water Permit" conditions.

Revegetate areas in which the natural cover is disturbed to minimize erosion using native plant species compatible with the local landscape and wildlife needs. Pollutants, including sediment, can have significant impacts far downstream.

Use silt fences and/or vegetative filter strips to buffer streams and drainages, and monitor those after rain events and until a well-rooted ground cover is reestablished.This county has known karst geologic eatures (e.g. caves, springs, and sinkholes, all characterized by subterranean watermovement).

Few karst features are recorded in heritage records, and ones not noted her my be encountered atteproject site or affected by the project. Cave fauna (many of wchare species of conserain concern) are influenced by changes to water quality, so check your project site for any as features and make every effort to protect groundwater in the project area. See http://mdc.

mo..ciovfnathis/caves/manaa construc.

htm for best management inoratonThe proposed project occur in the historic range of greater prairi cickens (tympanuchus cupido), a bird on the stae' list of endangered species. Populations§ have been in serious decline for decades, and have reched a point where greater prairie chickens could be gone from Missouri within a few yers. The dominant.

factor in their decline is of. native prairie habitats to other uses. Other praire dependent species are also in seriu decline for the same reason. Prairie chikns range over a broad territory perhaps nesting, breeinganfogign grasslands sevel miles aparFt. Even if prairie chickens are not present, it isimPortant to conserve as muhas possibl any grasslands dominated by native plant cove in the project area.See http://mdc best management reomnations.

~'Invasive exoi species, are significant issue for fish, wllife an agrcutrinMsoi.Se, eggs, and larvae ma bemoed to new sites on boats or cntuto qimns npc n clean equipmentrthroughly befor moving between projec sitesupeto npcn*Remove any mud, soil, trash, plants or animals from equLm~t efor leaving any water body or work area.*Drain water from boats and machinery that have operated in water, checking motor cavities, live-well, bilge and transom wltrcsbuks adny other water reservoirs.

  • When possible, wash and rinse equipment thorugh~ly itard spray or HOT water F, typically available at do-it-yourself carwash sites), and dry in the hot sun before using again.Pre-screen heritaqe data requests at httD:I/tnvurl.comleritaoerevie.

A "Level I response" makes further submission to MDC or UJSFWS unnecessary.

Prepared by Shannon Cave, March 15, 2011, MurrayBoone~assessment.doc, page 2 of 2 CULTURAL RESOURCE ASSESSMENT Section 106 Review CONTACT PERSONIADDRESS C: ITerracon 3601 Mojave Court, Suite A I Columbia.

Missouri 65203 _________________

PROJECT: IDiscover Ride Lots 2 5r 6 7v 9 10a 11! 12r 131 14r 15r 161 17 &18r Columbia FEDERAL AGENCY COUNTY: I UNKNOWN I I BOONE I II -i i II II --w The State Historic Preservation Office has reviewed the Information submitted on the above referenced project. Based on this review, we have made the following determination:

] After review of initial submission, the project area has a low potential for the occurrence of cultural resources.

A cultural resource survey, therefore, is not warranted.

[] Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historic properties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.

It has E~] been determined that for the proposed undertaking there will be "no historic properties affected".

For the above checked reason, the State Historic Preservation Office has no objection to the initiation of project activities.

PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARE CHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO ThiS OFFICE FOR FURTHER REVIEW AND COMMENT. Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: §March 7.2011 Mark A. Miles, Deputy State Historic Preservation Officer Date MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE P.O. Box 176, Jefferson City, Missouri 65102 For additional information, please contact Judith D~eel, (573) 751-7862.

Please be sure to refer to the project number: 015-BO-1 1 February 21, 2011 MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE Attn: Section 106 Review P.O. Box 176 Jefferson City, Missouri 65102-0176 RE: Request for Additional Review MDNR SHPO project number: 015-B0-11 Section 106 Review Discovery Ridge Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, and 18 Discovery Drive and Discovery Ridge Parkway Columbia, Boone County, Missouri T 48N N, R 12W, Sec 33, NY2 Terracon Project No.: 09117701 Terracon Consultants, Inc. (Terracon), on behalf of the Trabue, Hansen & Hinshaw, Inc and the University of Missouri Research Parks -University of Missouri Systems, is assisting with a preconstruction Phase 1 Environmental Site Assessment for a proposed expansion of the current scientific research park, Discovery Ridge, located on a portion of a historic University of Missouri research farm at Discovery Drive Discovery Ridge Parkway, east of U.S. Highway 63 in the vicinity of the southern limits of Columbia, Missouri.We are enclosing a Section 106 Project Information Form, A section of the topographic map which includes the subject site, a developmental phasing plan, and photographs of the on-site metal machine shed type buildings located on Lot 17 and the quacent hut building located on Lot 5. Additionally, photos have been included of structures located on properties adjacent to the site. Please review your records and files to determine if historic features are located on the site.The site has historically been agricultural land associated with a University of Missouri research farm. Portions of the site, which are located within Phase I of the project, have been graded to construct vacant lots suitable for development.

We would appreciate a response within 30 days following receipt of this information.

If you have any questions or wish to discuss this submittal, please contact me.Sincerely, Staff Environmental Scientist Enclosure WMISSOURI DEPARTMENT OF NATURAL RESOURCES ,~STATE HISTORIC PRESERVATION OFFICE 41SECTION 108 PROJECT INFORMATION FORM Submission of a completed Project Information Form with adequate information and attachments constitutes a request for a review pursuant to Section 106 of the National Historic Preservation Act of 1966 (as amended).

We reserve the right to request more information.

Please refer to the CHECKLUST on Page 2 to ensure that all basic information relevant to the project has been Included.

For further information, refer to our website at: htto:l/dnr.mo.aov/shoo and follow the links to Section 106 Review.NOTE: Section 106 regulations provide for a 30-day response time by the Missouri State Historic Preservation Office from the date of receipt.PROJECT NAME Discovery Ridge Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13. 14, 15, 16, 17, and 18 FEDERAL. AGENCY PROVDNG FUNDS. UCENSE. OR PERMIT ADDRESS FOR RESPONSE Terracon 3601 Mojave Court, Suite A Columbia, MO 65203 LOCATION OF PROJECT COUNTY Boone LEGAL DESCRIPTION OF PROJECT AREA (TOWNSHIP, RANGE, SECTION, 1/44 SECTION)USGS TOPOGRAPHIC MAP QUADRANGLE NAME (SEE MAP REQUIREMENTS ON PAGE 2)Columbia, Missouri 1981 l148 North 12 West 3 PROJECT DESCRIPTION DESCRIBE THE OVERALL PROJECT IN DETAIL. IF rr INVOLVES EXCAVATION.

INDICATE HOW WIDE, HOW DEEP, ETC. IF THE PROJECT INVOLVES DEMOLITION OF EXISTING BUILDI.S MAKE THAT CLEAR. IF THE PROJECT INVOLVES REHABILITATION, DESCRIBE T~l PROPOSED WO)RK IN DETAIL.USE ADDITIONAL PAGES IF NECESSARY.

The site consist of 15 lots. Eight of the lots (Lots 2, 5, 6, 7, 8, 9, 10, and 11) are located within Phase I of the research park development plan. Of the lots located within Phase I of the developmental plan, Lots 2, 6, 7, and 8 have been graded to construct vacant lots suitable for development, additional, Lot 9 is currently In the process of being graded to facility a lot suitable for development.

Currently lot 5 is the location of a quacent hut type building.

Seven of the lots that comprse the site (Lots 12, 13, 14, 15, 16, 17, and 18) are located within Phase II of the developmental plan and consist of vacant grass covered farm land utilized as grazing pasture for livestock and row crop research.

Currently Lot 17 is the location of two small metal machine sheds and one large machine shed type buildings.

Historically a residential structure, and four small mea machine sheds were located at the site starting between 1939-1968 with the residence being removed in 2001 and two of the machine sheds being removed in 2007.Historically the site has been utilized as farm land associated with a Uniersity of Missouri research farm (South Farms). Beginning in the early 2000s the area surrounding the site has been utilized as Discovery Ridge, a scientilic research park. The applicant is investigating the site for expanded use as a scientific research park.

ARCHAEOLOGY IEARTHMOVING ACTIVITIESI HAS THE GROUND INVOLVED BEEN GRADED. BUILT ON, BORROWED, OR OTHERWISE DISTURBED?

PLEASE DESCRIBE IN DETAIL (USE ADDITIONAL PAGES, IF NECESSARY)

PHOTOGRAPHS ARE HELPFUL: The site has hitrcfy been farmed associated with a University of Missouri research farm. During the early 2000s portions of the lots that comprise Phase I of the site were graded to construct multiple vacant building lots suitable for deeomn. Currently lots located within Phase II of the developmental plan are vacant grass covered land with portion utilized for row crop research.WILL THE PROJECT REQUIRE FILL MATERIAL?

0] YES [] NO IF YES, INDICATE PROPOSED BORROW AREAS (SOURCE OF FILL MATERIAL)

ON TOPOGRAPHIC MAP ARE YOU AWARE OF ARCHAEOLOGICAL SITES ON OR ADJACENT TO PROJECT AREA? [J YES NO IF YES8, IDENTIFY THEM ON THE TOPOGRAPHIC MAP STRUCTURES (REH LIATION, DEMOLOTION.

ADDITIONS TO, OR CONTRUCTION NEAR EXISTING STRUCTURES)

TO THE BEST OF YOUR KNWLDGE, IS THE STRUCTURE LOCATED IN ANY OF THE FOLLOWING?

U] AN AREA PREVIOUSLY SURVEYED F] A NATIONAL REGISTER DISTRICT El A LOCAL HISTORIC DISTRICT FOR HISTORIC PROPERTIES.

IF YES. PLEASE PROVIDE ThE NAME OF IF YES. PLEASE PROVIDE THE NAME OF IF YES, PLEASE PROVIDE THE NAME OF THE SURVEY OR DISTRICT:

THE SURVEY OR DISTRICT:

Th SURVEY OR DISTRICT:* PLEASE PROVIDE PHOTOGRAPHS OF ALL STRUCTURJES.

SEE PHOTOGRAPHY REQUIREMENTS

  • NOTE: ALL PHOTOGRAPHS SHOULD BE LABELED AND KEYED TO ONE MAP OF THE PROJECT AREA* PLEASE PROVIDE A BRIEF HISTORY OF THE BUILDING(S), INCLUDING CONSTRUCTION DATES AND BUILDING USES. (USE ADDITONAL PAGES, IF NECESSARY.)

ADDITONAL REQUIREMENTS Map Requirements:

Attach a copy of the relevant portion (8 'A x 11) of the curn USGS 7.5 min. topographic map and, If necessary, a large scala project map. Please do not send an Individual map with each structure or site. Wlean orIginal mapIs preferable, a good copy Is acceptable.

