ENS 58002: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 21: | Line 21: | ||
Operations responded using the emergency operating procedure for reactor pressure vessel control and stabilized the plant in mode 3. Decay heat is being removed by discharging steam to the main condenser using the turbine bypass valves, which have a separate EHC oil system. | Operations responded using the emergency operating procedure for reactor pressure vessel control and stabilized the plant in mode 3. Decay heat is being removed by discharging steam to the main condenser using the turbine bypass valves, which have a separate EHC oil system. | ||
There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. | There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251024en.html#en58002 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 1 | | Unit = 1 | ||
Latest revision as of 06:20, 24 October 2025
| Where | |
|---|---|
| Clinton Illinois (NRC Region 3) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
| Time - Person (Reporting Time:+-1.63 h-0.0679 days <br />-0.0097 weeks <br />-0.00223 months <br />) | |
| Opened: | Pat Bulpitt 18:57 Oct 22, 2025 |
| NRC Officer: | Josue Ramirez |
| Last Updated: | Oct 22, 2025 |
| 58002 - NRC Website
| |