{{#Wiki_filter:JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.A Job Position                                           No.                        Revision Nuclear Supervising Operator                           NRC EXAM 2003-301-B1.a           1 JPM Title                                             Duration            Page Feeding Reactor Vessel with SBFW during Reactor           15 Minutes      COVER SHEET Vessel Low Level (Alternate Path)
{{#Wiki_filter:JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.A Job Position Nuclear Supervising Operator No.
Examinee:                                                           SRO / RO Evaluator:
NRC EXAM 2003-301-B1.a Revision 1
Evaluation Method:       Perform / Simulator                       Start Time Stop Time Total Time PERFORMANCE EVALUATION Element     S     U     Comments               Element     S     U     Comments 1.
JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)
Duration 15 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:
Evaluation Method:
Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
U Comments Element S
U Comments 1.
2.
2.
* 3.
* 3.
Line 26: Line 31:
6.
6.
7.
7.
______ SATISFACTORY                             ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY
Question #   S     U     Comments               Question #   S     U     Comments
______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY                             ______ UNSATISFACTORY Evaluator Signature / Date:                                     /
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                             No.: NRC EXAM 2003-301-B1.a Feeding Reactor Vessel with SBFW during Reactor                      Revision: 1 Vessel Low Level (Alternate Path)                                    Page 2
JOB PERFORMANCE MEASURE JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)
No.: NRC EXAM 2003-301-B1.a Revision: 1 Page 2


==References:==
==References:==
Line 37: Line 50:
Tools and Equipment Required:
Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                   X           Walkthrough                         Discuss Plant                                 Simulator               X         Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
Start this JPM at the CRS Desk in the Simulator.
Start this JPM at the CRS Desk in the Simulator.
K/A Reference :
K/A Reference :
2.1       Generic Knowledge and Abilities:
2.1 Generic Knowledge and Abilities:
2.1.17 Ability to make accurate, clear, and concise verbal reports.                 3.5 / 3.6 2.1.20 Ability to execute procedure steps.                                         4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.                     3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.
2.1.17 Ability to make accurate, clear, and concise verbal reports.
3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.           3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls                                                               3.2 / 3.3 295031 Reactor Low Water Level EA1. Ability to operate and/or monitor the following as they apply to reactor low water level (CFR: 41.7 / 45.6):
3.5 / 3.6 2.1.20 Ability to execute procedure steps.
EA1.08 Alternate injection systems                                                 3.8 / 3.9 Task Standard:
4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.
3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.
3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.
3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls 3.2 / 3.3 295031 Reactor Low Water Level EA1. Ability to operate and/or monitor the following as they apply to reactor low water level (CFR: 41.7 / 45.6):
EA1.08 Alternate injection systems 3.8 / 3.9 Task Standard:
It is realized that SBFW Pump A(B) is unable to inject to the vessel with the Keylock Mode Select Switch in the TEST position, reposition the Keylock Mode Select Switch and successfully inject to the RPV to restore RPV level to 173 to 214 inches.
It is realized that SBFW Pump A(B) is unable to inject to the vessel with the Keylock Mode Select Switch in the TEST position, reposition the Keylock Mode Select Switch and successfully inject to the RPV to restore RPV level to 173 to 214 inches.
Initial Conditions:
Initial Conditions:
Line 53: Line 72:
The CRS has directed you to feed the RPV with Standby Feedwater and restore RPV level to 173 to 214 inches The system is in Standby, IAW 23.107.01 section 5.0.
The CRS has directed you to feed the RPV with Standby Feedwater and restore RPV level to 173 to 214 inches The system is in Standby, IAW 23.107.01 section 5.0.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.a Feeding Reactor Vessel with SBFW during Reactor                Revision: 1 Vessel Low Level (Alternate Path)                              Page 3 PERFORMANCE EVALUATION Time Start Elements                                           Standards NOTE: All controls and indications are located       NOTE: The operator may Recognize and on H11-P601 unless otherwise                        report to CRS the Keylock Mode Select specified.                                          Switch in TEST and request CRS concurrence to place in NORMAL prior to start of the procedure.
JOB PERFORMANCE MEASURE JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)
No.: NRC EXAM 2003-301-B1.a Revision: 1 Page 3 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located on H11-P601 unless otherwise specified.
NOTE: The operator may Recognize and report to CRS the Keylock Mode Select Switch in TEST and request CRS concurrence to place in NORMAL prior to start of the procedure.
NOTE: The operator may perform feeding of the RPV with Standby Feedwater from memory in accordance with Operations Department Expectation (ODE) 10, Emergency Operating Procedure Expectations.
NOTE: The operator may perform feeding of the RPV with Standby Feedwater from memory in accordance with Operations Department Expectation (ODE) 10, Emergency Operating Procedure Expectations.
PREREQUSITES: NONE 6.2.1   Start N2103-C003A (B), West (East)           6.2.1 Starts N2103-C003A (B), West (East)
PREREQUSITES: NONE 6.2.1 Start N2103-C003A (B), West (East)
Pump A (B) Aux Lube Oil Pump, if                    Pump A (B) Aux Lube Oil Pump, if available.                                          available.
Pump A (B) Aux Lube Oil Pump, if available.
6.2.2   If Lube Oil Pump is running, dispatch an     NOTE: This Step can be ommitted.
6.2.1 Starts N2103-C003A (B), West (East)
operator to verify lube oil pressure and flow as follows:
Pump A (B) Aux Lube Oil Pump, if available.
6.2.2 If Lube Oil Pump is running, dispatch an operator to verify lube oil pressure and flow as follows:
: 1. Lube oil pressure on N21-RA04 (RA03), SBFW Pump A (B) Lube Oil Supply Press Indicator, is greater than 15 psig.
: 1. Lube oil pressure on N21-RA04 (RA03), SBFW Pump A (B) Lube Oil Supply Press Indicator, is greater than 15 psig.
: 2. There is oil flow through all four bull's eye flow indicators (two on pump and two on motor).
: 2. There is oil flow through all four bull's eye flow indicators (two on pump and two on motor).
NOTE: If SBFW pumps are needed for vessel inventory and Aux Lube Oil Pump is running, Step 6.2.2 can be omitted without damage to the SBFW Pump CUE:   IF ASKED 6.2.2.1 Press>15psig 6.2.2.2 Flow through all four bulls eyes
NOTE: If SBFW pumps are needed for vessel inventory and Aux Lube Oil Pump is running, Step 6.2.2 can be omitted without damage to the SBFW Pump CUE:
  *6.2.3 Start N2103-C001 (2), West (East)           *6.2.3 Starts N2103-C001 (2), West (East)
IF ASKED 6.2.2.1 Press>15psig 6.2.2.2 Flow through all four bulls eyes NOTE: This Step can be ommitted.
Standby Feedwater Pump A (B).                      Standby Feedwater Pump A (B).
*6.2.3 Start N2103-C001 (2), West (East)
Standby Feedwater Pump A (B).
*6.2.3 Starts N2103-C001 (2), West (East)
Standby Feedwater Pump A (B).


JOB PERFORMANCE MEASURE JPM Title                                                         No.: NRC EXAM 2003-301-B1.a Feeding Reactor Vessel with SBFW during Reactor                  Revision: 1 Vessel Low Level (Alternate Path)                                Page 4 Elements                                           Standards
JOB PERFORMANCE MEASURE JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)
  *6.2.4   Verify the following:                       *6.2.4 Recognize and report to CRS, N2103-
No.: NRC EXAM 2003-301-B1.a Revision: 1 Page 4 Elements Standards
: 1. N2103-F001, SBFW Disch To RPV                   F001 did not Open.
*6.2.4 Verify the following:
Iso Valve, automatically opens (first           Place Keylock Mode Select Switch in pump).                                          NORMAL with CRS concurrence.
1.
: 2. If running, N2103-C003A (B), West (East) Pump A (B) Aux Lube Oil                 Verify N2103-F001 Opens.
N2103-F001, SBFW Disch To RPV Iso Valve, automatically opens (first pump).
Pump, automatically stops.
2.
: 3. Lube oil pressure on N21-RA04 (RA03), SBFW Pump A (B) Lube Oil Supply Press Indicator, is greater than 15 psig.
If running, N2103-C003A (B), West (East) Pump A (B) Aux Lube Oil Pump, automatically stops.
: 4. There is oil flow through all four bull's eye flow indicators (two on pump and two on CUE:     IF ASKED:
3.
Lube oil pressure on N21-RA04 (RA03), SBFW Pump A (B) Lube Oil Supply Press Indicator, is greater than 15 psig.
4.
There is oil flow through all four bull's eye flow indicators (two on pump and two on CUE:
IF ASKED:
6.2.2.1 Press>15psig 6.2.2.2 Flow through all four bulls eyes
6.2.2.1 Press>15psig 6.2.2.2 Flow through all four bulls eyes
  *6.2.5   Throttle N2103-F003, SBFW 4" Disch           6.2.5  RPV level restored to 173 to 214 inches Flow Ctrl Vlv, to restore RPV level 173 to 214 inches.
*6.2.4 Recognize and report to CRS, N2103-F001 did not Open.
6.2.6   If more flow is desired, repeat Steps 6.2.1 6.2.6 If more flow is desired, repeat Steps 6.2.1 through 6.2.5 for the second SBFW                   through 6.2.5 for the second SBFW Pump.                                              Pump.
Place Keylock Mode Select Switch in NORMAL with CRS concurrence.
6.2.7   If more flow is necessary, throttle open     6.2.7 If more flow is necessary, throttle open N2103-F002, SBFW 6" Disch Flow Ctrl                 N2103-F002, SBFW 6" Disch Flow Ctrl Vlv, to achieve desired flow.                      Vlv, to achieve desired flow.
Verify N2103-F001 Opens.
*6.2.5 Throttle N2103-F003, SBFW 4" Disch Flow Ctrl Vlv, to restore RPV level 173 to 214 inches.
6.2.5 RPV level restored to 173 to 214 inches 6.2.6 If more flow is desired, repeat Steps 6.2.1 through 6.2.5 for the second SBFW Pump.
6.2.6 If more flow is desired, repeat Steps 6.2.1 through 6.2.5 for the second SBFW Pump.
6.2.7 If more flow is necessary, throttle open N2103-F002, SBFW 6" Disch Flow Ctrl Vlv, to achieve desired flow.
6.2.7 If more flow is necessary, throttle open N2103-F002, SBFW 6" Disch Flow Ctrl Vlv, to achieve desired flow.
Time Stop
Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):
After correcting position of the F001 Keylock Mode Select Switch, SBFW is injecting to the RPV, and RPV level is restored to 173 to 214 inches
After correcting position of the F001 Keylock Mode Select Switch, SBFW is injecting to the RPV, and RPV level is restored to 173 to 214 inches


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC EXAM 2003-301-B1.a Feeding Reactor Vessel with SBFW during Reactor    Revision: 1 Vessel Low Level (Alternate Path)                  Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)
No.: NRC EXAM 2003-301-B1.a Revision: 1 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
 
JOB PERFORMANCE MEASURE JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)
JOB PERFORMANCE MEASURE JPM Title                                               No.: NRC EXAM 2003-301-B1.a Feeding Reactor Vessel with SBFW during Reactor        Revision: 1 Vessel Low Level (Alternate Path)                      Page 6 Simulator Setup IC#:
No.: NRC EXAM 2003-301-B1.a Revision: 1 Page 6 Simulator Setup IC#:
Any shutdown IC with RPV level at approximately 150 inches Malfunctions:
Any shutdown IC with RPV level at approximately 150 inches Malfunctions:
None Remote Functions:
None Remote Functions:
Line 107: Line 141:
The CRS has directed you to feed the RPV with Standby Feedwater and restore RPV level to 173 to 214 inches The system is in Standby, IAW 23.107.01 section 5.0.
The CRS has directed you to feed the RPV with Standby Feedwater and restore RPV level to 173 to 214 inches The system is in Standby, IAW 23.107.01 section 5.0.


JOB PERFORMANCE MEASURE JPM Title                                                   No.: NRC EXAM 2003-301-B1.b CCHVAC to Chlorine Mode                                      Revision: 1 Page 2 Job Position                                             No.                      Revision Nuclear Supervising Operator                             NRC EXAM 2003-301-B1.b         1 JPM Title                                               Duration          Page Open MSIVs Following an Isolation with Inboard MSIV(s)   20 Minutes       COVER SHEET Failed Closed Examinee:                                                           SRO / RO Evaluator:
JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.
Evaluation Method:     Perform / Simulator                         Start Time Stop Time Total Time PERFORMANCE EVALUATION Element       S   U   Comments                   Element     S     U     Comments
NRC EXAM 2003-301-B1.b Revision 1
  *1.
JPM Title Open MSIVs Following an Isolation with Inboard MSIV(s)
  *2.
Failed Closed Duration 20 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:
  *3.
Evaluation Method:
  *4.
Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
  *5.
U Comments Element S
  *6.
U Comments
  *7
* 1.
  *8
* 2.
  *9
* 3.
  *10
* 4.
  *11
* 5.
______ SATISFACTORY                               ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
* 6.
Question #   S   U   Comments                   Question # S     U     Comments
* 7
______ SATISFACTORY                               ______ UNSATISFACTORY
* 8
* 9
*10
*11
______ SATISFACTORY
______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY


JOB PERFORMANCE MEASURE JPM Title                                       No.: NRC EXAM 2003-301-B1.b CCHVAC to Chlorine Mode                          Revision: 1 Page 3 Evaluator Signature / Date:                           /
JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 3 Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC EXAM 2003-301-B1.b CCHVAC to Chlorine Mode                                            Revision: 1 Page 4
JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 4


==References:==
==References:==
Line 132: Line 179:
Tools and Equipment Required:
Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                   X         Walkthrough                         Discuss Plant                               Simulator                 X         Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
This JPM may be performed in IC-18 with a Reactor Scram Start this JPM at the CRS Desk in the Simulator.
This JPM may be performed in IC-18 with a Reactor Scram Start this JPM at the CRS Desk in the Simulator.
K/A Reference :
K/A Reference :
2.1       Generic Knowledge and Abilities:
2.1 Generic Knowledge and Abilities:
2.1.17 Ability to make accurate, clear, and concise verbal reports.               3.5 / 3.6 2.1.20 Ability to execute procedure steps.                                       4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.                   3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.
2.1.17 Ability to make accurate, clear, and concise verbal reports.
3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.         3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls                                                             3.2 / 3.3 239001 - Main and Reheat Steam:
3.5 / 3.6 2.1.20 Ability to execute procedure steps.
4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.
3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.
3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.
3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls 3.2 / 3.3 239001 - Main and Reheat Steam:
K2 - Knowledge of electrical power supplies to the following: (CFR: 41.7)
K2 - Knowledge of electrical power supplies to the following: (CFR: 41.7)
K2.01 - Main steam isolation valve solenoids                                     3.2 / 3.3 A4 - Ability to manually operate and/or monitor in the control room: (CFR: 41.7 / 45.5 to 45.8)
K2.01 - Main steam isolation valve solenoids 3.2 / 3.3 A4 - Ability to manually operate and/or monitor in the control room: (CFR: 41.7 / 45.5 to 45.8)
A4.01 - MSIVs                                                                     4.2 / 4.0 Task Standard:
A4.01 - MSIVs 4.2 / 4.0 Task Standard:
MSIVs have been opened following an isolation Initial Conditions:
MSIVs have been opened following an isolation Initial Conditions:
The plant has experienced a Reactor Scram.
The plant has experienced a Reactor Scram.
Line 149: Line 202:
The CRS has directed you to open the MSIVs in accordance with 23.137 Prerequisites have been met, and Step 7.1.2.1 and 7.1.2.2 are complete.
The CRS has directed you to open the MSIVs in accordance with 23.137 Prerequisites have been met, and Step 7.1.2.1 and 7.1.2.2 are complete.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B1.b CCHVAC to Chlorine Mode                                        Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements                                         Standards NOTE: All controls and indications are located on COP H11-P601, H11-P602, and H11-P804 unless otherwise specified.
JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located on COP H11-P601, H11-P602, and H11-P804 unless otherwise specified.
NOTE: Per the Cue Sheet, all prerequisites have been met, and Step 7.1.2.1 and 7.1.2.2 are complete.
NOTE: Per the Cue Sheet, all prerequisites have been met, and Step 7.1.2.1 and 7.1.2.2 are complete.
  *7.1.2.3.         Equalize across Main Steam     *7.1.2.3.
*7.1.2.3.
Isolation Valves by performing the               a. Verifies the following 3rd MSIVs are following:                                            open:
Equalize across Main Steam Isolation Valves by performing the following:
: a. Verify the following 3rd MSIVs are
a.
* N1100-F607, 3rd MSIV Line open:                                                    C Iso Vlv
Verify the following 3rd MSIVs are open:
* N1100-F607, 3rd MSIV Line
N1100-F607, 3rd MSIV Line C Iso Vlv N1100-F608, 3rd MSIV Line D Iso Vlv N1100-F609, 3rd MSIV Line A Iso Vlv N1100-F610, 3rd MSIV Line B Iso Vlv
* N1100-F608, 3rd MSIV Line C Iso Vlv                                        D Iso Vlv
*7.1.2.3.
* N1100-F608, 3rd MSIV Line
a.
* N1100-F609, 3rd MSIV Line A D Iso Vlv                                        Iso Vlv
Verifies the following 3rd MSIVs are open:
* N1100-F609, 3rd MSIV Line A
N1100-F607, 3rd MSIV Line C Iso Vlv N1100-F608, 3rd MSIV Line D Iso Vlv N1100-F609, 3rd MSIV Line A Iso Vlv N1100-F610, 3rd MSIV Line B Iso Vlv
* N1100-F610, 3rd MSIV Line B Iso Vlv                                          Iso Vlv
*b. Open the following Outboard MSIVs one at a time:
* N1100-F610, 3rd MSIV Line B Iso Vlv
B2103-F028A, Outboard MSIV Line A B2103-F028B, Outboard MSIV Line B B2103-F028C, Outboard MSIV Line C B2103-F028D, Outboard MSIV Line D
          *b. Open the following Outboard MSIVs             *b. Opens the following Outboard MSIVs one at a time:                                  one at a time:
*b. Opens the following Outboard MSIVs one at a time:
* B2103-F028A, Outboard
B2103-F028A, Outboard MSIV Line A B2103-F028B, Outboard MSIV Line B B2103-F028C, Outboard MSIV Line C B2103-F028D, Outboard MSIV Line D
* B2103-F028A, Outboard MSIV Line A                                      MSIV Line A
*c. Close or verify closed the following valves:
* B2103-F028B, Outboard
P9500-F654, MS Line Drain to Cndr Iso Valve
* B2103-F028B, Outboard MSIV Line B                                      MSIV Line B
* B2100-F033, Main Steam Line Continuous Drain Isolation Valve.
* B2103-F028C, Outboard
B2103-F021, Main Steam Drain Line Orifice Bypass Valve.
* B2103-F028C, Outboard MSIV Line C                                     MSIV Line C
*c. Closes or verifies closed P9500-F654, MS Line Drain to Cndr Iso Valve B2100-F033, Main Steam Line Continuous Drain Isolation Valve.
* B2103-F028D, Outboard
B2103-F021, Main Steam Drain Line Orifice Bypass Valve.
* B2103-F028D, Outboard MSIV Line D                                      MSIV Line D
          *c. Close or verify closed the following         *c. Closes or verifies closed valves:
* P9500-F654, MS Line Drain
* P9500-F654, MS Line Drain                         to Cndr Iso Valve to Cndr Iso Valve
* B2100-F033, Main Steam
* B2100-F033, Main Steam Line                        Line Continuous Drain Continuous Drain Isolation                      Isolation Valve.
Valve.
* B2103-F021, Main Steam
* B2103-F021, Main Steam                             Drain Line Orifice Bypass Drain Line Orifice Bypass                       Valve.
Valve.


JOB PERFORMANCE MEASURE JPM Title                                               No.: NRC EXAM 2003-301-B1.b CCHVAC to Chlorine Mode                                  Revision: 1 Page 6 Elements                                   Standards
JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 6 Elements Standards
        *d. Open the following Main Steam Line       *d. Opens Outboard Drain Valves:
*d. Open the following Main Steam Line Outboard Drain Valves:
* B2100-F080A, Main Steam
B2100-F080A, Main Steam Line A Drain Valve B2100-F080B, Main Steam Line B Drain Valve B2100-F080C, Main Steam Line C Drain Valve B2100-F080D, Main Steam Line D Drain Valve
* B2100-F080A, Main Steam                         Line A Drain Valve Line A Drain Valve
*d. Opens B2100-F080A, Main Steam Line A Drain Valve B2100-F080B, Main Steam Line B Drain Valve B2100-F080C, Main Steam Line C Drain Valve B2100-F080D, Main Steam Line D Drain Valve
* B2100-F080B, Main Steam
*e. To admit steam to Outboard Steam Line Area, open the following valves:
* B2100-F080B, Main Steam                         Line B Drain Valve Line B Drain Valve
B2103-F600, MS Line Otbd Drains Hdr Iso Vlv B2103-F019, MS Line Otbd Drain Iso Valve B2103-F016, MS Line Inbd Drain Iso Valve
* B2100-F080C, Main Steam
*e. Opens the following valves:
* B2100-F080C, Main Steam                         Line C Drain Valve Line C Drain Valve
B2103-F600, MS Line Otbd Drains Hdr Iso Vlv B2103-F019, MS Line Otbd Drain Iso Valve B2103-F016, MS Line Inbd Drain Iso Valve
* B2100-F080D, Main Steam
*f.
* B2100-F080D, Main Steam                        Line D Drain Valve Line D Drain Valve
Close the following valves (COP H11-P804):
        *e. To admit steam to Outboard Steam         *e. Opens the following valves:
P9500-F410, 52 Manifold East Drain Valve P9500-F411, 52 Manifold West Drain Valve N3039-F621, MS to Reheater Line Drain Valve
Line Area, open the following valves:
*f.
* B2103-F600, MS Line Otbd
Closes the following valves (COP H11-P804):
* B2103-F600, MS Line Otbd                       Drains Hdr Iso Vlv Drains Hdr Iso Vlv
P9500-F410, 52 Manifold East Drain Valve P9500-F411, 52 Manifold West Drain Valve N3039-F621, MS to Reheater Line Drain Valve
* B2103-F019, MS Line Otbd
*g. Close or verify closed N3013-F601, Gland Steam Inlet Hdr Iso Vlv.
* B2103-F019, MS Line Otbd                        Drain Iso Valve Drain Iso Valve
*g. Closes or verifies closed N3013-F601, Gland Steam Inlet Hdr Iso Vlv.
* B2103-F016, MS Line Inbd
*h. Determine differential pressure across Inboard MSIVs from the following pressure indicators:
* B2103-F016, MS Line Inbd                        Drain Iso Valve Drain Iso Valve
: 1) If less than 200 psig RPV Pressure, use the following:
        *f. Close the following valves (COP H11-    *f. Closes the following valves P804):                                      (COP H11-P804):
C32-R609, Reactor Pressure Recorder (COP H11-P603).
* P9500-F410, 52 Manifold
B21-R801 (R804), Div 1(2)
* P9500-F410, 52 Manifold East Drain Valve                             East Drain Valve
MSIVLC Line Pressure Indicator (COP H11-P601/P602).
* P9500-F411, 52 Manifold
: 2) If greater than 200 psig RPV Pressure, use the following:
* P9500-F411, 52 Manifold West Drain Valve                             West Drain Valve
C32-R609, Reactor Pressure Recorder (COP H11-P603).
* N3039-F621, MS to Reheater
N11-R800, Main Steam 52 Manifold Pressure Recorder (COP-H11-P804).
* N3039-F621, MS to Reheater Line Drain Valve                            Line Drain Valve
*h.
        *g. Close or verify closed N3013-F601,       *g. Closes or verifies closed N3013-F601, Gland Steam Inlet Hdr Iso Vlv.              Gland Steam Inlet Hdr Iso Vlv.
: 1) If less than 200 psig RPV Pressure, uses the following:
        *h. Determine differential pressure across   *h.
C32-R609, Reactor Pressure Recorder (COP H11-P603).
Inboard MSIVs from the following                 1) If less than 200 psig RPV pressure indicators:                                  Pressure, uses the following:
B21-R801 (R804), Div 1(2)
: 1) If less than 200 psig RPV
MSIVLC Line Pressure Indicator (COP H11-P601/P602).
* C32-R609, Reactor Pressure Pressure, use the following:                Recorder (COP H11-P603).
: 2) If greater than 200 psig RPV Pressure, uses the following:
* C32-R609, Reactor Pressure
C32-R609, Reactor Pressure Recorder (COP H11-P603).
* B21-R801 (R804), Div 1(2)
N11-R800, Main Steam 52 Manifold Pressure Recorder (COP-H11-P804).
Recorder (COP H11-P603).                     MSIVLC Line Pressure
* B21-R801 (R804), Div 1(2)                       Indicator (COP H11-MSIVLC Line Pressure                         P601/P602).
Indicator (COP H11-                     2) If greater than 200 psig RPV P601/P602).                                 Pressure, uses the following:
: 2) If greater than 200 psig RPV
* C32-R609, Reactor Pressure Pressure, use the following:                 Recorder (COP H11-P603).
* C32-R609, Reactor Pressure
* N11-R800, Main Steam 52 Recorder (COP H11-P603).                     Manifold Pressure Recorder
* N11-R800, Main Steam 52                       (COP-H11-P804).
Manifold Pressure Recorder (COP-H11-P804).


JOB PERFORMANCE MEASURE JPM Title                                               No.: NRC EXAM 2003-301-B1.b CCHVAC to Chlorine Mode                                  Revision: 1 Page 7 Elements                                   Standards The maximum allowable differential pressure for opening Main Steam Isolation Valves (MSIVs) is 150 psid. Under all normal operating circumstances, MSIVs should not be opened with a differential pressure greater than 50 psid.
JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 7 Elements Standards The maximum allowable differential pressure for opening Main Steam Isolation Valves (MSIVs) is 150 psid. Under all normal operating circumstances, MSIVs should not be opened with a differential pressure greater than 50 psid.
            *i. When the differential pressure across  *i. When the differential pressure across the Inboard MSIVs is less than or          the Inboard MSIVs is less than or equal to 50 psid, open the following        equal to 50 psid, opens the following Inboard MSIVs, one at a time:              Inboard MSIVs, one at a time:
*i.
* B2103-F022A, Inboard MSIV
When the differential pressure across the Inboard MSIVs is less than or equal to 50 psid, open the following Inboard MSIVs, one at a time:
* B2103-F022A, Inboard MSIV Line A.                                    Line A.
B2103-F022A, Inboard MSIV Line A.
* B2103-F022B, Inboard MSIV
B2103-F022B, Inboard MSIV Line B.
* B2103-F022B, Inboard MSIV Line B.                                     Line B.
B2103-F022C, Inboard MSIV Line C.
* B2103-F022C, Inboard MSIV
B2103-F022D, Inboard MSIV Line D.
* B2103-F022C, Inboard MSIV Line C.                                    Line C.
*i.
* B2103-F022D, Inboard MSIV
When the differential pressure across the Inboard MSIVs is less than or equal to 50 psid, opens the following Inboard MSIVs, one at a time:
* B2103-F022D, Inboard MSIV Line D.                                    Line D.
B2103-F022A, Inboard MSIV Line A.
            *j. Open the following valves:             *j. Opens the following valves:
B2103-F022B, Inboard MSIV Line B.
* B2100-F033, Main Steam
B2103-F022C, Inboard MSIV Line C.
* B2100-F033, Main Steam Line Continuous Drain                       Line Continuous Drain Isolation Valve.                            Isolation Valve.
B2103-F022D, Inboard MSIV Line D.
* P9500-F654, MS Line Drain
*j.
* P9500-F654, MS Line Drain to Cndr Iso Valve.                          to Cndr Iso Valve.
Open the following valves:
* P9500-F410, 52 Manifold
B2100-F033, Main Steam Line Continuous Drain Isolation Valve.
* P9500-F410, 52 Manifold East Drain Valve.                           East Drain Valve.
P9500-F654, MS Line Drain to Cndr Iso Valve.
* P9500-F411, 52 Manifold
P9500-F410, 52 Manifold East Drain Valve.
* P9500-F411, 52 Manifold West Drain Valve.                           West Drain Valve.
P9500-F411, 52 Manifold West Drain Valve.
* N3039-F621, MS to Reheater
N3039-F621, MS to Reheater Line Drain Valve.
* N3039-F621, MS to Reheater Line Drain Valve.                          Line Drain Valve.
*j.
            *k. Close the following Main Steam Line    *k. Closes the following Main Steam Line Drain Valves:                              Drain Valves:
Opens the following valves:
* B2103-F016, MS Line Inbd
B2100-F033, Main Steam Line Continuous Drain Isolation Valve.
* B2103-F016, MS Line Inbd Drain Iso Valve                             Drain Iso Valve
P9500-F654, MS Line Drain to Cndr Iso Valve.
* B2103-F019, MS Line Otbd
P9500-F410, 52 Manifold East Drain Valve.
* B2103-F019, MS Line Otbd Drain Iso Valve                            Drain Iso Valve Time Stop
P9500-F411, 52 Manifold West Drain Valve.
N3039-F621, MS to Reheater Line Drain Valve.
*k. Close the following Main Steam Line Drain Valves:
B2103-F016, MS Line Inbd Drain Iso Valve B2103-F019, MS Line Otbd Drain Iso Valve
*k. Closes the following Main Steam Line Drain Valves:
B2103-F016, MS Line Inbd Drain Iso Valve B2103-F019, MS Line Otbd Drain Iso Valve Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):
MSIVs are open
MSIVs are open


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC EXAM 2003-301-B1.b CCHVAC to Chlorine Mode                            Revision: 1 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
 
JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 9 Simulator Setup IC#:
JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.b CCHVAC to Chlorine Mode                                        Revision: 1 Page 9 Simulator Setup IC#:
IC 18 with Reactor Scram Malfunctions:
IC 18 with Reactor Scram Malfunctions:
None Remote Functions:
None Remote Functions:
Number                                         Title                                         Value (B21) RF10               Condenser vacuum Isolation Logic Bypass Switch 34A                 Bypass (B21) RF10               Condenser vacuum Isolation Logic Bypass Switch 34B                 Bypass (B21) RF10               Condenser vacuum Isolation Logic Bypass Switch 34C                 Bypass (B21) RF10               Condenser vacuum Isolation Logic Bypass Switch 34D                 Bypass Override Functions:
Number Title Value (B21) RF10 Condenser vacuum Isolation Logic Bypass Switch 34A Bypass (B21) RF10 Condenser vacuum Isolation Logic Bypass Switch 34B Bypass (B21) RF10 Condenser vacuum Isolation Logic Bypass Switch 34C Bypass (B21) RF10 Condenser vacuum Isolation Logic Bypass Switch 34D Bypass Override Functions:
None Special Instructions:
None Special Instructions:
Start the simulator in IC 18 Scram the Reactor Close the MSIVs Close N3013-F601, Gland Steam Inlet Hdr Iso Vlv.
Start the simulator in IC 18 Scram the Reactor Close the MSIVs Close N3013-F601, Gland Steam Inlet Hdr Iso Vlv.
Line 279: Line 316:
The CRS has directed you to open the MSIVs in accordance with 23.137 Prerequisites have been met, and Step 7.1.2.1 and 7.1.2.2 are complete.
The CRS has directed you to open the MSIVs in accordance with 23.137 Prerequisites have been met, and Step 7.1.2.1 and 7.1.2.2 are complete.


