GO2-17-186, Response to Request for Additional Information Related to License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Alex L Javorik Columbia Generating Station P.O. Box 968, PE23 Richland, WA 99352-0968 Ph. 509.377. 2354 l F. 509.377. 8555 aljavorik @energy-northwest.com January 2, 2018 GO2-17-186 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
{{#Wiki_filter:Alex L Javorik Columbia Generating Station P.O. Box 968, PE23 Richland, WA 99352-0968 Ph. 509.377. 2354 l F. 509.377. 8555 aljavorik @energy-northwest.com January 2, 2018 GO2-17-186 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001  


==Subject:==
==Subject:==
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST - REVISE TECHNICAL SPECIFICATION 5.5.12 FOR PERMANENT EXTENSION OF TYPE A TEST AND TYPE C LEAK RATE TEST FREQUENCIES
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST - REVISE TECHNICAL SPECIFICATION 5.5.12 FOR PERMANENT EXTENSION OF TYPE A TEST AND TYPE C LEAK RATE TEST FREQUENCIES  


==References:==
==References:==
: 1. Letter, GO2-17-009, A.L. Javorik (Energy Northwest) to NRC, "License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extensions of Type A Test and Type C Leak Rate Test Frequencies," dated March 27, 2017 (ADAMS Accession Number ML17086A586)
: 1. Letter, GO2-17-009, A.L. Javorik (Energy Northwest) to NRC, "License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extensions of Type A Test and Type C Leak Rate Test Frequencies," dated March 27, 2017 (ADAMS Accession Number ML17086A586)
: 2. Email, Klos (NRC) to L.L. Williams (Energy Northwest), "RAIs for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR," dated October 13, 2017 (ADAMS Accession Number ML17286A575)
: 2. Email, Klos (NRC) to L.L. Williams (Energy Northwest), "RAIs for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR," dated October 13, 2017 (ADAMS Accession Number ML17286A575)
: 3. Email, Klos (NRC) to S.J. Christianson (Energy Northwest), "RAIs for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - new RAI response date," dated December 7, 2017 (ADAMS Accession Number ML17341B027)
: 3. Email, Klos (NRC) to S.J. Christianson (Energy Northwest), "RAIs for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - new RAI response date," dated December 7, 2017 (ADAMS Accession Number ML17341B027)  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By Reference 1 Energy Northwest submitted a License Amendment Request to revise the Columbia Generating Station (Columbia) Technical Specification (TS) 5.5.12 for permanent extension of Type A and Type C leak rate test frequencies. By Reference 2 the Nuclear Regulatory Commission (NRC) requested additional information related to the Energy Northwest submittal. The enclosure to this letter contains the requested information.
By Reference 1 Energy Northwest submitted a License Amendment Request to revise the Columbia Generating Station (Columbia) Technical Specification (TS) 5.5.12 for permanent extension of Type A and Type C leak rate test frequencies. By Reference 2 the Nuclear Regulatory Commission (NRC) requested additional information related to the Energy Northwest submittal. The enclosure to this letter contains the requested information.
The No Significant Hazards Consideration Determination (NSHCD) provided in the original submittal is not altered by this submittal. No new commitments are being made by this letter or the enclosure.
The No Significant Hazards Consideration Determination (NSHCD) provided in the original submittal is not altered by this submittal. No new commitments are being made by this letter or the enclosure.
If there are any questions or if additional information is needed, please contact Ms. L. L.
If there are any questions or if additional information is needed, please contact Ms. L. L.
Williams, Licensing Supervisor, at 509-377-8148.
Williams, Licensing Supervisor, at 509-377-8148.  


G02-17-186 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct.
G02-17-186 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed this 2 d. day of January, 2018.
Executed this 2 i1 d. day of January, 2018.
i1 A. L. Jav. ik Vice President, Engineering
A. L. Jav. ik Vice President, Engineering  


==Enclosure:==
==Enclosure:==
As stated cc:   NRC RIV Regional Administrator NRC NRR Project Manager NRC Senior Resident lnspector/988C CD Sonoda - BPA/1399 (email)
As stated cc:
NRC RIV Regional Administrator NRC NRR Project Manager NRC Senior Resident lnspector/988C CD Sonoda - BPA/1399 (email)
EFSECutc.wa.gov - EFSEC (email)
EFSECutc.wa.gov - EFSEC (email)
RR Cowley - WDOH (email)
RR Cowley - WDOH (email)
WA Horin - Winston & Strawn
WA Horin - Winston & Strawn  


GO2-17-186 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION
GO2-17-186 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION  


ll ENERCON         Excellence-Every project. Every day Response to RAis for the ILRT LAR Columbia Generating Station Revision 2 Vig .... _     .. -~....
ll ENERCON Excellence-Every project. Every day Response to RAis for the ILRT LAR Columbia Generating Station Revision 2 Vig.... _  
.. -~
Joseph Lavelline ::;::-.:::;.--:;..:.....:~.~"""'
Joseph Lavelline ::;::-.:::;.--:;..:.....:~.~"""'
Prepared by: _ _ _ _ _ _ _ _      "''*__"_u_''"_
Prepared by: ________
20 1 Joe Lavell ine, ENERCON Services Dl9l1ally signed by Elle Jorgenson ON <n* Enk JOJgffi~ o.-.Enerieori Services, Inc . ou, eman*ejorgen'o~rcon.<om.. ,       . us Date*2017.12.17 U0Hl2--08W Reviewed by: Er~O:                               Services         12/:t7/t7 Habib Shtaih, Energy Northwest Blake Smith, Energy Nonhwest Page l
"''*_20_"_
1u_''"_"'"_'..,_'"" __ _
Joe Lavelline, ENERCON Services Dl9l1ally signed by Elle Jorgenson ON <n*Enk JOJgffi~ o.-.Enerieori Services, Inc. ou, eman*ejorgen'o~rcon.<om..,. us Date*2017.12.17 U0Hl2--08W Reviewed by: Er~O: Services 12/:t7/t7 Habib Shtaih, Energy Northwest Blake Smith, Energy Nonhwest Page l  


Response to RAIs for ILRT Permanent Surveillance Interval Extension By letter dated March 27, 2017 (Agencywide Documents Access and Management System (ADAMS)
Page 2 Response to RAIs for ILRT Permanent Surveillance Interval Extension By {{letter dated|date=March 27, 2017|text=letter dated March 27, 2017}} (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17086A586), Energy Northwest (the licensee) submitted a License Amendment Request (LAR) to revise the Columbia Generating Station (Columbia) Technical Specification (TS) 5.5.12 for permanent extension of Type A and Type C Leak Rate Test Frequencies to 15 years (180 months) and 75 months respectively.
Accession No. ML17086A586), Energy Northwest (the licensee) submitted a License Amendment Request (LAR) to revise the Columbia Generating Station (Columbia) Technical Specification (TS) 5.5.12 for permanent extension of Type A and Type C Leak Rate Test Frequencies to 15 years (180 months) and 75 months respectively.
The Probabilistic Risk Assessment Licensing Branch has reviewed the LAR and has identified areas where additional information is needed to complete its review. Responses to Request for Additional Information (RAI) 01 through 04 are provided below.
The Probabilistic Risk Assessment Licensing Branch has reviewed the LAR and has identified areas where additional information is needed to complete its review. Responses to Request for Additional Information (RAI) 01 through 04 are provided below.
Line 63: Line 66:
: 6. RG 1.200, "An Approach for Determining the Technical Adequacy Probabilistic Risk Assessment Results for Risk-Informed Activities," Revision 2, dated March 2009
: 6. RG 1.200, "An Approach for Determining the Technical Adequacy Probabilistic Risk Assessment Results for Risk-Informed Activities," Revision 2, dated March 2009
: 7. Practical Guidance on the Use of Probabilistic Risk Assessment in Risk-Informed Applications with a Focus on the Treatment of Uncertainty, Electrical Power Research Institute (EPRI), Palo Alto, CA: 2012, 1026511
: 7. Practical Guidance on the Use of Probabilistic Risk Assessment in Risk-Informed Applications with a Focus on the Treatment of Uncertainty, Electrical Power Research Institute (EPRI), Palo Alto, CA: 2012, 1026511
: 8. Letter, GO2-15-045, D.A. Swank (Energy Northwest) to Nuclear Regulatory Commission (NRC),
: 8. Letter, GO2-15-045, D.A. Swank (Energy Northwest) to Nuclear Regulatory Commission (NRC),  
        "Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident," dated March 12, 2015
"Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident," dated March 12, 2015
: 9. FRANX, R&R Workstation, EPRI, Version 4.2.0.4, 2013
: 9. FRANX, R&R Workstation, EPRI, Version 4.2.0.4, 2013
: 10. NUREG/CR-1278, Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications, dated August 1983
: 10. NUREG/CR-1278, Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications, dated August 1983
: 11. IPEEE-2-RE-0001, Re-examination of the external events evaluation in the IPEEE, Revision 0, dated 2017 Page 2
: 11. IPEEE-2-RE-0001, Re-examination of the external events evaluation in the IPEEE, Revision 0, dated 2017  
 
Page 3
: 12. RG 1.174, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, Revision 2, dated May 2011
: 12. RG 1.174, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, Revision 2, dated May 2011
: 13. PSA-2-HR-0001, Human Reliability Assessment, Revision 3, dated July 6, 2016
: 13. PSA-2-HR-0001, Human Reliability Assessment, Revision 3, dated July 6, 2016
: 14. Flood Hazard Reevaluation Report, Response to the 50.54(f) information request regarding near-term task force recommendation 2.1: Flooding for the Columbia Generating Station, ENERCON Services, Inc., Revision 0, dated September 27, 2016
: 14. Flood Hazard Reevaluation Report, Response to the 50.54(f) information request regarding near-term task force recommendation 2.1: Flooding for the Columbia Generating Station, ENERCON Services, Inc., Revision 0, dated September 27, 2016
: 15. An Approach to Human Reliability Analysis for External Events with a Focus on Seismic, Electrical Power Research Institute (EPRI), Palo Alto, CA: 2016, 3002008093 Page 3
: 15. An Approach to Human Reliability Analysis for External Events with a Focus on Seismic, Electrical Power Research Institute (EPRI), Palo Alto, CA: 2016, 3002008093  


PRA RAI 1 - Internal Events PRA Technical Adequacy The License Amendment Request (LAR) states that the Columbia Generating Station (CGS) internal events PRA last underwent a peer review in 2009 against the American Society of Mechanical Engineers (ASME)/ American Nuclear Society (ANS) PRA Standard ASME/ANS RA-Sa-2009, as clarified by Regulatory Guide (RG) 1.200, Revision 2. The NRC staff notes that the License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A (ADAMS Accession Number ML16313A573) states that the 2009 peer review was a full-scope peer review against ASME/ANS RA-Sa-2009 and RG 1.200, Revision 2, using the industry peer review process guidelines in NEI-05-04, Revision 2.
Page 4 PRA RAI 1 - Internal Events PRA Technical Adequacy The License Amendment Request (LAR) states that the Columbia Generating Station (CGS) internal events PRA last underwent a peer review in 2009 against the American Society of Mechanical Engineers (ASME)/ American Nuclear Society (ANS) PRA Standard ASME/ANS RA-Sa-2009, as clarified by Regulatory Guide (RG) 1.200, Revision 2. The NRC staff notes that the License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A (ADAMS Accession Number ML16313A573) states that the 2009 peer review was a full-scope peer review against ASME/ANS RA-Sa-2009 and RG 1.200, Revision 2, using the industry peer review process guidelines in NEI-05-04, Revision 2.
: a. Confirm that the 2009 peer review included a full-scope peer review of the internal flooding PRA model, otherwise provide the necessary information to assess the quality of the internal flooding PRA model against RG 1.200, Revision 2, including history of peer reviews, Facts and Observations (F&Os) and their resolution or disposition for the application.
: a. Confirm that the 2009 peer review included a full-scope peer review of the internal flooding PRA model, otherwise provide the necessary information to assess the quality of the internal flooding PRA model against RG 1.200, Revision 2, including history of peer reviews, Facts and Observations (F&Os) and their resolution or disposition for the application.
: b. Describe the changes made to the internal events and internal flooding PRA since the last full-scope peer review. This description should be of sufficient detail to assess whether these changes are PRA maintenance or PRA upgrades as defined in Section 1-5.4 of the PRA Standard.
: b. Describe the changes made to the internal events and internal flooding PRA since the last full-scope peer review. This description should be of sufficient detail to assess whether these changes are PRA maintenance or PRA upgrades as defined in Section 1-5.4 of the PRA Standard.
Since the following may indicate a PRA upgrade, include in your discussion: any new methodologies, changes in scope that impacts the significant accident sequences or the significant accident progression sequences, changes in capability that impacts the significant accident sequences or the significant accident progression sequences.
Since the following may indicate a PRA upgrade, include in your discussion: any new methodologies, changes in scope that impacts the significant accident sequences or the significant accident progression sequences, changes in capability that impacts the significant accident sequences or the significant accident progression sequences.
: c. Indicate, and provide justification, whether the changes described in Part b are PRA maintenance or PRA upgrades as defined in Section 1-5.4 of the PRA Standard.
: c. Indicate, and provide justification, whether the changes described in Part b are PRA maintenance or PRA upgrades as defined in Section 1-5.4 of the PRA Standard.
: d. Indicate whether focused-scope peer review(s) has been performed for those PRA upgrades identified in Part 2. As applicable, provide a list of the F&Os from the peer review(s) that do not meet the appropriate Capability Category in accordance with EPRI TR 1021467-A, and explain how the F&Os were dispositioned for this application. If focused-scope peer review(s) have not been performed for these PRA upgrades, then provide a quantitative evaluation (e.g., sensitivity or bounding analysis) of its effect on the application until a focused-scope peer review can be completed.
: d. Indicate whether focused-scope peer review(s) has been performed for those PRA upgrades identified in Part 2. As applicable, provide a list of the F&Os from the peer review(s) that do not meet the appropriate Capability Category in accordance with EPRI TR 1021467-A, and explain how the F&Os were dispositioned for this application. If focused-scope peer review(s) have not been performed for these PRA upgrades, then provide a quantitative evaluation (e.g., sensitivity or bounding analysis) of its effect on the application until a focused-scope peer review can be completed.  


