ML12093A315: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 19: Line 19:


==SUMMARY==
==SUMMARY==
 
LICENSEE:
LICENSEE:       PPL SUSQUEHANNA, LLC.
PPL SUSQUEHANNA, LLC.
FACILITY:       SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2
FACILITY:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF MARCH 21, 2012 95002 SUPPLEMENTAL INSPECTION PUBLIC EXIT AND REGULATORY PERFORMANCE MEETING WITH PPL SUSQUEHANNA, LLC.
OF MARCH 21, 2012 95002 SUPPLEMENTAL INSPECTION PUBLIC EXIT AND REGULATORY PERFORMANCE MEETING WITH PPL SUSQUEHANNA, LLC.
Line 30: Line 30:
A notice of the meeting and agenda was issued on March 7, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML12066A077). The NRC slides can be located in ADAMS under Accession Number ML12089A430. ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html.
A notice of the meeting and agenda was issued on March 7, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML12066A077). The NRC slides can be located in ADAMS under Accession Number ML12089A430. ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html.
The NRC presented slides, met with PPL management, answered questions and listened to statements from members of the public, and was available to discuss its results of the 95002 Supplemental Inspection for Susquehanna Unit 1. The NRC slides presented included background on the findings and results of the inspection. Additional information relative to the NRC's Inspection and the safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at: http://www.nrc.gov/info-finder/reactor/susq1.html.
The NRC presented slides, met with PPL management, answered questions and listened to statements from members of the public, and was available to discuss its results of the 95002 Supplemental Inspection for Susquehanna Unit 1. The NRC slides presented included background on the findings and results of the inspection. Additional information relative to the NRC's Inspection and the safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at: http://www.nrc.gov/info-finder/reactor/susq1.html.
Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding Susquehannas performance and the role of the agency in ensuring safe plant operations.
Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding Susquehannas performance and the role of the agency in ensuring safe plant operations.  
                                                          /RA/
/RA/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects  


==Enclosures:==
==Enclosures:==
Public Meeting Sign in Sheet NRC Meeting Slides
Public Meeting Sign in Sheet NRC Meeting Slides  


ML12066A077). The NRC slides can be located in ADAMS under Accession Number ML12089A430. ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html.
ML12066A077). The NRC slides can be located in ADAMS under Accession Number ML12089A430. ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html.
The NRC presented slides, met with PPL management, answered questions and listened to statements from members of the public, and was available to discuss its results of the 95002 Supplemental Inspection for Susquehanna Unit 1. The NRC slides presented included background on the findings and results of the inspection. Additional information relative to the NRC's Inspection and the safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at http://www.nrc.gov/info-finder/reactor/susq1.html.
The NRC presented slides, met with PPL management, answered questions and listened to statements from members of the public, and was available to discuss its results of the 95002 Supplemental Inspection for Susquehanna Unit 1. The NRC slides presented included background on the findings and results of the inspection. Additional information relative to the NRC's Inspection and the safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at http://www.nrc.gov/info-finder/reactor/susq1.html.
Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding Susquehannas performance and the role of the agency in ensuring safe plant operations.
Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding Susquehannas performance and the role of the agency in ensuring safe plant operations.  
                                                                  /RA/
/RA/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution:
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution:
W. Dean, RA                             J. Clifford, DRP                         P. Finney, DRP, SRI D. Lew, DRA                             P. Krohn, DRP                           J. Greives, DRP, SRI J. Trapp, DRP                           A. Rosebrook, DRP                       S. Ibarrola, DRP E. Miller, DRP                           S. Farrell, DRP, OA                     D. Schroeder, DRP DOC NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 12\2011 EOC\AAMNOTICES\SQ2011\
W. Dean, RA J. Clifford, DRP P. Finney, DRP, SRI D. Lew, DRA P. Krohn, DRP J. Greives, DRP, SRI J. Trapp, DRP A. Rosebrook, DRP S. Ibarrola, DRP E. Miller, DRP S. Farrell, DRP, OA D. Schroeder, DRP DOC NAME: G:\\DRP\\BRANCH4\\ASSESSMENT (EOC, MC)\\ROP 12\\2011 EOC\\AAMNOTICES\\SQ2011\\
SUS 95002 EXIT MTG  
SUS 95002 EXIT MTG  


