{{#Wiki_filter:Sudesh K. Gambhir ENERGY                                                  Vice President, Technical Services P.O. Box 968, Mail Drop PE04 NORTHWEST                                                        Richland, WA 99352-0968\,
{{#Wiki_filter:ENERGY NORTHWEST Sudesh K. Gambhir Vice President, Technical Services P.O. Box 968, Mail Drop PE04 Richland, WA 99352-0968\\,
Ph. 509-377-8313 F. 509-377-2354 sgambhir@energy-northwest.com August 28, 2008 G02-08-122 10 CFR 90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Ph. 509-377-8313 F. 509-377-2354 sgambhir@energy-northwest.com August 28, 2008 G02-08-122 10 CFR 90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001


==Subject:==
==Subject:==
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES Letter G02-07-1 11, dated July 30, 2007, SK Gambhir (Energy Northwest) to NRC, "License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves" (TAC No. MD6208)


==Reference:==
==Reference:==
Letter G02-07-1 11, dated July 30, 2007, SK Gambhir (Energy Northwest) to NRC, "License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves" (TAC No. MD6208)
==Dear Sir or Madam:==
==Dear Sir or Madam:==
Via the referenced letter, Energy Northwest proposed a change to the Columbia Generating Station (Columbia) Technical Specifications (TS) to support adoption of a number of Technical Specification Task Force (TSTF) travelers related to Containment Isolation Valves. TSTF-306-A, Revision 2, "Add Action to LCO 3.3.6.1 to give option to isolate penetration" was included as one of the travelers proposed for adoption in the referenced request.
Via the referenced letter, Energy Northwest proposed a change to the Columbia Generating Station (Columbia) Technical Specifications (TS) to support adoption of a number of Technical Specification Task Force (TSTF) travelers related to Containment Isolation Valves. TSTF-306-A, Revision 2, "Add Action to LCO 3.3.6.1 to give option to isolate penetration" was included as one of the travelers proposed for adoption in the referenced request.
During the NRC review process of the aforementioned submittal, a question with regard to the proposed adoption of TSTF-306-A was raised in that Energy Northwest had not included the recommended Surveillance Requirement (SR) 3.3.6.1.1 requiring a channel check for the proposed addition of Function 6, "Traversing Incore Probe Isolation," to Table 3.3.6.1-1, "Primary Containment Isolation Instrumentation," nor justified its exclusion as a deviation from the traveler. Energy Northwest reviewed the referenced submittal against the recommendations of TSTF-306-A and has concluded that this SR was inappropriately omitted. During this review Energy Northwest also determined that for LCO 3.3.6.1 - Condition A, Function 6.a was not included in the Completion Time as recommended by TSTF-306-A. This deviation from the traveler was also not identified or justified in the referenced submittal.
During the NRC review process of the aforementioned submittal, a question with regard to the proposed adoption of TSTF-306-A was raised in that Energy Northwest had not included the recommended Surveillance Requirement (SR) 3.3.6.1.1 requiring a channel check for the proposed addition of Function 6, "Traversing Incore Probe Isolation," to Table 3.3.6.1-1, "Primary Containment Isolation Instrumentation," nor justified its exclusion as a deviation from the traveler. Energy Northwest reviewed the referenced submittal against the recommendations of TSTF-306-A and has concluded that this SR was inappropriately omitted. During this review Energy Northwest also determined that for LCO 3.3.6.1 - Condition A, Function 6.a was not included in the Completion Time as recommended by TSTF-306-A. This deviation from the traveler was also not identified or justified in the referenced submittal.
KA i(
KA i(


SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES Page 2 The correction of these two issues with the referenced submittal makes the proposed changes consistent with TSTF-306-A. The corrected mark-up of the affected pages are included in Attachment 1. These corrections include 1) the addition of SR 3.3.6.1.1 to Table 3.3.6.1-1 for Functions 6.a and 6.b, and 2) the addition of Function 6.a to the Completion Time of LCO 3.3.6.1 Condition A. The revised TS pages for the changes discussed above are included in Attachment 2. For administrative simplification, includes all of the revised TS pages for this amendment request, inclusive of the two pages affected by this supplement as well as the unaffected pages from the original submittal.
SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES Page 2 The correction of these two issues with the referenced submittal makes the proposed changes consistent with TSTF-306-A. The corrected mark-up of the affected pages are included in Attachment 1. These corrections include 1) the addition of SR 3.3.6.1.1 to Table 3.3.6.1-1 for Functions 6.a and 6.b, and 2) the addition of Function 6.a to the Completion Time of LCO 3.3.6.1 Condition A. The revised TS pages for the changes discussed above are included in Attachment 2. For administrative simplification, includes all of the revised TS pages for this amendment request, inclusive of the two pages affected by this supplement as well as the unaffected pages from the original submittal.
There are no new commitments being made with this submittal.
There are no new commitments being made with this submittal.
The changes being made in this supplemental letter meet the intent of TSTF-306-A and do not affect the original evaluation of the proposed changes, including the conclusion of the No Significant Hazards Consideration, submitted via the referenced letter.
The changes being made in this supplemental letter meet the intent of TSTF-306-A and do not affect the original evaluation of the proposed changes, including the conclusion of the No Significant Hazards Consideration, submitted via the referenced letter.
Should you have any questions or require additional information regarding this matter, please contact Mr. MC Humphreys, Licensing Supervisor, at 509-377-4025.
Should you have any questions or require additional information regarding this matter, please contact Mr. MC Humphreys, Licensing Supervisor, at 509-377-4025.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.
Repctfully, S3 ambhir Vice President, Technical Services Attachments:     1)   Mark-up TS pages
Repctfully, S3 ambhir Vice President, Technical Services Attachments:
: 2)   Re-typed TS pages cc:     EE Collins, Jr. - NRC RIV CF Lyon - NRC NRR NRC Senior Resident Inspector/988C RN Sherman - BPA/1 399 WA Horin - Winston & Strawn
: 1)
Mark-up TS pages
: 2)
Re-typed TS pages cc:
EE Collins, Jr. - NRC RIV CF Lyon - NRC NRR NRC Senior Resident Inspector/988C RN Sherman - BPA/1 399 WA Horin - Winston & Strawn


SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES Mark-up TS pages 3.3.6.1-1 3.3.6.1-8 and associated Insert Page 3.3.6.1-A
SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES Mark-up TS pages 3.3.6.1-1 3.3.6.1-8 and associated Insert Page 3.3.6.1-A


Primary Containment Isolation Instrumentat~ion 3.3.6.1 3.3   INSTRUMENTATION 3.3.6.1   Primary Containment Isolation Instrumentation LCO   3.3.6.1       The. pri~mary containment isolation. Anstrumentation for 'each Function in Table 3.3.6.1-1 shall be OPERABLE.
Primary Containment Isolation Instrumentat~ion 3.3.6.1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 APPLICABILITY:
APPLICABILITY:      According to Table 3.3.6.1-1.
The. pri~mary containment isolation. Anstrumentation for 'each Function in Table 3.3.6.1-1 shall be OPERABLE.
ACTIONS                                                 -
According to Table 3.3.6.1-1.
  .Separate Condition entry is allowed for each channel.
ACTIONS  
CONDITION                       REQUIRED ACTION           COMPLETION TIME
.Separate Condition entry is allowed for each channel.
                                                                                          -r"rr-309 A. One or more required       A.1       Place channel in       12 hours for
CONDITION REQUIRED ACTION COMPLETION TIME
: f.        channels inoperable.                  trip.                  Functions 2.a,.
-r" rr-309 A.
2.c, M 5,d       "
One or more required channels inoperable.
Penetration flow paths may be AND             42 ab  .
: f.
unisolated intermittently under administrative controls.                                              24 hours for Functions other than Functions 2.a, 2.c, 60   5.d B. One or more automatic,       B.1     Restore isolation       I hour Functions with                       capability.
Penetration flow paths may be unisolated intermittently under administrative controls.
A.1 Place channel in trip.
12 hours for Functions 2.a,.
2.c, M 5,d AND ab 42.
24 hours for Functions other than Functions 2.a, 2.c, 60 5.d B. One or more automatic, B.1 Restore isolation I hour Functions with capability.
isolation capability not maintained.
isolation capability not maintained.
(continued)
(continued)
Columbia Generating Station             3.3.6.1-1             Amendment No. 4-44 169*
Columbia Generating Station 3.3.6.1-1 Amendment No. 4-44 169*


Primary Containment Isolation Instrumentation 3,3.6.1 Table 3.3.6.1-1 (page 4 of 4)
Primary Containment Isolation Instrumentation 3,3.6.1 Table 3.3.6.1-1 (page 4 of 4)
Primary Containment Isolation Instrumentation APPLICABLE                   CONDITIONS MODES OR,       REQUIRED   REFERENCED OTHER         CHANNELS       FROM SPECIFIED       P'ER TRIP   REQUIRED     SURVEILLANCE       ALLOWABLE FUNCTION           CONDITIONS         SYSTEM   ACTION C.1   REQUIREMENTS         VALUE
Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR, REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED P'ER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
: 5. RHR SDC System Isolation
: 5.
: a. Pump Room Area           3         1 per room         F     SR 3.3.6.1.3   < 150&deg;F Temperature-High                                               SR 3.3.6.1.4 SR 3.3.6.1.6
RHR SDC System Isolation
: b. Pump Room Area           3         1 per roomi       F     SR 3,3.6.1.3   < 70&deg;F, Ventilation                                                   SR 3.3.6.1.4 Differential                                                   SR 3.3.6.1.6 Temperature- High
: a.
: c. Heat Exchanger           3         1 per room         F     SR. 3.3.6.1.3 Area                                                           SR 3.3.6.1.4 Temperature -High                                             SR 3.3.6.1.L.6 Room 505 Area                                                                   < 140&deg;F Room 507 Area                                                                   < 160&deg;F Room 605 Area                                                                   < 150&deg;F Room 606 Area                                                                   < 140*F
Pump Room Area 3
: d. Reactor Vessel         3,4.5           2(d)           J     SR 3.3.6.1.1   > 9.5   inches Water Level - Low,                                             SR 3.3.6.1.2 Level 3                                                       SR 3.3.6.1.4 SR 3.3.6.1.6
1 per room F
: e. Reactor Vessel           1.,2,3             1           F     SR 3.3.6.1.2   < 135 psig Pressure- High                                                 SR 3.3.6.1.4 SR 3.3.6.1.6
SR 3.3.6.1.3  
: f. Manual Initiation       1,2,3             2           G     SR 3.3.6.1.6   NA F-S(d)   Only one trip system required ii n MODES 4 and 5 with RHR Shutdown Cooling  System integrity maintained.
< 150&deg;F Temperature-High SR 3.3.6.1.4 SR 3.3.6.1.6
TiS T7F-(WCej:             3.3.6.1 A)                                                                           306 Columbia Generating Station                       3.3.6.1-8             Amendment No. 149,161 169*
: b.
Pump Room Area 3
1 per roomi F
SR 3,3.6.1.3  
< 70&deg;F, Ventilation SR 3.3.6.1.4 Differential SR 3.3.6.1.6 Temperature-High
: c.
Heat Exchanger 3
1 per room F
SR. 3.3.6.1.3 Area SR 3.3.6.1.4 Temperature -High SR 3.3.6.1.L.6 Room 505 Area  
< 140&deg;F Room 507 Area  
< 160&deg;F Room 605 Area  
< 150&deg;F Room 606 Area  
< 140*F
: d.
Reactor Vessel 3,4.5 2(d)
J SR 3.3.6.1.1  
> 9.5 inches Water Level -
: Low, SR 3.3.6.1.2 Level 3 SR 3.3.6.1.4 SR 3.3.6.1.6
: e. Reactor Vessel 1.,2,3 1
F SR 3.3.6.1.2  
< 135 psig Pressure-High SR 3.3.6.1.4 SR 3.3.6.1.6
: f.
Manual Initiation 1,2,3 2
G SR 3.3.6.1.6 NA F-S(d)
Only one trip system required ii maintained.
(WCej:
3.3.6.1 A) n MODES 4 and 5 with RHR Shutdown Cooling System integrity TiS T7F-306 Columbia Generating Station 3.3.6.1-8 Amendment No. 149,161 169*