===Response===
===Response===
The requested information is provided below.
The requested information is provided below.
: a. The Columbia 2009 peer review included a full-scope review of the internal flooding Probabilistic Risk Assessment (PRA) model.
: a. The Columbia 2009 peer review included a full-scope review of the internal flooding Probabilistic Risk Assessment (PRA) model.
: b. Following the Columbia 2009 full-scope peer review, three PRA updates have been performed of the Columbia internal events and internal flooding PRAs, PRA Revisions 7.1, 7.2, and minor PRA Revision 7.2.1. See Tables RAI01-1, RAI01-2, and RAI01-3 for descriptions of model changes for these PRA updates. Tables RAI01-1, RAI01-2, and RAI01-3 document, as applicable, the use of any new methodologies, changes in scope that impact the significant accident sequences or the significant accident progression sequences, and / or changes in capability that impact the significant accident sequences or the significant accident progression sequences.
: b. Following the Columbia 2009 full-scope peer review, three PRA updates have been performed of the Columbia internal events and internal flooding PRAs, PRA Revisions 7.1, 7.2, and minor PRA Revision 7.2.1. See Tables RAI01-1, RAI01-2, and RAI01-3 for descriptions of model changes for these PRA updates. Tables RAI01-1, RAI01-2, and RAI01-3 document, as applicable, the use of any new methodologies, changes in scope that impact the significant accident sequences or the significant accident progression sequences, and / or changes in capability that impact the significant accident sequences or the significant accident progression sequences.  
Page 4
 
Page 5
: c. See Tables RAI01-1, RAI01-2, and RAI01-3 for descriptions of model change classifications and rationale. All PRA model changes performed since the peer review constitute model maintenance.
: c. See Tables RAI01-1, RAI01-2, and RAI01-3 for descriptions of model change classifications and rationale. All PRA model changes performed since the peer review constitute model maintenance.
: d. All PRA model changes performed since the peer review constitute model maintenance; therefore, no focused-scope peer review was required for the Columbia PRA.
: d. All PRA model changes performed since the peer review constitute model maintenance; therefore, no focused-scope peer review was required for the Columbia PRA.  
Page 5


Table RAI01-1 Model Changes Performed for PRA Revision 7.1 1      2 Source     F&O      SR        Level                             Model Change                         Classification               Rationale Peer Review   1-11   IE-   Suggestion   The interface loss of coolant accident (ISLOCA) modeling       PRA            In response to a peer review 2009                  C14                was revised for PRA Rev. 7.1 to resolve this peer review       Maintenance    suggestion, this change consisted of suggestion. Cutsets containing multiple pre-initiator                         correcting a model error. This change operator failures were determined to not be appropriate                       has no significant impact on risk (they are demand-related, and do not represent                               insights.
Page 6 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Peer Review 2009 1-11 IE-C14 Suggestion The interface loss of coolant accident (ISLOCA) modeling was revised for PRA Rev. 7.1 to resolve this peer review suggestion. Cutsets containing multiple pre-initiator operator failures were determined to not be appropriate (they are demand-related, and do not represent frequencies). No cutsets contain multiple pre-initiator operator failures in the revised ISLOCA initiating event model. All cutsets now appropriately represent yearly frequencies.
frequencies). No cutsets contain multiple pre-initiator operator failures in the revised ISLOCA initiating event model. All cutsets now appropriately represent yearly frequencies.
PRA Maintenance In response to a peer review suggestion, this change consisted of correcting a model error. This change has no significant impact on risk insights.
Peer Review   1-14   IE-   Finding     The ISLOCA analysis was revised to replace older valve         PRA            In response to a peer review finding, 2009                  C14                failure data published by NSAC-154 with the latest valve       Maintenance    this change corrected a model error.
Peer Review 2009 1-14 IE-C14 Finding The ISLOCA analysis was revised to replace older valve failure data published by NSAC-154 with the latest valve failure data published in NUREG/CR-6928, wherever newer data was available. A review of NUREG/CR-5124 revealed that the conditional probability of check valve closure (event tree node CV) is applicable only to scenarios in which a testable check valve is held open due to reverse air flow to the controller. The 0.01 credit had minimal impact on the ISLOCA sequence cutsets, as the significant check valve failures are leakage and rupture. Therefore, event tree node CV was removed from the ISLOCA event tree. Event tree node SML (small leak through the high/low pressure interface) is moved to an earlier position in the event tree, as leaks through the high/low pressure boundary are judged to be isolable (the 900-pound MOVs that are present at the boundaries are judged to be capable of closing against a leak). The model retains the assumption that MOVs would not likely close if a piping rupture and interface rupture were to occur, per NUREG/CR-5124 guidelines. Also, the event tree node ISOVAV (early isolation of the ISLOCA)
failure data published in NUREG/CR-6928, wherever newer data was available. A review of NUREG/CR-5124 revealed that the conditional probability of check valve closure (event tree node CV) is applicable only to scenarios in which a testable check valve is held open due to reverse air flow to the controller. The 0.01 credit had minimal impact on the ISLOCA sequence cutsets, as the significant check valve failures are leakage and rupture. Therefore, event tree node CV was removed from the ISLOCA event tree. Event tree node SML (small leak through the high/low pressure interface) is moved to an earlier position in the event tree, as leaks through the high/low pressure boundary are judged to be isolable (the 900-pound MOVs that are present at the boundaries are judged to be capable of closing against a leak). The model retains the assumption that MOVs would not likely close if a piping rupture and interface rupture were to occur, per NUREG/CR-5124 guidelines. Also, the event tree node ISOVAV (early isolation of the ISLOCA) 1 Finding & Observation (F&O) 2 Supporting Requirement (SR)
PRA Maintenance In response to a peer review finding, this change corrected a model error.
Page 6
1 Finding & Observation (F&O) 2 Supporting Requirement (SR)  


Table RAI01-1 Model Changes Performed for PRA Revision 7.1 1    2 Source F&O  SR  Level                             Model Change                       Classification Rationale probability has been changed to a 0.1 based on documentation provided with the Columbia SPAR model.
Page 7 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale probability has been changed to a 0.1 based on documentation provided with the Columbia SPAR model.
From the Columbia SPAR model documentation:
From the Columbia SPAR model documentation:
Without doing detailed pressure capacity calculations and detailed modeling of the expected internal pressures and temperatures expected in the connected systems, it is impossible to predict the location of potential ruptures.
Without doing detailed pressure capacity calculations and detailed modeling of the expected internal pressures and temperatures expected in the connected systems, it is impossible to predict the location of potential ruptures.
Even with detailed calculations and modeling, precise rupture locations are impossible to identify. Nevertheless, some general observations can be made based on the GI-105 research. For most situations the RHR heat exchanger, and pump suction pipe are the components with the lowest pressure capacities. Generally, these components are positioned within the systems such that one or more valves are available to isolate a rupture, should an ISLOCA occur at these locations. However, it is possible that if the pressure isolation interface were to fail, that either the available valves would not successfully isolate the rupture, or the rupture could occur in a location that cannot be isolated. To account for these possibilities, a generic 10% probability is assumed that if a rupture were to occur, it cannot be isolated.
Even with detailed calculations and modeling, precise rupture locations are impossible to identify. Nevertheless, some general observations can be made based on the GI-105 research. For most situations the RHR heat exchanger, and pump suction pipe are the components with the lowest pressure capacities. Generally, these components are positioned within the systems such that one or more valves are available to isolate a rupture, should an ISLOCA occur at these locations. However, it is possible that if the pressure isolation interface were to fail, that either the available valves would not successfully isolate the rupture, or the rupture could occur in a location that cannot be isolated. To account for these possibilities, a generic 10% probability is assumed that if a rupture were to occur, it cannot be isolated.
This 10% probability for the rupture being non-isolable can be considered to be a reasonable estimate for a number of reasons. First, virtually every rupture location examined as part of the GI-105 research program was found to be potentially isolable. The pipe and other components (e.g.,
This 10% probability for the rupture being non-isolable can be considered to be a reasonable estimate for a number of reasons. First, virtually every rupture location examined as part of the GI-105 research program was found to be potentially isolable. The pipe and other components (e.g.,
pump suction pipe and RHR heat exchangers) that are most susceptible to over-pressure induced rupture, are located deeper within the connected system such that a number Page 7
pump suction pipe and RHR heat exchangers) that are most susceptible to over-pressure induced rupture, are located deeper within the connected system such that a number  


Table RAI01-1 Model Changes Performed for PRA Revision 7.1 1    2 Source   F&O    SR      Level                           Model Change                           Classification               Rationale of valves are typically available for isolating the rupture.
Page 8 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale of valves are typically available for isolating the rupture.
Further, the typical failure mode postulated in the ISLOCA analysis for motor operated valves is spurious operation.
Further, the typical failure mode postulated in the ISLOCA analysis for motor operated valves is spurious operation.
The few actual instances of this observed in the operating experience were all recoverable from the control room.
The few actual instances of this observed in the operating experience were all recoverable from the control room.
However, one factor that affects the ability to isolate the rupture is local accessibility. If a rupture were to occur, the resulting local environment would likely preclude access to the immediate vicinity. Therefore, if local access was necessary, and if the potential isolation valves were located close to the rupture then isolation would be unlikely. Again, the research performed to support resolution of GI-105 included an assessment of induced flooding and the resultant environment. That work concluded these effects would not significantly affect the ISLOCA risk. Therefore, the non-isolable ruptures are assumed to compose 10% of the potential ISLOCA ruptures.
However, one factor that affects the ability to isolate the rupture is local accessibility. If a rupture were to occur, the resulting local environment would likely preclude access to the immediate vicinity. Therefore, if local access was necessary, and if the potential isolation valves were located close to the rupture then isolation would be unlikely. Again, the research performed to support resolution of GI-105 included an assessment of induced flooding and the resultant environment. That work concluded these effects would not significantly affect the ISLOCA risk. Therefore, the non-isolable ruptures are assumed to compose 10% of the potential ISLOCA ruptures.
The accident sequence notebook was updated to reflect all of these changes to the ISLOCA model.
The accident sequence notebook was updated to reflect all of these changes to the ISLOCA model.
Peer Review 1-15 AS-   Finding     To address this peer review finding, the TIA initiating event   PRA            In response to a peer review finding, 2009              A5                is now modeled to impact systems for only loss of non-         Maintenance    this change corrected a model error.
Peer Review 2009 1-15 AS-A5 Finding To address this peer review finding, the TIA initiating event is now modeled to impact systems for only loss of non-safety air. The loss of non-safety and safety air is not relevant as an initiating event, since the loss of non-safety air itself causes a reactor trip. The potential loss of safety-related air is now modeled as part of the TIA accident sequence development. Depressurization is included in the updated TIA event tree, as safety-related air can support this function.
safety air. The loss of non-safety and safety air is not relevant as an initiating event, since the loss of non-safety air itself causes a reactor trip. The potential loss of safety-related air is now modeled as part of the TIA accident sequence development. Depressurization is included in the updated TIA event tree, as safety-related air can support this function.
PRA Maintenance In response to a peer review finding, this change corrected a model error.
Page 8


Table RAI01-1 Model Changes Performed for PRA Revision 7.1 1    2 Source   F&O    SR      Level                           Model Change                           Classification               Rationale Peer Review 1-17 DA-   Suggestion   To address this peer review suggestion, the distribution or   PRA            In response to a peer review 2009              A3                failure types were corrected for specific type codes: the     Maintenance    suggestion, this change corrected a running failure for compressor was corrected to be failure-                   data error.
Page 9 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Peer Review 2009 1-17 DA-A3 Suggestion To address this peer review suggestion, the distribution or failure types were corrected for specific type codes: the running failure for compressor was corrected to be failure-to-run-related rather than demand-related; standby pump and air handling unit failures-to-run, as well as air-operated valve (AOV) spurious operation were corrected to be a gamma distribution; AOV failures to open / closed were changed to demand-related failures.
to-run-related rather than demand-related; standby pump and air handling unit failures-to-run, as well as air-operated valve (AOV) spurious operation were corrected to be a gamma distribution; AOV failures to open / closed were changed to demand-related failures.
PRA Maintenance In response to a peer review suggestion, this change corrected a data error.
Peer Review 1-23 HR-   Finding     Procedure-specific pre-initiator human error probability       PRA            In response to a peer review finding, 2009              D2                (HEP) calculations were developed for the top three pre-       Maintenance    this change enhances completeness.
Peer Review 2009 1-23 HR-D2 Finding Procedure-specific pre-initiator human error probability (HEP) calculations were developed for the top three pre-initiator human failure events when sorted by RAW and the top three pre-initiator human failure events when sorted by Fussell-Vesely based on the Columbia Rev. 7.0 Level 1 PRA model results. This resulted in a total of five pre-initiator human failure events for which to perform procedure-specific HEP calculations.
initiator human failure events when sorted by RAW and the top three pre-initiator human failure events when sorted by Fussell-Vesely based on the Columbia Rev. 7.0 Level 1 PRA model results. This resulted in a total of five pre-initiator human failure events for which to perform procedure-specific HEP calculations.
(Note - Five are evaluated, rather than six, because the top pre-initiator human failure event when sorted by RAW was also the top pre-initiator action when sorted by F-V).
(Note - Five are evaluated, rather than six, because the top pre-initiator human failure event when sorted by RAW was also the top pre-initiator action when sorted by F-V).
Section 3.0a and Appendix A.0 were added to the HRA Notebook to document the updated procedure specific pre-initiator HEP calculations.
Section 3.0a and Appendix A.0 were added to the HRA Notebook to document the updated procedure specific pre-initiator HEP calculations.
The five revised pre-initiator HEPs were subsequently incorporated into the final HRA Calculator file CGS 2008 HRA.HRA Peer Review 1-24 HR-   Suggestion   The Columbia PRA human reliability analysis (HRA)             PRA            In response to a peer review 2009              G7                dependency analysis was performed/updated using the HRA       Maintenance    suggestion, this change enhances calculator dependency module. This addresses the concern                     completeness.
The five revised pre-initiator HEPs were subsequently incorporated into the final HRA Calculator file CGS 2008 HRA.HRA PRA Maintenance In response to a peer review finding, this change enhances completeness.
cited by this peer review suggestion regarding missing human failure events (HFE) combinations.
Peer Review 2009 1-24 HR-G7 Suggestion The Columbia PRA human reliability analysis (HRA) dependency analysis was performed/updated using the HRA calculator dependency module. This addresses the concern cited by this peer review suggestion regarding missing human failure events (HFE) combinations.
Page 9
PRA Maintenance In response to a peer review suggestion, this change enhances completeness.


