L-12-242, FENOC Response to NRC Request for Information Pursuant 10 CFR 50.54(f) Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:FENOC | {{#Wiki_filter:FENOC 76 South Main Street FirstEnergy Nuclear Operating Company Akron. Ohio 44308 Rotor P. Sena III President and Chief Operating Officer July 10, 2012 L-12-242 10CFR50.54(f) | ||
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 | ATTN: | ||
Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Beaver Valley Power Station, Unit Nos. | |||
Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) | 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) | ||
Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a letter titled, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," to all power reactor licensees and holders of construction permits in active or deferred status. | Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a letter titled, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," to all power reactor licensees and holders of construction permits in active or deferred status. of the 10 CFR 50.54(f) letter contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic Walkdowns. | ||
This letter provides FENOC's 120 day response to the 10 CFR 50.54(f) letter for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS), Davis-Besse Nuclear Power Station (DBNPS), and Perry Nuclear Power Plant (PNPP). | This letter provides FENOC's 120 day response to the 10 CFR 50.54(f) letter for Beaver Valley Power Station, Unit Nos. | ||
1 and 2 (BVPS), Davis-Besse Nuclear Power Station (DBNPS), and Perry Nuclear Power Plant (PNPP). | |||
For seismic Recommendation 2.3 (walkdowns), Enclosure 3 of the 10 CFR 50.54(f) letter states that each licensee will confirm that it intends to use the NRC-endorsed seismic walkdown procedure or provide a description of the process it will use. | For seismic Recommendation 2.3 (walkdowns), Enclosure 3 of the 10 CFR 50.54(f) letter states that each licensee will confirm that it intends to use the NRC-endorsed seismic walkdown procedure or provide a description of the process it will use. | ||
Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station Perry Nuclear Power Plant L-12-242 Page 2 FENOC confirms that it intends to use the seismic walkdown procedure (EPRI Report 1025286, Seismic Walkdown Guidance: For Resolution ofFukushima Near-Term Task Force Recommendation 2.3: Seismic) endorsed by the NRC as the basis for the seismic walkdowns at BVPS, DBNPS, and PNPP. | Beaver Valley Power Station, Unit Nos. | ||
This letter contains no new regulatory commitments. Should you have any questions concerning the content of this letter, please contact Mr. Phil H. Lashley, Supervisor-Fleet Licensing, at 330-315-6808. | 1 and 2 Davis-Besse Nuclear Power Station Perry Nuclear Power Plant L-12-242 Page 2 FENOC confirms that it intends to use the seismic walkdown procedure (EPRI Report 1025286, Seismic Walkdown Guidance: | ||
I declare under penalty of perjury that the foregoing is true and correct. Executed on July to .2012. | For Resolution ofFukushima Near-Term Task Force Recommendation 2.3: | ||
Respectfully, Peter P. Sena, III cc: | Seismic) endorsed by the NRC as the basis for the seismic walkdowns at BVPS, DBNPS, and PNPP. | ||
This letter contains no new regulatory commitments. | |||
Should you have any questions concerning the content of this letter, please contact Mr. Phil H. Lashley, Supervisor-Fleet Licensing, at 330-315-6808. | |||
I declare under penalty of perjury that the foregoing is true and correct. | |||
Executed on July to | |||
.2012. | |||
Respectfully, Peter P. Sena, III cc: | |||
Director, Office of Nuclear Reactor Regulation (NRR) | |||
NRC Region I Administrator NRC Region III Administrator NRC Resident Inspector (BVPS) | NRC Region I Administrator NRC Region III Administrator NRC Resident Inspector (BVPS) | ||
NRC Resident Inspector (DBNPS) | NRC Resident Inspector (DBNPS) | ||
Latest revision as of 02:04, 12 January 2025
| ML12192A615 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley, Davis Besse, Perry |
| Issue date: | 07/10/2012 |
| From: | Sena P FirstEnergy Nuclear Operating Co |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| L-12-242 | |
| Download: ML12192A615 (2) | |
Text
FENOC 76 South Main Street FirstEnergy Nuclear Operating Company Akron. Ohio 44308 Rotor P. Sena III President and Chief Operating Officer July 10, 2012 L-12-242 10CFR50.54(f)
ATTN:
Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Beaver Valley Power Station, Unit Nos.
1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)
Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued a letter titled, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," to all power reactor licensees and holders of construction permits in active or deferred status. of the 10 CFR 50.54(f) letter contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic Walkdowns.
This letter provides FENOC's 120 day response to the 10 CFR 50.54(f) letter for Beaver Valley Power Station, Unit Nos.
1 and 2 (BVPS), Davis-Besse Nuclear Power Station (DBNPS), and Perry Nuclear Power Plant (PNPP).
For seismic Recommendation 2.3 (walkdowns), Enclosure 3 of the 10 CFR 50.54(f) letter states that each licensee will confirm that it intends to use the NRC-endorsed seismic walkdown procedure or provide a description of the process it will use.
Beaver Valley Power Station, Unit Nos.
1 and 2 Davis-Besse Nuclear Power Station Perry Nuclear Power Plant L-12-242 Page 2 FENOC confirms that it intends to use the seismic walkdown procedure (EPRI Report 1025286, Seismic Walkdown Guidance:
For Resolution ofFukushima Near-Term Task Force Recommendation 2.3:
Seismic) endorsed by the NRC as the basis for the seismic walkdowns at BVPS, DBNPS, and PNPP.
This letter contains no new regulatory commitments.
Should you have any questions concerning the content of this letter, please contact Mr. Phil H. Lashley, Supervisor-Fleet Licensing, at 330-315-6808.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on July to
.2012.
Respectfully, Peter P. Sena, III cc:
Director, Office of Nuclear Reactor Regulation (NRR)
NRC Region I Administrator NRC Region III Administrator NRC Resident Inspector (BVPS)
NRC Resident Inspector (DBNPS)
NRC Resident Inspector (PNPP)
Director BRP/DEP Site BRP/DEP Representative Utility Radiological Safety Board