Insert 3.3.6.1-A
Insert 3.3.6.1-A
: 6. Traversing Incore Probe Isolation
: 6. Traversing Incore Probe Isolation
: a. Reactor Vessel Water 1,2,3 2 G SR 3.3.6.1.1 > -58 inches Level - Low, Low               SR 3.3.6.1.2 Level 2                       SR 3.3.6.1.4 SR 3.3.6.1.6
: a.
: b. Drywell Pressure     1,2,3 2 G SR 3.3.6.1.1 < 1.88 psig High                           SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.6
Reactor Vessel Water 1,2,3 2
G SR 3.3.6.1.1  
> -58 inches Level - Low, Low SR 3.3.6.1.2 Level 2 SR 3.3.6.1.4 SR 3.3.6.1.6
: b.
Drywell Pressure 1,2,3 2
G SR 3.3.6.1.1  
< 1.88 psig High SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.6


SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES Re-typed TS pages 3.3.3.1-3 no changes, included as back side of changed page 3.3.3.1-4 3.3.3.1-4 3.3.6.1-1 3.3.6.1-2 no changes, included as back side of changed page 3.3.6.1-1 3.3.6.1.7 no changes, included as back side of changed page 3.3.6.1-7 3.3.6.1-8 3.6.1.3-1 3.6.1.3-2 3.6.1.3-3 3.6.1.3-4 3.6.1.3-5 3.6.1.3-6 3.6.1.3-7 3.6.1.3-8 3.6.1.3-9 no content change, included due to format changes re-numbering this page and included as back side of new. page in this section 3.6.1.3-10 3.6.1.3-10 no content change, new page in this section due to formatting of changes on preceding pages requiring this page addition and page renumbering 3.6.4.2-1 no changes, included as back side of changed page 3.6.4.2-2 3.6.4.2-2 3.6.4.2-3 proposed change necessitates format change and creation of new page in this section, this page has been included as backside of new page 3.6.4.2-4 3.6.4.2-4
SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES Re-typed TS pages 3.3.3.1-3 no changes, included as back side of changed page 3.3.3.1-4 3.3.3.1-4 3.3.6.1-1 3.3.6.1-2 no changes, included as back side of changed page 3.3.6.1-1 3.3.6.1.7 no changes, included as back side of changed page 3.3.6.1-7 3.3.6.1-8 3.6.1.3-1 3.6.1.3-2 3.6.1.3-3 3.6.1.3-4 3.6.1.3-5 3.6.1.3-6 3.6.1.3-7 3.6.1.3-8 3.6.1.3-9 no content change, included due to format changes re-numbering this page and included as back side of new. page in this section 3.6.1.3-10 3.6.1.3-10 no content change, new page in this section due to formatting of changes on preceding pages requiring this page addition and page renumbering 3.6.4.2-1 no changes, included as back side of changed page 3.6.4.2-2 3.6.4.2-2 3.6.4.2-3 proposed change necessitates format change and creation of new page in this section, this page has been included as backside of new page 3.6.4.2-4 3.6.4.2-4
Line 77: Line 114:
PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS
PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS
------------------------------------- NOTES----------------------------------
------------------------------------- NOTES----------------------------------
: 1. These SRs apply to each Function in Table 3.3.3.1-1.
: 1.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the other required channel(s) in the associated Function is OPERABLE.
These SRs apply to each Function in Table 3.3.3.1-1.
SURVEILLANCE                               FREQUENCY SR 3.3.3.1.1   Perform CHANNEL CHECK.                       31 days SR 3.3.3.1.2   Deleted SR 3.3.3.1.3   Perform CHANNEL CALIBRATION for               18 months Functions 1, 2, 4, 5, and 10.
: 2.
SR 3.3.3.1.4   Perform CHANNEL CALIBRATION for               24 months Functions 3, 6, and 7.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the other required channel(s) in the associated Function is OPERABLE.
Columbia Generating Station         3.3.3.1-3     Amendment No.            .
SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK.
149.169.17n   189
31 days SR 3.3.3.1.2 Deleted SR 3.3.3.1.3 Perform CHANNEL CALIBRATION for 18 months Functions 1, 2, 4,
5, and 10.
SR 3.3.3.1.4 Perform CHANNEL CALIBRATION for 24 months Functions 3, 6,
and 7.
Columbia Generating Station 3.3.3.1-3 Amendment No.
149.169.17n 189


PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)
PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED
                                                                  . REOUIRED           FROM REQUIRED FUNCTION                                 CHANNELS             ACTION D.1
. REOUIRED FROM REQUIRED FUNCTION CHANNELS ACTION D.1
: 1. Reactor Vessel   Pressure                                   2                     E
: 1.
: 2. Reactor Vessel Water Level
Reactor Vessel Pressure 2
: a. -150 inches.to +60 inches                                 2                     E
E
: b. -310 inches to -110 inches                               2                     E
: 2.
: 3. Suppression Pool Water Level
Reactor Vessel Water Level
: a. -25 inches to +25 inches                                 2                     E
: a.  
: b. 2 ft to 52 ft                                             2                     E
-150 inches.to +60 inches 2
: 4. Suppression Chamber Pressure                                 2                     E
E
: 5. Drywell Pressure.
: b.  
: a. -5 p'sig to +3 psig                                       2                     E
-310 inches to -110 inches 2
: b. 0 psig to 25 psig                                         2                     E
E
: c. 0 psig to 180 psig                                         2                     E 6,. Primary Containment Area Radiation                           2                     F
: 3.
: 7. Penetration   Flow Path PCIV Position               2 per penetration               E flbw path (a)(b)
Suppression Pool Water Level
: 8. Deleted 9.. Deleted
: a.  
: 10. ECCS Pump Room Flood Level                                   5                     E (a) Not required for isolation valves whose associated penetration flow path is isolated by at least one closed and de-activated automatic valv*e, closed manual valve, blind flange, or check. v.alve with flow through the valve secured..              ...
-25 inches to +25 inches 2
(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.                   .              ,
E
Columbi-a Genera,ting S'tation               3 .3.,3 .,11-,4       &#xfd;'Amendment No.. 149,169,48&#xfd;&#xfd;
: b. 2 ft to 52 ft 2
E
: 4.
Suppression Chamber Pressure 2
E
: 5.
Drywell Pressure.
: a.  
-5 p'sig to +3 psig 2
E
: b. 0 psig to 25 psig 2
E
: c.
0 psig to 180 psig 2
E 6,.
Primary Containment Area Radiation 2
F
: 7.
Penetration Flow Path PCIV Position 2 per penetration E
flbw path (a)(b)
: 8.
Deleted 9..
Deleted
: 10.
ECCS Pump Room Flood Level 5
E (a)
Not required for isolation valves whose associated penetration flow path is isolated by at least one closed and de-activated automatic valv*e, closed manual valve, blind flange, or check. v.alve with flow through the valve secured..
(b)
Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.
Columbi-a Genera,ting S'tation 3.3.,3., 11-,4
&#xfd;'Amendment No.. 149,169,48&#xfd;&#xfd;


Primary Containment Isolation     Instrumentation 3.3.6.1 3.3   INSTRUMENTATION 3.3.6.1   Primary Containment Isolation Instrumentation LCO   3.3.6.1     The primary containment isolation instrumentation         for each Function in Table 3.3.6.1-1 shall be OPERABLE.
Primary Containment Isolation Instrumentation 3.3.6.1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 APPLICABILITY:
APPLICABILITY:      According to Table 3.3.6.1-1.
The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.
ACTIONS
According to Table 3.3.6.1-1.
-------------------------------------      NOTES----------------------------------
ACTIONS NOTES----------------------------------
: 1. Penetration flow paths may be unisolated intermittently under administrative control s.
: 1.
: 2. Separate Condition entry is     allowed for each channel.
Penetration flow paths may be unisolated intermittently under administrative control s.
CONDITION                       REQUIRED ACTION             COMPLETION TIME A. One or more required       A.1       Place channel in         12 hours for channels inoperable,                 trip.                     Functions 2.a, 2.c, 5.d, 6.a and 6.b AND 24 hours   for Functions   other than Functions   2.a, 2.c, 5.d,   6.a and 6.b B. One or more automatic       B.1       Restore isolation         1 hour Functions with                       capability.
: 2.
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required A.1 Place channel in 12 hours for channels inoperable, trip.
Functions 2.a, 2.c, 5.d, 6.a and 6.b AND 24 hours for Functions other than Functions 2.a, 2.c, 5.d, 6.a and 6.b B.
One or more automatic B.1 Restore isolation 1 hour Functions with capability.
isolation capability not maintained.
isolation capability not maintained.
(continued)
(continued)
Columbia Generat-ing Sta~tioon           3.3..6.1-I1         , AmendmentNo. 149,169
Columbia Generat-ing Sta~tioon 3.3..6.1-I1
, AmendmentNo. 149,169


