LR-N09-0218, Unit 2 - License Amendment Request (LAR) S09-06 Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236
{{#Wiki_filter:PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236
(@ PSEG NuclearLLC 10 CFR 50.90 SEP 2 3 2009 LR-N09-0218 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SALEM GENERATING STATION - UNIT 1 AND UNIT 2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR 75 NRC DOCKET NOS. 50-272 AND 50-311
(@ PSEG Nuclear LLC 10 CFR 50.90 SEP 2 3 2009 LR-N09-0218 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SALEM GENERATING STATION - UNIT 1 AND UNIT 2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR 75 NRC DOCKET NOS. 50-272 AND 50-311


==Subject:==
==Subject:==
Line 27: Line 27:
PSEG has determined that this LAR does not involve a significant hazard consideration as determined per 10 CFR 50.92. PSEG's technical and regulatory evaluation of this LAR, the TS changes, and the TS Bases changes (for information only), are provided in Attachments 1, 2 and 3. There are no regulatory commitments contained in this submittal.
PSEG has determined that this LAR does not involve a significant hazard consideration as determined per 10 CFR 50.92. PSEG's technical and regulatory evaluation of this LAR, the TS changes, and the TS Bases changes (for information only), are provided in Attachments 1, 2 and 3. There are no regulatory commitments contained in this submittal.
The changes in this LAR are not required to address an immediate safety concern.
The changes in this LAR are not required to address an immediate safety concern.
PSEG requests approval of this LAR no later than October 30, 2010. Once approved, the amendment will be implemented within 60 days from the date of issuance.
PSEG requests approval of this LAR no later than October 30, 2010. Once approved, the amendment will be implemented within 60 days from the date of qI issuance.  
qI
%-o
                                                                                            %-o


Document Control Desk                     2 LR-N09-0218 Should you have any questions regarding this submittal, please contact Mr. Jeff Keenan at (856) 339-5429.
Document Control Desk 2
LR-N09-0218 Should you have any questions regarding this submittal, please contact Mr. Jeff Keenan at (856) 339-5429.
I declare under penalty of perjury that the foregoing is true and correct.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on     9/A S/0 9 (Date)
Executed on 9/A S/0 9 (Date)
Sincerely, Robert C. Braun Site Vice President Salem Generating Station Attachments (3)
Sincerely, Robert C. Braun Site Vice President Salem Generating Station Attachments (3)
CC S. Collins, Regional Administrator - NRC Region I R. Ennis, Project Manager - USNRC NRC Senior Resident Inspector - Salem P. Mulligan, Manager IV, NJBNE Commitment Coordinator - Salem PSEG Corporate Commitment Manager
CC S. Collins, Regional Administrator - NRC Region I R. Ennis, Project Manager - USNRC NRC Senior Resident Inspector - Salem P. Mulligan, Manager IV, NJBNE Commitment Coordinator - Salem PSEG Corporate Commitment Manager


LR-N09-0218                                                                                                       Attachment 1 SALEM GENERATING STATION - UNIT 1 and Unit 2
LR-N09-0218 SALEM GENERATING STATION - UNIT 1 and Unit 2
                              -DOCKET NOS. 50-272 and 50-311 LICENSE AMENDMENT REQUEST LAR S09-06 REVISION TO TECHNICAL SPECIFICATION 4.0.5, SURVEILLANCE REQUIREMENTS FOR INSERVICE INSPECTION AND TESTING-OF ASME CODE COMPONENTS Table of Contents
-DOCKET NOS. 50-272 and 50-311 LICENSE AMENDMENT REQUEST LAR S09-06 REVISION TO TECHNICAL SPECIFICATION 4.0.5, SURVEILLANCE REQUIREMENTS FOR INSERVICE INSPECTION AND TESTING-OF ASME CODE COMPONENTS Table of Contents
: 1. DESCRIPTION                                                                 ...............................                    1
: 1.
: 2. PR O PO S ED C HA NG E .....................................................................................                   1
DESCRIPTION 1
: 3. BAC KG R O UND ........................................................................             .................. . . 3
: 2.
: 4. TEC HNICA L A NA LY S IS ............................................................................. 4
PR O PO S ED C HA N G E.....................................................................................
: 5. REGULATORY SAFETY ANALYSIS ..........................                           ......................................... 5 5.1   No Significant Hazards Consideration .........                             ...........      .......................... 5 5.2,   Applicable Regulatory Requirements/Criteria ..........................................                                 7 5 .3   P re ce d e nts ................     .......... ,................................................................ 7 5.4   C onclusions..           .......................................
1
                                                            .                                                                    ... 7
: 3.
: 6. ENVIRONM ENTAL CONSIDERATION ..................................................................                               8
BA C K G R O U N D........................................................................  
: 7. REFERENCES ..............................................                                                                     8
.................... 3
: 4.
TEC H N ICA L A NA LY S IS............................................................................. 4
: 5.
REGULATORY SAFETY ANALYSIS..........................  
......................................... 5 5.1 No Significant Hazards Consideration.........  
.......................... 5 5.2, Applicable Regulatory Requirements/Criteria..........................................
7 5.3 P re ce d e nts................  
..........,................................................................ 7 5.4 C onclusions..  
..... 7
: 6.
ENVIRONM ENTAL CONSIDERATION..................................................................
8
: 7.
REFERENCES..............................................
8


LR-N09-0218                                                                         Attachment 1
LR-N09-0218  
 
==1.0        DESCRIPTION==


==1.0 DESCRIPTION==
This submittal requests an amendment to Technical Specification (TS) 4.0.5 of Facility Operating License Nos. DPR-70 and DPR-75, Salem Units 1 and 2. TS 4.0.5, Surveillance Requirements for Inservice Inspections and Testing of ASME Code Components, would be revised to (1) update references to the source of requirements for inservice testing of ASME Code Class 1, 2, and 3 pumps and valves and (2) to address the applicability of Surveillance Requirement (SR) 4.0.2 to some non-standard pump and valve testing frequencies. In addition, the revised inservice testing requirements would be relocated to Section 6.0 of TS, while the inservice inspection requirements would be removed from TS as they are redundant to the existing 10 CFR 50.55a ISI Program. The proposed changes are consistent with1 NRC-approved Technical Specification Task Force (TSTF) Travelers TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a," (Reference 1), TSTF 497, Revision 0, " Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less,"
This submittal requests an amendment to Technical Specification (TS) 4.0.5 of Facility Operating License Nos. DPR-70 and DPR-75, Salem Units 1 and 2. TS 4.0.5, Surveillance Requirements for Inservice Inspections and Testing of ASME Code Components, would be revised to (1) update references to the source of requirements for inservice testing of ASME Code Class 1, 2, and 3 pumps and valves and (2) to address the applicability of Surveillance Requirement (SR) 4.0.2 to some non-standard pump and valve testing frequencies. In addition, the revised inservice testing requirements would be relocated to Section 6.0 of TS, while the inservice inspection requirements would be removed from TS as they are redundant to the existing 10 CFR 50.55a ISI Program. The proposed changes are consistent with1 NRC-approved Technical Specification Task Force (TSTF) Travelers TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a," (Reference 1), TSTF 497, Revision 0, " Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less,"
(Reference 2), and NUREG-1431, "Standard Technical Specifications (STS),
(Reference 2), and NUREG-1431, "Standard Technical Specifications (STS),
Westinghouse Plants, Revision 3.0".
Westinghouse Plants, Revision 3.0".


==2.0       PROPOSED CHANGE==
==2.0 PROPOSED CHANGE==
 
The proposed changes to TS 4.0.5 would provide consistency with (i) TSTF 479, (ii)
The proposed changes to TS 4.0.5 would provide consistency with (i) TSTF 479, (ii)
TSTF 497, and (iii) NUREG-1431:
TSTF 497, and (iii) NUREG-1431:
(i) TSTF-479 updates references for Inservice Testing of ASME Code
(i) TSTF-479 updates references for Inservice Testing of ASME Code
        ,Components, providing consistency with the requirements of 10 CFR 50.55a(f)(4) for pumps and valves which are classified as American Society of
,Components, providing consistency with the requirements of 10 CFR 50.55a(f)(4) for pumps and valves which are classified as American Society of
        .Mechanical Engineers (ASME) Code Class 1, Class 2 and Class 3. The specification is revised to indicate that the Inservice Testing Program shall include testing frequencies applicable to the ASME Codefor Operations and Maintenance (ASME OM Code), replacing the current reference to ASME Section Xl.
.Mechanical Engineers (ASME) Code Class 1, Class 2 and Class 3. The specification is revised to indicate that the Inservice Testing Program shall include testing frequencies applicable to the ASME Codefor Operations and Maintenance (ASME OM Code), replacing the current reference to ASME Section Xl.
(ii) TSTF-497 revises TS 4.0.5 to indicate that there may be some frequencies specified as 2 years or less in the Inservice Testing (IST) Program to which the provisions of SR 4.0.2 are applicable.
(ii) TSTF-497 revises TS 4.0.5 to indicate that there may be some frequencies specified as 2 years or less in the Inservice Testing (IST) Program to which the provisions of SR 4.0.2 are applicable.
(iii) NUREG-1431 relocates the InserviceTesting (IST) Program portion of TS 4.0.5 to Section 6.0 of the TS (Administrative Controls) and removes the Inservice Inspection (ISI) Program from TS. The NUREG also removes the superfluous statement that the inservice requirements are in addition to other required surveillances and further clarifies that the provisions of SR 4.0.3 are applicable to the IST Program. Other TS that currently reference TS 4.0.5 are accordingly revised to reference the IST or ISI Programs as appropriate.
(iii) NUREG-1431 relocates the InserviceTesting (IST) Program portion of TS 4.0.5 to Section 6.0 of the TS (Administrative Controls) and removes the Inservice Inspection (ISI) Program from TS. The NUREG also removes the superfluous statement that the inservice requirements are in addition to other required surveillances and further clarifies that the provisions of SR 4.0.3 are applicable to the IST Program. Other TS that currently reference TS 4.0.5 are accordingly revised to reference the IST or ISI Programs as appropriate.
Line 69: Line 82:
1
1


LR-N09-0218                                                               Attachment 1 The specific changes to 4.0.5, additions and deletions, are provided below (see for complete marked up TS pages):
LR-N09-0218 The specific changes to 4.0.5, additions and deletions, are provided below (see for complete marked up TS pages):
TS 4.0.5.a will be deleted and reolaced with new TS 6.8.4.i:
TS 4.0.5.a will be deleted and reolaced with new TS 6.8.4.i:
Inservice Testing Program This Program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
Inservice Testing Program This Program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:
In..servie in.eton of ASME Code Class 1, 2 and 3 components and i....vic.
In..servie in.eton of ASME Code Class 1, 2 and 3 components and i....vic.
testing of ASME Code Class 1, 2 and 3 pumps and v1'alves shall be per*f*rme in accordance with Section Xv of the ASME Boilrand Pressure Vessel Code and applicable Addenda     as brequied     by 10 CFR 50, Section 50.55a(g), except wh spcfic writtcn relief has been granted by the Commission pursuant to 10 CFR 50, Sec~tio~n 50.55a(g)(6)(i).
testing of ASME Code Class 1, 2 and 3 pumps and v1'alves shall be per*f*rme in accordance with Section Xv of the ASME Boilr and Pressure Vessel Code and applicable Addenda as brequied by 10 CFR 50, Section 50.55a(g), except wh spcfic writtcn relief has been granted by the Commission pursuant to 10 CFR 50, Sec~tio~n 50.55a(g)(6)(i).
TS 4.0.5.b. which will be -relocated as TS 6.8.4.i.a is revised to state:
TS 4.0.5.b. which will be -relocated as TS 6.8.4.i.a is revised to state:
Surveillan~e Intervals specified in Testing frequencies applicable toSeetiGR XI of the ASME Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code) Boiler and Pressure Vessel Code and applicable Addenda foF-the inservice inspec.*ti and testing activities required by the AS^MIE Boiler ad Pressure Vessel Code and applieable Addenda shall be applicable as follows in these Technical Specific;ations:
Surveillan~e Intervals specified in Testing frequencies applicable toSeetiGR XI of the ASME Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code) Boiler and Pressure Vessel Code and applicable Addenda foF-the inservice inspec.*ti and testing activities required by the AS^MIE Boiler ad Pressure Vessel Code and applieable Addenda shall be applicable as follows in these Technical Specific;ations:
ASME OM Boil.er and P.essuc Vessel                       Required Frequencies for Code and applicable Addenda                               performing inservice p .. and;    testing terminology for inservice and-testing activities                                   activities Weekly                                                    At least once per"7 days Monthly                                                  At least once per 31 days Quarterly or-every 3 months                              At least once per 92 days Semiannually or every 6 months                            At least once per 184 days Every 9 months                                            At least once per 276 days Yearly or annually                                        At least once per 366 days.
ASME OM Boil.er and P.essuc Vessel Code and applicable Addenda terminology for inservice and-testing activities Weekly Monthly Quarterly or-every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice p
Biennially or every 2 years                              At least once per 731 days TS 4.0.5.c, which will be relocated as TS 6.8.4.i.b is revised to state:
; and testing activities At least once per"7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days.
The provision of Specification 4.0.2 are applicable to the above required frequencies for performing inservic inspec;tio and testig ativ,*",,,.s-toother normal and accelerated frequencies specified as2 years or less in the Inservice Testing Program for performing inservice testing activities,
At least once per 731 days TS 4.0.5.c, which will be relocated as TS 6.8.4.i.b is revised to state:
                                            .2
The provision of Specification 4.0.2 are applicable to the above required frequencies for performing inservic inspec;tio and testig ativ,*",,,.s-to other normal and accelerated frequencies specified as2 years or less in the Inservice Testing Program for performing inservice testing activities,
.2


LR-N09-0218                                                               Attachment 1 TS 4.0.5.d, which will be relocated as TS 6.8.4.j.c is revised to state:
LR-N09-0218 TS 4.0.5.d, which will be relocated as TS 6.8.4.j.c is revised to state:
Performance of the above isrcinpconand tcsting activities shall be in addition to other specified Survefillance Rcquircmcnt. . The provisions of Specification 4.0.3 are applicable to inservice testing activities, and TS 4.0.5.e, which will be relocated as TS 6.8,4.i.d is revised to state:
Performance of the above isrcinpconand tcsting activities shall be in addition to other specified Survefillance Rcquircmcnt.. The provisions of Specification 4.0.3 are applicable to inservice testing activities, and TS 4.0.5.e, which will be relocated as TS 6.8,4.i.d is revised to state:
Nothing in the ASME Boiler and Pressure Vessel OM Code shall be construed to supersede the requirements of any Technical Specification.
Nothing in the ASME Boiler and Pressure Vessel OM Code shall be construed to supersede the requirements of any Technical Specification.
Sections of the TS Bases are also revised (see Attachment 3) for consistency with the requirements of 10 CFR 50.55a(f)(4). The changes to the affected TS Bases pages will be incorporated in accordance with TS 6.17 (Salem Unit 1) and TS 6.16 (Salem Unit 2), "Technical Specifications (TS) Bases Control Program."
Sections of the TS Bases are also revised (see Attachment 3) for consistency with the requirements of 10 CFR 50.55a(f)(4). The changes to the affected TS Bases pages will be incorporated in accordance with TS 6.17 (Salem Unit 1) and TS 6.16 (Salem Unit 2), "Technical Specifications (TS) Bases Control Program."


==3.0     BACKGROUND==
==3.0 BACKGROUND==
 
The purpose of the IST Program isto assess the operational readiness of pumps and valves, to detect degradation that might affect component operability, and tomaintain safety margins with provisions for increased surveillance and corrective action. 10 CFR 50.55a defines the requirements for applying industry codes to each licensed nuclear powered facility. Section Xl of the ASME Code has been revised on a continuing basis over the years to provide updated requirements for the inservice inspection and inservice testing of components. Until 1990, the ASME Code requirements addressing the inservice testing of pumps and valves were contained in Section Xl, Subsections IWP (pumps) and IWV (valves). Subsequently, the ASME OM Code replaced Section Xl of the Boiler and Pressure Vessel Code for inservice testing of pumps and valves.
The purpose of the IST Program isto assess the operational readiness of pumps and valves, to detect degradation that might affect component operability, and tomaintain safety margins with provisions for increased surveillance and corrective action. 10 CFR 50.55a defines the requirements for applying industry codes to each licensed nuclear powered facility. Section Xl of the ASME Code has been revised on a continuing basis over the years to provide updated requirements for the inservice inspection and inservice testing of components. Until 1990, the ASME Code requirements addressing the inservice testing of pumps and valves were contained in Section Xl, Subsections IWP (pumps) and IWV (valves). Subsequently, the ASME OM Code replaced Section Xl of the Boiler and Pressure Vessel Code for inservice testing of pumps and valves.
As identified in NRC SECY-.99-017 (Reference 4), the NRC has generally considered evolution of the ASME Code to result in a net improvement'in the measures for inspecting piping and components and testing pumps and valves. By final rule issued on September 22, 1999 (Reference 5), the NRC amended 10 CFR 50.55a(f)(4)(ii) to require licensees to update their IST Program to the latest approved edition of the ASME OM Code incorporated by Reference 5 into 10 CFR 50.55a(b).
As identified in NRC SECY-.99-017 (Reference 4), the NRC has generally considered evolution of the ASME Code to result in a net improvement'in the measures for inspecting piping and components and testing pumps and valves. By final rule issued on September 22, 1999 (Reference 5), the NRC amended 10 CFR 50.55a(f)(4)(ii) to require licensees to update their IST Program to the latest approved edition of the ASME OM Code incorporated by Reference 5 into 10 CFR 50.55a(b).
Line 93: Line 106:
Subsequently, members of the Component Branch of the NRC stated that TSTF-479 did not provide an adequate justification for applying SR 3.0.2 to Frequencies 3
Subsequently, members of the Component Branch of the NRC stated that TSTF-479 did not provide an adequate justification for applying SR 3.0.2 to Frequencies 3


LR-N09-0218                                                             Attachment 1 specified in the Inservice Testing Program as greater than 2 years and the NRC would not approve plant-specific amendments based on TSTF-479 incorporating this change without further justification. The NRC stated that they would accept applying SR 3.0.2 to IST Frequencies not listed in the Inservice Testing Program table provided that those Frequencies are specified in the Inservice Testing Program as 2 years or less. Consequently, TSTF 497, Revision 0, " Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less," was developed to address the "2 years or less" provision, and was subsequently approved by the NRC (Reference 8).
LR-N09-0218 specified in the Inservice Testing Program as greater than 2 years and the NRC would not approve plant-specific amendments based on TSTF-479 incorporating this change without further justification. The NRC stated that they would accept applying SR 3.0.2 to IST Frequencies not listed in the Inservice Testing Program table provided that those Frequencies are specified in the Inservice Testing Program as 2 years or less. Consequently, TSTF 497, Revision 0, " Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less," was developed to address the "2 years or less" provision, and was subsequently approved by the NRC (Reference 8).
The ISTS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993 (58 FR 39132), which was subsequently codified by changes to
The ISTS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993 (58 FR 39132), which was subsequently codified by changes to
'Section 36 of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.36)
'Section 36 of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.36)
(60 FR 36953). Licensees are encouraged to upgrade their technical specifications consistent with those criteria and conforming, to the practical extent, to Revision 3-to the improved STS. Licensees adopting portions of the improved STS to existing technical specifications should adopt all related requirements, as applicable, to achieve a high degree of standardization and consistency.
(60 FR 36953). Licensees are encouraged to upgrade their technical specifications consistent with those criteria and conforming, to the practical extent, to Revision 3-to the improved STS. Licensees adopting portions of the improved STS to existing technical specifications should adopt all related requirements, as applicable, to achieve a high degree of standardization and consistency.


==4.0     TECHNICAL ANALYSIS==
==4.0 TECHNICAL ANALYSIS==
 
TS 4.0.5 currently references the ASME Boiler and Pressure Vessel Code, Section Xl, as the source of the IST Program requirements for ASME Code 1, 2, and 3 components. The ASME OM Code replaced Section XI of the Boiler and Pressure Vessel Code for inservice testing of pumps and valves. The ASME OM Code applies to the current 10-year IST Interval at Salem. The proposed changes to TS 4.0.5 will provide consistency with the IST requirements of 10 CFR 50.55a.
TS 4.0.5 currently references the ASME Boiler and Pressure Vessel Code, Section Xl, as the source of the IST Program requirements for ASME Code 1, 2, and 3 components. The ASME OM Code replaced Section XI of the Boiler and Pressure Vessel Code for inservice testing of pumps and valves. The ASME OM Code applies to the current 10-year IST Interval at Salem. The proposed changes to TS 4.0.5 will provide consistency with the IST requirements of 10 CFR 50.55a.
Additionally, TS 4.0.5 is revised to indicate that the provisions of SR 4.0.2 are applicable to other IST Frequencies that are not specifically listed -in the testing frequencies identified inTS 4.0.5. The IST Program may have frequencies (normal and accelerated) for testing that are based on risk or other factors and do not conform to the standard testing Frequencies specified in TS 4.0.5. The Frequency of the Surveillance may be determined through a mix of risk informed and performance based means in accordance with the IST Program. Application of SR 4.0.2 to other IST Frequencies specified as 2 years or less is consistent with the guidance in NUREG-1482, paragraph 3.1.3 (Reference 6). Consequently, the 25 percent tolerance specified in SR 4.0.2 is applicable to any IST Frequency specified as 2 years or less.
Additionally, TS 4.0.5 is revised to indicate that the provisions of SR 4.0.2 are applicable to other IST Frequencies that are not specifically listed -in the testing frequencies identified inTS 4.0.5. The IST Program may have frequencies (normal and accelerated) for testing that are based on risk or other factors and do not conform to the standard testing Frequencies specified in TS 4.0.5. The Frequency of the Surveillance may be determined through a mix of risk informed and performance based means in accordance with the IST Program. Application of SR 4.0.2 to other IST Frequencies specified as 2 years or less is consistent with the guidance in NUREG-1482, paragraph 3.1.3 (Reference 6). Consequently, the 25 percent tolerance specified in SR 4.0.2 is applicable to any IST Frequency specified as 2 years or less.
Relocation of the IST Program portion of TS.4.0.5 to Section 6.0 of TS is consistent with ISTS, NUREG-1431. NUREG-1431 established that the IST Program is appropriately located in Section 5.0, "Administrative Controls" (Section 6.0 for Salem). The NUREG also removed-the superfluous statement that the inservice requirements are in addition to .other required surveillances and further clarifies that 4
Relocation of the IST Program portion of TS.4.0.5 to Section 6.0 of TS is consistent with ISTS, NUREG-1431. NUREG-1431 established that the IST Program is appropriately located in Section 5.0, "Administrative Controls" (Section 6.0 for Salem). The NUREG also removed-the superfluous statement that the inservice requirements are in addition to.other required surveillances and further clarifies that 4


LR-N09-0218A                                                         Attachment 1 the provisions of SR-4.0.3 are applicable to the IST Program (consistent with NUREG-1431, Section 5.5.8.c).
LR-N09-0218A the provisions of SR-4.0.3 are applicable to the IST Program (consistent with NUREG-1431, Section 5.5.8.c).
Similarly, NUREG-1431 established that the ISI Program was not required to be maintained in'TS (i.e., it did not meet the requirements of 10 CFR 50.36). During each ISI 10-year interval, 10 CFR 50.55a(g)(4) requires PSEG to meet the ISI requirements for ASME Code Class 1, Class 2 and Class 3 components set forth in Section Xl of editions of the ASME Boiler and Pressure Vessel Code and Addenda that are incorporated by reference in 10 CFR 50.55a(b) 12 months before the start of the interval. The ISI requirements in current TS SR 4.0.5 are identical and redundant to the requirements of 10 CFR 50.55a. The proposed change does not eliminate any inservice inspections; they are covered by the existing ISI Program required by 10 CFR 50.55a. For inspections determined to be impractical, PSEG will still be required to seek relief in accordance with 10 CFR 50.55a(g)(5).
Similarly, NUREG-1431 established that the ISI Program was not required to be maintained in'TS (i.e., it did not meet the requirements of 10 CFR 50.36). During each ISI 10-year interval, 10 CFR 50.55a(g)(4) requires PSEG to meet the ISI requirements for ASME Code Class 1, Class 2 and Class 3 components set forth in Section Xl of editions of the ASME Boiler and Pressure Vessel Code and Addenda that are incorporated by reference in 10 CFR 50.55a(b) 12 months before the start of the interval. The ISI requirements in current TS SR 4.0.5 are identical and redundant to the requirements of 10 CFR 50.55a. The proposed change does not eliminate any inservice inspections; they are covered by the existing ISI Program required by 10 CFR 50.55a. For inspections determined to be impractical, PSEG will still be required to seek relief in accordance with 10 CFR 50.55a(g)(5).
5.0     REGULATORY SAFETY ANALYSIS The proposed changes revise the requirements in TS 4.0.5, Surveillance Requirements for Inservice Inspections and Testing of ASME Code Components. TS 4.0.5, would be revised to (1) update references to the source of requirements for inservice testing ofl ASME Code Class 1, .2, and 3 pumps and valves and (2) to address the applicability of' Surveillance Requirement (SR) 4.0.2 to some pump and valve testing frequencies. In addition, the revised inservice testing requirements would be relocated to Section 6.0 of TS, while the inservice inspection requirements would be removed. The proposed changes are consistent with NRC-approved Technical Specification Task Force (TSTF)
5.0 REGULATORY SAFETY ANALYSIS The proposed changes revise the requirements in TS 4.0.5, Surveillance Requirements for Inservice Inspections and Testing of ASME Code Components. TS 4.0.5, would be revised to (1) update references to the source of requirements for inservice testing ofl ASME Code Class 1,.2, and 3 pumps and valves and (2) to address the applicability of' Surveillance Requirement (SR) 4.0.2 to some pump and valve testing frequencies. In addition, the revised inservice testing requirements would be relocated to Section 6.0 of TS, while the inservice inspection requirements would be removed. The proposed changes are consistent with NRC-approved Technical Specification Task Force (TSTF)
Travelers TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a,"
Travelers TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a,"
(Reference 1), TSTF 497, Revision 0, " Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less," (Reference.2), and NUREG-1431, "Standard Technical Specifications (STS), Westinghouse Plants, Revision 3.0".
(Reference 1), TSTF 497, Revision 0, " Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less," (Reference.2), and NUREG-1431, "Standard Technical Specifications (STS), Westinghouse Plants, Revision 3.0".
5.1     Significant Hazards Consideration PSEG has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth 'in 10 CFR 50.92, "Issuance of amendment," as discussed below:
5.1 Significant Hazards Consideration PSEG has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth 'in 10 CFR 50.92, "Issuance of amendment," as discussed below:
: 1. Does the.proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
: 1. Does the.proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
Response: No.
The proposed changes revise TS 4.0.5, Surveillance Requirements for Inservice Inspections and Testing of ASME Code Components, for consistency with of 10 CFR 50.55a(f)(4) requirements regarding inservice testing of pumps and valves. The proposed change incorporates revisions to the ASME OM Code and clarifies testing 5
The proposed changes revise TS 4.0.5, Surveillance Requirements for Inservice Inspections and Testing of ASME Code Components, for consistency with of 10 CFR 50.55a(f)(4) requirements regarding inservice testing of pumps and valves. The proposed change incorporates revisions to the ASME OM Code and clarifies testing 5


