ML17244A174: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:BEFORETHEUNITEDSTATESNUCLEARREGULATORY COMMISSION IntheMatterof))ROCHESTER GASANDELECTRIC)CORPORATION
{{#Wiki_filter:BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of))ROCHESTER GAS AND ELECTRIC)CORPORATION
)(R.E.GinnaNuclearPower)Station,UnitNo.1))DocketNo.50-244CERTIFICATE OFSERVICElherebydecertify thatIhaveservedadocumententitled"Application forAmendment toOperating License:withthree(3)documents,.
)(R.E.Ginna Nuclear Power)Station, Unit No.1))Docket No.50-244 CERTIFICATE OF SERVICE l hereby decertify that I have served a document entitled"Application for Amendment to Operating License: with three (3)documents,.
Attachments A,BandC,attachedthereto,bymailingcopiesthereoffirstclass,postagepre-paid,toeachofthefollowing personsthis16thdayofOctober,1978:Mr.MichaelL.Slade1250CrownPointDriveWebster,NewYork14580WarrenB.Rosenbaum, EsquireOneMainStreet707WilderBuildingRochester, NewYork14614EdwardG.Ketchen,EsquireOfficeoftheExecutive LegalDirectorU.S.NuclearRegulatory Commission Washington, D.C.20555Mr.RobertN.PinkneySupervisor TownofOntario107RidgeRoadWestOntario,NewYork14519 JeffreyL.Cohen,EsquireNewYorkStateEnergyOfficeSwanStreetBuildingCore1,SecondFloorEmpireStatePlazaAlbany,NewYork12223EdwardLuton,EsquireAtomicSafetyandLicensing BoardU.S.NuclearRegulatory Commission Washington, D.C.20555Dr.EmmethA.LuebkeAtomicSafetyandLicensing BoardU.S.NuclearRegulatory Commission Washington, D.C.20555Dr.DixonCallihanUnionCarbideCorporation P.O.BoxYOakRidge,Tennessee 37830L.LarsonLeBoeuf,Lamb,LeibyGMacRaeAttorneys forRochester GasandElectricCorporation UNITEDSTATESOFAMERICANUCLEARREGULATORY COMMISSION IntheMatterofRochester GasandElectricCorporation (R.E.GinnaNuclearPowerPlant,UnitNo.1))))DocketNo.50-244))APPLICATION FORAMENDMENT TOOPERATING LICENSEPursuantto.Section 50.90oftheregulations oftheU.S.NuclearRegulatory Commission (the"Commission"
Attachments A, B and C, attached thereto, by mailing copies thereof first class, postage pre-paid, to each of the following persons this 16th day of October, 1978: Mr.Michael L.Slade 1250 Crown Point Drive Webster, New York 14580 Warren B.Rosenbaum, Esquire One Main Street 707 Wilder Building Rochester, New York 14614 Edward G.Ketchen, Esquire Office of the Executive Legal Director U.S.Nuclear Regulatory Commission Washington, D.C.20555 Mr.Robert N.Pinkney Supervisor Town of Ontario 107 Ridge Road West Ontario, New York 14519 Jeffrey L.Cohen, Esquire New York State Energy Office Swan Street Building Core 1, Second Floor Empire State Plaza Albany, New York 12223 Edward Luton, Esquire Atomic Safety and Licensing Board U.S.Nuclear Regulatory Commission Washington, D.C.20555 Dr.Emmeth A.Luebke Atomic Safety and Licensing Board U.S.Nuclear Regulatory Commission Washington, D.C.20555 Dr.Dixon Callihan Union Carbide Corporation P.O.Box Y Oak Ridge, Tennessee 37830 L.Larson LeBoeuf, Lamb, Leiby G MacRae Attorneys for Rochester Gas and Electric Corporation UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Rochester Gas and Electric Corporation (R.E.Ginna Nuclear Power Plant, Unit No.1))))Docket No.50-244))APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to.Section 50.90 of the regulations of the U.S.Nuclear Regulatory Commission (the"Commission"), Rochester Gas and Electric Corporation
),Rochester GasandElectricCorporation