Table RAI01-1 Model Changes Performed for PRA Revision 7.1 1    2 Source   F&O    SR      Level                             Model Change                         Classification               Rationale Peer Review 1-28 SY-   Finding     The need for gland seal cooling in the event of a loss of     PRA            In response to a peer review finding, 2009              A11                reactor core isolation cooling (RCIC) pump room cooling was   Maintenance    this change corrected an omission.
Page 10 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Peer Review 2009 1-28 SY-A11 Finding The need for gland seal cooling in the event of a loss of reactor core isolation cooling (RCIC) pump room cooling was added to the pump cooling dependency model.
added to the pump cooling dependency model.                                 This change has no significant impact Miscalibration of RCIC leak detection temperature sensors                   on risk insights.
Miscalibration of RCIC leak detection temperature sensors could cause a spurious RCIC isolation, and miscalibration basic events are now modeled in the appropriate fault tree locations for the failing closed of RCIC valves 8 and 63. The modeling of temperature sensor miscalibration is not applicable to the RCIC pump cooling dependency logic, and was therefore removed.
could cause a spurious RCIC isolation, and miscalibration basic events are now modeled in the appropriate fault tree locations for the failing closed of RCIC valves 8 and 63. The modeling of temperature sensor miscalibration is not applicable to the RCIC pump cooling dependency logic, and was therefore removed.
PRA Maintenance In response to a peer review finding, this change corrected an omission.
Peer Review 1-32 QU-   Suggestion   For the ISLOCA initiating event development: 1) ISLOCA       PRA            In response to a peer review 2009              E4                pathways up-to-and-including three valves were included in   Maintenance    suggestion, this change corrected PRA the ISLOCA evaluation, and 2) common cause internal                         model omissions. This change has no leakage and rupture was included wherever applicable.                       significant impact on risk insights.
This change has no significant impact on risk insights.
Peer Review 1-34 LE-E1 Suggestion   A basic event had two different labels in the PRA model.     PRA            In response to a peer review 2009                                These two labels were consolidated into one consistent       Maintenance   suggestion, this change corrected a label for the basic event.                                                  model error. This change has no significant impact on risk insights.
Peer Review 2009 1-32 QU-E4 Suggestion For the ISLOCA initiating event development: 1) ISLOCA pathways up-to-and-including three valves were included in the ISLOCA evaluation, and 2) common cause internal leakage and rupture was included wherever applicable.
Peer Review 1-42 HR-I2 Finding     The Columbia PRA HRA dependency analysis now includes         PRA            In response to a peer review finding, 2009                                dependent HRA development for the Level II PRA. The Level     Maintenance    this change corrected a PRA model I HEP dependency analysis was again updated for Rev. 7.2                     omission. The same modeling techniques as those in the Level I model were used.
PRA Maintenance In response to a peer review suggestion, this change corrected PRA model omissions. This change has no significant impact on risk insights.
Peer Review 1-43 LE-   Finding     The residual heat removal (RHR)-V-8 and RHR-V-9 have         PRA            In response to a peer review finding, 2009              D4                interlocks that prevent valve opening at normal reactor       Maintenance    this change corrected a model error.
Peer Review 2009 1-34 LE-E1 Suggestion A basic event had two different labels in the PRA model.
pressure vessel RPV pressures above about 125 psig.                         This change has no significant impact Therefore human failure events RHRHUMN-V--8O3XX and                         on risk insights.
These two labels were consolidated into one consistent label for the basic event.
RHRHUMN-V--9O3XX have been removed from the ISLOCA initiating event fault tree.
PRA Maintenance In response to a peer review suggestion, this change corrected a model error. This change has no significant impact on risk insights.
Peer Review 1-45 SY-   Suggestion   The modeling for alternating current (AC) bus transfers was   PRA            In response to a peer review 2009              A10                revised to model the direct current (DC) power dependency     Maintenance    suggestion, this change corrected a solely on associated battery in the fault tree logic, and not               model error.
Peer Review 2009 1-42 HR-I2 Finding The Columbia PRA HRA dependency analysis now includes dependent HRA development for the Level II PRA. The Level I HEP dependency analysis was again updated for Rev. 7.2 PRA Maintenance In response to a peer review finding, this change corrected a PRA model omission. The same modeling techniques as those in the Level I model were used.
the associated battery charger.
Peer Review 2009 1-43 LE-D4 Finding The residual heat removal (RHR)-V-8 and RHR-V-9 have interlocks that prevent valve opening at normal reactor pressure vessel RPV pressures above about 125 psig.
Page 10
Therefore human failure events RHRHUMN-V--8O3XX and RHRHUMN-V--9O3XX have been removed from the ISLOCA initiating event fault tree.
PRA Maintenance In response to a peer review finding, this change corrected a model error.
This change has no significant impact on risk insights.
Peer Review 2009 1-45 SY-A10 Suggestion The modeling for alternating current (AC) bus transfers was revised to model the direct current (DC) power dependency solely on associated battery in the fault tree logic, and not the associated battery charger.
PRA Maintenance In response to a peer review suggestion, this change corrected a model error.


Table RAI01-1 Model Changes Performed for PRA Revision 7.1 1    2 Source   F&O    SR      Level                           Model Change                       Classification               Rationale Peer Review 2-12 SY-   Finding     Consequential loss of offsite power (LOOP) modeling, as a   PRA            In response to a peer review finding, 2009              B5                single basic event, has been added to the Columbia PRA     Maintenance   this change corrects an omission.
Page 11 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Peer Review 2009 2-12 SY-B5 Finding Consequential loss of offsite power (LOOP) modeling, as a single basic event, has been added to the Columbia PRA model.
model.                                                                    This change has no significant impact on risk insights.
PRA Maintenance In response to a peer review finding, this change corrects an omission.
Peer Review 2-16 SY-   Finding     A Tier 3 calculation was prepared to ensure that failure   PRA            In response to a peer review finding, 2009              B13              modes have been considered in development of the system     Maintenance    this change enhanced completeness.
This change has no significant impact on risk insights.
models adequately, with evaluation for both the inclusion                 This change has no significant impact and exclusion of the failure modes for components within                   on risk insights.
Peer Review 2009 2-16 SY-B13 Finding A Tier 3 calculation was prepared to ensure that failure modes have been considered in development of the system models adequately, with evaluation for both the inclusion and exclusion of the failure modes for components within the system boundary, including justification. Failure modes were added or corrected in the system models and system notebooks were updated based on this evaluation.
the system boundary, including justification. Failure modes were added or corrected in the system models and system notebooks were updated based on this evaluation.
PRA Maintenance In response to a peer review finding, this change enhanced completeness.
Peer Review 2-26 IFEV- Finding     The following resolutions have been made:                   PRA            In response to a peer review finding, 2009              A5                a. The formula in the spreadsheet cell for flood frequency Maintenance    this change corrected initiating event calculation, D2*'Mean Pipe Failure Rates'!$D$110*'Mean                     frequency errors. This change has no Pipe Failure Rates'!$D$148, reflects the standby service                   significant impact on risk insights.
This change has no significant impact on risk insights.
water (SW) failure rate and the impact factor. This was noted to be incorrect since the flooding scenario is associated with the plant service water (TSW) piping break.
Peer Review 2009 2-26 IFEV-A5 Finding The following resolutions have been made:
: a. The formula in the spreadsheet cell for flood frequency calculation, D2*'Mean Pipe Failure Rates'!$D$110*'Mean Pipe Failure Rates'!$D$148, reflects the standby service water (SW) failure rate and the impact factor. This was noted to be incorrect since the flooding scenario is associated with the plant service water (TSW) piping break.
This error has been corrected.
This error has been corrected.
: b. The integrity management data used for IE-FLDC502TSW-U in the Initiating Events Frequency Development Report, PSA-2FL-0003, was incorrect. The equation in the flood frequency calculation spreadsheet and the value in PSA-2FL-0003 have been corrected.
: b. The integrity management data used for IE-FLDC502TSW-U in the Initiating Events Frequency Development Report, PSA-2FL-0003, was incorrect. The equation in the flood frequency calculation spreadsheet and the value in PSA-2FL-0003 have been corrected.
Line 146: Line 154:
: d. Further, all formulas in the flood initiating event spreadsheet were reviewed for correctness. A total of five frequencies were found to be incorrect and were revised.
: d. Further, all formulas in the flood initiating event spreadsheet were reviewed for correctness. A total of five frequencies were found to be incorrect and were revised.
Only one of these initiators increased in frequency.
Only one of these initiators increased in frequency.
Page 11
PRA Maintenance In response to a peer review finding, this change corrected initiating event frequency errors. This change has no significant impact on risk insights.


Table RAI01-1 Model Changes Performed for PRA Revision 7.1 1    2 Source   F&O    SR      Level                           Model Change                         Classification               Rationale Peer Review 4-5   AS-   Suggestion   Credit for condensate booster injection was removed from     PRA            In response to a peer review 2009              A2                the Medium loss of cooling accident (LOCA) event tree.       Maintenance   suggestion, this change corrected a model error. This change has no significant impact on risk insights.
Page 12 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Peer Review 2009 4-5 AS-A2 Suggestion Credit for condensate booster injection was removed from the Medium loss of cooling accident (LOCA) event tree.
Peer Review 6-12 LE-C6 Suggestion   The exposure periods for containment isolation valves were   PRA           In response to a peer review 2009                                reviewed and corrected as applicable.                        Maintenance    suggestion, this change corrected a data error. This change has no significant impact on risk insights.
PRA Maintenance In response to a peer review suggestion, this change corrected a model error. This change has no significant impact on risk insights.
Peer Review 6-14 LE-B2 Finding     The likelihood for wetwell failure was revised to be         PRA            In response to a peer review 2009                                consistent for the Level 1 and Level 2 PRAs. The existing   Maintenance    suggestion, this change corrected a structure analysis (ME-02-91-77) is appropriate and                         modeling error.
Peer Review 2009 6-12 LE-C6 Suggestion The exposure periods for containment isolation valves were reviewed and corrected as applicable.
applicable analysis. The Level 2 PRA had inappropriately credited the biological shield wall to reduce the likelihood for wetwell failure.
PRA Maintenance In response to a peer review suggestion, this change corrected a data error. This change has no significant impact on risk insights.
Peer Review 6-8   SY-   Finding     The process to develop common cause groups is now           PRA            In response to a peer review finding, 2009              B1                documented in PSA- 2-DA-0004. Columbia employs               Maintenance    this change corrected a data staggered testing of redundant trains modeled in the PRA.                   development error. This change Therefore, CCF probabilities were recalculated using the CCF               involves no new data update equations for staggered testing, and these equations are                   methods.
Peer Review 2009 6-14 LE-B2 Finding The likelihood for wetwell failure was revised to be consistent for the Level 1 and Level 2 PRAs. The existing structure analysis (ME-02-91-77) is appropriate and applicable analysis. The Level 2 PRA had inappropriately credited the biological shield wall to reduce the likelihood for wetwell failure.
documented in PSA-2-DA-0004, and the PRA was updated.
PRA Maintenance In response to a peer review suggestion, this change corrected a modeling error.
Peer Review 6-9   SY-   Finding       Columbia employs staggered testing of redundant trains     PRA            In response to a peer review finding, 2009              B1                modeled in the PRA. Therefore, CCF probabilities were       Maintenance    this change corrected a data recalculated using the CCF equations for staggered testing,                 development error. This change and these equations are documented in PSA-2-DA-0004,                       involves no new data update and the PRA was updated.                                                   methods and no change in scope or capability.
Peer Review 2009 6-8 SY-B1 Finding The process to develop common cause groups is now documented in PSA-2-DA-0004. Columbia employs staggered testing of redundant trains modeled in the PRA.
Self-       SA2- SY-   Self-       Logic for the condensate storage tank (CST) and failure     PRA            This change corrected a model error.
Therefore, CCF probabilities were recalculated using the CCF equations for staggered testing, and these equations are documented in PSA-2-DA-0004, and the PRA was updated.
Assessment  15    A11  Assessment  modes of the tank isolation valves was corrected.           Maintenance   This change has no significant impact on risk insights.
PRA Maintenance In response to a peer review finding, this change corrected a data development error. This change involves no new data update methods.
Self-       SA2- AS-   Self-       Credit was removed for RCIC operation for medium and         PRA            This change corrected a model error.
Peer Review 2009 6-9 SY-B1 Finding Columbia employs staggered testing of redundant trains modeled in the PRA. Therefore, CCF probabilities were recalculated using the CCF equations for staggered testing, and these equations are documented in PSA-2-DA-0004, and the PRA was updated.
Assessment  29    B3    Assessment  large reactor feedwater (RFW) LOCAs outside containment,     Maintenance    This change has no significant impact based on insufficient steam pressure for operation of the                   on risk insights.
PRA Maintenance In response to a peer review finding, this change corrected a data development error. This change involves no new data update methods and no change in scope or capability.
RCIC pump turbine.
Self-Assessment SA2-15 SY-A11 Self-Assessment Logic for the condensate storage tank (CST) and failure modes of the tank isolation valves was corrected.
Page 12
PRA Maintenance This change corrected a model error.
This change has no significant impact on risk insights.
Self-Assessment SA2-29 AS-B3 Self-Assessment Credit was removed for RCIC operation for medium and large reactor feedwater (RFW) LOCAs outside containment, based on insufficient steam pressure for operation of the RCIC pump turbine.
PRA Maintenance This change corrected a model error.
This change has no significant impact on risk insights.