LR-N09-0218                                                             Attachment 1 frequency, requirements for testing pumps and valves. The proposed change also relocates the ISI and IST Programs consistent with NUREG-1431.
LR-N09-0218 frequency, requirements for testing pumps and valves. The proposed change also relocates the ISI and IST Programs consistent with NUREG-1431.
The proposed changes do not impact any accident initiators or analyzed events or assumed mitigation of accident or transient events. They do not involve the addition or removal of any equipment, or any design changes to the facility.
The proposed changes do not impact any accident initiators or analyzed events or assumed mitigation of accident or transient events. They do not involve the addition or removal of any equipment, or any design changes to the facility.
Therefore, the proposed changes do not represent a significant increase in the probability or consequences of an accident previously evaluated.
Therefore, the proposed changes do not represent a significant increase in the probability or consequences of an accident previously evaluated.
Line 125: Line 137:
6
6


LR-N09-0218                                                                       Attachment 1 5.2     Applicable Regulatory Requirements/Criteria NRC regulation, 10 CFR 50.55a, defines the requirements for applying industry codes to each licensed nuclear powered facility. The regulations require that during successive 120-month intervals, programs be developed utilizing the latest edition and addenda incorporated into paragraph (b) of 10 CFR 50.55a 12 months before the start of the 120-month interval of the operating license subject to the limitations and modifications identified in paragraph (b).
LR-N09-0218 5.2 Applicable Regulatory Requirements/Criteria NRC regulation, 10 CFR 50.55a, defines the requirements for applying industry codes to each licensed nuclear powered facility. The regulations require that during successive 120-month intervals, programs be developed utilizing the latest edition and addenda incorporated into paragraph (b) of 10 CFR 50.55a 12 months before the start of the 120-month interval of the operating license subject to the limitations and modifications identified in paragraph (b).
Section 50.55a(f)(4) of Title 10 of the Code of Federal Regulations (10 CFR),
Section 50.55a(f)(4) of Title 10 of the Code of Federal Regulations (10 CFR),
requires, in part, that ASME Class 1, 2, and 3 components must meet the requirements of the ASME Code. Section 50.55a(f)(4)(ii) requires that IST programs be revised every 10 years (120-months)-to comply with the requirements of the latest edition and addenda of the ASME Code that is incorporated by reference in 10 CFR 50.55a(b)(3). Section 50.55a(f)(5)(ii) requires that, if a revised IST program for a facility conflicts with the TS for that facility, the licensee shall apply to the Nuclear Regulatory Commission (NRC or Commission) for amendment of the TS to conform the TS to therevised program. The licensee is required to submit the -application, at least 6 months before the start of the period during which the provisions become applicable, in accordance with 10 CFR 50.55a(f)(4).
requires, in part, that ASME Class 1, 2, and 3 components must meet the requirements of the ASME Code. Section 50.55a(f)(4)(ii) requires that IST programs be revised every 10 years (120-months)-to comply with the requirements of the latest edition and addenda of the ASME Code that is incorporated by reference in 10 CFR 50.55a(b)(3). Section 50.55a(f)(5)(ii) requires that, if a revised IST program for a facility conflicts with the TS for that facility, the licensee shall apply to the Nuclear Regulatory Commission (NRC or Commission) for amendment of the TS to conform the TS to therevised program. The licensee is required to submit the -application, at least 6 months before the start of the period during which the provisions become applicable, in accordance with 10 CFR 50.55a(f)(4).
There are no changes being proposed that would result in non-compliance with any of the regulatory requirements. The evaluations documented above confirm that PSEG will continue to comply with all applicable regulatory requirements.
There are no changes being proposed that would result in non-compliance with any of the regulatory requirements. The evaluations documented above confirm that PSEG will continue to comply with all applicable regulatory requirements.
5.3     Precedent The NRC accepted TSTF-479 in December 2005 (Reference 7) and TSTF-497 in October 2006 (Reference 8). A similar TS change was approved for the Shearon Harris Nuclear Power Plant in Amendment 127 on June 12, 2008, for the Wolf Creek Generating Station in Amendment 172 on November 15, 2006, and for the Cooper Nuclear Station in Amendment No. 223 on September 6, 2006.2.
5.3 Precedent The NRC accepted TSTF-479 in December 2005 (Reference 7) and TSTF-497 in October 2006 (Reference 8). A similar TS change was approved for the Shearon Harris Nuclear Power Plant in Amendment 127 on June 12, 2008, for the Wolf Creek Generating Station in Amendment 172 on November 15, 2006, and for the Cooper Nuclear Station in Amendment No. 223 on September 6, 2006.2.
5.4     Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that-the health and safety of the public will not 'be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.4 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that-the health and safety of the public will not 'be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
2       Even thoughTSTF-497 was not approved at this time, this amendment addressed the application of SR 4.0.2 to other IST Frequencies with the same wording that is now included in the approved TSTF-497
2 Even thoughTSTF-497 was not approved at this time, this amendment addressed the application of SR 4.0.2 to other IST Frequencies with the same wording that is now included in the approved TSTF-497
                                                  .7
.7


LR-N09-0218                                                             Attachment 1
LR-N09-0218  
 
==6.0    ENVIRONMENTAL CONSIDERATION==


==6.0 ENVIRONMENTAL CONSIDERATION==
PSEG has evaluated the proposed amendment for environmental considerations.
PSEG has evaluated the proposed amendment for environmental considerations.
The review has determined that the proposed amendment would change requirements with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, and would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
The review has determined that the proposed amendment would change requirements with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, and would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Line 143: Line 154:
no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.


==7.0     REFERENCES==
==7.0 REFERENCES==
: 1. Technical .Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a"
: 1. Technical.Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a"
: 2. Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-497, Revision 0, "Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less"
: 2. Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-497, Revision 0, "Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less"
: 3. ASME Operation and Maintenance Code for Operation and Maintenance of Nuclear Power Plants, 2001 Edition including the OMa-2002 and OMb-2003 Addenda
: 3. ASME Operation and Maintenance Code for Operation and Maintenance of Nuclear Power Plants, 2001 Edition including the OMa-2002 and OMb-2003 Addenda
Line 153: Line 164:
: 8. Letter dated October 4, 2006, from USNRC to Technical Specifications Task Force 8
: 8. Letter dated October 4, 2006, from USNRC to Technical Specifications Task Force 8


LR-N09-0218                                         Aftachment 2 TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES Facility Operating License DPR-70 Technical Specification                 Page 4.0.5                                   3/4 0-2a, 3 4.1.2.3                                 3/4 1-10 4.1.2.4                                 3/4 1-11 4.4.2.1                                 3/4 4-4 4.4.2.2                                 3/4 4-4a 4.4.3.1                                 3/4 4-5a 4.4.6.3                                 3/4.4-16a 4.4.9.3. 1.d                           3/4 4-31 3.4.4.10                               3/4 4-33 4.5.2-f                                 3/4 5-5a S4.6.2. 1. b                             3/4 6-9 4.6.3.1.4                               3/4 6-13 4.7.1.1                                 3/4 7-1 4.7.1.5                                 3/4 7-10 4.7.9                                   3/4 7-28 4.9.8.2                                 3/4 9-8a 6.10                                   6-26 6.8.4.j (new)                           6-19e new Facility Operating License DPR-75 Technical Specification                 Page 4.0.5                                   3/4 0-2a, 3 4.1.2.3                                 3/4 1-9 4.1.2.4                                 3/4 1-10 4.4.2.1                                 3/4 4-5 4.4.3                                   3/4 4-6
LR-N09-0218 Aftachment 2 TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES Facility Operating License DPR-70 Technical Specification Page 4.0.5 3/4 0-2a, 3 4.1.2.3 3/4 1-10 4.1.2.4 3/4 1-11 4.4.2.1 3/4 4-4 4.4.2.2 3/4 4-4a 4.4.3.1 3/4 4-5a 4.4.6.3 3/4.4-16a 4.4.9.3. 1. d 3/4 4-31 3.4.4.10 3/4 4-33 4.5.2-f 3/4 5-5a S4.6.2. 1. b 3/4 6-9 4.6.3.1.4 3/4 6-13 4.7.1.1 3/4 7-1 4.7.1.5 3/4 7-10 4.7.9 3/4 7-28 4.9.8.2 3/4 9-8a 6.10 6-26 6.8.4.j (new) 6-19e new Facility Operating License DPR-75 Technical Specification Page 4.0.5 3/4 0-2a, 3 4.1.2.3 3/4 1-9 4.1.2.4 3/4 1-10 4.4.2.1 3/4 4-5 4.4.3 3/4 4-6
.4.4.5.1                                 3/4 4-8a 4.4.7.2                                 3/4 4-18 4.4.10.3.1.d                           3/4 4-32 3/4.4.11                               3/4 4-33 4.5.2.f                                 3/4 5-6 4.6.2.1 .b                             3/4 6-10 4.6.3.4                                 3/4 6-15 4.7.1.1                                 3/4 7-1 4.7.1.5                                 3/4 7-10 4.7.9                                   3/4 7-23 4.9.8.2                                 3/4 9-9 6.10                                   6-26 6.8.4.j (new)                           6-19g (new)
.4.4.5.1 3/4 4-8a 4.4.7.2 3/4 4-18 4.4.10.3.1.d 3/4 4-32 3/4.4.11 3/4 4-33 4.5.2.f 3/4 5-6 4.6.2.1.b 3/4 6-10 4.6.3.4 3/4 6-15 4.7.1.1 3/4 7-1 4.7.1.5 3/4 7-10 4.7.9 3/4 7-23 4.9.8.2 3/4 9-9 6.10 6-26 6.8.4.j (new) 6-19g (new)


APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1   Surveillance Requirements shall be met during the OPERATIONAL MODES or other specified conditions in the Applicability for individual Limiting Conditions for Operation, unless otherwise stated in the Surveillance Requirement. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the Limiting Condition for Operation.
APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other specified conditions in the Applicability for individual Limiting Conditions for Operation, unless otherwise stated in the Surveillance Requirement.
Failure to perform a Surveillance within the specified frequency shall be failure to meet the Limiting Condition for Operation, except as provided in Specification 4.0.3.     Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.
Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the Limiting Condition for Operation.
4.0.2   Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.
Failure to perform a Surveillance within the specified frequency shall be failure to meet the Limiting Condition for Operation, except as provided in Specification 4.0.3.
4.0.3   If it is discovered that a Surveillance was not performed within its.
Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.
4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.
4.0.3 If it is discovered that a Surveillance was not performed within its.
specified frequency, then compliance with the requirement to declare the Limiting Condition for Operation not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified frequency, whichever is greater..
specified frequency, then compliance with the requirement to declare the Limiting Condition for Operation not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified frequency, whichever is greater..
This delay period is permitted to allow performance of the Surveillance.. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours and the risk impact shall be managed.
This delay period is permitted to allow performance of the Surveillance..
A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours and the risk impact shall be managed.
If the Surveillance is not performed within the delay period, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.
If the Surveillance is not performed within the delay period, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.
4.0.4 *Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 4.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.
4.0.4  
*Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 4.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.
This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
4.0.5 Survoillanco                   Roquiromonts for insorvioc inspoction and tasting of ASME Coda Glass 1, 2 and 3                     penont-s shall boe. ap .ioablo as f .ll.ws.
4.0.5 Survoillanco Roquiromonts for insorvioc inspoction and tasting of ASME Coda Glass 1, 2 and 3 penont-s shall boe ap  
: a.               Inscrviso inspoction of ASCHE Cod Class 1, 2 and 3 ...pononts and 5.ns5ag), toting of AHE Coi Class 1, 2 andt 3 pumpfh                   s and valves shall be por-formodee i~n aeeeirdanoa with.l Seotian XI! of the ASME BDolino                   and Pr-essuro&
.ioablo as f  
Vassal Codae and applieablo! Aýddondla as requq irod bay 10 CCL 50, Saotian S0.;5a(gf), eorooptr whoroe speeAifio writtoý.n roeliof has boon gr-antode by thie Commffission puirsuaant to 10 CCL 5G, Seotioen 50.55a(g) (6) (i) b..               uir-voillanog i-nter-vals spocifiod i-n Saotian X! o.f the AGME; Bodlio             an 4" ý q' q7I* I   l ,j -! q sel t--e=e anm app:r=ea==e 2tdaenaa er F. 4ý1q P 4c ý4 P P ;; q*; P P and testing aotivities                   required by the ASME Boilor and Prcssurc Vessel Codo and applicablo Addenda shall be applieable as follows in these Teehnioal Speeifiaeations:
.ll.ws.
SALEM - UNIT             1                       3/4 0-2a                     Amendment No.-2 3/4S.0     APPLICABILITY SURVEILLANCE REQUIREMENTS ACMES Boilor andl Piroouro Veese!Requirodee       frequenoicos for Codoane a       a i lcabloe Ad...nd..                 per.f.rming           or tar..i..nol.gy for inservioc                           inspection and testing
: a.
      '-p in           and. testing a..ivitie.               e tivities Weekly                             At least onoe per 7 days Monthly                             At least onoe per 31 days Quarterly or every 3 months                           At least onoe per 92 days sefftiannually or- evary 6 fforths                     At least       none per 124 doays Eve ry 9 months                          At boast onoe per 27ý6 days Yea r! y e r      Rnnnq11v                      At least none per 3 66 do yoF
Inscrviso inspoction of ASCHE Cod Class 1, 2 and 3...pononts and 5.ns5ag), toting of AHE Coi Class 1, 2 andt 3 pumpfh s
: e. The provsonan of Spe...fia.ti. n 4.0.2 are applieable to the above required frequencies far performing insorvi e inspeetion and testing activities.
and valves shall be por-formodee i~n aeeeirdanoa with.l Seotian XI! of the ASME BDolino and Pr-essuro&
: d. Performanoe of the ab.v. inservica inspection and tooting a.tiviti.s.     .hal.      .
Vassal Codae and applieablo! Aýddondla as requq irod bay 10 CCL 50, Saotian S0.;5a(gf),
eorooptr whoroe speeAifio writtoý.n roeliof has boon gr-antode by thie Commffission puirsuaant to 10 CCL 5G, Seotioen 50.55a(g) (6) (i) b..
uir-voillanog i-nter-vals spocifiod i-n Saotian X! o.f the AGME; Bodlio an 4" ý q' q7
* I I l  
,j  
-! q sel t--e=e anm app:r=ea==e 2tdaenaa er F.
4ý1 q P 4c ý4 P P  
;; q*; P P and testing aotivities required by the ASME Boilor and Prcssurc Vessel Codo and applicablo Addenda shall be applieable as follows in these Teehnioal Speeifiaeations:
SALEM -
UNIT 1 3/4 0-2a Amendment No.-2 3/4S.0 APPLICABILITY SURVEILLANCE REQUIREMENTS ACMES Boilor andl Piroouro Veese!Requirodee frequenoicos for Codoane a i
a lcabloe Ad...nd..
per.f.rming or tar..i..nol.gy for inservioc inspection and testing
'-p in and. testing a..ivitie.
e tivities Weekly At least onoe per 7 days Monthly At least onoe per 31 days Quarterly or every 3 months At least onoe per 92 days sefftiannually Eve ry Yea r! y e or-evary 6 fforths 9 months r
Rnnnq11v At least none per At boast onoe per At least none per 124 doays 27ý6 days 3 66 do yoF
: e.
The provsonan of Spe...fia.ti. n 4.0.2 are applieable to the above required frequencies far performing insorvi e inspeetion and testing activities.
: d.
Performanoe of the ab.v. inservica inspection and tooting a.tiviti.s.  
.hal.
be in addition to other speoified Surveillana RePquiremaents.
be in addition to other speoified Surveillana RePquiremaents.
p     Nothing in the ASME Boiler and tra~ssurae vesool kznnatsfta+/-+/- fD
p Nothing in the ASME Boiler and
            ... p.r.soada tharequirements of an;y Tpplq4rli P:;l PnPP
... p.r.soada tharequirements of tra~ssurae vesool kznnat sfta+/-+/- fD an;y Tpplq4rli P:;l PnPP :i F-;;#ý sr
                                                                  ý I
ý I SALEM--
:i F-;;#ý sr SALEM--     UNIT .1                         3/4 0-3                             Amendment No. 27
UNIT.1 3/4 0-3 Amendment No.
27


REACTIVITY CONTROL SYSTEMS CHARGING PUMP -   SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3   At least one charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE.#
REACTIVITY CONTROL SYSTEMS CHARGING PUMP -
APPLICABILITY:     MODES 4, 5 and 6.
SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 At least one charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE.#
APPLICABILITY:
MODES 4, 5 and 6.
ACTION:
ACTION:
With no charging pump OPERABLE, suspend all       operations involving CORE ALTERATIONS or positive reactivity     changes until   one charging pump is restored to OPERABLE status.
With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until one charging pump is restored to OPERABLE status.
SURVEILLANCE REQUIREMENTS 4.1.2.3   No additional Surveillance Requirements other than those required by Spccification 4.0.5 the Inservice Testing Program.
SURVEILLANCE REQUIREMENTS 4.1.2.3 No additional Surveillance Requirements other than those required by Spccification 4.0.5 the Inservice Testing Program.
# A maximum of   one centrifugal   charging pump shall be OPERABLE while in   MODE 4 when the temperature of one or more of the RCS cold legs is less than or equal to 3120 F, MODE 5, or MODE 6 when the head is on the reactor vessel.
# A maximum of one centrifugal charging pump shall be OPERABLE while in MODE 4 when the temperature of one or more of the RCS cold legs is less than or equal to 3120 F, MODE 5, or MODE 6 when the head is on the reactor vessel.
SALEM - UNIT 1                           3/4 1-10                 Amendment No. 449
SALEM -
UNIT 1 3/4 1-10 Amendment No. 449


REACTIVITY CONTROL SYSTEMS CHARGING PUMPS - OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.4 At least two charging pumps shall be OPERABLE..
REACTIVITY CONTROL SYSTEMS CHARGING PUMPS -
APPLICABILITY:   MODES 1, 2, and 3.
OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.4 At least two charging pumps shall be OPERABLE..
APPLICABILITY:
MODES 1, 2, and 3.
ACTION:
ACTION:
With only one charging pump OPERABLE, restore at least two charging pumps to OPERABLE status within 72 hours or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to at least 1% Ak/k at 200'F within the next 6 hours; restore at least two charging pumps to OPERABLE status within the next 7 days or be in COLD SHUTDOWN within the next 30 hours.
With only one charging pump OPERABLE, restore at least two charging pumps to OPERABLE status within 72 hours or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to at least 1% Ak/k at 200'F within the next 6 hours; restore at least two charging pumps to OPERABLE status within the next 7 days or be in COLD SHUTDOWN within the next 30 hours.
SURVEILLANCE REQUIREMENTS 4.1.2-.4 No additional Surveillance Requirements other than those required by SpcJification 4.9.S the Inservice Testing Program.
SURVEILLANCE REQUIREMENTS 4.1.2-.4 No additional Surveillance Requirements other than those required by SpcJification 4.9.S the Inservice Testing Program.
SALEM - UNIT 1                     3/4 1-11                 Amendment No.
SALEM -
REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY VALVES SAFETY VALVES -     SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2.1     A minimum of one pressurizer code safety valve shall be OPERABLE* with a lift   setting of 2485 psig +/- 3%.**,***
UNIT 1 3/4 1-11 Amendment No.
APPLICABILITY:       Mode 4 and 5 ACTION:
REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY VALVES SAFETY VALVES -
With no pressurizer code safety valve OPERABLE, immediately suspend all operations involving positive reactivity         changes and place an OPERABLE RHR loop into operation in the shutdown cooling mode.
SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2.1 A minimum of one pressurizer code safety valve shall be OPERABLE* with a lift setting of 2485 psig +/- 3%.**,***
SURVEILLANCE     REQUIREMENTS 4.4.2.1     No additional Surveillance Requirements other than those required by Specification 4.0.5 the Inservice Testing Program.
APPLICABILITY:
* While in Mode       5, an equivalent size vent pathway may be used provided that the vent pathway is     not isolated or sealed.
Mode 4 and 5 ACTION:
**  The lift   setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.
With no pressurizer code safety valve OPERABLE, immediately suspend all operations involving positive reactivity changes and place an OPERABLE RHR loop into operation in the shutdown cooling mode.
Following testing the lift       setting shall be reset to within +/- 1%.
SURVEILLANCE REQUIREMENTS 4.4.2.1 No additional Surveillance Requirements other than those required by Specification 4.0.5 the Inservice Testing Program.
SALEM - UNIT 1                             3/4 4-4                 Amendment No. 2-4-4
While in Mode 5, an equivalent size vent pathway may be used provided that the vent pathway is not isolated or sealed.
The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.
Following testing the lift setting shall be reset to within +/- 1%.
SALEM -
UNIT 1 3/4 4-4 Amendment No.
2-4-4


3/4.4   REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY VALVES SAFETY VALVES   - OPERATING LIMITING CONDITION FOR OPERATION 3.4.2.2     All pressurizer code safety valve shall be OPERABLE with a lift, setting of 2485 psig +/- 3%.*,**
3/4.4 REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY VALVES SAFETY VALVES -
APPLICABILITY:     MODES 1, 2 and 3.
OPERATING LIMITING CONDITION FOR OPERATION 3.4.2.2 All pressurizer code safety valve shall be OPERABLE with a lift, setting of 2485 psig +/- 3%.*,**
APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
ACTION:
With one pressurizer code safety valve inoperable, either restore the inoperable valve to OPERABLE status within 15 minutes, or be in HOT SHUTDOWN within 12 hours.
With one pressurizer code safety valve inoperable, either restore the inoperable valve to OPERABLE status within 15 minutes, or be in HOT SHUTDOWN within 12 hours.
SURVEILLANCE REQUIREMENTS 4.4.2.2     No additional Surveillance Requirements other than those required by Spccification 4.0.5 the Inservice Testing Program.
SURVEILLANCE REQUIREMENTS 4.4.2.2 No additional Surveillance Requirements other than those required by Spccification 4.0.5 the Inservice Testing Program.
The lift   setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.
The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.
**  Following testing     the lift setting shall be reset to within +/- 1%.
Following testing the lift setting shall be reset to within +/- 1%.
SALEM - UNIT 1                           3/4 4-4a               'Amendment No. 244
SALEM - UNIT 1 3/4 4-4a
'Amendment No.
244