Primary Containment Isolation     Instrumentation 3.3.6.1 ACTIONS                             .
Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS CONDITION REQU-IRED ACTION COMPLETION TIME C.
CONDITION             .        REQU-IRED ACTION     -    COMPLETION TIME C. Required Action, and. C..1'       Enter the Condition     Immediately associated Completion                 referenced-.i-.n.n Time of Condition A                   Table 3.3.6.1-1 for or B not met.                         the channel.
Required Action, and.
D. As required by           D.1         Isolate associated       12 hours Required Action C.1                   main steam line and referenced/in                     (MSL).
C..1' Enter the Condition Immediately associated Completion referenced-.i-.n.n Time of Condition A Table 3.3.6.1-1 for or B not met.
the channel.
D.
As required by D.1 Isolate associated 12 hours Required Action C.1 main steam line and referenced/in (MSL).
Table 3.3.6.1-1.
Table 3.3.6.1-1.
OR D.2.1       Be in MODE 3.           12 hours AND D.2.2       Be in     MODE 4.       36 hours E. As required by           E.1         Be in     MODE 2.       6 hours Required Action.C.1 and referenced in Table 3.3.6.1-1.
OR D.2.1 Be in MODE 3.
F. As required by           F.1         Isolate the affected     1 hour Required Action C.1                   penetration flow and referenced in                     path(s).
12 hours AND D.2.2 Be in MODE 4.
36 hours E.
As required by E.1 Be in MODE 2.
6 hours Required Action.C.1 and referenced in Table 3.3.6.1-1.
F.
As required by F.1 Isolate the affected 1 hour Required Action C.1 penetration flow and referenced in path(s).
Table 3.3.6.1-1.
Table 3.3.6.1-1.
G. As required by           G.1         Isolate the affected     24 hours Required Action C.I                   penetration flow and referenced in                     path(s).
G.
As required by G.1 Isolate the affected 24 hours Required Action C.I penetration flow and referenced in path(s).
Table 3.3.6.1-1.
Table 3.3.6.1-1.
(continued)
(continued)
Columbia Generatin'g Station:         3A1 8.3&#xfd;..6.,.1 -.2         [Amendment, No&#xfd;. 44 .169
Columbia Generatin'g Station:
3A1 8.3&#xfd;..6.,.1 -.2
[Amendment, No&#xfd;. 44.169


Primary.Containment             Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 3 of 4)
Primary.Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 3 of 4)
Primar-y Containment..Isol-ati.on..Instrumentation APPLICABLE                         CONDITIONS MODES OR     'REQUIRED-         REFERENCED..
Primar-y Containment..Isol-ati.on..Instrumentation APPLICABLE CONDITIONS MODES OR  
OTHER         CHANNELS             FROM FUNCTIONSPECIFIED.         PERTRIP           REQUIRED,     SURVEILLANCE       ALLOWABLE FUNCTION               CONDITIONS       SYSTEM         ACTION C.;1     REQUIREMENTS           VALUE
'REQUIRED-REFERENCED..
: 4. RWCU System Isolation (continued)
OTHER CHANNELS FROM FUNCTIONSPECIFIED.
: b. Differential               1,2,3             1                 F       SR 3.3.6.1.2     < 46.5 seconds Flow-Time Delay                                                          SR  3.3. 6. 1.5 SR  3.3.6.1.6
PERTRIP
: c. Bl owdowh Flow-:          1,2,3>'                              F        SR  3.3.6.1.1     (271:7    gpm High                                                                    SR  3.3.6.1.2 SR  3.3.6.1.5 SR  3.3.6.1.6 SR  3.3.6.1.7
: REQUIRED, SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.;1 REQUIREMENTS VALUE
: d. Heat Exchanger            1,2,3                                F        SR  3.3.6.1.3     < 160'F Room Area                                                                SR  3.3.6.1.4 Temperature - High                                                      SR  3.3.6.1.6
: 4.
: a. Heat Exchanger            1,2,3              1                F        SR  3.3.6.1.3     < 70'F Room Area                                                                SR  3.3.6.1.4 Ventilation                                                              SR  3.3.6.1.6 Differential, Temperature-    High
RWCU System Isolation (continued)
: f. Pump Room Area .          1,2,3      1 per room              F        SR  3.3.6.1.3     < 180'F Temperature - High                                                      SR  3.3. 6. 1'.4 SR  3.3.6.1.6
: b. Differential Flow-Time Delay
: g. Pump Room Area            1,2,3      1 per room              F "      SR 3.3.6.1.3     < IO0&deg;F Ventilation                                                              SSR 3.3.6.1.4 Differential                                                            SR 3.3.6.1.6 Temperature - High
: c.
                                                                                                      < 180'F
Bl owdowh Flow-:
: h. RWCU/RCIC Line            1,2,3              1                F        SR  3.3.6.1.3 Routing Area                                                            SR  3.3.6.1.4 Temperature-High                                                        SR  3. 3. 6. 1 .6
High
: i. RWCU Line Routing          1,2,3      1 per room              F      SR 3.3.6.1.3 Area                                                                    SR 3.3.6.1.4 Temperature - High                                                      SSR 3.3.6.1.6 Room 409,   509                                                                            K 175'F Areas Room 408,  511                                                                            < 180'F Areas      -
: d. Heat Exchanger Room Area Temperature - High
: j. Reactor Vessel            1,2,3             2                 F       SR   3.3.6.1.2     > -58  inches Water Level - Low                                                      SR  3.3.6.1.4 Low,  Level 2                                                          SR  3.3.6.1.6
: a. Heat Exchanger Room Area Ventilation Differential, Temperature-High
: k. SLC System                  1,2.3            Z( c)              I      SR  3.3.6.1.6     NA Initiation
: f.
: 1. Manual    Initiation        1.2.3              2                G       SR   3.3.6.1.6     NA (continued)
Pump Room Area.
(c) SLC System   Initiation only inputs into one of the two trip systems.
Temperature -
Col'umbia Generating -S-t-ation                     3". 31.. 6:.l1- 7         Amendment: No.:,149,169,172 199
High
: g.
Pump Room Area Ventilation Differential Temperature - High
: h.
RWCU/RCIC Line Routing Area Temperature-High
: i.
RWCU Line Routing Area Temperature - High Room 409, 509 Areas Room 408, 511 Areas
: j.
Reactor Vessel Water Level -
Low
: Low, Level 2
: k. SLC System Initiation
: 1. Manual Initiation 1,2,3 1,2,3>'
1,2,3 1,2,3 1
F SR SR SR F
S R SR SR SR SR F
SR SR SR F
SR SR SR 1
3.3.6.1.2 3.3. 6. 1.5 3.3.6.1.6 3.3.6.1.1 3.3.6.1.2 3.3.6.1.5 3.3.6.1.6 3.3.6.1.7 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6 3.3.6.1.3 3.3. 6. 1'.4 3.3.6.1.6 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6 3.3.6.1.3 3.3.6.1.4
: 3. 3. 6. 1.6 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6
< 46.5 seconds (271:7 gpm
< 160'F
< 70'F 1,2,3 1 per room 1,2,3 1 per room F
SR SR SR F "
SR S SR SR F
SR SR SR F
SR SR S SR
< 180'F
< IO0&deg;F
< 180'F 1,2,3 1
1,2,3 1 per room K 175'F
< 180'F 1,2,3 1,2.3 1.2.3 2
Z( c)
F SR SR SR I
SR 3.3.6.1.2 3.3.6.1.4 3.3.6.1.6 3.3.6.1.6
> -58 inches NA 2
G SR 3.3.6.1.6 NA (continued)
(c)
SLC System Initiation only inputs into one of the two trip systems.
Col'umbia Generating -S-t-ation 3". 31.. 6:.l 1-7 Amendment: No.:,149,169,172 199


Primary Containment Isolation                       Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 4 of 4)
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 4 of 4)
Primary Containment Isolation Instrumentation APPLICABLE                       CONDITIONS MODES OR         REQUIRED       REFERENCED OTHER         CHANNELS           FROM.
Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM.
SPECIF:IED   ''PER TRIP         REQUIRED.     SURVEILLANCE           ALLOWABLE FUNCTION               CONDITIONS         SYSTEM       ACTION C.1       REQUIREMENTS               VALUE
SPECIF:IED  
: 5. RHR SDC System Isolation
''PER TRIP REQUIRED.
: a. Pump: Room Area             ,3          1 p.er room,.        F        SR 3.3.6.1.3        < 150'F Temperature-   High                                                     SR 3.3.6.1.4 SR '3.3.6.1.6
SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
: b. Pump Room Area                 3          1 per room            F        SR    3.3.6.1.3    < 70&deg;F Ventilation                                                               SR    3.3.6.1.4 Differential                                                             SR    3.3.6.1.6 Temperature-   High
: 5.
: c. Heat Exchanger                 3          1 per room            F        SR    3.3.6.1.3 Area                                                                     SR    3.3.6.1.4 Temperature-   High                                                     SR    3.3.6.1.6 Room 505 Area                                                                                   < 140'F Room .507 Area                                                                                 < 160'F Room 605 Area                                                                                 < 150'F Room 606 Area                                                                                   < 140'F
RHR SDC System Isolation
: d. Reactor Vessel             3,4,5            2  (d)                      SR    3.3.6.1.1      > 9.5 inches Water Level - Low,                                                     SR    3.3.6. 1.2 Level 3                                                                 SR    3.3.6.1.4 SR    3.3.6.1.6
: a.
: e. Reactor Vessel             1.2,3                1              F        SR    3.3.6.1.2    < 135, p'sig Pressure - High                                                           SR    3.3.6.1.4 SR    3.3.6.1.6
Pump: Room Area Temperature-High
      .f. Manual 'Initiati~on                                                                                   .
: b.
1,2 :3                              G        SR    3.3.6.1.6    'NA
Pump Room Area Ventilation Differential Temperature-High
: c.
Heat Exchanger Area Temperature-High Room 505 Area Room.507 Area Room 605 Area Room 606 Area
: d.
Reactor Vessel Water Level -
: Low, Level 3
: e.
Reactor Vessel Pressure - High
.f. Manual 'Initiati~on
: 6. Traversing Incore Probe Isolation
: 6. Traversing Incore Probe Isolation
: a. Reactor Vessel,             1,2,3               2              G          SR 3.3.6.1.1         > -58 i.nches Water  Level' - Low                                                        SR 3.3.6.1.2 Low, Level 2                                                             SR .3.3.3 6.1.4 SR 3.3.6.1.6
: a.
: b. Drywell Pressure    -      1 .2,3             :2               G   .     SR  3.3.6.1.1       < 1.88 psig High                                                                      SR 3.3.6.1.2 SR 3.3.6.1.4 SR .3.3.6.1.6 (d) Only one trip system required i'nMODES 4 and 5 with RHR Shutdown Cooling System integ rity maintained.
Reactor Vessel, Water Level' -
Col umbia Generating Station                           . 3 . 6 .1           .'A'm'en:'d'm'en t No. 444,         69
Low
: Low, Level 2
: b.
Drywell Pressure High
,3 1 p.er room,.
3 1 per room 3
1 per room F
SR SR SR F
SR SR SR F
SR SR SR 3.3.6.1.3 3.3.6.1.4
'3.3.6.1.6 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6
< 150'F
< 70&deg;F 3,4,5 1.2,3 1,2 :3 2 (d) 1 SR SR SR SR F
SR SR SR G
SR 3.3.6.1.1 3.3.6. 1.2 3.3.6.1.4 3.3.6.1.6 3.3.6.1.2 3.3.6.1.4 3.3.6.1.6 3.3.6.1.6
< 140'F
< 160'F
< 150'F
< 140'F
> 9.5 inches
< 135, p'sig
'NA 1,2,3 1.2,3 2
:2 G
SR SR SR SR G
SR SR SR SR 3.3.6.1.1 3.3.6.1.2
.3.3.3 6.1.4 3.3.6.1.6 3.3.6.1.1 3.3.6.1.2 3.3.6.1.4
.3.3.6.1.6
> -58 i.nches
< 1.88 psig (d)
Only one trip system required i'n MODES 4 and 5 maintained.
with RHR Shutdown Cooling System integ rity Col umbia Generating Station
. 3. 6.1.'A'm'en:'d'm'en t No.
: 444, 6 9