Table RAI01-1 Model Changes Performed for PRA Revision 7.1 1    2 Source   F&O    SR      Level                             Model Change                         Classification               Rationale Self-       SA2- AS-   Self-       The possibility for RPV depressurization was added to         PRA            This change enhances completeness.
Page 13 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Self-Assessment SA2-36 AS-A7 Self-Assessment The possibility for RPV depressurization was added to Sequence S14 of the loss of offsite power (LOOP) event tree.
Assessment  36    A7    Assessment  Sequence S14 of the loss of offsite power (LOOP) event tree. Maintenance   This change has no significant impact on risk insights.
PRA Maintenance This change enhances completeness.
Self-       SA2- AS-   Self-       The PP event tree node (no stuck open safety relief valve     PRA            This change enhances completeness.
This change has no significant impact on risk insights.
Assessment  37    A7    Assessment  (SRV) after reaching heat capacity temperature limit) was     Maintenance    This change has no significant impact removed from station black out (SBO) sequences in which                       on risk insights.
Self-Assessment SA2-37 AS-A7 Self-Assessment The PP event tree node (no stuck open safety relief valve (SRV) after reaching heat capacity temperature limit) was removed from station black out (SBO) sequences in which diesel generator (DG)-3 cross tie succeeds, as there is much less potential for a stuck-open safety relief valve (SORV).
diesel generator (DG)-3 cross tie succeeds, as there is much less potential for a stuck-open safety relief valve (SORV).
Success of the crosstie represents a controlled depressurization, with much less potential for a SORV.
Success of the crosstie represents a controlled depressurization, with much less potential for a SORV.
Self-       SA2- IE-A5 Self-       Partial LOOP was added to the modeling of switchgear E-       PRA            This change enhances completeness.
PRA Maintenance This change enhances completeness.
Assessment  46          Assessment  SM-7 and E-SM-8. Partial LOOP represents loss of offsite       Maintenance    This change has no significant impact power to one switchgear, E-SM-7 or E-SM-8.                                   on risk insights.
This change has no significant impact on risk insights.
Self-       SA2- HR-   Self-       Backup cooling of the control rod drive (CRD) pumps from       PRA            This change enhances completeness.
Self-Assessment SA2-46 IE-A5 Self-Assessment Partial LOOP was added to the modeling of switchgear E-SM-7 and E-SM-8. Partial LOOP represents loss of offsite power to one switchgear, E-SM-7 or E-SM-8.
Assessment  8    D1    Assessment  condensate (COND)-P-3A was added to the model.                 Maintenance   This change has no significant impact on risk insights.
PRA Maintenance This change enhances completeness.
Self-       SA-   QU-   Self-       The PRA was converted from a WinNUPRA solution to a           PRA           The cutsets produced from the CAFTA Assessment  10-  B1    Assessment  CAFTA solution.                                                Maintenance    solution were reconciled with the QU-                                                                                                    cutsets produce from the WinNUPRA A1                                                                                                    model. This reconciliation constituted a thorough internal review and demonstrated that there was no significant impact on risk insights.
This change has no significant impact on risk insights.
Peer Review 3-9   SY-   Finding     Failure of makeup from the fuel oil makeup from the           PRA            In response to a peer review finding, 2009              A6                individual fuel oil storage tanks to the respective electrical Maintenance    this change enhanced completeness.
Self-Assessment SA2-8 HR-D1 Self-Assessment Backup cooling of the control rod drive (CRD) pumps from condensate (COND)-P-3A was added to the model.
diesel generator (EDG) fuel oil day tank was added as part of                 This change has no significant impact the EDG logic.                                                                on risk insights.
PRA Maintenance This change enhances completeness.
Page 13
This change has no significant impact on risk insights.
Self-Assessment SA-10-QU-A1 QU-B1 Self-Assessment The PRA was converted from a WinNUPRA solution to a CAFTA solution.
PRA Maintenance The cutsets produced from the CAFTA solution were reconciled with the cutsets produce from the WinNUPRA model. This reconciliation constituted a thorough internal review and demonstrated that there was no significant impact on risk insights.
Peer Review 2009 3-9 SY-A6 Finding Failure of makeup from the fuel oil makeup from the individual fuel oil storage tanks to the respective electrical diesel generator (EDG) fuel oil day tank was added as part of the EDG logic.
PRA Maintenance In response to a peer review finding, this change enhanced completeness.
This change has no significant impact on risk insights.  


Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source     F&O   SR     Level                           Model Change                       Classification               Rationale Peer       1-3   HR-   Finding       The assignments of stress levels were reviewed for       PRA            In response to a peer review Review            G3                  all Columbia post-initiator human failure events,       Maintenance finding, this change corrected a 2009                                    and all post-initiator human failure events now                         model error utilize the stress levels recommended by the HRA Calculator. On a case-by-case basis the next higher stress level, above the stress level recommended by the HRA Calculator was selected, based on HRA analyst judgment.
Page 14 Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source F&O SR Level Model Change Classification Rationale Peer Review 2009 1-3 HR-G3 Finding The assignments of stress levels were reviewed for all Columbia post-initiator human failure events, and all post-initiator human failure events now utilize the stress levels recommended by the HRA Calculator. On a case-by-case basis the next higher stress level, above the stress level recommended by the HRA Calculator was selected, based on HRA analyst judgment.
Self-       217963 SY-B4 Self-         CCF probabilities were reviewed and corrected as         PRA            This change corrected common Assessment              Assessment    applicable. Also, common cause failures-to-run and       Maintenance    cause failure modeling and data failures-to-start probabilities were also separated into                 errors.
PRA Maintenance In response to a peer review finding, this change corrected a model error Self-Assessment 217963 SY-B4 Self-Assessment CCF probabilities were reviewed and corrected as applicable. Also, common cause failures-to-run and failures-to-start probabilities were also separated into separate basic events, where applicable, where these failures were previously modeled by single combined CCF basic events.
separate basic events, where applicable, where these failures were previously modeled by single combined CCF basic events.
PRA Maintenance This change corrected common cause failure modeling and data errors.
Self-       279126 SY-   Self-         The dependency of switchgear E-SM-4 on diesel building   PRA            This change corrected a model error.
Self-Assessment 279126 SY-A6 Self-Assessment The dependency of switchgear E-SM-4 on diesel building mixed-air air handling unit DMA-AH-31 was removed from the PRA model. DMA-AH-31 supports the HPCS diesel generator, but it doesn't not support E-SM-4.
Assessment        A6    Assessment    mixed-air air handling unit DMA-AH-31 was removed       Maintenance from the PRA model. DMA-AH-31 supports the HPCS diesel generator, but it doesn't not support E-SM-4.
PRA Maintenance This change corrected a model error.
Self-       SA QU-   Self-         For Rev. 7.2, a truncation sensitivity was performed for PRA            This is a necessary step in the PRA Assessment  QU-B3- B3    Assessment    the core damage frequency (CDF) and large early         Maintenance    maintenance process. The same 1                          release frequency (LERF) quantifications to validate the                 modeling techniques were used.
Self-Assessment SA QU-B3-1 QU-B3 Self-Assessment For Rev. 7.2, a truncation sensitivity was performed for the core damage frequency (CDF) and large early release frequency (LERF) quantifications to validate the CDF and LERF PRA truncation levels. The sensitivity demonstrates appropriate convergence of the solution for the selected truncation level.
CDF and LERF PRA truncation levels. The sensitivity demonstrates appropriate convergence of the solution for the selected truncation level.
PRA Maintenance This is a necessary step in the PRA maintenance process. The same modeling techniques were used.
Peer Review 6-3   IE-C4 Finding       The Bayesian updating of the turbine trip, loss of       PRA            Based on a peer review finding, this 2009                                    feedwater and loss of condenser initiating event         Maintenance    change corrected a data frequencies TT, TF and TC Bayesian updates were                         development error. This change corrected.                                                              involves no new modeling techniques and no change in scope or capability.
Peer Review 2009 6-3 IE-C4 Finding The Bayesian updating of the turbine trip, loss of feedwater and loss of condenser initiating event frequencies TT, TF and TC Bayesian updates were corrected.
Self-       8076   SC-   Self-         The success criteria for standby liquid control was     PRA            The PRA model was changed to Assessment        A3    Assessment    changed from 2-of-2 pumps to 1-of-2 pumps based on a     Maintenance     reflect a plant design change.
PRA Maintenance Based on a peer review finding, this change corrected a data development error. This change involves no new modeling techniques and no change in scope or capability.
plant change.
Self-Assessment 8076 SC-A3 Self-Assessment The success criteria for standby liquid control was changed from 2-of-2 pumps to 1-of-2 pumps based on a plant change.
Page 14
PRA Maintenance The PRA model was changed to reflect a plant design change.  


Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source   F&O   SR     Level                             Model Change                         Classification               Rationale Self-     8772   HR- Self-         The human failure probability development for failure     PRA            One human error probability was Assessment        G3  Assessment    to open the reactor feedwater bypass loop, RFWHUMN-       Maintenance    changed to reflect a plant design V109H3LL, was revised to conform to a plant design                         change. There was no change in change. The switch for the valve was moved from a                         plant risk.
Page 15 Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source F&O SR Level Model Change Classification Rationale Self-Assessment 8772 HR-G3 Self-Assessment The human failure probability development for failure to open the reactor feedwater bypass loop, RFWHUMN-V109H3LL, was revised to conform to a plant design change. The switch for the valve was moved from a back panel to a front panel.
back panel to a front panel.
PRA Maintenance One human error probability was changed to reflect a plant design change. There was no change in plant risk.
Self-     HPCS- AS- Self-         Credit for injection after containment failure was added   PRA            This change enhances completeness Assessment 1A    A3  Assessment    to additional accident sequences.                         Maintenance     and the same modeling techniques were used.
Self-Assessment HPCS-1A AS-A3 Self-Assessment Credit for injection after containment failure was added to additional accident sequences.
Self-     HPCS- AS- Self-         Credit for late depressurization, and late emergency       PRA            This change enhances completeness Assessment 1B    A5  Assessment    core cooling systems (ECCS) or alternate injection was     Maintenance     and the same modeling techniques added to accident sequences.                                              were used.
PRA Maintenance This change enhances completeness and the same modeling techniques were used.
Self-     HPCS- HR- Self-         The HEP for failure to align the service water cross-tie, PRA            This change enhances completeness Assessment 2D    G3  Assessment    RHRHUMNSWCRTIELL, now uses the CBDTM, rather               Maintenance     and utilizes an existing HRA than a conservative screening value.                                      calculation option. No new modeling techniques were used.
Self-Assessment HPCS-1B AS-A5 Self-Assessment Credit for late depressurization, and late emergency core cooling systems (ECCS) or alternate injection was added to accident sequences.
Self-     SA14- AS- Self-         Model logic was corrected to remove credit for injection   PRA            This change corrected a model error.
PRA Maintenance This change enhances completeness and the same modeling techniques were used.
Assessment AS-A1- B1  Assessment    post-containment-failure for sequences in which HPCS is   Maintenance     This change has no significant impact 05                        unavailable.                                                              on risk insights.
Self-Assessment HPCS-2D HR-G3 Self-Assessment The HEP for failure to align the service water cross-tie, RHRHUMNSWCRTIELL, now uses the CBDTM, rather than a conservative screening value.
Self-     SA14- AS- Self-         Model logic was corrected to remove credit HPCS after     PRA             This change corrected a model error.
PRA Maintenance This change enhances completeness and utilizes an existing HRA calculation option. No new modeling techniques were used.
Assessment AS-A3- A3  Assessment    containment failure for the large LOCA sequence in        Maintenance    There was no change to the PRA 11                        which HPCS is unavailable.                                                results.
Self-Assessment SA14-AS-A1-05 AS-B1 Self-Assessment Model logic was corrected to remove credit for injection post-containment-failure for sequences in which HPCS is unavailable.
Self-     SA14- AS- Self-         Model logic was corrected to remove credit for power       PRA            This change corrected a model error.
PRA Maintenance This change corrected a model error.
Assessment AS-B1- B1  Assessment    control system (PCS) for the stuck-open safety relief     Maintenance    The same modeling techniques were 14                        valve anticipated transient without scram (ATWS) event                     used.
This change has no significant impact on risk insights.
tree.
Self-Assessment SA14-AS-A3-11 AS-A3 Self-Assessment Model logic was corrected to remove credit HPCS after containment failure for the large LOCA sequence in which HPCS is unavailable.
Self-     SA14- AS- Self-         Completeness was enhanced for cutset post-processing       PRA            This change enhances completeness.
PRA Maintenance This change corrected a model error.
Assessment AS-B6- B6  Assessment    for loss of offsite power loss cutsets in which RCIC fails Maintenance    This change has no significant impact 16                        due to failure of emergency diesel generator, (EDG)-1 to                   on risk insights.
There was no change to the PRA results.
start or run. Where offsite power recovery has not be otherwise credited, an offsite power non-recovery term was added.
Self-Assessment SA14-AS-B1-14 AS-B1 Self-Assessment Model logic was corrected to remove credit for power control system (PCS) for the stuck-open safety relief valve anticipated transient without scram (ATWS) event tree.
Page 15
PRA Maintenance This change corrected a model error.
The same modeling techniques were used.
Self-Assessment SA14-AS-B6-16 AS-B6 Self-Assessment Completeness was enhanced for cutset post-processing for loss of offsite power loss cutsets in which RCIC fails due to failure of emergency diesel generator, (EDG)-1 to start or run. Where offsite power recovery has not be otherwise credited, an offsite power non-recovery term was added.
PRA Maintenance This change enhances completeness.
This change has no significant impact on risk insights.


Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source   F&O     SR     Level                             Model Change                       Classification               Rationale Self-     SA14-   HR-   Self-         The CBDTM HRA Calculator option was selected for 64       PRA            The change removed the use of the Assessment HR-G1-  G3    Assessment    HFEs that had previously utilized the combination-sum     Maintenance    HRA Calculator combination-sum 29                          (ASEP + CBDTM) option.                                                   option. There are no new techniques involved.
Page 16 Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source F&O SR Level Model Change Classification Rationale Self-Assessment SA14-HR-G1-29 HR-G3 Self-Assessment The CBDTM HRA Calculator option was selected for 64 HFEs that had previously utilized the combination-sum (ASEP + CBDTM) option.
Self-     SA HR-   Self-         The HCR/ORE HRA Calculator option was selected for 23     PRA            The change involved selecting the Assessment HR-A1-  G3    Assessment    HFEs that had previously utilized the combination-sum     Maintenance     HRA Calculator HCR/ORE option for 1                            (ASEP + CBDTM) calculation option.                                        applicable human failure events.
PRA Maintenance The change removed the use of the HRA Calculator combination-sum option. There are no new techniques involved.
Self-Assessment SA HR-A1-1 HR-G3 Self-Assessment The HCR/ORE HRA Calculator option was selected for 23 HFEs that had previously utilized the combination-sum (ASEP + CBDTM) calculation option.
PRA Maintenance The change involved selecting the HRA Calculator HCR/ORE option for applicable human failure events.
There are no new techniques involved.
There are no new techniques involved.
Self-     SA14-   IE-A1 Self-         Loss of HPCS charger was removed from the manual         PRA             This change corrected a modeling Assessment IE-A1-        Assessment    shutdown initiating event logic.                          Maintenance    error. This change has no significant 41                                                                                                    impact on risk insights.
Self-Assessment SA14-IE-A1-41 IE-A1 Self-Assessment Loss of HPCS charger was removed from the manual shutdown initiating event logic.
Self-     SA14-   IE-C2 Self-         The initiating event Bayesian update evaluations were     PRA             This change reflects new information Assessment IE-C2-        Assessment    updated.                                                  Maintenance    on plant performance (new data).
PRA Maintenance This change corrected a modeling error. This change has no significant impact on risk insights.
42 Self-     SA14-   IE-C8 Self-         Loss of E-PP-7AA was recategorized and modeled as         PRA            This change corrected a model error.
Self-Assessment SA14-IE-C2-42 IE-C2 Self-Assessment The initiating event Bayesian update evaluations were updated.
Assessment IE-C8-        Assessment    causing a main steam isolation valve (MSIV) closure       Maintenance    This change has no significant impact 52                          initiating event, rather than as a manual shutdown.                       on risk insights.
PRA Maintenance This change reflects new information on plant performance (new data).
Self-     SA14-   IFSN- Self-         Corrected the internal flooding logic to fail balance of PRA            This change corrected a model error.
Self-Assessment SA14-IE-C8-52 IE-C8 Self-Assessment Loss of E-PP-7AA was recategorized and modeled as causing a main steam isolation valve (MSIV) closure initiating event, rather than as a manual shutdown.
Assessment IFSN-  A10  Assessment    plant motor control center E-MC-1B for an additional     Maintenance     This change produced no change to A10-59                      seven flood scenarios.                                                    the risk results.
PRA Maintenance This change corrected a model error.
Self-     SA14-   IFSN- Self-         Failure probabilities for reactor building basement floor PRA            This change was made to address a Assessment IFSN-  A10  Assessment    drain isolation valves were changed to utilize           Maintenance    change of plant procedures. There A10-60                      appropriate failure data rather than failing with a                       are no new techniques involved.
This change has no significant impact on risk insights.
probability of 1.0.
Self-Assessment SA14-IFSN-A10-59 IFSN-A10 Self-Assessment Corrected the internal flooding logic to fail balance of plant motor control center E-MC-1B for an additional seven flood scenarios.
Self-     SA14-   IFSN- Self-         The consequential loss of the CST was add to the         PRA            This change enhances completeness.
PRA Maintenance This change corrected a model error.
Assessment IFSN-  A10  Assessment    internal flooding model if the flooding source involves a Maintenance     This change has no significant impact A10-61                      pipe connected to the CST.                                                on risk insights.
This change produced no change to the risk results.
Self-     SA14-   SY-   Self-         Power dependencies were added for reactor building       PRA            This change corrected a model error.
Self-Assessment SA14-IFSN-A10-60 IFSN-A10 Self-Assessment Failure probabilities for reactor building basement floor drain isolation valves were changed to utilize appropriate failure data rather than failing with a probability of 1.0.
Assessment SY-A1-  A1    Assessment    heating ventilation and air conditioning (HVAC) isolation Maintenance     There was no change to the PRA 111                          valves.                                                                  results.
PRA Maintenance This change was made to address a change of plant procedures. There are no new techniques involved.
Self-     SA14-   SY-   Self-         The main steam relief valve nitrogen accumulators were   PRA             This change enhances completeness.
Self-Assessment SA14-IFSN-A10-61 IFSN-A10 Self-Assessment The consequential loss of the CST was add to the internal flooding model if the flooding source involves a pipe connected to the CST.
Assessment SY-A11- A11  Assessment    added to the model.                                      Maintenance    There was no change to the PRA 112                                                                                                    results.
PRA Maintenance This change enhances completeness.
Page 16
This change has no significant impact on risk insights.
Self-Assessment SA14-SY-A1-111 SY-A1 Self-Assessment Power dependencies were added for reactor building heating ventilation and air conditioning (HVAC) isolation valves.
PRA Maintenance This change corrected a model error.
There was no change to the PRA results.
Self-Assessment SA14-SY-A11-112 SY-A11 Self-Assessment The main steam relief valve nitrogen accumulators were added to the model.
PRA Maintenance This change enhances completeness.
There was no change to the PRA results.  


Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source   F&O   SR       Level                             Model Change                         Classification               Rationale Self-     SA14-   SY-   Self-         The detail of the drywell cooling model was enhanced.     PRA             This change enhances completeness.
Page 17 Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source F&O SR Level Model Change Classification Rationale Self-Assessment SA14-SY-A1-93 SY-A1 Self-Assessment The detail of the drywell cooling model was enhanced.
Assessment SY-A1-  A1    Assessment                                                                Maintenance    This change has no significant impact 93                                                                                                      on risk insights.
PRA Maintenance This change enhances completeness.
Self-     SA14-   SY-   Self-         The dependency of CRD on the CST was added to the         PRA             This change enhances completeness.
This change has no significant impact on risk insights.
Assessment SY-A1-  A1    Assessment    model.                                                    Maintenance    This change has no significant impact 94                                                                                                      on risk insights.
Self-Assessment SA14-SY-A1-94 SY-A1 Self-Assessment The dependency of CRD on the CST was added to the model.
Self-     SA14-   SY-   Self-         The conditional probability (0.5) that plant service water PRA            This change enhances completeness.
PRA Maintenance This change enhances completeness.
Assessment SY-A1-  A1    Assessment    pump A or B is running was added to the model.             Maintenance     There was no change to core damage 99                                                                                                      frequency (CDF) and LERF.
This change has no significant impact on risk insights.
Self-     SA14-   SY-   Self-         The possibility for plant service water (TSW) backflow     PRA            This change enhances completeness.
Self-Assessment SA14-SY-A1-99 SY-A1 Self-Assessment The conditional probability (0.5) that plant service water pump A or B is running was added to the model.
Assessment SY-A3-  A3    Assessment    through a failed TSW pump was added to the model.         Maintenance     This change has no significant impact 120                                                                                                    on risk insights.
PRA Maintenance This change enhances completeness.
Self-     SA14-   SY-   Self-         HVAC dependencies were added for E-MC-7BB and E-           PRA             This change corrected a model error.
There was no change to core damage frequency (CDF) and LERF.
Assessment SY-A3-  A3    Assessment    MC-8BB.                                                    Maintenance    This change has no significant impact 122                                                                                                    on risk insights.
Self-Assessment SA14-SY-A3-120 SY-A3 Self-Assessment The possibility for plant service water (TSW) backflow through a failed TSW pump was added to the model.
Self-     SA14-   SY-   Self-         Modeling of the RCIC lube oil system was removed. The     PRA            This change corrected a model error.
PRA Maintenance This change enhances completeness.
Assessment SY-A6-  A6    Assessment    lube oil system is now part of the RCIC pump system       Maintenance     This change has no significant impact 126                          boundary.                                                                  on risk insights.
This change has no significant impact on risk insights.
Self-     SA14-   SY-   Self-         Credit for local alignment of containment venting was     PRA             This change addresses a plant Assessment SY-A17- A17  Assessment    added to the model.                                        Maintenance    procedure change. There were no 1                                                                                                      new methods involved.
Self-Assessment SA14-SY-A3-122 SY-A3 Self-Assessment HVAC dependencies were added for E-MC-7BB and E-MC-8BB.
Self-     SA14-   SY-B1 Self-         Failure modes were corrected for the plant service         PRA            This change corrected a model error.
PRA Maintenance This change corrected a model error.
Assessment SY-B1-        Assessment    water (balance of plant) discharge valves.                 Maintenance     This change has no significant impact 127                                                                                                    on risk insights.
This change has no significant impact on risk insights.
Self-     SA14-   SY-C1 Self-         The HPCS model was corrected to credit pump suction       PRA             This change corrected a model error.
Self-Assessment SA14-SY-A6-126 SY-A6 Self-Assessment Modeling of the RCIC lube oil system was removed. The lube oil system is now part of the RCIC pump system boundary.
Assessment SY-C1-        Assessment    from the CST for LOCAs.                                    Maintenance    This change has no significant impact 128                                                                                                    on risk insights.
PRA Maintenance This change corrected a model error.
Self-     SWC-   SY-   Self-         The dependency of HPCS-P-2 on pump house cooling           PRA             This change corrected a model error.
This change has no significant impact on risk insights.
Assessment HVAC    A1    Assessment    was removed.                                              Maintenance    This change has no significant impact on risk insights.
Self-Assessment SA14-SY-A17-1 SY-A17 Self-Assessment Credit for local alignment of containment venting was added to the model.
Page 17
PRA Maintenance This change addresses a plant procedure change. There were no new methods involved.
Self-Assessment SA14-SY-B1-127 SY-B1 Self-Assessment Failure modes were corrected for the plant service water (balance of plant) discharge valves.
PRA Maintenance This change corrected a model error.
This change has no significant impact on risk insights.
Self-Assessment SA14-SY-C1-128 SY-C1 Self-Assessment The HPCS model was corrected to credit pump suction from the CST for LOCAs.
PRA Maintenance This change corrected a model error.
This change has no significant impact on risk insights.
Self-Assessment SWC-HVAC SY-A1 Self-Assessment The dependency of HPCS-P-2 on pump house cooling was removed.
PRA Maintenance This change corrected a model error.
This change has no significant impact on risk insights.  


Table RAI01-3 Model Change Performed for PRA Revision 7.2.1 Source   F&O SR     Level                           Model Change                     Classification               Rationale Self-     SA   Self-         Selected dependent HEP values were modified for use in PRA            The changes associated with this Assessment QU-A1    Assessment    the non-LERF Level 2 release term quantification and   Maintenance   model release had no impact on the separate recovery files were constituted to implement                CDF or LERF (only on non-LERF Level 2 these recoveries.                                                    release terms) modeling or quantitative solutions.
Page 18 Table RAI01-3 Model Change Performed for PRA Revision 7.2.1 Source F&O SR Level Model Change Classification Rationale Self-Assessment SA QU-A1 Self-Assessment Selected dependent HEP values were modified for use in the non-LERF Level 2 release term quantification and separate recovery files were constituted to implement these recoveries.
Page 18
PRA Maintenance The changes associated with this model release had no impact on the CDF or LERF (only on non-LERF Level 2 release terms) modeling or quantitative solutions.  


PRA RAI 2 - Internal Events F&Os A summary of the F&Os from the 2009 peer review were provided in Table A-1 of Enclosure 3 to the LAR. Address the following:
Page 19 PRA RAI 2 - Internal Events F&Os A summary of the F&Os from the 2009 peer review were provided in Table A-1 of Enclosure 3 to the LAR. Address the following:
: a. F&O 1-42 related to SR HR-I2 found that Human Reliability Analysis (HRA) Dependency Analysis has not been conducted for the Level 2 model. In resolution to this F&O, the licensee stated that the Level 2 HRA dependency analysis has been performed and documented. Confirm that the Level 2 dependent Human Error Probabilities (HEPs) meet the HR supporting requirements in the PRA Standard ASME/ANS RA-Sa-2009 and justify why no focused-scope peer review is required.
: a. F&O 1-42 related to SR HR-I2 found that Human Reliability Analysis (HRA) Dependency Analysis has not been conducted for the Level 2 model. In resolution to this F&O, the licensee stated that the Level 2 HRA dependency analysis has been performed and documented. Confirm that the Level 2 dependent Human Error Probabilities (HEPs) meet the HR supporting requirements in the PRA Standard ASME/ANS RA-Sa-2009 and justify why no focused-scope peer review is required.
: b. F&O 2-17 related to SY-A14 identified inadequate consideration of system operational history in the PRA system models. In resolution to this F&O the licensee stated that operational history has been collected and will be added to the PRA documentation. Confirm that the system operational history has been reflected in the PRA models, or alternatively, justify why exclusion of operational history has no impact on the application.
: b. F&O 2-17 related to SY-A14 identified inadequate consideration of system operational history in the PRA system models. In resolution to this F&O the licensee stated that operational history has been collected and will be added to the PRA documentation. Confirm that the system operational history has been reflected in the PRA models, or alternatively, justify why exclusion of operational history has no impact on the application.  


