{{#Wiki_filter:May 15, 2015 EA-15-020 | {{#Wiki_filter:May 15, 2015 | ||
EA-15-020 | |||
Lou Cortopassi, Vice President | Lou Cortopassi, Vice President | ||
and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 | |||
and Chief Nuclear Officer Omaha Public Power District | |||
Fort Calhoun Station FC-2-4 | |||
P.O. Box 550 | P.O. Box 550 | ||
Fort Calhoun, NE 68023-0550 | Fort Calhoun, NE 68023-0550 | ||
SUBJECT: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT 05000285/2015010 | |||
SUBJECT: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT 05000285/2015010 | |||
Dear Mr. Cortopassi: | Dear Mr. Cortopassi: | ||
Thank you for your letter, dated April 23, 2015 (ML15113B248), in which you responded to NRC Inspection Report 05000285/2015010 and Notice of Violation, dated March 30, 2015 (ML15089A393). The violation involved the failure to: | Thank you for your letter, dated April 23, 2015 (ML15113B248), in which you responded to NRC Inspection Report 05000285/2015010 and Notice of Violation, dated March 30, 2015 (ML15089A393). The violation involved the failure to: | ||
* provide information to the Commission required by statute or Commission regulation, order or license condition that was complete and accurate in all material respects * conduct a medical examination of an applicant/licensed operator using guidance in American National Standards Institute/American Nuclear Society (ANSI/ANS) Standard 3.4-1996, "Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants" * test for the ability to detect products of combustion by provocation testing per ANSI/ANS Standard 3.4-1996, "Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants" | |||
* provide information to the Commission required by statute or Commission regulation, order or license condition that was complete and accurate in all material respects | |||
* conduct a medical examination of an applicant/licensed operator using guidance in American National Standards Institute/American Nuclear Society (ANSI/ANS) Standard 3.4-1996, "Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants" | |||
* test for the ability to detect products of combustion by provocation testing per ANSI/ANS Standard 3.4-1996, "Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants" | |||
After reviewing the information you provided in your response to the Notice of Violation and in the additional supplemental information provided, we have concluded that your completed and proposed actions appear to adequately address the regulatory noncompliances described in the | After reviewing the information you provided in your response to the Notice of Violation and in the additional supplemental information provided, we have concluded that your completed and proposed actions appear to adequately address the regulatory noncompliances described in the | ||
Notice of Violation. We will review your implementation of these corrective actions during a | Notice of Violation. We will review your implementation of these corrective actions during a | ||
future inspection to determine whether full compliance has been restored and whether | future inspection to determine whether full compliance has been restored and whether | ||
compliance will be maintained. UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 | compliance will be maintained. | ||
L. Coropassi - 2 - | UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC | L. Coropassi - 2 - | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for | |||
public inspection in the NRC Pub | |||
lic Document Room or from | |||
the NRC's Agencywide Documents Access Management | |||
System (ADAMS), accessible from the | |||
NRC Web site at http://www.nrc.gov/reading-rm/adams.html | |||
. Sincerely, | |||
/RA/ | /RA/ | ||
Vincent G. Gaddy, Chief | Vincent G. Gaddy, Chief | ||
Operations Branch Division of Reactor Safety | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket No. 50-285 | Docket No. 50-285 | ||
License No. DPR-40 | License No. DPR-40 | ||
cc: Electronic Distribution for Fort Calhoun Station | cc: Electronic Distribution for Fort Calhoun Station | ||
ML15135A119 | ML15135A119 | ||
SUNSI Review By: TBuchanan | |||
ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE OE:OB C:OB NAME TBuchanan VGaddy SIGNATURE /RA/ VGG for /RA/ DATE 5/15/15 5/15/15 | |||
Letter to Lou Cortopassi from Vincent G. Gaddy, dated May 15, 2015 | Letter to Lou Cortopassi from Vincent G. Gaddy, dated May 15, 2015 | ||
SUBJECT: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT 05000285/2015010 | |||
DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov) | SUBJECT: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT 05000285/2015010 | ||
DISTRIBUTION | |||
: Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) | ||