For a list of sites from wh'ich to order, download or print the required USGS 7.5 min. topographic map at litl or no cot cosl htto'J/dnr.mo.oovlshoo/sectionrev.htm.

Photography Requlrements:

Clear black and white or color photographs (minimum 3" x 5") are acceptable.

Poladiods, photocopies, emalaed or faxed photographs are not acceptable.

Good quality photographs are Important for expedltlous project review. Photographs of neighboring or nearby buildings are also helpful. All photographs should be labeled and keyed to one map of the project area.CHECKLIST-DID YOU PROVIDE THE FOLLOWING INFORMATION?

0] Topographic map 7.5 min. (per project, not stutr) 0] Other sup~porting documents (If necessary to explain the project)[] Thorough description (aln projects)

El For new construction, rehabilitations, etc., attach work write-ups, plans, drawings, etc.0] Photographs (all structures) 0] Is topographic map Identified by quadrangle and year?Return this Form and Attachments to: MISSOUR DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE Attn: Section 106 Review P.O. BOX 176 JEFFERSON CITY, MISSOURI 65102-0176 Quacent hut building located on the southern portion of Lot 5. Quacent hut south adjoining property.

Quacent hut constructed between 1980 and 1992.!from the Quacent hut building located on the southern portion of Lot 5. Quacent hut viewed from the west portion of Lot 5. Quacent hut constructed between 1980 and 1992.

Trailer park located west of Lots 5, and 16. Trailer park est=Trailer park viewed from the western portion of Lot 5.and 1968.Trailer park located west of Lots 5, and 16. Trailer park established between Trailer park viewed from the western portion of Lot 5.;6 and 1968.

University of Missouri Civil Engineering research building located east of Lot 5.constructed between 1956 and 1968.ding Metal sided USDA building located within the vicinity of the University of Missouri Civil Engineering research building and east of Lot 5. Building constructed between 1995 and 2002.

ABC Lab building located west of Lot 2.viewed from Discovery Drive.and 2007. Building Radii building located east of Lot 2. Building constructed between 2002 viewed from the intersection of Discovery Drive and Discovery Parkway.*Building Residence located south of Lot 11. Residence constructed between Residence viewed from US Highway 63, southwest of the structure.

Residence located south of Lot 11. Residence constructed between Residence viewed from US Highway 63, southwest of the structure.

Residence located south of Lot 11. Residence constructed between 1 Residence viewed from Lot 11, north of the structure.

Barn located south of the residence south of Lot I1. Barn constructed betwveen 1939 and 1956.Barn viewed from US Highway 63, southwest of the structure.

Residence located south of Lot 11. Residence coi Residence viewed from Lot 11 looking southwest.

Barn located south of Lot 11. Barn constructed between 11 looking southwest.

arn viewed from Lot

Two small metal machine sheds located on Lot 17. Small metal machine sheds constructed between 1939 and 1968.Eastern small metal machine 1939 and 1968.ichine shed constructed between Western small n 1939 and 1968.ne sheds located on Lot 17. Machine shed constructed between CULTURAL RESOURCE ASSESSMENT Section 106 Review CONTACT PERSON/ADDRESS ,C: IAdam J. whitei Terracon 3601 Mojave Court, Suite A I Columbia, Missouri 65203 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PROJECT: IDis.cover Ride Lots 2 5a 8r 9 101 11r 12r 13T 141 15 &16r Columbia FEDERAL AGENCY COUNTY: I UNKNOWN! I BOONE I" II I II ...... III I fl The State Historic Preservation Office has reviewed the Information submitted on the above referenced project. Based on this review, we have made the following determination:

[] After review of initial submission, the project area has a low potential for the occurrence of cultural resources.

A cultural resource survey, therefore, is not warranted.Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historic properties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.

It has[~] been determined that for the proposed undertaking there will be "no historic properties affected".

For the above checked reason, the State Hitoric Prmsrvation Off ice has no objection to the Initiation of project activiis PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARE CHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO THIS OFFICE FOR FURTHER REVIEW AND COMMENT. Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: £ February 9. 2011 Mark A. Miles, Deputy State Historic Preservation Officer Date MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE P.O. Box 176, Jefferson City, Missouri165102 For additional Information, please contact Judith Dsel, (573) 751-7862.

Please be sure to refer to the project number: 015-BO-11 Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 Columbia, Missouri February 17,2011 Terracon Project No. 09105094.1 Prepared for: Trabue, Hansen & Hinshaw, Inc.Columbia, Missouri Prepared by: Terracon Consultants, Inc.Columbia, Missouri llti[' U ll Feray1721r erracon Trabue, Hansen & Hinshaw, Inc.1901 Pennsylvania Columbia, Missouri 65202 Attn: Mr. John Huss, R.E.P: [573] 814-1568 F: [573] 814-1128 Re: Preliminary Geotec~hnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6,7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 Columbia, Missouri Terracon Project Number: 09105094.1

Dear Mr. Huss Terracon Consultants,

Inc. (Terracon) has completed the preliminary geotechnical engineering services for the above referenced project. This study was performed in general accordance with our proposal number D091 0226 dated December 15, 2010 and our Supplemental Change Order dated February 2, 2011. This report presents the findings of the subsurface exploration and provides preliminary geotechnical recommendations concerning earthwork and the design and construction of foundations, floor slabs and pavements for the proposed project.We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us.Sincerely, Terracon Consultants, Inc.Staff Geotechnical Engineer t"Senior Principal Missouri:

PE 2009001099 7S UMBER Office Manager Enclosures 2- cc: 3- Client 1 -File Terracon Consultants, Inc. 3601 Molave court, Ste. A Columbia, Missouri 65202 P [573J 214 2817 F [5731 214 2714 terracon.com i

TABLE OF CONTENTS Page EXECUTIVE

SUMMARY

.................................................................................I

1.0 INTRODUCTION

.................................................................................I 2.0 PROJECT INFORMATION

.....................................................................

I 2.1 Project Description...................................................................I..

2.2 Site Location and Description

.........................................................

2 3.0 SUBSURFACE CONDITIONS

................................................................

2 3.1 Geology .................................................................................

2 3.2 Typical Profile...........................................................................

3 3.3 Groundwater............................................................................

4 4.0 SITE SUITABILITY AND PRELIMINARY FINDINGS AND RECOMMENDATIONS

.....5 4.1 Geotechnical Considerations..........................................................

5 4.2 Earthwork...............................................................................

6 4.3 Foundations.............................................................................

6 4.4 Seismic Considerations

................................................................

7 4.5 Floor Slabs ..............................................................................

8 4.6 Pavements

..............................................................................

8 5.0

GENERAL COMMENT

S.......................................................................

9 APPENDIX A -FIELD EXPLORATION Exhibit A-I Site Location Map Exhibit A-2 USGS Map Exhibit A-3 Geologic Map Exhibit A-4 Boring Location Diagram Exhibit A-5 to A-I13 Boring Logs Exhibit A-14 Field Exploration Description APPENDIX B -SUPPORTING INFORMATION Exhibit B-I Laboratory Testing APPENDIX C -SUPPORTING DOCUMENTS Exhibit C-I General Notes Exhibit C-2 Unified Soil Classification System Exhibit C-3 General Notes -Description of Rock Properties Exhibit C-4 Projected Earthquake Intensities (Modified Mercalli Scale)Reliable u Responsive u Convenient.*

Innovative Preliminary Geotechnical Engineering Report__l ra Discovery Ridge -Certified Site Program o Lots 2, 5, 6,7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 EXECUTIVE

SUMMARY

A preliminary geotechnical investigation has been performed for the proposed certified site which consists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of the Discovery Ridge Research Park in southeastern Columbia, Missouri.

Nine (9) borings, designated B-I through B-9, were performed to depths of approximately 13 to 20 feet below the existing ground surface at the subject site.Based on the information obtained from our subsurface exploration, the site can be developed for future construction.

The following geotechnical considerations were identified:

  • Typical lightly loaded commercial buildings may be supported on shallow footings bearing on stiff to very stiff native clay or on compacted structural fill.* Assuming proper site preparation and any necessary subgrade repair, total and differential settlement should be within anticipated client/owner specifications.
  • Existing fill was encountered in Borings B-3 and B-4, however we understand that this material was placed as part of mass grading during mid to late 2008. At that time, Terracon was onsite to observe and test the density and moisture during placement of engineered fill material.* Based on the USGS map, it appears that a pond may have been located in the vicinity of lot 16 and that the existing pond located north of the Radii Facility previously extended west onto a portion of Lot 2. We recommend these areas be thoroughly investigated during the final geotechnical investigation for each respective lot.* The near-surface soils are active and prone to volume change with variations in moisture content. For this reason, a low volume change zone (LVC) is typically constructed beneath at-grade, grade-supported floor slabs. Depending on final grading plans, construction of the LVC may require overexcavation within future building pads.* On-site soils appear suitable for use as compacted structural fill; however, if they do not meet the low plasticity fill criteria, they should not be utilized for LVC material.* The 2006/2009 International Building Code (IBC), Table 1613.5.2 seismic site classification for this site is C* The Modified Mercalli Intensity Scale for seismic events for Boone County is VII.Reliable m Responsive
  • Convenient.*

Innovative i

Preliminary Geotechnical Engineering Report"l ra n Discovery Ridge -Certified Site Program 1rra o Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18

  • Columbia, Missouri February 17, 2011 m Terracon Project No. 09105094.1.1 EXECUTIVE

SUMMARY

(continued)

  • Close monitoring of the construction operations discussed herein will be critical in achieving the design subgrade support. We recommend that Terracon be retained to monitor this portion of the work.This summary should be used in conjunction with the entire report for design purposes.

It should be recognized that details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled

GENERAL COMMENT

S should be read for an understanding of the report limitations.

Although this report discusses design parameters, these parameters are preliminary.

This preliminary report is not intended to be relied upon for final design.Reliable

  • Responsive u Convenient
  • Innovative i ii PRELIMINARY GEOTECHNICAL ENGINEERING REPORT DISCOVERY RIDGE -CERTIFIED SITE PROGRAM LOTS 2, 5, 6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 COLUMBIA, MISSOURI Terracon Project No. 09105094.1 February 17, 2011

1.0 INTRODUCTION

A preliminary geotechnical engineering report has been completed for the proposed certified which consists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of Discovery Ridge Research Park in Columbia, Missouri.

Nine (9) borings, designated B-i through B-9, were performed to depths of approximately 13 to 20 feet below the existing ground surface at the subject site. Logs of the borings along with a site location map, USGS map, geologic map and boring location diagram are included in Appendix A of this report.The purpose of these services is to provide information and preliminary geotechnical engineering recommendations relative to: U U U U subsurface soil conditions groundwater conditions earthwork pavements* foundation design and construction

  • floor slab design and construction
  • seismic considerations It is important to note that this preliminary geotechnical engineering report is not meant to provide final design recommendations.