JOB PERFORMANCE MEASURE JPM Title                                               No.: NRC EXAM 2003-301-B1.c Perform Manual Scram Functional Test                    Revision: 1 Page 2 Job Position                                         No.                        Revision Nuclear Supervising Operator                         NRC EXAM 2003-301-B1.c           1 JPM Title                                           Duration            Page Perform Manual Scram Functional Test                 20 Minutes         COVER SHEET Examinee:                                                         SRO / RO Evaluator:
JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.
Evaluation Method:       Perform / Simulator                     Start Time Stop Time Total Time PERFORMANCE EVALUATION Element     S     U     Comments             Element     S     U     Comments
NRC EXAM 2003-301-B1.c Revision 1
  *1.                                         *14.
JPM Title Perform Manual Scram Functional Test Duration 20 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:
  *2.                                         *15.
Evaluation Method:
  *3.                                         *16.
Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
  *4.                                         *17.
U Comments Element S
  *5.                                         *18.
U Comments
  *6.                                         *19.
* 1.
  *7.                                         *20.
*14.
  *8.                                         *21.
* 2.
  *9.                                           22.
*15.
  *10.
* 3.
  *11.
*16.
  *12.
* 4.
  *13.
*17.
______ SATISFACTORY                           ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
* 5.
Question #   S     U     Comments             Question # S     U     Comments
*18.
______ SATISFACTORY                           ______ UNSATISFACTORY Evaluator Signature / Date:                                   /
* 6.
*19.
* 7.
*20.
* 8.
*21.
* 9.
22.
*10.
*11.
*12.
*13.
______ SATISFACTORY
______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC EXAM 2003-301-B1.c Perform Manual Scram Functional Test                                Revision: 1 Page 3
JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 3


==References:==
==References:==
Line 304: Line 362:
Tools and Equipment Required:
Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                   X           Walkthrough                         Discuss Plant                                 Simulator               X         Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
This JPM may be performed in any IC.
This JPM may be performed in any IC.
Line 310: Line 370:
K/A Reference :
K/A Reference :
212000 Reactor Protection System - K4. Knowledge of REACTOR PROTECTION SYSTEM design feature(s) and/or interlocks which provide for the following (CFR: 41.7):
212000 Reactor Protection System - K4. Knowledge of REACTOR PROTECTION SYSTEM design feature(s) and/or interlocks which provide for the following (CFR: 41.7):
K4.05 - Functional testing of the system while maintaining power operation         3.4 / 3.6 A1. Ability to predict and/or monitor changes in parameters associated with operating the REACTOR PROTECTION SYSTEM controls including (CFR: 41.5 / 45.5):
K4.05 - Functional testing of the system while maintaining power operation 3.4 / 3.6 A1. Ability to predict and/or monitor changes in parameters associated with operating the REACTOR PROTECTION SYSTEM controls including (CFR: 41.5 / 45.5):
A1.11 - System status lights and alarms                                           3.4 / 3.3; A2. Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations (CFR: 41.5 / 45.6):
A1.11 - System status lights and alarms 3.4 / 3.3; A2. Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations (CFR: 41.5 / 45.6):
A2.03 - Surveillance testing                                                     3.3 / 3.5 A2.19 - Partial system activation (half-SCRAM)                                   3.8 / 3.9 A4. Ability to manually operate and/or monitor in the control room (CFR: 41.7 / 45.5 to 45.8):
A2.03 - Surveillance testing 3.3 / 3.5 A2.19 - Partial system activation (half-SCRAM) 3.8 / 3.9 A4. Ability to manually operate and/or monitor in the control room (CFR: 41.7 / 45.5 to 45.8):
A4.02 - Perform system functional test(s)                                         3.6 / 3.7 A4.07 - System status lights and alarms                                           4.0 / 3.9*
A4.02 - Perform system functional test(s) 3.6 / 3.7 A4.07 - System status lights and alarms 4.0 / 3.9*
A4.14 - Reset system following system activation                                 3.8 / 3.8 Task Standard:
A4.14 - Reset system following system activation 3.8 / 3.8 Task Standard:
Perform RPS Manual Scram Functional Test in accordance with 24.610.01 Initial Conditions:
Perform RPS Manual Scram Functional Test in accordance with 24.610.01 Initial Conditions:
You are the Control Room Nuclear Supervising Operator.
You are the Control Room Nuclear Supervising Operator.
Line 322: Line 382:
A Licensed Operator is in the Relay Room standing by to assist.
A Licensed Operator is in the Relay Room standing by to assist.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.c Perform Manual Scram Functional Test                            Revision: 1 Page 4 PERFORMANCE EVALUATION Time Start Elements                                         Standards NOTE: All controls and indications are located on COP H11-P603 unless otherwise noted.
JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 4 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located on COP H11-P603 unless otherwise noted.
PREREQUSITES:
PREREQUSITES:
4.3     Communications have been established between Control Room and an operator stationed at RPS Trip Logic Panel RR H11-P609 and RR H11-P611.
4.3 Communications have been established between Control Room and an operator stationed at RPS Trip Logic Panel RR H11-P609 and RR H11-P611.
NOTE: Simulator Booth Operator will act as the operator in Relay Room. The Booth Operator will be seated at the SOER terminal/printer and will function as both the Relay Room Operator and the SOER verifier.
NOTE: Simulator Booth Operator will act as the operator in Relay Room. The Booth Operator will be seated at the SOER terminal/printer and will function as both the Relay Room Operator and the SOER verifier.
  *5.1.1 Verify following annunciators clear:       *5.1.1 Verifies annunciators clear:
*5.1.1 Verify following annunciators clear:
: 1. 3D73, TRIP ACTUATORS A1/A2                    1. 3D73, TRIP ACTUATORS A1/A2 TRIPPED                                           TRIPPED
1.
: 2. 3D74, TRIP ACTUATORS B1/B2                     2. 3D74, TRIP ACTUATORS B1/B2 TRIPPED                                          TRIPPED
3D73, TRIP ACTUATORS A1/A2 TRIPPED 2.
: 3. 3D77, MANUAL TRIP A SYS TRIP                   3. 3D77, MANUAL TRIP A SYS TRIP
3D74, TRIP ACTUATORS B1/B2 TRIPPED 3.
: 4. 3D78, MANUAL TRIP B SYS TRIP                   4. 3D78, MANUAL TRIP B SYS TRIP
3D77, MANUAL TRIP A SYS TRIP 4.
  *5.1.2 Verify following white scram Group 1, 2, 3, *5.1.2 Verifies white scram Group 1, 2, 3, and 4 and 4 lights are ON:                              lights are ON:
3D78, MANUAL TRIP B SYS TRIP
: 1. RPS "A" on RR H11-P609                         1. RPS "A" on RR H11-P609
*5.1.1 Verifies annunciators clear:
: 2. RPS "B" on RR H11-P611                        2. RPS "B" on RR H11-P611
1.
  *5.1.3 Verify following blue scram GROUP 1, 2, 3, *5.1.3 Verifies blue scram GROUP 1, 2, 3, and 4 and 4 lights on COP H11-P603 are ON:              lights on COP H11-P603 are ON:
3D73, TRIP ACTUATORS A1/A2 TRIPPED 2.
: 1. Pilot Scram Valve Solenoids, Trip              1. Pilot Scram Valve Solenoids, Trip System A                                         System A
3D74, TRIP ACTUATORS B1/B2 TRIPPED 3.
: 2. Pilot Scram Valve Solenoids, Trip             2. Pilot Scram Valve Solenoids, Trip System B                                          System B
3D77, MANUAL TRIP A SYS TRIP 4.
3D78, MANUAL TRIP B SYS TRIP
*5.1.2 Verify following white scram Group 1, 2, 3, and 4 lights are ON:
1.
RPS "A" on RR H11-P609 2.
RPS "B" on RR H11-P611
*5.1.2 Verifies white scram Group 1, 2, 3, and 4 lights are ON:
1.
RPS "A" on RR H11-P609 2.
RPS "B" on RR H11-P611
*5.1.3 Verify following blue scram GROUP 1, 2, 3, and 4 lights on COP H11-P603 are ON:
1.
Pilot Scram Valve Solenoids, Trip System A 2.
Pilot Scram Valve Solenoids, Trip System B
*5.1.3 Verifies blue scram GROUP 1, 2, 3, and 4 lights on COP H11-P603 are ON:
1.
Pilot Scram Valve Solenoids, Trip System A 2.
Pilot Scram Valve Solenoids, Trip System B


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC EXAM 2003-301-B1.c Perform Manual Scram Functional Test                                Revision: 1 Page 5 Elements                                           Standards
JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 5 Elements Standards step will initiate a Half Scram.
                                                      *5.1.4  Depresses Manual Scram Trip A1 pushbutton on COP H11-P603 and step will initiate a Half Scram.                               verifies:
NOTE: Since the Manual Scram trip channel will auto-reset upon return of the A1 pushbutton to its normally closed position, Annunciator 3D77, with its associated SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight will go out when the operator releases the Manual Scram Pushbutton Switch.
NOTE: Since the Manual Scram trip channel will               1. Annunciator 3D77, MANUAL TRIP A auto-reset upon return of the A1                         SYS TRIP, alarms.
*5.1.4 Momentarily depress Manual Scram Trip A1 pushbutton on COP H11-P603 and verify:
pushbutton to its normally closed position,         2. Sequence of Events Recorder Point Annunciator 3D77, with its associated                     013C71, alarms.
1.
SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight               3. Red Manual Scram Trip A1 will go out when the operator releases the               pushbutton light comes ON.
Annunciator 3D77, MANUAL TRIP A SYS TRIP, alarms.
Manual Scram Pushbutton Switch.                      4. White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609
2.
*5.1.4 Momentarily depress Manual Scram Trip A1                    are OFF.
Sequence of Events Recorder Point 013C71, alarms.
pushbutton on COP H11-P603 and verify:
3.
: 5. Blue scram GROUP 1, 2, 3, and 4
Red Manual Scram Trip A1 pushbutton light comes ON.
: 1. Annunciator 3D77, MANUAL TRIP A                        lights for Pilot Scram Valve Solenoids, SYS TRIP, alarms.                                    Trip System A on COP H11-P603 are
4.
: 2. Sequence of Events Recorder Point                     OFF.
White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609 are OFF.
013C71, alarms.
5.
: 3. Red Manual Scram Trip A1 pushbutton light comes ON.
Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are OFF.
: 4. White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609 are OFF.
*5.1.4 Depresses Manual Scram Trip A1 pushbutton on COP H11-P603 and verifies:
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are OFF.
1.
*5.1.5   Place Scram Reset switch to GP1 and         *5.1.5 Places Scram Reset switch to GP1 and GP4 then GP2 and GP3 Position and                   GP4 then GP2 and GP3 Position and release.                                            release.
Annunciator 3D77, MANUAL TRIP A SYS TRIP, alarms.
*5.1.6 Verify the following:                         *5.1.6 Verifies the following:
2.
: 1. Red Manual Scram Trip A1,                        1. Red Manual Scram Trip A1, pushbutton light is OFF.                            pushbutton light is OFF.
Sequence of Events Recorder Point 013C71, alarms.
: 2. Annunciator 3D77, MANUAL TRIP A                   2. Annunciator 3D77, MANUAL TRIP A SYS TRIP, has cleared.                              SYS TRIP, has cleared.
3.
: 3. Sequence of Events Recorder Point                3. Sequence of Events Recorder Point 013C71, has reset.                                  013C71, has reset.
Red Manual Scram Trip A1 pushbutton light comes ON.
: 4. White scram Group 1, 2, 3, and 4                 4. White scram Group 1, 2, 3, and 4 lights for RPS A on RR H11-P609 are                 lights for RPS A on RR H11-P609 are ON.                                                 ON.
4.
: 5. Blue scram GROUP 1, 2, 3, and 4                   5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids,              lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are                   Trip System A on COP H11-P603 are ON.                                                  ON.
White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609 are OFF.
5.
Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are OFF.
*5.1.5 Place Scram Reset switch to GP1 and GP4 then GP2 and GP3 Position and release.
*5.1.5 Places Scram Reset switch to GP1 and GP4 then GP2 and GP3 Position and release.
*5.1.6 Verify the following:
1.
Red Manual Scram Trip A1, pushbutton light is OFF.
2.
Annunciator 3D77, MANUAL TRIP A SYS TRIP, has cleared.
3.
Sequence of Events Recorder Point 013C71, has reset.
4.
White scram Group 1, 2, 3, and 4 lights for RPS A on RR H11-P609 are ON.
5.
Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are ON.
*5.1.6 Verifies the following:
1.
Red Manual Scram Trip A1, pushbutton light is OFF.
2.
Annunciator 3D77, MANUAL TRIP A SYS TRIP, has cleared.
3.
Sequence of Events Recorder Point 013C71, has reset.
4.
White scram Group 1, 2, 3, and 4 lights for RPS A on RR H11-P609 are ON.
5.
Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are ON.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.c Perform Manual Scram Functional Test                            Revision: 1 Page 6 Elements                                           Standards
JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 6 Elements Standards step will initiate a Half Scram.
                                                      *5.1.7 Momentarily depresses Manual Scram Trip A2 pushbutton on COP H11-P603 step will initiate a Half Scram.                             and verifies:
NOTE:Since the Manual Scram trip channel will auto-reset upon return of the A2 pushbutton to its normally closed position, Annunciator 3D77, with its associated SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight will go out when the operator releases the Manual Scram Pushbutton Switch.
NOTE:Since the Manual Scram trip channel will               1. Annunciator 3D77, MANUAL TRIP A auto-reset upon return of the A2                       SYS TRIP, alarms.
*5.1.7 Momentarily depress Manual Scram Trip A2 pushbutton on COP H11-P603 and verify:
pushbutton to its normally closed position,         2. Sequence of Events Recorder Point Annunciator 3D77, with its associated                   011C71, alarms.
1.
SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight               3. Red Manual Scram Trip A2 will go out when the operator releases the             pushbutton light comes ON.
Annunciator 3D77, MANUAL TRIP A SYS TRIP, alarms.
Manual Scram Pushbutton Switch.                    4. White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609
2.
*5.1.7  Momentarily depress Manual Scram Trip                  are OFF.
Sequence of Events Recorder Point 011C71, alarms.
A2 pushbutton on COP H11-P603 and verify:                                            5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids,
3.
: 1. Annunciator 3D77, MANUAL TRIP A                     Trip System A on COP H11-P603 are SYS TRIP, alarms.                                  OFF.
Red Manual Scram Trip A2 pushbutton light comes ON.
: 2. Sequence of Events Recorder Point 011C71, alarms.
4.
: 3. Red Manual Scram Trip A2 pushbutton light comes ON.
White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609 are OFF.
: 4. White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609 are OFF.
5.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are OFF.
Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are OFF.
*5.1.8   Place Scram Reset switch to GP1 and         *5.1.8 Places Scram Reset switch to GP1 and GP4 then GP2 and GP3 Position and                   GP4 then GP2 and GP3 Position and release.                                            releases.
*5.1.7 Momentarily depresses Manual Scram Trip A2 pushbutton on COP H11-P603 and verifies:
*5.1.9   Verify the following:                       *5.1.9 Verifies the following:
1.
: 1. Red Manual Scram Trip A2,                       1. Red Manual Scram Trip A2, pushbutton light is OFF.                          pushbutton light is OFF.
Annunciator 3D77, MANUAL TRIP A SYS TRIP, alarms.
: 2. Annunciator 3D77, MANUAL TRIP A                 2. Annunciator 3D77, MANUAL TRIP A SYS TRIP, has cleared.                            SYS TRIP, has cleared.
2.
: 3. Sequence of Events Recorder Point                3. Sequence of Events Recorder Point 011C71, has reset.                                011C71, has reset.
Sequence of Events Recorder Point 011C71, alarms.
: 4. White scram Group 1, 2, 3, and 4                 4. White scram Group 1, 2, 3, and 4 lights for RPS A on RR H11-P609 are               lights for RPS A on RR H11-P609 are ON.                                               ON.
3.
: 5. Blue scram GROUP 1, 2, 3, and 4                 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids,            lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are                 Trip System A on COP H11-P603 are ON.                                                ON.
Red Manual Scram Trip A2 pushbutton light comes ON.
4.
White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609 are OFF.
5.
Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are OFF.
*5.1.8 Place Scram Reset switch to GP1 and GP4 then GP2 and GP3 Position and release.
*5.1.8 Places Scram Reset switch to GP1 and GP4 then GP2 and GP3 Position and releases.
*5.1.9 Verify the following:
1.
Red Manual Scram Trip A2, pushbutton light is OFF.
2.
Annunciator 3D77, MANUAL TRIP A SYS TRIP, has cleared.
3.
Sequence of Events Recorder Point 011C71, has reset.
4.
White scram Group 1, 2, 3, and 4 lights for RPS A on RR H11-P609 are ON.
5.
Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are ON.
*5.1.9 Verifies the following:
1.
Red Manual Scram Trip A2, pushbutton light is OFF.
2.
Annunciator 3D77, MANUAL TRIP A SYS TRIP, has cleared.
3.
Sequence of Events Recorder Point 011C71, has reset.
4.
White scram Group 1, 2, 3, and 4 lights for RPS A on RR H11-P609 are ON.
5.
Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are ON.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B1.c Perform Manual Scram Functional Test                          Revision: 1 Page 7 Elements                                         Standards
JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 7 Elements Standards
*5.1.10 Verify following annunciators clear:     *5.1.10 Verifies following annunciators clear:
*5.1.10 Verify following annunciators clear:
: 1. 3D73, TRIP ACTUATORS A1/A2                     1. 3D73, TRIP ACTUATORS A1/A2 TRIPPED                                          TRIPPED
1.
: 2. 3D74, TRIP ACTUATORS B1/B2                    2. 3D74, TRIP ACTUATORS B1/B2 TRIPPED                                           TRIPPED
3D73, TRIP ACTUATORS A1/A2 TRIPPED 2.
: 3. 3D77, MANUAL TRIP A SYS TRIP                   3. 3D77, MANUAL TRIP A SYS TRIP
3D74, TRIP ACTUATORS B1/B2 TRIPPED 3.
: 4. 3D78, MANUAL TRIP B SYS TRIP                   4. 3D78, MANUAL TRIP B SYS TRIP
3D77, MANUAL TRIP A SYS TRIP 4.
*5.1.11 Verify the following white scram Group 1, *5.1.11 Verifies the following white scram Group 2, 3, and 4 lights on:                            1, 2, 3, and 4 lights on:
3D78, MANUAL TRIP B SYS TRIP
: 1. RPS A on RR H11-P609                           1. RPS A on RR H11-P609
*5.1.10 Verifies following annunciators clear:
: 2. RPS B on RR H11-P611                          2. RPS B on RR H11-P611
1.
*5.1.12 Verify the following blue scram Group 1,  *5.1.12 Verifies the following blue scram Group 1, 2, 3, and 4 lights on COP H11-P603 on:            2, 3, and 4 lights on COP H11-P603 on:
3D73, TRIP ACTUATORS A1/A2 TRIPPED 2.
: 1. Pilot Scram Valve Solenoids, Trip             1. Pilot Scram Valve Solenoids, Trip System A                                          System A
3D74, TRIP ACTUATORS B1/B2 TRIPPED 3.
: 2. Pilot Scram Valve Solenoids, Trip             2. Pilot Scram Valve Solenoids, Trip System B                                          System B NOTE: Since trip system B is tested in the same manner as trip system A, the Examiner may choose to terminate the JPM at this point. If terminating at this point, place N/A on the remaining steps on the JPM Cover Sheet.
3D77, MANUAL TRIP A SYS TRIP 4.
3D78, MANUAL TRIP B SYS TRIP
*5.1.11 Verify the following white scram Group 1, 2, 3, and 4 lights on:
1.
RPS A on RR H11-P609 2.
RPS B on RR H11-P611
*5.1.11 Verifies the following white scram Group 1, 2, 3, and 4 lights on:
1.
RPS A on RR H11-P609 2.
RPS B on RR H11-P611
*5.1.12 Verify the following blue scram Group 1, 2, 3, and 4 lights on COP H11-P603 on:
1.
Pilot Scram Valve Solenoids, Trip System A 2.
Pilot Scram Valve Solenoids, Trip System B
*5.1.12 Verifies the following blue scram Group 1, 2, 3, and 4 lights on COP H11-P603 on:
1.
Pilot Scram Valve Solenoids, Trip System A 2.
Pilot Scram Valve Solenoids, Trip System B NOTE: Since trip system B is tested in the same manner as trip system A, the Examiner may choose to terminate the JPM at this point. If terminating at this point, place N/A on the remaining steps on the JPM Cover Sheet.


JOB PERFORMANCE MEASURE JPM Title                                                         No.: NRC EXAM 2003-301-B1.c Perform Manual Scram Functional Test                              Revision: 1 Page 8 Elements                                           Standards
JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 8 Elements Standards step will initiate a Half Scram.
                                                      *5.1.13 Momentarily depresses Manual Scram Trip B1 pushbutton on COP H11-P603 step will initiate a Half Scram.                             and verifies:
NOTE: Since the Manual Scram trip channel will auto-reset upon return of the B1 pushbutton to its normally closed position, Annunciator 3D78, with its associated SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight will go out when the operator releases the Manual Scram Pushbutton Switch.
NOTE: Since the Manual Scram trip channel will               1. Annunciator 3D78, MANUAL TRIP B auto-reset upon return of the B1                         SYS TRIP, alarms.
*5.1.13 Momentarily depress Manual Scram Trip B1 pushbutton on COP H11-P603 and verify:
pushbutton to its normally closed position,         2. Sequence of Events Recorder Point Annunciator 3D78, with its associated                   014C71, alarms.
1.
SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight               3. Red Manual Scram Trip B1 pushbutton will go out when the operator releases the               light on.
Annunciator 3D78, MANUAL TRIP B SYS TRIP, alarms.
Manual Scram Pushbutton Switch.                     4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
2.
*5.1.13 Momentarily depress Manual Scram Trip B1 pushbutton on COP H11-P603 and                  5. Blue scram GROUP 1, 2, 3, and 4 lights verify:                                                  for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
Sequence of Events Recorder Point 014C71, alarms.
: 1. Annunciator 3D78, MANUAL TRIP B SYS TRIP, alarms.
: 3. Red Manual Scram Trip B1 pushbutton light on.
: 2. Sequence of Events Recorder Point 014C71, alarms.
: 4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
*5.1.13 Momentarily depresses Manual Scram Trip B1 pushbutton on COP H11-P603 and verifies:
1.
Annunciator 3D78, MANUAL TRIP B SYS TRIP, alarms.
2.
Sequence of Events Recorder Point 014C71, alarms.
: 3. Red Manual Scram Trip B1 pushbutton light on.
: 3. Red Manual Scram Trip B1 pushbutton light on.
: 4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
: 4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
*5.1.14 Place Scram Reset switch to GP1 and         *5.1.14 Places Scram Reset switch to GP1 and GP4 then, GP2 and GP3 Position and                 GP4 then, GP2 and GP3 Position and release.                                            releases.
*5.1.14 Place Scram Reset switch to GP1 and GP4 then, GP2 and GP3 Position and release.
*5.1.15 Verify the following:                        *5.1.15 Verifies the following:
*5.1.14 Places Scram Reset switch to GP1 and GP4 then, GP2 and GP3 Position and releases.
: 1. Red Manual Scram Trip B1, pushbutton             1. Red Manual Scram Trip B1, pushbutton light is off.                                      light is off.
*5.1.15 Verify the following:
: 2. Annunciator 3D78, MANUAL TRIP B                  2. Annunciator 3D78, MANUAL TRIP B SYS TRIP, has cleared.                              SYS TRIP, has cleared.
: 1. Red Manual Scram Trip B1, pushbutton light is off.
: 3. Sequence of Events Recorder Point               3. Sequence of Events Recorder Point 014C71, has reset.                                  014C71, has reset.
: 2. Annunciator 3D78, MANUAL TRIP B SYS TRIP, has cleared.
: 4. White scram Group 1, 2, 3, and 4 lights         4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 on.                       for RPS B on RR H11-P611 on.
: 3. Sequence of Events Recorder Point 014C71, has reset.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights           5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip               for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 on.                        System B on COP H11-P603 on.
: 4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 on.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 on.
*5.1.15 Verifies the following:
: 1. Red Manual Scram Trip B1, pushbutton light is off.
: 2. Annunciator 3D78, MANUAL TRIP B SYS TRIP, has cleared.
: 3. Sequence of Events Recorder Point 014C71, has reset.
: 4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 on.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 on.


JOB PERFORMANCE MEASURE JPM Title                                                         No.: NRC EXAM 2003-301-B1.c Perform Manual Scram Functional Test                              Revision: 1 Page 9 Elements                                           Standards
JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 9 Elements Standards step will initiate a Half Scram.
                                                      *5.1.16 Momentarily depress Manual Scram Trip B2 pushbutton on COP H11-P603 and step will initiate a Half Scram.                             verifies:
NOTE: Since the Manual Scram trip channel will auto-reset upon return of the B2 pushbutton to its normally closed position, Annunciator 3D78, with its associated SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight will go out when the operator releases the Manual Scram Pushbutton Switch.
NOTE: Since the Manual Scram trip channel will               1. Annunciator 3D78, MANUAL TRIP B auto-reset upon return of the B2                         SYS TRIP, alarms.
*5.1.16 Momentarily depress Manual Scram Trip B2 pushbutton on COP H11-P603 and verify:
pushbutton to its normally closed position,         2. Sequence of Events Recorder Point Annunciator 3D78, with its associated                   012C71 alarms.
: 1. Annunciator 3D78, MANUAL TRIP B SYS TRIP, alarms.
SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight               3. Red Manual Scram Trip B2 pushbutton will go out when the operator releases the               light on.
: 2. Sequence of Events Recorder Point 012C71 alarms.
Manual Scram Pushbutton Switch.                     4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
: 3. Red Manual Scram Trip B2 pushbutton light on.
*5.1.16 Momentarily depress Manual Scram Trip B2 pushbutton on COP H11-P603 and                  5. Blue scram GROUP 1, 2, 3, and 4 lights verify:                                                  for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
: 4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
*5.1.16 Momentarily depress Manual Scram Trip B2 pushbutton on COP H11-P603 and verifies:
: 1. Annunciator 3D78, MANUAL TRIP B SYS TRIP, alarms.
: 1. Annunciator 3D78, MANUAL TRIP B SYS TRIP, alarms.
: 2. Sequence of Events Recorder Point 012C71 alarms.
: 2. Sequence of Events Recorder Point 012C71 alarms.
Line 427: Line 590:
: 4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
: 4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
*5.1.17 Place Scram Reset switch to GP1 and         *5.1.17 Places Scram Reset switch to GP1 and GP4 then, GP2 and GP3 Position and                 GP4 then, GP2 and GP3 Position and release.                                            releases.
*5.1.17 Place Scram Reset switch to GP1 and GP4 then, GP2 and GP3 Position and release.
*5.1.18 Verify the following:                        *5.1.18 Verifies the following:
*5.1.17 Places Scram Reset switch to GP1 and GP4 then, GP2 and GP3 Position and releases.
: 1. Red Manual Scram Trip B2, pushbutton             1. Red Manual Scram Trip B2, pushbutton light is off.                                      light is off.
*5.1.18 Verify the following:
: 2. Annunciator 3D78, MANUAL TRIP B                  2. Annunciator 3D78, MANUAL TRIP B SYS TRIP, has cleared.                              SYS TRIP, has cleared.
: 1. Red Manual Scram Trip B2, pushbutton light is off.
: 3. Sequence of Events Recorder Point               3. Sequence of Events Recorder Point 012C71, has reset.                                  012C71, has reset.
: 2. Annunciator 3D78, MANUAL TRIP B SYS TRIP, has cleared.
: 4. White scram Group 1, 2, 3, and 4 lights         4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 on.                       for RPS B on RR H11-P611 on.
: 3. Sequence of Events Recorder Point 012C71, has reset.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights           5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip               for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 on.                        System B on COP H11-P603 on.
: 4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 on.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 on.
*5.1.18 Verifies the following:
: 1. Red Manual Scram Trip B2, pushbutton light is off.
: 2. Annunciator 3D78, MANUAL TRIP B SYS TRIP, has cleared.
: 3. Sequence of Events Recorder Point 012C71, has reset.
: 4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 on.
: 5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 on.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.c Perform Manual Scram Functional Test                            Revision: 1 Page 10 Elements                                           Standards
JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 10 Elements Standards
  *5.1.19 Verify following annunciators clear:        *5.1.19 Verifies following annunciators clear:
*5.1.19 Verify following annunciators clear:
: 1. 3D73, TRIP ACTUATORS A1/A2                     1. 3D73, TRIP ACTUATORS A1/A2 TRIPPED                                            TRIPPED
: 1. 3D73, TRIP ACTUATORS A1/A2 TRIPPED
: 2. 3D74, TRIP ACTUATORS B1/B2                      2. 3D74, TRIP ACTUATORS B1/B2 TRIPPED                                            TRIPPED
: 2. 3D74, TRIP ACTUATORS B1/B2 TRIPPED
: 3. 3D77, MANUAL TRIP A SYS TRIP                   3. 3D77, MANUAL TRIP A SYS TRIP
: 3. 3D77, MANUAL TRIP A SYS TRIP
: 4. 3D78, MANUAL TRIP B SYS TRIP                   4. 3D78, MANUAL TRIP B SYS TRIP
: 4. 3D78, MANUAL TRIP B SYS TRIP
  *5.1.20 Verify the following white scram Group 1,   *5.1.20 Verifies the following white scram Group 1, 2, 3, and 4 lights on:                            2, 3, and 4 lights on:
*5.1.19 Verifies following annunciators clear:
: 1. RPS A on RR H11-P609.                          1. RPS A on RR H11-P609.
: 1. 3D73, TRIP ACTUATORS A1/A2 TRIPPED
: 2. RPS B on RR H11-P611.                          2. RPS B on RR H11-P611.
: 2. 3D74, TRIP ACTUATORS B1/B2 TRIPPED
  *5.1.21 Verify the following blue scram Group 1, 2, *5.1.21 Verifies the following blue scram Group 1, 3, and 4 lights on COP H11-P603 on:                2, 3, and 4 lights on COP H11-P603 on:
: 3. 3D77, MANUAL TRIP A SYS TRIP
: 1. Pilot Scram Valve Solenoids, Trip               1. Pilot Scram Valve Solenoids, Trip System A                                            System A
: 4. 3D78, MANUAL TRIP B SYS TRIP
: 2. Pilot Scram Valve Solenoids, Trip              2. Pilot Scram Valve Solenoids, Trip System B                                            System B 5.1.22 Record test personnel.                       5.1.22 Records test personnel.
*5.1.20 Verify the following white scram Group 1, 2, 3, and 4 lights on:
: 1. RPS A on RR H11-P609.
: 2. RPS B on RR H11-P611.
*5.1.20 Verifies the following white scram Group 1, 2, 3, and 4 lights on:
: 1. RPS A on RR H11-P609.
: 2. RPS B on RR H11-P611.
*5.1.21 Verify the following blue scram Group 1, 2, 3, and 4 lights on COP H11-P603 on:
: 1. Pilot Scram Valve Solenoids, Trip System A
: 2. Pilot Scram Valve Solenoids, Trip System B
*5.1.21 Verifies the following blue scram Group 1, 2, 3, and 4 lights on COP H11-P603 on:
: 1. Pilot Scram Valve Solenoids, Trip System A
: 2. Pilot Scram Valve Solenoids, Trip System B 5.1.22 Record test personnel.
5.1.22 Records test personnel.
CUE:The CRS will assign an independent reviewer Time Stop
CUE:The CRS will assign an independent reviewer Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):
24.610.01 complete or stopped at Step 5.1.12 per examiner discretion.
24.610.01 complete or stopped at Step 5.1.12 per examiner discretion.