REACTOR COOLANT SYSTEM 3/4.4.3 RELIEF VALVES SURVEILLANCE REQUIREMENTS 4.4.3.1   In addition to the requirements of Spccif--Jiton 4.0.5 the Inservice Testing Program, each PORV shall be demonstrated OPERABLE at least once per 18 months by:
REACTOR COOLANT SYSTEM 3/4.4.3 RELIEF VALVES SURVEILLANCE REQUIREMENTS 4.4.3.1 In addition to the requirements of Spccif--Jiton 4.0.5 the Inservice Testing Program, each PORV shall be demonstrated OPERABLE at least once per 18 months by:
: a. Operating the PORV through one complete cycle of full   travel during MODES 3 or 4, and
: a.
: b. Operating solenoid valves, air control valves, and check valves on associated air accumulators in PORV control systems through one complete cycle of full travel, and
Operating the PORV through one complete cycle of full travel during MODES 3 or 4, and
: c. Performing a CHANNEL CALIBRATION of the actuation .instrumentation.
: b.
4.4.3.2   Each block valve shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full   travel unless-the block valve is closed in order to meet the requirements of ACTION b, or c in-Specification 3.4.3.
Operating solenoid valves, air control valves, and check valves on associated air accumulators in PORV control systems through one complete cycle of full travel, and
SALEM - UNIT 1                       3/4 4-5a               Amendment No. 47&9
: c.
Performing a CHANNEL CALIBRATION of the actuation.instrumentation.
4.4.3.2 Each block valve shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel unless-the block valve is closed in order to meet the requirements of ACTION b, or c in-Specification 3.4.3.
SALEM -
UNIT 1 3/4 4-5a Amendment No.
47&9


REACTOR COOLANT SYSTEM PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.4.6.3     Reactor Coolant System Pressure Isolation Valves specified in         table 4.4-3 shall be OPERABLE.
REACTOR COOLANT SYSTEM PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.4.6.3 Reactor Coolant System Pressure Isolation Valves specified in table 4.4-3 shall be OPERABLE.
APPLICABILITY:   MODES 1, 2, 3, and 4.
APPLICABILITY:
ACTION:     With any Reactor Coolant System Pressure Isolation Valve leakage greater than the specified limit in Table 4.4-3, isolate the high pressure portion of the affected system from the low pressure portion within 4 hours by use *of at least two closed manual or deactivated automatic valves, or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
MODES 1, 2, 3,
SURVEILLANCE REQUIREMENTS 4.4.6.3   Each Reactor Coolant System Pressure Isolation Valve specified in Table 4.4-3 shall be demonstrated OPERABLE pursuant to Specification 4.0.5 the Inservice Testing Program, except that in lieu of any leakage testing required by Specifieation 4.0.5 the Inservice Testing Program, each valve shall ,be demonstrated OPERABLE by verifying leakage to be within its     limit:
and 4.
: a. At least once per 18 months.
ACTION:
: b. Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN           for 72 hours or more and if leakage testing has not been performed in         the previous 9 months.                                                         I
With any Reactor Coolant System Pressure Isolation Valve leakage greater than the specified limit in Table 4.4-3, isolate the high pressure portion of the affected system from the low pressure portion within 4 hours by use *of at least two closed manual or deactivated automatic valves, or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
: c. Prior to returning the valve to service following maintenance repair or replacement work on the valve.
SURVEILLANCE REQUIREMENTS 4.4.6.3 Each Reactor Coolant System Pressure Isolation Valve specified in Table 4.4-3 shall be demonstrated OPERABLE pursuant to Specification 4.0.5 the Inservice Testing Program, except that in lieu of any leakage testing required by Specifieation 4.0.5 the Inservice Testing Program, each valve shall,be demonstrated OPERABLE by verifying leakage to be within its limit:
: d. For the Residual Heat Removal and Safety Injection Systems hot and cold         leg injection valves and accumulator valves listed     in Table 4.4-3 the testing will be done within 24 hours following valve actuation due to automatic         or manual action or flow through the valve.     For all other systems testing   will be done once per refueling.
: a.
The provisions of specification   4-.0.4 are not applicable for entry into MODE 3 or 4.
At least once per 18 months.
SALEM - UNIT 1                 3/4 4-16a                 Amendment No. 272-_ýý
: b. Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 72 hours or more and if leakage testing has not been performed in the previous 9 months.
I
: c.
Prior to returning the valve to service following maintenance repair or replacement work on the valve.
: d.
For the Residual Heat Removal and Safety Injection Systems hot and cold leg injection valves and accumulator valves listed in Table 4.4-3 the testing will be done within 24 hours following valve actuation due to automatic or manual action or flow through the valve.
For all other systems testing will be done once per refueling.
The provisions of specification 4-.0.4 are not applicable for entry into MODE 3 or 4.
SALEM -
UNIT 1 3/4 4-16a Amendment No. 272-_ýý


REACTOR COOLANT SYSTEM OVERPRESSURE PROTECTION SYSTEMS SURVEILLANCE REQUIREMENTS 4.4.9.3.1 Each POPS shall be demonstrated OPERABLE by:
REACTOR COOLANT SYSTEM OVERPRESSURE PROTECTION SYSTEMS SURVEILLANCE REQUIREMENTS 4.4.9.3.1 Each POPS shall be demonstrated OPERABLE by:
: a. Performance of a CHANNEL FUNCTIONAL TEST on the POPS actuation channel, but excluding valve operation, within 31 days prior to entering a condition in which the POPS is required OPERABLE, and at least once per 31 days thereafter when the POPS is required OPERABLE.
: a.
: b. Performance of a CHANNEL CALIBRATION on the POPS actuation channel at least once per 18 months.
Performance of a CHANNEL FUNCTIONAL TEST on the POPS actuation channel, but excluding valve operation, within 31 days prior to entering a condition in which the POPS is required OPERABLE, and at least once per 31 days thereafter when the POPS is required OPERABLE.
: c. Verifying the POPS isolation valve is open at least once per 72 hours when the POPS is being used for overpressure protection.
: b.
: d. Testing pursuant to Specifipati-n 4.0.5 the Inservice Testing Program.
Performance of a CHANNEL CALIBRATION on the POPS actuation channel at least once per 18 months.
: c.
Verifying the POPS isolation valve is open at least once per 72 hours when the POPS is being used for overpressure protection.
: d.
Testing pursuant to Specifipati-n 4.0.5 the Inservice Testing Program.
4.4.9.3.2 The RCS vent(s) shall be verified to be open at least once per 12 hours* when the vents(s) is being used for overpressure protection.
4.4.9.3.2 The RCS vent(s) shall be verified to be open at least once per 12 hours* when the vents(s) is being used for overpressure protection.
*Except when the vent pathway is provided with a valve which is locked, sealed, or otherwise secured in the open position, then verify these valves open at least once per 31 days.
*Except when the vent pathway is provided with a valve which is
SALEM - UNIT 1                     3/4 4-31                 Amendment No. 2-2-5
: locked, sealed, or otherwise secured in the open position, then verify these valves open at least once per 31 days.
SALEM -
UNIT 1 3/4 4-31 Amendment No.
2-2-5


REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS     (Continued)
REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued)
In addition to the requirements of Spccificatien 40.5 the Inservice Inspection Program, each Reactor Coolant Pump flywheel shall be inspected per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, August 1975.     In lieu of Position C.4.b(l) and C.4.b(2), a qualified in-place UT examination over the volume from the inner bore of the flywheel to the circle one-half of the outer radius or a surface examination (MT and/or PT) of exposed surfaces of the removed flywheels may be conducted at 20 year intervals.
In addition to the requirements of Spccificatien 40.5 the Inservice Inspection Program, each Reactor Coolant Pump flywheel shall be inspected per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, August 1975.
4.4.10.1.2   Augmented Inservice Inspection Program for Steam Generator Channel Heads - The steam generator channel heads shall be ultrasonically inspected during each of the first     three refueling outages using the same ultrasonic inspection procedures and equipment used to generate the baseline data.         These inservice ultrasonic inspections shall verify that the cracks observed in the stainless steel cladding prior to operation have not propagated into the base material. The stainless   steel clad surfaces of the steam generator channel heads shall also be visually inspected during the above outages.     This may be accomplished by direct visual examination or by remote means such as television camera. If the visual examination, either direct or remote, reveals detectable cladding indications, a record shall be made-by means of a video tape recording or photographs for comparison purposes.
In lieu of Position C.4.b(l) and C.4.b(2),
SAL EM   UNIT 1                         3/4 4-33             Amendment No. 2-4-&
a qualified in-place UT examination over the volume from the inner bore of the flywheel to the circle one-half of the outer radius or a surface examination (MT and/or PT) of exposed surfaces of the removed flywheels may be conducted at 20 year intervals.
4.4.10.1.2 Augmented Inservice Inspection Program for Steam Generator Channel Heads -
The steam generator channel heads shall be ultrasonically inspected during each of the first three refueling outages using the same ultrasonic inspection procedures and equipment used to generate the baseline data.
These inservice ultrasonic inspections shall verify that the cracks observed in the stainless steel cladding prior to operation have not propagated into the base material.
The stainless steel clad surfaces of the steam generator channel heads shall also be visually inspected during the above outages.
This may be accomplished by direct visual examination or by remote means such as television camera.
If the visual examination, either direct or remote, reveals detectable cladding indications, a record shall be made-by means of a video tape recording or photographs for comparison purposes.
EM UNIT 1 3/4 4-33 Amendment No.
2-4-&
SAL


EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS       (Continued)
EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
: f. By verifying that each of the following pumps develops the indicated Total Dynamic Head (TDH) when tested at the test             flow point pursuant to Specifieation 4.0.5 the Inservice Testing Program.:
: f.
: 1.       Centrifugal charging pump           2338 psi TDH
By verifying that each of the following pumps develops the indicated Total Dynamic Head (TDH) when tested at the test flow point pursuant to Specifieation 4.0.5 the Inservice Testing Program.:
: 2.       Safety Injection Pump               1369 psi TDH
: 1.
: 3.       Residual   heat removal pump         165 psi TDH
Centrifugal charging pump
: g. By verifying the correct position of each of the following ECCS throttle     valves:
: 2.
: 1.       Within 4 hours following completion of each valve stroking operation or maintenance on the valve when the ECCS subsystems are required to be OPERABLE.
Safety Injection Pump
: 2.       At least once per 18 months.
: 3.
HPSI SYSTEM                       LPSI SYSTEM VALVE NUMBER                      VALVE NUMBER 11 SJ 16                         11  SJ  138 i2 SJ 16                         12  SJ  138 13 SJ 16                         13  SJ  138 14 SJ 16                         14 SJ 138 11 SJ 143 12 SJ 143 13 SJ 143 14 SJ 143 h.. By performing a flow balance test,         during shutdown, following completion of modifications to the ECCS subsystems that alter            the subsystem flow characteristics and verifying that:
Residual heat removal pump 2338 psi TDH 1369 psi TDH 165 psi TDH
: 1.       For Safety Injection pumps,     with a single pump running:
: g.
a)     The sum of the injection line flow rates,       excluding the highest flow rate, is Ž 453 gpm; and b)     The total   flow rate through all     four injection lines is
By verifying the correct position of each of the following ECCS throttle valves:
                          < 647 gpm, and c)     The difference between any pair of injection line flow rates is
: 1.
* 12.0 gpm, and d)     The total   pump flow rate is
Within 4 hours following completion of each valve stroking operation or maintenance on the valve when the ECCS subsystems are required to be OPERABLE.
* 664 gpm in   the cold leg alignment, and e)     The total   pump flow rate is
: 2.
* 654 gpm in the hot leg alignment..
At least once per 18 months.
SALEM - UNIT 1                               3/4 5-5a               Amendment No. 4-44 2-&&
HPSI SYSTEM VALVE NUMBER LPSI SYSTEM VALVE NUMBER 11 SJ 16 i2 SJ 16 13 SJ 16 14 SJ 16 11 SJ 12 SJ 13 SJ 14 SJ 11 SJ 12 SJ 13 SJ 14 SJ 138 138 138 138 143 143 143 143 h..
By performing a flow balance test, during shutdown, completion of modifications to the ECCS subsystems subsystem flow characteristics and verifying that:
following that alter the
: 1.
For Safety Injection pumps, with a single pump running:
a)
The sum of the injection line flow rates, excluding the highest flow rate, is  
&#x17d; 453 gpm; and b)
The total flow rate through all four injection lines is
< 647 gpm, and c)
The difference between any pair of injection line flow rates is
* 12.0 gpm, and d)
The total pump flow rate is
* 664 gpm in the cold leg alignment, and e)
The total pump flow rate is
* 654 gpm in the hot leg alignment..
SALEM -
UNIT 1 3/4 5-5a Amendment No.
4-44 2-&&


CONTAINMENT     SYSTEMS 3/4.6.2   DEPRESSURIZATION AND COOLING SYSTEMS CONTAINMENT     SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.1   Two independent containment spray systems shall be OPERABLE with each spray system capable of taking suction from the RWST and transferring suction to the RHR pump discharge.
CONTAINMENT SYSTEMS 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS CONTAINMENT SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.1 Two independent containment spray systems shall be OPERABLE with each spray system capable of taking suction from the RWST and transferring suction to the RHR pump discharge.
APPLICABILITY:           MODES 1, 2, 3 and 4.
APPLICABILITY:
MODES 1,
2, 3 and 4.
ACTION:
ACTION:
With one containment spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours; restore the inoperable spray system to OPERABLE status within the next 48 hours or be in COLD SHUTDOWN within the following 30 hours..
With one containment spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours; restore the inoperable spray system to OPERABLE status within the next 48 hours or be in COLD SHUTDOWN within the following 30 hours..
SURVEILLANCE REQUIREMENTS 4.6.2.1   Each containment         spray system shall be demonstrated OPERABLE:
SURVEILLANCE REQUIREMENTS 4.6.2.1 Each containment spray system shall be demonstrated OPERABLE:
: a. At least once per 3.1 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its         correct position.
: a.
: b. By verifying, that on recirculation flow, each pump develops a differential       pressure of greater than or equal to 204 psid when tested pursuant to Spccificaticn 4.0.5 the Inservice Testing Program.
At least once per 3.1 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
: c. At least once per 18 months during shutdown,           by:
: b.
: 1.           Verifying that each automatic valve in the flow path actuates to its correct position on a Containment High-High pressure test signal.
By verifying, that on recirculation flow, each pump develops a differential pressure of greater than or equal to 204 psid when tested pursuant to Spccificaticn 4.0.5 the Inservice Testing Program.
: 2.           Verifying that each spray pump starts     automatically on a Containment High-High pressure test     signal.
: c.
: d. Following activities       that could result in nozzle blockage, either evaluate the work performed to determine the impact to the containment spray system, or perform           an air or smoke flow test through each spray header and verifying each spray nozzle is unobstructed.
At least once per 18 months during shutdown, by:
SALEM - UNIT 1                               3/4 6-9             Amendment No. 2LS-2
: 1.
Verifying that each automatic valve in the flow path actuates to its correct position on a Containment High-High pressure test signal.
: 2.
Verifying that each spray pump starts automatically on a Containment High-High pressure test signal.
: d.
Following activities that could result in nozzle blockage, either evaluate the work performed to determine the impact to the containment spray system, or perform an air or smoke flow test through each spray header and verifying each spray nozzle is unobstructed.
SALEM -
UNIT 1 3/4 6-9 Amendment No.
2LS-2


CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.6.3.1.2   Each containment isolation valve shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by:
CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.6.3.1.2 Each containment isolation valve shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by:
: a. Verifying that on a Phase A containment isolation test signal, each Phase A isolation valve actuates to its isolation position.
: a.
: b. Verifying that on a Phase B containment isolation test signal, each Phase B isolation valve actuates to its isolation position.
Verifying that on a Phase A containment isolation test signal, each Phase A isolation valve actuates to its isolation position.
: c. Not used.
: b.
: d. Verifying that on a Containment Purge and Pressure-Vacuum Relief isolation test signal, each required Purge and each Pressure-Vacuum Relief valve actuates to its isolation position.
Verifying that on a Phase B containment isolation test signal, each Phase B isolation valve actuates to its isolation position.
: e. Verifying that the Containment Pressure-Vacuum Relief Isolation valves are limited to = 60%opening angle.
: c.
4.6.3.1.3   At least once per 18 months, verify that on a main steam isolation.
Not used.
test signal, each main steam isolation valve actuates to its isolation position.
: d.
4.6.3.1.4  The isolation time of each-power operated or automatic containment isolation valve shall be determined to be within its limit when tested pursdant to Spccificatien 4.0.5 the Inservice Testing Program.
Verifying that on a Containment Purge and Pressure-Vacuum Relief isolation test signal, each required Purge and each Pressure-Vacuum Relief valve actuates to its isolation position.
4.6.3.1.5  Each required containment purge isolation valve shall be demonstrated OPERABLE within 24 hours after each closing of the valve, except when the valve is being used for multiple cyclings, then at least once per 72 hours, by verifying that when the measured leakage rate is added to the leakage rates determined pursuant to Specification 4.6.1.2.b for all other Type B and C penetrations, the combined leakage rate is less than or equal to 0.60La.
: e.
4.6.3.1.6  A pressure drop test to identify excessive degradation of resilient valve seals shall be conducted on the:
Verifying that the Containment Pressure-Vacuum Relief Isolation valves are limited to = 60%opening angle.
: a. Required Containment Purge Supply and Exhaust Isolation Valves at least once per 6 months.
4.6.3.1.3 4.6.3.1.4 4.6.3.1.5 4.6.3.1.6 At least once per 18 months, verify that on a main steam isolation.
: b. Deleted.
test signal, each main steam isolation valve actuates to its isolation position.
4.6.3.1.7   The required containment purge supply and exhaust isolation valves shall be determined closed at least once per 31 days.
The isolation time of each-power operated or automatic containment isolation valve shall be determined to be within its limit when tested pursdant to Spccificatien 4.0.5 the Inservice Testing Program.
SALEM - UNIT 1                   3/4 6-13                 Amendment No.2 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE SAFETY VALVES LIMITING CONDITION FOR OPERATION 3.7.1.1   All main steam line code safety valves       (MSSVs) associated with each steam generator shall be OPERABLE.
Each required containment purge isolation valve shall be demonstrated OPERABLE within 24 hours after each closing of the valve, except when the valve is being used for multiple cyclings, then at least once per 72 hours, by verifying that when the measured leakage rate is added to the leakage rates determined pursuant to Specification 4.6.1.2.b for all other Type B and C penetrations, the combined leakage rate is less than or equal to 0.60La.
APPLICABILITY: MODES 1, 2 and 3.
A pressure drop test to identify excessive degradation of resilient valve seals shall be conducted on the:
: a.
Required Containment Purge Supply and Exhaust Isolation Valves at least once per 6 months.
: b.
Deleted.
4.6.3.1.7 The required containment purge supply and exhaust isolation valves shall be determined closed at least once per 31 days.
SALEM -
UNIT 1 3/4 6-13 Amendment No.2 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE SAFETY VALVES LIMITING CONDITION FOR OPERATION 3.7.1.1 All main steam line code safety valves (MSSVs) associated with each steam generator shall be OPERABLE.
APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
ACTION:
: a. With one or two main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1, 2 and 3 may proceed provided, that within 4 hours, either the inoperable valve is restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
: a.
: b. With three main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1, 2 and 3 may proceed provided, that within 4 hours, either the inoperable valves are restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1 and within 36 hours, reduce the Power Range Neutron Flux High trip   setpoint to less than or equal to the RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
With one or two main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1, 2 and 3 may proceed provided, that within 4 hours, either the inoperable valve is restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE REQUIREMENTS 4.7.1.1   Verify each required MSSV lift     setpoint per Table 4.7-1. No additional Surveillance Requirements other than those required by, Spccification       the Inservice Testing Program.
: b.
t..5 SALEM - UNIT 1                         3/4 7-1                 Amendment No.. 2-44
With three main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1, 2 and 3 may proceed provided, that within 4 hours, either the inoperable valves are restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1 and within 36 hours, reduce the Power Range Neutron Flux High trip setpoint to less than or equal to the RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE REQUIREMENTS 4.7.1.1 Verify each required MSSV lift setpoint per Table 4.7-1.
No additional Surveillance Requirements other than those required by, Spccification t..5 the Inservice Testing Program.
SALEM -
UNIT 1 3/4 7-1 Amendment No..
2-44


PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.5 Each main steam line isolation valve shall be OPERABLE.
PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.5 Each main steam line isolation valve shall be OPERABLE.
APPLICABILITY:   MODES 1, 2 and 3.
APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
ACTION:
MODES   1 - With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is either restored to OPERABLE status or closed within 4 hours; otherwise, be in MODE 2 within the next 6 hours.
MODES 1 -
MODES 2   -With   one or more main steam line isolation valve(s) inoperable, and 3       subsequent operation in MODES 2 or 3 may proceed provided;
With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is either restored to OPERABLE status or closed within 4 hours; otherwise, be in MODE 2 within the next 6 hours.
: a. The isolation valve(s)     is (are) maintained closed, and
MODES 2 -With one or more main steam line isolation valve(s) inoperable, and 3 subsequent operation in MODES 2 or 3 may proceed provided;
: b. The isolation valve(s)     is (are) verified closed once per 7 days.
: a.
Otherwise, be in MODE 3,   HOT STANDBY, within the next 6 hours, and-MODE 4,   HOT SHUTDOWN, within the following 6 hours.
The isolation valve(s) is (are) maintained closed, and
SURVEILLANCE REQUIREMENTS 4.7.1.5 Each main steam line isolation valve shall be. demonstrated OPERABLE by verifying full   closure within 5 seconds when tested pursuant to Spccificaticn 4.9.5 the Inservice Testing Program.         The provisions of Specification 4..0.4-are not applicable.
: b.
SALEM   - UNIT 1                       -3/4 7-10                     Amendment No..1-8-7
The isolation valve(s) is (are) verified closed once per 7 days.
Otherwise, be in MODE 3, HOT STANDBY, within the next 6 hours, and-MODE 4, HOT SHUTDOWN, within the following 6 hours.
SURVEILLANCE REQUIREMENTS 4.7.1.5 Each main steam line isolation valve shall be. demonstrated OPERABLE by verifying full closure within 5 seconds when tested pursuant to Spccificaticn 4.9.5 the Inservice Testing Program.
The provisions of Specification 4..0.4-are not applicable.
SALEM -
UNIT 1  
-3/4 7-10 Amendment No..1-8-7


PLANT SYSTEMS 3/4.7.9   SNUBBERS LIMITING CONDITION FOR OPERATION 3.7.9   All snubbers shall be OPERABLE.
PLANT SYSTEMS 3/4.7.9 SNUBBERS LIMITING CONDITION FOR OPERATION 3.7.9 All snubbers shall be OPERABLE.
APPLICABILITY:   MODES 1, 2, 3 and 4.   (MODES 5 and 6 for snubbers located on systems required OPERABLE in those MODES)..
APPLICABILITY:
MODES 1, 2, 3 and 4.
(MODES 5 and 6 for snubbers located on systems required OPERABLE in those MODES)..
ACTION:
ACTION:
With one or more snubbers inoperable, within 72 hours, replace or restore the inoperable snubber(s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.9c on the supported component or declare the supported system inoperable and follow appropriate ACTION statement for that system.
With one or more snubbers inoperable, within 72 hours, replace or restore the inoperable snubber(s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.9c on the supported component or declare the supported system inoperable and follow appropriate ACTION statement for that system.
SURVEILLANCE REQUIREMENTS 4.7.9   Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program, in addition to the regular Inservice Inspection Program requirements-e#* Spccifioation 4.0.5.
SURVEILLANCE REQUIREMENTS 4.7.9 Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program, in addition to the regular Inservice Inspection Program requirements-e#* Spccifioation 4.0.5.
: a. Visual Inspection All snubbers shall be categorized into two groups:   those accessible and those inaccessible during reactor operation. The visual inspection interval for each category of snubbers shall be determined based upon the criteria provided in Table 4.7-3.
: a.
SALEM - UNIT 1                         3/4 7-28                 Amendment No.. 4-61
Visual Inspection All snubbers shall be categorized into two groups:
those accessible and those inaccessible during reactor operation.
The visual inspection interval for each category of snubbers shall be determined based upon the criteria provided in Table 4.7-3.
SALEM -
UNIT 1 3/4 7-28 Amendment No..
4-61


REFUELING OPERATIONS LOW WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.2 Two independent     Residual Heat Removal (RHR) loops shall be OPERABLE.*
REFUELING OPERATIONS LOW WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.2 Two independent Residual Heat Removal (RHR) loops shall be OPERABLE.*
APPLICABILITY:   MODE 6 when water level above the top of the reactor pressure vessel flange is less than 23 feet.
APPLICABILITY:
MODE 6 when water level above the top of the reactor pressure vessel flange is less than 23 feet.
ACTION:
ACTION:
: a. With less than the required RHR loops operable, immediately initiate   corrective action to return the required RHR loops to OPERABLE status as soon as possible.
: a.
: b. The provisions of Specification     3.0.3 are not applicable.
With less than the required RHR loops operable, immediately initiate corrective action to return the required RHR loops to OPERABLE status as soon as possible.
SURVEILLANCE REQUIREMENTS 4.9.8.2 The required Residual Heat Removal loops shall be determined OPERABLE per Specificatien 4.0.5 the Inservice Testing Program..
: b.
The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE REQUIREMENTS 4.9.8.2 The required Residual Heat Removal loops shall be determined OPERABLE per Specificatien 4.0.5 the Inservice Testing Program..
* Systems supporting RHR loop operability may be excepted as follows:
* Systems supporting RHR loop operability may be excepted as follows:
: a. The normal or emergency power source may be inoperable.
: a.
SALEM - UNIT 1                   3/4 9-8a           Amendment No. 24
The normal or emergency power source may be inoperable.
SALEM -
UNIT 1 3/4 9-8a Amendment No.
24