Once final development plans are available, a final geotechnical investigation should be performed for site and structure-specific geotechnical recommendations.

2.0 PROJECT INFORMATION 2.1 Project Description ITEM DESCRIPTION Site layout See Appendix A, Exhibit A-4: Boring Location Diagram The project will include future development of approximately 90 Structures acres of vacant land. Finalized specific building or site layout details were unknown at the time this report was prepared.Reliable

  • Responsive m Convenient m Innovative1 1

Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18

  • Columbia, Missouri February 17, 2011 m Terracon Project No. 09105094.1.1 irerracon ITEM DESCRIPTION Site grading information was not available at the time that this report was prepared.

However for the purpose and scope of this report, we have assumed that local cuts and/or fills required for Grading development will be limited to approximately 10 feet.Additionally, we understand that mass grading was performed in mid to late 2008 in the vicinity of the existing Radii Facility and ABC Laboratories building.

At that time, Terracon was onsite to observe and test the placement of engineered fill material.Cut and fill slopes No steeper than 3H:IV (Horizontal to Vertical) (assumed)2.2 Site Location and Description ITEM DESCRIPTION The proposed project site consists of Lots 2, 5, 6, 7 8, 9, 10, 11, 12, Location 13, 14, 15, 16, 17 and 18 of Discovery Ridge Research Park in______________________

Columbia, Missoudi.The lots are vacant with the exception of Lot 5 which is developed Exisingimprvemntswith a storage building.Generally grass covered, however portions of the site in the vicinity Curret grund overof Lot 16 were cultivated fields.In general, slightly to moderately sloped downward towards the Existing topography south and west.3.0 SUBSURFACE CONDITIONS 3.1 Geology Most of the upland area is covered by a thin loess blanket and glacial drift. Highly plastic clays that exhibit volume change with variations in moisture are commonly encountered near the ground surface.Based on the 2003 Geologic Map of Missouri, Missouri Department of Natural Resources, bedrock at this site consists primarily of the Pennsylvanian aged Cherokee Group (Pc), the Pennsylvanian aged Marmaton Group (Pm), and the Mississippian aged Burlington formation (Mo). The Cherokee Group is predominantly shale with minor amounts of carbonates and sandstone.

This group contains most of the mineable coal beds in Missouri.

The Marmaton Group consists of a succession of shale, limestone, clay, and coal beds.Reliable

  • Responsive
  • Convenient
  • Innovative2 2

Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18

  • Terracon Project No. 09105094.1

.1 irerracon The Burlington formation is characteristically a white to gray, medium to coarsely crystalline, medium to coarsely crinoidal, chert free to sparsely cherty limestone.

Solution features, including caves and sinkholes, are commonly present in this formation.

No caves or sinkholes are known to exist, or are published to exist, within approximately 1 mile of this project site.However several areas of known karst activity are present west and southwest of the project site.It is difficult to predict future sinkhole activity.

Sinkholes and caves in this area are in various stages of development and can appear at any time. Site grading and drainage may alter site conditions and could possibly cause sinkholes in areas that have no history of this activity.3.2 Typical Profile Based on the results of the borings, as follows: subsurface conditions on the project site can be generalized Stratum Approximate Depth to Mtra ecito ossec/est Stratum Bottom of Stratum (feet) Mtra ecito ossec/est Surface 0.2 to 0.5 Topsoil: brown, friable and contained N/A significant organic matter 3 to 12 Existing Fill ' consisting of lean clay 1 and lean to fat clay with Very stiff to hard (Borings B-3 & B-4 only) varying amounts of sand and gravel 2 3 to 12 Lean clay, lean to fat clay and fat clay Stiff to very stiff Undeermned BorngsB-i Lean to fat clay and fat clay with through B-5, B-B and B-9 varying amounts of sand, gravel andStftohr 3 teminaed wthi thi strtum possible cobbles (visually classified as at the planned depth of glacial drift)approximately 20 feet __________________________

Undetermined:

Borings B-6 Caused split spoon 4 and B-7 terminated within Limestone sampler refusal and this stratum.,________________

auger refusal Note 1: The existing fill material was placed in mid to late 2008. Terracon provided onsite observation and moisture/density testing during the placement of fill material.The upper soil encountered in the borings generally consisted of lean to fat clay and fat clay which was of moderate to high plasticity, and had the following measured liquid limits, plastic limits, and plasticity indices: Reliable.*

Responsive u Convenient.*

Innovative3 3

Preliminary Geotechnical Engineering Report 1r Discovery Ridge -Certified Site Program 1rrracon Lots 2, 5,6, 7,8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 Sample Location Depth (feet) Liquid Limit (%) Plastic Limit (%) Plasticity Index (%)Boring B-1 3 -5 43 15 28 Boring B-3 1 -3 41 16 25 Boring B-5 1 -3 31 21 10 Boring B-9 1 -3 44 21 23 Conditions encountered at each boring location are indicated on the individual boring logs.Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in situ, the transition between materials may be gradual. Details for each of the borings can be found on the boring logs in Appendix A of this report.3.3 Groundwater The boreholes were observed while drilling and after completion for the presence and level of groundwater.

Groundwater was observed at in Borings B-5 and B-6 at depths of approximately 12 to 18.5 feet. Groundwater was not observed in the remaining borings during drilling or for the short amount of time the borings were allowed to remain open following drilling completion.

However, this does not necessarily mean that stable groundwater levels were observed in Borings B-5 and B-6, or that the remaining borings were terminated above groundwater.

Due to the low permeability of the soils encountered in the borings, a relatively long period of time may be necessary for a groundwater level to develop and stabilize in a borehole in these materials.

Long term observations in piezometers or observation wells sealed from the influence of surface water are often required to define groundwater levels in materials of this type.Pockets, lenses, and stringers of sand are sometimes encountered in the glacial soils found in the vicinity of the referenced project. These sand pockets are normally discontinuous and often contain water of variable quality and quantity.

These sand pockets may be encountered during foundation excavation.

This possibility should be considered when developing design and construction plans and specifications for the project.Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff, proximity to existing ponds, and other factors not evident at the time the borings were performed.

In addition, perched water can develop over low permeability soil strata. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project.Reliable u Responsive

  • Convenient m Innovative4 4

Preliminary Geotechnical Engineering Report 1r Discovery Ridge -Certified Site Program ra a Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 u Columbia, Missouri February 17, 2011

  • Terracon Project No. 09105094.1.1 4.0 SITE SUITABILITY AND PRELIMINARY FINDINGS AND RECOMMENDATIONS 4.1 Geotechnical Considerations The borings performed for this project generally encountered native lean to fat clay and fat clay underlain by glacial drift. Existing fill was encountered in Borings B-3 and B-4 to depths of 3 to 12 feet, and limestone bedrock was encountered in Borings B-6 and B-7 at depths of approximately 17 and 12.5 feet, respectively.

Depending on final site grading plans, we anticipate that either the native clay or compacted structural fill will form the subgrade for future building foundations and floor slabs.Based on the USGS map, it appears that a pond may have been located in the vicinity of lot 16.Further, based on aerial photography the existing pond located north of the Radii Facility previously extended southwest onto a portion of Lot 2. We recommend these areas be thoroughly investigated during the final geotechnical investigation for each respective lot.Performance of foundations depends on many factors including, but not limited to, the depth of footings, amounts of cuts or fill, bearing material, and foundation loads. Structural loads, final grades, and other design details should be provided when available.

Although this report discusses design parameters, these parameters are preliminary.

This preliminary report is not intended to be relied upon for final design. We recommend a more detailed study be performed when specific project details are known, and/or possibly following completion of general site grading.Examination of the boring logs indicates a range of soil-moisture conditions are present at this site. At the time of drilling, some of the soils at various depths are at moisture levels above their measured plastic limit. Typically, soil with moisture levels above their measured plastic limit may be prone to rutting, pumping, and can develop into unstable subgrade conditions during general construction operations.

Moderately to highly plastic, lean to fat clay and fat clay soils were present on site. Such soils are commonly referred to as "expansive" or "swelling" soils because they expand or swell as their moisture contents increase.

However, these soils also "contract" or "shrink" as their moisture levels decrease.

Footings, floor slabs, and pavements supported on expansive soils will move upward and downward and such movements will result in distortion, possibly causing cracking or structural damage to structures.

For this reason, a low volume change zone will likely be required beneath at-grade floor slabs. We recommend that additional laboratory testing be performed during the final geotechnical exploration to better evaluate the expansive nature of these soils.Reliable

  • Responsive
  • Convenient
  • Innovative 5

Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program ra o Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011

  • Terracon Project No. 09105094.1.1 We recommend that the exposed subgrade be thoroughly evaluated after stripping of any topsoil and creation of all cut areas, but prior to the start of any fill operations.

We recommend that the geotechnical engineer be retained to evaluate the bearing material for the foundations and floor slab subgrade soils. Subsurface conditions, as identified by the field and laboratory testing programs, have been reviewed and evaluated with respect to the proposed development plans known to us at this time.4.2 Earthwork The widely spaced preliminary borings typically encountered stiff to hard lean to fat clay and fat clay. Shallow bedrock, karst features, or extensive pervious deposits of water-bearing sand that could impact site development did not appear to be present based on the preliminary site and subsurface information gathered at this time.Based on the subsurface conditions encountered in the widely spaced borings, the site soils are suitable for future development.

Additional borings should be completed so that each site can be adequately characterized and recommendations can be more fully developed to assist and guide future mass grading.Recommendations will need to be developed for site preparation and proof-rolling operations as well as construction of cut and structural fill operations.

In our opinion, full-time testing and observation should be employed during mass grading to evaluate compliance with project earthwork recommendations and requirements.

If site grading results in relatively thick structural fills, settlement and cut/fill slope stability may need to be evaluated.

4.3 Foundations

Shallow foundations could be used to support lightly loaded commercial structures provided the footings are supported by suitable material (stiff to hard native clay or compacted structural fill).Depending on the design footing elevation and bearing material (native clay or newly placed compacted structural fill), allowable bearing pressures would likely be in the range of 1,000 psf to 3,000 psf. Due to the presence of clay soils, shallow foundations are typically soil-formed in the general vicinity of this site. Further testing at the individual structure locations should be performed to determine the appropriate bearing capacity for structural support.Heavier loads, which could cause excessive settlement, are normally supported by shallow foundations which are supported, in turn, by aggregate-pier intermediate foundations or by drilled piers. Pier drilling through the native soils is not expected to become difficult based upon the material encountered within the borings; however, the drilled pier contractor should be prepared should sandy zones or large boulders be encountered.

