{{#Wiki_filter: | {{#Wiki_filter: November 5, 2012 | ||
Lou Cortopassi, Vice President | |||
and Chief Nuclear Officer | |||
Lou Cortopassi, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550 | Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 | ||
Fort Calhoun, NE 68023-0550 | |||
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000285/2012005) AND REQUEST FOR INFORMATION | |||
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000285/2012005) AND REQUEST FOR INFORMATION | |||
Dear Mr. Cortopassi: | |||
From November 26-30, 2012, inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline biennial requalification inspection at Fort Calhoun Station, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program." Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into three groups. The first group (Section A of the enclosure) identifies information to be provided prior to the onsite portion of the inspection to support inspector preparation. The second group (Section B of the enclosure) identifies information the inspectors will need upon arrival at the site. The third group (Section C of the enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has departed the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or onsite portions of the inspection. | |||
From November 26-30, 2012, inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline biennial requalification inspection at Fort Calhoun Station, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program." Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into three groups. The first group (Section A of the enclosure) identifies information to be provided prior to the onsite portion of the inspection | |||
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Randy Cade of your Training organization. Our inspection dates are subject to change based on your updated schedule of examination activities. If there are any questions about this inspection or the material requested, please contact the lead inspector, Brian Larson, at (817) 200-1172 (brian.larson@nrc.gov) or Clyde Osterholtz at (817) 200-1269 (clyde.osterholtz@nrc.gov). This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | to support inspector preparation. The second group (Section B of the enclosure) identifies | ||
information the inspectors will need upon arrival at the site. The third group (Section C of the | |||
Sincerely,/RA/ Vincent Gaddy, Chief Operations Branch Division of Reactor Safety | enclosure) identifies the items which are necessary to close out the inspection and are usually | ||
sent a few weeks after the team has departed the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or onsite portions of the inspection. | |||
Docket: 50-285 License: DPR-40 | |||
We have discussed the schedule for these inspection activities with your staff and understand | |||
that our regulatory contact for this inspection will be Mr. Randy Cade of your Training organization. Our inspection dates are subject to change based on your updated schedule of examination activities. If there are any questions about this inspection or the material | |||
requested, please contact the lead inspector, Brian Larson, at (817) 200-1172 | |||
(brian.larson@nrc.gov) or Clyde Osterholtz at (817) 200-1269 (clyde.osterholtz@nrc.gov). This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a | |||
request for information or an information collection requirement unless the requesting document | |||
displays a currently valid Office of Management and Budget control number. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 | |||
L. Cortopassi - 3 - | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document | |||
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Vincent Gaddy, Chief Operations Branch Division of Reactor Safety | |||
Docket: 50-285 | |||
License: DPR-40 Enclosure: | |||
Inservice Inspection Document Request | Inservice Inspection Document Request | ||
cc w/enclosure: Electronic Distribution for Fort Calhoun Station | |||
L. Cortopassi - 4 - | |||
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) | |||
DRP Director (Kriss.Kennedy@nrc.gov) | |||
Acting DRP Deputy Director (Barry.Westreich@nrc.gov) | |||
Acting DRS Director (Tom.Blount@nrc.gov) | |||
Acting DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (John.Kirkland@nrc.gov) Resident Inspector (Jacob.Wingebach@nrc.gov) | |||
Branch Chief, DRP/F (Mike.Hay@nrc.gov) | |||
Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov) | |||
Project Engineer, DRP/F (Chris.Smith@nrc.gov) FCS Administrative Assistant - Vacant Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | |||
Project Manager (Lynnea.Wilkins@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV/ETA: OEDO (Cayetano.Santos@nrc.gov) | |||
DRS/TSB STA (Dale.Powers@nrc.gov) | |||
SUNSI Review Completed: ___Y___ ADAMS: Yes No Initials: __BTL___ Publicly Available Non-Publicly Available Sensitive Non-Sensitive | |||
SOE:OB C:OB BLarson VGaddy /RA/ /RA/ 11/2/12 11/5/12 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | |||
R:\_REACTORS\_FCS\2012\FCS 2012005-RFI LTR-btl.doc ML12310A307 | |||
- 1 - Enclosure BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST From: Brian Larson Senior Operations Engineer, NRC RIV | |||
817-200-1172 | |||
To: Randy Cade Manager, Operations Training and Simulator, Fort Calhoun Station 402-533-6032 | |||
Subject: Information Request to Support November 2012 Licensed Operator Requalification Program Inspection (IP 71111.11B) | |||
A. The following information is requested in order to support inspection preparation activities. These items are listed by section as they appear in the inspection module | |||
(i.e., 2.02, 2.04, etc.). Requested materials should be sent either electronically or | |||