("RGSE"), holder of Provisional Operating License No.DPR-18, hereby requests that the Technical Specifica-tions set forth in Appendix A to that License be amended to revise the organization as shown in Figures 6.2-1 and 6.2-2 and the PORC membership.
("RGSE"),
This request, for a change in the Technical Specifications is submitted as a result of changes in the RGGE organization.
holderofProvisional Operating LicenseNo.DPR-18,herebyrequeststhattheTechnical Specifica-tionssetforthinAppendixAtothatLicensebeamendedtorevisetheorganization asshowninFigures6.2-1and6.2-2andthePORCmembership.
The proposed technical specification change is set forth in Attachment A to this Application.
Thisrequest,forachangeintheTechnical Specifications issubmitted asaresultofchangesintheRGGEorganization.
A safety evaluation is set forth in Attachment B.This evaluation also demonstrates that the proposed change does not.involve a significant change in the types or a significant increase in the amounts of effluents or any change in the authorized power level of the facility.Justi-fication for classification of the amendment pursuant to 10 CFR Section 170.22 is included as Attachment C.A check for the appropriate fee accompanies this Application.
Theproposedtechnical specification changeissetforthinAttachment AtothisApplication.
WHEREFORE, Applicant respectfully requests that Appendix A to Provisional Operating License No.DPR-18 be amended in the form attached hereto as Attachment A.Rochester Gas and Electric Corporation By L.D.White, Jr.Vice President Electric and Steam Production Subscribed and sworn to before me on this/~@day of October 1978/GARY L'REISS NOTARY PUBLIC, State of N.Y.Monroe Co.My Commission Expires March 30, 19..$P' t J W Attachment A Proposed Technical Specifications 1.Replace pages 6.2-2, 6.2-3, 6.5-2, and 6.5-10 arith the enclosed revised pages.  
Asafetyevaluation issetforthinAttachment B.Thisevaluation alsodemonstrates thattheproposedchangedoesnot.involveasignificant changeinthetypesorasignificant increaseintheamountsofeffluents oranychangeintheauthorized powerlevelofthefacility.
't 4 I CHAIRNAN OF THE BOARD SUPERVISIOM AND AUNINISTRATI4AV OTHER FUNCTIIHIAL RELATIONSHIPS
Justi-ficationforclassification oftheamendment pursuantto10CFRSection170.22isincludedasAttachment C.Acheckfortheappropriate feeaccompanies thisApplication.
~RESPONSIBLE FOR PIRE PROTECTION PROCRAN PRESIDENT EXECUTIVE VICE PRESIDENT V P NARKETINC RCHASINCg PUBLIC INFOILNATI OH DISTRICTS V P ELECTRIC TRANSPORTATIOM DISTRIBUTION t VTILISATI044 V.P ELECTRIC SYSTEM PIANMING AND OPERATION VICE PRESIDENT ELECTRIC I STEAN PRODUCTION
WHEREFORE, Applicant respectfully requeststhatAppendixAtoProvisional Operating LicenseNo.DPR-18beamendedintheformattachedheretoasAttachment A.Rochester GasandElectricCorporation ByL.D.White,Jr.VicePresident ElectricandSteamProduction Subscribed andsworntobeforemeonthis/~@dayofOctober1978/GARYL'REISSNOTARYPUBLIC,StateofN.Y.MonroeCo.MyCommission ExpiresMarch30,19..$P' tJW Attachment AProposedTechnical Specifications 1.Replacepages6.2-2,6.2-3,6.5-2,and6.5-10ariththeenclosedrevisedpages.  