ADMINISTRATIVE CONTROLS C.     Records of radiation       exposure for all   individuals entering radiation control areas.
ADMINISTRATIVE CONTROLS C.
: d.     Records of gaseous and liquid radioactive material released to the environs..
Records of radiation exposure for all individuals entering radiation control areas.
: e.     Records of transient or operational cycles for *those facility components identified in Table 5.7-1.
: d.
: f.     Records of reactor tests       and experiments.
Records of gaseous and liquid radioactive material released to the environs..
: g.     Records of training and qualification         for current members of the plant staff.
: e.
: h.     Records of in-service       inspections   erferi..d pursuant tz #thzs Tchniezel Spcoifieations.
Records of transient or operational cycles for *those facility components identified in Table 5.7-1.
: i.     Records of Quality Assurance activities         required by the QA Manual:.
: f.
: j.     DELETED
Records of reactor tests and experiments.
: k.     Records of SORC meetings and activities         of the Nuclear Review Board (and activities   of its   predecessor,   the Offsite Safety Review (OSR) staff.)
: g.
: 1.     Records for Environmental Qualification which are         covered under the provisions of Paragraph 6.16.
Records of training and qualification for current members of the plant staff.
: m.     Records of the service lives of all         hydraulic and mechanical snubbers including the date at which the service life         commences and associated installation     and maintenance records.
: h.
n.. Records of secondary water sampling and water quality.
Records of in-service inspections erferi..d pursuant tz #thzs Tchniezel Spcoifieations.
: 0.     Records of analyses required by the radiological environmental monitoring program which would permit evaluation of the accuracy of the analysis at a later     date. This should include procedures effective at specified times and QA records -showing that these procedures were followed.
: i.
: p. Records of reviews performed for changes made to the OFFSITE DOSE CALCULATION MANUAL and the PROCESS CONTROL PROGRAM.
Records of Quality Assurance activities required by the QA Manual:.
6.11   RADIATION PROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all   operations involving personnel radiation exposure.
: j.
SALEM - UNIT 1                               6-26                   Amendment No. 2-34
DELETED
: k.
Records of SORC meetings and activities of the Nuclear Review Board (and activities of its predecessor, the Offsite Safety Review (OSR) staff.)
: 1.
Records for Environmental Qualification which are covered under the provisions of Paragraph 6.16.
: m.
Records of the service lives of all hydraulic and mechanical snubbers including the date at which the service life commences and associated installation and maintenance records.
n..
Records of secondary water sampling and water quality.
: 0.
Records of analyses required by the radiological environmental monitoring program which would permit evaluation of the accuracy of the analysis at a later date.
This should include procedures effective at specified times and QA records -showing that these procedures were followed.
: p.
Records of reviews performed for changes made to the OFFSITE DOSE CALCULATION MANUAL and the PROCESS CONTROL PROGRAM.
6.11 RADIATION PROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.
SALEM -
UNIT 1 6-26 Amendment No.
2-34


-        I' I2TF&sect;QII'i CONTROL:
I' I2TF&sect;QII'i CONTROL:
6.8.4.j         iNSERVICE     TESTING   PROGRAM This Program provides           controls     for   inservice     testing   of ASME Code Class 1, 2,     and 3 components.       The program     shall       include the following:
6.8.4.j iNSERVICE TESTING PROGRAM This Program provides controls for inservice testing of ASME Code Class 1, 2,
: a. Testing frequencies       applicable     to   the ASME Code for       Operations and Maintenance of Nuclear Power Plants                   (ASME OM Code) and applicable       Addenda as follows:
and 3 components.
ASME OM Code and applicable                                           Required Frequencies for Addenda terminology for                                               performing inservice inservice testing activities                                           testing activities Weekly                                                                At least once per 7 days Monthly                                                                At least once per 31 days Quarterly or every 3 months                                            At least once per 92 days Semiannually or every 6 months                                        At least once per 184 days Every 9 months                                                        At least once per 276 days Yearly or annually                                                    At least once per 366 days Biennially or every 2 years                                            At least once per 731 days
The program shall include the following:
: b. The provisions of           Specification 4.0.2 are applicable to the above required frequencies           and to other normal and accelerated frequencies specified as 2 years           or less in the Inservice Testing Program for performing inservice           testing activities,
: a.
: c. The provisions         of Specification 4.0.3 are applicable to inservice testing activities,         and
Testing frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda as follows:
ASME OM Code and applicable Addenda terminology for inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice testing activities At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days
: b. The provisions of Specification 4.0.2 are applicable to the above required frequencies and to other normal and accelerated frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities,
: c.
The provisions of Specification 4.0.3 are applicable to inservice testing activities, and
: d. Nothing in the ASME OM Code shall be construed to supersede the requirements of any Technical Specification.
: d. Nothing in the ASME OM Code shall be construed to supersede the requirements of any Technical Specification.
SALEM -       UNIT 1                             6-19e                                 Amendment No.
SALEM -
UNIT 1 6-19e Amendment No.


APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1   Surveillance Requirements shall be met during the OPERATIONAL MODES or other specified conditions in the Applicability for-individual Limiting Conditions for Operation, unless otherwise stated in the Surveillance Requirement. Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the Limiting Condition for Operation. Failure to perform a Surveillance within the specified frequency shall be failure to meet the Limiting Condition for Operation, except as provided in Specification 4.0.3.           Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.
APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other specified conditions in the Applicability for-individual Limiting Conditions for Operation, unless otherwise stated in the Surveillance Requirement.
4.0.2   Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.
Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the Limiting Condition for Operation. Failure to perform a Surveillance within the specified frequency shall be failure to meet the Limiting Condition for Operation, except as provided in Specification 4.0.3.
4.0&#xfd;3   If it   is discovered that a Surveillance was not performed within its specified frequency, then compliance with the requirement to declare the Limiting Condition for Operation not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified frequency, whichever is greater.
Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.
This delay period is permitted to allow performance of the Surveillance. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours and the risk     impact shall be managed.
4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.
4.0&#xfd;3 If it is discovered that a Surveillance was not performed within its specified frequency, then compliance with the requirement to declare the Limiting Condition for Operation not met may be delayed, from the time of discovery, up to 24 hours or up to the limit of the specified frequency, whichever is greater.
This delay period is permitted to allow performance of the Surveillance.
A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours and the risk impact shall be managed.
If the Surveillance is not performed within the delay period, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.
If the Surveillance is not performed within the delay period, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.
When the Surveillance is performed within the delay period and the Surveillance is not met, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.
4.0.4   Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided .by SR 4.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.
4.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided.by SR 4.0.3.
When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.
This provision shall not prevent entry-into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
This provision shall not prevent entry-into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.
4.0.5   Survaillanac     Requirements for inservica inspoation and testing of ASME Coda Class 1, 2 and 3 oomponents shall be opp ieabla as follows.
4.0.5 Survaillanac Requirements for inservica inspoation and testing of ASME Coda Class 1, 2 and 3 oomponents shall be opp ieabla as follows.
a.aris         inspeetion of ASME Coda Class 1, 2 andl 3 comaponants and insarvica testing of ASHE GCeld       lass 1, 2 and 3 pumps andi valves shall b3   pearformed in accordance with Sot-ien X&#xfd; of the 4SME Dollar and Praessura Vassal Coda andl appldiaable Addalneda as raquidiamd by 10 CFR 50, Section 50.55a(g), exaept where speaifie written relief         has been gr.ante.d by the Co......issien pursuant to 10 CEP 50, Soati* n 50.55a(g) (6) (i)
a.aris inspeetion of ASME Coda Class 1, 2 andl 3 comaponants and insarvica testing of ASHE GCeld lass 1, 2 and 3 pumps andi valves shall b3 pearformed in accordance with Sot-ien X&#xfd; of the 4SME Dollar and Praessura Vassal Coda andl appldiaable Addalneda as raquidiamd by 10 CFR 50, Section 50.55a(g),
: b. Sur.v.illane. intr..al     specified in Svetion X! of tha ASMS ailor-a-nd Draessurae Vassal Codae andi applicablal Addandia for- the navc inspection and testing ativiti*ie       required by the ASME Dailar and Praossur Vassel Coda and applialapalat    Addenda shall be appliha     as follows in these Taahnieal Speaifieatiens:
exaept where speaifie written relief has been gr.ante.d by the Co......issien pursuant to 10 CEP 50, Soati* n 50.55a(g) (6)
SALE:M-- UNIT 2                         3/4 0-2a                   Amendment No. 258
(i)
: b.
Sur.v.illane. intr..al specified in Svetion X! of tha ASMS ailor-a-nd Draessurae Vassal Codae andi applicablal Addandia for-the navc inspection and testing ativiti*ie required by the ASME Dailar and Praossur Vassel Coda and appliala Addenda shall be appliha palat as follows in these Taahnieal Speaifieatiens:
SALE:M-- UNIT 2 3/4 0-2a Amendment No.
258


APPLICABILITY SURVEILLANCE REQUIREMENTS (Continued)
APPLICABILITY SURVEILLANCE REQUIREMENTS (Continued)
Requirad fretuanaies           T_&#xa9;r Code and appliaablc Addenda                                        performing insarviao terminology for insarviac                                           inspection and testing inspeation and testing activities                                   activities Weekly                                                   At   least     onee per 7 days Monthly                                                 At   least     enee per 31 days Quart=rly or every 3 months                                         At   least     onae per 92 days Seaiannually or every 6 oenthe                                       .n..
Code and appliaablc Addenda Requirad fretuanaies performing insarviao T_&#xa9;r terminology for insarviac inspection and testing inspeation and testing activities activities Weekly At least onee per 7 days Monthly At least enee per 31 days Quart=rly or every 3 months At least onae per 92 days Seaiannually or every 6 oenthe  
                                                                          .t  leat            par 184 days Every 9 months                                         At   least     once per 276 days Yearly or annually                                         At   least     once per 366 days.
.t leat
: e.     The provision of GspAification 4.0.2 ara appliaabla to tha. abva raquir-d fraquan-ias *f*a               p...rfrng insav*..           inspaatl.n
.n..
                                                                                    .              and tasting aativitios.
par 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days.
dl.                           of the abeva imnsarviaa eafraa                        inspaation andi tastidng&#xfd; aativitiodm~s shall     lh     in ad.dition. to   tha spsaifi.d       Surveillanae RPquiramants.
: e.
e       othijng in       the ASME; Beilar, and Paessur-a Vassal             Cdia shiall btea     nstr.d I    supe;qpn,
The provision of GspAification 4.0.2 ara appliaabla to tha. abva raquir-d fraquan-ias  
                  'Iir-*~---   eh-   #1i     r:r'-rmp;i pf any~ Taahnqpi Paa;       ZL
*f*a p...rfrng insav*..  
                                                                                                -#4n.&#xfd; spcipificai SALEM -   UNIT 2                                     3/4 0-3
.inspaatl.n and tasting aativitios.
dl.
eafraa of the abeva imnsarviaa inspaation andi tastidng&#xfd; aativitiodm~s shall lh in ad.dition to tha spsaifi.d Surveillanae RPquiramants.
e othijng in the ASME; Beilar, and Paessur-a Vassal Cdia shiall btea nstr.d
'Iir-*~---
eh-supe;qpn,
#1i r:r'-rmp;i pf any~ Taahnqpi Paa; spcipificai
-#4n.&#xfd; I
ZL SALEM -
UNIT 2 3/4 0-3


REACTIVITY CONTROL SYSTEMS CHARGING   PUMP- SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 At least one charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE.'
REACTIVITY CONTROL SYSTEMS CHARGING PUMP-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 At least one charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE.'
APPLICABILITY:   MODES 4, 5 and 6.
APPLICABILITY:
MODES 4,
5 and 6.
ACTION:
ACTION:
With no charging pump OPERABLE,     suspend all operations involving CORE ALTERATIONS or positive reactivity     changes until one charging pump is restored to OPERABLE status.
With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until one charging pump is restored to OPERABLE status.
SURVEILLANCE REQUIREMENTS 4.1.2.3   No additional Surveillance Requirements other than those required by Spccification {.0.5 the Inservice Testing Program..
SURVEILLANCE REQUIREMENTS 4.1.2.3 No additional Surveillance Requirements other than those required by Spccification {.0.5 the Inservice Testing Program..
# A maximum of one centrifugal charging pump shall be OPERABLE while in MODE 4 when the temperature of one or more of the RCS cold legs is less than or equal to 312 0 F, MODE 5, or MODE 6 when the head is on the reactor vessel.
# A maximum of one centrifugal charging pump shall be OPERABLE while in MODE 4 when the temperature of one or more of the RCS cold legs is less than or equal to 312 0 F, MODE 5, or MODE 6 when the head is on the reactor vessel.
SALEM -   UNIT 2                       3/4 1-9                 Amendment No.
SALEM -
UNIT 2 3/4 1-9 Amendment No.


REACTIVITY CONTROL SYSTEMS CHARGING PUMPS - OPERATING LIMITING CONDITION FOR OPERATION 3..1.2..4 At least two charging pumps shall be OPERABLE.
REACTIVITY CONTROL SYSTEMS CHARGING PUMPS -
APPLICABILITY:   MODES 1, 2 and 3.
OPERATING LIMITING CONDITION FOR OPERATION 3..1.2..4 At least two charging pumps shall be OPERABLE.
APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
ACTION:
With only one charging pump OPERABLE, restore at least two charging pumps to OPERABLE status within 72 hours or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to at least 1% delta k/k at 200'F within the next 6 hours; restore at least two charging pumps to OPERABLE status within the next 7 days or be in COLD SHUTDOWN within the next 30 hours.
With only one charging pump OPERABLE, restore at least two charging pumps to OPERABLE status within 72 hours or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to at least 1% delta k/k at 200'F within the next 6 hours; restore at least two charging pumps to OPERABLE status within the next 7 days or be in COLD SHUTDOWN within the next 30 hours.
SURVEILLANCE REQUIREMENTS 4.1..2.4 No additional Surveillance Requirements other than those required by Spec*lfiation 4.0.5 the Inservice Testing Program.
SURVEILLANCE REQUIREMENTS 4.1..2.4 No additional Surveillance Requirements other than those required by Spec*lfiation 4.0.5 the Inservice Testing Program.
SALEM - UNIT 2                       3/4 1-10               Amendment No. 1-
SALEM -
UNIT 2 3/4 1-10 Amendment No.
1-


REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY VALVES SAFETY VALVES     - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2           A minimum of one pressurizer code safety valve shall be OPERABLE*
REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY VALVES SAFETY VALVES -
with a lift   setting of 2485 psig +/- 3%.**,***
SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2 A minimum of one pressurizer code safety valve shall be OPERABLE*
APPLICABILITY:       Mode 4 and 5 ACTION:
with a lift setting of 2485 psig +/- 3%.**,***
With no pressurizer code safety valve OPERABLE, immediately suspend all operations involving positive reactivity       changes and place an OPERABLE RHR loop into operation in the shutdown cooling mode..
APPLICABILITY:
SURVEILLANCE REQUIREMENTS 4.4.2.1         No additional Surveillance Requirements other than those required by Specification 4.G,5 the Inservice Testing Program.
Mode 4 and 5 ACTION:
I While in     Mode 5, an equivalent   size vent pathway may be used provided that the vent pathway is     not isolated or sealed.
With no pressurizer code safety valve OPERABLE, immediately suspend all operations involving positive reactivity changes and place an OPERABLE RHR loop into operation in the shutdown cooling mode..
**    The lift     setting pressure. shall correspond to ambient conditions of the valve at nominal operating temperature       and pressure.
SURVEILLANCE REQUIREMENTS 4.4.2.1 No additional Surveillance Requirements other than those required by Specification 4.G,5 the Inservice Testing Program.
***    Following testing the lift     setting shall be reset to within +/- 1%.
I While in Mode 5, an equivalent size vent pathway may be used provided that the vent pathway is not isolated or sealed.
SALEM - UNIT 2                             3/4 4-5                 Amendment No. 272--
The lift setting pressure. shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.
Following testing the lift setting shall be reset to within +/- 1%.
SALEM -
UNIT 2 3/4 4-5 Amendment No.
272--


REACTOR COOLANT SYSTEM 3/4.4.3 SAFETY VALVES - OPERATING LIMITING CONDITION FOR OPERATION 3.4.3 All pressurizer code safety valves     shall be OPERABLE with a lift setting of 2485 psig +/- 3%.*,**
REACTOR COOLANT SYSTEM 3/4.4.3 SAFETY VALVES -
APPLICABILITY:   MODES 1, 2 and 3.
OPERATING LIMITING CONDITION FOR OPERATION 3.4.3 All pressurizer code safety valves shall be OPERABLE with a lift setting of 2485 psig +/- 3%.*,**
APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
ACTION:
With one pressurizer code safety valve inoperable, either restore. the inoperable valve to OPERABLE status within 15 minutes or be in HOT SHUTDOWN within 12 hours.
With one pressurizer code safety valve inoperable, either restore. the inoperable valve to OPERABLE status within 15 minutes or be in HOT SHUTDOWN within 12 hours.
SURVEILLANCE REQUIREMENTS 4.4.3 No additional Surveillance Requirements other than those required by Spccificatien 4.0.5 the Inservice Testing Program.
SURVEILLANCE REQUIREMENTS 4.4.3 No additional Surveillance Requirements other than those required by Spccificatien 4.0.5 the Inservice Testing Program.
The lift setting pressure   shall correspond to ambient conditions of the valve at nominal operating temperature and pressure..
The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure..
**    Following testing the lift   setting shall be reset to +/- 1%.
Following testing the lift setting shall be reset to +/- 1%.
SALEM - UNIT 2                         3/4 4-6                 Amendment No. 2 REACTOR COOLANT SYSTEM 3/4.4.5 RELIEF VALVES SURVEILLANCE REQUIREMENTS 4.4.5.1     In addition to the requirements of Spcfificaticn 4.0.5 the Inservice Testing Program, each PORV shall be demonstrated OPERABLE at least once per 18 months by:
SALEM -
      .a. Operating the PORV through one complete cycle of full   travel during MODES 3 or 4, and
UNIT 2 3/4 4-6 Amendment No.
: b. Operating solenoid valves, air   control valves, and check valves on associated air accumulators in   PORV control systems through one complete cycle of full travel,   and
2 REACTOR COOLANT SYSTEM 3/4.4.5 RELIEF VALVES SURVEILLANCE REQUIREMENTS 4.4.5.1 In addition to the requirements of Spcfificaticn 4.0.5 the Inservice Testing Program, each PORV shall be demonstrated OPERABLE at least once per 18 months by:
: c. Performing a CHANNEL CALIBRATION   of the actuation instrumentation.
.a.
4.4.5.2     Each block valve shall be demonstrated OPERABLE at least once per 92 days by operating the valve :through one complete cycle of full   travel unless the block valve is closed in order to meet the requirements of ACTION b, or c in Specification 3.4.5.
Operating the PORV through one complete cycle of full travel during MODES 3 or 4, and
SALEM - UNIT 2                       3/4 4-8a                   Amendment No. 449
: b.
Operating solenoid valves, air control valves, and check valves on associated air accumulators in PORV control systems through one complete cycle of full travel, and
: c.
Performing a CHANNEL CALIBRATION of the actuation instrumentation.
4.4.5.2 Each block valve shall be demonstrated OPERABLE at least once per 92 days by operating the valve :through one complete cycle of full travel unless the block valve is closed in order to meet the requirements of ACTION b, or c in Specification 3.4.5.
SALEM -
UNIT 2 3/4 4-8a Amendment No.
449


SURVEILLANCE REQUIREMENTS     (Continued).
SURVEILLANCE REQUIREMENTS (Continued).
c*. Verifying primary-to-secondary leakage is = 150 gallons per day through any one steam generator at least once per 72 hours during steady state operation, d*. Performance of a Reactor Coolant System water inventory balance** at least once per 72 hours.     The water inventory balance shall be performed with the plant at steady state conditions.       The provisions   of specification 4.0.4 are not applicable for entry into Mode 4, and
c*.
: e. Monitoring the reactor head flange leakoff system at least once per 24 hours.
Verifying primary-to-secondary leakage is  
= 150 gallons per day through any one steam generator at least once per 72 hours during steady state operation, d*.
Performance of a Reactor Coolant System water inventory balance** at least once per 72 hours.
The water inventory balance shall be performed with the plant at steady state conditions.
The provisions of specification 4.0.4 are not applicable for entry into Mode 4, and
: e.
Monitoring the reactor head flange leakoff system at least once per 24 hours.
4.4.7.2.2 Each Reactor Coolant System Pressure Isolation Valve specified in Table 3.4-1 shall be demonstrated OPERABLE pursuant to Specification 4.0.5 the Inservice Testing Program, except that in lieu of any leakage testing required by Spccification 4.0'.5 the Inservice Testing Program, each valve shall be demonstrated OPERABLE by verifying leakage to be within its limit:
4.4.7.2.2 Each Reactor Coolant System Pressure Isolation Valve specified in Table 3.4-1 shall be demonstrated OPERABLE pursuant to Specification 4.0.5 the Inservice Testing Program, except that in lieu of any leakage testing required by Spccification 4.0'.5 the Inservice Testing Program, each valve shall be demonstrated OPERABLE by verifying leakage to be within its limit:
: a. At least once per 18 months.
: a.
: b. Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 72 hours or moreand if leakage testing has not been performed in the previous 9 months.
At least once per 18 months.
: c. Prior to returning the valve to service following maintenance repair or replacement work on the valve.
: b.
: b. For the Residual Heat Removal and Safety Injection Systems hot and cold leg injection valves and accumulator valves listed     in Table 3.4-1 the testing will be done within 24 hours following valve actuation due to automatic or manual action or flow through the valve.       For all other systems testing will be done once per refueling.
Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 72 hours or moreand if leakage testing has not been performed in the previous 9 months.
The provisions of specification 4.0.4       are not applicable for entry into MODE 3 or 4.
: c.
*Not required     to be completed until   12 hours after establishment of steady state operation.
Prior to returning the valve to service following maintenance repair or replacement work on the valve.
: b.
For the Residual Heat Removal and Safety Injection Systems hot and cold leg injection valves and accumulator valves listed in Table 3.4-1 the testing will be done within 24 hours following valve actuation due to automatic or manual action or flow through the valve.
For all other systems testing will be done once per refueling.
The provisions of specification 4.0.4 are not applicable for entry into MODE 3 or 4.
*Not required to be completed until 12 hours after establishment of steady state operation.
**Not applicable to primary-to-secondary leakage.
**Not applicable to primary-to-secondary leakage.
SALEM -   UNI.T 2                       3/4 4-18                   Amendment No. 2 REACTOR COOLANT. SYSTEM SURVEILLANCE REQUIREMENTS     (Continued)
SALEM -
: a.     Performance of a CHANNEL FUNCTIONAL TEST on the POPS actuation channel, but excluding valve operation, within 31 days prior to entering a condition in which the POPS is required OPERABLE and at least once per 31 days thereafter when the POPS is required OPERABLE.
UNI.T 2 3/4 4-18 Amendment No.
: b.     Performance of a CHANNEL CALIBRATION   on the POPS actuation channel at least once per 18 months.
2 REACTOR COOLANT. SYSTEM SURVEILLANCE REQUIREMENTS (Continued)
: c.     Verifying the POPS isolation valve is open at least once per 72 hours when the POPS is being used for overpressure protection.
: a.
: d.     Testing pursuant to Specification   4.0.5 the Inservice Testing Program.
Performance of a CHANNEL FUNCTIONAL TEST on the POPS actuation channel, but excluding valve operation, within 31 days prior to entering a condition in which the POPS is required OPERABLE and at least once per 31 days thereafter when the POPS is required OPERABLE.
4.4.10.3.2     The RCS vent(s) shall be verified to be open at least   once per 12 hours* when the vent(s) is being used for overpressure protection.
: b.
*Except when the vent pathway is     provided with a valve which is   locked, sealed, or otherwise secured in   the open position,   then verify these valves open at least once per 31 days.
Performance of a CHANNEL CALIBRATION on the POPS actuation channel at least once per 18 months.
SALEM   - UNIT 2                       3/4 4.-32
: c.
Verifying the POPS isolation valve is open at least once per 72 hours when the POPS is being used for overpressure protection.
: d.
Testing pursuant to Specification 4.0.5 the Inservice Testing Program.
4.4.10.3.2 The RCS vent(s) shall be verified to be open at least once per 12 hours* when the vent(s) is being used for overpressure protection.
*Except when the vent pathway is provided with a valve which is locked, sealed, or otherwise secured in the open position, then verify these valves open at least once per 31 days.
SALEM -
UNIT 2 3/4 4.-32