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC EXAM 2003-301-B1.c Perform Manual Scram Functional Test                Revision: 1 Page 11 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 11 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
 
JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 12 Simulator Setup IC#:
JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC EXAM 2003-301-B1.c Perform Manual Scram Functional Test                Revision: 1 Page 12 Simulator Setup IC#:
Any Malfunctions:
Any Malfunctions:
None Remote Functions:
None Remote Functions:
Number                                     Title                               Value None Override Functions:
Number Title Value None Override Functions:
None Special Instructions:
None Special Instructions:


Line 474: Line 654:
The CRS directs you to perform RPS Manual Scram Functional Test in accordance with 24.610.01 A Licensed Operator is in the Relay Room standing by to assist.
The CRS directs you to perform RPS Manual Scram Functional Test in accordance with 24.610.01 A Licensed Operator is in the Relay Room standing by to assist.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.d Drywell Vent in accordance with 29.ESP.07 (Alternate Path)     Revision: 1 Page 2 Job Position                                               No.                        Revision Nuclear Supervising Operator                               NRC EXAM 2003-301-B1.d           1 JPM Title                                                   Duration          Page Drywell Vent in accordance with 29.ESP.07 (Alternate       10 Minutes       COVER SHEET Path)
JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)
Examinee:                                                               SRO / RO Evaluator:
No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.
Evaluation Method:       Perform / Simulator                           Start Time Stop Time Total Time PERFORMANCE EVALUATION Element       S   U   Comments                   Element     S     U     Comments 1.
NRC EXAM 2003-301-B1.d Revision 1
JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)
Duration 10 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:
Evaluation Method:
Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
U Comments Element S
U Comments 1.
2.
2.
3.
3.
4.
4.
5.
5.
  *6.
* 6.
  *7.
* 7.
  *8.
* 8.
  *9
* 9
______ SATISFACTORY                                 ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY
Question #   S   U   Comments                   Question #   S     U     Comments
______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY                                 ______ UNSATISFACTORY
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY


JOB PERFORMANCE MEASURE JPM Title                                                 No.: NRC EXAM 2003-301-B1.d Drywell Vent in accordance with 29.ESP.07 (Alternate Path) Revision: 1 Page 3 Evaluator Signature / Date:                                     /
JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)
No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 3 Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.d Drywell Vent in accordance with 29.ESP.07 (Alternate Path)     Revision: 1 Page 4
JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)
No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 4


==References:==
==References:==
Required (R) / Available (A) 29.ESP.07, Primary Containment Venting Tools and Equipment Required:
Required (R) / Available (A) 29.ESP.07, Primary Containment Venting Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                 X         Walkthrough                       Discuss Plant                               Simulator             X         Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
This JPM may be performed in IC 18 Start this JPM at the CRS Desk in the Simulator.
This JPM may be performed in IC 18 Start this JPM at the CRS Desk in the Simulator.
K/A Reference :
K/A Reference :
EPE: 295024 High Drywell Pressure EK3 - Knowledge of the reasons for the following responses as they apply to high drywell pressure (CFR: 41.5 / 45.6):
EPE: 295024 High Drywell Pressure EK3 - Knowledge of the reasons for the following responses as they apply to high drywell pressure (CFR: 41.5 / 45.6):
EK3.07 Drywell venting                                                 3.5 / 4.0 EA1 - Ability to operate and/or monitor the following as they apply to high drywell pressure (CFR: 41.7 / 45.6):
EK3.07 Drywell venting 3.5 / 4.0 EA1 - Ability to operate and/or monitor the following as they apply to high drywell pressure (CFR: 41.7 / 45.6):
EA1.14 - Drywell ventilation system                                   3.4 / 3.5 EA2 - Ability to determine and/or interpret the following as they apply to high drywell pressure (CFR: 41.10 / 43.5 / 45.13):
EA1.14 - Drywell ventilation system 3.4 / 3.5 EA2 - Ability to determine and/or interpret the following as they apply to high drywell pressure (CFR: 41.10 / 43.5 / 45.13):
EA2.01 Drywell pressure                                               4.2 / 4.4 Task Standard:
EA2.01 Drywell pressure 4.2 / 4.4 Task Standard:
Vent the Drywell to maintain pressure less than 1.68 psig.
Vent the Drywell to maintain pressure less than 1.68 psig.
Initial Conditions:
Initial Conditions:
Line 512: Line 709:
The CRS directs you to keep Dw pressure less than 1.68 psig in accordance with 29.ESP.07
The CRS directs you to keep Dw pressure less than 1.68 psig in accordance with 29.ESP.07


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.d Drywell Vent in accordance with 29.ESP.07 (Alternate Path)     Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements                                         Standards NOTE: All controls and indications are located on COP H11-P808 or COP-H11-P817 unless otherwise specified.
JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)
No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located on COP H11-P808 or COP-H11-P817 unless otherwise specified.
PREREQUSITES: NONE venting the Drywell and Torus is prohibited.
PREREQUSITES: NONE venting the Drywell and Torus is prohibited.
1.1     If venting the Torus, notify the SM and exit 1.1   If venting the Torus, notify the SM and exit this section.                                      this section.
1.1 If venting the Torus, notify the SM and exit this section.
1.2     If conditions permit, verify RBHVAC is in   1.2   If conditions permit, verify RBHVAC is in operation.                                        operation.
1.1 If venting the Torus, notify the SM and exit this section.
1.3     If RBHVAC is unavailable, start or verify   1.3   RBHVAC is running.
1.2 If conditions permit, verify RBHVAC is in operation.
running SGTS.
1.2 If conditions permit, verify RBHVAC is in operation.
1.3 If RBHVAC is unavailable, start or verify running SGTS.
1.3 RBHVAC is running.
SGTS must be shutdown while venting to ensure that one charcoal bed is kept in reserve for later use.
SGTS must be shutdown while venting to ensure that one charcoal bed is kept in reserve for later use.
1.4     If venting through SGTS and both             1.4  RBHVAC will be running.
1.4 If venting through SGTS and both divisions of SGTS are operating, shutdown one division of SGTS.
divisions of SGTS are operating, shutdown one division of SGTS.
1.4 RBHVAC will be running.
1.5    If PCRMS is alarming or inoperable:          1.5   PCRMS is NOT alarming or inoperable:
1.5 If PCRMS is alarming or inoperable:
1.5.1 Contact Chemistry to sample Primary Containment atmosphere for activity.
1.5.1 Contact Chemistry to sample Primary Containment atmosphere for activity.
1.5.2 When Primary Containment atmosphere sample results are complete, continue at Step 1.6.
1.5.2 When Primary Containment atmosphere sample results are complete, continue at Step 1.6.
1.5 PCRMS is NOT alarming or inoperable:
mary Containment may release radioactive gas/steam into the Reactor Building.
mary Containment may release radioactive gas/steam into the Reactor Building.
CUE: If the candidate reports to the CRS that T4800-F455 is not opening and requests direction, tell the candidate (as the CRS) to follow the procedure.
CUE:
If the candidate reports to the CRS that T4800-F455 is not opening and requests direction, tell the candidate (as the CRS) to follow the procedure.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.d Drywell Vent in accordance with 29.ESP.07 (Alternate Path)     Revision: 1 Page 6 Elements                                         Standards
JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)
  *1.6     Vent from the Drywell as follows:             *1.6 Recognizes that T4800-F455 is not 1.6.1 Close or verify closed T4800-               opening. Proceed to Step 1.6.4 F454, DW Press Ctrl N2 Supply Iso Vlv.
No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 6 Elements Standards
*1.6 Vent from the Drywell as follows:
1.6.1 Close or verify closed T4800-F454, DW Press Ctrl N2 Supply Iso Vlv.
1.6.2 Open the following 1 Inch Pressure Control Valves:
1.6.2 Open the following 1 Inch Pressure Control Valves:
: 1. T4800-F453, DW Press Ctrl Vent Iso Vlv.
1.
: 2. T4800-F455, DW Press Ctrl Inbd Iso Vlv.
T4800-F453, DW Press Ctrl Vent Iso Vlv.
2.
T4800-F455, DW Press Ctrl Inbd Iso Vlv.
NOTE (1): The Drywell Vent Path can be secured at any time (Step 1.6.8) to prevent Drywell Pressure from going below 5 inches wc.
NOTE (1): The Drywell Vent Path can be secured at any time (Step 1.6.8) to prevent Drywell Pressure from going below 5 inches wc.
NOTE (2): Drywell Pressure may not be reduced immediately, plant conditions will have to be evaluated by the Shift Team to determine if the larger vent paths are required.
NOTE (2): Drywell Pressure may not be reduced immediately, plant conditions will have to be evaluated by the Shift Team to determine if the larger vent paths are required.
1.6.3 If Drywell Pressure is reduced to normal (5 to 19 inches wc), proceed to Step 1.6.8, otherwise continue.
*1.6 Recognizes that T4800-F455 is not opening. Proceed to Step 1.6.4 1.6.3 If Drywell Pressure is reduced to normal (5 to 19 inches wc), proceed to Step 1.6.8, otherwise continue.
            *1.6.4 If Drywell Pressure is not being           *1.6.4 Opens the following 6" Vent Path reduced as fast as necessary, open               Valves:
*1.6.4 If Drywell Pressure is not being reduced as fast as necessary, open the following 6" Vent Path Valves:
the following 6" Vent Path Valves:                     1. T4600-F411, DW 6" Purge
1.
: 1. T4600-F411, DW 6" Purge                            Iso Vlv.
T4600-F411, DW 6" Purge Iso Vlv.
Iso Vlv.                                     2. T4803-F602, DW Exh Iso Vlv.
2.
: 2. T4803-F602, DW Exh Iso Vlv.
T4803-F602, DW Exh Iso Vlv.
            *1.6.5 If Drywell Pressure is reduced to           *1.6.5  Proceed to Step 1.6.8.
*1.6.4 Opens the following 6" Vent Path Valves:
normal (5 to 19 inches wc), proceed to Step 1.6.8, otherwise continue.
1.
            *1.6.8 Close or verify closed the                  *1.6.8 Closes or verifies closed the following valves as necessary to                 following valves maintain Drywell Pressure greater                     1. T4600-F402, DW 24" Purge than 5 inches wc:                                         Iso Vlv.
T4600-F411, DW 6" Purge Iso Vlv.
: 1. T4600-F402, DW 24" Purge                       2. T4803-F602, DW Exh Iso Vlv.
2.
Iso Vlv.
T4803-F602, DW Exh Iso Vlv.
: 3. T4600-F411, DW 6" Purge
*1.6.5 If Drywell Pressure is reduced to normal (5 to 19 inches wc), proceed to Step 1.6.8, otherwise continue.
: 2. T4803-F602, DW Exh Iso Vlv.                       Iso Vlv.
*1.6.5 Proceed to Step 1.6.8.
: 3. T4600-F411, DW 6" Purge                       4. T4800-F455, DW Press Ctrl Iso Vlv.                                         Inbd Iso Vlv.
*1.6.8 Close or verify closed the following valves as necessary to maintain Drywell Pressure greater than 5 inches wc:
: 4. T4800-F455, DW Press Ctrl                      5. T4800-F453, DW Press Ctrl Inbd Iso Vlv.                                    Vent Iso Vlv.
1.
: 5. T4800-F453, DW Press Ctrl Vent Iso Vlv.
T4600-F402, DW 24" Purge Iso Vlv.
2.
T4803-F602, DW Exh Iso Vlv.
3.
T4600-F411, DW 6" Purge Iso Vlv.
4.
T4800-F455, DW Press Ctrl Inbd Iso Vlv.
5.
T4800-F453, DW Press Ctrl Vent Iso Vlv.
*1.6.8 Closes or verifies closed the following valves 1.
T4600-F402, DW 24" Purge Iso Vlv.
2.
T4803-F602, DW Exh Iso Vlv.
3.
T4600-F411, DW 6" Purge Iso Vlv.
4.
T4800-F455, DW Press Ctrl Inbd Iso Vlv.
5.
T4800-F453, DW Press Ctrl Vent Iso Vlv.
Time Stop
Time Stop
* Critical Steps
* Critical Steps


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B1.d Drywell Vent in accordance with 29.ESP.07 (Alternate Path)     Revision: 1 Page 7 Terminating Cue(s):
JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)
No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 7 Terminating Cue(s):
Drywell pressure between 5 and 19 in wc, with all valves closed.
Drywell pressure between 5 and 19 in wc, with all valves closed.


JOB PERFORMANCE MEASURE JPM Title                                                 No.: NRC EXAM 2003-301-B1.d Drywell Vent in accordance with 29.ESP.07 (Alternate Path) Revision: 1 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)
No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
 
JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)
JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B1.d Drywell Vent in accordance with 29.ESP.07 (Alternate Path)     Revision: 1 Page 9 Simulator Setup IC#:
No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 9 Simulator Setup IC#:
IC 18 - Full Power Malfunctions:
IC 18 - Full Power Malfunctions:
Number                                         Title                                       Value None Remote Functions:
Number Title Value None Remote Functions:
Number                                         Title                                       Value None Override Functions:
Number Title Value None Override Functions:
None Special Instructions:
None Special Instructions:
To Inactivate the Block and prevent T4800-F455 from operating, go to the CETRAN window and type the following:
To Inactivate the Block and prevent T4800-F455 from operating, go to the CETRAN window and type the following:
Line 583: Line 808:
The CRS directs you to keep Dw pressure less than 1.68 psig in accordance with 29.ESP.07
The CRS directs you to keep Dw pressure less than 1.68 psig in accordance with 29.ESP.07


JOB PERFORMANCE MEASURE JPM Title                                               No.: NRC EXAM 2003-301-B1.e Start Individual CTG 11 from the Control Room            Revision 1 Page 2 Job Position                                         No.                        Revision Nuclear Supervising Operator                         NRC EXAM 2003-301-B1.e           1 JPM Title                                           Duration            Page Start Individual CTG 11 from the Control Room       25 Minutes         COVER SHEET Examinee:                                                         SRO / RO Evaluator:
JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 2 Job Position Nuclear Supervising Operator No.
Evaluation Method:       Perform / Simulator                     Start Time Stop Time Total Time PERFORMANCE EVALUATION Element       S   U     Comments           Element     S     U     Comments 1.
NRC EXAM 2003-301-B1.e Revision 1
  *2.
JPM Title Start Individual CTG 11 from the Control Room Duration 25 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:
  *3.
Evaluation Method:
  *4.
Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
U Comments Element S
U Comments 1.
* 2.
* 3.
* 4.
5.
5.
  *6.
* 6.
  *7.
* 7.
8.
8.
  *9.
* 9.
______ SATISFACTORY                           ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY
Question #     S   U     Comments           Question # S     U     Comments
______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY                           ______ UNSATISFACTORY Evaluator Signature / Date:                                   /
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC EXAM 2003-301-B1.e Start Individual CTG 11 from the Control Room                      Revision 1 Page 3
JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 3


==References:==
==References:==
Required (R) / Available (A) 23.324, Supervisory Control - 120 KV Switchyard and CTG11 Generators Tools and Equipment Required:
Required (R) / Available (A) 23.324, Supervisory Control - 120 KV Switchyard and CTG11 Generators Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                   X         Walkthrough                         Discuss Plant                               Simulator               X           Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
This JPM can be performed in in any IC.
This JPM can be performed in in any IC.
Start this JPM at the CRS Desk in the Simulator.
Start this JPM at the CRS Desk in the Simulator.
K/A Reference :
K/A Reference :
2.1     Generic Knowledge and Abilities:
2.1 Generic Knowledge and Abilities:
2.1.17 Ability to make accurate, clear, and concise verbal reports.               3.5 / 3.6 2.1.20 Ability to execute procedure steps.                                       4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.                   3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.     3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.         3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls                                                             3.2 / 3.3 2.4.2 Ability to recognize abnormal indications for system operating parameters which are entry into emergency/abnormal procedures.                               4.0 / 4.3 2.4.11 Knowledge of abnormal condition procedures                                 3.4 / 3.6 262001 A.C. Electrical Distribution:
2.1.17 Ability to make accurate, clear, and concise verbal reports.
K1.     Knowledge of the physical connections and/or cause-effect relationships for the following:
3.5 / 3.6 2.1.20 Ability to execute procedure steps.
:                K1.01 EDGs                                                             3.8 / 4.3 K1.02 D.C. electrical distribution                                       3.3 / 3.6 K1.03 Offsite power sources                                             3.4 / 3.8 K1.06 Alternate shutdown system                                         3.6 / 3.9 K2.     Knowledge of electrical power supplies to the following:
4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.
K2.01 Offsite sources of power                                           3.3 / 3.6 K3.     Knowledge of the effect that a loss or malfunction of will have on the following:
3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.
K3.02 Emergency Generators                                               3.8 / 4.2 K4.     Knowledge of design feature(s) and/or interlocks which provide for:
3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.
3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls 3.2 / 3.3 2.4.2 Ability to recognize abnormal indications for system operating parameters which are entry into emergency/abnormal procedures.
4.0 / 4.3 2.4.11 Knowledge of abnormal condition procedures 3.4 / 3.6 262001 A.C. Electrical Distribution:
K1.
Knowledge of the physical connections and/or cause-effect relationships for the following:
K1.01 EDGs 3.8 / 4.3 K1.02 D.C. electrical distribution 3.3 / 3.6 K1.03 Offsite power sources 3.4 / 3.8 K1.06 Alternate shutdown system 3.6 / 3.9 K2.
Knowledge of electrical power supplies to the following:
K2.01 Offsite sources of power 3.3 / 3.6 K3.
Knowledge of the effect that a loss or malfunction of will have on the following:
K3.02 Emergency Generators 3.8 / 4.2 K4.
Knowledge of design feature(s) and/or interlocks which provide for:


JOB PERFORMANCE MEASURE JPM Title                                                               No.: NRC EXAM 2003-301-B1.e Start Individual CTG 11 from the Control Room                          Revision 1 Page 4 K4.03 Interlocks between auto bus transfer and breakers                   3.1 / 3.4 K4.05 Paralleling AC sources (synchroscope)                               3.4 / 3.6 K5.     Knowledge of operational implications of:
JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 4 K4.03 Interlocks between auto bus transfer and breakers 3.1 / 3.4 K4.05 Paralleling AC sources (synchroscope) 3.4 / 3.6 K5.
K5.01 Paralleling two AC sources                                           3.1 / 3.4 K6.     Knowledge of the effect that a loss or malfunction of will have on the following:
Knowledge of operational implications of:
K6.02 Offsite power                                                       3.6 / 3.9 A1.     Ability to predict and/or monitor changes in parameters associated with operating controls including:
K5.01 Paralleling two AC sources 3.1 / 3.4 K6.
A1.01 Effect on instrumentation and controls of switching power supplies 3.1 / 3.4 A1.02 Effects of loads when energizing a bus                               3.1 / 3.5 A1.05 Breaker lineups                                                     3.2 / 3.5 A2.     Ability to (a) predict the impacts of the following; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of:
Knowledge of the effect that a loss or malfunction of will have on the following:
A2.03 Loss of Offsite power.                                               3.9 / 4.3 A2.04 Loads that if deenergized would degrade/hinder plant ops             3.8 / 4.2 A2.08 Opening a disconnect under load                                     3.3 / 3.6 A2.09 Exceeding voltage limitations                                       3.1 / 3.4 A2.11 Degraded system voltages                                             3.2 / 3.6 A3.     Ability to monitor auto operations of, including:
K6.02 Offsite power 3.6 / 3.9 A1.
A3.01 Breaker tripping                                                     3.1 / 3.2 A4.     Ability to manually operate and/or monitor in the Control room:
Ability to predict and/or monitor changes in parameters associated with operating controls including:
A4.01 All breakers and disconnects                                         3.4 / 3.7 A4.02 Synchroscope, understanding running and incoming voltages           3.4 / 3.4 A4.03 Local operation of breakers                                         3.2 / 3.4 A4.04 Synchronizing and paralleling of different A.C. supplies             3.6 / 3.7 A4.05 Voltage, current, power, and frequency on A.C. buses                 3.3 / 3.3 264000 Emergency Generators (Diesel/Jet):
A1.01 Effect on instrumentation and controls of switching power supplies 3.1 / 3.4 A1.02 Effects of loads when energizing a bus 3.1 / 3.5 A1.05 Breaker lineups 3.2 / 3.5 A2.
K1.     Knowledge of the physical connections and/or cause-effect relationships for the following:
Ability to (a) predict the impacts of the following; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of:
K1.01 A.C. electrical distribution                                         3.8 / 4.1 K1.02 D.C. electrical distribution                                         3.3 / 3.4 K1.04 Emergency generator C.W. system                                     3.2 / 3.3 K1.05 Emergency generator F.O. system                                     3.2 / 3.3 K1.06 Starting air system                                                 3.2 / 3.2 K1.07 ECCS systems                                                         3.9 / 4.1 K3.     Knowledge of the effect that a loss or malfunction of will have on The following:
A2.03 Loss of Offsite power.
K3.01 ECCS systems                                                         4.2 / 4.4 K3.02 A.C. electrical distribution                                         3.9 / 4.2 K3.03 Major loads fed from buses fed by emergency generators               4.1 / 4.2 K4.     Knowledge of design feature(s) and/or interlocks which provide for:
3.9 / 4.3 A2.04 Loads that if deenergized would degrade/hinder plant ops 3.8 / 4.2 A2.08 Opening a disconnect under load 3.3 / 3.6 A2.09 Exceeding voltage limitations 3.1 / 3.4 A2.11 Degraded system voltages 3.2 / 3.6 A3.
Ability to monitor auto operations of, including:
A3.01 Breaker tripping 3.1 / 3.2 A4.
Ability to manually operate and/or monitor in the Control room:
A4.01 All breakers and disconnects 3.4 / 3.7 A4.02 Synchroscope, understanding running and incoming voltages 3.4 / 3.4 A4.03 Local operation of breakers 3.2 / 3.4 A4.04 Synchronizing and paralleling of different A.C. supplies 3.6 / 3.7 A4.05 Voltage, current, power, and frequency on A.C. buses 3.3 / 3.3 264000 Emergency Generators (Diesel/Jet):
K1.
Knowledge of the physical connections and/or cause-effect relationships for the following:
K1.01 A.C. electrical distribution 3.8 / 4.1 K1.02 D.C. electrical distribution 3.3 / 3.4 K1.04 Emergency generator C.W. system 3.2 / 3.3 K1.05 Emergency generator F.O. system 3.2 / 3.3 K1.06 Starting air system 3.2 / 3.2 K1.07 ECCS systems 3.9 / 4.1 K3.
Knowledge of the effect that a loss or malfunction of will have on The following:
K3.01 ECCS systems 4.2 / 4.4 K3.02 A.C. electrical distribution 3.9 / 4.2 K3.03 Major loads fed from buses fed by emergency generators 4.1 / 4.2 K4.
Knowledge of design feature(s) and/or interlocks which provide for:


JOB PERFORMANCE MEASURE JPM Title                                                               No.: NRC EXAM 2003-301-B1.e Start Individual CTG 11 from the Control Room                          Revision 1 Page 5 K4.01 Emergency generator trips (normal)                                     3.5 / 3.7 K4.02 Emergency generator trips (emergency/LOCA)                             4.0 / 4.2 K4.07 Local operation and control                                           3.3 / 3.4 K4.08 Automatic startup                                                     3.8 / 3.7 K5. Knowledge of Knowledge of operational implications of:
JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 5 K4.01 Emergency generator trips (normal) 3.5 / 3.7 K4.02 Emergency generator trips (emergency/LOCA) 4.0 / 4.2 K4.07 Local operation and control 3.3 / 3.4 K4.08 Automatic startup 3.8 / 3.7 K5.
K5.05 Paralleling A.C. sources                                               3.4 / 3.4 K6. Knowledge of the effect that a loss or malfunction will have on the following:
Knowledge of Knowledge of operational implications of:
K6.01 Starting air                                                           3.8 / 3.9 K6.02 F.O. pumps                                                             3.6 / 3.6 K6.03 L.O. pumps                                                             3.5 / 3.7 K6.07 C.W. system                                                           3.8 / 3.9 K6.08 A.C. power                                                             3.6 / 3.7 K6.09 D.C. power                                                             3.3 / 3.5 A2. Ability to (a) predict the impacts of the following; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of:
K5.05 Paralleling A.C. sources 3.4 / 3.4 K6.
A2.01 Parallel operation of emergency generator                             3.5 / 3.6 A2.02 Unloading prior to securing emergency generator                       3.1 / 3.1 A2.03 Operating under different loading conditions                           3.4 / 3.4 A2.05 Synch of emergency generator with electrical supplies                 3.6 / 3.6 A2.06 Opening normal and/or alternate power to emergency bus                 3.4 / 3.4 A2.08 Initiation of emergency generator fire protection system               3.3 / 3.7 A2.09 Loss of A.C. power                                                     3.7 / 4.1 A2.10 LOCA                                                                   3.9 / 4.2 A4. Ability to manually operate and/or monitor in the Control room:
Knowledge of the effect that a loss or malfunction will have on the following:
A4.01 Adjustment of exciter voltage                                         3.3 / 3.4 A4.02 Synchroscope                                                           3.4 / 3.4 A4.04 Man start, load, and stop of generator                                 3.7 / 3.7 A4.05 Transfer of generator to grid                                         3.6 / 3.7 Task Standard:
K6.01 Starting air 3.8 / 3.9 K6.02 F.O. pumps 3.6 / 3.6 K6.03 L.O. pumps 3.5 / 3.7 K6.07 C.W. system 3.8 / 3.9 K6.08 A.C. power 3.6 / 3.7 K6.09 D.C. power 3.3 / 3.5 A2.
Ability to (a) predict the impacts of the following; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of:
A2.01 Parallel operation of emergency generator 3.5 / 3.6 A2.02 Unloading prior to securing emergency generator 3.1 / 3.1 A2.03 Operating under different loading conditions 3.4 / 3.4 A2.05 Synch of emergency generator with electrical supplies 3.6 / 3.6 A2.06 Opening normal and/or alternate power to emergency bus 3.4 / 3.4 A2.08 Initiation of emergency generator fire protection system 3.3 / 3.7 A2.09 Loss of A.C. power 3.7 / 4.1 A2.10 LOCA 3.9 / 4.2 A4.
Ability to manually operate and/or monitor in the Control room:
A4.01 Adjustment of exciter voltage 3.3 / 3.4 A4.02 Synchroscope 3.4 / 3.4 A4.04 Man start, load, and stop of generator 3.7 / 3.7 A4.05 Transfer of generator to grid 3.6 / 3.7 Task Standard:
Perform Startup and loading of individual CTG11-1 from the Control Room Initial Conditions:
Perform Startup and loading of individual CTG11-1 from the Control Room Initial Conditions:
The Plant is Operating at full power.
The Plant is Operating at full power.
Line 636: Line 899:
Prerequisites are complete.
Prerequisites are complete.