*VICE PRESIDENT RATES 4 C4PI'T AFFAIRS PURCHAS INC AC ENT DIV SUPT.g ELECT.TRANS~~DIST.~c UTIL.DIV SUPT ELFC SYSTEM PLAtUiINC 4 OPERATION CHIEF ENGINEER SUPERINTENDENT NUCLEAR PRDDUCTION SUPT.~ELECTRIC NETER I IAB ASSISTANT CHIEF ENGINEER ENGINEERINC I CONSTRUCTION ASST, CHIEF ENGINEER SUPERINTENDENT Clh'CA STATIO'4 I I L MANAGER OP SECURITY NANACERS DESICN K CONSTR.SUPERINTENDENT GENERAL MAINTENANCE FORAGER QUALITY ASSURANCE ASSISTANT SUPERINTENDENT STAI'F ASSISTANT SEC DEPT CINNA PURCHASING ELECTRIC HETER C LAB STAFI'UEL RAVAGEMENT DESIGN S CONSTR.EhC INEERS RECORDS~DOCUMENT GENERAL C4NTROL, DRAFT INC NAlhTENANCE AND TRAININC STAFF QUALITY CONTROL QUALITY ASSURANCE STAFF QUALITY COKT ROI, PLANT OPERAT14N4S STAFF TRAIN INC COO RD.CINNA STATION SECURITY ORCANIEAT ION Figure 6.2-2 t J ol ROCHESTER CAS AND ELECTRIC CORPORATION CINNA STATION ORCJQllSAtlON SUPERINTENDENT tRAINI NC COORDINATOR ASSISTANT SUPERINTENDENT ENClNEER IS)Ch bD I 4)SUPERVISOR CHENI SPRY AND HEALTH PHYSICS OPERATIONS ENGINEER FIRE PROTECTION AND SAFETY COORD.NA INTENANCE ENGINEER TECHNICAL ENC INSTR QUALITY CONTROL ENC INTER HEALTH PHYSICIST OPERATIONS SVPERVI SON NAINTENANCE SUPERVISOR I AC SUPERVISOR NICLEAR ENCINEER RESVLts I TEST SUPERVISOR ENCINEER CHENI SPRY TECHNICIhlS RADIATION PROTECTION TEC)$ICI ASS SHIFT PORuuTSOL I/SHIFT NAINIENANCE FORERAN INSTRVNENT I CONTROL FORERAN TECHNICIAN(S)
't 4ICHAIRNANOFTHEBOARDSUPERVISIOM ANDAUNINISTRATI4AV OTHERFUNCTIIHIAL RELATIONSHIPS
TECHNICIAN (S)ROIOL OPERATOR)/SHIIT FITTERS NECNA.'I ICS ELECTRICIÃIS NANDYNEN STOCXXEEPER TECHNICIANS I REPAIIP)EN 0 0 lA 8 P CONTROL OPERATOR I/SHIFT SOL SENIOR OPERAtOR LICENSE OL OPERATOR LICENSE AUXILIARY OPERATOR 2/SH IFT Figure 6.2-2 A
~RESPONSIBLE FORPIREPROTECTION PROCRANPRESIDENT EXECUTIVE VICEPRESIDENT VPNARKETINC RCHASINCg PUBLICINFOILNATI OHDISTRICTS VPELECTRICTRANSPORTATIOM DISTRIBUTION tVTILISATI044 V.PELECTRICSYSTEMPIANMINGANDOPERATION VICEPRESIDENT ELECTRICISTEANPRODUCTION
COMPOSITION 6.5.1.2 The PORC shall be composed of the Chairman: Member: Member: Member: Member: Member: Member: Member: Member: Member: l" Station Superintendent Results and Test Supervisor Assistant Superintendent Operations Engineer Maintenance Engineer Technical Engineer Nuclear Engineer Supervisor Chemistry and Health Physics Quality Control Engineer Instrument and Control Supervisor ALTERNATES 6.5.1.3 Alternate members shall be designated by name, in writing, by the Chairman.MEETING FREQUENCY 6.5.1.4 The PORC shall meet at least once per calendar month and as convened by the PORC Chairman.QUORUM 6.5.1.5 A quorum of the PORC shall consist of the Chairman and four members including alternates.
*VICEPRESIDENT RATES4C4PI'TAFFAIRSPURCHASINCACENTDIVSUPT.gELECT.TRANS~~DIST.~cUTIL.DIVSUPTELFCSYSTEMPLAtUiINC 4OPERATION CHIEFENGINEERSUPERINTENDENT NUCLEARPRDDUCTION SUPT.~ELECTRICNETERIIABASSISTANT CHIEFENGINEERENGINEERINC ICONSTRUCTION ASST,CHIEFENGINEERSUPERINTENDENT Clh'CASTATIO'4IILMANAGEROPSECURITYNANACERSDESICNKCONSTR.SUPERINTENDENT GENERALMAINTENANCE FORAGERQUALITYASSURANCE ASSISTANT SUPERINTENDENT STAI'FASSISTANT SECDEPTCINNAPURCHASING ELECTRICHETERCLABSTAFI'UEL RAVAGEMENT DESIGNSCONSTR.EhCINEERSRECORDS~DOCUMENTGENERALC4NTROL,DRAFTINCNAlhTENANCE ANDTRAININCSTAFFQUALITYCONTROLQUALITYASSURANCE STAFFQUALITYCOKTROI,PLANTOPERAT14N4S STAFFTRAININCCOORD.CINNASTATIONSECURITYORCANIEAT IONFigure6.2-2tJ ol ROCHESTER CASANDELECTRICCORPORATION CINNASTATIONORCJQllSAtlON SUPERINTENDENT tRAININCCOORDINATOR ASSISTANT SUPERINTENDENT ENClNEERIS)ChbDI4)SUPERVISOR CHENISPRYANDHEALTHPHYSICSOPERATIONS ENGINEERFIREPROTECTION ANDSAFETYCOORD.NAINTENANCE ENGINEERTECHNICAL ENCINSTRQUALITYCONTROLENCINTERHEALTHPHYSICIST OPERATIONS SVPERVISONNAINTENANCE SUPERVISOR IACSUPERVISOR NICLEARENCINEERRESVLtsITESTSUPERVISOR ENCINEERCHENISPRYTECHNICIhlS RADIATION PROTECTION TEC)$ICIASSSHIFTPORuuTSOL I/SHIFTNAINIENANCE FORERANINSTRVNENT ICONTROLFORERANTECHNICIAN(S)