===Response===
===Response===
Line 258: Line 295:
PRA RAI 3 - Seismic In Section 3.2.4.2, "Scope of the PRA," of the SE for EPRI TR-1009325, Revision 2, the NRC staff stated that:
PRA RAI 3 - Seismic In Section 3.2.4.2, "Scope of the PRA," of the SE for EPRI TR-1009325, Revision 2, the NRC staff stated that:
Although the emphasis of the quantitative evaluation is on the risk impact from internal events, the guidance in EPRI Report No. 1009325, Revision 2, Section 4.2.7, "External Events," states that: "Where possible, the analysis should include a quantitative assessment of the contribution of external events (e.g., fire and seismic) in the risk impact assessment for extended ILRT intervals." This section also states that: "If the external event analysis is not of sufficient quality or detail to directly apply the methodology provided in this document [(i.e., EPRI Report No.
Although the emphasis of the quantitative evaluation is on the risk impact from internal events, the guidance in EPRI Report No. 1009325, Revision 2, Section 4.2.7, "External Events," states that: "Where possible, the analysis should include a quantitative assessment of the contribution of external events (e.g., fire and seismic) in the risk impact assessment for extended ILRT intervals." This section also states that: "If the external event analysis is not of sufficient quality or detail to directly apply the methodology provided in this document [(i.e., EPRI Report No.
1009325, Revision 2)], the quality or detail will be increased or a suitable estimate of the risk impact from the external events should be performed." This assessment can be taken from Page 19
1009325, Revision 2)], the quality or detail will be increased or a suitable estimate of the risk impact from the external events should be performed." This assessment can be taken from  


existing, previously submitted and approved analyses or other alternate method of assessing an order of magnitude estimate for contribution of the external event to the impact of the changed interval.
Page 20 existing, previously submitted and approved analyses or other alternate method of assessing an order of magnitude estimate for contribution of the external event to the impact of the changed interval.
In Section 5.4.2 of Enclosure 4 to the LAR, the licensee performed an analysis of the external events contributions. The licensee stated that the seismic CDF and LERF risk estimates were taken from the Individual Plant Examination for External Events (IPEEE), with periodic updates to reflect the as-built and as-operated plant. This estimate does not appear to take into account the re-evaluated seismic hazard for Columbia, obtained in response to the Near-Term Task Force (NTTF) recommendation 2.1. Justify, preferably quantitatively, why the seismic estimate provided in the LAR is a bounding estimate of seismic risk given the re-evaluated seismic hazard, or, alternatively, provide with justification, a conservative or bounding estimate of seismic risk that takes into account the new re-evaluated seismic hazard, and assess its impact on the application.
In Section 5.4.2 of Enclosure 4 to the LAR, the licensee performed an analysis of the external events contributions. The licensee stated that the seismic CDF and LERF risk estimates were taken from the Individual Plant Examination for External Events (IPEEE), with periodic updates to reflect the as-built and as-operated plant. This estimate does not appear to take into account the re-evaluated seismic hazard for Columbia, obtained in response to the Near-Term Task Force (NTTF) recommendation 2.1. Justify, preferably quantitatively, why the seismic estimate provided in the LAR is a bounding estimate of seismic risk given the re-evaluated seismic hazard, or, alternatively, provide with justification, a conservative or bounding estimate of seismic risk that takes into account the new re-evaluated seismic hazard, and assess its impact on the application.  


===Response===
===Response===
Line 269: Line 306:
: 3. SPRA walkdown Seismic PRA walkdowns have been performed. This task is complete pending final review and acceptance.
: 3. SPRA walkdown Seismic PRA walkdowns have been performed. This task is complete pending final review and acceptance.
: 4. Draft representative fragilities The SPRA model uses draft representative fragilities for structures, components and contact chatter. The SPRA representative fragilities are developed based on the new Columbia seismic hazard, available plant specific information, and plant walk downs.
: 4. Draft representative fragilities The SPRA model uses draft representative fragilities for structures, components and contact chatter. The SPRA representative fragilities are developed based on the new Columbia seismic hazard, available plant specific information, and plant walk downs.
These representative fragilities have a conservative bias. Detailed fragility analyses still need to be performed. Refinements to the draft representative fragilities will produce higher seismic capacities. Therefore, the seismic CDF and LERF are not Page 20
These representative fragilities have a conservative bias. Detailed fragility analyses still need to be performed. Refinements to the draft representative fragilities will produce higher seismic capacities. Therefore, the seismic CDF and LERF are not  


expected to increase beyond the magnitudes listed in this RAI response as a result of further refinements to seismic fragilities.
Page 21 expected to increase beyond the magnitudes listed in this RAI response as a result of further refinements to seismic fragilities.
: 5. Contact chatter assessment Contact chatter assessment has been performed and added to the plant response model. This task is complete pending final review and acceptance.
: 5. Contact chatter assessment Contact chatter assessment has been performed and added to the plant response model. This task is complete pending final review and acceptance.
: 6. Draft human reliability assessment The seismic HRA uses conservative screening human error probabilities (HEPs) for all post-initiator human failure events (HFEs) modeled in the SPRA, including the HFEs carried over from the internal events PRA. A post-initiator HEP dependency analysis has been performed to assess the degree of dependency between the HFEs and these dependencies are addressed in the SPRA quantification. Detailed HEP analyses still need to be performed. The HEPs for HFEs included in the SPRA are expected to decrease when the HRA guidance is applied (EPRI 3002008093). The seismic CDF and LERF are not expected to increase as a result of further refinements to the HEPs.
: 6. Draft human reliability assessment The seismic HRA uses conservative screening human error probabilities (HEPs) for all post-initiator human failure events (HFEs) modeled in the SPRA, including the HFEs carried over from the internal events PRA. A post-initiator HEP dependency analysis has been performed to assess the degree of dependency between the HFEs and these dependencies are addressed in the SPRA quantification. Detailed HEP analyses still need to be performed. The HEPs for HFEs included in the SPRA are expected to decrease when the HRA guidance is applied (EPRI 3002008093). The seismic CDF and LERF are not expected to increase as a result of further refinements to the HEPs.
Line 279: Line 316:
The quantified CDF and LERF has been updated for revision 2 of this document to reflect work that has been completed on the SPRA since revision 0. The quantified CDF for the interim SPRA model is 1.88E-5/yr. This value is used to calculate an estimate for the LERF increase associated with the integrated leak rate test (ILRT) frequency extension. Equation RAI3-1 below (Equation 5-3 in the risk assessment for the regulatory submittal) is used as the basis for the calculation of the LERF increase.
The quantified CDF and LERF has been updated for revision 2 of this document to reflect work that has been completed on the SPRA since revision 0. The quantified CDF for the interim SPRA model is 1.88E-5/yr. This value is used to calculate an estimate for the LERF increase associated with the integrated leak rate test (ILRT) frequency extension. Equation RAI3-1 below (Equation 5-3 in the risk assessment for the regulatory submittal) is used as the basis for the calculation of the LERF increase.
FClass 3b = (CDFtotal - CDFAONL)
FClass 3b = (CDFtotal - CDFAONL)
* PROBClass 3b             (Equation RAI3-1)
* PROBClass 3b (Equation RAI3-1)  
Page 21


Where, FClass 3b is the Class 3b release frequency.
Page 22
: Where, FClass 3b is the Class 3b release frequency.
CDFtotal is the total seismic hazard CDF.
CDFtotal is the total seismic hazard CDF.
CDFAONL is the portion of the CDF that is always or never LERF.
CDFAONL is the portion of the CDF that is always or never LERF.
Line 289: Line 326:
To simplify the evaluation and to ensure that there is a conservative bias in the treatment of the seismic hazard, CDFAONL is set to zero and Equation RAI3-1 simplifies to:
To simplify the evaluation and to ensure that there is a conservative bias in the treatment of the seismic hazard, CDFAONL is set to zero and Equation RAI3-1 simplifies to:
FClass 3b = CDFtotal
FClass 3b = CDFtotal
* PROBClass 3b.                               (Equation RAI3-2)
* PROBClass 3b.
(Equation RAI3-2)
Numerically, FClass 3b = 1.88E-5/yr
Numerically, FClass 3b = 1.88E-5/yr
* 0.0023 = 4.32E-8/yr.
* 0.0023 = 4.32E-8/yr.
Line 295: Line 333:
The baseline seismic LERF is quantified as 8.41E-6/yr.
The baseline seismic LERF is quantified as 8.41E-6/yr.
The combined results for internal events, fire, and seismic hazards are summarized in Table RAI03-1. The 1E-6/yr LERF acceptance threshold (based upon the baseline LERF value being between 1.0E-6/yr to 1.0E-5/yr) is met with large margins to that threshold.
The combined results for internal events, fire, and seismic hazards are summarized in Table RAI03-1. The 1E-6/yr LERF acceptance threshold (based upon the baseline LERF value being between 1.0E-6/yr to 1.0E-5/yr) is met with large margins to that threshold.
Table RAI03-1: External Events LERF Summary Hazard                   LERF (yr-1)           LERF (yr-1) (3)
Table RAI03-1: External Events LERF Summary Hazard LERF (yr-1)
Internal Events                       3.28E-07               3.07E-08 Fire                                 2.69E-07               6.79E-08 Seismic                               8.41E-06               1.73E-07 Total                                 9.01E-06               2.72E-07 Threshold                           1.00E-05 (1)           1.00E-06 (2)
LERF (yr-1) (3)
Internal Events 3.28E-07 3.07E-08 Fire 2.69E-07 6.79E-08 Seismic 8.41E-06 1.73E-07 Total 9.01E-06 2.72E-07 Threshold 1.00E-05 (1) 1.00E-06 (2)
(1) Threshold based upon the RG 1.174 (Reference 12) maximum LERF for Region II as illustrated in Figure 5-1 of the risk evaluation for the submittal.
(1) Threshold based upon the RG 1.174 (Reference 12) maximum LERF for Region II as illustrated in Figure 5-1 of the risk evaluation for the submittal.
(2) Threshold based upon the RG 1.174 (Reference 12) maximum LERF for Region II as illustrated in Figure 5-1 of the risk evaluation for the submittal.
(2) Threshold based upon the RG 1.174 (Reference 12) maximum LERF for Region II as illustrated in Figure 5-1 of the risk evaluation for the submittal.  
Page 22


(3) Columbia internal fire and seismic model results are presented to provide qualitative insights into the risk associated with these hazards, as well as to provide an order of magnitude estimate for the increase in LERF attributable to these hazards.
Page 23 (3) Columbia internal fire and seismic model results are presented to provide qualitative insights into the risk associated with these hazards, as well as to provide an order of magnitude estimate for the increase in LERF attributable to these hazards.
PRA RAI 4 Section 5.4.2 of Enclosure 3 to the LAR states that external hazards other than fire and seismic (e.g., high winds and tornadoes, external floods, transportation accidents, and nearby facility accidents) were not considered because of their negligible contribution to overall plant risk. This conclusion was reached based on the IPEEE.
PRA RAI 4 Section 5.4.2 of Enclosure 3 to the LAR states that external hazards other than fire and seismic (e.g., high winds and tornadoes, external floods, transportation accidents, and nearby facility accidents) were not considered because of their negligible contribution to overall plant risk. This conclusion was reached based on the IPEEE.
: a. Since the IPEEE studies were performed in 1994 and have not been updated, discuss, in the context of the current plant and its environs, the applicability of the IPEEE conclusions for the current LAR.
: a. Since the IPEEE studies were performed in 1994 and have not been updated, discuss, in the context of the current plant and its environs, the applicability of the IPEEE conclusions for the current LAR.
: b. In light of recent external flooding re-evaluation performed in response to the NTTF recommendations, provide technical justification for why the risk from external flooding is negligible, or provide, with justification, a conservative or bounding estimate of the impact of external flooding risk for the current application.
: b. In light of recent external flooding re-evaluation performed in response to the NTTF recommendations, provide technical justification for why the risk from external flooding is negligible, or provide, with justification, a conservative or bounding estimate of the impact of external flooding risk for the current application.  


===Response===
===Response===
: a. A re-examination of the external events evaluation in the internal plant examination of external events (IPEEE) was performed in early 2017 and is documented in Reference 11.
: a. A re-examination of the external events evaluation in the internal plant examination of external events (IPEEE) was performed in early 2017 and is documented in Reference 11.
This examination assessed the applicability of the information presented in Section 5 of the IPEEE (which addresses external events excluding seismic and internal fire hazard) to the current as-built, as-operated plant. Updated information (where applicable) was presented in the analysis for the hazards discussed in Section 5 of the IPEEE. This evaluation looked at the following areas to identify hazards whose IPEEE disposition might need to be updated:
This examination assessed the applicability of the information presented in Section 5 of the IPEEE (which addresses external events excluding seismic and internal fire hazard) to the current as-built, as-operated plant. Updated information (where applicable) was presented in the analysis for the hazards discussed in Section 5 of the IPEEE. This evaluation looked at the following areas to identify hazards whose IPEEE disposition might need to be updated:
: 1)   Results of new research on the topics in question.
: 1) Results of new research on the topics in question.
: 2)   Data revisions.
: 2) Data revisions.
: 3)   New measures for risk management.
: 3) New measures for risk management.
: 4)   Revised procedures for addressing external hazards.
: 4) Revised procedures for addressing external hazards.
The re-examination concluded that the risk associated with each of the external hazards was qualitatively similar or lower in magnitude to that portrayed in the IPEEE. Based upon this evaluation, the conclusion for the ILRT that these hazards pose a negligible contribution to risk remains appropriate.
The re-examination concluded that the risk associated with each of the external hazards was qualitatively similar or lower in magnitude to that portrayed in the IPEEE. Based upon this evaluation, the conclusion for the ILRT that these hazards pose a negligible contribution to risk remains appropriate.
: b. The Flood Hazard Reevaluation Report reevaluated all appropriate external flooding sources at Columbia Generating Station, including the effects of local intense precipitation (LIP) on the site, probable maximum flood (PMF) on streams and rivers, storm surges, seiches, tsunamis, and dam failures (as applicable).
: b. The Flood Hazard Reevaluation Report reevaluated all appropriate external flooding sources at Columbia Generating Station, including the effects of local intense precipitation (LIP) on the site, probable maximum flood (PMF) on streams and rivers, storm surges, seiches, tsunamis, and dam failures (as applicable).
The reevaluated maximum water surface elevations validate the current flood mitigation strategy of the current license basis, which states that the site can be maintained in a safe condition for water levels up to 441 ft mean sea level (MSL). The reevaluated LIP maximum water surface elevations at Columbia vary between 435.14 ft and 443.27 ft. The calculated Page 23
The reevaluated maximum water surface elevations validate the current flood mitigation strategy of the current license basis, which states that the site can be maintained in a safe condition for water levels up to 441 ft mean sea level (MSL). The reevaluated LIP maximum water surface elevations at Columbia vary between 435.14 ft and 443.27 ft. The calculated  


maximum water depths vary between 0.03 ft and 0.79 ft. Although the water surface elevations exceed 441 ft, MSL, the results indicate no flooding of site safety-related SSCs.
Page 24 maximum water depths vary between 0.03 ft and 0.79 ft. Although the water surface elevations exceed 441 ft, MSL, the results indicate no flooding of site safety-related SSCs.
The addition of a site procedure, ABN-FLOODING, several years after the issuance of the IPEEE and the continued refinement of that procedure have enhanced the sites ability to mitigate this hazard.
The addition of a site procedure, ABN-FLOODING, several years after the issuance of the IPEEE and the continued refinement of that procedure have enhanced the sites ability to mitigate this hazard.
Based upon this evaluation, the conclusion for the ILRT that the external flooding hazard poses a negligible contribution to risk remains appropriate.
Based upon this evaluation, the conclusion for the ILRT that the external flooding hazard poses a negligible contribution to risk remains appropriate.}}
Page 24}}