JOB PERFORMANCE MEASURE JPM Title                                                         No.: NRC EXAM 2003-301-B1.e Start Individual CTG 11 from the Control Room                    Revision 1 Page 6 PERFORMANCE EVALUATION Time Start Elements                                           Standards NOTE: Unless otherwise noted, all controls and indications for this section are located on COP H11-P811.
JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 6 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: Unless otherwise noted, all controls and indications for this section are located on COP H11-P811.
CUE:     All prerequisites are complete:
CUE:
4.1.1 Prerequisites                                 4.1.1 Prerequisites complete
All prerequisites are complete:
: 1.      120kV Circuit Breakers and CTG11 Units are in Standby Mode at the Fermi 2 Control Room, Fermi 1 Control Room, and CTG11 Control Center in accordance with the following sections of this procedure.
4.1.1 Prerequisites 1.
: a. Section 5.1, Standby Mode Of CTG11 Generators And 120kV Circuit Breakers At COP H11-P811
120kV Circuit Breakers and CTG11 Units are in Standby Mode at the Fermi 2 Control Room, Fermi 1 Control Room, and CTG11 Control Center in accordance with the following sections of this procedure.
: b. Section 5.2, Standby Mode Of 120kV Circuit Breakers And CTG11 Generators At Fermi 1 Control Room Panel 2 And CTG11 Master Control Panel
a.
: c. Section 5.3, Standby Mode Of CTG11 Generators At CTG11 Control Center
Section 5.1, Standby Mode Of CTG11 Generators And 120kV Circuit Breakers At COP H11-P811 b.
  *2.     If CTG11 Unit 1 is to be started, required *2. Records required data on the CTG11 Unit 1 data has been recorded on the CTG11             Start/Failure Log (Attachment 4).
Section 5.2, Standby Mode Of 120kV Circuit Breakers And CTG11 Generators At Fermi 1 Control Room Panel 2 And CTG11 Master Control Panel c.
Unit 1 Start/Failure Log (Attachment 4).
Section 5.3, Standby Mode Of CTG11 Generators At CTG11 Control Center 4.1.1 Prerequisites complete
CUE: Provide candidate with copy of Attachment 4 OTE (1): If operating CTG11 Units for any reason       *1. Directs operator to complete Attachment 3 except to supply emergency power to the               every 15 minutes for CTG11-1. Refer to plant, with the concurrence of the CSS,               Section 6.8, CTG11 Exhaust Temperature CTG11 Units must be shutdown before                   Thermocouple Operation.
*2.
CTG11 Fuel Oil Tank Level goes below 13 feet or CTG11 Unit 1 must be declared inoperable.
If CTG11 Unit 1 is to be started, required data has been recorded on the CTG11 Unit 1 Start/Failure Log (Attachment 4).
CUE:
Provide candidate with copy of
*2.
Records required data on the CTG11 Unit 1 Start/Failure Log (Attachment 4).
OTE (1): If operating CTG11 Units for any reason except to supply emergency power to the plant, with the concurrence of the CSS, CTG11 Units must be shutdown before CTG11 Fuel Oil Tank Level goes below 13 feet or CTG11 Unit 1 must be declared inoperable.
OTE (2): Enclosure F contains related alarm responses.
OTE (2): Enclosure F contains related alarm responses.
  *1.     If a CTG11 Unit is loaded without any warmup period, complete Attachment 3 every 15 minutes for associated Units.
*1.
If a CTG11 Unit is loaded without any warmup period, complete Attachment 3 every 15 minutes for associated Units.
Refer to Section 6.8, CTG11 Exhaust Temperature Thermocouple Operation.
Refer to Section 6.8, CTG11 Exhaust Temperature Thermocouple Operation.
*1.
Directs operator to complete Attachment 3 every 15 minutes for CTG11-1. Refer to Section 6.8, CTG11 Exhaust Temperature Thermocouple Operation.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B1.e Start Individual CTG 11 from the Control Room                Revision 1 Page 7 Elements                                       Standards CAUTION CTG11 Units 2, 3, and 4 must be             *2. Depresses START pushbutton for the started at approximately 1 minute          desired Unit 1 and verifies:
JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 7 Elements Standards CAUTION CTG11 Units 2, 3, and 4 must be started at approximately 1 minute intervls. This is necessary to prevent overload of Peaker Aux Power Transformer and excessive loading of Peaker Control Air Compressor.
intervls. This is necessary to            a. Red backlighted START pushbutton is prevent overload of Peaker Aux                  ON.
*2.
Power Transformer and excessive            b. Green backlighted READY TO loading of Peaker Control Air                  START indication goes OFF.
Depress START pushbutton for the desired Unit (1, 2, 3 or 4) and verify following:
Compressor.
a.
: c. Red backlighted SEQUENCE IN
Red backlighted START pushbutton is ON.
*2.     Depress START pushbutton for the                         PROGRESS indication is ON.
b.
desired Unit (1, 2, 3 or 4) and verify following:
Green backlighted READY TO START indication goes OFF.
: a. Red backlighted START pushbutton is ON.
c.
: b. Green backlighted READY TO START indication goes OFF.
Red backlighted SEQUENCE IN PROGRESS indication is ON.
: c. Red backlighted SEQUENCE IN PROGRESS indication is ON.
*2.
NOTE: CTG11 Units 2, 3 and 4 will require           3. When Unit Breaker closes as indicated by approximately 8 to 10 minutes and CTG11         a red CLOSED light ON, verifies:
Depresses START pushbutton for the desired Unit 1 and verifies:
Unit 1, 12 minutes to reach synchronous         a. Red backlighted SEQUENCE IN speed and to automatically synchronize.              PROGRESS indication goes OFF.
a.
: 3.       When Unit Breaker closes as indicated by       b. Red backlighted SEQUENCE a red CLOSED light ON, verify:                       COMPLETE indication is ON.
Red backlighted START pushbutton is ON.
: a. Red backlighted SEQUENCE IN                      c. Unit MW output increases up to 3 PROGRESS indication goes OFF.                      to 5 MW (Minimum).
b.
: b. Red backlighted SEQUENCE COMPLETE indication is ON.
Green backlighted READY TO START indication goes OFF.
: c. Unit MW output increases up to 3 to 5 MW (Minimum).
: c.
: 4.       If ambient temperature is > 75°F., or it is 4. No Action anticipated that this temperature will be met during operation, CTG Auxiliary Cooling should be utilized to maintain optimum performance in accordance with Section 7.9.
Red backlighted SEQUENCE IN PROGRESS indication is ON.
CUE:     Ambient temperature is 55 °F
NOTE: CTG11 Units 2, 3 and 4 will require approximately 8 to 10 minutes and CTG11 Unit 1, 12 minutes to reach synchronous speed and to automatically synchronize.
3.
When Unit Breaker closes as indicated by a red CLOSED light ON, verify:
a.
Red backlighted SEQUENCE IN PROGRESS indication goes OFF.
b.
Red backlighted SEQUENCE COMPLETE indication is ON.
c.
Unit MW output increases up to 3 to 5 MW (Minimum).
3.
When Unit Breaker closes as indicated by a red CLOSED light ON, verifies:
a.
Red backlighted SEQUENCE IN PROGRESS indication goes OFF.
b.
Red backlighted SEQUENCE COMPLETE indication is ON.
: c.
Unit MW output increases up to 3 to 5 MW (Minimum).
4.
If ambient temperature is > 75°F., or it is anticipated that this temperature will be met during operation, CTG Auxiliary Cooling should be utilized to maintain optimum performance in accordance with Section 7.9.
CUE:
Ambient temperature is 55 °F 4.
No Action


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.e Start Individual CTG 11 from the Control Room                  Revision 1 Page 8 Elements                                           Standards 4.1.3 Detailed Procedure - Loading                   1. Manual Load Control NOTE (1): There are two sets of controls available   *a. Turns Governor to RAISE/LOWER and to adjust the MW output of CTG11 Units.            increase/decrease load to 13 MW .
JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 8 Elements Standards 4.1.3 Detailed Procedure - Loading NOTE (1): There are two sets of controls available to adjust the MW output of CTG11 Units.
NOTE (2): Raising load on CTG 11 Unit 1 to BASE LOAD (13-15MW) must be performed either in Manual Load Control per Step 4.1.3.1 below or by taking Local Control per Step 4.1.3.2.d and raising load per Section 4.2.4 or 4.2.5.
NOTE (2): Raising load on CTG 11 Unit 1 to BASE LOAD (13-15MW) must be performed either in Manual Load Control per Step 4.1.3.1 below or by taking Local Control per Step 4.1.3.2.d and raising load per Section 4.2.4 or 4.2.5.
: 1. Manual Load Control NOTE: When operating Lower/Raise Control Switches for Unit Voltage and Governor Controls, be aware that command signal is present as long as switch is held in LOWER or RAISE. Anticipate time lag of controlled value after release of Control Switch.
: 1. Manual Load Control NOTE: When operating Lower/Raise Control Switches for Unit Voltage and Governor Controls, be aware that command signal is present as long as switch is held in LOWER or RAISE. Anticipate time lag of controlled value after release of Control Switch.
  *a. Turn Governor to RAISE/LOWER and increase/decrease load to desired value.
*a. Turn Governor to RAISE/LOWER and increase/decrease load to desired value.
: b. If PEAK LOAD is desired, perform Section 6.1             b. No Action (6.2), Increasing Load To Peak In Manual (Automatic).
: 1. Manual Load Control
CUE:     Peak Load not desired.
*a.
NOTE: Maintain Voltage and VARS within the                 *c. Adjusts VARS as indicated on the capability curve (see Enclosure B).                    individual Megavar (MVAR) indicator using the Voltage Switch to maintain
Turns Governor to RAISE/LOWER and increase/decrease load to 13 MW.
  *c. Adjust VARS as indicated on the individual                 within limits of Enclosure B.
: b. If PEAK LOAD is desired, perform Section 6.1 (6.2), Increasing Load To Peak In Manual (Automatic).
Megavar (MVAR) indicator using the Voltage Switch.
CUE:
Peak Load not desired.
b.
No Action NOTE: Maintain Voltage and VARS within the capability curve (see Enclosure B).
*c. Adjust VARS as indicated on the individual Megavar (MVAR) indicator using the Voltage Switch.
*c. Adjusts VARS as indicated on the individual Megavar (MVAR) indicator using the Voltage Switch to maintain within limits of Enclosure B.
Time Stop
Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):
CTG11-1 is loaded to 13 MW
CTG11-1 is loaded to 13 MW


JOB PERFORMANCE MEASURE JPM Title                                             No.: NRC EXAM 2003-301-B1.e Start Individual CTG 11 from the Control Room        Revision 1 Page 9 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 9 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
 
JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 10 Simulator Setup IC#:
JOB PERFORMANCE MEASURE JPM Title                                               No.: NRC EXAM 2003-301-B1.e Start Individual CTG 11 from the Control Room          Revision 1 Page 10 Simulator Setup IC#:
18 Malfunctions:
18 Malfunctions:
Number                                         Title                             Value None Remote Functions:
Number Title Value None Remote Functions:
Number                                         Title                             Value None Override Functions:
Number Title Value None Override Functions:
None Special Instructions:
None Special Instructions:


Line 706: Line 1,001:
Prerequisites are complete.
Prerequisites are complete.


JOB PERFORMANCE MEASURE JPM Title                                               No.: NRC EXAM 2003-301-B1.f Switch Operating RBCCW Pumps                            Revision: 1 Page 2 Job Position                                       No.                        Revision Nuclear Supervisory Operator                       NRC EXAM 2003-3001-B1.f         1 JPM Title                                           Duration        Page Switch Operating RBCCW Pumps                         15 Minutes       COVER SHEET Examinee:                                                       SRO / RO Evaluator:
JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 2 Job Position Nuclear Supervisory Operator No.
Evaluation Method:     Perform / Simulator                     Start Time Stop Time Total Time PERFORMANCE EVALUATION Element       S   U   Comments             Element       S   U     Comments 1.
NRC EXAM 2003-3001-B1.f Revision 1
  *2.
JPM Title Switch Operating RBCCW Pumps Duration 15 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:
  *3.
Evaluation Method:
Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
U Comments Element S
U Comments 1.
* 2.
* 3.
4.
4.
5.
5.
______ SATISFACTORY                         ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY
Question #   S   U   Comments             Question #   S   U     Comments
______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY                         ______ UNSATISFACTORY
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY


JOB PERFORMANCE MEASURE JPM Title                                       No.: NRC EXAM 2003-301-B1.f Switch Operating RBCCW Pumps                    Revision: 1 Page 3 Evaluator Signature / Date:                                 /
JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 3 Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B1.f Switch Operating RBCCW Pumps                                  Revision: 1 Page 4
JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 4


==References:==
==References:==
Line 724: Line 1,031:
Tools and Equipment Required:
Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                 X           Walkthrough                     Discuss Plant                               Simulator           X           Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant Simulator X
Classroom Evaluator Notes:
Start the JPM in the Simulator Control Room at the CRS desk.
Start the JPM in the Simulator Control Room at the CRS desk.
This JPM is performed in IC-18 at full power Task Standard:
This JPM is performed in IC-18 at full power Task Standard:
Line 732: Line 1,041:
You are the Control Nuclear Supervising Operator The CRS directs you to shift from North and Center pumps running to South and Center pumps running.
You are the Control Nuclear Supervising Operator The CRS directs you to shift from North and Center pumps running to South and Center pumps running.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.f Switch Operating RBCCW Pumps                                    Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements                                         Standards NOTE: Unless otherwise noted, all controls and indication are located on COP H11-P601 and P602.
JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: Unless otherwise noted, all controls and indication are located on COP H11-P601 and P602.
An EECW actuation may occur during pump shifts due to transients on system.
An EECW actuation may occur during pump shifts due to transients on system.
6.1.2.1. To place standby RBCCW pump in             6.1.2.1 Plant announcement made that pump will service:                                            be starting NOTE: When standby RBCCW Pump is started                     *a. Start Standby RBCCW Pump.
6.1.2.1. To place standby RBCCW pump in service:
P42-F403, RBCCW Differential Pressure Control Valve, will OPEN to compensate for the increased flow.
6.1.2.1 Plant announcement made that pump will be starting NOTE: When standby RBCCW Pump is started P42-F403, RBCCW Differential Pressure Control Valve, will OPEN to compensate for the increased flow.
            *a. Start Standby RBCCW Pump.
*a. Start Standby RBCCW Pump.
            *b. Stop RBCCW Pump to be removed                   *b. Stop RBCCW Pump to be removed from service.                                      from service.
*a. Start Standby RBCCW Pump.
            *c. Verify P42-F403, RBCCW Differential             *c. Verify P42-F403, RBCCW Differential Pressure Control Valve, is maintaining            Pressure Control Valve, is maintaining a proper differential pressure by                  a proper differential pressure by verifying Annunciators, clear:                     verifying Annunciators, clear:
*b. Stop RBCCW Pump to be removed from service.
* 2D100, RBCCW PUMPS
*b. Stop RBCCW Pump to be removed from service.
* 2D100, RBCCW PUMPS RECIRC VLV OPEN                                   RECIRC VLV OPEN
*c. Verify P42-F403, RBCCW Differential Pressure Control Valve, is maintaining a proper differential pressure by verifying Annunciators, clear:
* 2D104, RBCCW PUMPS
2D100, RBCCW PUMPS RECIRC VLV OPEN 2D104, RBCCW PUMPS RECIRC VLV CLOSED
* 2D104, RBCCW PUMPS RECIRC VLV CLOSED                                 RECIRC VLV CLOSED
*c. Verify P42-F403, RBCCW Differential Pressure Control Valve, is maintaining a proper differential pressure by verifying Annunciators, clear:
: d. Periodically monitor temperatures and            d. Periodically monitor temperatures and pressures in the system to ensure                  pressures in the system to ensure continued proper system operation                 continued proper system operation using the following instruments:                  using the following instruments:
2D100, RBCCW PUMPS RECIRC VLV OPEN 2D104, RBCCW PUMPS RECIRC VLV CLOSED d.
* P42-R802, RBCCW Press
Periodically monitor temperatures and pressures in the system to ensure continued proper system operation using the following instruments:
* P42-R802, RBCCW Press Ind                                                Ind
P42-R802, RBCCW Press Ind P42-R800, RBCCW Hx Outlet Temp Recorder d.
* P42-R800, RBCCW Hx Outlet
Periodically monitor temperatures and pressures in the system to ensure continued proper system operation using the following instruments:
* P42-R800, RBCCW Hx Outlet Temp Recorder                                      Temp Recorder Time Stop
P42-R802, RBCCW Press Ind P42-R800, RBCCW Hx Outlet Temp Recorder Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):
Standby pump is operating, operating pump is in standby
Standby pump is operating, operating pump is in standby


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC EXAM 2003-301-B1.f Switch Operating RBCCW Pumps                        Revision: 1 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
 
JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 7 Simulator Setup IC#:
JOB PERFORMANCE MEASURE JPM Title                                       No.: NRC EXAM 2003-301-B1.f Switch Operating RBCCW Pumps                    Revision: 1 Page 7 Simulator Setup IC#:
18 Malfunctions:
18 Malfunctions:
Number                               Title                               Value None Remote Functions:
Number Title Value None Remote Functions:
Number                               Title                               Value None Override Functions:
Number Title Value None Override Functions:
None Special Instructions:
None Special Instructions:


Line 772: Line 1,079:
You are the Control Room Nuclear Supervising Operator The CRS directs you to shift RBCCW pumps from North and Center pumps running to South and Center pumps running.
You are the Control Room Nuclear Supervising Operator The CRS directs you to shift RBCCW pumps from North and Center pumps running to South and Center pumps running.


JOB PERFORMANCE MEASURE JPM Title                                               No.: NRC EXAM 2003-301-B1.g Shift Divisions of CCHVAC (Alternate Path)              Revision: 0 Page 2 Job Position                                       No.                          Revision Nuclear Supervising Operator                       NRC EXAM 2003-301-B1.g             1 JPM Title                                           Duration            Page Shift Divisions of CCHVAC (Alternate Path)           25 Minutes         COVER SHEET Examinee:                                                         SRO / RO Evaluator:
JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)
Evaluation Method:       Perform / Simulator                     Start Time Stop Time Total Time PERFORMANCE EVALUATION Element       S   U   Comments             Element     S     U     Comments 1.
No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 2 Job Position Nuclear Supervising Operator No.
NRC EXAM 2003-301-B1.g Revision 1
JPM Title Shift Divisions of CCHVAC (Alternate Path)
Duration 25 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:
Evaluation Method:
Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
U Comments Element S
U Comments 1.
2.
2.
* 3.
* 3.
4.
4.
5.
5.
  *6.
* 6.
  *7.
* 7.
  *8.
* 8.
  *9.
* 9.
10.
10.
11.
11.
  *12.
*12.
  *13.
*13.
______ SATISFACTORY                           ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY
Question #     S   U   Comments             Question # S     U     Comments
______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY                           ______ UNSATISFACTORY Evaluator Signature / Date:                                   /
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC EXAM 2003-301-B1.g Shift Divisions of CCHVAC (Alternate Path)                          Revision: 0 Page 3
JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)
No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 3


==References:==
==References:==
Line 799: Line 1,121:
Tools and Equipment Required:
Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                   X           Walkthrough                       Discuss Plant                                 Simulator                 X       Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant Simulator X
Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
This JPM may be performed in any IC.
This JPM may be performed in any IC.
Start this JPM at the CRS Desk in the Simulator.
Start this JPM at the CRS Desk in the Simulator.
K/A Reference :
K/A Reference :
2.1     Generic Knowledge and Abilities:
2.1 Generic Knowledge and Abilities:
2.1.17 Ability to make accurate, clear, and concise verbal reports.             3.5 / 3.6 2.1.20 Ability to execute procedure steps.                                       4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.                   3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation. 3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.       3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls                                                             3.2 / 3.3 2.4.2 Ability to recognize abnormal indications for system operating parameters which are entry into emergency/abnormal procedures.                     4.0 / 4.3 2.4.11 Knowledge of abnormal condition procedures                               3.4 / 3.6 290003 Control Room HVAC:
2.1.17 Ability to make accurate, clear, and concise verbal reports.
K3. Knowledge of effect that loss or malfunction will have on the following:
3.5 / 3.6 2.1.20 Ability to execute procedure steps.
K3.01     Control room habitability                                     3.5 / 3.8 K4. Knowledge of design feature(s) and/or interlocks for the following:
4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.
K4.01 System initiations/reconfigurations                               3.1 / 3.2 A2. Ability to predict the impact of the following:
3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.
A2.01 Initiation/reconfiguration                                         3.1 / 3.2 A2.03 Initiation/reconfiguration failure                                 3.4 / 3.6 A3. Ability to monitor automatic operation of:
3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.
A3.01 Initiation/reconfiguration                                         3.3 / 3.5 A4. Ability to manually operate and/or monitor in the control room:
3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls 3.2 / 3.3 2.4.2 Ability to recognize abnormal indications for system operating parameters which are entry into emergency/abnormal procedures.
4.0 / 4.3 2.4.11 Knowledge of abnormal condition procedures 3.4 / 3.6 290003 Control Room HVAC:
K3.
Knowledge of effect that loss or malfunction will have on the following:
K3.01 Control room habitability 3.5 / 3.8 K4.
Knowledge of design feature(s) and/or interlocks for the following:
K4.01 System initiations/reconfigurations 3.1 / 3.2 A2.
Ability to predict the impact of the following:
A2.01 Initiation/reconfiguration 3.1 / 3.2 A2.03 Initiation/reconfiguration failure 3.4 / 3.6 A3.
Ability to monitor automatic operation of:
A3.01 Initiation/reconfiguration 3.3 / 3.5 A4.
Ability to manually operate and/or monitor in the control room:


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B1.g Shift Divisions of CCHVAC (Alternate Path)                      Revision: 0 Page 4 A4.01   Initiate/reset the system                               3.2 / 3.2 Task Standard:
JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)
No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 4 A4.01 Initiate/reset the system 3.2 / 3.2 Task Standard:
Shift Control Center HVAC operating trains in accordance with 23.413.
Shift Control Center HVAC operating trains in accordance with 23.413.
Initial Conditions:
Initial Conditions:
Line 825: Line 1,161:
The CCHVAC Chiller unit will be automatically loaded.
The CCHVAC Chiller unit will be automatically loaded.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B1.g Shift Divisions of CCHVAC (Alternate Path)                    Revision: 0 Page 5 PERFORMANCE EVALUATION Time Start Elements                                       Standards NOTE: All controls and indications are located on COP H11-P808 (817) unless otherwise specified.
JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)
PREREQUSITES: NONE NOTE (1): Next step shall require an independent       1. No Action verifier.
No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located on COP H11-P808 (817) unless otherwise specified.
PREREQUSITES: NONE NOTE (1): Next step shall require an independent verifier.
NOTE (2): Independent Verification and logging requirements only need to be done the first time if repetitive starts are to be made within a one hour time frame. Radiation monitors should be checked again if suspected changes to radiological conditions, electric power supplies, or alarms received dictate this conservative action.
NOTE (2): Independent Verification and logging requirements only need to be done the first time if repetitive starts are to be made within a one hour time frame. Radiation monitors should be checked again if suspected changes to radiological conditions, electric power supplies, or alarms received dictate this conservative action.
: 1.       Perform operational checkout of D11-K809 (K813), Div 1 (2) CCHVAC Makeup Air Radiation Monitor, in accordance with 23.625, "Process Gaseous Radiation Monitoring."
1.
CUE:     Operational check complete.
Perform operational checkout of D11-K809 (K813), Div 1 (2) CCHVAC Makeup Air Radiation Monitor, in accordance with 23.625, "Process Gaseous Radiation Monitoring."
: 2. Document action taken and completion of           2. No Action independent verification in the Fermi 2 Unit Log.
CUE:
CUE:     Documentation complete.
Operational check complete.
NOTE: While both Divisions are operating, the damper lineup in Enclosures A, B, or C will not be correct.
1.
  *3.     For the Division to be started verify:           *a. Verified Div 2 Mode Select switch is selected to the same mode as the
No Action
: a. Div 1 (2) Mode Select switch is running division.
: 2. Document action taken and completion of independent verification in the Fermi 2 Unit Log.
selected to the same mode as the running division.                           *b. Verified Div 2 Emergency Air Intake Selector switch in AUTO.
CUE:
: b. Div 1 (2) Emergency Air Intake Selector switch in AUTO.
Documentation complete.
2.
No Action NOTE: While both Divisions are operating, the damper lineup in Enclosures A, B, or C will not be correct.
*3.
For the Division to be started verify:
a.
Div 1 (2) Mode Select switch is selected to the same mode as the running division.
b.
Div 1 (2) Emergency Air Intake Selector switch in AUTO.
*a. Verified Div 2 Mode Select switch is selected to the same mode as the running division.
*b. Verified Div 2 Emergency Air Intake Selector switch in AUTO.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B1.g Shift Divisions of CCHVAC (Alternate Path)                    Revision: 0 Page 6 Elements                                       Standards
JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)
: 4.       For the Division to be started, verify or   4. Verified or placed Division 2 switches for place Division 1 (2) switches for the           the following equipment in AUTO:
No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 6 Elements Standards 4.
following equipment in AUTO:
For the Division to be started, verify or place Division 1 (2) switches for the following equipment in AUTO:
* T4100-B007 (B006), Div 1 (2)
T4100-B007 (B006), Div 1 (2)
* T4100-B007 (B006), Div 1 (2)                     CCHVAC Supply Fan.
CCHVAC Supply Fan.
T4100-C041 (C040), Div 1 (2)
CCHVAC Chilled Wtr Pump.
T4100-B028 (B027), Div 1 (2)
CCHVAC Equip Room Cooler.
T4100-C031 (C030), Div 1 (2)
CCHVAC Return Air Fan.
T4100-B009 (B008), Div 1 (2)
CCHVAC Chiller.
T4100-C047 (C048), Div 1 (2)
CCHVAC Emerg Makeup Fan.
4.
Verified or placed Division 2 switches for the following equipment in AUTO:
T4100-B007 (B006), Div 1 (2)
CCHVAC Supply Fan.
CCHVAC Supply Fan.
* T4100-C041 (C040), Div 1 (2)
T4100-C041 (C040), Div 1 (2)
* T4100-C041 (C040), Div 1 (2)                      CCHVAC Chilled Wtr Pump.
CCHVAC Chilled Wtr Pump.
CCHVAC Chilled Wtr Pump.
* T4100-B028 (B027), Div 1 (2)
T4100-B028 (B027), Div 1 (2)
* T4100-B028 (B027), Div 1 (2)                      CCHVAC Equip Room Cooler.
CCHVAC Equip Room Cooler.
CCHVAC Equip Room Cooler.
* T4100-C031 (C030), Div 1 (2)
T4100-C031 (C030), Div 1 (2)
* T4100-C031 (C030), Div 1 (2)                      CCHVAC Return Air Fan.
CCHVAC Return Air Fan.
CCHVAC Return Air Fan.
* T4100-B009 (B008), Div 1 (2)
T4100-B009 (B008), Div 1 (2)
* T4100-B009 (B008), Div 1 (2)                      CCHVAC Chiller.
CCHVAC Chiller.
CCHVAC Chiller.
* T4100-C047 (C048), Div 1 (2)
T4100-C047 (C048), Div 1 (2)
* T4100-C047 (C048), Div 1 (2)                      CCHVAC Emerg Makeup Fan CCHVAC Emerg Makeup Fan.
CCHVAC Emerg Makeup Fan 5
5        If selected T4100-B009 (B008), Div 1 (2)   5  No action CCHVAC Chiller, is to be manually loaded, place Div 1 (2) Capacity Control Module AUTOMANUAL switch in MANUAL (H21-P285A (B), AB5-G13).
If selected T4100-B009 (B008), Div 1 (2)
CUE: As per initiating cues, the Chiller is to be automatically loaded
CCHVAC Chiller, is to be manually loaded, place Div 1 (2) Capacity Control Module AUTOMANUAL switch in MANUAL (H21-P285A (B), AB5-G13).
*6.     For division being placed in service, place *6. Places Control Center HVAC Div 2 Mode Control Center HVAC Div 1 (2) Mode             Select switch in ALL AUTO and verifies:
CUE:
Select switch in ALL AUTO and verify:
As per initiating cues, the Chiller is to be automatically loaded 5
* T4100-B007 (B006), Div 1 (2)
No action
* T4100-B007 (B006), Div 1 (2)                     CCHVAC Supply Fan, starts.
*6.
For division being placed in service, place Control Center HVAC Div 1 (2) Mode Select switch in ALL AUTO and verify:
T4100-B007 (B006), Div 1 (2)
CCHVAC Supply Fan, starts.
T4100-C041 (C040), Div 1 (2)
CCHVAC Chilled Wtr Pump, starts.
*6.
Places Control Center HVAC Div 2 Mode Select switch in ALL AUTO and verifies:
T4100-B007 (B006), Div 1 (2)
CCHVAC Supply Fan, starts.
CCHVAC Supply Fan, starts.
* T4100-C041 (C040), Div 1 (2)
T4100-C041 (C040), Div 1 (2)
* T4100-C041 (C040), Div 1 (2)                      CCHVAC Chilled Wtr Pump, starts.
CCHVAC Chilled Wtr Pump, starts.
CCHVAC Chilled Wtr Pump, starts.
*7.     For division being removed from service,   *7. Places Control Center Div 1 switch in ALL place Control Center Div 1 (2) switch in       STOP.
*7.
ALL STOP.
For division being removed from service, place Control Center Div 1 (2) switch in ALL STOP.
* Refers to ARP 17D27 CUE: Booth Operator - Activate (T41)
CUE:
* Reports to CRS that CCHVAC Return MF 3575, CCHVAC Div 2 Return Air Fan Trip                   Air Fan is tripped when ready to shift CCHVAC.
Booth Operator - Activate (T41)
* References AOP 20.413.01, Control CUE: As CRS, direct to return Div 1 CCHVAC                   Center HVAC System Failure to service.
MF 3575, CCHVAC Div 2 Return Air Fan Trip when ready to shift CCHVAC.
* Recommends returning Div 1 CCHVAC to service to CRS
CUE:
*8       Returns to Step 6.1.2.3 of 23.413, Control *8 Returns to Step 6.1.2.3 of 23.413, Control Center HVAC                                    Center HVAC
As CRS, direct to return Div 1 CCHVAC to service.
*7.
Places Control Center Div 1 switch in ALL STOP.
Refers to ARP 17D27 Reports to CRS that CCHVAC Return Air Fan is tripped References AOP 20.413.01, Control Center HVAC System Failure Recommends returning Div 1 CCHVAC to service to CRS
*8 Returns to Step 6.1.2.3 of 23.413, Control Center HVAC
*8 Returns to Step 6.1.2.3 of 23.413, Control Center HVAC


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B1.g Shift Divisions of CCHVAC (Alternate Path)                    Revision: 0 Page 7 Elements                                       Standards
JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)
  *3.     For the Division to be started verify:      *3. Verifies:
No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 7 Elements Standards
: a. Div 1 (2) Mode Select switch is             a. Div 1 Mode Select switch is selected selected to the same mode as the              to the same mode as the running running division.                              division.
*3.
: b. Div 1 (2) Emergency Air Intake               b. Div 1 Emergency Air Intake Selector Selector switch in AUTO.                      switch in AUTO.
For the Division to be started verify:
: 4.       For the Division to be started, verify or   4. Verifies or places Division 1 switches for place Division 1 (2) switches for the           the following equipment in AUTO:
a.
following equipment in AUTO:
Div 1 (2) Mode Select switch is selected to the same mode as the running division.
* T4100-B007 (B006), Div 1 CCHVAC
b.
* T4100-B007 (B006), Div 1 (2)                     Supply Fan.
Div 1 (2) Emergency Air Intake Selector switch in AUTO.
*3.
Verifies:
a.
Div 1 Mode Select switch is selected to the same mode as the running division.
b.
Div 1 Emergency Air Intake Selector switch in AUTO.
4.
For the Division to be started, verify or place Division 1 (2) switches for the following equipment in AUTO:
T4100-B007 (B006), Div 1 (2)
CCHVAC Supply Fan.
CCHVAC Supply Fan.
* T4100-C041 (C040), Div 1 CCHVAC
T4100-C041 (C040), Div 1 (2)
* T4100-C041 (C040), Div 1 (2)                     Chilled Wtr Pump.
CCHVAC Chilled Wtr Pump.
CCHVAC Chilled Wtr Pump.
* T4100-B028 (B027), Div 1 CCHVAC
T4100-B028 (B027), Div 1 (2)
* T4100-B028 (B027), Div 1 (2)                     Equip Room Cooler.
CCHVAC Equip Room Cooler.
CCHVAC Equip Room Cooler.
* T4100-C031 (C030), Div 1 CCHVAC
T4100-C031 (C030), Div 1 (2)
* T4100-C031 (C030), Div 1 (2)                     Return Air Fan.
CCHVAC Return Air Fan.
CCHVAC Return Air Fan.
* T4100-B009 (B008), Div 1 CCHVAC
T4100-B009 (B008), Div 1 (2)
* T4100-B009 (B008), Div 1 (2)                     Chiller.
CCHVAC Chiller.
CCHVAC Chiller.
* T4100-C047 (C048), Div 1 CCHVAC
T4100-C047 (C048), Div 1 (2)
* T4100-C047 (C048), Div 1 (2)                     Emerg Makeup Fan.
CCHVAC Emerg Makeup Fan.
CCHVAC Emerg Makeup Fan.
: 5.       If selected T4100-B009 (B008), Div 1 (2)   5. No action CCHVAC Chiller, is to be manually loaded, place Div 1 (2) Capacity Control Module AUTOMANUAL switch in MANUAL (H21-P285A (B), AB5-G13).
4.
  *6.     For division being placed in service, place *6. Place Control Center HVAC Div 1 Mode Control Center HVAC Div 1 (2) Mode             Select switch in ALL AUTO and verify:
Verifies or places Division 1 switches for the following equipment in AUTO:
Select switch in ALL AUTO and verify:
T4100-B007 (B006), Div 1 CCHVAC Supply Fan.
* T4100-B007 (B006), Div 1 CCHVAC
T4100-C041 (C040), Div 1 CCHVAC Chilled Wtr Pump.
* T4100-B007 (B006), Div 1 (2)                     Supply Fan, starts.
T4100-B028 (B027), Div 1 CCHVAC Equip Room Cooler.
T4100-C031 (C030), Div 1 CCHVAC Return Air Fan.
T4100-B009 (B008), Div 1 CCHVAC Chiller.
T4100-C047 (C048), Div 1 CCHVAC Emerg Makeup Fan.
5.
If selected T4100-B009 (B008), Div 1 (2)
CCHVAC Chiller, is to be manually loaded, place Div 1 (2) Capacity Control Module AUTOMANUAL switch in MANUAL (H21-P285A (B), AB5-G13).
5.
No action
*6.
For division being placed in service, place Control Center HVAC Div 1 (2) Mode Select switch in ALL AUTO and verify:
T4100-B007 (B006), Div 1 (2)
CCHVAC Supply Fan, starts.
CCHVAC Supply Fan, starts.
* T4100-C041 (C040), Div 1 CCHVAC
T4100-C041 (C040), Div 1 (2)
* T4100-C041 (C040), Div 1 (2)                     Chilled Wtr Pump, starts.
CCHVAC Chilled Wtr Pump, starts.
CCHVAC Chilled Wtr Pump, starts.
  *7.     For division being removed from service,   *7. Places Control Center Div 1 (2) switch in place Control Center Div 1 (2) switch in       ALL STOP.
*6.
ALL STOP..
Place Control Center HVAC Div 1 Mode Select switch in ALL AUTO and verify:
T4100-B007 (B006), Div 1 CCHVAC Supply Fan, starts.
T4100-C041 (C040), Div 1 CCHVAC Chilled Wtr Pump, starts.
*7.
For division being removed from service, place Control Center Div 1 (2) switch in ALL STOP..
*7.
Places Control Center Div 1 (2) switch in ALL STOP.
Time Stop
Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):
Informs CRS Dicvision 1 CCHVAC is operating in Normal Mode in accordance with 23.413
Informs CRS Dicvision 1 CCHVAC is operating in Normal Mode in accordance with 23.413