No more than two shall be alternates.
TECHNICIAN (S)ROIOLOPERATOR)/SHIITFITTERSNECNA.'IICSELECTRICIÃIS NANDYNENSTOCXXEEPER TECHNICIANS IREPAIIP)EN 00lA8PCONTROLOPERATORI/SHIFTSOLSENIOROPERAtORLICENSEOLOPERATORLICENSEAUXILIARY OPERATOR2/SHIFTFigure6.2-2 A
6.5-2 Proposed AUDITS (Continued) h.1~The Facility Fire Protection Program and implementing procedures at least once per two years.An independent fire protection and loss prevention pro-gram inspection and audit shall be perfoxmed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.An inspection and audit of the fire protection and loss prevention program shall be performed by non-licensee personnel at least once per 36 months.The personnel may be representatives of NELPIA, an insurance brokerage firm, or other qualified individuals.
COMPOSITION 6.5.1.2ThePORCshallbecomposedoftheChairman:
Any other area of facility operation considexed appro-priate by the NSARB ox the Vice President, Electric and Steam Production.
Member:Member:Member:Member:Member:Member:Member:Member:Member:l"StationSuperintendent ResultsandTestSupervisor Assistant Superintendent Operations EngineerMaintenance EngineerTechnical EngineerNuclearEngineerSupervisor Chemistry andHealthPhysicsQualityControlEngineerInstrument andControlSupervisor ALTERNATES 6.5.1.3Alternate membersshallbedesignated byname,inwriting,bytheChairman.
AUTHORITY 6.5.2.9 a~The chairman of the Nuclear Safety Audit and Review Board is responsible to the Executive Vice Pxesident on all activities for which the review board is responsible.
MEETINGFREQUENCY 6.5.1.4ThePORCshallmeetatleastoncepercalendarmonthandasconvenedbythePORCChairman.
b.The NSARB shall report to and advise the Vice President, Electric and Steam Production, on those areas of respon-sibility specified in Sections 6.5.2.7 and 6.5.2.8.RECORDS 6.5.2.10 Records of NSARB activities shall be prepared, approved and distributed as indicated below: 6.5-10 Proposed
QUORUM6.5.1.5AquorumofthePORCshallconsistoftheChairmanandfourmembersincluding alternates.
Nomorethantwoshallbealternates.
6.5-2Proposed AUDITS(Continued) h.1~TheFacilityFireProtection Programandimplementing procedures atleastoncepertwoyears.Anindependent fireprotection andlossprevention pro-graminspection andauditshallbeperfoxmed atleastonceper12monthsutilizing eitherqualified offsitelicenseepersonnel oranoutsidefireprotection firm.Aninspection andauditofthefireprotection andlossprevention programshallbeperformed bynon-licensee personnel atleastonceper36months.Thepersonnel mayberepresentatives ofNELPIA,aninsurance brokerage firm,orotherqualified individuals.
Anyotherareaoffacilityoperation considexed appro-priatebytheNSARBoxtheVicePresident, ElectricandSteamProduction.
AUTHORITY 6.5.2.9a~ThechairmanoftheNuclearSafetyAuditandReviewBoardisresponsible totheExecutive VicePxesident onallactivities forwhichthereviewboardisresponsible.
b.TheNSARBshallreporttoandadvisetheVicePresident, ElectricandSteamProduction, onthoseareasofrespon-sibilityspecified inSections6.5.2.7and6.5.2.8.RECORDS6.5.2.10RecordsofNSARBactivities shallbeprepared, approvedanddistributed asindicated below:6.5-10Proposed


