UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 11,2012 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
COLUMBIA GENERATING STATION - CORRECTION TO PAGES ISSUED WITH AMENDMENT NO. 210
Dear Mr. Reddemann:
By letter dated September 30,2008 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML082610049), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 210 to Facility Operating License No. NPF-21 for the Columbia Generating Station (CGS). The amendment consisted of changes to the Technical Specifications (TSs) in response to your application dated July 26, 2007, as superseded by application dated August 8,2007, and as supplemented by letters dated November 19,2007, and June 5 and July 21, 2008.
An administrative error was discovered in the electronic version of the amended TS pages for CGS following issuance of Amendment No. 210. The error resulted in the omission of page 3.3,5.2-3 and the duplication of page 3.3.5.2-4 from the attachment to the amendment document. The administrative error does not change the NRC staffs conclusions in Amendment No. 210.
Enclosed are corrected TS pages for Amendment No, 210. If you have any questions, please contact me at 301-415-1056 or via e-mail at Lauren,Gibson@nrc.gov.
Sincerely, Lauren Gibson, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No, 50-397
Enclosure:
As stated cc w/encl: Distribution via Listserv
ENCLOSURE Replacement Pages 3.3.5.2-3 and 3.3.5.2-4 issued with License Amendment No. 210, Issued September 30, 2008
RCIC System Instrumentation 3.3.5.2 SURVEILLANCE REQUIREMENTS
N()TES---------------------------------------------------------
- 1.
Refer to Table 3.3.5.2-1 to determine which SRs apply for each RCIC Function.
- 2.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 2 and 4; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 1 and 3 provided the associated Function maintains RCIC initiation capability.
SURVEILLANCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.5.2.2 Perform CHANNEL FUNCTI()NAL TEST.
92 days SR 3.3.5.2.3 Perform CHANNEL CALIBRATI()N.
18 months SR 3.3.5.2.4 Perform L()GIC SYSTEM FUNCTI()NAL TEST.
24 months Columbia Generating Station 3.3.5.2-3 Amendment No..:t49 169
RCIC System Instrumentation 3.3.5.2 Table 3.3.5.2-1 (page 1 of 1)
Reactor Core Isolation Cooling System Instrumentation FUNCTION REQUIRED CHANNELS PER FUNCTION CONDITIONS REFERENCED FROM REQUIRED ACTION A.1 SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE
- 1.
Reactor Vessel Water Level-Low Low, Level 2 4
B SR 3.3.5.2.1 SR 3.3.5.2.2 SR 3.3.5.2.3 SR 3.3.5.2.4
~ -58 inches
- 2.
Reactor Vessel Water Level - High, Level 8 2
C SR 3.3.5.2.1 SR 3.3.5.2.2 SR 3.3.5.2.3 SR 3.3.5.2.4
- <:; 56 inches
- 3.
Condensate Storage Tank Level-Low 2
0 SR 3.3.5.2.1 SR 3.3.5.2.2 SR 3.3.5.2.3 SR 3.3.5.2.4
~ 447ft 7 inches elevation
- 4.
Manual Initiation 2
C SR 3.3.5.2.4 NA Columbia Generating Station 3.3.5.2-4 Amendment No..:teQ 210
ML12172A025 OFFICE NRR/LPL4/PM NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRRlLPL4/PM NAME LWilkins LGibson JBurkhardt MMarkley LGibson DATE 7/6112
~
7/6/12 17/11/1?