REACTOR COOLANT SYSTEM 3.4.11   STRUCTURAL INTEGRITY ASME CODE CLASS 1, 2 and 3 COMPONENTS LIMITING CONDITION FOR OPERATION 3.4.11.1   The structural integrity     of ASME Code Class 1, 2 and 3 components shall be maintained in accordance with Specification 4.4.11.1.
REACTOR COOLANT SYSTEM 3.4.11 STRUCTURAL INTEGRITY ASME CODE CLASS 1, 2 and 3 COMPONENTS LIMITING CONDITION FOR OPERATION 3.4.11.1 The structural integrity of ASME Code Class 1, 2 and 3 components shall be maintained in accordance with Specification 4.4.11.1.
APPLICABILITY:   ALL MODES.
APPLICABILITY:
ALL MODES.
ACTION:
ACTION:
: a. With the structural integrity       of any ASME Code Class 1 component(s) not conforming to the above requirements, restore the structural integrity       of the affected component(s) to within its limit or isolate     the affected component(s) prior to increasing the Reactor Coolant System temperature more than 50'F above the minimum temperature required by NDT considerations.
: a.
: b. With the structural integrity       of any ASME Code Class 2 component(s). not conforming to the above requirements, restore the structural integrity       of the affected component(s) to within its limit or isolate     the affected component(s) prior to increasing the Reactor Coolant System temperature above 200'F.
With the structural integrity of any ASME Code Class 1 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) prior to increasing the Reactor Coolant System temperature more than 50'F above the minimum temperature required by NDT considerations.
: c. With the structural integrity       of any ASME Code Class 3 component(s) not conforming to the above requirements, restore the structural integrity       of the affected component(s) to within its limit or isolate the affected component(s) from service.
: b.
SURVEILLANCE REQUIREMENTS 4.4.11.1     In addition to the requirements of Spccification 4.0.5 the Inservice Inspection Program, each Reactor Coolant Pump flywheel shall be inspected per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, August 1975. In lieu of Position C.4.b(1) and C.4.b(2), a qualified in-place UT examination over the volume from the inner bore of the flywheel to the circle one-half of the outer radius or a surface examination (MT and/or PT) of exposed surfaces of the removed 'flywheels may be conducted at 20 year intervals.
With the structural integrity of any ASME Code Class 2 component(s). not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) prior to increasing the Reactor Coolant System temperature above 200'F.
4.4.11.2   Augmented Inservice Inspection Program for Steam Generator Channel Heads - The No. 21 Steam Generator channel head shall be ultrasonically inspected in a selected area during each of the first         three refueling outages using the same ultrasonic inspection procedures and equipment used to generate the baseline data. These inservice ultrasonic inspections shall verify that the cracks observed in the stainless steel cladding prior to operation have not propagated into-the base material.
: c.
SALEM - UNIT 2                             3/4 4-33                       Amendment No. 2-5-9
With the structural integrity of any ASME Code Class 3 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) from service.
SURVEILLANCE REQUIREMENTS 4.4.11.1 In addition to the requirements of Spccification 4.0.5 the Inservice Inspection Program, each Reactor Coolant Pump flywheel shall be inspected per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, August 1975.
In lieu of Position C.4.b(1) and C.4.b(2),
a qualified in-place UT examination over the volume from the inner bore of the flywheel to the circle one-half of the outer radius or a surface examination (MT and/or PT) of exposed surfaces of the removed 'flywheels may be conducted at 20 year intervals.
4.4.11.2 Augmented Inservice Inspection Program for Steam Generator Channel Heads -
The No.
21 Steam Generator channel head shall be ultrasonically inspected in a selected area during each of the first three refueling outages using the same ultrasonic inspection procedures and equipment used to generate the baseline data.
These inservice ultrasonic inspections shall verify that the cracks observed in the stainless steel cladding prior to operation have not propagated into-the base material.
SALEM -
UNIT 2 3/4 4-33 Amendment No.
2-5-9


EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS       (Continued)
EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
: f. By verifying that each of the following pumps develops the indicated Total Dynamic Head (TDH) when tested at the test         flow point pursuant to Spceificatizn 4.0.5 the Inservice Testing Program:
: f.
: 1.       Centrifugal Charging pump           2338 psi TDH
By verifying that each of the following pumps develops the indicated Total Dynamic Head (TDH) when tested at the test flow point pursuant to Spceificatizn 4.0.5 the Inservice Testing Program:
: 2.       Safety Injection pump               1369 psi TDH
: 1.
: 3.       Residual Heat Removal pump           165 psi TDH
Centrifugal Charging pump
: g. By verifying the correct position of each of the following ECCS throttle   valves,:
: 2.
: 1.       Within 4 hours following completion of each valve stroking operation or maintenance on the valve when the ECCS subsystems are required to-be OPERABLE.
Safety Injection pump
: 2.       At least once per 18 months.
: 3.
HPSI System                       LPSI System Valve Number                      Valve Number 21 SJ   16                       21  SJ 138 22 SJ   16                       22  SJ 138 23 SJ   16                       23  SJ 138 24 SJ   16                       24 SJ 138 21 SJ 143 22 SJ 143 23 SJ 143 24 SJ 143
Residual Heat Removal pump 2338 psi TDH 1369 psi TDH 165 psi TDH
: h. By performing a flow balance test,     during shutdown, following completion of modifications to the ECCS subsystems that alter the subsystem flow characteristics and verifying that.:
: g.
: 1. For Safety Injection pumps,     with a single pump running:
By verifying the correct position of each of the following ECCS throttle valves,:
a)   The sum of the injection line flow rates,     excluding the highest flow rate, is &#x17d; 453 gpm, and b)   The total   flow rate through all   four injection lines is &#x17d; 647 gpm, and c)   The difference between any pair of injection line flow rates is
: 1.
* 12.0 gpm, and d)   The total   pump flow rate is
Within 4 hours following completion of each valve stroking operation or maintenance on the valve when the ECCS subsystems are required to-be OPERABLE.
* 664 gpm in the cold leg alignment, and e)   The total   pump flow rate is
: 2.
* 654 gpm in the hot leg alignment.
At least once per 18 months.
SALEM-- UNIT 2                           3/4 5-6                 Amendment No. 444
HPSI System Valve Number LPSI System Valve Number 21 SJ 16 22 SJ 16 23 SJ 16 24 SJ 16 21 SJ 22 SJ 23 SJ 24 SJ 21 SJ 22 SJ 23 SJ 24 SJ 138 138 138 138 143 143 143 143
: h.
By performing a flow balance test, completion of modifications to the the subsystem flow characteristics during shutdown, following ECCS subsystems that alter and verifying that.:
: 1.
For Safety Injection pumps, with a single pump running:
a)
The sum of the injection line flow rates, excluding the highest flow rate, is  
&#x17d; 453 gpm, and b)
The total flow rate through all four injection lines is  
&#x17d; 647 gpm, and c)
The difference between any pair of injection line flow rates is
* 12.0 gpm, and d)
The total pump flow rate is
* 664 gpm in the cold leg alignment, and e)
The total pump flow rate is
* 654 gpm in the hot leg alignment.
SALEM-- UNIT 2 3/4 5-6 Amendment No.
444


3/4.6.2   DEPRESSURIZATION AND COOLING SYSTEMS CONTAINMENT   SPRAY SYSTEM LIMITING CONDITION FOR OPERATION
3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS CONTAINMENT SPRAY SYSTEM LIMITING CONDITION FOR OPERATION
.3.6.2.1 Two independent containment spray systems shall be OPERABLE with each spray system capable of taking suction from the RWST and transferring suction to the RHR. pump discharge.
.3.6.2.1 Two independent containment spray systems shall be OPERABLE with each spray system capable of taking suction from the RWST and transferring suction to the RHR. pump discharge.
APPLICABILITY:         MODES 1, 2, 3 and 4.
APPLICABILITY:
MODES 1, 2, 3 and 4.
ACTION:
ACTION:
With one containment spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours; restore the inoperable spray system to OPERABLE status within the next 48 hours or be in COLD SHUTDOWN within the following 30 hours.
With one containment spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours; restore the inoperable spray system to OPERABLE status within the next 48 hours or be in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE REQUIREMENTS 4.6.2.1   Each containment spray system shall be demonstrated OPERABLE:
SURVEILLANCE REQUIREMENTS 4.6.2.1 Each containment spray system shall be demonstrated OPERABLE:
: a. At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its       correct position.
: a.
: b. By verifying, that on recirculation flow, each pump develops a differential     pressure of greater than or equal to 204 psid when tested pursuant to Specificatien 4.0.5 the Inservice Testing Program.
At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
: c. At least     once per 18 months during shutdown,   by:
: b.
: 1.         Verifying that each automatic valve in the flow path actuates to its correct position on a Containment High-High pressure test signal.
By verifying, that on recirculation flow, each pump develops a differential pressure of greater than or equal to 204 psid when tested pursuant to Specificatien 4.0.5 the Inservice Testing Program.
: 2.         Verifying each spray pump starts   automatically on a Containment High-High pressure test   signal.
: c.
: d. Following activities       that could result in nozzle blockage, either evaluate the work performed to determine the impact to the containment spray system, or perform an air       or smoke flow test through each spray header and verifying each spray nozzle is unobstructed.
At least once per 18 months during shutdown, by:
SALEM - UNIT 2                               3/4 6-10         Amendment No.. 2 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS     (Continued) 4.6.3.2   Each containment isolation valve shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by:
: 1.
: a. Verifying that on a Phase A containment isolation test         signal, each Phase A isolation valve actuates to its     isolation position.
Verifying that each automatic valve in the flow path actuates to its correct position on a Containment High-High pressure test signal.
: b. Verifying that on a Phase B containment isolation test         signal, each Phase B isolation valve actuates to its     isolation position.
: 2.
: c. NOT USED
Verifying each spray pump starts automatically on a High-High pressure test signal.
: d. Verifying that on a Containment Purge and Pressure-Vacuum Relief isolation test signal,.each required Purge and each Pressure-Vacuum Relief valve actuates to its     isolation position.
: d.
: e. Verifying that the Containment Pressure-Vacuum Relief Isolation valves are limited to = 60' opening angle..
Following activities that could result in nozzle blockage, evaluate the work performed to determine the impact to the spray system, or perform an air or smoke flow test through header and verifying each spray nozzle is unobstructed.
4.6.3.3   At least   once per 18 months, verify that on a main steam isolation test signal, each main steam isolation valve actuates to its       isolation position.
Containment either containment each spray SALEM -
4.6.3.4   *The isolation time of each power operated or automatic containment isolation valve shall be determined to be within its limit when tested pursuant to Spcifiecation 4;.0.5 the Inservice Testing Program.
UNIT 2 3/4 6-10 Amendment No..
4.6.3.5   Each required containment purge isolation valve shall be demonstrated OPERABLE within 24 hours after       each closing of the valve, except when the valve is being used for. multiple cyclings, then at least once per 72 hours, by verifying that when the measured leakage rate is added to the leakage rates determined pursuant to Specification 4.6.1.2.b for all   other Type B and C penetrations, the combined leakage rate is less than or equal to 0.60La.
2 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.6.3.2 Each containment isolation valve shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by:
4.6.3..6   A pressure drop test     to identify excessive degradation of resilient valve seals shall be conducted on the:
: a.
: a. Required Containment Purge Supply and Exhaust Isolation Valves at least once per 6 months.
Verifying that on a Phase A containment isolation test
: b. Deleted.
: signal, each Phase A isolation valve actuates to its isolation position.
4.6.3.7       The required containment purge supply and exhaust isolation valves shall be determined closed at least once per 31 days.
: b.
SALEM-- UNIT 2                           3/.4 6-15                 Amendment No.260
Verifying that on a Phase B containment isolation test
: signal, each Phase B isolation valve actuates to its isolation position.
: c.
NOT USED
: d.
Verifying that on a Containment Purge and Pressure-Vacuum Relief isolation test signal,.each required Purge and each Pressure-Vacuum Relief valve actuates to its isolation position.
: e.
Verifying that the Containment Pressure-Vacuum Relief Isolation valves are limited to = 60' opening angle..
4.6.3.3 At least once per 18 months, verify that on a main steam isolation test signal, each main steam isolation valve actuates to its isolation position.
4.6.3.4  
*The isolation time of each power operated or automatic containment isolation valve shall be determined to be within its limit when tested pursuant to Spcifiecation 4;.0.5 the Inservice Testing Program.
4.6.3.5 Each required containment purge isolation valve shall be demonstrated OPERABLE within 24 hours after each closing of the valve, except when the valve is being used for. multiple cyclings, then at least once per 72 hours, by verifying that when the measured leakage rate is added to the leakage rates determined pursuant to Specification 4.6.1.2.b for all other Type B and C penetrations, the combined leakage rate is less than or equal to 0.60La.
4.6.3..6 A pressure drop test to identify excessive degradation of resilient valve seals shall be conducted on the:
: a.
Required Containment Purge Supply and Exhaust Isolation Valves at least once per 6 months.
: b.
Deleted.
4.6.3.7 The required containment purge supply and exhaust isolation valves shall be determined closed at least once per 31 days.
SALEM-- UNIT 2 3/.4 6-15 Amendment No.260


3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE SAFETY VALVES LIMITING CONDITION FOR OPERATION 3.7.1.1   All main steam line code safety valves (MSSVs) associated with each steam generator shall be OPERABLE with lift     settings as specified in Table 3.7-4,.
3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE SAFETY VALVES LIMITING CONDITION FOR OPERATION 3.7.1.1 All main steam line code safety valves (MSSVs) associated with each steam generator shall be OPERABLE with lift settings as specified in Table 3.7-4,.
APPLICABILITY:   MODES 1, 2 and 3.
APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
ACTION:
: a. With one or two main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1, 2 and 3 may proceed provided, that within 4 hours, either the inoperable valve is restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
: a.
: b. With three main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1, .2 and 3 may proceed?.
With one or two main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1, 2 and 3 may proceed provided, that within 4 hours, either the inoperable valve is restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
: b.
With three main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1,.2 and 3 may proceed?.
provided, that within 4 hours, either the inoperable valves are restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1 and within 36 hours, reduce the Power Range Neutron Flux High'trip setpoint to less than or equal to the RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
provided, that within 4 hours, either the inoperable valves are restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1 and within 36 hours, reduce the Power Range Neutron Flux High'trip setpoint to less than or equal to the RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
SURVEILLANCE REQUIREMENTS 4.7.1-1       Verify each required MSSV lift   setpoint per Table 3.7-4. No additional Surveillance Requirements other than those required by Spccifizaticn 4.0.5 the Inservice Testing Program.
SURVEILLANCE REQUIREMENTS 4.7.1-1 Verify each required MSSV lift setpoint per Table 3.7-4.
SALEM - UNIT 2                         3/4 7-1                 Amendment No. 2-2-5
No additional Surveillance Requirements other than those required by Spccifizaticn 4.0.5 the Inservice Testing Program.
SALEM - UNIT 2 3/4 7-1 Amendment No.
2-2-5


PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.5     Each main steam line isolation valve shall be OPERABLE.
PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.5 Each main steam line isolation valve shall be OPERABLE.
APPLICABILITY:   MODES 1, 2 and 3.
APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
ACTION:
MODES 1 -   With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is either restored to OPERABLE status or closed within 4 hours; Otherwise,   be in MODE 2 within the next 6 hours.
MODES 1 -
MODES 2 With one or more main steam -line isolation valve(s) inoperable, and 3       subsequent operation in MODES 2 or 3 may proceed provided;
With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is either restored to OPERABLE status or closed within 4 hours; Otherwise, be in MODE 2 within the next 6 hours.
: a. The isolation valve(s)   is (are) maintained closed, and
MODES 2 With one or more main steam -line isolation valve(s) inoperable, and 3 subsequent operation in MODES 2 or 3 may proceed provided;
: b. The isolation valve(s)   is (are) verified closed once per 7 days.. -
: a.
Otherwise, be in MODE 3, HOT STANDBY, within the next 6 hours,       and MODE 4, HOT SHUTDOWN, within the following 6 hours.
The isolation valve(s) is (are) maintained closed, and
SURVEILLANCE REQUIREMENTS 4.7.1.5   - Each main steam line isolation valve shall be demonstrated OPERABLE by verifying full   closure within 5 seconds when tested pursuant to Spocifieaticn 4.0.5 the Inservice Testing Program.     The provisions of Specification 4.0.4 are not applicable.
: b.
SALEM - UNIT 2                           3/4 7-10                 Amendment   No.. 2-0-6
The isolation valve(s) is (are) verified closed once per 7 days..
Otherwise, be in MODE 3, HOT STANDBY, within the next 6 hours, and MODE 4, HOT SHUTDOWN, within the following 6 hours.
SURVEILLANCE REQUIREMENTS 4.7.1.5  
- Each main steam line isolation valve shall be demonstrated OPERABLE by verifying full closure within 5 seconds when tested pursuant to Spocifieaticn 4.0.5 the Inservice Testing Program.
The provisions of Specification 4.0.4 are not applicable.
SALEM -
UNIT 2 3/4 7-10 Amendment No..
2-0-6


PLANT SYSTEMS 3/4.7.9   SNUBBERS LIMITING CONDITION FOR OPERATION 3.7.9   All snubbers shall be OPERABLE.
PLANT SYSTEMS 3/4.7.9 SNUBBERS LIMITING CONDITION FOR OPERATION 3.7.9 All snubbers shall be OPERABLE.
APPLICABILITY:   MODES 1, 2, 3 and 4.     (MODES 5 and 6 for snubbers located on systems required OPERABLE in those MODES).
APPLICABILITY:
MODES 1, 2, 3 and 4.
(MODES 5 and 6 for snubbers located on systems required OPERABLE in those MODES).
ACTION:
ACTION:
With one or more snubbers inoperable, within 72 hours, replace or restore the inoperable snubber(s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.9c on the supported component or declare the supported system inoperable and follow appropriate ACTION statement for that system.
With one or more snubbers inoperable, within 72 hours, replace or restore the inoperable snubber(s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.9c on the supported component or declare the supported system inoperable and follow appropriate ACTION statement for that system.
SURVEILLANCE REQUIREMENTS 4.7.9 Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program in addition to the regular Inservice Inspection Program requirements-e# Spccificaticn 4.0.5.
SURVEILLANCE REQUIREMENTS 4.7.9 Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program in addition to the regular Inservice Inspection Program requirements-e# Spccificaticn 4.0.5.
: a. Visual Inspection All snubbers shall be categorized into two groups:     those accessible and those inaccessible during reactor operation.. The visual inspection interval for each category of snubbers -shall be determined based upon the criteria provided inTable 4.7-3.
: a.
SALEM - UNIT 2                         3/4 7-23                 Amendment No. 44.1
Visual Inspection All snubbers shall be categorized into two groups:
those accessible and those inaccessible during reactor operation..
The visual inspection interval for each category of snubbers -shall be determined based upon the criteria provided inTable 4.7-3.
SALEM -
UNIT 2 3/4 7-23 Amendment No.
44.1


REFUELING OPERATIONS LOW WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.2     Two independent Residual Heat   Removal (RHR) loops shall be   OPERABLE.*
REFUELING OPERATIONS LOW WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.2 Two independent Residual Heat Removal (RHR) loops shall be OPERABLE.*
APPLICABILITY:       MODE 6 when water level above the top of the reactor pressure vessel flange is less than 23 feet.
APPLICABILITY:
MODE 6 when water level above the top of the reactor pressure vessel flange is less than 23 feet.
ACTION:
ACTION:
: a. With less than the required RHR loops operable, immediately initiate corrective action to return the required RHR loops to OPERABLE status as soon as possible.
: a.
: b. The provisions of Specification 3.0.3 are not applicable.
With less than the required RHR loops operable, immediately initiate corrective action to return the required RHR loops to OPERABLE status as soon as possible.
SURVEILLANCE   REQUIREMENTS 4.9.8.2     The required Residual Heat Removal loops shall be determined OPERABLE per Cpccification 4.0.5 the Inservice Testing Program.
: b.
The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE REQUIREMENTS 4.9.8.2 The required Residual Heat Removal loops shall be determined OPERABLE per Cpccification 4.0.5 the Inservice Testing Program.
* Systems supporting RHR loop operability may be excepted as follows:
* Systems supporting RHR loop operability may be excepted as follows:
: a. The normal or emergency power source may be inoperable.
: a.
SALEM - UNIT 2                       3/4 9-9                 Amendment No. 4-
The normal or emergency power source may be inoperable.
SALEM -
UNIT 2 3/4 9-9 Amendment No.
4-


ADMINISTRATIVE CONTROLS
ADMINISTRATIVE CONTROLS
: c. Records of radiation exposure for all       individuals entering radiation control areas.
: c.
: d. Records of gaseous and liquid radioactive material released to the environs..
Records of radiation exposure for all individuals entering radiation control areas.
: e. Records of transient or operational       cycles for those facility components identified in Table 5.7-1.
: d.
: f. Records of reactor   tests   and experiments.
Records of gaseous and liquid radioactive material released to the environs..
: g. Records of training and qualification for current members of the plant staff.
: e.
: h. Records of in-service       inspections performcd pursuant to these Technical Specifications.
Records of transient or operational cycles for those facility components identified in Table 5.7-1.
: i. Records of Quality Assurance activities       required by the QA Manual..
: f.
: j. DELETED k.. Records of SORC meetings and activities       of the Nuclear Review Board (and activities     of its   predecessor, the Offsite Safety Review
Records of reactor tests and experiments.
            .(OSR) staff).
: g.
: 1. Records for Environmental Qualification which are covered under the provisions of Paragraph 2.C(7) and 2.C(8) of Facility Operating License DPR-75.
Records of training and qualification for current members of the plant staff.
: m. Records of the service lives of all       hydraulic and mechanical snubbers including the date at which the service life         commences and associated installation     and maintenance records.
: h.
: n. Records   of secondary water sampling and water quality.
Records of in-service inspections performcd pursuant to these Technical Specifications.
: o. Records of analyses required by the radiological environmental monitoring program which would permit evaluation of-the accuracy of the analysis at a later     date. This should include procedures effective at specified times and QA records showing that these procedures were followed.
: i.
: p. Records of reviews performed for changes made to the 0FFSITE DOSE CALCULATION MANUAL and the PROCESS CONTROL PROGRAM.
Records of Quality Assurance activities required by the QA Manual..
6.11 RADIATION PROTECTION     PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.
: j.
SALEM - UNIT 2                           6-26                       Amendment No.. 2-1h
DELETED k..
Records of SORC meetings and activities of the Nuclear Review Board (and activities of its predecessor, the Offsite Safety Review
.(OSR) staff).
: 1.
Records for Environmental Qualification which are covered under the provisions of Paragraph 2.C(7) and 2.C(8) of Facility Operating License DPR-75.
: m.
Records of the service lives of all hydraulic and mechanical snubbers including the date at which the service life commences and associated installation and maintenance records.
: n.
Records of secondary water sampling and water quality.
: o.
Records of analyses required by the radiological environmental monitoring program which would permit evaluation of-the accuracy of the analysis at a later date.
This should include procedures effective at specified times and QA records showing that these procedures were followed.
: p.
Records of reviews performed for changes made to the 0FFSITE DOSE CALCULATION MANUAL and the PROCESS CONTROL PROGRAM.
6.11 RADIATION PROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.
SALEM -
UNIT 2 6-26 Amendment No.. 2-1h


ADMIK STFATI.'E   CONYRCI.
ADMIK STFATI.'E CONYRCI.
6.8.4.j           iNSERVICE TESTING   PROGRATM This Program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components.     The program shall include the following:
6.8.4.j iNSERVICE TESTING PROGRATM This Program provides controls for inservice testing of ASME Code Class 1, 2,
and 3 components.
The program shall include the following:
: a. Testing frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda as follows:
: a. Testing frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda as follows:
ASME OM Code and applicable                             Required Frequencies for Addenda terminology for                                 performing inservice inservice testing activities                             testing activities Weekly                                                  At least once per 7 days Monthly                                                  At least once per 31 days Quarterly or every 3 months                              At least once per 92 days Semiannually or every 6 months                          At least once per 184 days Every 9 months                                          At least once per 276 days Yearly or annually                                      At least once per 366 days Biennially or every 2 years                              At least once per 731 days
ASME OM Code and applicable Addenda terminology for inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice testing activities At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days
: b. The provisions of     Specification 4.0.2 are applicable to the above required frequencies     and to other normal and accelerated frequencies specified as 2 years     or less in the Inservice Testing Program for performing inservice     testing activities,
: b. The provisions of Specification 4.0.2 are applicable to the above required frequencies and to other normal and accelerated frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities,
: c. The provisions of Specification           4.0.3 are applicable to inservice testing activities,     and
: c.
: d. Nothing in the ASME OM Code shall be construed to supersede the requirements of any Technical Specification.
The provisions of Specification 4.0.3 are applicable to inservice testing activities, and
SALEM -   UNIT 2                       6-19g                           Amendment No.
: d.
Nothing in the ASME OM Code shall be construed to supersede the requirements of any Technical Specification.
SALEM -
UNIT 2 6-19g Amendment No.