hardcopy in order to arrive at the Region IV office no later than November 16, 2012. * Electronically: To: brian.larson@nrc.gov cc: clyde.osterholtz@nrc.gov and nicholas.hernandez@nrc.gov * Hard copy to: US Nuclear Regulatory Commission, Region IV 1600 E. Lamar Blvd Arlington, TX 76011 | |||
ATTN: Brian Larson General Requests: * List of licensed operators (SRO & RO) by crew (operating & staff) * Training and Operations Department organization charts (with qualified LOR evaluators identified) * Procedures that identify process for revising and maintaining LO continuing training program up to date * List of outstanding LOR program changes * List of plant events and industry operating experience incorporated into LOR program since last BRQ * Audits and/or self-assessment reports addressing the licensed operator requalification training program * Last two years of Simulator Review Committee (or equivalent) meeting minutes * Last two years of Training Review Group (or equivalent) meeting minutes 02.03: Biennial Requalification Written Examination Quality * Biennial requalification written examination schedule * All available biennial requalification written examination results for both SRO & RO that have been administered up to this submittal * All biennial requalification written examinations that have been approved for administration. This will need to have adequate password protection if e-mailed or double envelope protection if mailed via regular mail per NUREG-1021. * Current biennial requalification cycle examination methodology (sample plan) | |||
- 2 - Enclosure 02.04: Annual Requalification Operating Test Quality * Schedule for the operating tests (JPMs & scenarios) to be given the week of November 26th (onsite inspection week) * Operating test materials (JPMs & scenarios) (password protected) to be given the week of November 26th (onsite inspection week) * Annual operating test materials (JPMs & scenarios) and results up to this submittal * All of the previous year's NRC required annual operating test materials (JPMs & scenarios) * Current annual operating test methodology (sample plan) * Documents (UFSAR, procedures, etc.) that identify operator response times for time critical operator actions and risk significant operator actions 02.05: Licensee Administration of Requalification Exams * All procedures used to administer the annual operating test * All procedures used to assess operator performance * All procedures that describe conduct of simulator training * All procedures used to test, operate, and maintain the simulator 02.06: Requalification Examination Security * Submit any tracking tools that you use as a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis. * Submit any tracking tools that you use as a means to prevent excessive overlap on the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc.) on a periodic basis. * All procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations in current exam cycle tests and prior year examinations * List of all Condition Reports since the last biennial requalification inspection related to examination security and overlap | |||
02.07: Licensee Remedial Training Program * List of remedial training conducted or planned since last requalification exams (includes training provided to operators to enable passing requalification exams and training provided to correct generic or individual weaknesses observed during requalification exam cycle) * Remediation plans (lesson plans, reference materials, and attendance documentation) 02.08: Conformance with Operator License Conditions * All procedures and program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators * All procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial requalification inspection | |||
- 3 - Enclosure 02.10: Problem Identification and Resolution * A summary report of all condition reports related to operator actions/errors in the control room * Any revised requalification training that was based on licensed operator performance issues | |||
B. The following information is requested in order to support the onsite inspection activities. Requested materials should be available to the inspection team, either | |||
electronically or hardcopy, upon site arrival on November 26, 2012. 02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality * All operating test materials (JPMs & scenarios) to be given in all subsequent weeks after onsite week * All results up to the day the team leaves the site. 02.08: Conformance with Operator License Conditions * Access to licensed operators' records (operating and staff crews) * Access to licensed operators' training attendance records * Access to licensed operators' medical records 02.09: Simulator Performance * Simulator discrepancies (DR's) from last biennial requalification inspection to present. This should include all open DR's and DR's that have been closed, including the documentation/justification for closure. * Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant. * All current model deficiencies, including FSAR vs. Design differences in the simulator (any documentation on this) * Summary list of plant modifications from last biennial requalification inspection to November 2012. * List of plant modifications (both hardware and software) completed on the simulator by due date from last biennial requalification inspection to November 2012. * Simulator Differences Lesson plan used in training (current to November 23, 2012). * The complete book of all simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests. This should also include the | |||
test procedure(s) for each test, the acceptance criteria, and results. For each | |||