PCIVs 3.6.1.3 3.6     CONTAINMENT SYSTEMS 3.6.1.3         Primary Containment Isolation Valves                   (PCIVs)
PCIVs 3.6.1.3 3.6 CONTAINMENT SYSTEMS 3.6.1.3 Primary Containment Isolation Valves (PCIVs)
LCO     3.6.1.3               Each PCIV, except reactor building-to-suppression                           chamber
LCO 3.6.1.3 APPLICABILITY:
                              .vacuum breakers, shall be OPERABLE.
Each PCIV, except reactor building-to-suppression chamber
APPLICABILITY:                  MODES 1, 2, and 3, When associated instrumentation is: required to be OPERABLE per LCO 3.3.6.1, "Primary Containment Isolation Instrumentation."
.vacuum breakers, shall be OPERABLE.
ACTIONS
MODES 1, 2,
------------------------------                          NOTES       -------------------------------
and 3, When associated instrumentation is: required to be OPERABLE per LCO 3.3.6.1, "Primary Containment Isolation Instrumentation."
: 1.     Penetration flow paths may be unisolated intermittently under; administrative controls.
ACTIONS NOTES
: 2.     Separate Condition entry is             allowed for each penetration                       flow path.
: 1.
: 3.     Enter applicable Conditions and Required Actions for systems made inoperable by PCIVs.
Penetration flow paths may be unisolated intermittently under; administrative controls.
: 4.     Enter applicable Conditions and Required Actions of LCO 3.6.1.1, "Primary Containment," when PCIV leakage results in exceeding overall containment leakage rate acceptance criteria.
: 2.
CONDITION                             REQUIRED ACTION                             COMPLETION TIME A.----------- NOTE ----------             A.1         Isolate the affected                     4 hours except Only applicable to.                               penetration flow path,                   for main steam penetration flow paths                           by use of at least                         line with two PCIVs.                                 one closed and de-activated                             AND automatic valve, One or more                                     closed manual valve,                       8 hours for penetration flow paths                           blind flange, or                         main steam line w.ith one PCIV             .  .                  check..valve wi.th flow.                      .          .
Separate Condition entry is allowed for each penetration flow path.
inoperable for reasons                           thrQugh the valve other than                                       secured.
: 3.
Enter applicable Conditions and Required Actions for systems made inoperable by PCIVs.
: 4.
Enter applicable Conditions and Required Actions of LCO 3.6.1.1, "Primary Containment," when PCIV leakage results in exceeding overall containment leakage rate acceptance criteria.
CONDITION REQUIRED ACTION COMPLETION TIME A. -----------
NOTE ----------
A.1 Isolate the affected 4 hours except Only applicable to.
penetration flow path, for main steam penetration flow paths by use of at least line with two PCIVs.
one closed and de-activated AND automatic valve, One or more closed manual valve, 8 hours for penetration flow paths blind flange, or main steam line w.ith one PCIV check..valve wi.th flow.
inoperable for reasons thrQugh the valve other than secured.
Condition D.
Condition D.
AND (continued)
AND (continued)
Col.umbi.a Ge-neratiing ,Statio*n3                 3&#xfd;:.&#xfd;6..1 .13 -.I                     Amendment No., 149:,1.69
Col.umbi.a Ge-neratiing,Statio*n3 3&#xfd;:.  
&#xfd;6..1.13 -. I Amendment No., 149:,1.69


PCIVs 3.6.1.3 ACT.IONS -
PCIVs 3.6.1.3 ACT.IONS -
CONDITION               REQUIRED ACTION                   COMPLETION TIME A.   (continued)           A.2               --- NOTES------              ----
CONDITION REQUIRED ACTION COMPLETION TIME A.
: 1.     Isolatidn devices in high radiation areas may be verified by use of administrative means.
(continued)
: 2.     Isolation devices that are locked, sealed, *or otherwise secured may be verified by use of     . . .
A.2
administrative means.
--- NOTES------
Verify the affected             Once per penetration flow path           31 days for is isolated..                   i sol ati on devices outside primary containment AND Prior to entering MODE 2 or 3 from MODE 4 if primary containment was de-inerted while in MODE 4, if not performed within the previous 92 days, for isolation devices inside primary containment (continued)
: 1.
Columbia Generating'Station     3. 6.4.1:.3- 2.         "&#xfd;. .',Amendment. No'. 1494'-19
Isolatidn devices in high radiation areas may be verified by use of administrative means.
: 2.
Isolation devices that are locked, sealed, *or otherwise secured may be verified by use of administrative means.
Verify the affected penetration flow path is isolated..
Once per 31 days for i sol ati on devices outside primary containment AND Prior to entering MODE 2 or 3 from MODE 4 if primary containment was de-inerted while in MODE 4, if not performed within the previous 92 days, for isolation devices inside primary containment (continued)
Columbia Generating'Station
: 3. 6.4.1:.3-2.
"&#xfd;..',Amendment. No'.
1494'-19


PCIVs 3.6.1.3 ACTIONS CONDITION                     REQUIRED ACTION           COMPLETION TIME B.----------   NOTE--------- -B..1       Isolate the affected     1 hour Only applicable, to                   penetration flow path penetration flow paths,               by *use of at:least with two PCIVs.                       one closed and
PCIVs 3.6.1.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. ----------
      ------------- --....... .de-activated.
NOTE--------- -B..1 Isolate the affected 1 hour Only applicable, to penetration flow path penetration flow paths, by *use of at:least with two PCIVs.
automatic va,lve One or more                           closed manual valve, penetration flow paths               or blind flange.
one closed and
.de-activated.
automatic va,lve One or more closed manual valve, penetration flow paths or blind flange.
with two PCIVs inoperable for reasons other than Condition D.
with two PCIVs inoperable for reasons other than Condition D.
C.---------- NOTE ----------     C.1       Isolate the &#xfd;affected   4 hours except Only applicable to                   penetration flow path   for excess flow penetration flow paths               by use of at least       check valves with only one PCIV.                   one closed and           (EFCVs) de-activated!
C. ----------
automatic vaIve,         AND One or more                           closed manua'l valve, penetration flow paths               or blind flange.         72 hours for with one PCIV                                                 EFCVs inoperable foh reasons     AND other than Condition D.
NOTE ----------
C.1 Isolate the &#xfd;affected 4 hours except Only applicable to penetration flow path for excess flow penetration flow paths by use of at least check valves with only one PCIV.
one closed and (EFCVs) de-activated!
automatic vaIve, AND One or more closed manua'l valve, penetration flow paths or blind flange.
72 hours for with one PCIV EFCVs inoperable foh reasons AND other than Condition D.
(continued)
(continued)
Columbi.a Generating Station           3. 6J.1.3,           Amendment No. 149,169
Columbi.a Generating Station
: 3. 6J.1.3, Amendment No. 149,169


PCIVs 3.6.1.3 ACT..ION S CONDITION         j         REWUIRED ACTI'N                     COMPLETION     IME C.     (continued)             C.2   *--------          NOTES-----
PCIVs 3.6.1.3 ACT..ION S CONDITION j
* 1.         Isolatiodn devices in high radiation areas may be verified by use of administrative, means.
REWUIRED ACTI'N COMPLETION IME C.
: 2.       Isolatio~n devices that are locked, sealed, or otherwise secured may be verified by use of administrative means.
(continued)
Verify the affected             Once per penetration flow path           31 days for is isolated.:                   isolation devices outside primary containment AND Prior to entering MODE 2 or 3 from MODE 4 if pri mary containment was de-inerted while in MODE 4, if not performed within the previous 92 days, for isolation devices inside primary containment (continued)
C.2 NOTES-----
Columbia Generating   Station       3 :.6' . .1I.-3 L!
: 1.
4&#xfd;           ;--Amendme&#xfd;'nt No,'. 149,169
Isolatiodn devices in high radiation areas may be verified by use of administrative, means.
: 2.
Isolatio~n devices that are locked,
: sealed, or otherwise secured may be verified by use of administrative means.
Verify the affected penetration flow path is isolated.:
Once per 31 days for isolation devices outside primary containment AND Prior to entering MODE 2 or 3 from MODE 4 if pri mary containment was de-inerted while in MODE 4, if not performed within the previous 92 days, for isolation devices inside primary containment (continued)
Columbia Generating Station 3 :. 6'..1I.-3 L!
4 &#xfd;
;--Amendme&#xfd;'nt No,'.
149,169