Attachment BSafetyEvaluation Thechangereflectschangesinboththeoffsiteandonsiteorganization atRochester GasandElectricCorporation.
Attachment B Safety Evaluation The change reflects changes in both the offsite and onsite organization at Rochester Gas and Electric Corporation.
ApositionentitledSuperintendent ofNuclearProduction replacesthepositionDivisionSuperintendent, ElectricandSteamProduction intheGinnaoffsitemanagement organization.
A position entitled Superintendent of Nuclear Production replaces the position Division Superintendent, Electric and Steam Production in the Ginna offsite management organization.
Thepositions responsible forcorporate andGinnaStationsecurityarereflected ontheoffsiteorganization chartandotherchangesinthecorporate structure arealsoshown.TheNSARBis'esponsible totheExecu-tiveVicePresident insteadoftheCorporate ChairmanoftheBoard.Thechangesdonotdegradetheoffsitemanagement controlofGinnaStation.AtGinnaStation,apositionofTechnical Engineerhasbeencreatedwithresponsibility forbothplantnuclearengineering andtheresultsandtestgroup.TheTechnical EngineerhasalsobeenaddedtothePlantOperations ReviewCommittee (PORC)member-ship.ThepositionofResultsandTestEngineerhasbeenreplacedbyResultsandTestSupervisor.
The positions responsible for corporate and Ginna Station security are reflected on the offsite organization chart and other changes in the corporate structure are also shown.The NSARB is'esponsible to the Execu-tive Vice President instead of the Corporate Chairman of the Board.The changes do not degrade the offsite management control of Ginna Station.At Ginna Station, a position of Technical Engineer has been created with responsibility for both plant nuclear engineering and the results and test group.The Technical Engineer has also been added to the Plant Operations Review Committee (PORC)member-ship.The position of Results and Test Engineer has been replaced by Results and Test Supervisor.
ThepositionofFireProtection andSafetyCoordinator hasbeenaddedtotheplantorganization chart.Thispositionisresponsible foronsitefireprotection measures.
The position of Fire Protection and Safety Coordinator has been added to the plant organization chart.This position is responsible for onsite fire protection measures.The Office Supervisor no longer has responsibility for Ginna Station security and the position has therefore been deleted from the organization chart.Security responsibilities are reflected on the offsite organization chart instead.The changes in the onsite organization chart do not degrade the Ginna Station organization.
TheOfficeSupervisor nolongerhasresponsibility forGinnaStationsecurityandthepositionhastherefore beendeletedfromtheorganization chart.Securityresponsibilities arereflected ontheoffsiteorganization chartinstead.Thechangesintheonsiteorganization chartdonotdegradetheGinnaStationorganization.
Attachment C Fee Determination The proposed Technical Specification change is administrative in nature and has no safety or environmental significance.
Attachment CFeeDetermination TheproposedTechnical Specification changeisadministrative innatureandhasnosafetyorenvironmental significance.
It therefore falls within Class II as defined in 10 CFR Section 170.22 with a fee of 91200.00.}}
Ittherefore fallswithinClassIIasdefinedin10CFRSection170.22withafeeof91200.00.}}