==SUMMARY==
==SUMMARY==
.DOCX ADAMS Accession No.: ML12093A315 SUNSI Review
.DOCX ADAMS Accession No.: ML12093A315 SUNSI Review  
                                    ;     Non-Sensitive                       ;    Publicly Available Sensitive                                Non-Publicly Available OFFICE RI/DRP               RI/DRP                   R1/DRP mmt NAME           ARosebrook/AAR       D. Schroeder /PGK         PKrohn/PGK DATE           03/ 25 /12           04/02 /12                 04/02 /12}}
; Non-Sensitive Sensitive Publicly Available  
 
Non-Publicly Available OFFICE mmt RI/DRP RI/DRP R1/DRP NAME ARosebrook/AAR D. Schroeder /PGK PKrohn/PGK DATE 03/ 25 /12 04/02 /12 04/02 /12}}

Latest revision as of 02:55, 12 January 2025

Summary of March 21, 2012 Susquehanna 95002 Supplemental Inspection Public Exit and Regulatory Performance Meeting
ML12093A315
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/02/2012
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
Susquehanna
KROHN, PG
Shared Package
ML12055A178 List:
References
Download: ML12093A315 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 April 2, 2012 MEETING

SUMMARY

LICENSEE:

PPL SUSQUEHANNA, LLC.

FACILITY:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF MARCH 21, 2012 95002 SUPPLEMENTAL INSPECTION PUBLIC EXIT AND REGULATORY PERFORMANCE MEETING WITH PPL SUSQUEHANNA, LLC.

On March 21, from 7:00 pm to 8:30 pm, the U. S. Nuclear Regulatory Commission (NRC) conducted a public meeting at the Eagle Building in Berwick, PA. The NRC conducted the Public Exit and Regulatory Performance Meeting to discuss the results of the NRCs Supplemental Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, conducted during the weeks of February 13 and February 27, 2012. The supplemental inspection was performed as the result of one White Finding and one White Performance Indicator, both in the Initiating Events Cornerstone of the NRCs Action Matrix.

A notice of the meeting and agenda was issued on March 7, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML12066A077). The NRC slides can be located in ADAMS under Accession Number ML12089A430. ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html.

The NRC presented slides, met with PPL management, answered questions and listened to statements from members of the public, and was available to discuss its results of the 95002 Supplemental Inspection for Susquehanna Unit 1. The NRC slides presented included background on the findings and results of the inspection. Additional information relative to the NRC's Inspection and the safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at: http://www.nrc.gov/info-finder/reactor/susq1.html.

Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding Susquehannas performance and the role of the agency in ensuring safe plant operations.

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Public Meeting Sign in Sheet NRC Meeting Slides

ML12066A077). The NRC slides can be located in ADAMS under Accession Number ML12089A430. ADAMS is accessible from the NRC website at: http://nrc.gov/reading-rm/adams.html.

The NRC presented slides, met with PPL management, answered questions and listened to statements from members of the public, and was available to discuss its results of the 95002 Supplemental Inspection for Susquehanna Unit 1. The NRC slides presented included background on the findings and results of the inspection. Additional information relative to the NRC's Inspection and the safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at http://www.nrc.gov/info-finder/reactor/susq1.html.

Members of the public, local officials, state officials, and members of the media attended the meeting and were offered the opportunity to question the NRC regarding Susquehannas performance and the role of the agency in ensuring safe plant operations.

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution:

W. Dean, RA J. Clifford, DRP P. Finney, DRP, SRI D. Lew, DRA P. Krohn, DRP J. Greives, DRP, SRI J. Trapp, DRP A. Rosebrook, DRP S. Ibarrola, DRP E. Miller, DRP S. Farrell, DRP, OA D. Schroeder, DRP DOC NAME: G:\\DRP\\BRANCH4\\ASSESSMENT (EOC, MC)\\ROP 12\\2011 EOC\\AAMNOTICES\\SQ2011\\

SUS 95002 EXIT MTG

SUMMARY

.DOCX ADAMS Accession No.: ML12093A315 SUNSI Review

Non-Sensitive Sensitive Publicly Available

Non-Publicly Available OFFICE mmt RI/DRP RI/DRP R1/DRP NAME ARosebrook/AAR D. Schroeder /PGK PKrohn/PGK DATE 03/ 25 /12 04/02 /12 04/02 /12