DRS Director (Anton.Vegel@nrc.gov) | DRS Director (Anton.Vegel@nrc.gov) | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | DRS Deputy Director (Jeff.Clark@nrc.gov) | ||
Senior Resident Inspector (Max.Schneider@nrc.gov) Resident Inspector (Brian.Cummings@nrc.gov) FCS Site Administrative Assistant (Janise.Schwee@nrc.gov) | Senior Resident Inspector (Max.Schneider@nrc.gov) | ||
Resident Inspector (Brian.Cummings@nrc.gov) FCS Site Administrative Assistant (Janise.Schwee@nrc.gov) | |||
Branch Chief, DRP/D (Goeff.Miller@nrc.gov) | Branch Chief, DRP/D (Goeff.Miller@nrc.gov) | ||
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov) | Senior Project Engineer, DRP (Bob.Hagar@nrc.gov) | ||
Line 57: | Line 89: | ||
RIV Public Affairs Officer (Lara.Uselding@nrc.gov) | RIV Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
NRR Project Manager (Fred.Lyon@nrc.gov) | NRR Project Manager (Fred.Lyon@nrc.gov) | ||
Team Leader, DRS/TSS (Don.Allen@nrc.gov | Team Leader, DRS/TSS (Don.Allen@nrc.gov | ||
RIV RITS Coordinator (Marisa.Herrera@nrc.gov) RIV Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) | RIV RITS Coordinator (Marisa.Herrera@nrc.gov) RIV Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ||
Line 62: | Line 95: | ||
OEWebResource@nrc.gov | OEWebResource@nrc.gov | ||
OEWEB Resource (Sue.Bogle@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov) | OEWEB Resource (Sue.Bogle@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov) | ||
RIV RSLO (Bill.Maier@nrc.gov) | RIV RSLO (Bill.Maier@nrc.gov) | ||
ACES (R4Enforcement.Resource@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
}} | }} |
Revision as of 00:10, 1 July 2018
ML15135A119 | |
Person / Time | |
---|---|
Site: | Fort Calhoun |
Issue date: | 05/15/2015 |
From: | Vincent Gaddy Operations Branch IV |
To: | Cortopassi L Omaha Public Power District |
References | |
EA-15-020 IR2015010 | |
Download: ML15135A119 (3) | |
See also: IR 05000285/2015010
Text
May 15, 2015
Lou Cortopassi, Vice President
and Chief Nuclear Officer Omaha Public Power District
Fort Calhoun Station FC-2-4
P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT 05000285/2015010
Dear Mr. Cortopassi:
Thank you for your letter, dated April 23, 2015 (ML15113B248), in which you responded to NRC Inspection Report 05000285/2015010 and Notice of Violation, dated March 30, 2015 (ML15089A393). The violation involved the failure to:
- provide information to the Commission required by statute or Commission regulation, order or license condition that was complete and accurate in all material respects
- conduct a medical examination of an applicant/licensed operator using guidance in American National Standards Institute/American Nuclear Society (ANSI/ANS) Standard 3.4-1996, "Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants"
- test for the ability to detect products of combustion by provocation testing per ANSI/ANS Standard 3.4-1996, "Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants"
After reviewing the information you provided in your response to the Notice of Violation and in the additional supplemental information provided, we have concluded that your completed and proposed actions appear to adequately address the regulatory noncompliances described in the
Notice of Violation. We will review your implementation of these corrective actions during a
future inspection to determine whether full compliance has been restored and whether
compliance will be maintained.
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511
L. Coropassi - 2 -
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for
public inspection in the NRC Pub
lic Document Room or from
the NRC's Agencywide Documents Access Management
System (ADAMS), accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html
. Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket No. 50-285
License No. DPR-40
cc: Electronic Distribution for Fort Calhoun Station
SUNSI Review By: TBuchanan
ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE OE:OB C:OB NAME TBuchanan VGaddy SIGNATURE /RA/ VGG for /RA/ DATE 5/15/15 5/15/15
Letter to Lou Cortopassi from Vincent G. Gaddy, dated May 15, 2015
SUBJECT: RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT 05000285/2015010
DISTRIBUTION
- Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Resident Inspector (Brian.Cummings@nrc.gov) FCS Site Administrative Assistant (Janise.Schwee@nrc.gov)
Branch Chief, DRP/D (Goeff.Miller@nrc.gov)
Senior Project Engineer, DRP (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov) Project Engineer, DRP/D (Jan.Tice@nrc.gov) RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
NRR Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/TSS (Don.Allen@nrc.gov
RIV RITS Coordinator (Marisa.Herrera@nrc.gov) RIV Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
OEWebResource@nrc.gov
OEWEB Resource (Sue.Bogle@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)