Latest revision as of 08:46, 7 January 2025

Response to Request for Additional Information Related to License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies
ML18002A501
Person / Time
Site: Columbia 
Issue date: 01/02/2018
From: Javorik A
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-17-186
Download: ML18002A501 (27)


Text

Alex L Javorik Columbia Generating Station P.O. Box 968, PE23 Richland, WA 99352-0968 Ph. 509.377. 2354 l F. 509.377. 8555 aljavorik @energy-northwest.com January 2, 2018 GO2-17-186 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST - REVISE TECHNICAL SPECIFICATION 5.5.12 FOR PERMANENT EXTENSION OF TYPE A TEST AND TYPE C LEAK RATE TEST FREQUENCIES

References:

1. Letter, GO2-17-009, A.L. Javorik (Energy Northwest) to NRC, "License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extensions of Type A Test and Type C Leak Rate Test Frequencies," dated March 27, 2017 (ADAMS Accession Number ML17086A586)
2. Email, Klos (NRC) to L.L. Williams (Energy Northwest), "RAIs for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR," dated October 13, 2017 (ADAMS Accession Number ML17286A575)
3. Email, Klos (NRC) to S.J. Christianson (Energy Northwest), "RAIs for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - new RAI response date," dated December 7, 2017 (ADAMS Accession Number ML17341B027)

Dear Sir or Madam:

By Reference 1 Energy Northwest submitted a License Amendment Request to revise the Columbia Generating Station (Columbia) Technical Specification (TS) 5.5.12 for permanent extension of Type A and Type C leak rate test frequencies. By Reference 2 the Nuclear Regulatory Commission (NRC) requested additional information related to the Energy Northwest submittal. The enclosure to this letter contains the requested information.

The No Significant Hazards Consideration Determination (NSHCD) provided in the original submittal is not altered by this submittal. No new commitments are being made by this letter or the enclosure.

If there are any questions or if additional information is needed, please contact Ms. L. L.

Williams, Licensing Supervisor, at 509-377-8148.

G02-17-186 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct.

Executed this 2 i1 d. day of January, 2018.

A. L. Jav. ik Vice President, Engineering

Enclosure:

As stated cc:

NRC RIV Regional Administrator NRC NRR Project Manager NRC Senior Resident lnspector/988C CD Sonoda - BPA/1399 (email)

EFSECutc.wa.gov - EFSEC (email)

RR Cowley - WDOH (email)

WA Horin - Winston & Strawn

GO2-17-186 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION

ll ENERCON Excellence-Every project. Every day Response to RAis for the ILRT LAR Columbia Generating Station Revision 2 Vig.... _

.. -~

Joseph Lavelline ::;::-.:::;.--:;..:.....:~.~"""'

Prepared by: ________

"*_20_"_

1u_"_"'"_'..,_'"" __ _

Joe Lavelline, ENERCON Services Dl9l1ally signed by Elle Jorgenson ON <n*Enk JOJgffi~ o.-.Enerieori Services, Inc. ou, eman*ejorgen'o~rcon.<om..,. us Date*2017.12.17 U0Hl2--08W Reviewed by: Er~O: Services 12/:t7/t7 Habib Shtaih, Energy Northwest Blake Smith, Energy Nonhwest Page l

Page 2 Response to RAIs for ILRT Permanent Surveillance Interval Extension By letter dated March 27, 2017 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML17086A586), Energy Northwest (the licensee) submitted a License Amendment Request (LAR) to revise the Columbia Generating Station (Columbia) Technical Specification (TS) 5.5.12 for permanent extension of Type A and Type C Leak Rate Test Frequencies to 15 years (180 months) and 75 months respectively.

The Probabilistic Risk Assessment Licensing Branch has reviewed the LAR and has identified areas where additional information is needed to complete its review. Responses to Request for Additional Information (RAI) 01 through 04 are provided below.

REFERENCES

1. Columbia PRA Peer Review Report Using American Society of Mechanical Engineers (ASME) PRA Standard Requirements, Boiling Water Reactor (BWR) Owners Group, 2009
2. MSE-EJJ-11-02, Columbia Generating Station Regulatory Guide 1.200 Compliance Database
3. FPSA-1-RE-0001, "Columbia Generating Station Fire Probabilistic Safety Assessment Quantification and Results," Revision 2, dated December 1, 2006
4. SPSA-1-SE-0001, "Seismic Probabilistic Safety Assessment," Revision 1, dated February 1, 2007
5. ASME/ANS RA-Sa-2009, Addenda to ASME/ANS RA-S-2008 Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications," dated February 2, 2009
6. RG 1.200, "An Approach for Determining the Technical Adequacy Probabilistic Risk Assessment Results for Risk-Informed Activities," Revision 2, dated March 2009
7. Practical Guidance on the Use of Probabilistic Risk Assessment in Risk-Informed Applications with a Focus on the Treatment of Uncertainty, Electrical Power Research Institute (EPRI), Palo Alto, CA: 2012, 1026511
8. Letter, GO2-15-045, D.A. Swank (Energy Northwest) to Nuclear Regulatory Commission (NRC),

"Seismic Hazard and Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(F) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident," dated March 12, 2015

9. FRANX, R&R Workstation, EPRI, Version 4.2.0.4, 2013
10. NUREG/CR-1278, Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications, dated August 1983
11. IPEEE-2-RE-0001, Re-examination of the external events evaluation in the IPEEE, Revision 0, dated 2017

Page 3

12. RG 1.174, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, Revision 2, dated May 2011
13. PSA-2-HR-0001, Human Reliability Assessment, Revision 3, dated July 6, 2016
14. Flood Hazard Reevaluation Report, Response to the 50.54(f) information request regarding near-term task force recommendation 2.1: Flooding for the Columbia Generating Station, ENERCON Services, Inc., Revision 0, dated September 27, 2016
15. An Approach to Human Reliability Analysis for External Events with a Focus on Seismic, Electrical Power Research Institute (EPRI), Palo Alto, CA: 2016, 3002008093

Page 4 PRA RAI 1 - Internal Events PRA Technical Adequacy The License Amendment Request (LAR) states that the Columbia Generating Station (CGS) internal events PRA last underwent a peer review in 2009 against the American Society of Mechanical Engineers (ASME)/ American Nuclear Society (ANS) PRA Standard ASME/ANS RA-Sa-2009, as clarified by Regulatory Guide (RG) 1.200, Revision 2. The NRC staff notes that the License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A (ADAMS Accession Number ML16313A573) states that the 2009 peer review was a full-scope peer review against ASME/ANS RA-Sa-2009 and RG 1.200, Revision 2, using the industry peer review process guidelines in NEI-05-04, Revision 2.

a. Confirm that the 2009 peer review included a full-scope peer review of the internal flooding PRA model, otherwise provide the necessary information to assess the quality of the internal flooding PRA model against RG 1.200, Revision 2, including history of peer reviews, Facts and Observations (F&Os) and their resolution or disposition for the application.
b. Describe the changes made to the internal events and internal flooding PRA since the last full-scope peer review. This description should be of sufficient detail to assess whether these changes are PRA maintenance or PRA upgrades as defined in Section 1-5.4 of the PRA Standard.

Since the following may indicate a PRA upgrade, include in your discussion: any new methodologies, changes in scope that impacts the significant accident sequences or the significant accident progression sequences, changes in capability that impacts the significant accident sequences or the significant accident progression sequences.

c. Indicate, and provide justification, whether the changes described in Part b are PRA maintenance or PRA upgrades as defined in Section 1-5.4 of the PRA Standard.
d. Indicate whether focused-scope peer review(s) has been performed for those PRA upgrades identified in Part 2. As applicable, provide a list of the F&Os from the peer review(s) that do not meet the appropriate Capability Category in accordance with EPRI TR 1021467-A, and explain how the F&Os were dispositioned for this application. If focused-scope peer review(s) have not been performed for these PRA upgrades, then provide a quantitative evaluation (e.g., sensitivity or bounding analysis) of its effect on the application until a focused-scope peer review can be completed.

Response

The requested information is provided below.

a. The Columbia 2009 peer review included a full-scope review of the internal flooding Probabilistic Risk Assessment (PRA) model.
b. Following the Columbia 2009 full-scope peer review, three PRA updates have been performed of the Columbia internal events and internal flooding PRAs, PRA Revisions 7.1, 7.2, and minor PRA Revision 7.2.1. See Tables RAI01-1, RAI01-2, and RAI01-3 for descriptions of model changes for these PRA updates. Tables RAI01-1, RAI01-2, and RAI01-3 document, as applicable, the use of any new methodologies, changes in scope that impact the significant accident sequences or the significant accident progression sequences, and / or changes in capability that impact the significant accident sequences or the significant accident progression sequences.

Page 5

c. See Tables RAI01-1, RAI01-2, and RAI01-3 for descriptions of model change classifications and rationale. All PRA model changes performed since the peer review constitute model maintenance.
d. All PRA model changes performed since the peer review constitute model maintenance; therefore, no focused-scope peer review was required for the Columbia PRA.

Page 6 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Peer Review 2009 1-11 IE-C14 Suggestion The interface loss of coolant accident (ISLOCA) modeling was revised for PRA Rev. 7.1 to resolve this peer review suggestion. Cutsets containing multiple pre-initiator operator failures were determined to not be appropriate (they are demand-related, and do not represent frequencies). No cutsets contain multiple pre-initiator operator failures in the revised ISLOCA initiating event model. All cutsets now appropriately represent yearly frequencies.

PRA Maintenance In response to a peer review suggestion, this change consisted of correcting a model error. This change has no significant impact on risk insights.

Peer Review 2009 1-14 IE-C14 Finding The ISLOCA analysis was revised to replace older valve failure data published by NSAC-154 with the latest valve failure data published in NUREG/CR-6928, wherever newer data was available. A review of NUREG/CR-5124 revealed that the conditional probability of check valve closure (event tree node CV) is applicable only to scenarios in which a testable check valve is held open due to reverse air flow to the controller. The 0.01 credit had minimal impact on the ISLOCA sequence cutsets, as the significant check valve failures are leakage and rupture. Therefore, event tree node CV was removed from the ISLOCA event tree. Event tree node SML (small leak through the high/low pressure interface) is moved to an earlier position in the event tree, as leaks through the high/low pressure boundary are judged to be isolable (the 900-pound MOVs that are present at the boundaries are judged to be capable of closing against a leak). The model retains the assumption that MOVs would not likely close if a piping rupture and interface rupture were to occur, per NUREG/CR-5124 guidelines. Also, the event tree node ISOVAV (early isolation of the ISLOCA)

PRA Maintenance In response to a peer review finding, this change corrected a model error.

1 Finding & Observation (F&O) 2 Supporting Requirement (SR)

Page 7 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale probability has been changed to a 0.1 based on documentation provided with the Columbia SPAR model.

From the Columbia SPAR model documentation:

Without doing detailed pressure capacity calculations and detailed modeling of the expected internal pressures and temperatures expected in the connected systems, it is impossible to predict the location of potential ruptures.

Even with detailed calculations and modeling, precise rupture locations are impossible to identify. Nevertheless, some general observations can be made based on the GI-105 research. For most situations the RHR heat exchanger, and pump suction pipe are the components with the lowest pressure capacities. Generally, these components are positioned within the systems such that one or more valves are available to isolate a rupture, should an ISLOCA occur at these locations. However, it is possible that if the pressure isolation interface were to fail, that either the available valves would not successfully isolate the rupture, or the rupture could occur in a location that cannot be isolated. To account for these possibilities, a generic 10% probability is assumed that if a rupture were to occur, it cannot be isolated.

This 10% probability for the rupture being non-isolable can be considered to be a reasonable estimate for a number of reasons. First, virtually every rupture location examined as part of the GI-105 research program was found to be potentially isolable. The pipe and other components (e.g.,

pump suction pipe and RHR heat exchangers) that are most susceptible to over-pressure induced rupture, are located deeper within the connected system such that a number

Page 8 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale of valves are typically available for isolating the rupture.

Further, the typical failure mode postulated in the ISLOCA analysis for motor operated valves is spurious operation.

The few actual instances of this observed in the operating experience were all recoverable from the control room.

However, one factor that affects the ability to isolate the rupture is local accessibility. If a rupture were to occur, the resulting local environment would likely preclude access to the immediate vicinity. Therefore, if local access was necessary, and if the potential isolation valves were located close to the rupture then isolation would be unlikely. Again, the research performed to support resolution of GI-105 included an assessment of induced flooding and the resultant environment. That work concluded these effects would not significantly affect the ISLOCA risk. Therefore, the non-isolable ruptures are assumed to compose 10% of the potential ISLOCA ruptures.