PCIVs 3.6.1.3 ACTIONS CONDITION                   REOUJRED ACTI:ON           COMPLETION TIME D. One or more secondary   D'.I       Restore leakage rate   4 hour~s for containment bypass                 to~within limit,       hydrostatically leakage rate,!MSIV                                         tested line leakage rate, or     ,                                    leakage not on hydrostatically tested                                     a closed system lines leakage rate not within limit.                                             AND 4 hours for secondary containment bypass leakage AND 8 hours for MSIV leakage AND 72 hours for hydrostatically tested line leakage on a closed system E. Required Action and     E.1       Be in     MODE 3.     12 hours associated Completion Time of Condition A,   AND B, C, or D not met in
PCIVs 3.6.1.3 ACTIONS CONDITION REOUJRED ACTI:ON COMPLETION TIME D.
    ,MODE 1, 2, or 3.       E.2       Be in     MODE 4.     36 hours (continued)
One or more secondary D'.I Restore leakage rate 4 hour~s for containment bypass to~within limit, hydrostatically leakage rate,!MSIV tested line leakage rate, or leakage not on hydrostatically tested a closed system lines leakage rate not within limit.
Columbia Generating Station       3. 6.. 1 . 3;- 5         Amendment No. 149,1,69
AND 4 hours for secondary containment bypass leakage AND 8 hours for MSIV leakage AND 72 hours for hydrostatically tested line leakage on a closed system E.
Required Action and E.1 Be in MODE 3.
12 hours associated Completion Time of Condition A, AND B, C, or D not met in
,MODE 1, 2, or 3.
E.2 Be in MODE 4.
36 hours (continued)
Columbia Generating Station
: 3. 6.. 1. 3;- 5 Amendment No.
149,1,69


PCIVs 3.6.1.3 ACT IONS     ..,_...              ...........                        _ . _  _ _  _  . _
PCIVs 3.6.1.3 ACT IONS CONDITIO'N REQUIRED"ACTION COMPLETION TIME F.
CONDITIO'N                   REQUIRED"ACTION             COMPLETION TIME F. Required Action and     F.1         Initiate action to       Immediately associated Completion'               suspend ope:rations Time of Condiltion A,               witha potential for.
Required Action and F.1 Initiate action to Immediately associated Completion' suspend ope:rations Time of Condiltion A, witha potential for.
B, C, or D not met for             d,rbining the reactor PCIV(s) required to 'be             vessel (OeDRVs).
B, C, or D not met for d,rbining the reactor PCIV(s) required to 'be vessel (OeDRVs).
OPERABLE during MODE 4 or 5.                   OR F.2         Initiate action to       Immediately restore valve(s) to OPERABLE status .
OPERABLE during MODE 4 or 5.
Columbia Genera'tihg   Station     3 . 6.1,-3-6               Amendment No. 1&#xfd;&#xfd;J,&#xfd;Uj A 0- 1
OR F.2 Initiate action to Immediately restore valve(s) to OPERABLE status.
Columbia Genera'tihg Station 3.6.1,-3-6 1 A 0-1 Amendment No. &#xfd;&#xfd;J,&#xfd;Uj


PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                           FREQUENCY SR        1 "3 "'N 6 ".
PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY S R 3 ".
3 ".      '1       7 7 -- - - ----  "-1                 -
6 ".
OT E - . . . . . -.
1 " 3 " '1 7 7 -- - -
Not required.,,to be'me.twhen the .24 inch.
"-1  
'N O T E -.......-
Not required.,,to be'me.twhen the.24 inch.
and 30 inch prima~rycontainment purge valves are openfobr !inerting, de-inerting,;pressure control, ALARA or air quality considerations for personnel entry, or Surveillances that require the valves to be open.
and 30 inch prima~rycontainment purge valves are openfobr !inerting, de-inerting,;pressure control, ALARA or air quality considerations for personnel entry, or Surveillances that require the valves to be open.
Verify each.24 inch and 30 inch primary                     31 days containment purge valve is closed.
Verify each.24 inch and 30 inch primary 31 days containment purge valve is closed.
SR 3.6.1.3.2       -------------------NOTES-----------------
SR 3.6.1.3.2  
: 1. Valves and blind flanges in high radiation areas may be verified by use of administrative means.
-------------------NOTES-----------------
: 2. Not required to be met for PCIVs that are open under administrative controls.
: 1.
Verify each primary containment isolation                   31 days manual valve and blind flange that is located outside primary containment and not locked, sealed, or otherwise secured and is required to be closed during accident conditions is closed.
Valves and blind flanges in high radiation areas may be verified by use of administrative means.
: 2.
Not required to be met for PCIVs that are open under administrative controls.
Verify each primary containment isolation 31 days manual valve and blind flange that is located outside primary containment and not locked, sealed, or otherwise secured and is required to be closed during accident conditions is closed.
(continued)
(continued)
Columbia Gen~erati.ng ,Station             3-. 6. 1-.. 3- 7               Amendment No. 149,,169
Columbia Gen~erati.ng,Station 3-. 6. 1-.. 3-7 Amendment No. 149,,169


PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS     .......  .....                                        ____"
PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.3 NOTES- -----------------
SURVEILLANCE                                   FREQUENCY SR 3.6.1.3.3     ---                  NOTES- -----------------
.1.
                  .1. Valves and blind f-langes i.n high radiation areas may be verified by use of administrative means.
Valves and blind f-langes i.n high radiation areas may be verified by use of administrative means.
                  -2.. Not required to-be met for...PCIVs that are open under administrative control.s.
-2..
Verify each primary containment isolation         Prior to manual valve and blind flange that is               entering MODE .2
Not required to-be met for...PCIVs that are open under administrative control.s.
                  ,located inside primary containment and             or 3 from
Verify each primary containment isolation Prior to manual valve and blind flange that is entering MODE.2
                  'not locked, sealed, or otherwise secured           MODE 4 if and is required to be closed during               primary accident conditions is closed.,                   containment was de-inerted while in MODE 4, if not performed within the previous 92 days SR 3.6.1.3.4     Verify continuity of the traversing               31 days
,located inside primary containment and or 3 from
                  ,incore probe (TIP) shear isolation valve explosive charge.
'not locked, sealed, or otherwise secured MODE 4 if and is required to be closed during primary accident conditions is closed.,
SR 3.6.1.3.5   .Verify the isolation time of each power.           In accordance
containment was de-inerted while in MODE 4, if not performed within the previous 92 days SR 3.6.1.3.4 Verify continuity of the traversing 31 days
                  &#xfd;operated, automatic PCIV, except MSIVs,             with the is.within limits.         ..                      Inservice Testing Program (continued)
,incore probe (TIP) shear isolation valve explosive charge.
Columbia Generating Station           3.6.1.3-8                         Amendment No.
SR 3.6.1.3.5  
449,4169, 1709 ,1'       199
.Verify the isolation time of each power.
In accordance
&#xfd;operated, automatic PCIV, except MSIVs, with the is.within limits.
Inservice Testing Program (continued)
Columbia Generating Station 3.6.1.3-8 Amendment No.
449,4169, 1709,1' 199


PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS                                       _    _    _    ,_
PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.6 Verify the isolation time of each MSIV is In accordance
SURVEILLANCE                               FREQUENCY SR 3.6.1.3.6     Verify the isolation time of each MSIV is       In accordance
> 3 seconds and K 5 seconds..
                  > 3 seconds and K 5 seconds..                 with the I1 Inservice Testing Program SR 3.6.1.3.7     &#xfd;Verify each automatic PCIV actuates to         24 months the isolation position on an actual or simulated isolation signal.
with the Inservice Testing Program SR 3.6.1.3.7  
SR 3.6.1.3.8     Verify a representative sample of reactor       24 months instrument line EFCVs actuate to the isolation positidn on an actual or simulated instrument line break signal.
&#xfd;Verify each automatic PCIV actuates to 24 months the isolation position on an actual or simulated isolation signal.
SR 3.6.1.3.9     Remove and test the explosive squib from       24 months on a each shear isolation valve of the TIP           STAGGERED TEST System.                                         BASIS SR 3.6.1.3.10   Verify the combined leakage rate for a l]       In accordance secondary containment bypass leakage           with the paths is < 0.04% primary containment           Primary volume/day when pressurized to > Pa.           Containment Leakage Rate Testing. Program (continued)
SR 3.6.1.3.8 Verify a representative sample of reactor 24 months instrument line EFCVs actuate to the isolation positidn on an actual or simulated instrument line break signal.
Columbia Generating. Station         3.6.1.3-9         Amendment No. 149.169 199
SR 3.6.1.3.9 Remove and test the explosive squib from 24 months on a each shear isolation valve of the TIP STAGGERED TEST System.
BASIS SR 3.6.1.3.10 Verify the combined leakage rate for a l]
In accordance secondary containment bypass leakage with the paths is  
< 0.04% primary containment Primary volume/day when pressurized to > Pa.
Containment Leakage Rate Testing. Program (continued)
I1 Columbia Generating. Station 3.6.1.3-9 Amendment No. 149.169 199


PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                         FREQUENCY SR 3.6.1.3.11   Verify leakage rate through each MSIV is In accordance
PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.11 Verify leakage rate through each MSIV is In accordance
                  < 16.0 scfh when tested at > 25.0 psig. with the Primary Containment Leakage Rate Testing Program SR 3.6.1.3.12   Verify combined leakage rate through     In accordance hydrostatically tested lines that       with the penetrate the primary containment is   Primary within limits.                           Containment Leakage Rate Testing Program Columbia Generating Station         3.6.1.3-10             Amendment No. I
< 16.0 scfh when tested at > 25.0 psig.
with the Primary Containment Leakage Rate Testing Program SR 3.6.1.3.12 Verify combined leakage rate through In accordance hydrostatically tested lines that with the penetrate the primary containment is Primary within limits.
Containment Leakage Rate Testing Program Columbia Generating Station 3.6.1.3-10 Amendment No. I


SCIVs 3.6.4.2 3.6     CONTAINMENT         SYSTEMS 3..6.14.2 .Secondary,         Contain.me}nt I.solat.ion Va.lves,.(.SCIVs LCO     3.6-.4-.2         Each SCIV shall. be-OPERABLE.
SCIVs 3.6.4.2 3.6 CONTAINMENT SYSTEMS 3..6.14.2.Secondary, Contain.me}nt I.solat.ion Va.lves,.(.SCIVs LCO 3.6-.4-.2 Each SCIV shall. be-OPERABLE.
APPLICABILITY:             MODES I, 2;, and 3,'
APPLICABILITY:
* During operations with a potential           for draining the reactor vessel (OPDRVs).
MODES I, 2;, and 3,'
ACTIONS I
During operations with a potential for draining the reactor vessel (OPDRVs).
                  -------------------------            NOTES-------------------------------
ACTIONS NOTES-------------------------------
: 1. Penetration flow paths may be unisolated intermittently under.
: 1.
Penetration flow paths may be unisolated intermittently under.
administrative controls.
administrative controls.
: 2. Separate Condition entry is             allowed for each penetration flow path.
: 2.
: 3. Enter applicable Conditions and'Required                 Actions for systems made inoperable by SCIVs.
Separate Condition entry is allowed for each penetration flow path.
CONDITION                             REQUIRED ACTION               COMPLETION TIME A. One or more                         A.1       Isolate the affected       8 hours penetration flow paths                         penetration flow path with one SCIV                                 by use of at least inoperable,                                   one closed and de-activated automatic valve, closed manual valve, or blind flange.
: 3.
Enter applicable Conditions and'Required Actions for systems made inoperable by SCIVs.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more A.1 Isolate the affected 8 hours penetration flow paths penetration flow path with one SCIV by use of at least inoperable, one closed and de-activated automatic valve, closed manual valve, or blind flange.
AND (continued)
AND (continued)
Columbia     Generating Station                   3.6.4.2-1             Amendment No. H9,H9 199
I Columbia Generating Station 3.6.4.2-1 Amendment No. H9,H9 199