These materials, although not Reliable

  • Responsive.*

Convenient.*

Innovative6 6

Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18

  • Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 rerracon encountered in our borings, can sometimes be encountered in the glacial soils that are present in the vicinity of this site when drilling pier holes which are much larger in diameter than the bore holes.Footln0 Level ExcavalonLee Lean Concrete Backfill Overexcavation

/ Backfill NOTE" IExcavations in sketches Shown vetia for convenience.

Excavations should be sloped as necessary for 4.4 Seismic Considerations

1. Missouri State Emergency Management Agency;, P.O. Box 116; Jefferson City, MO 65102 2. See Appendix C, Exhibit C-4 for Projected Earthquake Intensities (Modified Mercalli Scale)Code Used Site Classification 2006/2009 Intemational Building Code (IBC) 1 C 2 1.2.In general accordance with the 2006/2009 International Building Code, Table 1613.5.2.The 2006/2009 Intemational Building Code requires a site soil profile determination extending a depth of 100 feet for seismic site classification.

The current scope requested does not include the required 100 foot soil profile determination.

Borings for this report extended to a maximum depth of approximately 20 feet and this seismic site class assignment considers that shale or limestone bedrock is present within approximately 30 feet of the ground surface and continues below the maximum depth of the subsurface exploration.

Additional exploration to greater depths could be considered to confirm the conditions below the current depth of exploration.

Altematively, a geophysical exploration could be utilized in order to attempt to justify a more favorable seismic site class.Reliable

  • Responsive
  • Convenient.*

Innovative7 7

Preliminary Geotechnical Engineering Report 1e r Discovery Ridge -Certified Site Program n Lots 2, 5, 6, 7, 8, 9, 10, II, 12, 13, 14, 15, 16, 17 and 18 .Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 4.5 Floor Slabs Many of the clay soils in this locale have the potential to increase or decrease in volume with variations in moisture content. Soil having high plasticity characteristics (i.e., fat clay) generally has a greater potential for moisture related volume change than less plastic materials such as lean clay. In addition, swell potential is generally greater in material with a high dry unit weight and low initial moisture content. However, even low plasticity soils can swell significantly if their moisture levels are initially low.Because of the moderate to high shrink-swell potential of the lean to fat clay and fat clay soil encountered in the borings, a low volume change layer will likely be required below at-grade floor slabs. This layer typically varies from 12 to 36 inches in thickness.

The on-site lean to fat clay and fat clay soils encountered in the borings performed for this report are typically not suitable for use as low volume change material; however, on-site materials may exist which would meet the low volume change material criteria.

Further testing at the individual structure locations should be performed to determine the required low volume change layer thickness.

4.6 Pavements On most project sites, the site grading is accomplished relatively early in the construction phase.Fills are placed and compacted in a uniform manner. However, as construction proceeds, excavations are made into these areas, rainfall and surface water saturates some areas, heavy traffic from concrete trucks and other delivery vehicles disturbs the subgrade and many surface irregularities are filled in with loose soils to improve trafficability temporarily.

As a result, the pavement subgrades, initially prepared early in the project, should be carefully evaluated as the time for pavement construction approaches.

Pavement thickness can be determined using AASHTO, Asphalt Institute and/or other methods if specific wheel loads, axle configurations, frequencies, and desired pavement life are provided.Pavement design methods are intended to provide structural sections with adequate thickness over a particular subgrade such that wheel loads are reduced to a level the subgrade can support.The support characteristics of the subgrade for pavement design do not account for shrink/swell movements of an expansive clay subgrade such as the soils encountered on this project. Thus, the pavement may be adequate from a structural standpoint, yet still experience cracking and deformation due to shrink/swell related movement of the subgrade.Expansive soils are present at this site. It is important to minimize moisture changes in the subgrade both during construction and during the life of the pavement to reduce shrink/swell movements.

Reliable

  • Responsive.*

Convenient.*

Innovative8 8

Preliminary Geotechnical Engineering Report o~scov oe ,o1 terracon Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 .Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 5.0

GENERAL COMMENT

S Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications.

Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth-related construction phases of the project.The preliminary analysis and preliminary recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this preliminary report. This preliminary report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction.

If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided.The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions.

If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken.

This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices.

No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this preliminary report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing.Reliable.*

Responsive a Convenient

  • Innovative9 9

APPENDIX D Ground Photographs Wetland Delineation Report Discovery Ridge

  • Columbia, Boone County, Missouri March 14, 2011
  • Terracon Project: 09117701 1. View of Wetland Area A, facing northeast.
2. View of Wetland Area A, facing southwest.

1 Frrecon Wetland Delineation Report Discovery Ridge u Columbia, Boone County, Missouri March 14, 2011

  • Terracon Project: 09117701 3. View of Wetland Area B, facing east.4. View of Wetland Area B, facing west.1 Ferracon Wetland Delineation Report Discovery Ridge u Columbia, Boone County, Missouri March 14, 2011 u Terracon Project: 09117701 5. View of suspect drainageway, facing north.6. View of suspect drainageway, facing south.1 rerra can Wetland Delineation Report Discovery Ridge
  • Columbia, Boone County, Missouri March 14, 2011
  • Terracon Project: 09117701 7. View of suspect upland depression, facing west.8. View of suspect upland depression, facing east.1 rerracan Federal Emergency Management Agency Community Status Book Report MISSOURI Communities Participating in th(ClD 2901801*2901 811#2902751*2907831*2907911#290311 290035 290409 2902701*2900731*2907431*290231#*2908961*2902 16#290847#*290792#290630#2903401*2902891*2901261*2900861*2900891*2903411#290600 2907931*2901 551*2906011#2901 07#2900361*2904101*290745 2903421*2907941*290603 2901 591*290898#*290746#*290604 2901 60#2904301*2907951*290063#*2903431*2903441*2901891*2903451*2907961*2904641*2908991*2952631*2905041*2903461*Community Name CARTERVILLE, CITY OF CARTHAGE, CITY OF CARUTHERSVILLE, CITY OF CASS COUNTY *CEDAR COUNTY *CENTERVILLE, VILLAGE OF CENTRALIA, CITY OF CHAFFEE, CITY OF CHAMOIS, CITY OF CHARITON COUNTY*CHARLACK, CITY OF CHARLESTON, CITY OF CHESTERFIELD, CITY OF CHILLICOTHE, CITY OF CHRISTIAN COUNTY*CLARK COUNTY *CLARKSDALE, CITY OF CLARKSON VALLEY, CITY OF CLARKSVILLE, CITY OF CLARKTON, CITY OF CLAY COUNTY *CLAYCOMO, VILLAGE OF CLAYTON, CITY OF CLEVER, CITY OF CLINTON COUNTY*CLINTON, CITY OF COBALT VILLAGE,VILLAGE OF COLE COUNTY*COLUMBIA, CITY OF COMMERCE, CITY OF CONCORDIA, CITY OF COOL VALLEY, CITY OF COOPER COUNTY *COOTER, TOWN OF CORNING, TOWN OF COTTLEVILLE, CITY OF COUNTRY CLUB HILLS, CITY OF COUNTRY CLUB, VILLAGE OF CRAIG, CITY OF CRANE, CITY OF CRAWFORD COUNTY*CREIGHTON, CITY OF CRESTWOOD, CITY OF CREVE COEUR, CITY OF CRYSTAL CITYCITY OF CRYSTAL LAKE PARK, CITY OF DADE COUNTY *DALTON, VILLAGE OF DARDENNE PRAIRIE, CITY OF DE SOTO, CITY OF DEARBORN, CITY OF DELLWOOD, CITY OF County JASPER COUNTY JASPER COUNTY PEMISCOT COUNTY CASS COUNTY CEDAR COUNTY REYNOLDS COUNTY BOONE COUNTY SCOTT COUNTY OSAGE COUNTY CHARITON COUNTY ST. LOUIS COUNTY MISSISSIPPI COUNTY ST. LOUIS COUNTY LIVINGSTON COUNTY CHRISTIAN COUNTY CLARK COUNTY DEKALB COUNTY ST. LOUIS COUNTY PIKE COUNTY DUNKLIN COUNTY CLAY COUNTY CLAY COUNTY ST. LOUIS COUNTY CHRISTIAN COUNTY CLINTON COUNTY HENRY COUNTY MADISON COUNTY COLE COUNTY BOONE COUNTY SCOTT COUNTY LAFAYETTE COUNTY ST. LOUIS COUNTY COOPER COUNTY PEMISCOT COUNTY HOLT COUNTY ST. CHARLES COUNTY ST. LOUIS COUNTY ANDREW COUNTY HOLT COUNTY STONE COUNTY CRAWFORD COUNTY CASS COUNTY ST. LOUIS COUNTY ST. LOUIS COUNTY JEFFERSON COUNTY ST. LOUIS COUNTY DADE COUNTY CHARITON COUNTY ST. CHARLES COUNTY JEFFERSON COUNTY PLATTE COUNTY ST. LOUIS COUNTY Ini Id In Id eNational Flood Program it FHBM Init FIRM Curr Eff entitled Identified Map Date 12/28/73 07/16/84 05102/07 03/15/74 06/15/83 05/02/07 02/20/76 01/16/81 01/16/81 03/14/78 04/15/82 03/16/06 07/17/02 07/17/02 11t/22/74 08/01/86 08/01/86(L) 06/07/74 04/15/77 04/15/77(M) 03/15/74 09/27/85 09/27/85(M) 03/29/74 11/15/84 09/02/05 04/19/83 12/03/87 12/03/87 02/14/75 11/23/84 08/23/00 03/29/74 01/04/85 01/18/89 09/15/78 08/23/00 01/09/74 08/05/85 08/05/85 04/19/83 04/01/04 04/01/04(L) 09/15/81 02/01/97 01/19/00 02/21/75 11/19/03 11/19/03(M) 07/26/74 04/08/77 08/23/00 05/24/74 04/19/10 04/19/1 0(>)12/21/73 01/29/80 04/17/95 09/06/74 03/18/80 04/16/03 01/23/74 08/01/77 12/02/80 04/05/74 02/14/76 08/23/00 07/18/75 (NSFHA)07/05/84 06/18/87 06/18/87(M) 04/15/74 07/04/88 07/04/88 03/26/76 07/02/87 12/06/02(M) 12/16/80 12/15/81 12/02/05 08/28/71 08/28/71 08/16/95 11/08/74 06/01/78 09/02/88 02/07/75 (NSFHA)05/03/74 05/16/77 08/23/00 11/16/83 09/01/89 09/01/89(L)(NSFHA)02/06/76 02/06/76 01/06/88 09/15/78 03/17/03 05/07/76 (NSFHA)08/22/75 (NSFHA)12/06/74 12/06/74 01/06/88 06/07/74 07/16/80 07/16/80 04/19/83 05/01/87 05/01/87(L) 05/13/77 03/16/06 03/16/06 05/03/74 05/02/77 08/23/00 02/01/74 08/01/78 08/23/00 03/15/74 09/01/77 04/05/06 05/13/77 08/02/95 (NSFHA)07/17/02 07/17/02 12/13/74 03/17/03 03/17/03 12/15/92 03/17/03 05/26/72 04/05/06 09/19/75 06/15/79 06/15/79 08/13/76 06/27/78 (NSFHA)Reg-Emer Date 07/16/84 06/15/83 01/116/81 04/15/82 04/11/06 08/01/86 04/15/77 09/27/85 11/15/84 12/03/87 11/23/84 01/04/85 09/15/78 08/05/85 04/01/04 02/01/97 11/19/03 04/08/77 04/01/77 01/29/80 03/18/80 08/01/77 02/14/76 03/30/81 06/18/87 07/04/88 07/02/87 01/21/82 08/27/71 06/01/78 02/09/79 05/16/77 09/01/89 06/30/76 01/06/88 02/01/90 05/25/78 08/24/84 01/06/88 07/16/80 05/01/87 06/30/80 05/02/77 08/01/78 09/01/77 08/01/86 1 2/22/03 10/10/03 03/13/95 05/26/72 06/15/79 06/27/78 Tribal No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No Page 3 of 17 01/11/2010 Page 3 of 17 01/1112010 Polcy Coordination Unit Missouri Department of Conservation P.0. Box 180 Heriage eviw Re ortJefferson City, MO 65102......Heritage Reviewrnd Report March 15, 2011 -- Page 1 of 2 573-522-4115X 3367 S Project type: Site Assessment Laura Murray Location/Scope:

Portions of Section 32 and 33 of T48N RI12W__________northeast of Highway 63 County: Boone Query reference: -Discovery Ridge Property ________Query received:

March 8, 2011 Prearu b: S,.ano cave______________________________________

[Authenticity may be con firmed by Policy Coordination Unit, Missouri Department of Consenration, 573-522-4115.

This NATURAL HERITAGE REVIEW is not a site clearance letter. Rather, it identifies public lands and sensitive resources known to have been located close to and/or potentially affected by the proposed project On-site verification is the responsibility of the project. Heritage records were identified at some date and location.

This report considers records near but not necessarily at the project site. Animals move and, over time, so do plant communities.

To say "there is a record" does not mean the species/habitat is still there. To say that "there is no record" does not mean a protected species will not be encountered.

These records only provide one reference and other information (e.g. wetland or soils maps, on-site inspections or sulveys) should be considered.

Look for additional information about the biological and habitat needs of records listed in order to avoid or minimize impacts. More information is at http://mdc.mo,,gov/discover-nature/places-, o/natural-areas and mdc4.mdc.mo.gov/applications/mofwis/mofwis searchl1.aspx.

Contact information for the department's Natural History Biologist is online at httlx//mdc.mo.qov/contact -us.Level 3 (federal-listed) and Leve 2 (state listed) isues: Records of listed species or habitats: Heritage records identify no. wildlif preserves, no designated wildeness areas or critical habitats, no.state or federal endangered-listspecies records within the public land survey sections listed above and northeast of highway 63> The site does drain to Gans Creek, which downstream of Highway6 is one of 138 state-designated spawning strem segments.

Activities that alter, destablie or destroy stream bottoms or banks should be avidd from March 15 to June 15 in order not to dsrupt spawning (laying and fertilizing fish eggs!,-At all times, avoid habitat destruction or introducingheavy sediment loads, chemical or organi po:!llutants.

Spawning stream segments were designaed because they are important to maintining, restoring, or avoiding future listing of species of coservation concern.~'Rock Bridge Ste Park col be affected by construction activities.

Within its premises are records of of conseration concern, including bot ray (2002 and (2007) bat records. *..Gray bats (Myotis federally and state listed "endangered")

are likely to occur in the project area, as thy oag ver streams, rivers, and in thi part of Missouri.

Avoid entry or disturbac of any cave inhabited by gray bats an he osible retain forest vegetation along the stream and from the gray bat cave opening to the stream. See http://mdc.mo..qov/1 04 for best management recommendations.

>' Indiana bats (Myotis sodalis, federally ad s tat e lite 'endangered")

may occur in this area.These mammals hibernate durin wntermothsincavesl in issouri primarily in the southern half of the state. They are found in summer months, primarily north of the Missouri River, roosting and raising young under the bark of trees in riparian forests and upland forests near perennial streams.During project activities, avoid degrading stream quality and where possible leave snags standing and preserve mature forest canopy. If large trees with nesting cavities or loose bark need to be removed by your project, that should be done between November and March. Additional information to incorporate in planning documents is available at http://mdc.mo..qov/1 10.> Topeka shiners (Notropis Topeka, federal- and state-listed "endangered")

are recorded (1997) om Bonne Femme Creek to the south. Historically, they probably used Gans Creek as well. These fish typically occupy permanent pools of small, clear, high quality streams draining upland areas, usually on substrates of gravel, rubble, sand or bedrock. Best manaciement practices for Topeka Prepared by Shannon Cave, March 15, 2011, MurrayBoone assessment.

doc, page 1 of 2 shiners may be found at http://mdc.mo.qiov/1 37*General recommendations related to this project or site, or based on information about the historic range of species (unrelated to any specific heritage records):

in the area should be protected from soil erosion, water pollution and in-stream activities that modify or diminish aquatic habitats*

Best management recommendations relating to streams and rivers may be found at http://mdc.mo.qov/79.

Minimize erosion and sedimentation/runoff to nearby streams and lakes, including adherence to any "Clean Water Permit" conditions.

Revegetate areas in which the natural cover is disturbed to minimize erosion using native plant species compatible with the local landscape and wildlife needs. Pollutants, including sediment, can have significant impacts far downstream.

Use silt fences and/or vegetative filter strips to buffer streams and drainages, and monitor those after rain events and until a well-rooted ground cover is reestablished.This county has known karst geologic eatures (e.g. caves, springs, and sinkholes, all characterized by subterranean watermovement).

Few karst features are recorded in heritage records, and ones not noted her my be encountered atteproject site or affected by the project. Cave fauna (many of wchare species of conserain concern) are influenced by changes to water quality, so check your project site for any as features and make every effort to protect groundwater in the project area. See http://mdc.

mo..ciovfnathis/caves/manaa construc.

htm for best management inoratonThe proposed project occur in the historic range of greater prairi cickens (tympanuchus cupido), a bird on the stae' list of endangered species. Populations§ have been in serious decline for decades, and have reched a point where greater prairie chickens could be gone from Missouri within a few yers. The dominant.

factor in their decline is of. native prairie habitats to other uses. Other praire dependent species are also in seriu decline for the same reason. Prairie chikns range over a broad territory perhaps nesting, breeinganfogign grasslands sevel miles aparFt. Even if prairie chickens are not present, it isimPortant to conserve as muhas possibl any grasslands dominated by native plant cove in the project area.See http://mdc best management reomnations.

~'Invasive exoi species, are significant issue for fish, wllife an agrcutrinMsoi.Se, eggs, and larvae ma bemoed to new sites on boats or cntuto qimns npc n clean equipmentrthroughly befor moving between projec sitesupeto npcn*Remove any mud, soil, trash, plants or animals from equLm~t efor leaving any water body or work area.*Drain water from boats and machinery that have operated in water, checking motor cavities, live-well, bilge and transom wltrcsbuks adny other water reservoirs.

  • When possible, wash and rinse equipment thorugh~ly itard spray or HOT water F, typically available at do-it-yourself carwash sites), and dry in the hot sun before using again.Pre-screen heritaqe data requests at httD:I/tnvurl.comleritaoerevie.

A "Level I response" makes further submission to MDC or UJSFWS unnecessary.

Prepared by Shannon Cave, March 15, 2011, MurrayBoone~assessment.doc, page 2 of 2 CULTURAL RESOURCE ASSESSMENT Section 106 Review CONTACT PERSONIADDRESS C: ITerracon 3601 Mojave Court, Suite A I Columbia.

Missouri 65203 _________________

PROJECT: IDiscover Ride Lots 2 5r 6 7v 9 10a 11! 12r 131 14r 15r 161 17 &18r Columbia FEDERAL AGENCY COUNTY: I UNKNOWN I I BOONE I II -i i II II --w The State Historic Preservation Office has reviewed the Information submitted on the above referenced project. Based on this review, we have made the following determination:

] After review of initial submission, the project area has a low potential for the occurrence of cultural resources.

A cultural resource survey, therefore, is not warranted.

[] Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historic properties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.

It has E~] been determined that for the proposed undertaking there will be "no historic properties affected".

For the above checked reason, the State Historic Preservation Office has no objection to the initiation of project activities.

PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARE CHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO ThiS OFFICE FOR FURTHER REVIEW AND COMMENT. Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: §March 7.2011 Mark A. Miles, Deputy State Historic Preservation Officer Date MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE P.O. Box 176, Jefferson City, Missouri 65102 For additional information, please contact Judith D~eel, (573) 751-7862.

Please be sure to refer to the project number: 015-BO-1 1 February 21, 2011 MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE Attn: Section 106 Review P.O. Box 176 Jefferson City, Missouri 65102-0176 RE: Request for Additional Review MDNR SHPO project number: 015-B0-11 Section 106 Review Discovery Ridge Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, and 18 Discovery Drive and Discovery Ridge Parkway Columbia, Boone County, Missouri T 48N N, R 12W, Sec 33, NY2 Terracon Project No.: 09117701 Terracon Consultants, Inc. (Terracon), on behalf of the Trabue, Hansen & Hinshaw, Inc and the University of Missouri Research Parks -University of Missouri Systems, is assisting with a preconstruction Phase 1 Environmental Site Assessment for a proposed expansion of the current scientific research park, Discovery Ridge, located on a portion of a historic University of Missouri research farm at Discovery Drive Discovery Ridge Parkway, east of U.S. Highway 63 in the vicinity of the southern limits of Columbia, Missouri.We are enclosing a Section 106 Project Information Form, A section of the topographic map which includes the subject site, a developmental phasing plan, and photographs of the on-site metal machine shed type buildings located on Lot 17 and the quacent hut building located on Lot 5. Additionally, photos have been included of structures located on properties adjacent to the site. Please review your records and files to determine if historic features are located on the site.The site has historically been agricultural land associated with a University of Missouri research farm. Portions of the site, which are located within Phase I of the project, have been graded to construct vacant lots suitable for development.

We would appreciate a response within 30 days following receipt of this information.

If you have any questions or wish to discuss this submittal, please contact me.Sincerely, Staff Environmental Scientist Enclosure WMISSOURI DEPARTMENT OF NATURAL RESOURCES ,~STATE HISTORIC PRESERVATION OFFICE 41SECTION 108 PROJECT INFORMATION FORM Submission of a completed Project Information Form with adequate information and attachments constitutes a request for a review pursuant to Section 106 of the National Historic Preservation Act of 1966 (as amended).