LR-N09-0218                                   Attachment 3 TECHNICAL SPECIFICATION BASES PAGES WITH PROPOSED CHANGES (Provided for INFORMATION ONLY)
LR-N09-0218 TECHNICAL SPECIFICATION BASES PAGES WITH PROPOSED CHANGES (Provided for INFORMATION ONLY)


APPLICABILITY BASES Specification 4.G.5 establishes the requirement tha.t             nservie
APPLICABILITY BASES Specification 4.G.5 establishes the requirement tha.t nservie inpe.t.on of ASME Code Class 1, 2, and 3 eomponents and inservice testing of ASME Code Close 1, 2, and 3 pufps e ned valves shall be performed in aecordance with a paeriodiceally updiatedl version of Section X1 of the ASME Boiler andl Praessur-e essel Code and Addenda as required by 10 CFR 50.55a.
                                                                  ..        inpe.t.on of ASME Code Class 1, 2, and 3 eomponents and inservice testing of ASME Code Close 1, 2, and 3 pufpse ned valves shall be performed in aecordance with a paeriodiceally updiatedl version of Section X1 of the ASME Boiler andl Praessur-e essel Code and Addenda as required by 10 CFR 50.55a.             These requirements app.ly e       ..when relief has been provided in writing bay the Csission.
These requirements app.ly e pt. when relief has been provided in writing bay the Csission.
pt.
This specification includes a clarification ef the frequencies for p.erfom***ting the inserviec inspeetion and testing activities required by Section XI of the AS.E Boiler and. Pr.essur.e Vessel Ce an applicable Addenda.
This specification includes a clarification           ef the frequencies for p.erfom***ting the inserviec inspeetion and testing activities             required by Section XI of the AS.E Boiler and. Pr.essur.e Vessel Ce           an applicable Addenda.     This clar~ificatio:n is prov&#xfd;&#xfd;ided to ensurce consistency in surcveillance intercvals thro*ue.hou the Technical Specifications and to i=ermve any ambiguities relative to the frequencies for performing the requir4:erd- inservice inspection and testing activities.
This clar~ificatio:n is prov&#xfd;&#xfd;ided to ensurce consistency in surcveillance intercvals thro*ue.hou the Technical Specifications and to i=ermve any ambiguities relative to the frequencies for performing the requir4:erd-inservice inspection and testing activities.
Under the terms of this specification, the more restrictive requirements ef the Technical Specifications take precedence over the ASME Boiler and Pressure Vessel Code and a pplicabld Addilenda.         The reqirmen         .f Specification 4.0.4 to perform surveillance activities             before entry into an OPEPRTIONAL&#xfd;     ODE e-r ot-her specimfiedi condition takees prcecedence over- the ASME Boiler- and Pri~ssur~e Vessel Codle proevision which allows paumfps andl valves to be tested uap to o ne week a;ft-er r-eturnn to normL Iffal opercation.. The Technfical Speceification diefinition of GPERAT,       does not allow a grace period       befere a   com.tponent;.., th.at is   not capable of performing its specified fuidt.ion,           is d*eclared ifper&#xfd;a*le andl takes pr~eeiee     e ver the ASME Boiler- and Pr-essure Vessel Codie provision whic.h al.lows a valve to be       incapable of performing its specified function f*r uap to 24 hourais beforce beingj declaredi inopercable.
Under the terms of this specification, the more restrictive requirements ef the Technical Specifications take precedence over the ASME Boiler and Pressure Vessel Code and a pplicabld Addilenda.
SALEM - UNIT 1                             B 3/4 0-9                       Amendment No.2-7-6
The reqirmen  
.f Specification 4.0.4 to perform surveillance activities before entry into an OPEPRTIONAL&#xfd; ODE e-r ot-her specimfiedi condition takees prcecedence over-the ASME Boiler-and Pri~ssur~e Vessel Codle proevision which allows paumfps andl valves to be tested uap to o ne week a;ft-er r-eturnn to normL Iffal opercation..
The Technfical Speceification diefinition of GPERAT, does not allow a grace period befere a com.tponent;..,
th.at is not capable of performing its specified fuidt.ion, is d*eclared ifper&#xfd;a*le andl takes pr~eeiee e ver the ASME Boiler-and Pr-essure Vessel Codie provision whic.h al.lows a valve to be incapable of performing its specified function f* r uap to 24 hourais beforce beingj declaredi inopercable.
SALEM -
UNIT 1 B 3/4 0-9 Amendment No.2-7-6


APPLI2ABLTY BASES
APPLI2ABLTY BASES
__.........____-_....._            :ostbishes       Tho reuirement             that :nr,:-oO.       inso_ ctiTr   of AqE1 2od: 2l::               1, 2, aond B o3muontonts aondi               o           ::
:ostbishes Tho reuirement that :nr,:-oO. inso_
Eesilng of .f_4_SM4E- Sods Glass !, 2, and 3 pump: and voI-alves shall                           pe pf             e   n     oanc         it per-Jeel-'elly apdiateei norrionF of Seetroe XIw of :oh: rASMZB ~e:11r- anei::u Vessel Code and Addenda as required by 10 CFR 50.55a.                                     These requirent:
ctiTr of AqE1 2od: 2l::
apply exeept when relief                   has been provided in     +/-       ritiRg by the ommi:ssion.
1, 2,
This specifiatio                 in.lud..     a eolarifieation of the frequrencles: fer performing the inservieo inspection and testing                                     .     rrgusr'd
aond B o3muontonts aondi o
                                                                                    .tivitie:by Se-tin&#xfd; XY of the
:: Eesilng of.f_4_SM4E-Sods Glass !,
...SM. Bilr r..d Pr..ur.                   Vessel     d...       adpliorable Addenda.             This clarification             is provided to ensure consistency in surveillane: intervals throughout the Tea                     l   Specifications and to^ remove any ambiguities relative to the freouencies for performing the required inservic: inspectionr and testing activities.
2, and 3 pump: and voI-alves shall pe pf e
Jndori t&#xfd;ho teLrm:i         of this speeifioratien, the ffor:~ r-estriative Y-qoguefteiromno                     of the Tochnica! Specifications take precedence over the ASME Beoiler and Pressure Vessel Code andi pplirbi: Addnda. The r....ire.ot...                                         oef.
n oanc it per-Jeel-'elly apdiateei norrionF of Seetroe XIw of :oh: rASMZB ~e:11r-anei::u Vessel Code and Addenda as required by 10 CFR 50.55a.
Specificatio.n 4.0.4 to perfom :-rvellanoo.       .                  a.tiviti: befe-.. entry into an OPERATIONAL DqODE; or other specified eondition takes preedoeneo                         ovr         the 4&#xfd;SE Boiler and Pr.ssur:
These requirent:
loseel Cod. provision whieh allows pump:s .... d                             .. lv:to     b: test-l     up to   n:
apply exeept when relief has been provided in  
weeoa           after   return to normal operation.               The Teehnical Spe::ification definition of OPERJABLE does niot allow a grace period before a component, that is net capablc of performing its                     sp.. ifi.. fnti...n.         is doelaaod inoperable and takes precedence over the ACME Boielr and Pressure Vessel Code provision which allows a valve to be incapable of performinfg its                                   specified funrtion for upf to 24 h.ur. boefr being declared inoperable.
+/-
SALEM - UNIT 2                                             B 3/4 0-9                             Amendment No.       2-5-4}}
ritiRg by the ommi:ssion.
This specifiatio in.lud..
a eolarifieation of the frequrencles:
fer performing the inservieo inspection and testing  
.tivitie:
rrgusr'd by Se-tin&#xfd; XY of the
...SM. Bilr r..d Pr..ur.
Vessel d...
ad pliorable Addenda.
This clarification is provided to ensure consistency in surveillane: intervals throughout the Tea l
Specifications and to^ remove any ambiguities relative to the freouencies for performing the required inservic: inspectionr and testing activities.
Jndori t&#xfd;ho teLrm:i of this speeifioratien, the ffor:~ r-estriative Y-qoguefteiromno of the Tochnica! Specifications take precedence over the ASME Beoiler and Pressure Vessel Code andi pplirbi: Addnda. The r....ire.ot...
oef.
Specificatio.n 4.0.4 to perfom :-rvellanoo.
a.tiviti: befe-.. entry into an OPERATIONAL DqODE; or other specified eondition takes preedoeneo ovr the 4&#xfd;SE Boiler and Pr.ssur:
loseel Cod. provision whieh allows pump:s  
.... d  
.. lv:to b: test-l up to n:
weeoa after return to normal operation.
The Teehnical Spe::ification definition of OPERJABLE does niot allow a grace period before a component, that is net capablc of performing its sp..
ifi..
fnti...n.
is doelaaod inoperable and takes precedence over the ACME Boielr and Pressure Vessel Code provision which allows a valve to be incapable of performinfg its specified funrtion for upf to 24 h.ur. boefr being declared inoperable.
SALEM -
UNIT 2 B 3/4 0-9 Amendment No.
2-5-4}}

Latest revision as of 09:01, 14 January 2025

Unit 2 - License Amendment Request (LAR) S09-06 Revision to Technical Specification 4.0.5, Surveillance Requirements for Inservice Inspection and Testing of ASME Code Components
ML092790463
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/23/2009
From: Braun R
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N09-0218
Download: ML092790463 (53)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236

(@ PSEG Nuclear LLC 10 CFR 50.90 SEP 2 3 2009 LR-N09-0218 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 SALEM GENERATING STATION - UNIT 1 AND UNIT 2 FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR 75 NRC DOCKET NOS. 50-272 AND 50-311

Subject:

LICENSE AMENDMENT REQUEST (LAR) S09-06 REVISION TO TECHNICAL SPECIFICATION 4.0.5, SURVEILLANCE REQUIREMENTS FOR INSERVICE INSPECTION AND TESTING OF ASME CODE COMPONENTS In accordance with the provisions of 10 CFR 50.90, PSEG Nuclear, LLC (PSEG) hereby requests an amendment of the Technical Specifications (TS) for Salem Generating Station Unit 1 and Unit 2.

This license amendment request proposes changes for consistency with the requirements of 10 CFR 50.55a(f)(4) for inservice testing of pumps and valves, and removes TS requirements that are redundant to the requirements of 10 CFR 50.55a.

TS 4.0.5 would be revised consistent with NRC-approved Technical Specification Task Force (TSTF) Travelers TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a," TSTF 497, Revision 0," Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less," and NUREG-1431, "Standard Technical Specifications, Westinghouse Plants, Revision 3.0."

PSEG has determined that this LAR does not involve a significant hazard consideration as determined per 10 CFR 50.92. PSEG's technical and regulatory evaluation of this LAR, the TS changes, and the TS Bases changes (for information only), are provided in Attachments 1, 2 and 3. There are no regulatory commitments contained in this submittal.

The changes in this LAR are not required to address an immediate safety concern.

PSEG requests approval of this LAR no later than October 30, 2010. Once approved, the amendment will be implemented within 60 days from the date of qI issuance.

%-o

Document Control Desk 2

LR-N09-0218 Should you have any questions regarding this submittal, please contact Mr. Jeff Keenan at (856) 339-5429.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on 9/A S/0 9 (Date)

Sincerely, Robert C. Braun Site Vice President Salem Generating Station Attachments (3)

CC S. Collins, Regional Administrator - NRC Region I R. Ennis, Project Manager - USNRC NRC Senior Resident Inspector - Salem P. Mulligan, Manager IV, NJBNE Commitment Coordinator - Salem PSEG Corporate Commitment Manager

LR-N09-0218 SALEM GENERATING STATION - UNIT 1 and Unit 2

-DOCKET NOS. 50-272 and 50-311 LICENSE AMENDMENT REQUEST LAR S09-06 REVISION TO TECHNICAL SPECIFICATION 4.0.5, SURVEILLANCE REQUIREMENTS FOR INSERVICE INSPECTION AND TESTING-OF ASME CODE COMPONENTS Table of Contents

1.

DESCRIPTION 1

2.

PR O PO S ED C HA N G E.....................................................................................

1

3.

BA C K G R O U N D........................................................................

.................... 3

4.

TEC H N ICA L A NA LY S IS............................................................................. 4

5.

REGULATORY SAFETY ANALYSIS..........................

......................................... 5 5.1 No Significant Hazards Consideration.........

.......................... 5 5.2, Applicable Regulatory Requirements/Criteria..........................................

7 5.3 P re ce d e nts................

..........,................................................................ 7 5.4 C onclusions..

..... 7

6.

ENVIRONM ENTAL CONSIDERATION..................................................................

8

7.

REFERENCES..............................................

8

LR-N09-0218

1.0 DESCRIPTION

This submittal requests an amendment to Technical Specification (TS) 4.0.5 of Facility Operating License Nos. DPR-70 and DPR-75, Salem Units 1 and 2. TS 4.0.5, Surveillance Requirements for Inservice Inspections and Testing of ASME Code Components, would be revised to (1) update references to the source of requirements for inservice testing of ASME Code Class 1, 2, and 3 pumps and valves and (2) to address the applicability of Surveillance Requirement (SR) 4.0.2 to some non-standard pump and valve testing frequencies. In addition, the revised inservice testing requirements would be relocated to Section 6.0 of TS, while the inservice inspection requirements would be removed from TS as they are redundant to the existing 10 CFR 50.55a ISI Program. The proposed changes are consistent with1 NRC-approved Technical Specification Task Force (TSTF) Travelers TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a," (Reference 1), TSTF 497, Revision 0, " Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less,"

(Reference 2), and NUREG-1431, "Standard Technical Specifications (STS),

Westinghouse Plants, Revision 3.0".

2.0 PROPOSED CHANGE

The proposed changes to TS 4.0.5 would provide consistency with (i) TSTF 479, (ii)

TSTF 497, and (iii) NUREG-1431:

(i) TSTF-479 updates references for Inservice Testing of ASME Code

,Components, providing consistency with the requirements of 10 CFR 50.55a(f)(4) for pumps and valves which are classified as American Society of

.Mechanical Engineers (ASME) Code Class 1, Class 2 and Class 3. The specification is revised to indicate that the Inservice Testing Program shall include testing frequencies applicable to the ASME Codefor Operations and Maintenance (ASME OM Code), replacing the current reference to ASME Section Xl.

(ii) TSTF-497 revises TS 4.0.5 to indicate that there may be some frequencies specified as 2 years or less in the Inservice Testing (IST) Program to which the provisions of SR 4.0.2 are applicable.

(iii) NUREG-1431 relocates the InserviceTesting (IST) Program portion of TS 4.0.5 to Section 6.0 of the TS (Administrative Controls) and removes the Inservice Inspection (ISI) Program from TS. The NUREG also removes the superfluous statement that the inservice requirements are in addition to other required surveillances and further clarifies that the provisions of SR 4.0.3 are applicable to the IST Program. Other TS that currently reference TS 4.0.5 are accordingly revised to reference the IST or ISI Programs as appropriate.

The changes are consistent with bothTSTF-479 and TSTF-497; however, since Salem does not have Improved Standard Technical Specifications (ISTS), NUREG-1431, the impacted TS at.

Salem are not numbered the same as ISTS, and have minor wording differences. In the Salem TS the IST program is currently TS 4.0.5 (vs. 5.5.8 in ISTS), and the surveillance frequency extension allowance is TS 4.0.2 (vs. 3.0.2 in ISTS).

1

LR-N09-0218 The specific changes to 4.0.5, additions and deletions, are provided below (see for complete marked up TS pages):

TS 4.0.5.a will be deleted and reolaced with new TS 6.8.4.i:

Inservice Testing Program This Program provides controls for inservice testing of ASME Code Class 1, 2, and 3 components. The program shall include the following:

In..servie in.eton of ASME Code Class 1, 2 and 3 components and i....vic.

testing of ASME Code Class 1, 2 and 3 pumps and v1'alves shall be per*f*rme in accordance with Section Xv of the ASME Boilr and Pressure Vessel Code and applicable Addenda as brequied by 10 CFR 50, Section 50.55a(g), except wh spcfic writtcn relief has been granted by the Commission pursuant to 10 CFR 50, Sec~tio~n 50.55a(g)(6)(i).

TS 4.0.5.b. which will be -relocated as TS 6.8.4.i.a is revised to state:

Surveillan~e Intervals specified in Testing frequencies applicable toSeetiGR XI of the ASME Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code) Boiler and Pressure Vessel Code and applicable Addenda foF-the inservice inspec.*ti and testing activities required by the AS^MIE Boiler ad Pressure Vessel Code and applieable Addenda shall be applicable as follows in these Technical Specific;ations:

ASME OM Boil.er and P.essuc Vessel Code and applicable Addenda terminology for inservice and-testing activities Weekly Monthly Quarterly or-every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice p

and testing activities At least once per"7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days.

At least once per 731 days TS 4.0.5.c, which will be relocated as TS 6.8.4.i.b is revised to state:

The provision of Specification 4.0.2 are applicable to the above required frequencies for performing inservic inspec;tio and testig ativ,*",,,.s-to other normal and accelerated frequencies specified as2 years or less in the Inservice Testing Program for performing inservice testing activities,

.2

LR-N09-0218 TS 4.0.5.d, which will be relocated as TS 6.8.4.j.c is revised to state:

Performance of the above isrcinpconand tcsting activities shall be in addition to other specified Survefillance Rcquircmcnt.. The provisions of Specification 4.0.3 are applicable to inservice testing activities, and TS 4.0.5.e, which will be relocated as TS 6.8,4.i.d is revised to state:

Nothing in the ASME Boiler and Pressure Vessel OM Code shall be construed to supersede the requirements of any Technical Specification.

Sections of the TS Bases are also revised (see Attachment 3) for consistency with the requirements of 10 CFR 50.55a(f)(4). The changes to the affected TS Bases pages will be incorporated in accordance with TS 6.17 (Salem Unit 1) and TS 6.16 (Salem Unit 2), "Technical Specifications (TS) Bases Control Program."

3.0 BACKGROUND

The purpose of the IST Program isto assess the operational readiness of pumps and valves, to detect degradation that might affect component operability, and tomaintain safety margins with provisions for increased surveillance and corrective action. 10 CFR 50.55a defines the requirements for applying industry codes to each licensed nuclear powered facility. Section Xl of the ASME Code has been revised on a continuing basis over the years to provide updated requirements for the inservice inspection and inservice testing of components. Until 1990, the ASME Code requirements addressing the inservice testing of pumps and valves were contained in Section Xl, Subsections IWP (pumps) and IWV (valves). Subsequently, the ASME OM Code replaced Section Xl of the Boiler and Pressure Vessel Code for inservice testing of pumps and valves.

As identified in NRC SECY-.99-017 (Reference 4), the NRC has generally considered evolution of the ASME Code to result in a net improvement'in the measures for inspecting piping and components and testing pumps and valves. By final rule issued on September 22, 1999 (Reference 5), the NRC amended 10 CFR 50.55a(f)(4)(ii) to require licensees to update their IST Program to the latest approved edition of the ASME OM Code incorporated by Reference 5 into 10 CFR 50.55a(b).

TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a," revised the Inservice Testing Program to reflect-the latest NRC-approved version of the ASME Code. TSTF-479 also revised the surveillance extension paragraph of the Inservice Testing Program to state, "The provisions of SR 3.0.2 are applicable to.the above required Frequencies and other normal and accelerated Frequencies specified in the InserviceTesting Program-for performing inservice testing activities." The NRC approved TSTF-479 (Reference 7) as an administrative change to the Improved Standard Technical Specifications (ISTS) NUREGs. TSTF-479 was incorporated into Revision 3.0 of the ISTS NUREGs.

Subsequently, members of the Component Branch of the NRC stated that TSTF-479 did not provide an adequate justification for applying SR 3.0.2 to Frequencies 3

LR-N09-0218 specified in the Inservice Testing Program as greater than 2 years and the NRC would not approve plant-specific amendments based on TSTF-479 incorporating this change without further justification. The NRC stated that they would accept applying SR 3.0.2 to IST Frequencies not listed in the Inservice Testing Program table provided that those Frequencies are specified in the Inservice Testing Program as 2 years or less. Consequently, TSTF 497, Revision 0, " Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less," was developed to address the "2 years or less" provision, and was subsequently approved by the NRC (Reference 8).

The ISTS were developed based on the criteria in the Final Commission Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors, dated July 22, 1993 (58 FR 39132), which was subsequently codified by changes to

'Section 36 of Part 50 of Title 10 of the Code of Federal Regulations (10 CFR 50.36)

(60 FR 36953). Licensees are encouraged to upgrade their technical specifications consistent with those criteria and conforming, to the practical extent, to Revision 3-to the improved STS. Licensees adopting portions of the improved STS to existing technical specifications should adopt all related requirements, as applicable, to achieve a high degree of standardization and consistency.

4.0 TECHNICAL ANALYSIS

TS 4.0.5 currently references the ASME Boiler and Pressure Vessel Code, Section Xl, as the source of the IST Program requirements for ASME Code 1, 2, and 3 components. The ASME OM Code replaced Section XI of the Boiler and Pressure Vessel Code for inservice testing of pumps and valves. The ASME OM Code applies to the current 10-year IST Interval at Salem. The proposed changes to TS 4.0.5 will provide consistency with the IST requirements of 10 CFR 50.55a.

Additionally, TS 4.0.5 is revised to indicate that the provisions of SR 4.0.2 are applicable to other IST Frequencies that are not specifically listed -in the testing frequencies identified inTS 4.0.5. The IST Program may have frequencies (normal and accelerated) for testing that are based on risk or other factors and do not conform to the standard testing Frequencies specified in TS 4.0.5. The Frequency of the Surveillance may be determined through a mix of risk informed and performance based means in accordance with the IST Program. Application of SR 4.0.2 to other IST Frequencies specified as 2 years or less is consistent with the guidance in NUREG-1482, paragraph 3.1.3 (Reference 6). Consequently, the 25 percent tolerance specified in SR 4.0.2 is applicable to any IST Frequency specified as 2 years or less.

Relocation of the IST Program portion of TS.4.0.5 to Section 6.0 of TS is consistent with ISTS, NUREG-1431. NUREG-1431 established that the IST Program is appropriately located in Section 5.0, "Administrative Controls" (Section 6.0 for Salem). The NUREG also removed-the superfluous statement that the inservice requirements are in addition to.other required surveillances and further clarifies that 4

LR-N09-0218A the provisions of SR-4.0.3 are applicable to the IST Program (consistent with NUREG-1431, Section 5.5.8.c).

Similarly, NUREG-1431 established that the ISI Program was not required to be maintained in'TS (i.e., it did not meet the requirements of 10 CFR 50.36). During each ISI 10-year interval, 10 CFR 50.55a(g)(4) requires PSEG to meet the ISI requirements for ASME Code Class 1, Class 2 and Class 3 components set forth in Section Xl of editions of the ASME Boiler and Pressure Vessel Code and Addenda that are incorporated by reference in 10 CFR 50.55a(b) 12 months before the start of the interval. The ISI requirements in current TS SR 4.0.5 are identical and redundant to the requirements of 10 CFR 50.55a. The proposed change does not eliminate any inservice inspections; they are covered by the existing ISI Program required by 10 CFR 50.55a. For inspections determined to be impractical, PSEG will still be required to seek relief in accordance with 10 CFR 50.55a(g)(5).

5.0 REGULATORY SAFETY ANALYSIS The proposed changes revise the requirements in TS 4.0.5, Surveillance Requirements for Inservice Inspections and Testing of ASME Code Components. TS 4.0.5, would be revised to (1) update references to the source of requirements for inservice testing ofl ASME Code Class 1,.2, and 3 pumps and valves and (2) to address the applicability of' Surveillance Requirement (SR) 4.0.2 to some pump and valve testing frequencies. In addition, the revised inservice testing requirements would be relocated to Section 6.0 of TS, while the inservice inspection requirements would be removed. The proposed changes are consistent with NRC-approved Technical Specification Task Force (TSTF)

Travelers TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a,"

(Reference 1), TSTF 497, Revision 0, " Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less," (Reference.2), and NUREG-1431, "Standard Technical Specifications (STS), Westinghouse Plants, Revision 3.0".

5.1 Significant Hazards Consideration PSEG has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth 'in 10 CFR 50.92, "Issuance of amendment," as discussed below:

1. Does the.proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed changes revise TS 4.0.5, Surveillance Requirements for Inservice Inspections and Testing of ASME Code Components, for consistency with of 10 CFR 50.55a(f)(4) requirements regarding inservice testing of pumps and valves. The proposed change incorporates revisions to the ASME OM Code and clarifies testing 5

LR-N09-0218 frequency, requirements for testing pumps and valves. The proposed change also relocates the ISI and IST Programs consistent with NUREG-1431.

The proposed changes do not impact any accident initiators or analyzed events or assumed mitigation of accident or transient events. They do not involve the addition or removal of any equipment, or any design changes to the facility.

Therefore, the proposed changes do not represent a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No The proposed changes do not involve a modification to the physical configuration of the plant (i.e., no new equipment will be installed) or change in the methods governing normal plant operation. The proposed change will not impose any new or different requirements or introduce a new accident initiator, accident precursor, or malfunction mechanism. Therefore, this proposed change does not create the, possibility of an accident of a different kind than previously evaluated.

3. Does the proposed change involve a -significant reduction in a margin of safety?

Response: No The proposed changes revises and relocatesTS 4.0.5, Surveillance Requirements for Inservice Inspections and Testing of ASME Code Components, for consistency with (1) the requirements of 10 CFR 50.55a(f)(4) regarding the inservice testing of pumps and valves and (2) NUREG-1431. The proposed change updates references to the ASME OM Code, clarifies testing frequency requirementsfor testing pumps and valves, and relocates the IST Program to Section 6.0 ofTS, and the ISI Program to a licensee controlled document. The safety function of the affected pumps and valves will be maintained; the programs will continue to be implemented with the required regulations and codes.

Therefore, this proposed change does not involve a significant reduction in a margin of safety.

Based on the above, PSEG concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.

6

LR-N09-0218 5.2 Applicable Regulatory Requirements/Criteria NRC regulation, 10 CFR 50.55a, defines the requirements for applying industry codes to each licensed nuclear powered facility. The regulations require that during successive 120-month intervals, programs be developed utilizing the latest edition and addenda incorporated into paragraph (b) of 10 CFR 50.55a 12 months before the start of the 120-month interval of the operating license subject to the limitations and modifications identified in paragraph (b).