SCIVs 3.6.4.2 ACTIONS CONDITION               REQUIRED ACTION             COMPLETION TIME A.   (continued)           A.2   ---------NOTES------
SCIVs 3.6.4.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
: 1. Isolation devices in high radiation areas may be verified by use of administrative means.
(continued)
: 2. Isolation devices that are locked, sealed, or otherwis'e secured may be verified by use of administrative means Verify the affected       Once per 31 days penetration flow path is isolated.
A.2  
B. --------- NOTE- -------- B.1     Isolate the affected     4hours Only applicable to             penetration flow path penetration flow paths         by use of at least with two isolation             one closed and valves.                         de-activated automatic valve, closed manual valve, One or more                     or blind flange.
---------NOTES------
: 1.
Isolation devices in high radiation areas may be verified by use of administrative means.
: 2.
Isolation devices that are locked,
: sealed, or otherwis'e secured may be verified by use of administrative means Verify the affected Once per 31 days penetration flow path is isolated.
B. --------- NOTE- --------
B.1 Isolate the affected 4hours Only applicable to penetration flow path penetration flow paths by use of at least with two isolation one closed and valves.
de-activated automatic valve, closed manual valve, One or more or blind flange.
penetration flow paths with two SCIVs inoperable.
penetration flow paths with two SCIVs inoperable.
(continued)
(continued)
Columbia Generating Station       3.6.4.2-2           Amendment No. 149,169,199
Columbia Generating Station 3.6.4.2-2 Amendment No. 149,169,199


I I .
I I
SCIVs 3.6.4.2 ACTIONS CONDITION                 REHUIRED ACTION           COMPLETION TIME C. Required Action and     C.1     Be in MODE 3.           12 hours associated Completion Time of Condition A     AND or B not met in MODE 1, 2, or 3.       C.2     Be in MODE 4.           36 hours D. Required Action and     D.1         Initiate action     Immediately associated Completion               to suspend Time of Condition A                 OPDRVs.
SCIVs 3.6.4.2 ACTIONS CONDITION REHUIRED ACTION COMPLETION TIME C.
Required Action and C.1 Be in MODE 3.
12 hours associated Completion Time of Condition A AND or B not met in MODE 1, 2, or 3.
C.2 Be in MODE 4.
36 hours D.
Required Action and D.1 Initiate action Immediately associated Completion to suspend Time of Condition A OPDRVs.
or B not met during OPDRVs.
or B not met during OPDRVs.
Columbia Generating   Station     3.6.4.2-3         Amendment No. H9,H9 199
Columbia Generating Station 3.6.4.2-3 Amendment No. H9,H9 199


SCIVs 3.6.4.2 SIrnVFTIIANCF PFflIiIRFMFN~T~
SCIVs 3.6.4.2 SIrnVFTIIANCF PFflIiIRFMFN~T~
-,IIPVFTLIAN(-F RFnHTRFMFNT-,
-,IIPVFTLIAN(-F RFnHTRFMFNT-,
SURVEILLANCE                             FREQUENCY SR   3.6.4.2.1       -------------------    NOTES-----------------
SURVEILLANCE FREQUENCY SR 3.6.4.2.1 NOTES-----------------
: 1. Valves and blind flanges in high radiation areas may be verified by use of administrative controls.
: 1.
: 2. Not required to be met for SCIVs that are open under administrative controls.
Valves and blind flanges in high radiation areas may be verified by use of administrative controls.
Verify each secondary containment             31 days isolation manual valve and blind flange that is not locked, sealed, or otherwise secured, and is required to be closed during accident conditions is closed.
: 2.
SR   3.6.4.2.2     Verify the isolation time of each power       In accordance operated, automatic SCIV is within             with the limits.                                       Inservice Testing Program I
Not required to be met for SCIVs that are open under administrative controls.
SR   3.6.4.2.3     Verify each automatic SCIV actuates to         24 months the isolation position on an actual or simulated automatic isolation signal.
Verify each secondary containment isolation manual valve and blind flange that is not locked, sealed, or otherwise
j 3.6.4.2-4 Columbia Generating Station                                          Amendment No. I}}
: secured, and is required to be closed during accident conditions is closed.
31 days SR 3.6.4.2.2 Verify the isolation time of each power In accordance operated, automatic SCIV is within with the limits.
Inservice Testing Program SR 3.6.4.2.3 Verify each automatic SCIV actuates to 24 months the isolation position on an actual or simulated automatic isolation signal.
I Columbia Generating Station j
3.6.4.2-4 Amendment No. I}}

Latest revision as of 16:19, 14 January 2025

Supplement to Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves
ML082480298
Person / Time
Site: Columbia 
Issue date: 08/28/2008
From: Gambhir S
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-08-122, TAC MD6208
Download: ML082480298 (27)


Text

ENERGY NORTHWEST Sudesh K. Gambhir Vice President, Technical Services P.O. Box 968, Mail Drop PE04 Richland, WA 99352-0968\\,

Ph. 509-377-8313 F. 509-377-2354 sgambhir@energy-northwest.com August 28, 2008 G02-08-122 10 CFR 90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES Letter G02-07-1 11, dated July 30, 2007, SK Gambhir (Energy Northwest) to NRC, "License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves" (TAC No. MD6208)

Reference:

Dear Sir or Madam:

Via the referenced letter, Energy Northwest proposed a change to the Columbia Generating Station (Columbia) Technical Specifications (TS) to support adoption of a number of Technical Specification Task Force (TSTF) travelers related to Containment Isolation Valves. TSTF-306-A, Revision 2, "Add Action to LCO 3.3.6.1 to give option to isolate penetration" was included as one of the travelers proposed for adoption in the referenced request.

During the NRC review process of the aforementioned submittal, a question with regard to the proposed adoption of TSTF-306-A was raised in that Energy Northwest had not included the recommended Surveillance Requirement (SR) 3.3.6.1.1 requiring a channel check for the proposed addition of Function 6, "Traversing Incore Probe Isolation," to Table 3.3.6.1-1, "Primary Containment Isolation Instrumentation," nor justified its exclusion as a deviation from the traveler. Energy Northwest reviewed the referenced submittal against the recommendations of TSTF-306-A and has concluded that this SR was inappropriately omitted. During this review Energy Northwest also determined that for LCO 3.3.6.1 - Condition A, Function 6.a was not included in the Completion Time as recommended by TSTF-306-A. This deviation from the traveler was also not identified or justified in the referenced submittal.

KA i(

SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES Page 2 The correction of these two issues with the referenced submittal makes the proposed changes consistent with TSTF-306-A. The corrected mark-up of the affected pages are included in Attachment 1. These corrections include 1) the addition of SR 3.3.6.1.1 to Table 3.3.6.1-1 for Functions 6.a and 6.b, and 2) the addition of Function 6.a to the Completion Time of LCO 3.3.6.1 Condition A. The revised TS pages for the changes discussed above are included in Attachment 2. For administrative simplification, includes all of the revised TS pages for this amendment request, inclusive of the two pages affected by this supplement as well as the unaffected pages from the original submittal.

There are no new commitments being made with this submittal.

The changes being made in this supplemental letter meet the intent of TSTF-306-A and do not affect the original evaluation of the proposed changes, including the conclusion of the No Significant Hazards Consideration, submitted via the referenced letter.

Should you have any questions or require additional information regarding this matter, please contact Mr. MC Humphreys, Licensing Supervisor, at 509-377-4025.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.

Repctfully, S3 ambhir Vice President, Technical Services Attachments:

1)

Mark-up TS pages

2)

Re-typed TS pages cc:

EE Collins, Jr. - NRC RIV CF Lyon - NRC NRR NRC Senior Resident Inspector/988C RN Sherman - BPA/1 399 WA Horin - Winston & Strawn

SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES Mark-up TS pages 3.3.6.1-1 3.3.6.1-8 and associated Insert Page 3.3.6.1-A

Primary Containment Isolation Instrumentat~ion 3.3.6.1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 APPLICABILITY:

The. pri~mary containment isolation. Anstrumentation for 'each Function in Table 3.3.6.1-1 shall be OPERABLE.

According to Table 3.3.6.1-1.

ACTIONS

.Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME

-r" rr-309 A.

One or more required channels inoperable.

f.

Penetration flow paths may be unisolated intermittently under administrative controls.

A.1 Place channel in trip.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for Functions 2.a,.

2.c, M 5,d AND ab 42.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 2.a, 2.c, 60 5.d B. One or more automatic, B.1 Restore isolation I hour Functions with capability.

isolation capability not maintained.

(continued)

Columbia Generating Station 3.3.6.1-1 Amendment No. 4-44 169*

Primary Containment Isolation Instrumentation 3,3.6.1 Table 3.3.6.1-1 (page 4 of 4)

Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR, REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED P'ER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE

5.

RHR SDC System Isolation

a.

Pump Room Area 3

1 per room F

SR 3.3.6.1.3

< 150°F Temperature-High SR 3.3.6.1.4 SR 3.3.6.1.6

b.

Pump Room Area 3

1 per roomi F

SR 3,3.6.1.3

< 70°F, Ventilation SR 3.3.6.1.4 Differential SR 3.3.6.1.6 Temperature-High

c.

Heat Exchanger 3

1 per room F

SR. 3.3.6.1.3 Area SR 3.3.6.1.4 Temperature -High SR 3.3.6.1.L.6 Room 505 Area

< 140°F Room 507 Area

< 160°F Room 605 Area

< 150°F Room 606 Area

< 140*F

d.