Revision as of 16:14, 7 July 2018

Application for Amend to License DPR-18,changing Tech Specs to Reflect Revised Organizational Structure.Safety Evaluation & Fee Determination Encl
ML17244A174
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/11/1978
From: WHITE L D
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17244A173 List:
References
NUDOCS 7810180150
Download: ML17244A174 (16)


Text

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of))ROCHESTER GAS AND ELECTRIC)CORPORATION

)(R.E.Ginna Nuclear Power)Station, Unit No.1))Docket No.50-244 CERTIFICATE OF SERVICE l hereby decertify that I have served a document entitled"Application for Amendment to Operating License: with three (3)documents,.

Attachments A, B and C, attached thereto, by mailing copies thereof first class, postage pre-paid, to each of the following persons this 16th day of October, 1978: Mr.Michael L.Slade 1250 Crown Point Drive Webster, New York 14580 Warren B.Rosenbaum, Esquire One Main Street 707 Wilder Building Rochester, New York 14614 Edward G.Ketchen, Esquire Office of the Executive Legal Director U.S.Nuclear Regulatory Commission Washington, D.C.20555 Mr.Robert N.Pinkney Supervisor Town of Ontario 107 Ridge Road West Ontario, New York 14519 Jeffrey L.Cohen, Esquire New York State Energy Office Swan Street Building Core 1, Second Floor Empire State Plaza Albany, New York 12223 Edward Luton, Esquire Atomic Safety and Licensing Board U.S.Nuclear Regulatory Commission Washington, D.C.20555 Dr.Emmeth A.Luebke Atomic Safety and Licensing Board U.S.Nuclear Regulatory Commission Washington, D.C.20555 Dr.Dixon Callihan Union Carbide Corporation P.O.Box Y Oak Ridge, Tennessee 37830 L.Larson LeBoeuf, Lamb, Leiby G MacRae Attorneys for Rochester Gas and Electric Corporation UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Rochester Gas and Electric Corporation (R.E.Ginna Nuclear Power Plant, Unit No.1))))Docket No.50-244))APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to.Section 50.90 of the regulations of the U.S.Nuclear Regulatory Commission (the"Commission"), Rochester Gas and Electric Corporation

("RGSE"), holder of Provisional Operating License No.DPR-18, hereby requests that the Technical Specifica-tions set forth in Appendix A to that License be amended to revise the organization as shown in Figures 6.2-1 and 6.2-2 and the PORC membership.