Section 50.55a(f)(4) of Title 10 of the Code of Federal Regulations (10 CFR),

requires, in part, that ASME Class 1, 2, and 3 components must meet the requirements of the ASME Code. Section 50.55a(f)(4)(ii) requires that IST programs be revised every 10 years (120-months)-to comply with the requirements of the latest edition and addenda of the ASME Code that is incorporated by reference in 10 CFR 50.55a(b)(3). Section 50.55a(f)(5)(ii) requires that, if a revised IST program for a facility conflicts with the TS for that facility, the licensee shall apply to the Nuclear Regulatory Commission (NRC or Commission) for amendment of the TS to conform the TS to therevised program. The licensee is required to submit the -application, at least 6 months before the start of the period during which the provisions become applicable, in accordance with 10 CFR 50.55a(f)(4).

There are no changes being proposed that would result in non-compliance with any of the regulatory requirements. The evaluations documented above confirm that PSEG will continue to comply with all applicable regulatory requirements.

5.3 Precedent The NRC accepted TSTF-479 in December 2005 (Reference 7) and TSTF-497 in October 2006 (Reference 8). A similar TS change was approved for the Shearon Harris Nuclear Power Plant in Amendment 127 on June 12, 2008, for the Wolf Creek Generating Station in Amendment 172 on November 15, 2006, and for the Cooper Nuclear Station in Amendment No. 223 on September 6, 2006.2.

5.4 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that-the health and safety of the public will not 'be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

2 Even thoughTSTF-497 was not approved at this time, this amendment addressed the application of SR 4.0.2 to other IST Frequencies with the same wording that is now included in the approved TSTF-497

.7

LR-N09-0218

6.0 ENVIRONMENTAL CONSIDERATION

PSEG has evaluated the proposed amendment for environmental considerations.

The review has determined that the proposed amendment would change requirements with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, and would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.

Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b),

no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.

7.0 REFERENCES

1. Technical.Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-479, Revision 0, "Changes to Reflect Revision of 10 CFR 50.55a"
2. Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-497, Revision 0, "Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less"
3. ASME Operation and Maintenance Code for Operation and Maintenance of Nuclear Power Plants, 2001 Edition including the OMa-2002 and OMb-2003 Addenda
4. SECY-99-017, "Proposed Amendment to 10 CFR 50.55a," January 13, 1999
5. Federal Register Notice: Industry Codes and Standards; Amended Requirements, published September 22, 1999 (64 FR 51370)
6. NUREG-1482, Revision 1, "Guidelines for Inservice Testing at Nuclear Power Plants," January 2005
7. Letter dated December 6, 2005, from USNRCto Technical Specifications Task Force
8. Letter dated October 4, 2006, from USNRC to Technical Specifications Task Force 8

LR-N09-0218 Aftachment 2 TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES Facility Operating License DPR-70 Technical Specification Page 4.0.5 3/4 0-2a, 3 4.1.2.3 3/4 1-10 4.1.2.4 3/4 1-11 4.4.2.1 3/4 4-4 4.4.2.2 3/4 4-4a 4.4.3.1 3/4 4-5a 4.4.6.3 3/4.4-16a 4.4.9.3. 1. d 3/4 4-31 3.4.4.10 3/4 4-33 4.5.2-f 3/4 5-5a S4.6.2. 1. b 3/4 6-9 4.6.3.1.4 3/4 6-13 4.7.1.1 3/4 7-1 4.7.1.5 3/4 7-10 4.7.9 3/4 7-28 4.9.8.2 3/4 9-8a 6.10 6-26 6.8.4.j (new) 6-19e new Facility Operating License DPR-75 Technical Specification Page 4.0.5 3/4 0-2a, 3 4.1.2.3 3/4 1-9 4.1.2.4 3/4 1-10 4.4.2.1 3/4 4-5 4.4.3 3/4 4-6

.4.4.5.1 3/4 4-8a 4.4.7.2 3/4 4-18 4.4.10.3.1.d 3/4 4-32 3/4.4.11 3/4 4-33 4.5.2.f 3/4 5-6 4.6.2.1.b 3/4 6-10 4.6.3.4 3/4 6-15 4.7.1.1 3/4 7-1 4.7.1.5 3/4 7-10 4.7.9 3/4 7-23 4.9.8.2 3/4 9-9 6.10 6-26 6.8.4.j (new) 6-19g (new)

APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other specified conditions in the Applicability for individual Limiting Conditions for Operation, unless otherwise stated in the Surveillance Requirement.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the Limiting Condition for Operation.

Failure to perform a Surveillance within the specified frequency shall be failure to meet the Limiting Condition for Operation, except as provided in Specification 4.0.3.

Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.

4.0.3 If it is discovered that a Surveillance was not performed within its.

specified frequency, then compliance with the requirement to declare the Limiting Condition for Operation not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified frequency, whichever is greater..

This delay period is permitted to allow performance of the Surveillance..

A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.

4.0.4

  • Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 4.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

4.0.5 Survoillanco Roquiromonts for insorvioc inspoction and tasting of ASME Coda Glass 1, 2 and 3 penont-s shall boe ap

.ioablo as f

.ll.ws.

a.

Inscrviso inspoction of ASCHE Cod Class 1, 2 and 3...pononts and 5.ns5ag), toting of AHE Coi Class 1, 2 andt 3 pumpfh s

and valves shall be por-formodee i~n aeeeirdanoa with.l Seotian XI! of the ASME BDolino and Pr-essuro&

Vassal Codae and applieablo! Aýddondla as requq irod bay 10 CCL 50, Saotian S0.;5a(gf),

eorooptr whoroe speeAifio writtoý.n roeliof has boon gr-antode by thie Commffission puirsuaant to 10 CCL 5G, Seotioen 50.55a(g) (6) (i) b..

uir-voillanog i-nter-vals spocifiod i-n Saotian X! o.f the AGME; Bodlio an 4" ý q' q7

  • I I l

,j

-! q sel t--e=e anm app:r=ea==e 2tdaenaa er F.

4ý1 q P 4c ý4 P P

q*; P P and testing aotivities required by the ASME Boilor and Prcssurc Vessel Codo and applicablo Addenda shall be applieable as follows in these Teehnioal Speeifiaeations

SALEM -

UNIT 1 3/4 0-2a Amendment No.-2 3/4S.0 APPLICABILITY SURVEILLANCE REQUIREMENTS ACMES Boilor andl Piroouro Veese!Requirodee frequenoicos for Codoane a i

a lcabloe Ad...nd..

per.f.rming or tar..i..nol.gy for inservioc inspection and testing

'-p in and. testing a..ivitie.

e tivities Weekly At least onoe per 7 days Monthly At least onoe per 31 days Quarterly or every 3 months At least onoe per 92 days sefftiannually Eve ry Yea r! y e or-evary 6 fforths 9 months r

Rnnnq11v At least none per At boast onoe per At least none per 124 doays 27ý6 days 3 66 do yoF

e.

The provsonan of Spe...fia.ti. n 4.0.2 are applieable to the above required frequencies far performing insorvi e inspeetion and testing activities.

d.

Performanoe of the ab.v. inservica inspection and tooting a.tiviti.s.

.hal.

be in addition to other speoified Surveillana RePquiremaents.

p Nothing in the ASME Boiler and

... p.r.soada tharequirements of tra~ssurae vesool kznnat sfta+/-+/- fD an;y Tpplq4rli P:;l PnPP :i F-;;#ý sr

ý I SALEM--

UNIT.1 3/4 0-3 Amendment No.

27

REACTIVITY CONTROL SYSTEMS CHARGING PUMP -

SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 At least one charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE.#

APPLICABILITY:

MODES 4, 5 and 6.

ACTION:

With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until one charging pump is restored to OPERABLE status.

SURVEILLANCE REQUIREMENTS 4.1.2.3 No additional Surveillance Requirements other than those required by Spccification 4.0.5 the Inservice Testing Program.

  1. A maximum of one centrifugal charging pump shall be OPERABLE while in MODE 4 when the temperature of one or more of the RCS cold legs is less than or equal to 3120 F, MODE 5, or MODE 6 when the head is on the reactor vessel.

SALEM -

UNIT 1 3/4 1-10 Amendment No. 449

REACTIVITY CONTROL SYSTEMS CHARGING PUMPS -

OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.4 At least two charging pumps shall be OPERABLE..

APPLICABILITY:

MODES 1, 2, and 3.

ACTION:

With only one charging pump OPERABLE, restore at least two charging pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to at least 1% Ak/k at 200'F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore at least two charging pumps to OPERABLE status within the next 7 days or be in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.2-.4 No additional Surveillance Requirements other than those required by SpcJification 4.9.S the Inservice Testing Program.

SALEM -

UNIT 1 3/4 1-11 Amendment No.

REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY VALVES SAFETY VALVES -

SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2.1 A minimum of one pressurizer code safety valve shall be OPERABLE* with a lift setting of 2485 psig +/- 3%.**,***

APPLICABILITY:

Mode 4 and 5 ACTION:

With no pressurizer code safety valve OPERABLE, immediately suspend all operations involving positive reactivity changes and place an OPERABLE RHR loop into operation in the shutdown cooling mode.

SURVEILLANCE REQUIREMENTS 4.4.2.1 No additional Surveillance Requirements other than those required by Specification 4.0.5 the Inservice Testing Program.

While in Mode 5, an equivalent size vent pathway may be used provided that the vent pathway is not isolated or sealed.

The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.

Following testing the lift setting shall be reset to within +/- 1%.

SALEM -

UNIT 1 3/4 4-4 Amendment No.

2-4-4

3/4.4 REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY VALVES SAFETY VALVES -

OPERATING LIMITING CONDITION FOR OPERATION 3.4.2.2 All pressurizer code safety valve shall be OPERABLE with a lift, setting of 2485 psig +/- 3%.*,**

APPLICABILITY:

MODES 1, 2 and 3.

ACTION:

With one pressurizer code safety valve inoperable, either restore the inoperable valve to OPERABLE status within 15 minutes, or be in HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.2.2 No additional Surveillance Requirements other than those required by Spccification 4.0.5 the Inservice Testing Program.

The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.

Following testing the lift setting shall be reset to within +/- 1%.

SALEM - UNIT 1 3/4 4-4a

'Amendment No.

244

REACTOR COOLANT SYSTEM 3/4.4.3 RELIEF VALVES SURVEILLANCE REQUIREMENTS 4.4.3.1 In addition to the requirements of Spccif--Jiton 4.0.5 the Inservice Testing Program, each PORV shall be demonstrated OPERABLE at least once per 18 months by:

a.

Operating the PORV through one complete cycle of full travel during MODES 3 or 4, and

b.

Operating solenoid valves, air control valves, and check valves on associated air accumulators in PORV control systems through one complete cycle of full travel, and

c.

Performing a CHANNEL CALIBRATION of the actuation.instrumentation.

4.4.3.2 Each block valve shall be demonstrated OPERABLE at least once per 92 days by operating the valve through one complete cycle of full travel unless-the block valve is closed in order to meet the requirements of ACTION b, or c in-Specification 3.4.3.

SALEM -

UNIT 1 3/4 4-5a Amendment No.

47&9

REACTOR COOLANT SYSTEM PRIMARY COOLANT SYSTEM PRESSURE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.4.6.3 Reactor Coolant System Pressure Isolation Valves specified in table 4.4-3 shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3,

and 4.

ACTION:

With any Reactor Coolant System Pressure Isolation Valve leakage greater than the specified limit in Table 4.4-3, isolate the high pressure portion of the affected system from the low pressure portion within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use *of at least two closed manual or deactivated automatic valves, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.6.3 Each Reactor Coolant System Pressure Isolation Valve specified in Table 4.4-3 shall be demonstrated OPERABLE pursuant to Specification 4.0.5 the Inservice Testing Program, except that in lieu of any leakage testing required by Specifieation 4.0.5 the Inservice Testing Program, each valve shall,be demonstrated OPERABLE by verifying leakage to be within its limit:

a.

At least once per 18 months.

b. Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or more and if leakage testing has not been performed in the previous 9 months.

I

c.

Prior to returning the valve to service following maintenance repair or replacement work on the valve.

d.

For the Residual Heat Removal and Safety Injection Systems hot and cold leg injection valves and accumulator valves listed in Table 4.4-3 the testing will be done within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following valve actuation due to automatic or manual action or flow through the valve.

For all other systems testing will be done once per refueling.

The provisions of specification 4-.0.4 are not applicable for entry into MODE 3 or 4.

SALEM -

UNIT 1 3/4 4-16a Amendment No. 272-_ýý

REACTOR COOLANT SYSTEM OVERPRESSURE PROTECTION SYSTEMS SURVEILLANCE REQUIREMENTS 4.4.9.3.1 Each POPS shall be demonstrated OPERABLE by:

a.

Performance of a CHANNEL FUNCTIONAL TEST on the POPS actuation channel, but excluding valve operation, within 31 days prior to entering a condition in which the POPS is required OPERABLE, and at least once per 31 days thereafter when the POPS is required OPERABLE.

b.

Performance of a CHANNEL CALIBRATION on the POPS actuation channel at least once per 18 months.

c.

Verifying the POPS isolation valve is open at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> when the POPS is being used for overpressure protection.

d.

Testing pursuant to Specifipati-n 4.0.5 the Inservice Testing Program.

4.4.9.3.2 The RCS vent(s) shall be verified to be open at least once per 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />s* when the vents(s) is being used for overpressure protection.

  • Except when the vent pathway is provided with a valve which is
locked, sealed, or otherwise secured in the open position, then verify these valves open at least once per 31 days.

SALEM -

UNIT 1 3/4 4-31 Amendment No.

2-2-5

REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued)

In addition to the requirements of Spccificatien 40.5 the Inservice Inspection Program, each Reactor Coolant Pump flywheel shall be inspected per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, August 1975.

In lieu of Position C.4.b(l) and C.4.b(2),

a qualified in-place UT examination over the volume from the inner bore of the flywheel to the circle one-half of the outer radius or a surface examination (MT and/or PT) of exposed surfaces of the removed flywheels may be conducted at 20 year intervals.

4.4.10.1.2 Augmented Inservice Inspection Program for Steam Generator Channel Heads -

The steam generator channel heads shall be ultrasonically inspected during each of the first three refueling outages using the same ultrasonic inspection procedures and equipment used to generate the baseline data.

These inservice ultrasonic inspections shall verify that the cracks observed in the stainless steel cladding prior to operation have not propagated into the base material.

The stainless steel clad surfaces of the steam generator channel heads shall also be visually inspected during the above outages.

This may be accomplished by direct visual examination or by remote means such as television camera.

If the visual examination, either direct or remote, reveals detectable cladding indications, a record shall be made-by means of a video tape recording or photographs for comparison purposes.

EM UNIT 1 3/4 4-33 Amendment No.

2-4-&

SAL

EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

f.

By verifying that each of the following pumps develops the indicated Total Dynamic Head (TDH) when tested at the test flow point pursuant to Specifieation 4.0.5 the Inservice Testing Program.:

1.

Centrifugal charging pump

2.

Safety Injection Pump

3.

Residual heat removal pump 2338 psi TDH 1369 psi TDH 165 psi TDH

g.

By verifying the correct position of each of the following ECCS throttle valves:

1.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following completion of each valve stroking operation or maintenance on the valve when the ECCS subsystems are required to be OPERABLE.

2.

At least once per 18 months.

HPSI SYSTEM VALVE NUMBER LPSI SYSTEM VALVE NUMBER 11 SJ 16 i2 SJ 16 13 SJ 16 14 SJ 16 11 SJ 12 SJ 13 SJ 14 SJ 11 SJ 12 SJ 13 SJ 14 SJ 138 138 138 138 143 143 143 143 h..

By performing a flow balance test, during shutdown, completion of modifications to the ECCS subsystems subsystem flow characteristics and verifying that:

following that alter the

1.

For Safety Injection pumps, with a single pump running:

a)

The sum of the injection line flow rates, excluding the highest flow rate, is

Ž 453 gpm; and b)

The total flow rate through all four injection lines is

< 647 gpm, and c)

The difference between any pair of injection line flow rates is

  • 12.0 gpm, and d)

The total pump flow rate is

  • 664 gpm in the cold leg alignment, and e)

The total pump flow rate is

  • 654 gpm in the hot leg alignment..

SALEM -

UNIT 1 3/4 5-5a Amendment No.

4-44 2-&&

CONTAINMENT SYSTEMS 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS CONTAINMENT SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.1 Two independent containment spray systems shall be OPERABLE with each spray system capable of taking suction from the RWST and transferring suction to the RHR pump discharge.

APPLICABILITY:

MODES 1,

2, 3 and 4.

ACTION:

With one containment spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the inoperable spray system to OPERABLE status within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />..

SURVEILLANCE REQUIREMENTS 4.6.2.1 Each containment spray system shall be demonstrated OPERABLE:

a.

At least once per 3.1 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.

b.

By verifying, that on recirculation flow, each pump develops a differential pressure of greater than or equal to 204 psid when tested pursuant to Spccificaticn 4.0.5 the Inservice Testing Program.

c.

At least once per 18 months during shutdown, by:

1.

Verifying that each automatic valve in the flow path actuates to its correct position on a Containment High-High pressure test signal.

2.

Verifying that each spray pump starts automatically on a Containment High-High pressure test signal.

d.

Following activities that could result in nozzle blockage, either evaluate the work performed to determine the impact to the containment spray system, or perform an air or smoke flow test through each spray header and verifying each spray nozzle is unobstructed.

SALEM -

UNIT 1 3/4 6-9 Amendment No.

2LS-2

CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.6.3.1.2 Each containment isolation valve shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by:

a.

Verifying that on a Phase A containment isolation test signal, each Phase A isolation valve actuates to its isolation position.

b.

Verifying that on a Phase B containment isolation test signal, each Phase B isolation valve actuates to its isolation position.

c.

Not used.

d.

Verifying that on a Containment Purge and Pressure-Vacuum Relief isolation test signal, each required Purge and each Pressure-Vacuum Relief valve actuates to its isolation position.

e.

Verifying that the Containment Pressure-Vacuum Relief Isolation valves are limited to = 60%opening angle.

4.6.3.1.3 4.6.3.1.4 4.6.3.1.5 4.6.3.1.6 At least once per 18 months, verify that on a main steam isolation.

test signal, each main steam isolation valve actuates to its isolation position.

The isolation time of each-power operated or automatic containment isolation valve shall be determined to be within its limit when tested pursdant to Spccificatien 4.0.5 the Inservice Testing Program.

Each required containment purge isolation valve shall be demonstrated OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after each closing of the valve, except when the valve is being used for multiple cyclings, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying that when the measured leakage rate is added to the leakage rates determined pursuant to Specification 4.6.1.2.b for all other Type B and C penetrations, the combined leakage rate is less than or equal to 0.60La.

A pressure drop test to identify excessive degradation of resilient valve seals shall be conducted on the:

a.

Required Containment Purge Supply and Exhaust Isolation Valves at least once per 6 months.

b.

Deleted.

4.6.3.1.7 The required containment purge supply and exhaust isolation valves shall be determined closed at least once per 31 days.

SALEM -

UNIT 1 3/4 6-13 Amendment No.2 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE SAFETY VALVES LIMITING CONDITION FOR OPERATION 3.7.1.1 All main steam line code safety valves (MSSVs) associated with each steam generator shall be OPERABLE.

APPLICABILITY:

MODES 1, 2 and 3.

ACTION:

a.

With one or two main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1, 2 and 3 may proceed provided, that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, either the inoperable valve is restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With three main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1, 2 and 3 may proceed provided, that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, either the inoperable valves are restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1 and within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, reduce the Power Range Neutron Flux High trip setpoint to less than or equal to the RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1.1 Verify each required MSSV lift setpoint per Table 4.7-1.

No additional Surveillance Requirements other than those required by, Spccification t..5 the Inservice Testing Program.

SALEM -

UNIT 1 3/4 7-1 Amendment No..

2-44

PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.5 Each main steam line isolation valve shall be OPERABLE.

APPLICABILITY:

MODES 1, 2 and 3.

ACTION:

MODES 1 -

With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is either restored to OPERABLE status or closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; otherwise, be in MODE 2 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

MODES 2 -With one or more main steam line isolation valve(s) inoperable, and 3 subsequent operation in MODES 2 or 3 may proceed provided;

a.

The isolation valve(s) is (are) maintained closed, and

b.

The isolation valve(s) is (are) verified closed once per 7 days.

Otherwise, be in MODE 3, HOT STANDBY, within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and-MODE 4, HOT SHUTDOWN, within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1.5 Each main steam line isolation valve shall be. demonstrated OPERABLE by verifying full closure within 5 seconds when tested pursuant to Spccificaticn 4.9.5 the Inservice Testing Program.

The provisions of Specification 4..0.4-are not applicable.

SALEM -

UNIT 1

-3/4 7-10 Amendment No..1-8-7

PLANT SYSTEMS 3/4.7.9 SNUBBERS LIMITING CONDITION FOR OPERATION 3.7.9 All snubbers shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3 and 4.

(MODES 5 and 6 for snubbers located on systems required OPERABLE in those MODES)..

ACTION:

With one or more snubbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, replace or restore the inoperable snubber(s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.9c on the supported component or declare the supported system inoperable and follow appropriate ACTION statement for that system.

SURVEILLANCE REQUIREMENTS 4.7.9 Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program, in addition to the regular Inservice Inspection Program requirements-e#* Spccifioation 4.0.5.

a.

Visual Inspection All snubbers shall be categorized into two groups:

those accessible and those inaccessible during reactor operation.

The visual inspection interval for each category of snubbers shall be determined based upon the criteria provided in Table 4.7-3.

SALEM -

UNIT 1 3/4 7-28 Amendment No..

4-61

REFUELING OPERATIONS LOW WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.2 Two independent Residual Heat Removal (RHR) loops shall be OPERABLE.*

APPLICABILITY:

MODE 6 when water level above the top of the reactor pressure vessel flange is less than 23 feet.

ACTION:

a.

With less than the required RHR loops operable, immediately initiate corrective action to return the required RHR loops to OPERABLE status as soon as possible.

b.

The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.9.8.2 The required Residual Heat Removal loops shall be determined OPERABLE per Specificatien 4.0.5 the Inservice Testing Program..

  • Systems supporting RHR loop operability may be excepted as follows:
a.

The normal or emergency power source may be inoperable.

SALEM -

UNIT 1 3/4 9-8a Amendment No.

24

ADMINISTRATIVE CONTROLS C.

Records of radiation exposure for all individuals entering radiation control areas.

d.

Records of gaseous and liquid radioactive material released to the environs..

e.

Records of transient or operational cycles for *those facility components identified in Table 5.7-1.

f.

Records of reactor tests and experiments.

g.

Records of training and qualification for current members of the plant staff.

h.

Records of in-service inspections erferi..d pursuant tz #thzs Tchniezel Spcoifieations.

i.

Records of Quality Assurance activities required by the QA Manual:.

j.

DELETED

k.

Records of SORC meetings and activities of the Nuclear Review Board (and activities of its predecessor, the Offsite Safety Review (OSR) staff.)

1.

Records for Environmental Qualification which are covered under the provisions of Paragraph 6.16.

m.

Records of the service lives of all hydraulic and mechanical snubbers including the date at which the service life commences and associated installation and maintenance records.

n..

Records of secondary water sampling and water quality.

0.

Records of analyses required by the radiological environmental monitoring program which would permit evaluation of the accuracy of the analysis at a later date.

This should include procedures effective at specified times and QA records -showing that these procedures were followed.

p.

Records of reviews performed for changes made to the OFFSITE DOSE CALCULATION MANUAL and the PROCESS CONTROL PROGRAM.

6.11 RADIATION PROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.

SALEM -

UNIT 1 6-26 Amendment No.

2-34

I' I2TF§QII'i CONTROL:

6.8.4.j iNSERVICE TESTING PROGRAM This Program provides controls for inservice testing of ASME Code Class 1, 2,

and 3 components.

The program shall include the following:

a.

Testing frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda as follows:

ASME OM Code and applicable Addenda terminology for inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice testing activities At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days

b. The provisions of Specification 4.0.2 are applicable to the above required frequencies and to other normal and accelerated frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities,
c.

The provisions of Specification 4.0.3 are applicable to inservice testing activities, and

d. Nothing in the ASME OM Code shall be construed to supersede the requirements of any Technical Specification.

SALEM -

UNIT 1 6-19e Amendment No.

APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other specified conditions in the Applicability for-individual Limiting Conditions for Operation, unless otherwise stated in the Surveillance Requirement.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the Limiting Condition for Operation. Failure to perform a Surveillance within the specified frequency shall be failure to meet the Limiting Condition for Operation, except as provided in Specification 4.0.3.

Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.

4.0ý3 If it is discovered that a Surveillance was not performed within its specified frequency, then compliance with the requirement to declare the Limiting Condition for Operation not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified frequency, whichever is greater.

This delay period is permitted to allow performance of the Surveillance.

A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the Limiting Condition for Operation must immediately be declared not met and the applicable Actions must be entered.

4.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided.by SR 4.0.3.