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC EXAM 2003-301-B1.g Shift Divisions of CCHVAC (Alternate Path)          Revision: 0 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)
No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


==Reference:==
==Reference:==
===Response===
===Response===
Question:
Question:
Reference
Reference  


===Response===
===Response===
 
JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)
JOB PERFORMANCE MEASURE JPM Title                                                 No.: NRC EXAM 2003-301-B1.g Shift Divisions of CCHVAC (Alternate Path)                Revision: 0 Page 9 Simulator Setup IC#:
No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 9 Simulator Setup IC#:
Any Malfunctions:
Any Malfunctions:
Number                                       Title                                 Value (T41) MF 3575                               CCHVAC Div 2 Return Air Fan Trip       On Remote Functions:
Number Title Value (T41) MF 3575 CCHVAC Div 2 Return Air Fan Trip On Remote Functions:
Number                                       Title                                 Value None Override Functions:
Number Title Value None Override Functions:
None Special Instructions:
None Special Instructions:


Line 943: Line 1,331:
The CCHVAC Chiller unit will be automatically loaded.
The CCHVAC Chiller unit will be automatically loaded.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B2.a Switching Control Rod Drive Hydraulic FCV (Alternate Path)    Revision: 1 Page 2 Job Position                                               No.                      Revision Nuclear Supervising Operator                               NRC EXAM 2003-301-B2.a         1 JPM Title                                                 Duration          Page Switching Control Rod Drive Hydraulic FCV                 30 Minutes        COVER SHEET (Alternate Path)
JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)
Examinee:                                                             SRO / RO Evaluator:
No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.
Evaluation Method:       Perform / Plant                             Start Time Stop Time Total Time PERFORMANCE EVALUATION Element       S   U   Comments                   Element     S     U     Comments
NRC EXAM 2003-301-B2.a Revision 1
: 1.                                                 *14.
JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)
: 2.                                                 *15.
Duration 30 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:
: 3.                                                 16.
Evaluation Method:
Perform / Plant Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
U Comments Element S
U Comments 1.
*14.
2.
*15.
3.
16.
4.
4.
  *5.
*5.
  *6.
*6.
  *7.
*7.
8.
8.
9.
9.
  *10.
*10.
  *11.
*11.
  *12.
*12.
  *13.
*13.
______ SATISFACTORY                                 ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY
Question #   S   U   Comments                   Question # S     U     Comments
______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY                                 ______ UNSATISFACTORY
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY


JOB PERFORMANCE MEASURE JPM Title                                                 No.: NRC EXAM 2003-301-B2.a Switching Control Rod Drive Hydraulic FCV (Alternate Path) Revision: 1 Page 3 Evaluator Signature / Date:                                     /
JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)
No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 3 Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                             No.: NRC EXAM 2003-301-B2.a Switching Control Rod Drive Hydraulic FCV (Alternate Path)            Revision: 1 Page 4
JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)
No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 4


==References:==
==References:==
Line 973: Line 1,378:
Tools and Equipment Required:
Tools and Equipment Required:
15 Crescent Wrench Preferred Evaluation Method:
15 Crescent Wrench Preferred Evaluation Method:
Perform                   X           Walkthrough                           Discuss Plant                     X           Simulator                             Classroom Evaluator Notes:
Perform X
Walkthrough Discuss Plant X
Simulator Classroom Evaluator Notes:
ENSURE All industrial and personnel safety practices are used and enforced.
ENSURE All industrial and personnel safety practices are used and enforced.
This JPM should be performed in the plant.
This JPM should be performed in the plant.
Line 982: Line 1,389:


==Reference:==
==Reference:==
 
201001 Control Rod Drive Hydraulic System K1 Knowledge of the physical connections and/or cause effect relationships between control rod drive hydraulic system and the following (CFR: 41.2 to 41.9 / 45.7 to 45.8):
201001 Control Rod Drive Hydraulic System K1     Knowledge of the physical connections and/or cause effect relationships between control rod drive hydraulic system and the following (CFR: 41.2 to 41.9 / 45.7 to 45.8):
K1.09, Plant air systems 3.1 / 3.2 A1 Ability to predict and/or monitor changes in parameters associated with operating the control rod drive hydraulic SYSTEM controls including (CFR: 41.5 / 45.5):
K1.09, Plant air systems                                                       3.1 / 3.2 A1     Ability to predict and/or monitor changes in parameters associated with operating the control rod drive hydraulic SYSTEM controls including (CFR: 41.5 / 45.5):
A1.09 - CRD drive water flow.
A1.09 - CRD drive water flow.                                                 2.9 / 2.8 A2     Ability to (a) predict the impacts of the following on the control rod drive hydraulic system ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations (CFR: 41.5 / 45.6):
2.9 / 2.8 A2 Ability to (a) predict the impacts of the following on the control rod drive hydraulic system ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations (CFR: 41.5 / 45.6):
A2.07, Flow control valve failure                                             3.2 / 3.1 Task Standard:
A2.07, Flow control valve failure 3.2 / 3.1 Task Standard:
The CRD Flow Control Valves are shifted.
The CRD Flow Control Valves are shifted.
Initial Conditions:
Initial Conditions:
Line 997: Line 1,404:
A CRD Flow Control Valve is in service.
A CRD Flow Control Valve is in service.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B2.a Switching Control Rod Drive Hydraulic FCV (Alternate Path)      Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements                                           Standards NOTE: Enters procedure 23.106, Control Rod Hydraulic Shift, beginning at Step 6.4.2.2 CUE: Communication with the Control Room is established.
JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)
: 1. Establish and maintain communication         1. Communication with the Control Room is with the Control Room until the evolution          established.
No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: Enters procedure 23.106, Control Rod Hydraulic Shift, beginning at Step 6.4.2.2 CUE:
is complete.
Communication with the Control Room is established.
CUE:     Report as Control Room NSO:
1.
* Control Rod Drive Hydraulic System Flow is 60 gpm.
Establish and maintain communication with the Control Room until the evolution is complete.
* Flow Controller is in AUTO.
1.
* Cooling Water Header to Reactor Differential Pressure is 11.5 psi.
Communication with the Control Room is established.
: 2. Have the Control Room verify the Control     2. Control Room verified:
CUE:
Rod Drive Hydraulic System Flow is 37 to           The Control Rod Drive Hydraulic System 63 gpm and the controller is in AUTO,             Flow is 37 to 63 gpm.
Report as Control Room NSO:
maintaining Cooling Water Header to The Controller is in AUTO.
Control Rod Drive Hydraulic System Flow is 60 gpm.
Reactor Differential Pressure 10 to 13 psi (H11-P603).                                       The Cooling Water Header to Reactor Differential Pressure is 10 to 13 psi.
Flow Controller is in AUTO.
Note:   The remaining steps are performed at the H21-P164 unless otherwise noted.
Cooling Water Header to Reactor Differential Pressure is 11.5 psi.
CUE: The Drive Water Valve Selector Switch is in MANUAL and at minimum output.
2.
: 3. Verify the Drive Water Valve Selector        3. The Drive Water Valve Selector Switch is Switch to be placed in service is in              in MANUAL and at minimum output.
Have the Control Room verify the Control Rod Drive Hydraulic System Flow is 37 to 63 gpm and the controller is in AUTO, maintaining Cooling Water Header to Reactor Differential Pressure 10 to 13 psi (H11-P603).
MANUAL and at minimum output.
2.
CUE: The A Drive Water Flow Control Valve is in AUTO.
Control Room verified:
: 4. Verify the A Drive Water Flow Control       4. The Drive Water Flow Control Valve is Valve is in AUTO.                                  verified in AUTO.
The Control Rod Drive Hydraulic System Flow is 37 to 63 gpm.
CUE: The C11-F047B Flow Control Outlet isolation Valve is open.
The Controller is in AUTO.
* 5. Open or verify open the C11-F047A(B)
The Cooling Water Header to Reactor Differential Pressure is 10 to 13 psi.
* 5. The C11-F047B Flow Control Outlet Flow Control Outlet Isolation Valve for the        Isolation Valve is open.
Note:
valve being placed in service.
The remaining steps are performed at the H21-P164 unless otherwise noted.
CUE:
The Drive Water Valve Selector Switch is in MANUAL and at minimum output.
3.
Verify the Drive Water Valve Selector Switch to be placed in service is in MANUAL and at minimum output.
3.
The Drive Water Valve Selector Switch is in MANUAL and at minimum output.
CUE:
The A Drive Water Flow Control Valve is in AUTO.
4.
Verify the A Drive Water Flow Control Valve is in AUTO.
4.
The Drive Water Flow Control Valve is verified in AUTO.
CUE:
The C11-F047B Flow Control Outlet isolation Valve is open.
* 5.
Open or verify open the C11-F047A(B)
Flow Control Outlet Isolation Valve for the valve being placed in service.
* 5.
The C11-F047B Flow Control Outlet Isolation Valve is open.


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B2.a Switching Control Rod Drive Hydraulic FCV (Alternate Path)      Revision: 1 Page 6 Elements                                         Standards CUE: The C11-F046B Flow Control Inlet Isolation Valve is open.
JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)
* 6. Open or verify open the C11-F046A(B)
No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 6 Elements Standards CUE:
* 6. The C11-F046B Flow Control Inlet Flow Control Inlet Isolation Valve for the        Isolation Valve is open.
The C11-F046B Flow Control Inlet Isolation Valve is open.
valve being placed in service.
* 6.
CUE: The B CRD Flow Controller demand is increased.
Open or verify open the C11-F046A(B)
* 7. Increase the demand on the Drive Water
Flow Control Inlet Isolation Valve for the valve being placed in service.
* 7. The demand on the Drive Water Valve valve MANUAL / AUTO C11-D009A(B)                  MANUAL / AUTO C11-D009B Controller Controller being placed in service.                has been increased.
* 6.
CUE:     The A Drive Water valve is closing.
The C11-F046B Flow Control Inlet Isolation Valve is open.
: 8. Verify the Drive Water Valve being taken     8. The A Drive Water Valve closing is out of service begins to close as the             verified.
CUE:
output controller for the Drive Water Flow Valve placed in service is increased.
The B CRD Flow Controller demand is increased.
Note:   The next step may require adjusting the Control Rod Drive Hydraulic System Flow Controller setpoint.
* 7.
CUE: C11-F002B, the B Drive Water Flow Control Valve is NOT opening.
Increase the demand on the Drive Water valve MANUAL / AUTO C11-D009A(B)
: 9. Verify the valve stem for the Drive Water     9. Verifies no response to flow control valve Flow valve being placed in service is opening.
Controller being placed in service.
CUE:     No response from the flow control valve.
* 7.
CUE:     Report as Control Room NSO:
The demand on the Drive Water Valve MANUAL / AUTO C11-D009B Controller has been increased.
* Crew has entered 20.106.03, CRD Flow Control Valve Failure
CUE:
* The FCV being removed from service had stopped responding.
The A Drive Water valve is closing.
* Cooling Water Header to Reactor Differential Pressure is 11.5 psi.
8.
* Perform Step D of 20.106.03, CRD Flow Control Valve Failure
Verify the Drive Water Valve being taken out of service begins to close as the output controller for the Drive Water Flow Valve placed in service is increased.
                  - provide copy
8.
*10. Adjust Control Rod Drive Hydraulic         *10. Reports no response from flow control System Flow controller setpoint                    valve
The A Drive Water Valve closing is verified.
Note:
The next step may require adjusting the Control Rod Drive Hydraulic System Flow Controller setpoint.
CUE:
C11-F002B, the B Drive Water Flow Control Valve is NOT opening.
9.
Verify the valve stem for the Drive Water Flow valve being placed in service is opening.
9.
Verifies no response to flow control valve CUE:
No response from the flow control valve.
CUE:
Report as Control Room NSO:
Crew has entered 20.106.03, CRD Flow Control Valve Failure The FCV being removed from service had stopped responding.
Cooling Water Header to Reactor Differential Pressure is 11.5 psi.
Perform Step D of 20.106.03, CRD Flow Control Valve Failure
- provide copy
*10.
Adjust Control Rod Drive Hydraulic System Flow controller setpoint
*10.
Reports no response from flow control valve


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B2.a Switching Control Rod Drive Hydraulic FCV (Alternate Path)    Revision: 1 Page 7 Elements                                       Standards NOTE: Begin at Step D.1 of 20.106.01, CRD Flow Control Valve Failure CUE: C11-K009A in Manual and Set to minimum
JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)
  *11. Verify C11-K009A in Manual and Set to     *11   Verified C11-K009A in Manual and Set to minimum                                          minimum CUE: C11-K009B in Manual and Set to minimum
No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 7 Elements Standards NOTE: Begin at Step D.1 of 20.106.01, CRD Flow Control Valve Failure CUE:
  *12. Verify C11-K009B in Manual and Set to     *12   Verified C11-K009B in Manual and Set to minimum                                          minimum CUE: The C11-F047A Flow Control Outlet isolation Valve is open.
C11-K009A in Manual and Set to minimum
CUE: The C11-F046A Flow Control Outlet isolation Valve is open.
*11.
  *13. For CRD FCV to be placed in service,       *13. Verified C1100-F047A open and verify C1100-F047A(B) open and C1100-             C1100-F046A open.
Verify C11-K009A in Manual and Set to minimum
F046A(B) open.
*11 Verified C11-K009A in Manual and Set to minimum CUE:
CUE:     The hand jack locking nut is loose.
C11-K009B in Manual and Set to minimum
  *14      Obtains crescent wrench from cart or tool  *14   Obtains crescent wrench from cart or tool bin and loosen hand jack locking nut on           bin and Loosen hand jack locking nut C11-F002A using a crescent wrench (15)           using a crescent wrench (15)
*12.
(Enclosure A).                                    (Enclosure A).
Verify C11-K009B in Manual and Set to minimum
CUE:     Flow is 60 gpm
*12 Verified C11-K009B in Manual and Set to minimum CUE:
  *15     For C11-F002A turn brass hand jack         *15    Establishes a flow of 60 gpm locally operator nut using a crescent wrench (15         (C11-R019).
The C11-F047A Flow Control Outlet isolation Valve is open.
or 12) to open (counterclockwise) or close (clockwise) CRD FCV, while observing flow. Establish a flow of 60 gpm locally (C11-R019).
CUE:
: 16. Notify the Control Room that the CRD       16. The Control Room is notified.
The C11-F046A Flow Control Outlet isolation Valve is open.
Flow Control Valve is in local manual control Time Stop
*13.
For CRD FCV to be placed in service, verify C1100-F047A(B) open and C1100-F046A(B) open.
*13.
Verified C1100-F047A open and C1100-F046A open.
CUE:
The hand jack locking nut is loose.
*14 Obtains crescent wrench from cart or tool bin and loosen hand jack locking nut on C11-F002A using a crescent wrench (15)
(Enclosure A).
*14 Obtains crescent wrench from cart or tool bin and Loosen hand jack locking nut using a crescent wrench (15)
(Enclosure A).
CUE:
Flow is 60 gpm
*15 For C11-F002A turn brass hand jack operator nut using a crescent wrench (15 or 12) to open (counterclockwise) or close (clockwise) CRD FCV, while observing flow. Establish a flow of 60 gpm locally (C11-R019).
*15 Establishes a flow of 60 gpm locally (C11-R019).
16.
Notify the Control Room that the CRD Flow Control Valve is in local manual control 16.
The Control Room is notified.
Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B2.a Switching Control Rod Drive Hydraulic FCV (Alternate Path)      Revision: 1 Page 8 Informs the Control Room that the Flow Control Valve A is in local manual control.
JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)
No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 8 Informs the Control Room that the Flow Control Valve A is in local manual control.


JOB PERFORMANCE MEASURE JPM Title                                                 No.: NRC EXAM 2003-301-B2.a Switching Control Rod Drive Hydraulic FCV (Alternate Path) Revision: 1 Page 9 FOLLOW-UP DOCUMENTATION QUESTIONS Question:
JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)
No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 9 FOLLOW-UP DOCUMENTATION QUESTIONS Question:


===Response===
===Response===
Line 1,065: Line 1,529:


===Response===
===Response===
 
JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)
JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B2.a Switching Control Rod Drive Hydraulic FCV (Alternate Path)    Revision: 1 Page 10 Plant Setup Special Instructions:
No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 10 Plant Setup Special Instructions:
: 1. Contact Control Room and inform CRS that this JPM is to be conducted.
: 1. Contact Control Room and inform CRS that this JPM is to be conducted.
: 2. Begin JPM.
: 2. Begin JPM.
Line 1,082: Line 1,546:
A CRD Flow Control Valve is in service.
A CRD Flow Control Valve is in service.


JOB PERFORMANCE MEASURE JPM Title                                               No.: NRC EXAM 2003-301-B2.b Defeat of RPS Automatic Logic Trips                      Revision: 0 Page 2 Job Position                                         No.                        Revision Nuclear Supervising Operator                         NRC Exam 2003-301-B2.b           0 JPM Title                                           Duration            Page Defeat of RPS Automatic Logic Trips                 25 Minutes         COVER SHEET Examinee:                                                         SRO / RO / NLO / SROC / STA Evaluator:
JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 2 Job Position Nuclear Supervising Operator No.
Evaluation Method:       Plant / Walkthrough                     Start Time Stop Time Total Time PERFORMANCE EVALUATION Element     S     U     Comments             Element     S     U     Comments
NRC Exam 2003-301-B2.b Revision 0
    *1.
JPM Title Defeat of RPS Automatic Logic Trips Duration 25 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:
  *2.
Evaluation Method:
  *3.
Plant / Walkthrough Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
  *4.
U Comments Element S
______ SATISFACTORY                           ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
U Comments
Question #   S     U     Comments             Question # S     U     Comments
* 1.
______ SATISFACTORY                           ______ UNSATISFACTORY Evaluator Signature / Date:                                   /
* 2.
* 3.
* 4.
______ SATISFACTORY
______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC EXAM 2003-301-B2.b Defeat of RPS Automatic Logic Trips                                Revision: 0 Page 3
JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 3


==References:==
==References:==
Required (R) / Available (A) 29.ESP.09, Defeat of RPS Automatic Logic Trips Tools and Equipment Required:
Required (R) / Available (A) 29.ESP.09, Defeat of RPS Automatic Logic Trips Tools and Equipment Required:
* EOP Defeat Package for 29.ESP.09, Defeat of RPS Automatic Logic Trips
EOP Defeat Package for 29.ESP.09, Defeat of RPS Automatic Logic Trips Flashlight Low voltage electrical gloves Preferred Evaluation Method:
* Flashlight
Perform X
* Low voltage electrical gloves Preferred Evaluation Method:
Walkthrough Discuss Plant X
Perform                   X         Walkthrough                         Discuss Plant                     X         Simulator                           Classroom Evaluator Notes:
Simulator Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
Ensure SM informed of JPM walkthrough in relay room and cabinet doors opened for walkthrough of this task.
Ensure SM informed of JPM walkthrough in relay room and cabinet doors opened for walkthrough of this task.
Stop the JPM if, at any time, this JPM interferes with plant operation.
Stop the JPM if, at any time, this JPM interferes with plant operation.
K/A Reference :
K/A Reference :
2.1     Generic Knowledge and Abilities:
2.1 Generic Knowledge and Abilities:
2.1.17 Ability to make accurate, clear, and concise verbal reports.               3.5 / 3.6 2.1.20 Ability to execute procedure steps.                                       4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.                   3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.     3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.         3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls                                                             3.2 / 3.3 212000 Reactor protection System:
2.1.17 Ability to make accurate, clear, and concise verbal reports.
K3. Knowledge of the effect that a loss or malfunction of RPS will have on the following:
3.5 / 3.6 2.1.20 Ability to execute procedure steps.
K3.05 RPS Logic Channels                                                 3.7 / 3.8 K4. Knowledge of design feature(s) and/or interlocks which provide:
4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.
K4.12 Bypassing selected SCRAM signals(manual and auto)                   3.9 / 4.1 K6. Knowledge of the loss and/or malfunction of, will have an the following:
3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.
K6.05 RPS sensor inputs.                                                 3.5 / 3.8 A3. Ability to monitor automatics operation of:
3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.
A3.04 System status lights and alarms                                     3.9 / 3.8 A.4. Ability to Manually operate and/or monitor in the Control Room:
3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls 3.2 / 3.3 212000 Reactor protection System:
A4.07 System status lights and alarms                                     4.0 / 3.9 A4.16 Manually activate ATWS circuitry                                   4.4 / 4.4 A4.17 Perform alternate reactivity/shutdown operations                   4.1 / 4.1
K3.
Knowledge of the effect that a loss or malfunction of RPS will have on the following:
K3.05 RPS Logic Channels 3.7 / 3.8 K4.
Knowledge of design feature(s) and/or interlocks which provide:
K4.12 Bypassing selected SCRAM signals(manual and auto) 3.9 / 4.1 K6.
Knowledge of the loss and/or malfunction of, will have an the following:
K6.05 RPS sensor inputs.
3.5 / 3.8 A3.
Ability to monitor automatics operation of:
A3.04 System status lights and alarms 3.9 / 3.8 A.4.
Ability to Manually operate and/or monitor in the Control Room:
A4.07 System status lights and alarms 4.0 / 3.9 A4.16 Manually activate ATWS circuitry 4.4 / 4.4 A4.17 Perform alternate reactivity/shutdown operations 4.1 / 4.1


JOB PERFORMANCE MEASURE JPM Title                                                         No.: NRC EXAM 2003-301-B2.b Defeat of RPS Automatic Logic Trips                              Revision: 0 Page 4 295015 Incomplete Scram:
JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 4 295015 Incomplete Scram:
AK2. Knowledge of interrelationships for the following:
AK2.
AK2.04 RPS                                                         4.0 / 4.1 AK2.08 Neutron monitoring system                                   3.6 / 3.7 AA1. Ability to operate and/or monitor the following:
Knowledge of interrelationships for the following:
AA1.02 RPS                                                         4.0 / 4.2 AA1.07 Neutron monitoring system                                   3.6 / 3.7 295037 Scram Condition and Reactor Power Above APRM Downscale:
AK2.04 RPS 4.0 / 4.1 AK2.08 Neutron monitoring system 3.6 / 3.7 AA1.
EK2. Knowledge of interrelations between the following:
Ability to operate and/or monitor the following:
EK2.01 RPS                                                         4.2 / 4.3 EK3. Knowledge of reasons for the following responses:
AA1.02 RPS 4.0 / 4.2 AA1.07 Neutron monitoring system 3.6 / 3.7 295037 Scram Condition and Reactor Power Above APRM Downscale:
EK3.07 Various alternate methods of control rod insertion           4.2 / 4.3 EA1. Ability to operate and monitor the following:
EK2.
EA1.01 RPS                                                         4.6 / 4.6 Task Standard:
Knowledge of interrelations between the following:
EK2.01 RPS 4.2 / 4.3 EK3.
Knowledge of reasons for the following responses:
EK3.07 Various alternate methods of control rod insertion 4.2 / 4.3 EA1.
Ability to operate and monitor the following:
EA1.01 RPS 4.6 / 4.6 Task Standard:
RPS Automatic scram functions have been simulated defeated in accordance with 29.ESP.09.
RPS Automatic scram functions have been simulated defeated in accordance with 29.ESP.09.
Initial Conditions:
Initial Conditions:
Line 1,129: Line 1,621:
Hand the candidate a copy of the procedure and the keys.
Hand the candidate a copy of the procedure and the keys.


JOB PERFORMANCE MEASURE JPM Title                                               No.: NRC EXAM 2003-301-B2.b Defeat of RPS Automatic Logic Trips                      Revision: 0 Page 5 PERFORMANCE EVALUATION Time Start Elements                                   Standards NOTE: All controls and indications are located PREREQUSITES: NONE
JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located PREREQUSITES: NONE
  *2.1     Install jumper Logic B2: H11-P611 Dev        Jumper H11-P611 Dev AX, Term 1 To AX, Term 1 To Dev BL, Term 4.               Dev BL, Term 4 installed.
*2.1 Install jumper Logic B2: H11-P611 Dev AX, Term 1 To Dev BL, Term 4.
  *2.2     Install jumper Logic B1: H11-P611 Dev       Jumper H11-P611 Dev DJ, Term 1 To DJ, Term 1 To Dev DW Term 4.                Dev DW Term 4installed.
Jumper H11-P611 Dev AX, Term 1 To Dev BL, Term 4 installed.
  *2.3     Install jumper Logic A2: H11-P609 Dev       Jumper H11-P609 Dev AX Term 1 To Dev AX Term 1 To Dev BL Term 4.                  BL Term 4 installed.
*2.2 Install jumper Logic B1: H11-P611 Dev DJ, Term 1 To Dev DW Term 4.
  *2.4     Install jumper Logic A1: H11-P609 dev DJ     Jumper H11-P609 dev DJ Term 1 To Dev Term 1 To Dev DW Term 4.                    DW Term 4 installed.
Jumper H11-P611 Dev DJ, Term 1 To Dev DW Term 4installed.
*2.3 Install jumper Logic A2: H11-P609 Dev AX Term 1 To Dev BL Term 4.
Jumper H11-P609 Dev AX Term 1 To Dev BL Term 4 installed.
*2.4 Install jumper Logic A1: H11-P609 dev DJ Term 1 To Dev DW Term 4.
Jumper H11-P609 dev DJ Term 1 To Dev DW Term 4 installed.
Time Stop
Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):
RPS Automatic Trips are defeated IAW 29.ESP.09
RPS Automatic Trips are defeated IAW 29.ESP.09


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC EXAM 2003-301-B2.b Defeat of RPS Automatic Logic Trips                Revision: 0 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


Line 1,145: Line 1,641:


===Response===
===Response===
 
JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 7 Plant Setup Special Instructions:
JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B2.b Defeat of RPS Automatic Logic Trips                          Revision: 0 Page 7 Plant Setup Special Instructions:
: 5. Contact Control Room and inform CRS that this JPM is to be conducted.
: 5. Contact Control Room and inform CRS that this JPM is to be conducted.
: 6. Begin JPM.
: 6. Begin JPM.
Line 1,158: Line 1,653:
CRS directs you to Defeat RPS Automatic Logic Trips per 29.ESP.09.
CRS directs you to Defeat RPS Automatic Logic Trips per 29.ESP.09.