transient test, the reference chart should be included or an equivalent subject matter | |||
expert review versus the simulator results with a write-up for any differences beyond the ANSI standard requirements. * All test packages used to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and | |||
the acceptance criteria with results. | |||
- 4 - Enclosure * All simulator test, configuration management, and related documents available for inspectors to review. This includes training needs analysis packages, simulator review committee meeting minutes, etc. * Current copy of ANSI 3.5 standard you are committed to for Simulator testing. * Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available). 02.10: Problem Identification and Resolution * All condition reports related to operator actions/errors in the control room C. Fort Calhoun Station is required to send the final results summary and any remaining written exams and operating tests that have not been submitted to the regional office | |||
lead inspector for this inspection for final review and comparison against the | |||
Significance Determination Tools in order to communicate the exit results for the | |||
inspection. | |||
}} | }} |
Revision as of 09:25, 28 March 2018
ML12310A307 | |
Person / Time | |
---|---|
Site: | Fort Calhoun |
Issue date: | 11/05/2012 |
From: | Vincent Gaddy Operations Branch IV |
To: | Cortopassi L Omaha Public Power District |
References | |
IR-12-005 | |
Download: ML12310A307 (7) | |
See also: IR 05000285/2012005
Text
November 5, 2012
Lou Cortopassi, Vice President
and Chief Nuclear Officer
Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000285/2012005) AND REQUEST FOR INFORMATION
Dear Mr. Cortopassi:
From November 26-30, 2012, inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline biennial requalification inspection at Fort Calhoun Station, using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program." Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into three groups. The first group (Section A of the enclosure) identifies information to be provided prior to the onsite portion of the inspection
to support inspector preparation. The second group (Section B of the enclosure) identifies
information the inspectors will need upon arrival at the site. The third group (Section C of the
enclosure) identifies the items which are necessary to close out the inspection and are usually
sent a few weeks after the team has departed the site. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Randy Cade of your Training organization. Our inspection dates are subject to change based on your updated schedule of examination activities. If there are any questions about this inspection or the material
requested, please contact the lead inspector, Brian Larson, at (817) 200-1172
(brian.larson@nrc.gov) or Clyde Osterholtz at (817) 200-1269 (clyde.osterholtz@nrc.gov). This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
L. Cortopassi - 3 -
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Vincent Gaddy, Chief Operations Branch Division of Reactor Safety
Docket: 50-285
License: DPR-40 Enclosure:
Inservice Inspection Document Request
cc w/enclosure: Electronic Distribution for Fort Calhoun Station
L. Cortopassi - 4 -
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Barry.Westreich@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (John.Kirkland@nrc.gov) Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Mike.Hay@nrc.gov)
Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)
Project Engineer, DRP/F (Chris.Smith@nrc.gov) FCS Administrative Assistant - Vacant Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
Project Manager (Lynnea.Wilkins@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Cayetano.Santos@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
SUNSI Review Completed: ___Y___ ADAMS: Yes No Initials: __BTL___ Publicly Available Non-Publicly Available Sensitive Non-Sensitive
SOE:OB C:OB BLarson VGaddy /RA/ /RA/ 11/2/12 11/5/12 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
R:\_REACTORS\_FCS\2012\FCS 2012005-RFI LTR-btl.doc ML12310A307
- 1 - Enclosure BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST From: Brian Larson Senior Operations Engineer, NRC RIV
817-200-1172
To: Randy Cade Manager, Operations Training and Simulator, Fort Calhoun Station 402-533-6032
Subject: Information Request to Support November 2012 Licensed Operator Requalification Program Inspection (IP 71111.11B)
A. The following information is requested in order to support inspection preparation activities. These items are listed by section as they appear in the inspection module
(i.e., 2.02, 2.04, etc.). Requested materials should be sent either electronically or
hardcopy in order to arrive at the Region IV office no later than November 16, 2012. * Electronically: To: brian.larson@nrc.gov cc: clyde.osterholtz@nrc.gov and nicholas.hernandez@nrc.gov * Hard copy to: US Nuclear Regulatory Commission, Region IV 1600 E. Lamar Blvd Arlington, TX 76011
ATTN: Brian Larson General Requests: * List of licensed operators (SRO & RO) by crew (operating & staff) * Training and Operations Department organization charts (with qualified LOR evaluators identified) * Procedures that identify process for revising and maintaining LO continuing training program up to date * List of outstanding LOR program changes * List of plant events and industry operating experience incorporated into LOR program since last BRQ * Audits and/or self-assessment reports addressing the licensed operator requalification training program * Last two years of Simulator Review Committee (or equivalent) meeting minutes * Last two years of Training Review Group (or equivalent) meeting minutes 02.03: Biennial Requalification Written Examination Quality * Biennial requalification written examination schedule * All available biennial requalification written examination results for both SRO & RO that have been administered up to this submittal * All biennial requalification written examinations that have been approved for administration. This will need to have adequate password protection if e-mailed or double envelope protection if mailed via regular mail per NUREG-1021. * Current biennial requalification cycle examination methodology (sample plan)