When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

This provision shall not prevent entry-into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

4.0.5 Survaillanac Requirements for inservica inspoation and testing of ASME Coda Class 1, 2 and 3 oomponents shall be opp ieabla as follows.

a.aris inspeetion of ASME Coda Class 1, 2 andl 3 comaponants and insarvica testing of ASHE GCeld lass 1, 2 and 3 pumps andi valves shall b3 pearformed in accordance with Sot-ien Xý of the 4SME Dollar and Praessura Vassal Coda andl appldiaable Addalneda as raquidiamd by 10 CFR 50, Section 50.55a(g),

exaept where speaifie written relief has been gr.ante.d by the Co......issien pursuant to 10 CEP 50, Soati* n 50.55a(g) (6)

(i)

b.

Sur.v.illane. intr..al specified in Svetion X! of tha ASMS ailor-a-nd Draessurae Vassal Codae andi applicablal Addandia for-the navc inspection and testing ativiti*ie required by the ASME Dailar and Praossur Vassel Coda and appliala Addenda shall be appliha palat as follows in these Taahnieal Speaifieatiens:

SALE:M-- UNIT 2 3/4 0-2a Amendment No.

258

APPLICABILITY SURVEILLANCE REQUIREMENTS (Continued)

Code and appliaablc Addenda Requirad fretuanaies performing insarviao T_©r terminology for insarviac inspection and testing inspeation and testing activities activities Weekly At least onee per 7 days Monthly At least enee per 31 days Quart=rly or every 3 months At least onae per 92 days Seaiannually or every 6 oenthe

.t leat

.n..

par 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days.

e.

The provision of GspAification 4.0.2 ara appliaabla to tha. abva raquir-d fraquan-ias

  • f*a p...rfrng insav*..

.inspaatl.n and tasting aativitios.

dl.

eafraa of the abeva imnsarviaa inspaation andi tastidngý aativitiodm~s shall lh in ad.dition to tha spsaifi.d Surveillanae RPquiramants.

e othijng in the ASME; Beilar, and Paessur-a Vassal Cdia shiall btea nstr.d

'Iir-*~---

eh-supe;qpn,

  1. 1i r:r'-rmp;i pf any~ Taahnqpi Paa; spcipificai

-#4n.ý I

ZL SALEM -

UNIT 2 3/4 0-3

REACTIVITY CONTROL SYSTEMS CHARGING PUMP-SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.3 At least one charging pump in the boron injection flow path required by Specification 3.1.2.1 shall be OPERABLE.'

APPLICABILITY:

MODES 4,

5 and 6.

ACTION:

With no charging pump OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes until one charging pump is restored to OPERABLE status.

SURVEILLANCE REQUIREMENTS 4.1.2.3 No additional Surveillance Requirements other than those required by Spccification {.0.5 the Inservice Testing Program..

  1. A maximum of one centrifugal charging pump shall be OPERABLE while in MODE 4 when the temperature of one or more of the RCS cold legs is less than or equal to 312 0 F, MODE 5, or MODE 6 when the head is on the reactor vessel.

SALEM -

UNIT 2 3/4 1-9 Amendment No.

REACTIVITY CONTROL SYSTEMS CHARGING PUMPS -

OPERATING LIMITING CONDITION FOR OPERATION 3..1.2..4 At least two charging pumps shall be OPERABLE.

APPLICABILITY:

MODES 1, 2 and 3.

ACTION:

With only one charging pump OPERABLE, restore at least two charging pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to at least 1% delta k/k at 200'F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore at least two charging pumps to OPERABLE status within the next 7 days or be in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.1..2.4 No additional Surveillance Requirements other than those required by Spec*lfiation 4.0.5 the Inservice Testing Program.

SALEM -

UNIT 2 3/4 1-10 Amendment No.

1-

REACTOR COOLANT SYSTEM 3/4.4.2 SAFETY VALVES SAFETY VALVES -

SHUTDOWN LIMITING CONDITION FOR OPERATION 3.4.2 A minimum of one pressurizer code safety valve shall be OPERABLE*

with a lift setting of 2485 psig +/- 3%.**,***

APPLICABILITY:

Mode 4 and 5 ACTION:

With no pressurizer code safety valve OPERABLE, immediately suspend all operations involving positive reactivity changes and place an OPERABLE RHR loop into operation in the shutdown cooling mode..

SURVEILLANCE REQUIREMENTS 4.4.2.1 No additional Surveillance Requirements other than those required by Specification 4.G,5 the Inservice Testing Program.

I While in Mode 5, an equivalent size vent pathway may be used provided that the vent pathway is not isolated or sealed.

The lift setting pressure. shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.

Following testing the lift setting shall be reset to within +/- 1%.

SALEM -

UNIT 2 3/4 4-5 Amendment No.

272--

REACTOR COOLANT SYSTEM 3/4.4.3 SAFETY VALVES -

OPERATING LIMITING CONDITION FOR OPERATION 3.4.3 All pressurizer code safety valves shall be OPERABLE with a lift setting of 2485 psig +/- 3%.*,**

APPLICABILITY:

MODES 1, 2 and 3.

ACTION:

With one pressurizer code safety valve inoperable, either restore. the inoperable valve to OPERABLE status within 15 minutes or be in HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.3 No additional Surveillance Requirements other than those required by Spccificatien 4.0.5 the Inservice Testing Program.

The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure..

Following testing the lift setting shall be reset to +/- 1%.

SALEM -

UNIT 2 3/4 4-6 Amendment No.

2 REACTOR COOLANT SYSTEM 3/4.4.5 RELIEF VALVES SURVEILLANCE REQUIREMENTS 4.4.5.1 In addition to the requirements of Spcfificaticn 4.0.5 the Inservice Testing Program, each PORV shall be demonstrated OPERABLE at least once per 18 months by:

.a.

Operating the PORV through one complete cycle of full travel during MODES 3 or 4, and

b.

Operating solenoid valves, air control valves, and check valves on associated air accumulators in PORV control systems through one complete cycle of full travel, and

c.

Performing a CHANNEL CALIBRATION of the actuation instrumentation.

4.4.5.2 Each block valve shall be demonstrated OPERABLE at least once per 92 days by operating the valve :through one complete cycle of full travel unless the block valve is closed in order to meet the requirements of ACTION b, or c in Specification 3.4.5.

SALEM -

UNIT 2 3/4 4-8a Amendment No.

449

SURVEILLANCE REQUIREMENTS (Continued).

c*.

Verifying primary-to-secondary leakage is

= 150 gallons per day through any one steam generator at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during steady state operation, d*.

Performance of a Reactor Coolant System water inventory balance** at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

The water inventory balance shall be performed with the plant at steady state conditions.

The provisions of specification 4.0.4 are not applicable for entry into Mode 4, and

e.

Monitoring the reactor head flange leakoff system at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

4.4.7.2.2 Each Reactor Coolant System Pressure Isolation Valve specified in Table 3.4-1 shall be demonstrated OPERABLE pursuant to Specification 4.0.5 the Inservice Testing Program, except that in lieu of any leakage testing required by Spccification 4.0'.5 the Inservice Testing Program, each valve shall be demonstrated OPERABLE by verifying leakage to be within its limit:

a.

At least once per 18 months.

b.

Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or moreand if leakage testing has not been performed in the previous 9 months.

c.

Prior to returning the valve to service following maintenance repair or replacement work on the valve.

b.

For the Residual Heat Removal and Safety Injection Systems hot and cold leg injection valves and accumulator valves listed in Table 3.4-1 the testing will be done within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following valve actuation due to automatic or manual action or flow through the valve.

For all other systems testing will be done once per refueling.

The provisions of specification 4.0.4 are not applicable for entry into MODE 3 or 4.

  • Not required to be completed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.
    • Not applicable to primary-to-secondary leakage.

SALEM -

UNI.T 2 3/4 4-18 Amendment No.

2 REACTOR COOLANT. SYSTEM SURVEILLANCE REQUIREMENTS (Continued)

a.

Performance of a CHANNEL FUNCTIONAL TEST on the POPS actuation channel, but excluding valve operation, within 31 days prior to entering a condition in which the POPS is required OPERABLE and at least once per 31 days thereafter when the POPS is required OPERABLE.

b.

Performance of a CHANNEL CALIBRATION on the POPS actuation channel at least once per 18 months.

c.

Verifying the POPS isolation valve is open at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> when the POPS is being used for overpressure protection.

d.

Testing pursuant to Specification 4.0.5 the Inservice Testing Program.

4.4.10.3.2 The RCS vent(s) shall be verified to be open at least once per 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />s* when the vent(s) is being used for overpressure protection.

  • Except when the vent pathway is provided with a valve which is locked, sealed, or otherwise secured in the open position, then verify these valves open at least once per 31 days.

SALEM -

UNIT 2 3/4 4.-32

REACTOR COOLANT SYSTEM 3.4.11 STRUCTURAL INTEGRITY ASME CODE CLASS 1, 2 and 3 COMPONENTS LIMITING CONDITION FOR OPERATION 3.4.11.1 The structural integrity of ASME Code Class 1, 2 and 3 components shall be maintained in accordance with Specification 4.4.11.1.

APPLICABILITY:

ALL MODES.

ACTION:

a.

With the structural integrity of any ASME Code Class 1 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) prior to increasing the Reactor Coolant System temperature more than 50'F above the minimum temperature required by NDT considerations.

b.

With the structural integrity of any ASME Code Class 2 component(s). not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) prior to increasing the Reactor Coolant System temperature above 200'F.

c.

With the structural integrity of any ASME Code Class 3 component(s) not conforming to the above requirements, restore the structural integrity of the affected component(s) to within its limit or isolate the affected component(s) from service.

SURVEILLANCE REQUIREMENTS 4.4.11.1 In addition to the requirements of Spccification 4.0.5 the Inservice Inspection Program, each Reactor Coolant Pump flywheel shall be inspected per the recommendations of Regulatory Position C.4.b of Regulatory Guide 1.14, Revision 1, August 1975.

In lieu of Position C.4.b(1) and C.4.b(2),

a qualified in-place UT examination over the volume from the inner bore of the flywheel to the circle one-half of the outer radius or a surface examination (MT and/or PT) of exposed surfaces of the removed 'flywheels may be conducted at 20 year intervals.

4.4.11.2 Augmented Inservice Inspection Program for Steam Generator Channel Heads -

The No.

21 Steam Generator channel head shall be ultrasonically inspected in a selected area during each of the first three refueling outages using the same ultrasonic inspection procedures and equipment used to generate the baseline data.

These inservice ultrasonic inspections shall verify that the cracks observed in the stainless steel cladding prior to operation have not propagated into-the base material.

SALEM -

UNIT 2 3/4 4-33 Amendment No.

2-5-9

EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

f.

By verifying that each of the following pumps develops the indicated Total Dynamic Head (TDH) when tested at the test flow point pursuant to Spceificatizn 4.0.5 the Inservice Testing Program:

1.

Centrifugal Charging pump

2.

Safety Injection pump

3.

Residual Heat Removal pump 2338 psi TDH 1369 psi TDH 165 psi TDH

g.

By verifying the correct position of each of the following ECCS throttle valves,:

1.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following completion of each valve stroking operation or maintenance on the valve when the ECCS subsystems are required to-be OPERABLE.

2.

At least once per 18 months.

HPSI System Valve Number LPSI System Valve Number 21 SJ 16 22 SJ 16 23 SJ 16 24 SJ 16 21 SJ 22 SJ 23 SJ 24 SJ 21 SJ 22 SJ 23 SJ 24 SJ 138 138 138 138 143 143 143 143

h.

By performing a flow balance test, completion of modifications to the the subsystem flow characteristics during shutdown, following ECCS subsystems that alter and verifying that.:

1.

For Safety Injection pumps, with a single pump running:

a)

The sum of the injection line flow rates, excluding the highest flow rate, is

Ž 453 gpm, and b)

The total flow rate through all four injection lines is

Ž 647 gpm, and c)

The difference between any pair of injection line flow rates is

  • 12.0 gpm, and d)

The total pump flow rate is

  • 664 gpm in the cold leg alignment, and e)

The total pump flow rate is

  • 654 gpm in the hot leg alignment.

SALEM-- UNIT 2 3/4 5-6 Amendment No.

444

3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS CONTAINMENT SPRAY SYSTEM LIMITING CONDITION FOR OPERATION

.3.6.2.1 Two independent containment spray systems shall be OPERABLE with each spray system capable of taking suction from the RWST and transferring suction to the RHR. pump discharge.

APPLICABILITY:

MODES 1, 2, 3 and 4.

ACTION:

With one containment spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the inoperable spray system to OPERABLE status within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.2.1 Each containment spray system shall be demonstrated OPERABLE:

a.

At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.

b.

By verifying, that on recirculation flow, each pump develops a differential pressure of greater than or equal to 204 psid when tested pursuant to Specificatien 4.0.5 the Inservice Testing Program.

c.

At least once per 18 months during shutdown, by:

1.

Verifying that each automatic valve in the flow path actuates to its correct position on a Containment High-High pressure test signal.

2.

Verifying each spray pump starts automatically on a High-High pressure test signal.

d.

Following activities that could result in nozzle blockage, evaluate the work performed to determine the impact to the spray system, or perform an air or smoke flow test through header and verifying each spray nozzle is unobstructed.

Containment either containment each spray SALEM -

UNIT 2 3/4 6-10 Amendment No..

2 CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.6.3.2 Each containment isolation valve shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 months by:

a.

Verifying that on a Phase A containment isolation test

signal, each Phase A isolation valve actuates to its isolation position.
b.

Verifying that on a Phase B containment isolation test

signal, each Phase B isolation valve actuates to its isolation position.
c.

NOT USED

d.

Verifying that on a Containment Purge and Pressure-Vacuum Relief isolation test signal,.each required Purge and each Pressure-Vacuum Relief valve actuates to its isolation position.

e.

Verifying that the Containment Pressure-Vacuum Relief Isolation valves are limited to = 60' opening angle..

4.6.3.3 At least once per 18 months, verify that on a main steam isolation test signal, each main steam isolation valve actuates to its isolation position.

4.6.3.4

  • The isolation time of each power operated or automatic containment isolation valve shall be determined to be within its limit when tested pursuant to Spcifiecation 4;.0.5 the Inservice Testing Program.

4.6.3.5 Each required containment purge isolation valve shall be demonstrated OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after each closing of the valve, except when the valve is being used for. multiple cyclings, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying that when the measured leakage rate is added to the leakage rates determined pursuant to Specification 4.6.1.2.b for all other Type B and C penetrations, the combined leakage rate is less than or equal to 0.60La.

4.6.3..6 A pressure drop test to identify excessive degradation of resilient valve seals shall be conducted on the:

a.

Required Containment Purge Supply and Exhaust Isolation Valves at least once per 6 months.

b.

Deleted.

4.6.3.7 The required containment purge supply and exhaust isolation valves shall be determined closed at least once per 31 days.

SALEM-- UNIT 2 3/.4 6-15 Amendment No.260

3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE SAFETY VALVES LIMITING CONDITION FOR OPERATION 3.7.1.1 All main steam line code safety valves (MSSVs) associated with each steam generator shall be OPERABLE with lift settings as specified in Table 3.7-4,.

APPLICABILITY:

MODES 1, 2 and 3.

ACTION:

a.

With one or two main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1, 2 and 3 may proceed provided, that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, either the inoperable valve is restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With three main steam line code safety valves inoperable in one or more steam generators, operation in Modes 1,.2 and 3 may proceed?.

provided, that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, either the inoperable valves are restored to OPERABLE status or reduce power to less than or equal to the applicable percent of RATED THERMAL POWER per Table 3.7-1 and within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, reduce the Power Range Neutron Flux High'trip setpoint to less than or equal to the RATED THERMAL POWER per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1-1 Verify each required MSSV lift setpoint per Table 3.7-4.

No additional Surveillance Requirements other than those required by Spccifizaticn 4.0.5 the Inservice Testing Program.

SALEM - UNIT 2 3/4 7-1 Amendment No.

2-2-5

PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7.1.5 Each main steam line isolation valve shall be OPERABLE.

APPLICABILITY:

MODES 1, 2 and 3.

ACTION:

MODES 1 -

With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is either restored to OPERABLE status or closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; Otherwise, be in MODE 2 within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

MODES 2 With one or more main steam -line isolation valve(s) inoperable, and 3 subsequent operation in MODES 2 or 3 may proceed provided;

a.

The isolation valve(s) is (are) maintained closed, and

b.

The isolation valve(s) is (are) verified closed once per 7 days..

Otherwise, be in MODE 3, HOT STANDBY, within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and MODE 4, HOT SHUTDOWN, within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1.5

- Each main steam line isolation valve shall be demonstrated OPERABLE by verifying full closure within 5 seconds when tested pursuant to Spocifieaticn 4.0.5 the Inservice Testing Program.

The provisions of Specification 4.0.4 are not applicable.

SALEM -

UNIT 2 3/4 7-10 Amendment No..

2-0-6

PLANT SYSTEMS 3/4.7.9 SNUBBERS LIMITING CONDITION FOR OPERATION 3.7.9 All snubbers shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3 and 4.

(MODES 5 and 6 for snubbers located on systems required OPERABLE in those MODES).

ACTION:

With one or more snubbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, replace or restore the inoperable snubber(s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.9c on the supported component or declare the supported system inoperable and follow appropriate ACTION statement for that system.

SURVEILLANCE REQUIREMENTS 4.7.9 Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program in addition to the regular Inservice Inspection Program requirements-e# Spccificaticn 4.0.5.

a.

Visual Inspection All snubbers shall be categorized into two groups:

those accessible and those inaccessible during reactor operation..

The visual inspection interval for each category of snubbers -shall be determined based upon the criteria provided inTable 4.7-3.

SALEM -

UNIT 2 3/4 7-23 Amendment No.

44.1

REFUELING OPERATIONS LOW WATER LEVEL LIMITING CONDITION FOR OPERATION 3.9.8.2 Two independent Residual Heat Removal (RHR) loops shall be OPERABLE.*

APPLICABILITY:

MODE 6 when water level above the top of the reactor pressure vessel flange is less than 23 feet.

ACTION:

a.

With less than the required RHR loops operable, immediately initiate corrective action to return the required RHR loops to OPERABLE status as soon as possible.

b.

The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.9.8.2 The required Residual Heat Removal loops shall be determined OPERABLE per Cpccification 4.0.5 the Inservice Testing Program.

  • Systems supporting RHR loop operability may be excepted as follows:
a.

The normal or emergency power source may be inoperable.

SALEM -

UNIT 2 3/4 9-9 Amendment No.

4-

ADMINISTRATIVE CONTROLS

c.

Records of radiation exposure for all individuals entering radiation control areas.

d.

Records of gaseous and liquid radioactive material released to the environs..

e.

Records of transient or operational cycles for those facility components identified in Table 5.7-1.

f.

Records of reactor tests and experiments.

g.

Records of training and qualification for current members of the plant staff.

h.

Records of in-service inspections performcd pursuant to these Technical Specifications.

i.

Records of Quality Assurance activities required by the QA Manual..

j.

DELETED k..

Records of SORC meetings and activities of the Nuclear Review Board (and activities of its predecessor, the Offsite Safety Review

.(OSR) staff).

1.

Records for Environmental Qualification which are covered under the provisions of Paragraph 2.C(7) and 2.C(8) of Facility Operating License DPR-75.

m.

Records of the service lives of all hydraulic and mechanical snubbers including the date at which the service life commences and associated installation and maintenance records.

n.

Records of secondary water sampling and water quality.

o.

Records of analyses required by the radiological environmental monitoring program which would permit evaluation of-the accuracy of the analysis at a later date.

This should include procedures effective at specified times and QA records showing that these procedures were followed.

p.

Records of reviews performed for changes made to the 0FFSITE DOSE CALCULATION MANUAL and the PROCESS CONTROL PROGRAM.

6.11 RADIATION PROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.

SALEM -

UNIT 2 6-26 Amendment No.. 2-1h

ADMIK STFATI.'E CONYRCI.

6.8.4.j iNSERVICE TESTING PROGRATM This Program provides controls for inservice testing of ASME Code Class 1, 2,

and 3 components.

The program shall include the following:

a. Testing frequencies applicable to the ASME Code for Operations and Maintenance of Nuclear Power Plants (ASME OM Code) and applicable Addenda as follows:

ASME OM Code and applicable Addenda terminology for inservice testing activities Weekly Monthly Quarterly or every 3 months Semiannually or every 6 months Every 9 months Yearly or annually Biennially or every 2 years Required Frequencies for performing inservice testing activities At least once per 7 days At least once per 31 days At least once per 92 days At least once per 184 days At least once per 276 days At least once per 366 days At least once per 731 days

b. The provisions of Specification 4.0.2 are applicable to the above required frequencies and to other normal and accelerated frequencies specified as 2 years or less in the Inservice Testing Program for performing inservice testing activities,
c.

The provisions of Specification 4.0.3 are applicable to inservice testing activities, and

d.

Nothing in the ASME OM Code shall be construed to supersede the requirements of any Technical Specification.

SALEM -

UNIT 2 6-19g Amendment No.

LR-N09-0218 TECHNICAL SPECIFICATION BASES PAGES WITH PROPOSED CHANGES (Provided for INFORMATION ONLY)

APPLICABILITY BASES Specification 4.G.5 establishes the requirement tha.t nservie inpe.t.on of ASME Code Class 1, 2, and 3 eomponents and inservice testing of ASME Code Close 1, 2, and 3 pufps e ned valves shall be performed in aecordance with a paeriodiceally updiatedl version of Section X1 of the ASME Boiler andl Praessur-e essel Code and Addenda as required by 10 CFR 50.55a.

These requirements app.ly e pt. when relief has been provided in writing bay the Csission.

This specification includes a clarification ef the frequencies for p.erfom***ting the inserviec inspeetion and testing activities required by Section XI of the AS.E Boiler and. Pr.essur.e Vessel Ce an applicable Addenda.

This clar~ificatio:n is provýýided to ensurce consistency in surcveillance intercvals thro*ue.hou the Technical Specifications and to i=ermve any ambiguities relative to the frequencies for performing the requir4:erd-inservice inspection and testing activities.

Under the terms of this specification, the more restrictive requirements ef the Technical Specifications take precedence over the ASME Boiler and Pressure Vessel Code and a pplicabld Addilenda.

The reqirmen

.f Specification 4.0.4 to perform surveillance activities before entry into an OPEPRTIONALý ODE e-r ot-her specimfiedi condition takees prcecedence over-the ASME Boiler-and Pri~ssur~e Vessel Codle proevision which allows paumfps andl valves to be tested uap to o ne week a;ft-er r-eturnn to normL Iffal opercation..

The Technfical Speceification diefinition of GPERAT, does not allow a grace period befere a com.tponent;..,

th.at is not capable of performing its specified fuidt.ion, is d*eclared ifperýa*le andl takes pr~eeiee e ver the ASME Boiler-and Pr-essure Vessel Codie provision whic.h al.lows a valve to be incapable of performing its specified function f* r uap to 24 hourais beforce beingj declaredi inopercable.

SALEM -

UNIT 1 B 3/4 0-9 Amendment No.2-7-6

APPLI2ABLTY BASES

ostbishes Tho reuirement that :nr,:-oO. inso_

ctiTr of AqE1 2od: 2l::

1, 2,

aond B o3muontonts aondi o

Eesilng of.f_4_SM4E-Sods Glass !,

2, and 3 pump: and voI-alves shall pe pf e

n oanc it per-Jeel-'elly apdiateei norrionF of Seetroe XIw of :oh: rASMZB ~e:11r-anei::u Vessel Code and Addenda as required by 10 CFR 50.55a.

These requirent:

apply exeept when relief has been provided in

+/-

ritiRg by the ommi:ssion.

This specifiatio in.lud..

a eolarifieation of the frequrencles:

fer performing the inservieo inspection and testing

.tivitie:

rrgusr'd by Se-tiný XY of the

...SM. Bilr r..d Pr..ur.

Vessel d...

ad pliorable Addenda.

This clarification is provided to ensure consistency in surveillane: intervals throughout the Tea l

Specifications and to^ remove any ambiguities relative to the freouencies for performing the required inservic: inspectionr and testing activities.

Jndori týho teLrm:i of this speeifioratien, the ffor:~ r-estriative Y-qoguefteiromno of the Tochnica! Specifications take precedence over the ASME Beoiler and Pressure Vessel Code andi pplirbi: Addnda. The r....ire.ot...

oef.

Specificatio.n 4.0.4 to perfom :-rvellanoo.

a.tiviti: befe-.. entry into an OPERATIONAL DqODE; or other specified eondition takes preedoeneo ovr the 4ýSE Boiler and Pr.ssur:

loseel Cod. provision whieh allows pump:s

.... d

.. lv:to b: test-l up to n:

weeoa after return to normal operation.

The Teehnical Spe::ification definition of OPERJABLE does niot allow a grace period before a component, that is net capablc of performing its sp..

ifi..

fnti...n.

is doelaaod inoperable and takes precedence over the ACME Boielr and Pressure Vessel Code provision which allows a valve to be incapable of performinfg its specified funrtion for upf to 24 h.ur. boefr being declared inoperable.

SALEM -

UNIT 2 B 3/4 0-9 Amendment No.

2-5-4