Reactor Vessel 3,4.5 2(d)

J SR 3.3.6.1.1

> 9.5 inches Water Level -

Low, SR 3.3.6.1.2 Level 3 SR 3.3.6.1.4 SR 3.3.6.1.6
e. Reactor Vessel 1.,2,3 1

F SR 3.3.6.1.2

< 135 psig Pressure-High SR 3.3.6.1.4 SR 3.3.6.1.6

f.

Manual Initiation 1,2,3 2

G SR 3.3.6.1.6 NA F-S(d)

Only one trip system required ii maintained.

(WCej:

3.3.6.1 A) n MODES 4 and 5 with RHR Shutdown Cooling System integrity TiS T7F-306 Columbia Generating Station 3.3.6.1-8 Amendment No. 149,161 169*

Insert 3.3.6.1-A

6. Traversing Incore Probe Isolation
a.

Reactor Vessel Water 1,2,3 2

G SR 3.3.6.1.1

> -58 inches Level - Low, Low SR 3.3.6.1.2 Level 2 SR 3.3.6.1.4 SR 3.3.6.1.6

b.

Drywell Pressure 1,2,3 2

G SR 3.3.6.1.1

< 1.88 psig High SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.6

SUPPLEMENT TO ADOPTION OF APPROVED GENERIC TECHNICAL SPECIFICATION CHANGES ASSOCIATED WITH CONTAINMENT ISOLATION VALVES Re-typed TS pages 3.3.3.1-3 no changes, included as back side of changed page 3.3.3.1-4 3.3.3.1-4 3.3.6.1-1 3.3.6.1-2 no changes, included as back side of changed page 3.3.6.1-1 3.3.6.1.7 no changes, included as back side of changed page 3.3.6.1-7 3.3.6.1-8 3.6.1.3-1 3.6.1.3-2 3.6.1.3-3 3.6.1.3-4 3.6.1.3-5 3.6.1.3-6 3.6.1.3-7 3.6.1.3-8 3.6.1.3-9 no content change, included due to format changes re-numbering this page and included as back side of new. page in this section 3.6.1.3-10 3.6.1.3-10 no content change, new page in this section due to formatting of changes on preceding pages requiring this page addition and page renumbering 3.6.4.2-1 no changes, included as back side of changed page 3.6.4.2-2 3.6.4.2-2 3.6.4.2-3 proposed change necessitates format change and creation of new page in this section, this page has been included as backside of new page 3.6.4.2-4 3.6.4.2-4

PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS


NOTES----------------------------------

1.

These SRs apply to each Function in Table 3.3.3.1-1.

2.

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the other required channel(s) in the associated Function is OPERABLE.

SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK.

31 days SR 3.3.3.1.2 Deleted SR 3.3.3.1.3 Perform CHANNEL CALIBRATION for 18 months Functions 1, 2, 4,

5, and 10.

SR 3.3.3.1.4 Perform CHANNEL CALIBRATION for 24 months Functions 3, 6,

and 7.

Columbia Generating Station 3.3.3.1-3 Amendment No.

149.169.17n 189

PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)

Post Accident Monitoring Instrumentation CONDITIONS REFERENCED

. REOUIRED FROM REQUIRED FUNCTION CHANNELS ACTION D.1

1.

Reactor Vessel Pressure 2

E

2.

Reactor Vessel Water Level

a.

-150 inches.to +60 inches 2

E

b.

-310 inches to -110 inches 2

E

3.

Suppression Pool Water Level

a.

-25 inches to +25 inches 2

E

b. 2 ft to 52 ft 2

E

4.

Suppression Chamber Pressure 2

E

5.

Drywell Pressure.

a.

-5 p'sig to +3 psig 2

E

b. 0 psig to 25 psig 2

E

c.

0 psig to 180 psig 2

E 6,.

Primary Containment Area Radiation 2

F

7.

Penetration Flow Path PCIV Position 2 per penetration E

flbw path (a)(b)

8.

Deleted 9..

Deleted

10.

ECCS Pump Room Flood Level 5

E (a)

Not required for isolation valves whose associated penetration flow path is isolated by at least one closed and de-activated automatic valv*e, closed manual valve, blind flange, or check. v.alve with flow through the valve secured..

(b)

Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.

Columbi-a Genera,ting S'tation 3.3.,3., 11-,4

ý'Amendment No.. 149,169,48ýý

Primary Containment Isolation Instrumentation 3.3.6.1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 APPLICABILITY:

The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.

According to Table 3.3.6.1-1.

ACTIONS NOTES----------------------------------

1.

Penetration flow paths may be unisolated intermittently under administrative control s.

2.

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Place channel in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable, trip.

Functions 2.a, 2.c, 5.d, 6.a and 6.b AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 2.a, 2.c, 5.d, 6.a and 6.b B.

One or more automatic B.1 Restore isolation 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Functions with capability.

isolation capability not maintained.

(continued)

Columbia Generat-ing Sta~tioon 3.3..6.1-I1

, AmendmentNo. 149,169

Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS CONDITION REQU-IRED ACTION COMPLETION TIME C.

Required Action, and.

C..1' Enter the Condition Immediately associated Completion referenced-.i-.n.n Time of Condition A Table 3.3.6.1-1 for or B not met.

the channel.

D.

As required by D.1 Isolate associated 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Action C.1 main steam line and referenced/in (MSL).

Table 3.3.6.1-1.

OR D.2.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND D.2.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> E.

As required by E.1 Be in MODE 2.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Required Action.C.1 and referenced in Table 3.3.6.1-1.

F.

As required by F.1 Isolate the affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Action C.1 penetration flow and referenced in path(s).

Table 3.3.6.1-1.

G.

As required by G.1 Isolate the affected 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Required Action C.I penetration flow and referenced in path(s).

Table 3.3.6.1-1.

(continued)

Columbia Generatin'g Station:

3A1 8.3ý..6.,.1 -.2

[Amendment, Noý. 44.169

Primary.Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 3 of 4)

Primar-y Containment..Isol-ati.on..Instrumentation APPLICABLE CONDITIONS MODES OR

'REQUIRED-REFERENCED..

OTHER CHANNELS FROM FUNCTIONSPECIFIED.

PERTRIP

REQUIRED, SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.;1 REQUIREMENTS VALUE
4.

RWCU System Isolation (continued)

b. Differential Flow-Time Delay
c.

Bl owdowh Flow-:

High

d. Heat Exchanger Room Area Temperature - High
a. Heat Exchanger Room Area Ventilation Differential, Temperature-High
f.

Pump Room Area.

Temperature -

High

g.

Pump Room Area Ventilation Differential Temperature - High

h.

RWCU/RCIC Line Routing Area Temperature-High

i.

RWCU Line Routing Area Temperature - High Room 409, 509 Areas Room 408, 511 Areas

j.

Reactor Vessel Water Level -

Low

Low, Level 2
k. SLC System Initiation
1. Manual Initiation 1,2,3 1,2,3>'

1,2,3 1,2,3 1

F SR SR SR F

S R SR SR SR SR F

SR SR SR F

SR SR SR 1

3.3.6.1.2 3.3. 6. 1.5 3.3.6.1.6 3.3.6.1.1 3.3.6.1.2 3.3.6.1.5 3.3.6.1.6 3.3.6.1.7 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6 3.3.6.1.3 3.3. 6. 1'.4 3.3.6.1.6 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6 3.3.6.1.3 3.3.6.1.4

3. 3. 6. 1.6 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6

< 46.5 seconds (271:7 gpm

< 160'F

< 70'F 1,2,3 1 per room 1,2,3 1 per room F

SR SR SR F "

SR S SR SR F

SR SR SR F

SR SR S SR

< 180'F

< IO0°F

< 180'F 1,2,3 1

1,2,3 1 per room K 175'F

< 180'F 1,2,3 1,2.3 1.2.3 2

Z( c)

F SR SR SR I

SR 3.3.6.1.2 3.3.6.1.4 3.3.6.1.6 3.3.6.1.6

> -58 inches NA 2

G SR 3.3.6.1.6 NA (continued)

(c)

SLC System Initiation only inputs into one of the two trip systems.

Col'umbia Generating -S-t-ation 3". 31.. 6:.l 1-7 Amendment: No.:,149,169,172 199

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 4 of 4)

Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM.

SPECIF:IED

PER TRIP REQUIRED.

SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE

5.

RHR SDC System Isolation

a.

Pump: Room Area Temperature-High

b.

Pump Room Area Ventilation Differential Temperature-High

c.

Heat Exchanger Area Temperature-High Room 505 Area Room.507 Area Room 605 Area Room 606 Area

d.

Reactor Vessel Water Level -

Low, Level 3
e.

Reactor Vessel Pressure - High

.f. Manual 'Initiati~on

6. Traversing Incore Probe Isolation
a.

Reactor Vessel, Water Level' -

Low

Low, Level 2
b.

Drywell Pressure High

,3 1 p.er room,.

3 1 per room 3

1 per room F

SR SR SR F

SR SR SR F

SR SR SR 3.3.6.1.3 3.3.6.1.4

'3.3.6.1.6 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6 3.3.6.1.3 3.3.6.1.4 3.3.6.1.6

< 150'F

< 70°F 3,4,5 1.2,3 1,2 :3 2 (d) 1 SR SR SR SR F

SR SR SR G

SR 3.3.6.1.1 3.3.6. 1.2 3.3.6.1.4 3.3.6.1.6 3.3.6.1.2 3.3.6.1.4 3.3.6.1.6 3.3.6.1.6

< 140'F

< 160'F

< 150'F

< 140'F

> 9.5 inches

< 135, p'sig

'NA 1,2,3 1.2,3 2

2 G

SR SR SR SR G

SR SR SR SR 3.3.6.1.1 3.3.6.1.2

.3.3.3 6.1.4 3.3.6.1.6 3.3.6.1.1 3.3.6.1.2 3.3.6.1.4

.3.3.6.1.6

> -58 i.nches

< 1.88 psig (d)

Only one trip system required i'n MODES 4 and 5 maintained.

with RHR Shutdown Cooling System integ rity Col umbia Generating Station

. 3. 6.1.'A'm'en:'d'm'en t No.

444, 6 9

PCIVs 3.6.1.3 3.6 CONTAINMENT SYSTEMS 3.6.1.3 Primary Containment Isolation Valves (PCIVs)

LCO 3.6.1.3 APPLICABILITY:

Each PCIV, except reactor building-to-suppression chamber

.vacuum breakers, shall be OPERABLE.

MODES 1, 2,

and 3, When associated instrumentation is: required to be OPERABLE per LCO 3.3.6.1, "Primary Containment Isolation Instrumentation."

ACTIONS NOTES

1.