We reserve the right to request more information.

Please refer to the CHECKLUST on Page 2 to ensure that all basic information relevant to the project has been Included.

For further information, refer to our website at: htto:l/dnr.mo.aov/shoo and follow the links to Section 106 Review.NOTE: Section 106 regulations provide for a 30-day response time by the Missouri State Historic Preservation Office from the date of receipt.PROJECT NAME Discovery Ridge Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13. 14, 15, 16, 17, and 18 FEDERAL. AGENCY PROVDNG FUNDS. UCENSE. OR PERMIT ADDRESS FOR RESPONSE Terracon 3601 Mojave Court, Suite A Columbia, MO 65203 LOCATION OF PROJECT COUNTY Boone LEGAL DESCRIPTION OF PROJECT AREA (TOWNSHIP, RANGE, SECTION, 1/44 SECTION)USGS TOPOGRAPHIC MAP QUADRANGLE NAME (SEE MAP REQUIREMENTS ON PAGE 2)Columbia, Missouri 1981 l148 North 12 West 3 PROJECT DESCRIPTION DESCRIBE THE OVERALL PROJECT IN DETAIL. IF rr INVOLVES EXCAVATION.

INDICATE HOW WIDE, HOW DEEP, ETC. IF THE PROJECT INVOLVES DEMOLITION OF EXISTING BUILDI.S MAKE THAT CLEAR. IF THE PROJECT INVOLVES REHABILITATION, DESCRIBE T~l PROPOSED WO)RK IN DETAIL.USE ADDITIONAL PAGES IF NECESSARY.

The site consist of 15 lots. Eight of the lots (Lots 2, 5, 6, 7, 8, 9, 10, and 11) are located within Phase I of the research park development plan. Of the lots located within Phase I of the developmental plan, Lots 2, 6, 7, and 8 have been graded to construct vacant lots suitable for development, additional, Lot 9 is currently In the process of being graded to facility a lot suitable for development.

Currently lot 5 is the location of a quacent hut type building.

Seven of the lots that comprse the site (Lots 12, 13, 14, 15, 16, 17, and 18) are located within Phase II of the developmental plan and consist of vacant grass covered farm land utilized as grazing pasture for livestock and row crop research.

Currently Lot 17 is the location of two small metal machine sheds and one large machine shed type buildings.

Historically a residential structure, and four small mea machine sheds were located at the site starting between 1939-1968 with the residence being removed in 2001 and two of the machine sheds being removed in 2007.Historically the site has been utilized as farm land associated with a Uniersity of Missouri research farm (South Farms). Beginning in the early 2000s the area surrounding the site has been utilized as Discovery Ridge, a scientilic research park. The applicant is investigating the site for expanded use as a scientific research park.

ARCHAEOLOGY IEARTHMOVING ACTIVITIESI HAS THE GROUND INVOLVED BEEN GRADED. BUILT ON, BORROWED, OR OTHERWISE DISTURBED?

PLEASE DESCRIBE IN DETAIL (USE ADDITIONAL PAGES, IF NECESSARY)

PHOTOGRAPHS ARE HELPFUL: The site has hitrcfy been farmed associated with a University of Missouri research farm. During the early 2000s portions of the lots that comprise Phase I of the site were graded to construct multiple vacant building lots suitable for deeomn. Currently lots located within Phase II of the developmental plan are vacant grass covered land with portion utilized for row crop research.WILL THE PROJECT REQUIRE FILL MATERIAL?

0] YES [] NO IF YES, INDICATE PROPOSED BORROW AREAS (SOURCE OF FILL MATERIAL)

ON TOPOGRAPHIC MAP ARE YOU AWARE OF ARCHAEOLOGICAL SITES ON OR ADJACENT TO PROJECT AREA? [J YES NO IF YES8, IDENTIFY THEM ON THE TOPOGRAPHIC MAP STRUCTURES (REH LIATION, DEMOLOTION.

ADDITIONS TO, OR CONTRUCTION NEAR EXISTING STRUCTURES)

TO THE BEST OF YOUR KNWLDGE, IS THE STRUCTURE LOCATED IN ANY OF THE FOLLOWING?

U] AN AREA PREVIOUSLY SURVEYED F] A NATIONAL REGISTER DISTRICT El A LOCAL HISTORIC DISTRICT FOR HISTORIC PROPERTIES.

IF YES. PLEASE PROVIDE ThE NAME OF IF YES. PLEASE PROVIDE THE NAME OF IF YES, PLEASE PROVIDE THE NAME OF THE SURVEY OR DISTRICT:

THE SURVEY OR DISTRICT:

Th SURVEY OR DISTRICT:* PLEASE PROVIDE PHOTOGRAPHS OF ALL STRUCTURJES.

SEE PHOTOGRAPHY REQUIREMENTS

  • NOTE: ALL PHOTOGRAPHS SHOULD BE LABELED AND KEYED TO ONE MAP OF THE PROJECT AREA* PLEASE PROVIDE A BRIEF HISTORY OF THE BUILDING(S), INCLUDING CONSTRUCTION DATES AND BUILDING USES. (USE ADDITONAL PAGES, IF NECESSARY.)

ADDITONAL REQUIREMENTS Map Requirements:

Attach a copy of the relevant portion (8 'A x 11) of the curn USGS 7.5 min. topographic map and, If necessary, a large scala project map. Please do not send an Individual map with each structure or site. Wlean orIginal mapIs preferable, a good copy Is acceptable.

For a list of sites from wh'ich to order, download or print the required USGS 7.5 min. topographic map at litl or no cot cosl htto'J/dnr.mo.oovlshoo/sectionrev.htm.

Photography Requlrements:

Clear black and white or color photographs (minimum 3" x 5") are acceptable.

Poladiods, photocopies, emalaed or faxed photographs are not acceptable.

Good quality photographs are Important for expedltlous project review. Photographs of neighboring or nearby buildings are also helpful. All photographs should be labeled and keyed to one map of the project area.CHECKLIST-DID YOU PROVIDE THE FOLLOWING INFORMATION?

0] Topographic map 7.5 min. (per project, not stutr) 0] Other sup~porting documents (If necessary to explain the project)[] Thorough description (aln projects)

El For new construction, rehabilitations, etc., attach work write-ups, plans, drawings, etc.0] Photographs (all structures) 0] Is topographic map Identified by quadrangle and year?Return this Form and Attachments to: MISSOUR DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE Attn: Section 106 Review P.O. BOX 176 JEFFERSON CITY, MISSOURI 65102-0176 Quacent hut building located on the southern portion of Lot 5. Quacent hut south adjoining property.

Quacent hut constructed between 1980 and 1992.!from the Quacent hut building located on the southern portion of Lot 5. Quacent hut viewed from the west portion of Lot 5. Quacent hut constructed between 1980 and 1992.

Trailer park located west of Lots 5, and 16. Trailer park est=Trailer park viewed from the western portion of Lot 5.and 1968.Trailer park located west of Lots 5, and 16. Trailer park established between Trailer park viewed from the western portion of Lot 5.;6 and 1968.

University of Missouri Civil Engineering research building located east of Lot 5.constructed between 1956 and 1968.ding Metal sided USDA building located within the vicinity of the University of Missouri Civil Engineering research building and east of Lot 5. Building constructed between 1995 and 2002.

ABC Lab building located west of Lot 2.viewed from Discovery Drive.and 2007. Building Radii building located east of Lot 2. Building constructed between 2002 viewed from the intersection of Discovery Drive and Discovery Parkway.*Building Residence located south of Lot 11. Residence constructed between Residence viewed from US Highway 63, southwest of the structure.

Residence located south of Lot 11. Residence constructed between Residence viewed from US Highway 63, southwest of the structure.

Residence located south of Lot 11. Residence constructed between 1 Residence viewed from Lot 11, north of the structure.

Barn located south of the residence south of Lot I1. Barn constructed betwveen 1939 and 1956.Barn viewed from US Highway 63, southwest of the structure.

Residence located south of Lot 11. Residence coi Residence viewed from Lot 11 looking southwest.

Barn located south of Lot 11. Barn constructed between 11 looking southwest.

arn viewed from Lot

Two small metal machine sheds located on Lot 17. Small metal machine sheds constructed between 1939 and 1968.Eastern small metal machine 1939 and 1968.ichine shed constructed between Western small n 1939 and 1968.ne sheds located on Lot 17. Machine shed constructed between CULTURAL RESOURCE ASSESSMENT Section 106 Review CONTACT PERSON/ADDRESS ,C: IAdam J. whitei Terracon 3601 Mojave Court, Suite A I Columbia, Missouri 65203 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PROJECT: IDis.cover Ride Lots 2 5a 8r 9 101 11r 12r 13T 141 15 &16r Columbia FEDERAL AGENCY COUNTY: I UNKNOWN! I BOONE I" II I II ...... III I fl The State Historic Preservation Office has reviewed the Information submitted on the above referenced project. Based on this review, we have made the following determination:

[] After review of initial submission, the project area has a low potential for the occurrence of cultural resources.

A cultural resource survey, therefore, is not warranted.Adequate documentation has been provided (36 CFR Section 800.1 1). There will be "no historic properties affected" by the current project.~An adequate cultural resource survey of the project area has been previously conducted.

It has[~] been determined that for the proposed undertaking there will be "no historic properties affected".

For the above checked reason, the State Hitoric Prmsrvation Off ice has no objection to the Initiation of project activiis PLEASE BE ADVISED THAT, IF THE CURRENT PROJECT AREA OR SCOPE OF WORK ARE CHANGED, A BORROW AREA IS INCLUDED IN THE PROJECT, OR CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION, APPROPRIATE INFORMATION MUST BE PROVIDED TO THIS OFFICE FOR FURTHER REVIEW AND COMMENT. Please retain this documentation as evidence of compliance with Section 106 of the National Historic Preservation Act, as amended.By: £ February 9. 2011 Mark A. Miles, Deputy State Historic Preservation Officer Date MISSOURI DEPARTMENT OF NATURAL RESOURCES STATE HISTORIC PRESERVATION OFFICE P.O. Box 176, Jefferson City, Missouri165102 For additional Information, please contact Judith Dsel, (573) 751-7862.