JOB PERFORMANCE MEASURE JPM Title                                               No.: NRC EXAM 2003-301-B2.c Sutdown the Diesel Fire Pump                            Revision: 0 Page 2 Job Position                                       No.                        Revision Nuclear Supervising Operator                       NRC EXAM 2003-301-B2.c           0 JPM Title                                           Duration            Page Sutdown the Diesel Fire Pump                       15 Minutes         COVER SHEET Examinee:                                                       SRO / RO / NLO / SROC / STA Evaluator:
JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 2 Job Position Nuclear Supervising Operator No.
Evaluation Method:       Walkthrough / Plant                   Start Time Stop Time Total Time PERFORMANCE EVALUATION Element     S     U     Comments           Element     S     U     Comments
NRC EXAM 2003-301-B2.c Revision 0
: 1.                                         *14
JPM Title Sutdown the Diesel Fire Pump Duration 15 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:
: 2.                                         15
Evaluation Method:
: 3.                                         16
Walkthrough / Plant Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S
: 4.                                         17 5.
U Comments Element S
U Comments 1.
*14 2.
15 3.
16 4.
17 5.
6.
6.
  *7
* 7
  *8 9
* 8 9
10
10
  *11
*11
  *12
*12
  *13
*13
______ SATISFACTORY                         ______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY
Question #   S     U     Comments           Question # S     U     Comments
______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)
______ SATISFACTORY                         ______ UNSATISFACTORY Evaluator Signature / Date:                                 /
Question #
S U
Comments Question #
S U
Comments
______ SATISFACTORY
______ UNSATISFACTORY Evaluator Signature / Date:
/


JOB PERFORMANCE MEASURE JPM Title                                                           No.: NRC EXAM 2003-301-B2.c Sutdown the Diesel Fire Pump                                        Revision: 0 Page 3
JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 3


==References:==
==References:==
Line 1,181: Line 1,688:
Tools and Equipment Required:
Tools and Equipment Required:
None Preferred Evaluation Method:
None Preferred Evaluation Method:
Perform                               Walkthrough             X           Discuss Plant                     X         Simulator                           Classroom Evaluator Notes:
Perform Walkthrough X
Discuss Plant X
Simulator Classroom Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.
This JPM should be performed in the plant.
This JPM should be performed in the plant.
Start this JPM at the Protected Area parking lot K/A Reference :
Start this JPM at the Protected Area parking lot K/A Reference :
286000 Fire Protection System K4. Knowledge of fire protection system design feature(s) and/or interlocks which provide for the following (CFR: 41.7) (CFR: 41.5 / 45.3) (CFR: 41.7 / 45.7) (CFR: 41.5 / 45.5)
286000 Fire Protection System K4.
Knowledge of fire protection system design feature(s) and/or interlocks which provide for the following (CFR: 41.7) (CFR: 41.5 / 45.3) (CFR: 41.7 / 45.7) (CFR: 41.5 / 45.5)
(CFR: 41.5 / 45.6) (CFR: 41.7 / 45.7) (CFR: 41.7 / 45.5 to 45.8)
(CFR: 41.5 / 45.6) (CFR: 41.7 / 45.7) (CFR: 41.7 / 45.5 to 45.8)
K4.05 Fire protection capability during loss of off-site power           3.7 / 3.8 K5     Knowledge of the operational implications of the following concepts as they apply to fire protection system (CFR: 41.5 / 45.3):
K4.05 Fire protection capability during loss of off-site power 3.7 / 3.8 K5 Knowledge of the operational implications of the following concepts as they apply to fire protection system (CFR: 41.5 / 45.3):
K5.05 Diesel operations                                                   3.0 / 3.1 A4     Ability to manually operate and/or monitor in the control room (CFR: 41.7 / 45.5 to 45.8):
K5.05 Diesel operations 3.0 / 3.1 A4 Ability to manually operate and/or monitor in the control room (CFR: 41.7 / 45.5 to 45.8):
A4.06 Fire diesel                                                         3.4 / 3.4 Task Standard:
A4.06 Fire diesel 3.4 / 3.4 Task Standard:
Shutdown the Diesel Fire Pump Initial Conditions:
Shutdown the Diesel Fire Pump Initial Conditions:
The plant is at full power 28.504.02, Diesel Fire Pump Engine Weekly Operability Test, is in progress.
The plant is at full power 28.504.02, Diesel Fire Pump Engine Weekly Operability Test, is in progress.
Line 1,196: Line 1,706:
The surveillance is on Step 5.1.18
The surveillance is on Step 5.1.18


JOB PERFORMANCE MEASURE JPM Title                                                 No.: NRC EXAM 2003-301-B2.c Sutdown the Diesel Fire Pump                              Revision: 0 Page 4 PERFORMANCE EVALUATION Time Start Elements                                     Standards PREREQUSITES: NONE NOTE: Begin at Step 5.1.18 of 28.504.02 CUE: Give the candidate a copy of the completed surveillance up to Step 5.1.18 CUE:   Speed is 1000 RPM CUE:   Five minutes is up
JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 4 PERFORMANCE EVALUATION Time Start Elements Standards PREREQUSITES: NONE NOTE: Begin at Step 5.1.18 of 28.504.02 CUE:
: 1.     Adjust Engine Governor Control clockwise to idle speed (less than 1200 rpm) and run engine for approximately 5 minutes.
Give the candidate a copy of the completed surveillance up to Step 5.1.18 CUE:
CUE:   Strobotac indicates 2250 RPM
Speed is 1000 RPM CUE:
  *2. Place Engine Governor Control to FULL      *2. Places Engine Governor Control to FULL SPEED (approximately 2300 rpm) position       SPEED and records engine speed.
Five minutes is up 1.
by turning counterclockwise to FULL OPEN and locking; then record engine speed below, from Strobotac:
Adjust Engine Governor Control clockwise to idle speed (less than 1200 rpm) and run engine for approximately 5 minutes.
: 3.     Open P8000-F154, Diesel Fire Pump         3. Open P8000-F154, Diesel Fire Pump Strainer Drain Valve.                          Strainer Drain Valve.
CUE:
: 4.     Turn each strainer handwheel 2 turns       4. Turns each strainer handwheel 2 turns clockwise.                                    clockwise.
Strobotac indicates 2250 RPM
: 5.       Close P8000-F154, Diesel Fire Pump       5. Closes P8000-F154, Diesel Fire Pump Strainer Drain Valve.                          Strainer Drain Valve.
*2.
: 6.       Close and seal lock P8000-F010, Diesel   6. Closes and seal lock P8000-F010, Diesel Fire Pump Recirc Test Valve.                  Fire Pump Recirc Test Valve.
Place Engine Governor Control to FULL SPEED (approximately 2300 rpm) position by turning counterclockwise to FULL OPEN and locking; then record engine speed below, from Strobotac:
CUE:   Discharge pressure is 170 psig
*2.
  *7. Record discharge pressure from X80-       *7. Records discharge pressure R401, Diesel Fire Pump Disch Press Indicator. Between 168 and 175 psig approximately.
Places Engine Governor Control to FULL SPEED and records engine speed.
CUE: CRNSO reports Diesel Fire Pump CMC Switch in OFF/RESET
3.
  *8. Have place Diesel Fire Pump CMC Switch    *8. Diesel Fire Pump CMC Switch in in OFF/RESET (COP H11-P807).                   OFF/RESET (COP H11-P807).
Open P8000-F154, Diesel Fire Pump Strainer Drain Valve.
9       Place Local Control Switch in OFF          9  Places Local Control Switch in OFF (Control Cabinet H21-P458).
3.
CUE: CRNSO reports 7D2, DIESEL FIRE PUMP TROUBLE, alarms.
Open P8000-F154, Diesel Fire Pump Strainer Drain Valve.
4.
Turn each strainer handwheel 2 turns clockwise.
4.
Turns each strainer handwheel 2 turns clockwise.
5.
Close P8000-F154, Diesel Fire Pump Strainer Drain Valve.
5.
Closes P8000-F154, Diesel Fire Pump Strainer Drain Valve.
6.
Close and seal lock P8000-F010, Diesel Fire Pump Recirc Test Valve.
6.
Closes and seal lock P8000-F010, Diesel Fire Pump Recirc Test Valve.
CUE:
Discharge pressure is 170 psig
*7.
Record discharge pressure from X80-R401, Diesel Fire Pump Disch Press Indicator. Between 168 and 175 psig approximately.
*7.
Records discharge pressure CUE:
CRNSO reports Diesel Fire Pump CMC Switch in OFF/RESET
*8.
Have place Diesel Fire Pump CMC Switch in OFF/RESET (COP H11-P807).
*8.
Diesel Fire Pump CMC Switch in OFF/RESET (COP H11-P807).
9 Place Local Control Switch in OFF (Control Cabinet H21-P458).
9 Places Local Control Switch in OFF CUE:
CRNSO reports 7D2, DIESEL FIRE PUMP TROUBLE, alarms.


JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B2.c Sutdown the Diesel Fire Pump                                  Revision: 0 Page 5 Elements                                         Standards
JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 5 Elements Standards 10.
: 10.     Verify Annunciator 7D2, DIESEL FIRE         10. Verifies Annunciator 7D2, DIESEL FIRE PUMP TROUBLE, alarms.                            PUMP TROUBLE, alarms.
Verify Annunciator 7D2, DIESEL FIRE PUMP TROUBLE, alarms.
CUE: CRNSO reports Diesel Fire Pump CMC Switch in AUTO.
10.
  *11. Have CRNSO place Diesel Fire Pump           *11. Diesel Fire Pump CMC Switch in AUTO CMC Switch in AUTO (COP H11-P807).               (COP H11-P807).
Verifies Annunciator 7D2, DIESEL FIRE PUMP TROUBLE, alarms.
  *12. Place Local Control Switch in AUTO         12. Places Local Control Switch in AUTO (Control Cabinet H21-P458).                      (Control Cabinet H21-P458).
CUE:
: 13.     Verify the following are clear:            13. Verifies clear:
CRNSO reports Diesel Fire Pump CMC Switch in AUTO.
Annunciator 7D2, DIESEL FIRE PUMP               Annunciator 7D2, DIESEL FIRE PUMP TROUBLE.                                         TROUBLE.
*11.
Annunciator 7D6, DIESEL FIRE PUMP               Annunciator 7D6, DIESEL FIRE PUMP AUTO START.                                      AUTO START.
Have CRNSO place Diesel Fire Pump CMC Switch in AUTO (COP H11-P807).
CUE: Diesel Fire Pump Fuel Oil Tank Level is 35 inches NOTE: The Diesel Fire Pump Fuel Oil Tank Level       *14. Performs the following:
*11.
is a TRM Section TR 3.12.2 limit. If the         1. Record Diesel Fire Pump Fuel Oil Tank tank level is less than 28 inches on the             Level:
Diesel Fire Pump CMC Switch in AUTO (COP H11-P807).
level indicator or graduated dipstick, the
*12.
: 2. Verify meets acceptable limits SM must be notified immediately (see Enclosure A for Level Conversion Chart).
Place Local Control Switch in AUTO (Control Cabinet H21-P458).
  *14. Perform the following:
12.
Places Local Control Switch in AUTO (Control Cabinet H21-P458).
13.
Verify the following are clear:
Annunciator 7D2, DIESEL FIRE PUMP TROUBLE.
Annunciator 7D6, DIESEL FIRE PUMP AUTO START.
13.
Verifies clear:
Annunciator 7D2, DIESEL FIRE PUMP TROUBLE.
Annunciator 7D6, DIESEL FIRE PUMP AUTO START.
CUE:
Diesel Fire Pump Fuel Oil Tank Level is 35 inches NOTE: The Diesel Fire Pump Fuel Oil Tank Level is a TRM Section TR 3.12.2 limit. If the tank level is less than 28 inches on the level indicator or graduated dipstick, the SM must be notified immediately (see Enclosure A for Level Conversion Chart).
*14.
Perform the following:
: 1. Record Diesel Fire Pump Fuel Oil Tank Level:
: 1. Record Diesel Fire Pump Fuel Oil Tank Level:
: 2. Verify meets acceptable limits.
: 2. Verify meets acceptable limits.
: 15.     Inform Control Room to order fuel for       15. No action Diesel Fire Pump if tank level is less than 32 inches (207 gallons).
*14.
: 16.     Notify the Control Room that the Diesel     16. Notifies the Control Room that the Diesel Fire Pump Weekly Test has been                   Fire Pump Weekly Test has been completed.                                        completed.
Performs the following:
: 17.     Record test personnel.                     17. Record test personnel.
: 1. Record Diesel Fire Pump Fuel Oil Tank Level:
CUE: CRS will assign an independent reviewer Time Stop
: 2. Verify meets acceptable limits 15.
Inform Control Room to order fuel for Diesel Fire Pump if tank level is less than 32 inches (207 gallons).
15.
No action 16.
Notify the Control Room that the Diesel Fire Pump Weekly Test has been completed.
16.
Notifies the Control Room that the Diesel Fire Pump Weekly Test has been completed.
17.
Record test personnel.
17.
Record test personnel.
CUE:
CRS will assign an independent reviewer Time Stop
* Critical Steps Terminating Cue(s):
* Critical Steps Terminating Cue(s):


JOB PERFORMANCE MEASURE JPM Title                                                       No.: NRC EXAM 2003-301-B2.c Sutdown the Diesel Fire Pump                                    Revision: 0 Page 6 Records test personnel and is informed the CRS will assignan independent reviewer.
JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 6 Records test personnel and is informed the CRS will assignan independent reviewer.


JOB PERFORMANCE MEASURE JPM Title                                           No.: NRC EXAM 2003-301-B2.c Sutdown the Diesel Fire Pump                        Revision: 0 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):
Question:
Question:


Line 1,242: Line 1,803:


===Response===
===Response===
 
JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 8 Plant Setup Special Instructions:
JOB PERFORMANCE MEASURE JPM Title                                                     No.: NRC EXAM 2003-301-B2.c Sutdown the Diesel Fire Pump                                  Revision: 0 Page 8 Plant Setup Special Instructions:
: 9. Contact Control Room and inform CRS that this JPM is to be conducted.
: 9. Contact Control Room and inform CRS that this JPM is to be conducted.
: 10. Begin JPM.
: 10. Begin JPM.

Latest revision as of 11:34, 16 January 2025

Final As-Administered Walkthrough Jpms for the Fermi Initial Examination - March 2003
ML030870921
Person / Time
Site: Fermi 
Issue date: 03/10/2003
From: Bollinger S
Detroit Edison
To:
Office of Nuclear Reactor Regulation
References
50-341/03-301 50-341/03-301
Download: ML030870921 (104)


Text

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.A Job Position Nuclear Supervising Operator No.

NRC EXAM 2003-301-B1.a Revision 1

JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)

Duration 15 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method:

Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments 1.

2.

  • 3.
  • 4.
  • 5.

6.

7.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)

No.: NRC EXAM 2003-301-B1.a Revision: 1 Page 2

References:

Required (R) / Available (A)

SOP 23.107.01 Standby Feedwater System (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

Start this JPM at the CRS Desk in the Simulator.

K/A Reference :

2.1 Generic Knowledge and Abilities:

2.1.17 Ability to make accurate, clear, and concise verbal reports.

3.5 / 3.6 2.1.20 Ability to execute procedure steps.

4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.

3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.

3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.

3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls 3.2 / 3.3 295031 Reactor Low Water Level EA1. Ability to operate and/or monitor the following as they apply to reactor low water level (CFR: 41.7 / 45.6):

EA1.08 Alternate injection systems 3.8 / 3.9 Task Standard:

It is realized that SBFW Pump A(B) is unable to inject to the vessel with the Keylock Mode Select Switch in the TEST position, reposition the Keylock Mode Select Switch and successfully inject to the RPV to restore RPV level to 173 to 214 inches.

Initial Conditions:

The plant has experienced a Reactor Scram.

HPCI, RCIC, and Feedwater are currently unavailable.

Initiating Cue(s):

You are the Control Room NSO.

The CRS has directed you to feed the RPV with Standby Feedwater and restore RPV level to 173 to 214 inches The system is in Standby, IAW 23.107.01 section 5.0.

JOB PERFORMANCE MEASURE JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)

No.: NRC EXAM 2003-301-B1.a Revision: 1 Page 3 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located on H11-P601 unless otherwise specified.

NOTE: The operator may Recognize and report to CRS the Keylock Mode Select Switch in TEST and request CRS concurrence to place in NORMAL prior to start of the procedure.

NOTE: The operator may perform feeding of the RPV with Standby Feedwater from memory in accordance with Operations Department Expectation (ODE) 10, Emergency Operating Procedure Expectations.

PREREQUSITES: NONE 6.2.1 Start N2103-C003A (B), West (East)

Pump A (B) Aux Lube Oil Pump, if available.

6.2.1 Starts N2103-C003A (B), West (East)

Pump A (B) Aux Lube Oil Pump, if available.

6.2.2 If Lube Oil Pump is running, dispatch an operator to verify lube oil pressure and flow as follows:

1. Lube oil pressure on N21-RA04 (RA03), SBFW Pump A (B) Lube Oil Supply Press Indicator, is greater than 15 psig.
2. There is oil flow through all four bull's eye flow indicators (two on pump and two on motor).

NOTE: If SBFW pumps are needed for vessel inventory and Aux Lube Oil Pump is running, Step 6.2.2 can be omitted without damage to the SBFW Pump CUE:

IF ASKED 6.2.2.1 Press>15psig 6.2.2.2 Flow through all four bulls eyes NOTE: This Step can be ommitted.

  • 6.2.3 Start N2103-C001 (2), West (East)

Standby Feedwater Pump A (B).

  • 6.2.3 Starts N2103-C001 (2), West (East)

Standby Feedwater Pump A (B).

JOB PERFORMANCE MEASURE JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)

No.: NRC EXAM 2003-301-B1.a Revision: 1 Page 4 Elements Standards

  • 6.2.4 Verify the following:

1.

N2103-F001, SBFW Disch To RPV Iso Valve, automatically opens (first pump).

2.

If running, N2103-C003A (B), West (East) Pump A (B) Aux Lube Oil Pump, automatically stops.

3.

Lube oil pressure on N21-RA04 (RA03), SBFW Pump A (B) Lube Oil Supply Press Indicator, is greater than 15 psig.

4.

There is oil flow through all four bull's eye flow indicators (two on pump and two on CUE:

IF ASKED:

6.2.2.1 Press>15psig 6.2.2.2 Flow through all four bulls eyes

  • 6.2.4 Recognize and report to CRS, N2103-F001 did not Open.

Place Keylock Mode Select Switch in NORMAL with CRS concurrence.

Verify N2103-F001 Opens.

  • 6.2.5 Throttle N2103-F003, SBFW 4" Disch Flow Ctrl Vlv, to restore RPV level 173 to 214 inches.

6.2.5 RPV level restored to 173 to 214 inches 6.2.6 If more flow is desired, repeat Steps 6.2.1 through 6.2.5 for the second SBFW Pump.

6.2.6 If more flow is desired, repeat Steps 6.2.1 through 6.2.5 for the second SBFW Pump.

6.2.7 If more flow is necessary, throttle open N2103-F002, SBFW 6" Disch Flow Ctrl Vlv, to achieve desired flow.

6.2.7 If more flow is necessary, throttle open N2103-F002, SBFW 6" Disch Flow Ctrl Vlv, to achieve desired flow.

Time Stop

  • Critical Steps Terminating Cue(s):

After correcting position of the F001 Keylock Mode Select Switch, SBFW is injecting to the RPV, and RPV level is restored to 173 to 214 inches

JOB PERFORMANCE MEASURE JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)

No.: NRC EXAM 2003-301-B1.a Revision: 1 Page 5 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE JPM Title Feeding Reactor Vessel with SBFW during Reactor Vessel Low Level (Alternate Path)

No.: NRC EXAM 2003-301-B1.a Revision: 1 Page 6 Simulator Setup IC#:

Any shutdown IC with RPV level at approximately 150 inches Malfunctions:

None Remote Functions:

None Override Functions:

None Special Instructions:

1. Place Standby Feedwater Keylock Mode Switch in TEST
2. Trip HPCI, RCIC, and RFPs.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.B JPM B1.a Cue Sheet Initial Conditions:

The plant has experienced a Reactor Scram.

HPCI, RCIC, and Feedwater are currently unavailable to feed the RPV.

Initiating Cue(s):

You are the Control Room NSO.

The CRS has directed you to feed the RPV with Standby Feedwater and restore RPV level to 173 to 214 inches The system is in Standby, IAW 23.107.01 section 5.0.

JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.

NRC EXAM 2003-301-B1.b Revision 1

JPM Title Open MSIVs Following an Isolation with Inboard MSIV(s)

Failed Closed Duration 20 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method:

Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7
  • 8
  • 9
  • 10
  • 11

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY

JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 3 Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 4

References:

Required (R) / Available (A) 23.137, Nuclear Boiler System(R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

This JPM may be performed in IC-18 with a Reactor Scram Start this JPM at the CRS Desk in the Simulator.

K/A Reference :

2.1 Generic Knowledge and Abilities:

2.1.17 Ability to make accurate, clear, and concise verbal reports.

3.5 / 3.6 2.1.20 Ability to execute procedure steps.

4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.

3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.

3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.

3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls 3.2 / 3.3 239001 - Main and Reheat Steam:

K2 - Knowledge of electrical power supplies to the following: (CFR: 41.7)

K2.01 - Main steam isolation valve solenoids 3.2 / 3.3 A4 - Ability to manually operate and/or monitor in the control room: (CFR: 41.7 / 45.5 to 45.8)

A4.01 - MSIVs 4.2 / 4.0 Task Standard:

MSIVs have been opened following an isolation Initial Conditions:

The plant has experienced a Reactor Scram.

The MSIVs have isolated due to a spurious isolation.

Initiating Cue(s):

You are the Control Room NSO.

The CRS has directed you to open the MSIVs in accordance with 23.137 Prerequisites have been met, and Step 7.1.2.1 and 7.1.2.2 are complete.

JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located on COP H11-P601, H11-P602, and H11-P804 unless otherwise specified.

NOTE: Per the Cue Sheet, all prerequisites have been met, and Step 7.1.2.1 and 7.1.2.2 are complete.

  • 7.1.2.3.

Equalize across Main Steam Isolation Valves by performing the following:

a.

Verify the following 3rd MSIVs are open:

N1100-F607, 3rd MSIV Line C Iso Vlv N1100-F608, 3rd MSIV Line D Iso Vlv N1100-F609, 3rd MSIV Line A Iso Vlv N1100-F610, 3rd MSIV Line B Iso Vlv

  • 7.1.2.3.

a.

Verifies the following 3rd MSIVs are open:

N1100-F607, 3rd MSIV Line C Iso Vlv N1100-F608, 3rd MSIV Line D Iso Vlv N1100-F609, 3rd MSIV Line A Iso Vlv N1100-F610, 3rd MSIV Line B Iso Vlv

  • b. Open the following Outboard MSIVs one at a time:

B2103-F028A, Outboard MSIV Line A B2103-F028B, Outboard MSIV Line B B2103-F028C, Outboard MSIV Line C B2103-F028D, Outboard MSIV Line D

  • b. Opens the following Outboard MSIVs one at a time:

B2103-F028A, Outboard MSIV Line A B2103-F028B, Outboard MSIV Line B B2103-F028C, Outboard MSIV Line C B2103-F028D, Outboard MSIV Line D

  • c. Close or verify closed the following valves:

P9500-F654, MS Line Drain to Cndr Iso Valve

B2103-F021, Main Steam Drain Line Orifice Bypass Valve.

  • c. Closes or verifies closed P9500-F654, MS Line Drain to Cndr Iso Valve B2100-F033, Main Steam Line Continuous Drain Isolation Valve.

B2103-F021, Main Steam Drain Line Orifice Bypass Valve.

JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 6 Elements Standards

B2100-F080A, Main Steam Line A Drain Valve B2100-F080B, Main Steam Line B Drain Valve B2100-F080C, Main Steam Line C Drain Valve B2100-F080D, Main Steam Line D Drain Valve

  • e. To admit steam to Outboard Steam Line Area, open the following valves:

B2103-F600, MS Line Otbd Drains Hdr Iso Vlv B2103-F019, MS Line Otbd Drain Iso Valve B2103-F016, MS Line Inbd Drain Iso Valve

  • e. Opens the following valves:

B2103-F600, MS Line Otbd Drains Hdr Iso Vlv B2103-F019, MS Line Otbd Drain Iso Valve B2103-F016, MS Line Inbd Drain Iso Valve

  • f.

Close the following valves (COP H11-P804):

P9500-F410, 52 Manifold East Drain Valve P9500-F411, 52 Manifold West Drain Valve N3039-F621, MS to Reheater Line Drain Valve

  • f.

Closes the following valves (COP H11-P804):

P9500-F410, 52 Manifold East Drain Valve P9500-F411, 52 Manifold West Drain Valve N3039-F621, MS to Reheater Line Drain Valve

  • g. Close or verify closed N3013-F601, Gland Steam Inlet Hdr Iso Vlv.
  • g. Closes or verifies closed N3013-F601, Gland Steam Inlet Hdr Iso Vlv.
  • h. Determine differential pressure across Inboard MSIVs from the following pressure indicators:
1) If less than 200 psig RPV Pressure, use the following:

C32-R609, Reactor Pressure Recorder (COP H11-P603).

B21-R801 (R804), Div 1(2)

MSIVLC Line Pressure Indicator (COP H11-P601/P602).

2) If greater than 200 psig RPV Pressure, use the following:

C32-R609, Reactor Pressure Recorder (COP H11-P603).

N11-R800, Main Steam 52 Manifold Pressure Recorder (COP-H11-P804).

  • h.
1) If less than 200 psig RPV Pressure, uses the following:

C32-R609, Reactor Pressure Recorder (COP H11-P603).

B21-R801 (R804), Div 1(2)

MSIVLC Line Pressure Indicator (COP H11-P601/P602).

2) If greater than 200 psig RPV Pressure, uses the following:

C32-R609, Reactor Pressure Recorder (COP H11-P603).

N11-R800, Main Steam 52 Manifold Pressure Recorder (COP-H11-P804).

JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 7 Elements Standards The maximum allowable differential pressure for opening Main Steam Isolation Valves (MSIVs) is 150 psid. Under all normal operating circumstances, MSIVs should not be opened with a differential pressure greater than 50 psid.

  • i.

When the differential pressure across the Inboard MSIVs is less than or equal to 50 psid, open the following Inboard MSIVs, one at a time:

B2103-F022A, Inboard MSIV Line A.

B2103-F022B, Inboard MSIV Line B.

B2103-F022C, Inboard MSIV Line C.

B2103-F022D, Inboard MSIV Line D.

  • i.

When the differential pressure across the Inboard MSIVs is less than or equal to 50 psid, opens the following Inboard MSIVs, one at a time:

B2103-F022A, Inboard MSIV Line A.

B2103-F022B, Inboard MSIV Line B.

B2103-F022C, Inboard MSIV Line C.

B2103-F022D, Inboard MSIV Line D.

  • j.

Open the following valves:

B2100-F033, Main Steam Line Continuous Drain Isolation Valve.

P9500-F654, MS Line Drain to Cndr Iso Valve.

P9500-F410, 52 Manifold East Drain Valve.

P9500-F411, 52 Manifold West Drain Valve.

N3039-F621, MS to Reheater Line Drain Valve.

  • j.

Opens the following valves:

B2100-F033, Main Steam Line Continuous Drain Isolation Valve.

P9500-F654, MS Line Drain to Cndr Iso Valve.

P9500-F410, 52 Manifold East Drain Valve.

P9500-F411, 52 Manifold West Drain Valve.

N3039-F621, MS to Reheater Line Drain Valve.

B2103-F016, MS Line Inbd Drain Iso Valve B2103-F019, MS Line Otbd Drain Iso Valve

B2103-F016, MS Line Inbd Drain Iso Valve B2103-F019, MS Line Otbd Drain Iso Valve Time Stop

  • Critical Steps Terminating Cue(s):

MSIVs are open

JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE JPM Title CCHVAC to Chlorine Mode No.: NRC EXAM 2003-301-B1.b Revision: 1 Page 9 Simulator Setup IC#:

IC 18 with Reactor Scram Malfunctions:

None Remote Functions:

Number Title Value (B21) RF10 Condenser vacuum Isolation Logic Bypass Switch 34A Bypass (B21) RF10 Condenser vacuum Isolation Logic Bypass Switch 34B Bypass (B21) RF10 Condenser vacuum Isolation Logic Bypass Switch 34C Bypass (B21) RF10 Condenser vacuum Isolation Logic Bypass Switch 34D Bypass Override Functions:

None Special Instructions:

Start the simulator in IC 18 Scram the Reactor Close the MSIVs Close N3013-F601, Gland Steam Inlet Hdr Iso Vlv.

Perform Step 7.1.2.1 of 23.137 - Insert Condenser Vacuum Isolation Logic Bypass Switchs 34A, 34B, 34C, and 34D.

Perform Step 7.1.2.2 of 23.137 - Reset MSIV Isolation Logic.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.C JPM B1.b Cue Sheet Initial Conditions:

The plant has experienced a Reactor Scram.

The MSIVs have isolated due to a spurious isolation.

Initiating Cue(s):

You are the Control Room NSO.

The CRS has directed you to open the MSIVs in accordance with 23.137 Prerequisites have been met, and Step 7.1.2.1 and 7.1.2.2 are complete.

JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.

NRC EXAM 2003-301-B1.c Revision 1

JPM Title Perform Manual Scram Functional Test Duration 20 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method:

Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments

  • 1.
  • 14.
  • 2.
  • 15.
  • 3.
  • 16.
  • 4.
  • 17.
  • 5.
  • 18.
  • 6.
  • 19.
  • 7.
  • 20.
  • 8.
  • 21.
  • 9.

22.

  • 10.
  • 11.
  • 12.
  • 13.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 3

References:

Required (R) / Available (A) 24.610.01, RPS - Manual Scram Functional Test (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

This JPM may be performed in any IC.

Start this JPM at the CRS Desk in the Simulator.

K/A Reference :

212000 Reactor Protection System - K4. Knowledge of REACTOR PROTECTION SYSTEM design feature(s) and/or interlocks which provide for the following (CFR: 41.7):

K4.05 - Functional testing of the system while maintaining power operation 3.4 / 3.6 A1. Ability to predict and/or monitor changes in parameters associated with operating the REACTOR PROTECTION SYSTEM controls including (CFR: 41.5 / 45.5):

A1.11 - System status lights and alarms 3.4 / 3.3; A2. Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations (CFR: 41.5 / 45.6):

A2.03 - Surveillance testing 3.3 / 3.5 A2.19 - Partial system activation (half-SCRAM) 3.8 / 3.9 A4. Ability to manually operate and/or monitor in the control room (CFR: 41.7 / 45.5 to 45.8):

A4.02 - Perform system functional test(s) 3.6 / 3.7 A4.07 - System status lights and alarms 4.0 / 3.9*

A4.14 - Reset system following system activation 3.8 / 3.8 Task Standard:

Perform RPS Manual Scram Functional Test in accordance with 24.610.01 Initial Conditions:

You are the Control Room Nuclear Supervising Operator.

Plant conditions are as you see them.

Initiating Cue(s):

The CRS directs you to perform RPS Manual Scram Functional Test in accordance with 24.610.01.

A Licensed Operator is in the Relay Room standing by to assist.

JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 4 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located on COP H11-P603 unless otherwise noted.

PREREQUSITES:

4.3 Communications have been established between Control Room and an operator stationed at RPS Trip Logic Panel RR H11-P609 and RR H11-P611.

NOTE: Simulator Booth Operator will act as the operator in Relay Room. The Booth Operator will be seated at the SOER terminal/printer and will function as both the Relay Room Operator and the SOER verifier.

1.

3D73, TRIP ACTUATORS A1/A2 TRIPPED 2.

3D74, TRIP ACTUATORS B1/B2 TRIPPED 3.

3D77, MANUAL TRIP A SYS TRIP 4.

3D78, MANUAL TRIP B SYS TRIP

1.

3D73, TRIP ACTUATORS A1/A2 TRIPPED 2.

3D74, TRIP ACTUATORS B1/B2 TRIPPED 3.

3D77, MANUAL TRIP A SYS TRIP 4.

3D78, MANUAL TRIP B SYS TRIP

  • 5.1.2 Verify following white scram Group 1, 2, 3, and 4 lights are ON:

1.

RPS "A" on RR H11-P609 2.

RPS "B" on RR H11-P611

  • 5.1.2 Verifies white scram Group 1, 2, 3, and 4 lights are ON:

1.

RPS "A" on RR H11-P609 2.

RPS "B" on RR H11-P611

  • 5.1.3 Verify following blue scram GROUP 1, 2, 3, and 4 lights on COP H11-P603 are ON:

1.

Pilot Scram Valve Solenoids, Trip System A 2.

Pilot Scram Valve Solenoids, Trip System B

  • 5.1.3 Verifies blue scram GROUP 1, 2, 3, and 4 lights on COP H11-P603 are ON:

1.

Pilot Scram Valve Solenoids, Trip System A 2.

Pilot Scram Valve Solenoids, Trip System B

JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 5 Elements Standards step will initiate a Half Scram.

NOTE: Since the Manual Scram trip channel will auto-reset upon return of the A1 pushbutton to its normally closed position, Annunciator 3D77, with its associated SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight will go out when the operator releases the Manual Scram Pushbutton Switch.

  • 5.1.4 Momentarily depress Manual Scram Trip A1 pushbutton on COP H11-P603 and verify:

1.

Annunciator 3D77, MANUAL TRIP A SYS TRIP, alarms.

2.

Sequence of Events Recorder Point 013C71, alarms.

3.

Red Manual Scram Trip A1 pushbutton light comes ON.

4.

White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609 are OFF.

5.

Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are OFF.

  • 5.1.4 Depresses Manual Scram Trip A1 pushbutton on COP H11-P603 and verifies:

1.

Annunciator 3D77, MANUAL TRIP A SYS TRIP, alarms.

2.

Sequence of Events Recorder Point 013C71, alarms.

3.

Red Manual Scram Trip A1 pushbutton light comes ON.

4.

White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609 are OFF.

5.

Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are OFF.

  • 5.1.5 Place Scram Reset switch to GP1 and GP4 then GP2 and GP3 Position and release.
  • 5.1.5 Places Scram Reset switch to GP1 and GP4 then GP2 and GP3 Position and release.
  • 5.1.6 Verify the following:

1.