Penetration flow paths may be unisolated intermittently under; administrative controls.

2.

Separate Condition entry is allowed for each penetration flow path.

3.

Enter applicable Conditions and Required Actions for systems made inoperable by PCIVs.

4.

Enter applicable Conditions and Required Actions of LCO 3.6.1.1, "Primary Containment," when PCIV leakage results in exceeding overall containment leakage rate acceptance criteria.

CONDITION REQUIRED ACTION COMPLETION TIME A. -----------

NOTE ----------

A.1 Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> except Only applicable to.

penetration flow path, for main steam penetration flow paths by use of at least line with two PCIVs.

one closed and de-activated AND automatic valve, One or more closed manual valve, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for penetration flow paths blind flange, or main steam line w.ith one PCIV check..valve wi.th flow.

inoperable for reasons thrQugh the valve other than secured.

Condition D.

AND (continued)

Col.umbi.a Ge-neratiing,Statio*n3 3ý:.

ý6..1.13 -. I Amendment No., 149:,1.69

PCIVs 3.6.1.3 ACT.IONS -

CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.2

--- NOTES------

1.

Isolatidn devices in high radiation areas may be verified by use of administrative means.

2.

Isolation devices that are locked, sealed, *or otherwise secured may be verified by use of administrative means.

Verify the affected penetration flow path is isolated..

Once per 31 days for i sol ati on devices outside primary containment AND Prior to entering MODE 2 or 3 from MODE 4 if primary containment was de-inerted while in MODE 4, if not performed within the previous 92 days, for isolation devices inside primary containment (continued)

Columbia Generating'Station

3. 6.4.1:.3-2.

"ý..',Amendment. No'.

1494'-19

PCIVs 3.6.1.3 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. ----------

NOTE--------- -B..1 Isolate the affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Only applicable, to penetration flow path penetration flow paths, by *use of at:least with two PCIVs.

one closed and

.de-activated.

automatic va,lve One or more closed manual valve, penetration flow paths or blind flange.

with two PCIVs inoperable for reasons other than Condition D.

C. ----------

NOTE ----------

C.1 Isolate the ýaffected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> except Only applicable to penetration flow path for excess flow penetration flow paths by use of at least check valves with only one PCIV.

one closed and (EFCVs) de-activated!

automatic vaIve, AND One or more closed manua'l valve, penetration flow paths or blind flange.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for with one PCIV EFCVs inoperable foh reasons AND other than Condition D.

(continued)

Columbi.a Generating Station

3. 6J.1.3, Amendment No. 149,169

PCIVs 3.6.1.3 ACT..ION S CONDITION j

REWUIRED ACTI'N COMPLETION IME C.

(continued)

C.2 NOTES-----

1.

Isolatiodn devices in high radiation areas may be verified by use of administrative, means.

2.

Isolatio~n devices that are locked,

sealed, or otherwise secured may be verified by use of administrative means.

Verify the affected penetration flow path is isolated.:

Once per 31 days for isolation devices outside primary containment AND Prior to entering MODE 2 or 3 from MODE 4 if pri mary containment was de-inerted while in MODE 4, if not performed within the previous 92 days, for isolation devices inside primary containment (continued)

Columbia Generating Station 3 :. 6'..1I.-3 L!

4 ý

--Amendmeý'nt No,'.

149,169

PCIVs 3.6.1.3 ACTIONS CONDITION REOUJRED ACTI:ON COMPLETION TIME D.

One or more secondary D'.I Restore leakage rate 4 hour~s for containment bypass to~within limit, hydrostatically leakage rate,!MSIV tested line leakage rate, or leakage not on hydrostatically tested a closed system lines leakage rate not within limit.

AND 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for secondary containment bypass leakage AND 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for MSIV leakage AND 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for hydrostatically tested line leakage on a closed system E.

Required Action and E.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, AND B, C, or D not met in

,MODE 1, 2, or 3.

E.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

Columbia Generating Station

3. 6.. 1. 3;- 5 Amendment No.

149,1,69

PCIVs 3.6.1.3 ACT IONS CONDITIO'N REQUIRED"ACTION COMPLETION TIME F.

Required Action and F.1 Initiate action to Immediately associated Completion' suspend ope:rations Time of Condiltion A, witha potential for.

B, C, or D not met for d,rbining the reactor PCIV(s) required to 'be vessel (OeDRVs).

OPERABLE during MODE 4 or 5.

OR F.2 Initiate action to Immediately restore valve(s) to OPERABLE status.

Columbia Genera'tihg Station 3.6.1,-3-6 1 A 0-1 Amendment No. ýýJ,ýUj

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY S R 3 ".

6 ".

1 " 3 " '1 7 7 -- - -

"-1

'N O T E -.......-

Not required.,,to be'me.twhen the.24 inch.

and 30 inch prima~rycontainment purge valves are openfobr !inerting, de-inerting,;pressure control, ALARA or air quality considerations for personnel entry, or Surveillances that require the valves to be open.

Verify each.24 inch and 30 inch primary 31 days containment purge valve is closed.

SR 3.6.1.3.2


NOTES-----------------

1.

Valves and blind flanges in high radiation areas may be verified by use of administrative means.

2.

Not required to be met for PCIVs that are open under administrative controls.

Verify each primary containment isolation 31 days manual valve and blind flange that is located outside primary containment and not locked, sealed, or otherwise secured and is required to be closed during accident conditions is closed.

(continued)

Columbia Gen~erati.ng,Station 3-. 6. 1-.. 3-7 Amendment No. 149,,169

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.3 NOTES- -----------------

.1.

Valves and blind f-langes i.n high radiation areas may be verified by use of administrative means.

-2..

Not required to-be met for...PCIVs that are open under administrative control.s.

Verify each primary containment isolation Prior to manual valve and blind flange that is entering MODE.2

,located inside primary containment and or 3 from

'not locked, sealed, or otherwise secured MODE 4 if and is required to be closed during primary accident conditions is closed.,

containment was de-inerted while in MODE 4, if not performed within the previous 92 days SR 3.6.1.3.4 Verify continuity of the traversing 31 days

,incore probe (TIP) shear isolation valve explosive charge.

SR 3.6.1.3.5

.Verify the isolation time of each power.

In accordance

ýoperated, automatic PCIV, except MSIVs, with the is.within limits.

Inservice Testing Program (continued)

Columbia Generating Station 3.6.1.3-8 Amendment No.

449,4169, 1709,1' 199

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.6 Verify the isolation time of each MSIV is In accordance

> 3 seconds and K 5 seconds..

with the Inservice Testing Program SR 3.6.1.3.7

ýVerify each automatic PCIV actuates to 24 months the isolation position on an actual or simulated isolation signal.

SR 3.6.1.3.8 Verify a representative sample of reactor 24 months instrument line EFCVs actuate to the isolation positidn on an actual or simulated instrument line break signal.

SR 3.6.1.3.9 Remove and test the explosive squib from 24 months on a each shear isolation valve of the TIP STAGGERED TEST System.

BASIS SR 3.6.1.3.10 Verify the combined leakage rate for a l]

In accordance secondary containment bypass leakage with the paths is

< 0.04% primary containment Primary volume/day when pressurized to > Pa.

Containment Leakage Rate Testing. Program (continued)

I1 Columbia Generating. Station 3.6.1.3-9 Amendment No. 149.169 199

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.3.11 Verify leakage rate through each MSIV is In accordance

< 16.0 scfh when tested at > 25.0 psig.

with the Primary Containment Leakage Rate Testing Program SR 3.6.1.3.12 Verify combined leakage rate through In accordance hydrostatically tested lines that with the penetrate the primary containment is Primary within limits.

Containment Leakage Rate Testing Program Columbia Generating Station 3.6.1.3-10 Amendment No. I

SCIVs 3.6.4.2 3.6 CONTAINMENT SYSTEMS 3..6.14.2.Secondary, Contain.me}nt I.solat.ion Va.lves,.(.SCIVs LCO 3.6-.4-.2 Each SCIV shall. be-OPERABLE.

APPLICABILITY:

MODES I, 2;, and 3,'

During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS NOTES-------------------------------

1.

Penetration flow paths may be unisolated intermittently under.

administrative controls.

2.

Separate Condition entry is allowed for each penetration flow path.

3.

Enter applicable Conditions and'Required Actions for systems made inoperable by SCIVs.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more A.1 Isolate the affected 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> penetration flow paths penetration flow path with one SCIV by use of at least inoperable, one closed and de-activated automatic valve, closed manual valve, or blind flange.

AND (continued)

I Columbia Generating Station 3.6.4.2-1 Amendment No. H9,H9 199

SCIVs 3.6.4.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.2


NOTES------

1.

Isolation devices in high radiation areas may be verified by use of administrative means.

2.

Isolation devices that are locked,

sealed, or otherwis'e secured may be verified by use of administrative means Verify the affected Once per 31 days penetration flow path is isolated.

B. --------- NOTE- --------

B.1 Isolate the affected 4hours Only applicable to penetration flow path penetration flow paths by use of at least with two isolation one closed and valves.

de-activated automatic valve, closed manual valve, One or more or blind flange.

penetration flow paths with two SCIVs inoperable.

(continued)

Columbia Generating Station 3.6.4.2-2 Amendment No. 149,169,199

I I

SCIVs 3.6.4.2 ACTIONS CONDITION REHUIRED ACTION COMPLETION TIME C.

Required Action and C.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A AND or B not met in MODE 1, 2, or 3.

C.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> D.

Required Action and D.1 Initiate action Immediately associated Completion to suspend Time of Condition A OPDRVs.

or B not met during OPDRVs.

Columbia Generating Station 3.6.4.2-3 Amendment No. H9,H9 199

SCIVs 3.6.4.2 SIrnVFTIIANCF PFflIiIRFMFN~T~

-,IIPVFTLIAN(-F RFnHTRFMFNT-,

SURVEILLANCE FREQUENCY SR 3.6.4.2.1 NOTES-----------------

1.

Valves and blind flanges in high radiation areas may be verified by use of administrative controls.

2.

Not required to be met for SCIVs that are open under administrative controls.

Verify each secondary containment isolation manual valve and blind flange that is not locked, sealed, or otherwise

secured, and is required to be closed during accident conditions is closed.

31 days SR 3.6.4.2.2 Verify the isolation time of each power In accordance operated, automatic SCIV is within with the limits.

Inservice Testing Program SR 3.6.4.2.3 Verify each automatic SCIV actuates to 24 months the isolation position on an actual or simulated automatic isolation signal.

I Columbia Generating Station j

3.6.4.2-4 Amendment No. I