Please be sure to refer to the project number: 015-BO-11 Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 Columbia, Missouri February 17,2011 Terracon Project No. 09105094.1 Prepared for: Trabue, Hansen & Hinshaw, Inc.Columbia, Missouri Prepared by: Terracon Consultants, Inc.Columbia, Missouri llti[' U ll Feray1721r erracon Trabue, Hansen & Hinshaw, Inc.1901 Pennsylvania Columbia, Missouri 65202 Attn: Mr. John Huss, R.E.P: [573] 814-1568 F: [573] 814-1128 Re: Preliminary Geotec~hnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6,7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 Columbia, Missouri Terracon Project Number: 09105094.1

Dear Mr. Huss Terracon Consultants,

Inc. (Terracon) has completed the preliminary geotechnical engineering services for the above referenced project. This study was performed in general accordance with our proposal number D091 0226 dated December 15, 2010 and our Supplemental Change Order dated February 2, 2011. This report presents the findings of the subsurface exploration and provides preliminary geotechnical recommendations concerning earthwork and the design and construction of foundations, floor slabs and pavements for the proposed project.We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report, or if we may be of further service, please contact us.Sincerely, Terracon Consultants, Inc.Staff Geotechnical Engineer t"Senior Principal Missouri:

PE 2009001099 7S UMBER Office Manager Enclosures 2- cc: 3- Client 1 -File Terracon Consultants, Inc. 3601 Molave court, Ste. A Columbia, Missouri 65202 P [573J 214 2817 F [5731 214 2714 terracon.com i

TABLE OF CONTENTS Page EXECUTIVE

SUMMARY

.................................................................................I

1.0 INTRODUCTION

.................................................................................I 2.0 PROJECT INFORMATION

.....................................................................

I 2.1 Project Description...................................................................I..

2.2 Site Location and Description

.........................................................

2 3.0 SUBSURFACE CONDITIONS

................................................................

2 3.1 Geology .................................................................................

2 3.2 Typical Profile...........................................................................

3 3.3 Groundwater............................................................................

4 4.0 SITE SUITABILITY AND PRELIMINARY FINDINGS AND RECOMMENDATIONS

.....5 4.1 Geotechnical Considerations..........................................................

5 4.2 Earthwork...............................................................................

6 4.3 Foundations.............................................................................

6 4.4 Seismic Considerations

................................................................

7 4.5 Floor Slabs ..............................................................................

8 4.6 Pavements

..............................................................................

8 5.0

GENERAL COMMENT

S.......................................................................

9 APPENDIX A -FIELD EXPLORATION Exhibit A-I Site Location Map Exhibit A-2 USGS Map Exhibit A-3 Geologic Map Exhibit A-4 Boring Location Diagram Exhibit A-5 to A-I13 Boring Logs Exhibit A-14 Field Exploration Description APPENDIX B -SUPPORTING INFORMATION Exhibit B-I Laboratory Testing APPENDIX C -SUPPORTING DOCUMENTS Exhibit C-I General Notes Exhibit C-2 Unified Soil Classification System Exhibit C-3 General Notes -Description of Rock Properties Exhibit C-4 Projected Earthquake Intensities (Modified Mercalli Scale)Reliable u Responsive u Convenient.*

Innovative Preliminary Geotechnical Engineering Report__l ra Discovery Ridge -Certified Site Program o Lots 2, 5, 6,7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 EXECUTIVE

SUMMARY

A preliminary geotechnical investigation has been performed for the proposed certified site which consists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of the Discovery Ridge Research Park in southeastern Columbia, Missouri.

Nine (9) borings, designated B-I through B-9, were performed to depths of approximately 13 to 20 feet below the existing ground surface at the subject site.Based on the information obtained from our subsurface exploration, the site can be developed for future construction.

The following geotechnical considerations were identified:

  • Typical lightly loaded commercial buildings may be supported on shallow footings bearing on stiff to very stiff native clay or on compacted structural fill.* Assuming proper site preparation and any necessary subgrade repair, total and differential settlement should be within anticipated client/owner specifications.
  • Existing fill was encountered in Borings B-3 and B-4, however we understand that this material was placed as part of mass grading during mid to late 2008. At that time, Terracon was onsite to observe and test the density and moisture during placement of engineered fill material.* Based on the USGS map, it appears that a pond may have been located in the vicinity of lot 16 and that the existing pond located north of the Radii Facility previously extended west onto a portion of Lot 2. We recommend these areas be thoroughly investigated during the final geotechnical investigation for each respective lot.* The near-surface soils are active and prone to volume change with variations in moisture content. For this reason, a low volume change zone (LVC) is typically constructed beneath at-grade, grade-supported floor slabs. Depending on final grading plans, construction of the LVC may require overexcavation within future building pads.* On-site soils appear suitable for use as compacted structural fill; however, if they do not meet the low plasticity fill criteria, they should not be utilized for LVC material.* The 2006/2009 International Building Code (IBC), Table 1613.5.2 seismic site classification for this site is C* The Modified Mercalli Intensity Scale for seismic events for Boone County is VII.Reliable m Responsive
  • Convenient.*

Innovative i

Preliminary Geotechnical Engineering Report"l ra n Discovery Ridge -Certified Site Program 1rra o Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18

  • Columbia, Missouri February 17, 2011 m Terracon Project No. 09105094.1.1 EXECUTIVE

SUMMARY

(continued)

  • Close monitoring of the construction operations discussed herein will be critical in achieving the design subgrade support. We recommend that Terracon be retained to monitor this portion of the work.This summary should be used in conjunction with the entire report for design purposes.

It should be recognized that details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled

GENERAL COMMENT

S should be read for an understanding of the report limitations.

Although this report discusses design parameters, these parameters are preliminary.

This preliminary report is not intended to be relied upon for final design.Reliable

  • Responsive u Convenient
  • Innovative i ii PRELIMINARY GEOTECHNICAL ENGINEERING REPORT DISCOVERY RIDGE -CERTIFIED SITE PROGRAM LOTS 2, 5, 6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 COLUMBIA, MISSOURI Terracon Project No. 09105094.1 February 17, 2011

1.0 INTRODUCTION

A preliminary geotechnical engineering report has been completed for the proposed certified which consists of Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 of Discovery Ridge Research Park in Columbia, Missouri.

Nine (9) borings, designated B-i through B-9, were performed to depths of approximately 13 to 20 feet below the existing ground surface at the subject site. Logs of the borings along with a site location map, USGS map, geologic map and boring location diagram are included in Appendix A of this report.The purpose of these services is to provide information and preliminary geotechnical engineering recommendations relative to: U U U U subsurface soil conditions groundwater conditions earthwork pavements* foundation design and construction

  • floor slab design and construction
  • seismic considerations It is important to note that this preliminary geotechnical engineering report is not meant to provide final design recommendations.

Once final development plans are available, a final geotechnical investigation should be performed for site and structure-specific geotechnical recommendations.

2.0 PROJECT INFORMATION 2.1 Project Description ITEM DESCRIPTION Site layout See Appendix A, Exhibit A-4: Boring Location Diagram The project will include future development of approximately 90 Structures acres of vacant land. Finalized specific building or site layout details were unknown at the time this report was prepared.Reliable

  • Responsive m Convenient m Innovative1 1

Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18

  • Columbia, Missouri February 17, 2011 m Terracon Project No. 09105094.1.1 irerracon ITEM DESCRIPTION Site grading information was not available at the time that this report was prepared.

However for the purpose and scope of this report, we have assumed that local cuts and/or fills required for Grading development will be limited to approximately 10 feet.Additionally, we understand that mass grading was performed in mid to late 2008 in the vicinity of the existing Radii Facility and ABC Laboratories building.

At that time, Terracon was onsite to observe and test the placement of engineered fill material.Cut and fill slopes No steeper than 3H:IV (Horizontal to Vertical) (assumed)2.2 Site Location and Description ITEM DESCRIPTION The proposed project site consists of Lots 2, 5, 6, 7 8, 9, 10, 11, 12, Location 13, 14, 15, 16, 17 and 18 of Discovery Ridge Research Park in______________________

Columbia, Missoudi.The lots are vacant with the exception of Lot 5 which is developed Exisingimprvemntswith a storage building.Generally grass covered, however portions of the site in the vicinity Curret grund overof Lot 16 were cultivated fields.In general, slightly to moderately sloped downward towards the Existing topography south and west.3.0 SUBSURFACE CONDITIONS 3.1 Geology Most of the upland area is covered by a thin loess blanket and glacial drift. Highly plastic clays that exhibit volume change with variations in moisture are commonly encountered near the ground surface.Based on the 2003 Geologic Map of Missouri, Missouri Department of Natural Resources, bedrock at this site consists primarily of the Pennsylvanian aged Cherokee Group (Pc), the Pennsylvanian aged Marmaton Group (Pm), and the Mississippian aged Burlington formation (Mo). The Cherokee Group is predominantly shale with minor amounts of carbonates and sandstone.

This group contains most of the mineable coal beds in Missouri.

The Marmaton Group consists of a succession of shale, limestone, clay, and coal beds.Reliable

  • Responsive
  • Convenient
  • Innovative2 2

Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18

  • Terracon Project No. 09105094.1

.1 irerracon The Burlington formation is characteristically a white to gray, medium to coarsely crystalline, medium to coarsely crinoidal, chert free to sparsely cherty limestone.

Solution features, including caves and sinkholes, are commonly present in this formation.

No caves or sinkholes are known to exist, or are published to exist, within approximately 1 mile of this project site.However several areas of known karst activity are present west and southwest of the project site.It is difficult to predict future sinkhole activity.

Sinkholes and caves in this area are in various stages of development and can appear at any time. Site grading and drainage may alter site conditions and could possibly cause sinkholes in areas that have no history of this activity.3.2 Typical Profile Based on the results of the borings, as follows: subsurface conditions on the project site can be generalized Stratum Approximate Depth to Mtra ecito ossec/est Stratum Bottom of Stratum (feet) Mtra ecito ossec/est Surface 0.2 to 0.5 Topsoil: brown, friable and contained N/A significant organic matter 3 to 12 Existing Fill ' consisting of lean clay 1 and lean to fat clay with Very stiff to hard (Borings B-3 & B-4 only) varying amounts of sand and gravel 2 3 to 12 Lean clay, lean to fat clay and fat clay Stiff to very stiff Undeermned BorngsB-i Lean to fat clay and fat clay with through B-5, B-B and B-9 varying amounts of sand, gravel andStftohr 3 teminaed wthi thi strtum possible cobbles (visually classified as at the planned depth of glacial drift)approximately 20 feet __________________________

Undetermined:

Borings B-6 Caused split spoon 4 and B-7 terminated within Limestone sampler refusal and this stratum.,________________

auger refusal Note 1: The existing fill material was placed in mid to late 2008. Terracon provided onsite observation and moisture/density testing during the placement of fill material.The upper soil encountered in the borings generally consisted of lean to fat clay and fat clay which was of moderate to high plasticity, and had the following measured liquid limits, plastic limits, and plasticity indices: Reliable.*

Responsive u Convenient.*

Innovative3 3

Preliminary Geotechnical Engineering Report 1r Discovery Ridge -Certified Site Program 1rrracon Lots 2, 5,6, 7,8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 Sample Location Depth (feet) Liquid Limit (%) Plastic Limit (%) Plasticity Index (%)Boring B-1 3 -5 43 15 28 Boring B-3 1 -3 41 16 25 Boring B-5 1 -3 31 21 10 Boring B-9 1 -3 44 21 23 Conditions encountered at each boring location are indicated on the individual boring logs.Stratification boundaries on the boring logs represent the approximate location of changes in soil types; in situ, the transition between materials may be gradual. Details for each of the borings can be found on the boring logs in Appendix A of this report.3.3 Groundwater The boreholes were observed while drilling and after completion for the presence and level of groundwater.