Red Manual Scram Trip A1, pushbutton light is OFF.

2.

Annunciator 3D77, MANUAL TRIP A SYS TRIP, has cleared.

3.

Sequence of Events Recorder Point 013C71, has reset.

4.

White scram Group 1, 2, 3, and 4 lights for RPS A on RR H11-P609 are ON.

5.

Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are ON.

  • 5.1.6 Verifies the following:

1.

Red Manual Scram Trip A1, pushbutton light is OFF.

2.

Annunciator 3D77, MANUAL TRIP A SYS TRIP, has cleared.

3.

Sequence of Events Recorder Point 013C71, has reset.

4.

White scram Group 1, 2, 3, and 4 lights for RPS A on RR H11-P609 are ON.

5.

Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are ON.

JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 6 Elements Standards step will initiate a Half Scram.

NOTE:Since the Manual Scram trip channel will auto-reset upon return of the A2 pushbutton to its normally closed position, Annunciator 3D77, with its associated SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight will go out when the operator releases the Manual Scram Pushbutton Switch.

  • 5.1.7 Momentarily depress Manual Scram Trip A2 pushbutton on COP H11-P603 and verify:

1.

Annunciator 3D77, MANUAL TRIP A SYS TRIP, alarms.

2.

Sequence of Events Recorder Point 011C71, alarms.

3.

Red Manual Scram Trip A2 pushbutton light comes ON.

4.

White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609 are OFF.

5.

Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are OFF.

  • 5.1.7 Momentarily depresses Manual Scram Trip A2 pushbutton on COP H11-P603 and verifies:

1.

Annunciator 3D77, MANUAL TRIP A SYS TRIP, alarms.

2.

Sequence of Events Recorder Point 011C71, alarms.

3.

Red Manual Scram Trip A2 pushbutton light comes ON.

4.

White scram Group 1, 2, 3, and 4 lights for RPS "A" on RR H11-P609 are OFF.

5.

Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are OFF.

  • 5.1.8 Place Scram Reset switch to GP1 and GP4 then GP2 and GP3 Position and release.
  • 5.1.8 Places Scram Reset switch to GP1 and GP4 then GP2 and GP3 Position and releases.
  • 5.1.9 Verify the following:

1.

Red Manual Scram Trip A2, pushbutton light is OFF.

2.

Annunciator 3D77, MANUAL TRIP A SYS TRIP, has cleared.

3.

Sequence of Events Recorder Point 011C71, has reset.

4.

White scram Group 1, 2, 3, and 4 lights for RPS A on RR H11-P609 are ON.

5.

Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are ON.

  • 5.1.9 Verifies the following:

1.

Red Manual Scram Trip A2, pushbutton light is OFF.

2.

Annunciator 3D77, MANUAL TRIP A SYS TRIP, has cleared.

3.

Sequence of Events Recorder Point 011C71, has reset.

4.

White scram Group 1, 2, 3, and 4 lights for RPS A on RR H11-P609 are ON.

5.

Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System A on COP H11-P603 are ON.

JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 7 Elements Standards

1.

3D73, TRIP ACTUATORS A1/A2 TRIPPED 2.

3D74, TRIP ACTUATORS B1/B2 TRIPPED 3.

3D77, MANUAL TRIP A SYS TRIP 4.

3D78, MANUAL TRIP B SYS TRIP

1.

3D73, TRIP ACTUATORS A1/A2 TRIPPED 2.

3D74, TRIP ACTUATORS B1/B2 TRIPPED 3.

3D77, MANUAL TRIP A SYS TRIP 4.

3D78, MANUAL TRIP B SYS TRIP

  • 5.1.11 Verify the following white scram Group 1, 2, 3, and 4 lights on:

1.

RPS A on RR H11-P609 2.

RPS B on RR H11-P611

  • 5.1.11 Verifies the following white scram Group 1, 2, 3, and 4 lights on:

1.

RPS A on RR H11-P609 2.

RPS B on RR H11-P611

  • 5.1.12 Verify the following blue scram Group 1, 2, 3, and 4 lights on COP H11-P603 on:

1.

Pilot Scram Valve Solenoids, Trip System A 2.

Pilot Scram Valve Solenoids, Trip System B

  • 5.1.12 Verifies the following blue scram Group 1, 2, 3, and 4 lights on COP H11-P603 on:

1.

Pilot Scram Valve Solenoids, Trip System A 2.

Pilot Scram Valve Solenoids, Trip System B NOTE: Since trip system B is tested in the same manner as trip system A, the Examiner may choose to terminate the JPM at this point. If terminating at this point, place N/A on the remaining steps on the JPM Cover Sheet.

JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 8 Elements Standards step will initiate a Half Scram.

NOTE: Since the Manual Scram trip channel will auto-reset upon return of the B1 pushbutton to its normally closed position, Annunciator 3D78, with its associated SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight will go out when the operator releases the Manual Scram Pushbutton Switch.

  • 5.1.13 Momentarily depress Manual Scram Trip B1 pushbutton on COP H11-P603 and verify:

1.

Annunciator 3D78, MANUAL TRIP B SYS TRIP, alarms.

2.

Sequence of Events Recorder Point 014C71, alarms.

3. Red Manual Scram Trip B1 pushbutton light on.
4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
  • 5.1.13 Momentarily depresses Manual Scram Trip B1 pushbutton on COP H11-P603 and verifies:

1.

Annunciator 3D78, MANUAL TRIP B SYS TRIP, alarms.

2.

Sequence of Events Recorder Point 014C71, alarms.

3. Red Manual Scram Trip B1 pushbutton light on.
4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
  • 5.1.14 Place Scram Reset switch to GP1 and GP4 then, GP2 and GP3 Position and release.
  • 5.1.14 Places Scram Reset switch to GP1 and GP4 then, GP2 and GP3 Position and releases.
  • 5.1.15 Verify the following:
1. Red Manual Scram Trip B1, pushbutton light is off.
2. Annunciator 3D78, MANUAL TRIP B SYS TRIP, has cleared.
3. Sequence of Events Recorder Point 014C71, has reset.
4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 on.
5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 on.
  • 5.1.15 Verifies the following:
1. Red Manual Scram Trip B1, pushbutton light is off.
2. Annunciator 3D78, MANUAL TRIP B SYS TRIP, has cleared.
3. Sequence of Events Recorder Point 014C71, has reset.
4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 on.
5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 on.

JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 9 Elements Standards step will initiate a Half Scram.

NOTE: Since the Manual Scram trip channel will auto-reset upon return of the B2 pushbutton to its normally closed position, Annunciator 3D78, with its associated SOER Alarm Point, will reset and the Scram Pushbutton Switch red backlight will go out when the operator releases the Manual Scram Pushbutton Switch.

  • 5.1.16 Momentarily depress Manual Scram Trip B2 pushbutton on COP H11-P603 and verify:
1. Annunciator 3D78, MANUAL TRIP B SYS TRIP, alarms.
2. Sequence of Events Recorder Point 012C71 alarms.
3. Red Manual Scram Trip B2 pushbutton light on.
4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
  • 5.1.16 Momentarily depress Manual Scram Trip B2 pushbutton on COP H11-P603 and verifies:
1. Annunciator 3D78, MANUAL TRIP B SYS TRIP, alarms.
2. Sequence of Events Recorder Point 012C71 alarms.
3. Red Manual Scram Trip B2 pushbutton light on.
4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 off.
5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 off.
  • 5.1.17 Place Scram Reset switch to GP1 and GP4 then, GP2 and GP3 Position and release.
  • 5.1.17 Places Scram Reset switch to GP1 and GP4 then, GP2 and GP3 Position and releases.
  • 5.1.18 Verify the following:
1. Red Manual Scram Trip B2, pushbutton light is off.
2. Annunciator 3D78, MANUAL TRIP B SYS TRIP, has cleared.
3. Sequence of Events Recorder Point 012C71, has reset.
4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 on.
5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 on.
  • 5.1.18 Verifies the following:
1. Red Manual Scram Trip B2, pushbutton light is off.
2. Annunciator 3D78, MANUAL TRIP B SYS TRIP, has cleared.
3. Sequence of Events Recorder Point 012C71, has reset.
4. White scram Group 1, 2, 3, and 4 lights for RPS B on RR H11-P611 on.
5. Blue scram GROUP 1, 2, 3, and 4 lights for Pilot Scram Valve Solenoids, Trip System B on COP H11-P603 on.

JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 10 Elements Standards

1. 3D73, TRIP ACTUATORS A1/A2 TRIPPED
2. 3D74, TRIP ACTUATORS B1/B2 TRIPPED
3. 3D77, MANUAL TRIP A SYS TRIP
4. 3D78, MANUAL TRIP B SYS TRIP
1. 3D73, TRIP ACTUATORS A1/A2 TRIPPED
2. 3D74, TRIP ACTUATORS B1/B2 TRIPPED
3. 3D77, MANUAL TRIP A SYS TRIP
4. 3D78, MANUAL TRIP B SYS TRIP
  • 5.1.20 Verify the following white scram Group 1, 2, 3, and 4 lights on:
1. RPS A on RR H11-P609.
2. RPS B on RR H11-P611.
  • 5.1.20 Verifies the following white scram Group 1, 2, 3, and 4 lights on:
1. RPS A on RR H11-P609.
2. RPS B on RR H11-P611.
  • 5.1.21 Verify the following blue scram Group 1, 2, 3, and 4 lights on COP H11-P603 on:
1. Pilot Scram Valve Solenoids, Trip System A
2. Pilot Scram Valve Solenoids, Trip System B
  • 5.1.21 Verifies the following blue scram Group 1, 2, 3, and 4 lights on COP H11-P603 on:
1. Pilot Scram Valve Solenoids, Trip System A
2. Pilot Scram Valve Solenoids, Trip System B 5.1.22 Record test personnel.

5.1.22 Records test personnel.

CUE:The CRS will assign an independent reviewer Time Stop

  • Critical Steps Terminating Cue(s):

24.610.01 complete or stopped at Step 5.1.12 per examiner discretion.

JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 11 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE JPM Title Perform Manual Scram Functional Test No.: NRC EXAM 2003-301-B1.c Revision: 1 Page 12 Simulator Setup IC#:

Any Malfunctions:

None Remote Functions:

Number Title Value None Override Functions:

None Special Instructions:

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.D JPM B1.c Cue Sheet Initial Conditions:

Plant conditions are as you see them.

Initiating Cue(s):

You are the Control Room Nuclear Supervising Operator.

The CRS directs you to perform RPS Manual Scram Functional Test in accordance with 24.610.01 A Licensed Operator is in the Relay Room standing by to assist.

JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)

No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.

NRC EXAM 2003-301-B1.d Revision 1

JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)

Duration 10 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method:

Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments 1.

2.

3.

4.

5.

  • 6.
  • 7.
  • 8.
  • 9

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY

JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)

No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 3 Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)

No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 4

References:

Required (R) / Available (A) 29.ESP.07, Primary Containment Venting Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

This JPM may be performed in IC 18 Start this JPM at the CRS Desk in the Simulator.

K/A Reference :

EPE: 295024 High Drywell Pressure EK3 - Knowledge of the reasons for the following responses as they apply to high drywell pressure (CFR: 41.5 / 45.6):

EK3.07 Drywell venting 3.5 / 4.0 EA1 - Ability to operate and/or monitor the following as they apply to high drywell pressure (CFR: 41.7 / 45.6):

EA1.14 - Drywell ventilation system 3.4 / 3.5 EA2 - Ability to determine and/or interpret the following as they apply to high drywell pressure (CFR: 41.10 / 43.5 / 45.13):

EA2.01 Drywell pressure 4.2 / 4.4 Task Standard:

Vent the Drywell to maintain pressure less than 1.68 psig.

Initial Conditions:

Division II Drywell Cooling Fans have tripped for unknown reasons, Maintenance is investigating.

The Crew has entered 29.100.01, SHEET 2, Primary Containment Control, due to high drywell temperature.

Initiating Cue(s):

You are the Control Room Nuclear Supervising Operator.

The CRS directs you to keep Dw pressure less than 1.68 psig in accordance with 29.ESP.07

JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)

No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located on COP H11-P808 or COP-H11-P817 unless otherwise specified.

PREREQUSITES: NONE venting the Drywell and Torus is prohibited.

1.1 If venting the Torus, notify the SM and exit this section.

1.1 If venting the Torus, notify the SM and exit this section.

1.2 If conditions permit, verify RBHVAC is in operation.

1.2 If conditions permit, verify RBHVAC is in operation.

1.3 If RBHVAC is unavailable, start or verify running SGTS.

1.3 RBHVAC is running.

SGTS must be shutdown while venting to ensure that one charcoal bed is kept in reserve for later use.

1.4 If venting through SGTS and both divisions of SGTS are operating, shutdown one division of SGTS.

1.4 RBHVAC will be running.

1.5 If PCRMS is alarming or inoperable:

1.5.1 Contact Chemistry to sample Primary Containment atmosphere for activity.

1.5.2 When Primary Containment atmosphere sample results are complete, continue at Step 1.6.

1.5 PCRMS is NOT alarming or inoperable:

mary Containment may release radioactive gas/steam into the Reactor Building.

CUE:

If the candidate reports to the CRS that T4800-F455 is not opening and requests direction, tell the candidate (as the CRS) to follow the procedure.

JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)

No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 6 Elements Standards

  • 1.6 Vent from the Drywell as follows:

1.6.1 Close or verify closed T4800-F454, DW Press Ctrl N2 Supply Iso Vlv.

1.6.2 Open the following 1 Inch Pressure Control Valves:

1.

T4800-F453, DW Press Ctrl Vent Iso Vlv.

2.

T4800-F455, DW Press Ctrl Inbd Iso Vlv.

NOTE (1): The Drywell Vent Path can be secured at any time (Step 1.6.8) to prevent Drywell Pressure from going below 5 inches wc.

NOTE (2): Drywell Pressure may not be reduced immediately, plant conditions will have to be evaluated by the Shift Team to determine if the larger vent paths are required.

  • 1.6 Recognizes that T4800-F455 is not opening. Proceed to Step 1.6.4 1.6.3 If Drywell Pressure is reduced to normal (5 to 19 inches wc), proceed to Step 1.6.8, otherwise continue.
  • 1.6.4 If Drywell Pressure is not being reduced as fast as necessary, open the following 6" Vent Path Valves:

1.

T4600-F411, DW 6" Purge Iso Vlv.

2.

T4803-F602, DW Exh Iso Vlv.

  • 1.6.4 Opens the following 6" Vent Path Valves:

1.

T4600-F411, DW 6" Purge Iso Vlv.

2.

T4803-F602, DW Exh Iso Vlv.

  • 1.6.5 If Drywell Pressure is reduced to normal (5 to 19 inches wc), proceed to Step 1.6.8, otherwise continue.
  • 1.6.5 Proceed to Step 1.6.8.
  • 1.6.8 Close or verify closed the following valves as necessary to maintain Drywell Pressure greater than 5 inches wc:

1.

T4600-F402, DW 24" Purge Iso Vlv.

2.

T4803-F602, DW Exh Iso Vlv.

3.

T4600-F411, DW 6" Purge Iso Vlv.

4.

T4800-F455, DW Press Ctrl Inbd Iso Vlv.

5.

T4800-F453, DW Press Ctrl Vent Iso Vlv.

  • 1.6.8 Closes or verifies closed the following valves 1.

T4600-F402, DW 24" Purge Iso Vlv.

2.

T4803-F602, DW Exh Iso Vlv.

3.

T4600-F411, DW 6" Purge Iso Vlv.

4.

T4800-F455, DW Press Ctrl Inbd Iso Vlv.

5.

T4800-F453, DW Press Ctrl Vent Iso Vlv.

Time Stop

  • Critical Steps

JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)

No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 7 Terminating Cue(s):

Drywell pressure between 5 and 19 in wc, with all valves closed.

JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)

No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE JPM Title Drywell Vent in accordance with 29.ESP.07 (Alternate Path)

No.: NRC EXAM 2003-301-B1.d Revision: 1 Page 9 Simulator Setup IC#:

IC 18 - Full Power Malfunctions:

Number Title Value None Remote Functions:

Number Title Value None Override Functions:

None Special Instructions:

To Inactivate the Block and prevent T4800-F455 from operating, go to the CETRAN window and type the following:

BP:T4800F455 <CR>

IA=

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.E JPM B1.d Cue Sheet Initial Conditions:

Division II Drywell Cooling Fans have tripped for unknown reasons, Maintenance is investigating.

The Crew has entered 29.100.01, SHEET 2, Primary Containment Control, due to high drywell temperature.

Initiating Cue(s):

You are the Control Room Nuclear Supervising Operator.

The CRS directs you to keep Dw pressure less than 1.68 psig in accordance with 29.ESP.07

JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 2 Job Position Nuclear Supervising Operator No.

NRC EXAM 2003-301-B1.e Revision 1

JPM Title Start Individual CTG 11 from the Control Room Duration 25 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method:

Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments 1.

  • 2.
  • 3.
  • 4.

5.

  • 6.
  • 7.

8.

  • 9.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 3

References:

Required (R) / Available (A) 23.324, Supervisory Control - 120 KV Switchyard and CTG11 Generators Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

This JPM can be performed in in any IC.

Start this JPM at the CRS Desk in the Simulator.

K/A Reference :

2.1 Generic Knowledge and Abilities:

2.1.17 Ability to make accurate, clear, and concise verbal reports.

3.5 / 3.6 2.1.20 Ability to execute procedure steps.

4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.

3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.

3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.

3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls 3.2 / 3.3 2.4.2 Ability to recognize abnormal indications for system operating parameters which are entry into emergency/abnormal procedures.

4.0 / 4.3 2.4.11 Knowledge of abnormal condition procedures 3.4 / 3.6 262001 A.C. Electrical Distribution:

K1.

Knowledge of the physical connections and/or cause-effect relationships for the following:

K1.01 EDGs 3.8 / 4.3 K1.02 D.C. electrical distribution 3.3 / 3.6 K1.03 Offsite power sources 3.4 / 3.8 K1.06 Alternate shutdown system 3.6 / 3.9 K2.

Knowledge of electrical power supplies to the following:

K2.01 Offsite sources of power 3.3 / 3.6 K3.

Knowledge of the effect that a loss or malfunction of will have on the following:

K3.02 Emergency Generators 3.8 / 4.2 K4.

Knowledge of design feature(s) and/or interlocks which provide for:

JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 4 K4.03 Interlocks between auto bus transfer and breakers 3.1 / 3.4 K4.05 Paralleling AC sources (synchroscope) 3.4 / 3.6 K5.

Knowledge of operational implications of:

K5.01 Paralleling two AC sources 3.1 / 3.4 K6.

Knowledge of the effect that a loss or malfunction of will have on the following:

K6.02 Offsite power 3.6 / 3.9 A1.

Ability to predict and/or monitor changes in parameters associated with operating controls including:

A1.01 Effect on instrumentation and controls of switching power supplies 3.1 / 3.4 A1.02 Effects of loads when energizing a bus 3.1 / 3.5 A1.05 Breaker lineups 3.2 / 3.5 A2.

Ability to (a) predict the impacts of the following; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of:

A2.03 Loss of Offsite power.

3.9 / 4.3 A2.04 Loads that if deenergized would degrade/hinder plant ops 3.8 / 4.2 A2.08 Opening a disconnect under load 3.3 / 3.6 A2.09 Exceeding voltage limitations 3.1 / 3.4 A2.11 Degraded system voltages 3.2 / 3.6 A3.

Ability to monitor auto operations of, including:

A3.01 Breaker tripping 3.1 / 3.2 A4.

Ability to manually operate and/or monitor in the Control room:

A4.01 All breakers and disconnects 3.4 / 3.7 A4.02 Synchroscope, understanding running and incoming voltages 3.4 / 3.4 A4.03 Local operation of breakers 3.2 / 3.4 A4.04 Synchronizing and paralleling of different A.C. supplies 3.6 / 3.7 A4.05 Voltage, current, power, and frequency on A.C. buses 3.3 / 3.3 264000 Emergency Generators (Diesel/Jet):

K1.

Knowledge of the physical connections and/or cause-effect relationships for the following:

K1.01 A.C. electrical distribution 3.8 / 4.1 K1.02 D.C. electrical distribution 3.3 / 3.4 K1.04 Emergency generator C.W. system 3.2 / 3.3 K1.05 Emergency generator F.O. system 3.2 / 3.3 K1.06 Starting air system 3.2 / 3.2 K1.07 ECCS systems 3.9 / 4.1 K3.

Knowledge of the effect that a loss or malfunction of will have on The following:

K3.01 ECCS systems 4.2 / 4.4 K3.02 A.C. electrical distribution 3.9 / 4.2 K3.03 Major loads fed from buses fed by emergency generators 4.1 / 4.2 K4.

Knowledge of design feature(s) and/or interlocks which provide for:

JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 5 K4.01 Emergency generator trips (normal) 3.5 / 3.7 K4.02 Emergency generator trips (emergency/LOCA) 4.0 / 4.2 K4.07 Local operation and control 3.3 / 3.4 K4.08 Automatic startup 3.8 / 3.7 K5.

Knowledge of Knowledge of operational implications of:

K5.05 Paralleling A.C. sources 3.4 / 3.4 K6.

Knowledge of the effect that a loss or malfunction will have on the following:

K6.01 Starting air 3.8 / 3.9 K6.02 F.O. pumps 3.6 / 3.6 K6.03 L.O. pumps 3.5 / 3.7 K6.07 C.W. system 3.8 / 3.9 K6.08 A.C. power 3.6 / 3.7 K6.09 D.C. power 3.3 / 3.5 A2.

Ability to (a) predict the impacts of the following; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of:

A2.01 Parallel operation of emergency generator 3.5 / 3.6 A2.02 Unloading prior to securing emergency generator 3.1 / 3.1 A2.03 Operating under different loading conditions 3.4 / 3.4 A2.05 Synch of emergency generator with electrical supplies 3.6 / 3.6 A2.06 Opening normal and/or alternate power to emergency bus 3.4 / 3.4 A2.08 Initiation of emergency generator fire protection system 3.3 / 3.7 A2.09 Loss of A.C. power 3.7 / 4.1 A2.10 LOCA 3.9 / 4.2 A4.

Ability to manually operate and/or monitor in the Control room:

A4.01 Adjustment of exciter voltage 3.3 / 3.4 A4.02 Synchroscope 3.4 / 3.4 A4.04 Man start, load, and stop of generator 3.7 / 3.7 A4.05 Transfer of generator to grid 3.6 / 3.7 Task Standard:

Perform Startup and loading of individual CTG11-1 from the Control Room Initial Conditions:

The Plant is Operating at full power.

Initiating Cue(s):

Central Systems Supervisor has requested that CTG11-1 be started and loaded to 13 MW for performance monitoring.

Prerequisites are complete.

JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 6 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: Unless otherwise noted, all controls and indications for this section are located on COP H11-P811.

CUE:

All prerequisites are complete:

4.1.1 Prerequisites 1.

120kV Circuit Breakers and CTG11 Units are in Standby Mode at the Fermi 2 Control Room, Fermi 1 Control Room, and CTG11 Control Center in accordance with the following sections of this procedure.

a.

Section 5.1, Standby Mode Of CTG11 Generators And 120kV Circuit Breakers At COP H11-P811 b.

Section 5.2, Standby Mode Of 120kV Circuit Breakers And CTG11 Generators At Fermi 1 Control Room Panel 2 And CTG11 Master Control Panel c.

Section 5.3, Standby Mode Of CTG11 Generators At CTG11 Control Center 4.1.1 Prerequisites complete

  • 2.

If CTG11 Unit 1 is to be started, required data has been recorded on the CTG11 Unit 1 Start/Failure Log (Attachment 4).

CUE:

Provide candidate with copy of

  • 2.

Records required data on the CTG11 Unit 1 Start/Failure Log (Attachment 4).

OTE (1): If operating CTG11 Units for any reason except to supply emergency power to the plant, with the concurrence of the CSS, CTG11 Units must be shutdown before CTG11 Fuel Oil Tank Level goes below 13 feet or CTG11 Unit 1 must be declared inoperable.

OTE (2): Enclosure F contains related alarm responses.

  • 1.

If a CTG11 Unit is loaded without any warmup period, complete Attachment 3 every 15 minutes for associated Units.

Refer to Section 6.8, CTG11 Exhaust Temperature Thermocouple Operation.

  • 1.

Directs operator to complete Attachment 3 every 15 minutes for CTG11-1. Refer to Section 6.8, CTG11 Exhaust Temperature Thermocouple Operation.

JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 7 Elements Standards CAUTION CTG11 Units 2, 3, and 4 must be started at approximately 1 minute intervls. This is necessary to prevent overload of Peaker Aux Power Transformer and excessive loading of Peaker Control Air Compressor.

  • 2.

Depress START pushbutton for the desired Unit (1, 2, 3 or 4) and verify following:

a.

Red backlighted START pushbutton is ON.

b.

Green backlighted READY TO START indication goes OFF.

c.

Red backlighted SEQUENCE IN PROGRESS indication is ON.

  • 2.

Depresses START pushbutton for the desired Unit 1 and verifies:

a.

Red backlighted START pushbutton is ON.

b.

Green backlighted READY TO START indication goes OFF.

c.

Red backlighted SEQUENCE IN PROGRESS indication is ON.

NOTE: CTG11 Units 2, 3 and 4 will require approximately 8 to 10 minutes and CTG11 Unit 1, 12 minutes to reach synchronous speed and to automatically synchronize.

3.

When Unit Breaker closes as indicated by a red CLOSED light ON, verify:

a.

Red backlighted SEQUENCE IN PROGRESS indication goes OFF.

b.

Red backlighted SEQUENCE COMPLETE indication is ON.

c.

Unit MW output increases up to 3 to 5 MW (Minimum).

3.

When Unit Breaker closes as indicated by a red CLOSED light ON, verifies:

a.

Red backlighted SEQUENCE IN PROGRESS indication goes OFF.

b.

Red backlighted SEQUENCE COMPLETE indication is ON.

c.

Unit MW output increases up to 3 to 5 MW (Minimum).

4.

If ambient temperature is > 75°F., or it is anticipated that this temperature will be met during operation, CTG Auxiliary Cooling should be utilized to maintain optimum performance in accordance with Section 7.9.

CUE:

Ambient temperature is 55 °F 4.

No Action

JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 8 Elements Standards 4.1.3 Detailed Procedure - Loading NOTE (1): There are two sets of controls available to adjust the MW output of CTG11 Units.

NOTE (2): Raising load on CTG 11 Unit 1 to BASE LOAD (13-15MW) must be performed either in Manual Load Control per Step 4.1.3.1 below or by taking Local Control per Step 4.1.3.2.d and raising load per Section 4.2.4 or 4.2.5.

1. Manual Load Control NOTE: When operating Lower/Raise Control Switches for Unit Voltage and Governor Controls, be aware that command signal is present as long as switch is held in LOWER or RAISE. Anticipate time lag of controlled value after release of Control Switch.
  • a. Turn Governor to RAISE/LOWER and increase/decrease load to desired value.
1. Manual Load Control
  • a.

Turns Governor to RAISE/LOWER and increase/decrease load to 13 MW.

b. If PEAK LOAD is desired, perform Section 6.1 (6.2), Increasing Load To Peak In Manual (Automatic).

CUE:

Peak Load not desired.

b.

No Action NOTE: Maintain Voltage and VARS within the capability curve (see Enclosure B).

  • c. Adjust VARS as indicated on the individual Megavar (MVAR) indicator using the Voltage Switch.
  • c. Adjusts VARS as indicated on the individual Megavar (MVAR) indicator using the Voltage Switch to maintain within limits of Enclosure B.

Time Stop

  • Critical Steps Terminating Cue(s):

CTG11-1 is loaded to 13 MW

JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 9 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE JPM Title Start Individual CTG 11 from the Control Room No.: NRC EXAM 2003-301-B1.e Revision 1 Page 10 Simulator Setup IC#:

18 Malfunctions:

Number Title Value None Remote Functions:

Number Title Value None Override Functions:

None Special Instructions:

JOB PERFORMANCE MEASURE NRC EXAM 2003-3001-B1.F JPM B1.e Cue Sheet Initial Conditions:

The Plant is Operating at full power.

Initiating Cue(s):

Central Systems Supervisor has requested that CTG11-1 be started and loaded to 13 MW for performance monitoring.

Prerequisites are complete.

JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 2 Job Position Nuclear Supervisory Operator No.

NRC EXAM 2003-3001-B1.f Revision 1

JPM Title Switch Operating RBCCW Pumps Duration 15 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method:

Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments 1.

  • 2.
  • 3.

4.

5.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY

JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 3 Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 4

References:

Required (R) / Available (A) 23.127, Reactor Building Closed Cooling Water/Emergency Equipment Cooling Water System (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant Simulator X

Classroom Evaluator Notes:

Start the JPM in the Simulator Control Room at the CRS desk.

This JPM is performed in IC-18 at full power Task Standard:

Start standby RBCCW pump and place running RBCCW pump in standby.

Initial Conditions:

The plant is operating at full power Initiating Cue(s):

You are the Control Nuclear Supervising Operator The CRS directs you to shift from North and Center pumps running to South and Center pumps running.

JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: Unless otherwise noted, all controls and indication are located on COP H11-P601 and P602.

An EECW actuation may occur during pump shifts due to transients on system.

6.1.2.1. To place standby RBCCW pump in service:

6.1.2.1 Plant announcement made that pump will be starting NOTE: When standby RBCCW Pump is started P42-F403, RBCCW Differential Pressure Control Valve, will OPEN to compensate for the increased flow.

  • a. Start Standby RBCCW Pump.
  • a. Start Standby RBCCW Pump.
  • b. Stop RBCCW Pump to be removed from service.
  • b. Stop RBCCW Pump to be removed from service.
  • c. Verify P42-F403, RBCCW Differential Pressure Control Valve, is maintaining a proper differential pressure by verifying Annunciators, clear:

2D100, RBCCW PUMPS RECIRC VLV OPEN 2D104, RBCCW PUMPS RECIRC VLV CLOSED

  • c. Verify P42-F403, RBCCW Differential Pressure Control Valve, is maintaining a proper differential pressure by verifying Annunciators, clear:

2D100, RBCCW PUMPS RECIRC VLV OPEN 2D104, RBCCW PUMPS RECIRC VLV CLOSED d.

Periodically monitor temperatures and pressures in the system to ensure continued proper system operation using the following instruments:

P42-R802, RBCCW Press Ind P42-R800, RBCCW Hx Outlet Temp Recorder d.

Periodically monitor temperatures and pressures in the system to ensure continued proper system operation using the following instruments:

P42-R802, RBCCW Press Ind P42-R800, RBCCW Hx Outlet Temp Recorder Time Stop

  • Critical Steps Terminating Cue(s):

Standby pump is operating, operating pump is in standby

JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE JPM Title Switch Operating RBCCW Pumps No.: NRC EXAM 2003-301-B1.f Revision: 1 Page 7 Simulator Setup IC#:

18 Malfunctions:

Number Title Value None Remote Functions:

Number Title Value None Override Functions:

None Special Instructions:

JOB PERFORMANCE MEASURE NRC EXAM 2003-3001-B1.G JPM B1.f Cue Sheet Initial Conditions:

The plant is operating at full power Initiating Cue(s):

You are the Control Room Nuclear Supervising Operator The CRS directs you to shift RBCCW pumps from North and Center pumps running to South and Center pumps running.

JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)

No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 2 Job Position Nuclear Supervising Operator No.

NRC EXAM 2003-301-B1.g Revision 1

JPM Title Shift Divisions of CCHVAC (Alternate Path)

Duration 25 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method:

Perform / Simulator Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments 1.

2.

  • 3.

4.

5.

  • 6.
  • 7.
  • 8.
  • 9.

10.

11.

  • 12.
  • 13.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)

No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 3

References:

Required (R) / Available (A)

SOP 23.413 Control Center HVAC (R)

ARP 17D27 (A)

AOP 20.413.01 Control Center HVAC System Failure (A)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant Simulator X

Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

This JPM may be performed in any IC.

Start this JPM at the CRS Desk in the Simulator.

K/A Reference :

2.1 Generic Knowledge and Abilities:

2.1.17 Ability to make accurate, clear, and concise verbal reports.

3.5 / 3.6 2.1.20 Ability to execute procedure steps.

4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.

3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.

3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.

3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls 3.2 / 3.3 2.4.2 Ability to recognize abnormal indications for system operating parameters which are entry into emergency/abnormal procedures.

4.0 / 4.3 2.4.11 Knowledge of abnormal condition procedures 3.4 / 3.6 290003 Control Room HVAC:

K3.

Knowledge of effect that loss or malfunction will have on the following:

K3.01 Control room habitability 3.5 / 3.8 K4.

Knowledge of design feature(s) and/or interlocks for the following:

K4.01 System initiations/reconfigurations 3.1 / 3.2 A2.

Ability to predict the impact of the following:

A2.01 Initiation/reconfiguration 3.1 / 3.2 A2.03 Initiation/reconfiguration failure 3.4 / 3.6 A3.

Ability to monitor automatic operation of:

A3.01 Initiation/reconfiguration 3.3 / 3.5 A4.

Ability to manually operate and/or monitor in the control room:

JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)

No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 4 A4.01 Initiate/reset the system 3.2 / 3.2 Task Standard:

Shift Control Center HVAC operating trains in accordance with 23.413.

Initial Conditions:

The plant is operating at full power.

Division 1 CCHVAC is operating.

Initiating Cue(s):

The CRS has directed that Division 2 CCHVAC placed in service and Division 1 CCHVAC be removed from service.

A pre-job brief has been completed.

All prerequisites are completed.

Steps 6.1.2.1 and 6.1.2.2 are complete.

An operator is in the field, standing by for direction.

The CCHVAC Chiller unit will be automatically loaded.

JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)

No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located on COP H11-P808 (817) unless otherwise specified.

PREREQUSITES: NONE NOTE (1): Next step shall require an independent verifier.

NOTE (2): Independent Verification and logging requirements only need to be done the first time if repetitive starts are to be made within a one hour time frame. Radiation monitors should be checked again if suspected changes to radiological conditions, electric power supplies, or alarms received dictate this conservative action.

1.

Perform operational checkout of D11-K809 (K813), Div 1 (2) CCHVAC Makeup Air Radiation Monitor, in accordance with 23.625, "Process Gaseous Radiation Monitoring."

CUE:

Operational check complete.

1.

No Action

2. Document action taken and completion of independent verification in the Fermi 2 Unit Log.

CUE:

Documentation complete.

2.

No Action NOTE: While both Divisions are operating, the damper lineup in Enclosures A, B, or C will not be correct.

  • 3.

For the Division to be started verify:

a.

Div 1 (2) Mode Select switch is selected to the same mode as the running division.

b.

Div 1 (2) Emergency Air Intake Selector switch in AUTO.

  • a. Verified Div 2 Mode Select switch is selected to the same mode as the running division.
  • b. Verified Div 2 Emergency Air Intake Selector switch in AUTO.

JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)

No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 6 Elements Standards 4.

For the Division to be started, verify or place Division 1 (2) switches for the following equipment in AUTO:

T4100-B007 (B006), Div 1 (2)

CCHVAC Supply Fan.

T4100-C041 (C040), Div 1 (2)

CCHVAC Chilled Wtr Pump.

T4100-B028 (B027), Div 1 (2)

CCHVAC Equip Room Cooler.

T4100-C031 (C030), Div 1 (2)

CCHVAC Return Air Fan.

T4100-B009 (B008), Div 1 (2)

CCHVAC Chiller.

T4100-C047 (C048), Div 1 (2)

CCHVAC Emerg Makeup Fan.

4.

Verified or placed Division 2 switches for the following equipment in AUTO:

T4100-B007 (B006), Div 1 (2)

CCHVAC Supply Fan.

T4100-C041 (C040), Div 1 (2)

CCHVAC Chilled Wtr Pump.

T4100-B028 (B027), Div 1 (2)

CCHVAC Equip Room Cooler.

T4100-C031 (C030), Div 1 (2)

CCHVAC Return Air Fan.

T4100-B009 (B008), Div 1 (2)

CCHVAC Chiller.

T4100-C047 (C048), Div 1 (2)

CCHVAC Emerg Makeup Fan 5

If selected T4100-B009 (B008), Div 1 (2)

CCHVAC Chiller, is to be manually loaded, place Div 1 (2) Capacity Control Module AUTOMANUAL switch in MANUAL (H21-P285A (B), AB5-G13).

CUE:

As per initiating cues, the Chiller is to be automatically loaded 5

No action

  • 6.

For division being placed in service, place Control Center HVAC Div 1 (2) Mode Select switch in ALL AUTO and verify:

T4100-B007 (B006), Div 1 (2)

CCHVAC Supply Fan, starts.

T4100-C041 (C040), Div 1 (2)

CCHVAC Chilled Wtr Pump, starts.

  • 6.

Places Control Center HVAC Div 2 Mode Select switch in ALL AUTO and verifies:

T4100-B007 (B006), Div 1 (2)

CCHVAC Supply Fan, starts.

T4100-C041 (C040), Div 1 (2)

CCHVAC Chilled Wtr Pump, starts.

  • 7.

For division being removed from service, place Control Center Div 1 (2) switch in ALL STOP.

CUE:

Booth Operator - Activate (T41)

MF 3575, CCHVAC Div 2 Return Air Fan Trip when ready to shift CCHVAC.

CUE:

As CRS, direct to return Div 1 CCHVAC to service.

  • 7.

Places Control Center Div 1 switch in ALL STOP.

Refers to ARP 17D27 Reports to CRS that CCHVAC Return Air Fan is tripped References AOP 20.413.01, Control Center HVAC System Failure Recommends returning Div 1 CCHVAC to service to CRS

  • 8 Returns to Step 6.1.2.3 of 23.413, Control Center HVAC
  • 8 Returns to Step 6.1.2.3 of 23.413, Control Center HVAC

JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)

No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 7 Elements Standards

  • 3.

For the Division to be started verify:

a.

Div 1 (2) Mode Select switch is selected to the same mode as the running division.

b.

Div 1 (2) Emergency Air Intake Selector switch in AUTO.

  • 3.

Verifies:

a.

Div 1 Mode Select switch is selected to the same mode as the running division.

b.

Div 1 Emergency Air Intake Selector switch in AUTO.

4.

For the Division to be started, verify or place Division 1 (2) switches for the following equipment in AUTO:

T4100-B007 (B006), Div 1 (2)

CCHVAC Supply Fan.

T4100-C041 (C040), Div 1 (2)

CCHVAC Chilled Wtr Pump.

T4100-B028 (B027), Div 1 (2)

CCHVAC Equip Room Cooler.

T4100-C031 (C030), Div 1 (2)

CCHVAC Return Air Fan.

T4100-B009 (B008), Div 1 (2)

CCHVAC Chiller.

T4100-C047 (C048), Div 1 (2)

CCHVAC Emerg Makeup Fan.

4.

Verifies or places Division 1 switches for the following equipment in AUTO:

T4100-B007 (B006), Div 1 CCHVAC Supply Fan.

T4100-C041 (C040), Div 1 CCHVAC Chilled Wtr Pump.

T4100-B028 (B027), Div 1 CCHVAC Equip Room Cooler.

T4100-C031 (C030), Div 1 CCHVAC Return Air Fan.

T4100-B009 (B008), Div 1 CCHVAC Chiller.

T4100-C047 (C048), Div 1 CCHVAC Emerg Makeup Fan.

5.

If selected T4100-B009 (B008), Div 1 (2)

CCHVAC Chiller, is to be manually loaded, place Div 1 (2) Capacity Control Module AUTOMANUAL switch in MANUAL (H21-P285A (B), AB5-G13).

5.

No action

  • 6.

For division being placed in service, place Control Center HVAC Div 1 (2) Mode Select switch in ALL AUTO and verify:

T4100-B007 (B006), Div 1 (2)

CCHVAC Supply Fan, starts.

T4100-C041 (C040), Div 1 (2)

CCHVAC Chilled Wtr Pump, starts.

  • 6.

Place Control Center HVAC Div 1 Mode Select switch in ALL AUTO and verify:

T4100-B007 (B006), Div 1 CCHVAC Supply Fan, starts.

T4100-C041 (C040), Div 1 CCHVAC Chilled Wtr Pump, starts.

  • 7.

For division being removed from service, place Control Center Div 1 (2) switch in ALL STOP..

  • 7.

Places Control Center Div 1 (2) switch in ALL STOP.

Time Stop

  • Critical Steps Terminating Cue(s):

Informs CRS Dicvision 1 CCHVAC is operating in Normal Mode in accordance with 23.413

JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)

No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Reference:

Response

Question:

Reference

Response

JOB PERFORMANCE MEASURE JPM Title Shift Divisions of CCHVAC (Alternate Path)

No.: NRC EXAM 2003-301-B1.g Revision: 0 Page 9 Simulator Setup IC#:

Any Malfunctions:

Number Title Value (T41) MF 3575 CCHVAC Div 2 Return Air Fan Trip On Remote Functions:

Number Title Value None Override Functions:

None Special Instructions:

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B2.A JPM B1.g Cue Sheet Initial Conditions:

The plant is operating at full power.

Division 1 CCHVAC is operating.

Initiating Cue(s):

The CRS has directed that Division 2 CCHVAC placed in service and Division 1 CCHVAC be removed from service.

A pre-job brief has been completed.

All prerequisites are completed.

Steps 6.1.2.1 and 6.1.2.2 are complete.

An operator is in the field, standing by for direction.

The CCHVAC Chiller unit will be automatically loaded.

JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)

No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 2 Job Position Nuclear Supervising Operator No.

NRC EXAM 2003-301-B2.a Revision 1

JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)

Duration 30 Minutes Page COVER SHEET Examinee: SRO / RO Evaluator:

Evaluation Method:

Perform / Plant Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments 1.

  • 14.

2.

  • 15.

3.

16.

4.

  • 5.
  • 6.
  • 7.

8.

9.

  • 10.
  • 11.
  • 12.
  • 13.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY

JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)

No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 3 Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)

No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 4

References:

Required (R) / Available (A)

SOP 23.106, Control Rod Hydraulic System (R)

AOP 20.206.03, CRD Flow Control Valve Failure (R)

Tools and Equipment Required:

15 Crescent Wrench Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant X

Simulator Classroom Evaluator Notes:

ENSURE All industrial and personnel safety practices are used and enforced.

This JPM should be performed in the plant.

Do not operate any plant equipment.

The evaluator should be prepared to simulate communications with the examinee as the Control Room and other plant operators as needed.

Start this JPM at the A Flow Control Valve.

K/A

Reference:

201001 Control Rod Drive Hydraulic System K1 Knowledge of the physical connections and/or cause effect relationships between control rod drive hydraulic system and the following (CFR: 41.2 to 41.9 / 45.7 to 45.8):

K1.09, Plant air systems 3.1 / 3.2 A1 Ability to predict and/or monitor changes in parameters associated with operating the control rod drive hydraulic SYSTEM controls including (CFR: 41.5 / 45.5):

A1.09 - CRD drive water flow.

2.9 / 2.8 A2 Ability to (a) predict the impacts of the following on the control rod drive hydraulic system ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations (CFR: 41.5 / 45.6):

A2.07, Flow control valve failure 3.2 / 3.1 Task Standard:

The CRD Flow Control Valves are shifted.

Initial Conditions:

You are the Shift Foreman Plant is operating normally at 100% power.

A CRD Flow Control Valve is in service.

Initiating Cue(s):

The CRS directs Shift Foreman to shift CRD flow control valves, the in service FCV is responding poorly.

All prerequisites are complete.

Plant is operating normally at 100% power.

A CRD Flow Control Valve is in service.

JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)

No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: Enters procedure 23.106, Control Rod Hydraulic Shift, beginning at Step 6.4.2.2 CUE:

Communication with the Control Room is established.

1.

Establish and maintain communication with the Control Room until the evolution is complete.

1.

Communication with the Control Room is established.

CUE:

Report as Control Room NSO:

Control Rod Drive Hydraulic System Flow is 60 gpm.

Flow Controller is in AUTO.

Cooling Water Header to Reactor Differential Pressure is 11.5 psi.

2.

Have the Control Room verify the Control Rod Drive Hydraulic System Flow is 37 to 63 gpm and the controller is in AUTO, maintaining Cooling Water Header to Reactor Differential Pressure 10 to 13 psi (H11-P603).

2.

Control Room verified:

The Control Rod Drive Hydraulic System Flow is 37 to 63 gpm.

The Controller is in AUTO.

The Cooling Water Header to Reactor Differential Pressure is 10 to 13 psi.

Note:

The remaining steps are performed at the H21-P164 unless otherwise noted.

CUE:

The Drive Water Valve Selector Switch is in MANUAL and at minimum output.

3.

Verify the Drive Water Valve Selector Switch to be placed in service is in MANUAL and at minimum output.

3.

The Drive Water Valve Selector Switch is in MANUAL and at minimum output.

CUE:

The A Drive Water Flow Control Valve is in AUTO.

4.

Verify the A Drive Water Flow Control Valve is in AUTO.

4.

The Drive Water Flow Control Valve is verified in AUTO.

CUE:

The C11-F047B Flow Control Outlet isolation Valve is open.

  • 5.

Open or verify open the C11-F047A(B)

Flow Control Outlet Isolation Valve for the valve being placed in service.

  • 5.

The C11-F047B Flow Control Outlet Isolation Valve is open.

JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)

No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 6 Elements Standards CUE:

The C11-F046B Flow Control Inlet Isolation Valve is open.

  • 6.

Open or verify open the C11-F046A(B)

Flow Control Inlet Isolation Valve for the valve being placed in service.

  • 6.

The C11-F046B Flow Control Inlet Isolation Valve is open.

CUE:

The B CRD Flow Controller demand is increased.

  • 7.

Increase the demand on the Drive Water valve MANUAL / AUTO C11-D009A(B)

Controller being placed in service.

  • 7.

The demand on the Drive Water Valve MANUAL / AUTO C11-D009B Controller has been increased.

CUE:

The A Drive Water valve is closing.

8.

Verify the Drive Water Valve being taken out of service begins to close as the output controller for the Drive Water Flow Valve placed in service is increased.

8.

The A Drive Water Valve closing is verified.

Note:

The next step may require adjusting the Control Rod Drive Hydraulic System Flow Controller setpoint.

CUE:

C11-F002B, the B Drive Water Flow Control Valve is NOT opening.

9.

Verify the valve stem for the Drive Water Flow valve being placed in service is opening.

9.

Verifies no response to flow control valve CUE:

No response from the flow control valve.

CUE:

Report as Control Room NSO:

Crew has entered 20.106.03, CRD Flow Control Valve Failure The FCV being removed from service had stopped responding.

Cooling Water Header to Reactor Differential Pressure is 11.5 psi.

Perform Step D of 20.106.03, CRD Flow Control Valve Failure

- provide copy

  • 10.

Adjust Control Rod Drive Hydraulic System Flow controller setpoint

  • 10.

Reports no response from flow control valve

JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)

No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 7 Elements Standards NOTE: Begin at Step D.1 of 20.106.01, CRD Flow Control Valve Failure CUE:

C11-K009A in Manual and Set to minimum

  • 11.

Verify C11-K009A in Manual and Set to minimum

  • 11 Verified C11-K009A in Manual and Set to minimum CUE:

C11-K009B in Manual and Set to minimum

  • 12.

Verify C11-K009B in Manual and Set to minimum

  • 12 Verified C11-K009B in Manual and Set to minimum CUE:

The C11-F047A Flow Control Outlet isolation Valve is open.

CUE:

The C11-F046A Flow Control Outlet isolation Valve is open.

  • 13.

For CRD FCV to be placed in service, verify C1100-F047A(B) open and C1100-F046A(B) open.

  • 13.

Verified C1100-F047A open and C1100-F046A open.

CUE:

The hand jack locking nut is loose.

  • 14 Obtains crescent wrench from cart or tool bin and loosen hand jack locking nut on C11-F002A using a crescent wrench (15)

(Enclosure A).

  • 14 Obtains crescent wrench from cart or tool bin and Loosen hand jack locking nut using a crescent wrench (15)

(Enclosure A).

CUE:

Flow is 60 gpm

  • 15 For C11-F002A turn brass hand jack operator nut using a crescent wrench (15 or 12) to open (counterclockwise) or close (clockwise) CRD FCV, while observing flow. Establish a flow of 60 gpm locally (C11-R019).
  • 15 Establishes a flow of 60 gpm locally (C11-R019).

16.

Notify the Control Room that the CRD Flow Control Valve is in local manual control 16.

The Control Room is notified.

Time Stop

  • Critical Steps Terminating Cue(s):

JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)

No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 8 Informs the Control Room that the Flow Control Valve A is in local manual control.

JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)

No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 9 FOLLOW-UP DOCUMENTATION QUESTIONS Question:

Response

Question:

Response

JOB PERFORMANCE MEASURE JPM Title Switching Control Rod Drive Hydraulic FCV (Alternate Path)

No.: NRC EXAM 2003-301-B2.a Revision: 1 Page 10 Plant Setup Special Instructions:

1. Contact Control Room and inform CRS that this JPM is to be conducted.
2. Begin JPM.
3. Complete JPM
4. Inform Control Room JPM is complete.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B2.B JPM B2.a Cue Sheet Initial Conditions:

You are the Patrol NSO.

Plant is operating normally at 100% power.

A CRD Flow Control Valve is in service.

Initiating Cue(s):

The CRS directs the Patrol NSO to shift CRD flow control valves, the in service FCV is responding poorly.

All prerequisites are complete.

Plant is operating normally at 100% power.

A CRD Flow Control Valve is in service.

JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 2 Job Position Nuclear Supervising Operator No.

NRC Exam 2003-301-B2.b Revision 0

JPM Title Defeat of RPS Automatic Logic Trips Duration 25 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:

Evaluation Method:

Plant / Walkthrough Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments

  • 1.
  • 2.
  • 3.
  • 4.

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 3

References:

Required (R) / Available (A) 29.ESP.09, Defeat of RPS Automatic Logic Trips Tools and Equipment Required:

EOP Defeat Package for 29.ESP.09, Defeat of RPS Automatic Logic Trips Flashlight Low voltage electrical gloves Preferred Evaluation Method:

Perform X

Walkthrough Discuss Plant X

Simulator Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

Ensure SM informed of JPM walkthrough in relay room and cabinet doors opened for walkthrough of this task.

Stop the JPM if, at any time, this JPM interferes with plant operation.

K/A Reference :

2.1 Generic Knowledge and Abilities:

2.1.17 Ability to make accurate, clear, and concise verbal reports.

3.5 / 3.6 2.1.20 Ability to execute procedure steps.

4.3 / 4.2 2.1.21 Ability to obtain and verify controlled procedure copy.

3.1 / 3.2 2.1.23 Ability to perform specific procedures during all modes of operation.

3.3 / 3.5 2.1.30 Ability to locate and operate components including local controls.

3.4 / 3.5 2.1.28 Knowledge of purpose and function of major system components and controls 3.2 / 3.3 212000 Reactor protection System:

K3.

Knowledge of the effect that a loss or malfunction of RPS will have on the following:

K3.05 RPS Logic Channels 3.7 / 3.8 K4.

Knowledge of design feature(s) and/or interlocks which provide:

K4.12 Bypassing selected SCRAM signals(manual and auto) 3.9 / 4.1 K6.

Knowledge of the loss and/or malfunction of, will have an the following:

K6.05 RPS sensor inputs.

3.5 / 3.8 A3.

Ability to monitor automatics operation of:

A3.04 System status lights and alarms 3.9 / 3.8 A.4.

Ability to Manually operate and/or monitor in the Control Room:

A4.07 System status lights and alarms 4.0 / 3.9 A4.16 Manually activate ATWS circuitry 4.4 / 4.4 A4.17 Perform alternate reactivity/shutdown operations 4.1 / 4.1

JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 4 295015 Incomplete Scram:

AK2.

Knowledge of interrelationships for the following:

AK2.04 RPS 4.0 / 4.1 AK2.08 Neutron monitoring system 3.6 / 3.7 AA1.

Ability to operate and/or monitor the following:

AA1.02 RPS 4.0 / 4.2 AA1.07 Neutron monitoring system 3.6 / 3.7 295037 Scram Condition and Reactor Power Above APRM Downscale:

EK2.

Knowledge of interrelations between the following:

EK2.01 RPS 4.2 / 4.3 EK3.

Knowledge of reasons for the following responses:

EK3.07 Various alternate methods of control rod insertion 4.2 / 4.3 EA1.

Ability to operate and monitor the following:

EA1.01 RPS 4.6 / 4.6 Task Standard:

RPS Automatic scram functions have been simulated defeated in accordance with 29.ESP.09.

Initial Conditions:

The plant has scrammed and power is NOT less than 3%.

Initiating Cue(s):

You are an extra operator assigened to the tagging center.

CRS directs you to Defeat RPS Automatic Logic Trips per 29.ESP.09.

Hand the candidate a copy of the procedure and the keys.

JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 5 PERFORMANCE EVALUATION Time Start Elements Standards NOTE: All controls and indications are located PREREQUSITES: NONE

  • 2.1 Install jumper Logic B2: H11-P611 Dev AX, Term 1 To Dev BL, Term 4.

Jumper H11-P611 Dev AX, Term 1 To Dev BL, Term 4 installed.

  • 2.2 Install jumper Logic B1: H11-P611 Dev DJ, Term 1 To Dev DW Term 4.

Jumper H11-P611 Dev DJ, Term 1 To Dev DW Term 4installed.

  • 2.3 Install jumper Logic A2: H11-P609 Dev AX Term 1 To Dev BL Term 4.

Jumper H11-P609 Dev AX Term 1 To Dev BL Term 4 installed.

  • 2.4 Install jumper Logic A1: H11-P609 dev DJ Term 1 To Dev DW Term 4.

Jumper H11-P609 dev DJ Term 1 To Dev DW Term 4 installed.

Time Stop

  • Critical Steps Terminating Cue(s):

RPS Automatic Trips are defeated IAW 29.ESP.09

JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Response

Question:

Response

JOB PERFORMANCE MEASURE JPM Title Defeat of RPS Automatic Logic Trips No.: NRC EXAM 2003-301-B2.b Revision: 0 Page 7 Plant Setup Special Instructions:

5. Contact Control Room and inform CRS that this JPM is to be conducted.
6. Begin JPM.
7. Complete JPM
8. Inform Control Room JPM is complete.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B2.B JPM B2.b Cue Sheet Initial Conditions:

The plant has scrammed and power is NOT less than 3%.

Initiating Cue(s):

You are an extra operator assigned to the tagging center.

CRS directs you to Defeat RPS Automatic Logic Trips per 29.ESP.09.

JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 2 Job Position Nuclear Supervising Operator No.

NRC EXAM 2003-301-B2.c Revision 0

JPM Title Sutdown the Diesel Fire Pump Duration 15 Minutes Page COVER SHEET Examinee: SRO / RO / NLO / SROC / STA Evaluator:

Evaluation Method:

Walkthrough / Plant Start Time Stop Time Total Time PERFORMANCE EVALUATION Element S

U Comments Element S

U Comments 1.

  • 14 2.

15 3.

16 4.

17 5.

6.

  • 7
  • 8 9

10

  • 11
  • 12
  • 13

______ SATISFACTORY

______ UNSATISFACTORY ORAL EVALUATION (Not Required for ILO Exams)

Question #

S U

Comments Question #

S U

Comments

______ SATISFACTORY

______ UNSATISFACTORY Evaluator Signature / Date:

/

JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 3

References:

Required (R) / Available (A) 28.504.02, Diesel Fire Pump Engine Weekly Operability Test (R)

Tools and Equipment Required:

None Preferred Evaluation Method:

Perform Walkthrough X

Discuss Plant X

Simulator Classroom Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED.

This JPM should be performed in the plant.

Start this JPM at the Protected Area parking lot K/A Reference :

286000 Fire Protection System K4.

Knowledge of fire protection system design feature(s) and/or interlocks which provide for the following (CFR: 41.7) (CFR: 41.5 / 45.3) (CFR: 41.7 / 45.7) (CFR: 41.5 / 45.5)

(CFR: 41.5 / 45.6) (CFR: 41.7 / 45.7) (CFR: 41.7 / 45.5 to 45.8)

K4.05 Fire protection capability during loss of off-site power 3.7 / 3.8 K5 Knowledge of the operational implications of the following concepts as they apply to fire protection system (CFR: 41.5 / 45.3):

K5.05 Diesel operations 3.0 / 3.1 A4 Ability to manually operate and/or monitor in the control room (CFR: 41.7 / 45.5 to 45.8):

A4.06 Fire diesel 3.4 / 3.4 Task Standard:

Shutdown the Diesel Fire Pump Initial Conditions:

The plant is at full power 28.504.02, Diesel Fire Pump Engine Weekly Operability Test, is in progress.

Initiating Cue(s):

The CRS directs you to relieve the person performing 28.504.02, Diesel Fire Pump Engine Weekly Operability Test.

The surveillance is on Step 5.1.18

JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 4 PERFORMANCE EVALUATION Time Start Elements Standards PREREQUSITES: NONE NOTE: Begin at Step 5.1.18 of 28.504.02 CUE:

Give the candidate a copy of the completed surveillance up to Step 5.1.18 CUE:

Speed is 1000 RPM CUE:

Five minutes is up 1.

Adjust Engine Governor Control clockwise to idle speed (less than 1200 rpm) and run engine for approximately 5 minutes.

CUE:

Strobotac indicates 2250 RPM

  • 2.

Place Engine Governor Control to FULL SPEED (approximately 2300 rpm) position by turning counterclockwise to FULL OPEN and locking; then record engine speed below, from Strobotac:

  • 2.

Places Engine Governor Control to FULL SPEED and records engine speed.

3.

Open P8000-F154, Diesel Fire Pump Strainer Drain Valve.

3.

Open P8000-F154, Diesel Fire Pump Strainer Drain Valve.

4.

Turn each strainer handwheel 2 turns clockwise.

4.

Turns each strainer handwheel 2 turns clockwise.

5.

Close P8000-F154, Diesel Fire Pump Strainer Drain Valve.

5.

Closes P8000-F154, Diesel Fire Pump Strainer Drain Valve.

6.

Close and seal lock P8000-F010, Diesel Fire Pump Recirc Test Valve.

6.

Closes and seal lock P8000-F010, Diesel Fire Pump Recirc Test Valve.

CUE:

Discharge pressure is 170 psig

  • 7.

Record discharge pressure from X80-R401, Diesel Fire Pump Disch Press Indicator. Between 168 and 175 psig approximately.

  • 7.

Records discharge pressure CUE:

CRNSO reports Diesel Fire Pump CMC Switch in OFF/RESET

  • 8.

Have place Diesel Fire Pump CMC Switch in OFF/RESET (COP H11-P807).

  • 8.

Diesel Fire Pump CMC Switch in OFF/RESET (COP H11-P807).

9 Place Local Control Switch in OFF (Control Cabinet H21-P458).

9 Places Local Control Switch in OFF CUE:

CRNSO reports 7D2, DIESEL FIRE PUMP TROUBLE, alarms.

JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 5 Elements Standards 10.

Verify Annunciator 7D2, DIESEL FIRE PUMP TROUBLE, alarms.

10.

Verifies Annunciator 7D2, DIESEL FIRE PUMP TROUBLE, alarms.

CUE:

CRNSO reports Diesel Fire Pump CMC Switch in AUTO.

  • 11.

Have CRNSO place Diesel Fire Pump CMC Switch in AUTO (COP H11-P807).

  • 11.

Diesel Fire Pump CMC Switch in AUTO (COP H11-P807).

  • 12.

Place Local Control Switch in AUTO (Control Cabinet H21-P458).

12.

Places Local Control Switch in AUTO (Control Cabinet H21-P458).

13.

Verify the following are clear:

Annunciator 7D2, DIESEL FIRE PUMP TROUBLE.

Annunciator 7D6, DIESEL FIRE PUMP AUTO START.

13.

Verifies clear:

Annunciator 7D2, DIESEL FIRE PUMP TROUBLE.

Annunciator 7D6, DIESEL FIRE PUMP AUTO START.

CUE:

Diesel Fire Pump Fuel Oil Tank Level is 35 inches NOTE: The Diesel Fire Pump Fuel Oil Tank Level is a TRM Section TR 3.12.2 limit. If the tank level is less than 28 inches on the level indicator or graduated dipstick, the SM must be notified immediately (see Enclosure A for Level Conversion Chart).

  • 14.

Perform the following:

1. Record Diesel Fire Pump Fuel Oil Tank Level:
2. Verify meets acceptable limits.
  • 14.

Performs the following:

1. Record Diesel Fire Pump Fuel Oil Tank Level:
2. Verify meets acceptable limits 15.

Inform Control Room to order fuel for Diesel Fire Pump if tank level is less than 32 inches (207 gallons).

15.

No action 16.

Notify the Control Room that the Diesel Fire Pump Weekly Test has been completed.

16.

Notifies the Control Room that the Diesel Fire Pump Weekly Test has been completed.

17.

Record test personnel.

17.

Record test personnel.

CUE:

CRS will assign an independent reviewer Time Stop

  • Critical Steps Terminating Cue(s):

JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 6 Records test personnel and is informed the CRS will assignan independent reviewer.

JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for Followup question(s):

Question:

Response

Question:

Response

JOB PERFORMANCE MEASURE JPM Title Sutdown the Diesel Fire Pump No.: NRC EXAM 2003-301-B2.c Revision: 0 Page 8 Plant Setup Special Instructions:

9. Contact Control Room and inform CRS that this JPM is to be conducted.
10. Begin JPM.
11. Complete JPM
12. Inform Control Room JPM is complete.

JOB PERFORMANCE MEASURE NRC EXAM 2003-301-B1.A JPM B2.c Cue Sheet Initial Conditions:

The plant is at full power 28.504.02, Diesel Fire Pump Engine Weekly Operability Test, is in progress.

Initiating Cue(s):

The CRS directs you to relieve the person performing 28.504.02, Diesel Fire Pump Engine Weekly Operability Test.

The surveillance is on Step 5.1.18