ENS 58036: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 21: Line 21:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
Limiting conditions for operation 3.5.1 and 3.6.1.3 were entered to address HPCI inoperable. The site remains on normal offsite power, and all emergency diesel generators remain available.
Limiting conditions for operation 3.5.1 and 3.6.1.3 were entered to address HPCI inoperable. The site remains on normal offsite power, and all emergency diesel generators remain available.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251113en.html#en58036
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251114en.html#en58036
}}{{unit info
}}{{unit info
| Unit = 2
| Unit = 2

Latest revision as of 07:20, 14 November 2025

ENS 58036 +/-
Where
Fermi DTE Energy icon.png
Michigan (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
Time - Person (Reporting Time:+1.4 h0.0583 days <br />0.00833 weeks <br />0.00192 months <br />)
Opened: Jeffrey Myers
19:14 Nov 12, 2025
NRC Officer: Ian Howard
Last Updated: Nov 12, 2025
58036 - NRC Website
Loading map...