This request, for a change in the Technical Specifications is submitted as a result of changes in the RGGE organization.

The proposed technical specification change is set forth in Attachment A to this Application.

A safety evaluation is set forth in Attachment B.This evaluation also demonstrates that the proposed change does not.involve a significant change in the types or a significant increase in the amounts of effluents or any change in the authorized power level of the facility.Justi-fication for classification of the amendment pursuant to 10 CFR Section 170.22 is included as Attachment C.A check for the appropriate fee accompanies this Application.

WHEREFORE, Applicant respectfully requests that Appendix A to Provisional Operating License No.DPR-18 be amended in the form attached hereto as Attachment A.Rochester Gas and Electric Corporation By L.D.White, Jr.Vice President Electric and Steam Production Subscribed and sworn to before me on this/~@day of October 1978/GARY L'REISS NOTARY PUBLIC, State of N.Y.Monroe Co.My Commission Expires March 30, 19..$P' t J W Attachment A Proposed Technical Specifications 1.Replace pages 6.2-2, 6.2-3, 6.5-2, and 6.5-10 arith the enclosed revised pages.

't 4 I CHAIRNAN OF THE BOARD SUPERVISIOM AND AUNINISTRATI4AV OTHER FUNCTIIHIAL RELATIONSHIPS

~RESPONSIBLE FOR PIRE PROTECTION PROCRAN PRESIDENT EXECUTIVE VICE PRESIDENT V P NARKETINC RCHASINCg PUBLIC INFOILNATI OH DISTRICTS V P ELECTRIC TRANSPORTATIOM DISTRIBUTION t VTILISATI044 V.P ELECTRIC SYSTEM PIANMING AND OPERATION VICE PRESIDENT ELECTRIC I STEAN PRODUCTION

  • VICE PRESIDENT RATES 4 C4PI'T AFFAIRS PURCHAS INC AC ENT DIV SUPT.g ELECT.TRANS~~DIST.~c UTIL.DIV SUPT ELFC SYSTEM PLAtUiINC 4 OPERATION CHIEF ENGINEER SUPERINTENDENT NUCLEAR PRDDUCTION SUPT.~ELECTRIC NETER I IAB ASSISTANT CHIEF ENGINEER ENGINEERINC I CONSTRUCTION ASST, CHIEF ENGINEER SUPERINTENDENT Clh'CA STATIO'4 I I L MANAGER OP SECURITY NANACERS DESICN K CONSTR.SUPERINTENDENT GENERAL MAINTENANCE FORAGER QUALITY ASSURANCE ASSISTANT SUPERINTENDENT STAI'F ASSISTANT SEC DEPT CINNA PURCHASING ELECTRIC HETER C LAB STAFI'UEL RAVAGEMENT DESIGN S CONSTR.EhC INEERS RECORDS~DOCUMENT GENERAL C4NTROL, DRAFT INC NAlhTENANCE AND TRAININC STAFF QUALITY CONTROL QUALITY ASSURANCE STAFF QUALITY COKT ROI, PLANT OPERAT14N4S STAFF TRAIN INC COO RD.CINNA STATION SECURITY ORCANIEAT ION Figure 6.2-2 t J ol ROCHESTER CAS AND ELECTRIC CORPORATION CINNA STATION ORCJQllSAtlON SUPERINTENDENT tRAINI NC COORDINATOR ASSISTANT SUPERINTENDENT ENClNEER IS)Ch bD I 4)SUPERVISOR CHENI SPRY AND HEALTH PHYSICS OPERATIONS ENGINEER FIRE PROTECTION AND SAFETY COORD.NA INTENANCE ENGINEER TECHNICAL ENC INSTR QUALITY CONTROL ENC INTER HEALTH PHYSICIST OPERATIONS SVPERVI SON NAINTENANCE SUPERVISOR I AC SUPERVISOR NICLEAR ENCINEER RESVLts I TEST SUPERVISOR ENCINEER CHENI SPRY TECHNICIhlS RADIATION PROTECTION TEC)$ICI ASS SHIFT PORuuTSOL I/SHIFT NAINIENANCE FORERAN INSTRVNENT I CONTROL FORERAN TECHNICIAN(S)