Groundwater was observed at in Borings B-5 and B-6 at depths of approximately 12 to 18.5 feet. Groundwater was not observed in the remaining borings during drilling or for the short amount of time the borings were allowed to remain open following drilling completion.

However, this does not necessarily mean that stable groundwater levels were observed in Borings B-5 and B-6, or that the remaining borings were terminated above groundwater.

Due to the low permeability of the soils encountered in the borings, a relatively long period of time may be necessary for a groundwater level to develop and stabilize in a borehole in these materials.

Long term observations in piezometers or observation wells sealed from the influence of surface water are often required to define groundwater levels in materials of this type.Pockets, lenses, and stringers of sand are sometimes encountered in the glacial soils found in the vicinity of the referenced project. These sand pockets are normally discontinuous and often contain water of variable quality and quantity.

These sand pockets may be encountered during foundation excavation.

This possibility should be considered when developing design and construction plans and specifications for the project.Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff, proximity to existing ponds, and other factors not evident at the time the borings were performed.

In addition, perched water can develop over low permeability soil strata. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project.Reliable u Responsive

  • Convenient m Innovative4 4

Preliminary Geotechnical Engineering Report 1r Discovery Ridge -Certified Site Program ra a Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 u Columbia, Missouri February 17, 2011

  • Terracon Project No. 09105094.1.1 4.0 SITE SUITABILITY AND PRELIMINARY FINDINGS AND RECOMMENDATIONS 4.1 Geotechnical Considerations The borings performed for this project generally encountered native lean to fat clay and fat clay underlain by glacial drift. Existing fill was encountered in Borings B-3 and B-4 to depths of 3 to 12 feet, and limestone bedrock was encountered in Borings B-6 and B-7 at depths of approximately 17 and 12.5 feet, respectively.

Depending on final site grading plans, we anticipate that either the native clay or compacted structural fill will form the subgrade for future building foundations and floor slabs.Based on the USGS map, it appears that a pond may have been located in the vicinity of lot 16.Further, based on aerial photography the existing pond located north of the Radii Facility previously extended southwest onto a portion of Lot 2. We recommend these areas be thoroughly investigated during the final geotechnical investigation for each respective lot.Performance of foundations depends on many factors including, but not limited to, the depth of footings, amounts of cuts or fill, bearing material, and foundation loads. Structural loads, final grades, and other design details should be provided when available.

Although this report discusses design parameters, these parameters are preliminary.

This preliminary report is not intended to be relied upon for final design. We recommend a more detailed study be performed when specific project details are known, and/or possibly following completion of general site grading.Examination of the boring logs indicates a range of soil-moisture conditions are present at this site. At the time of drilling, some of the soils at various depths are at moisture levels above their measured plastic limit. Typically, soil with moisture levels above their measured plastic limit may be prone to rutting, pumping, and can develop into unstable subgrade conditions during general construction operations.

Moderately to highly plastic, lean to fat clay and fat clay soils were present on site. Such soils are commonly referred to as "expansive" or "swelling" soils because they expand or swell as their moisture contents increase.

However, these soils also "contract" or "shrink" as their moisture levels decrease.

Footings, floor slabs, and pavements supported on expansive soils will move upward and downward and such movements will result in distortion, possibly causing cracking or structural damage to structures.

For this reason, a low volume change zone will likely be required beneath at-grade floor slabs. We recommend that additional laboratory testing be performed during the final geotechnical exploration to better evaluate the expansive nature of these soils.Reliable

  • Responsive
  • Convenient
  • Innovative 5

Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program ra o Lots 2, 5,6, 7, 8,9, 10, 11, 12, 13, 14, 15, 16, 17 and 18.* Columbia, Missouri February 17, 2011

  • Terracon Project No. 09105094.1.1 We recommend that the exposed subgrade be thoroughly evaluated after stripping of any topsoil and creation of all cut areas, but prior to the start of any fill operations.

We recommend that the geotechnical engineer be retained to evaluate the bearing material for the foundations and floor slab subgrade soils. Subsurface conditions, as identified by the field and laboratory testing programs, have been reviewed and evaluated with respect to the proposed development plans known to us at this time.4.2 Earthwork The widely spaced preliminary borings typically encountered stiff to hard lean to fat clay and fat clay. Shallow bedrock, karst features, or extensive pervious deposits of water-bearing sand that could impact site development did not appear to be present based on the preliminary site and subsurface information gathered at this time.Based on the subsurface conditions encountered in the widely spaced borings, the site soils are suitable for future development.

Additional borings should be completed so that each site can be adequately characterized and recommendations can be more fully developed to assist and guide future mass grading.Recommendations will need to be developed for site preparation and proof-rolling operations as well as construction of cut and structural fill operations.

In our opinion, full-time testing and observation should be employed during mass grading to evaluate compliance with project earthwork recommendations and requirements.

If site grading results in relatively thick structural fills, settlement and cut/fill slope stability may need to be evaluated.

4.3 Foundations

Shallow foundations could be used to support lightly loaded commercial structures provided the footings are supported by suitable material (stiff to hard native clay or compacted structural fill).Depending on the design footing elevation and bearing material (native clay or newly placed compacted structural fill), allowable bearing pressures would likely be in the range of 1,000 psf to 3,000 psf. Due to the presence of clay soils, shallow foundations are typically soil-formed in the general vicinity of this site. Further testing at the individual structure locations should be performed to determine the appropriate bearing capacity for structural support.Heavier loads, which could cause excessive settlement, are normally supported by shallow foundations which are supported, in turn, by aggregate-pier intermediate foundations or by drilled piers. Pier drilling through the native soils is not expected to become difficult based upon the material encountered within the borings; however, the drilled pier contractor should be prepared should sandy zones or large boulders be encountered.

These materials, although not Reliable

  • Responsive.*

Convenient.*

Innovative6 6

Preliminary Geotechnical Engineering Report Discovery Ridge -Certified Site Program Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18

  • Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 rerracon encountered in our borings, can sometimes be encountered in the glacial soils that are present in the vicinity of this site when drilling pier holes which are much larger in diameter than the bore holes.Footln0 Level ExcavalonLee Lean Concrete Backfill Overexcavation

/ Backfill NOTE" IExcavations in sketches Shown vetia for convenience.

Excavations should be sloped as necessary for 4.4 Seismic Considerations

1. Missouri State Emergency Management Agency;, P.O. Box 116; Jefferson City, MO 65102 2. See Appendix C, Exhibit C-4 for Projected Earthquake Intensities (Modified Mercalli Scale)Code Used Site Classification 2006/2009 Intemational Building Code (IBC) 1 C 2 1.2.In general accordance with the 2006/2009 International Building Code, Table 1613.5.2.The 2006/2009 Intemational Building Code requires a site soil profile determination extending a depth of 100 feet for seismic site classification.

The current scope requested does not include the required 100 foot soil profile determination.

Borings for this report extended to a maximum depth of approximately 20 feet and this seismic site class assignment considers that shale or limestone bedrock is present within approximately 30 feet of the ground surface and continues below the maximum depth of the subsurface exploration.

Additional exploration to greater depths could be considered to confirm the conditions below the current depth of exploration.

Altematively, a geophysical exploration could be utilized in order to attempt to justify a more favorable seismic site class.Reliable

  • Responsive
  • Convenient.*

Innovative7 7

Preliminary Geotechnical Engineering Report 1e r Discovery Ridge -Certified Site Program n Lots 2, 5, 6, 7, 8, 9, 10, II, 12, 13, 14, 15, 16, 17 and 18 .Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 4.5 Floor Slabs Many of the clay soils in this locale have the potential to increase or decrease in volume with variations in moisture content. Soil having high plasticity characteristics (i.e., fat clay) generally has a greater potential for moisture related volume change than less plastic materials such as lean clay. In addition, swell potential is generally greater in material with a high dry unit weight and low initial moisture content. However, even low plasticity soils can swell significantly if their moisture levels are initially low.Because of the moderate to high shrink-swell potential of the lean to fat clay and fat clay soil encountered in the borings, a low volume change layer will likely be required below at-grade floor slabs. This layer typically varies from 12 to 36 inches in thickness.

The on-site lean to fat clay and fat clay soils encountered in the borings performed for this report are typically not suitable for use as low volume change material; however, on-site materials may exist which would meet the low volume change material criteria.

Further testing at the individual structure locations should be performed to determine the required low volume change layer thickness.

4.6 Pavements On most project sites, the site grading is accomplished relatively early in the construction phase.Fills are placed and compacted in a uniform manner. However, as construction proceeds, excavations are made into these areas, rainfall and surface water saturates some areas, heavy traffic from concrete trucks and other delivery vehicles disturbs the subgrade and many surface irregularities are filled in with loose soils to improve trafficability temporarily.

As a result, the pavement subgrades, initially prepared early in the project, should be carefully evaluated as the time for pavement construction approaches.

Pavement thickness can be determined using AASHTO, Asphalt Institute and/or other methods if specific wheel loads, axle configurations, frequencies, and desired pavement life are provided.Pavement design methods are intended to provide structural sections with adequate thickness over a particular subgrade such that wheel loads are reduced to a level the subgrade can support.The support characteristics of the subgrade for pavement design do not account for shrink/swell movements of an expansive clay subgrade such as the soils encountered on this project. Thus, the pavement may be adequate from a structural standpoint, yet still experience cracking and deformation due to shrink/swell related movement of the subgrade.Expansive soils are present at this site. It is important to minimize moisture changes in the subgrade both during construction and during the life of the pavement to reduce shrink/swell movements.

Reliable

  • Responsive.*

Convenient.*

Innovative8 8

Preliminary Geotechnical Engineering Report o~scov oe ,o1 terracon Lots 2, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17 and 18 .Columbia, Missouri February 17, 2011 .Terracon Project No. 09105094.1.1 5.0

GENERAL COMMENT

S Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications.

Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth-related construction phases of the project.The preliminary analysis and preliminary recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this preliminary report. This preliminary report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction.

If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided.The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions.

If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken.

This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices.

No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this preliminary report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing.Reliable.*

Responsive a Convenient

  • Innovative9 9