- 2 - Enclosure 02.04: Annual Requalification Operating Test Quality * Schedule for the operating tests (JPMs & scenarios) to be given the week of November 26th (onsite inspection week) * Operating test materials (JPMs & scenarios) (password protected) to be given the week of November 26th (onsite inspection week) * Annual operating test materials (JPMs & scenarios) and results up to this submittal * All of the previous year's NRC required annual operating test materials (JPMs & scenarios) * Current annual operating test methodology (sample plan) * Documents (UFSAR, procedures, etc.) that identify operator response times for time critical operator actions and risk significant operator actions 02.05: Licensee Administration of Requalification Exams * All procedures used to administer the annual operating test * All procedures used to assess operator performance * All procedures that describe conduct of simulator training * All procedures used to test, operate, and maintain the simulator 02.06: Requalification Examination Security * Submit any tracking tools that you use as a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis. * Submit any tracking tools that you use as a means to prevent excessive overlap on the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc.) on a periodic basis. * All procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations in current exam cycle tests and prior year examinations * List of all Condition Reports since the last biennial requalification inspection related to examination security and overlap
02.07: Licensee Remedial Training Program * List of remedial training conducted or planned since last requalification exams (includes training provided to operators to enable passing requalification exams and training provided to correct generic or individual weaknesses observed during requalification exam cycle) * Remediation plans (lesson plans, reference materials, and attendance documentation) 02.08: Conformance with Operator License Conditions * All procedures and program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators * All procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial requalification inspection
- 3 - Enclosure 02.10: Problem Identification and Resolution * A summary report of all condition reports related to operator actions/errors in the control room * Any revised requalification training that was based on licensed operator performance issues
B. The following information is requested in order to support the onsite inspection activities. Requested materials should be available to the inspection team, either
electronically or hardcopy, upon site arrival on November 26, 2012. 02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality * All operating test materials (JPMs & scenarios) to be given in all subsequent weeks after onsite week * All results up to the day the team leaves the site. 02.08: Conformance with Operator License Conditions * Access to licensed operators' records (operating and staff crews) * Access to licensed operators' training attendance records * Access to licensed operators' medical records 02.09: Simulator Performance * Simulator discrepancies (DR's) from last biennial requalification inspection to present. This should include all open DR's and DR's that have been closed, including the documentation/justification for closure. * Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant. * All current model deficiencies, including FSAR vs. Design differences in the simulator (any documentation on this) * Summary list of plant modifications from last biennial requalification inspection to November 2012. * List of plant modifications (both hardware and software) completed on the simulator by due date from last biennial requalification inspection to November 2012. * Simulator Differences Lesson plan used in training (current to November 23, 2012). * The complete book of all simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests. This should also include the
test procedure(s) for each test, the acceptance criteria, and results. For each
transient test, the reference chart should be included or an equivalent subject matter
expert review versus the simulator results with a write-up for any differences beyond the ANSI standard requirements. * All test packages used to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and
the acceptance criteria with results.
- 4 - Enclosure * All simulator test, configuration management, and related documents available for inspectors to review. This includes training needs analysis packages, simulator review committee meeting minutes, etc. * Current copy of ANSI 3.5 standard you are committed to for Simulator testing. * Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available). 02.10: Problem Identification and Resolution * All condition reports related to operator actions/errors in the control room C. Fort Calhoun Station is required to send the final results summary and any remaining written exams and operating tests that have not been submitted to the regional office
lead inspector for this inspection for final review and comparison against the
Significance Determination Tools in order to communicate the exit results for the
inspection.