TECHNICIAN (S)ROIOL OPERATOR)/SHIIT FITTERS NECNA.'I ICS ELECTRICIÃIS NANDYNEN STOCXXEEPER TECHNICIANS I REPAIIP)EN 0 0 lA 8 P CONTROL OPERATOR I/SHIFT SOL SENIOR OPERAtOR LICENSE OL OPERATOR LICENSE AUXILIARY OPERATOR 2/SH IFT Figure 6.2-2 A

COMPOSITION 6.5.1.2 The PORC shall be composed of the Chairman: Member: Member: Member: Member: Member: Member: Member: Member: Member: l" Station Superintendent Results and Test Supervisor Assistant Superintendent Operations Engineer Maintenance Engineer Technical Engineer Nuclear Engineer Supervisor Chemistry and Health Physics Quality Control Engineer Instrument and Control Supervisor ALTERNATES 6.5.1.3 Alternate members shall be designated by name, in writing, by the Chairman.MEETING FREQUENCY 6.5.1.4 The PORC shall meet at least once per calendar month and as convened by the PORC Chairman.QUORUM 6.5.1.5 A quorum of the PORC shall consist of the Chairman and four members including alternates.

No more than two shall be alternates.

6.5-2 Proposed AUDITS (Continued) h.1~The Facility Fire Protection Program and implementing procedures at least once per two years.An independent fire protection and loss prevention pro-gram inspection and audit shall be perfoxmed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.An inspection and audit of the fire protection and loss prevention program shall be performed by non-licensee personnel at least once per 36 months.The personnel may be representatives of NELPIA, an insurance brokerage firm, or other qualified individuals.

Any other area of facility operation considexed appro-priate by the NSARB ox the Vice President, Electric and Steam Production.

AUTHORITY 6.5.2.9 a~The chairman of the Nuclear Safety Audit and Review Board is responsible to the Executive Vice Pxesident on all activities for which the review board is responsible.

b.The NSARB shall report to and advise the Vice President, Electric and Steam Production, on those areas of respon-sibility specified in Sections 6.5.2.7 and 6.5.2.8.RECORDS 6.5.2.10 Records of NSARB activities shall be prepared, approved and distributed as indicated below: 6.5-10 Proposed

Attachment B Safety Evaluation The change reflects changes in both the offsite and onsite organization at Rochester Gas and Electric Corporation.

A position entitled Superintendent of Nuclear Production replaces the position Division Superintendent, Electric and Steam Production in the Ginna offsite management organization.

The positions responsible for corporate and Ginna Station security are reflected on the offsite organization chart and other changes in the corporate structure are also shown.The NSARB is'esponsible to the Execu-tive Vice President instead of the Corporate Chairman of the Board.The changes do not degrade the offsite management control of Ginna Station.At Ginna Station, a position of Technical Engineer has been created with responsibility for both plant nuclear engineering and the results and test group.The Technical Engineer has also been added to the Plant Operations Review Committee (PORC)member-ship.The position of Results and Test Engineer has been replaced by Results and Test Supervisor.

The position of Fire Protection and Safety Coordinator has been added to the plant organization chart.This position is responsible for onsite fire protection measures.The Office Supervisor no longer has responsibility for Ginna Station security and the position has therefore been deleted from the organization chart.Security responsibilities are reflected on the offsite organization chart instead.The changes in the onsite organization chart do not degrade the Ginna Station organization.

Attachment C Fee Determination The proposed Technical Specification change is administrative in nature and has no safety or environmental significance.

It therefore falls within Class II as defined in 10 CFR Section 170.22 with a fee of 91200.00.