The accident sequence notebook was updated to reflect all of these changes to the ISLOCA model.

Peer Review 2009 1-15 AS-A5 Finding To address this peer review finding, the TIA initiating event is now modeled to impact systems for only loss of non-safety air. The loss of non-safety and safety air is not relevant as an initiating event, since the loss of non-safety air itself causes a reactor trip. The potential loss of safety-related air is now modeled as part of the TIA accident sequence development. Depressurization is included in the updated TIA event tree, as safety-related air can support this function.

PRA Maintenance In response to a peer review finding, this change corrected a model error.

Page 9 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Peer Review 2009 1-17 DA-A3 Suggestion To address this peer review suggestion, the distribution or failure types were corrected for specific type codes: the running failure for compressor was corrected to be failure-to-run-related rather than demand-related; standby pump and air handling unit failures-to-run, as well as air-operated valve (AOV) spurious operation were corrected to be a gamma distribution; AOV failures to open / closed were changed to demand-related failures.

PRA Maintenance In response to a peer review suggestion, this change corrected a data error.

Peer Review 2009 1-23 HR-D2 Finding Procedure-specific pre-initiator human error probability (HEP) calculations were developed for the top three pre-initiator human failure events when sorted by RAW and the top three pre-initiator human failure events when sorted by Fussell-Vesely based on the Columbia Rev. 7.0 Level 1 PRA model results. This resulted in a total of five pre-initiator human failure events for which to perform procedure-specific HEP calculations.

(Note - Five are evaluated, rather than six, because the top pre-initiator human failure event when sorted by RAW was also the top pre-initiator action when sorted by F-V).

Section 3.0a and Appendix A.0 were added to the HRA Notebook to document the updated procedure specific pre-initiator HEP calculations.

The five revised pre-initiator HEPs were subsequently incorporated into the final HRA Calculator file CGS 2008 HRA.HRA PRA Maintenance In response to a peer review finding, this change enhances completeness.

Peer Review 2009 1-24 HR-G7 Suggestion The Columbia PRA human reliability analysis (HRA) dependency analysis was performed/updated using the HRA calculator dependency module. This addresses the concern cited by this peer review suggestion regarding missing human failure events (HFE) combinations.

PRA Maintenance In response to a peer review suggestion, this change enhances completeness.

Page 10 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Peer Review 2009 1-28 SY-A11 Finding The need for gland seal cooling in the event of a loss of reactor core isolation cooling (RCIC) pump room cooling was added to the pump cooling dependency model.

Miscalibration of RCIC leak detection temperature sensors could cause a spurious RCIC isolation, and miscalibration basic events are now modeled in the appropriate fault tree locations for the failing closed of RCIC valves 8 and 63. The modeling of temperature sensor miscalibration is not applicable to the RCIC pump cooling dependency logic, and was therefore removed.

PRA Maintenance In response to a peer review finding, this change corrected an omission.

This change has no significant impact on risk insights.

Peer Review 2009 1-32 QU-E4 Suggestion For the ISLOCA initiating event development: 1) ISLOCA pathways up-to-and-including three valves were included in the ISLOCA evaluation, and 2) common cause internal leakage and rupture was included wherever applicable.

PRA Maintenance In response to a peer review suggestion, this change corrected PRA model omissions. This change has no significant impact on risk insights.

Peer Review 2009 1-34 LE-E1 Suggestion A basic event had two different labels in the PRA model.

These two labels were consolidated into one consistent label for the basic event.

PRA Maintenance In response to a peer review suggestion, this change corrected a model error. This change has no significant impact on risk insights.

Peer Review 2009 1-42 HR-I2 Finding The Columbia PRA HRA dependency analysis now includes dependent HRA development for the Level II PRA. The Level I HEP dependency analysis was again updated for Rev. 7.2 PRA Maintenance In response to a peer review finding, this change corrected a PRA model omission. The same modeling techniques as those in the Level I model were used.

Peer Review 2009 1-43 LE-D4 Finding The residual heat removal (RHR)-V-8 and RHR-V-9 have interlocks that prevent valve opening at normal reactor pressure vessel RPV pressures above about 125 psig.

Therefore human failure events RHRHUMN-V--8O3XX and RHRHUMN-V--9O3XX have been removed from the ISLOCA initiating event fault tree.

PRA Maintenance In response to a peer review finding, this change corrected a model error.

This change has no significant impact on risk insights.

Peer Review 2009 1-45 SY-A10 Suggestion The modeling for alternating current (AC) bus transfers was revised to model the direct current (DC) power dependency solely on associated battery in the fault tree logic, and not the associated battery charger.

PRA Maintenance In response to a peer review suggestion, this change corrected a model error.

Page 11 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Peer Review 2009 2-12 SY-B5 Finding Consequential loss of offsite power (LOOP) modeling, as a single basic event, has been added to the Columbia PRA model.

PRA Maintenance In response to a peer review finding, this change corrects an omission.

This change has no significant impact on risk insights.

Peer Review 2009 2-16 SY-B13 Finding A Tier 3 calculation was prepared to ensure that failure modes have been considered in development of the system models adequately, with evaluation for both the inclusion and exclusion of the failure modes for components within the system boundary, including justification. Failure modes were added or corrected in the system models and system notebooks were updated based on this evaluation.

PRA Maintenance In response to a peer review finding, this change enhanced completeness.

This change has no significant impact on risk insights.

Peer Review 2009 2-26 IFEV-A5 Finding The following resolutions have been made:

a. The formula in the spreadsheet cell for flood frequency calculation, D2*'Mean Pipe Failure Rates'!$D$110*'Mean Pipe Failure Rates'!$D$148, reflects the standby service water (SW) failure rate and the impact factor. This was noted to be incorrect since the flooding scenario is associated with the plant service water (TSW) piping break.

This error has been corrected.

b. The integrity management data used for IE-FLDC502TSW-U in the Initiating Events Frequency Development Report, PSA-2FL-0003, was incorrect. The equation in the flood frequency calculation spreadsheet and the value in PSA-2FL-0003 have been corrected.
c. The walkdown sheet in Walkdown Summary Report, PSA-3-FL-0001, for area C502 was determined to be incomplete, which missed the 100', 3" TSW pipe listed in PSA-2-FL-0001, Table 4. Energy Northwest verified this TSW pipe length in the field and added it to the walkdown sheet for this zone.
d. Further, all formulas in the flood initiating event spreadsheet were reviewed for correctness. A total of five frequencies were found to be incorrect and were revised.

Only one of these initiators increased in frequency.

PRA Maintenance In response to a peer review finding, this change corrected initiating event frequency errors. This change has no significant impact on risk insights.

Page 12 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Peer Review 2009 4-5 AS-A2 Suggestion Credit for condensate booster injection was removed from the Medium loss of cooling accident (LOCA) event tree.

PRA Maintenance In response to a peer review suggestion, this change corrected a model error. This change has no significant impact on risk insights.

Peer Review 2009 6-12 LE-C6 Suggestion The exposure periods for containment isolation valves were reviewed and corrected as applicable.

PRA Maintenance In response to a peer review suggestion, this change corrected a data error. This change has no significant impact on risk insights.

Peer Review 2009 6-14 LE-B2 Finding The likelihood for wetwell failure was revised to be consistent for the Level 1 and Level 2 PRAs. The existing structure analysis (ME-02-91-77) is appropriate and applicable analysis. The Level 2 PRA had inappropriately credited the biological shield wall to reduce the likelihood for wetwell failure.

PRA Maintenance In response to a peer review suggestion, this change corrected a modeling error.

Peer Review 2009 6-8 SY-B1 Finding The process to develop common cause groups is now documented in PSA-2-DA-0004. Columbia employs staggered testing of redundant trains modeled in the PRA.

Therefore, CCF probabilities were recalculated using the CCF equations for staggered testing, and these equations are documented in PSA-2-DA-0004, and the PRA was updated.

PRA Maintenance In response to a peer review finding, this change corrected a data development error. This change involves no new data update methods.

Peer Review 2009 6-9 SY-B1 Finding Columbia employs staggered testing of redundant trains modeled in the PRA. Therefore, CCF probabilities were recalculated using the CCF equations for staggered testing, and these equations are documented in PSA-2-DA-0004, and the PRA was updated.

PRA Maintenance In response to a peer review finding, this change corrected a data development error. This change involves no new data update methods and no change in scope or capability.

Self-Assessment SA2-15 SY-A11 Self-Assessment Logic for the condensate storage tank (CST) and failure modes of the tank isolation valves was corrected.

PRA Maintenance This change corrected a model error.

This change has no significant impact on risk insights.

Self-Assessment SA2-29 AS-B3 Self-Assessment Credit was removed for RCIC operation for medium and large reactor feedwater (RFW) LOCAs outside containment, based on insufficient steam pressure for operation of the RCIC pump turbine.

PRA Maintenance This change corrected a model error.

This change has no significant impact on risk insights.

Page 13 Table RAI01-1 Model Changes Performed for PRA Revision 7.1 Source F&O1 SR2 Level Model Change Classification Rationale Self-Assessment SA2-36 AS-A7 Self-Assessment The possibility for RPV depressurization was added to Sequence S14 of the loss of offsite power (LOOP) event tree.

PRA Maintenance This change enhances completeness.

This change has no significant impact on risk insights.

Self-Assessment SA2-37 AS-A7 Self-Assessment The PP event tree node (no stuck open safety relief valve (SRV) after reaching heat capacity temperature limit) was removed from station black out (SBO) sequences in which diesel generator (DG)-3 cross tie succeeds, as there is much less potential for a stuck-open safety relief valve (SORV).

Success of the crosstie represents a controlled depressurization, with much less potential for a SORV.

PRA Maintenance This change enhances completeness.

This change has no significant impact on risk insights.

Self-Assessment SA2-46 IE-A5 Self-Assessment Partial LOOP was added to the modeling of switchgear E-SM-7 and E-SM-8. Partial LOOP represents loss of offsite power to one switchgear, E-SM-7 or E-SM-8.

PRA Maintenance This change enhances completeness.

This change has no significant impact on risk insights.

Self-Assessment SA2-8 HR-D1 Self-Assessment Backup cooling of the control rod drive (CRD) pumps from condensate (COND)-P-3A was added to the model.

PRA Maintenance This change enhances completeness.

This change has no significant impact on risk insights.

Self-Assessment SA-10-QU-A1 QU-B1 Self-Assessment The PRA was converted from a WinNUPRA solution to a CAFTA solution.

PRA Maintenance The cutsets produced from the CAFTA solution were reconciled with the cutsets produce from the WinNUPRA model. This reconciliation constituted a thorough internal review and demonstrated that there was no significant impact on risk insights.

Peer Review 2009 3-9 SY-A6 Finding Failure of makeup from the fuel oil makeup from the individual fuel oil storage tanks to the respective electrical diesel generator (EDG) fuel oil day tank was added as part of the EDG logic.

PRA Maintenance In response to a peer review finding, this change enhanced completeness.

This change has no significant impact on risk insights.

Page 14 Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source F&O SR Level Model Change Classification Rationale Peer Review 2009 1-3 HR-G3 Finding The assignments of stress levels were reviewed for all Columbia post-initiator human failure events, and all post-initiator human failure events now utilize the stress levels recommended by the HRA Calculator. On a case-by-case basis the next higher stress level, above the stress level recommended by the HRA Calculator was selected, based on HRA analyst judgment.

PRA Maintenance In response to a peer review finding, this change corrected a model error Self-Assessment 217963 SY-B4 Self-Assessment CCF probabilities were reviewed and corrected as applicable. Also, common cause failures-to-run and failures-to-start probabilities were also separated into separate basic events, where applicable, where these failures were previously modeled by single combined CCF basic events.

PRA Maintenance This change corrected common cause failure modeling and data errors.

Self-Assessment 279126 SY-A6 Self-Assessment The dependency of switchgear E-SM-4 on diesel building mixed-air air handling unit DMA-AH-31 was removed from the PRA model. DMA-AH-31 supports the HPCS diesel generator, but it doesn't not support E-SM-4.

PRA Maintenance This change corrected a model error.

Self-Assessment SA QU-B3-1 QU-B3 Self-Assessment For Rev. 7.2, a truncation sensitivity was performed for the core damage frequency (CDF) and large early release frequency (LERF) quantifications to validate the CDF and LERF PRA truncation levels. The sensitivity demonstrates appropriate convergence of the solution for the selected truncation level.

PRA Maintenance This is a necessary step in the PRA maintenance process. The same modeling techniques were used.

Peer Review 2009 6-3 IE-C4 Finding The Bayesian updating of the turbine trip, loss of feedwater and loss of condenser initiating event frequencies TT, TF and TC Bayesian updates were corrected.

PRA Maintenance Based on a peer review finding, this change corrected a data development error. This change involves no new modeling techniques and no change in scope or capability.

Self-Assessment 8076 SC-A3 Self-Assessment The success criteria for standby liquid control was changed from 2-of-2 pumps to 1-of-2 pumps based on a plant change.

PRA Maintenance The PRA model was changed to reflect a plant design change.

Page 15 Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source F&O SR Level Model Change Classification Rationale Self-Assessment 8772 HR-G3 Self-Assessment The human failure probability development for failure to open the reactor feedwater bypass loop, RFWHUMN-V109H3LL, was revised to conform to a plant design change. The switch for the valve was moved from a back panel to a front panel.

PRA Maintenance One human error probability was changed to reflect a plant design change. There was no change in plant risk.

Self-Assessment HPCS-1A AS-A3 Self-Assessment Credit for injection after containment failure was added to additional accident sequences.

PRA Maintenance This change enhances completeness and the same modeling techniques were used.

Self-Assessment HPCS-1B AS-A5 Self-Assessment Credit for late depressurization, and late emergency core cooling systems (ECCS) or alternate injection was added to accident sequences.

PRA Maintenance This change enhances completeness and the same modeling techniques were used.

Self-Assessment HPCS-2D HR-G3 Self-Assessment The HEP for failure to align the service water cross-tie, RHRHUMNSWCRTIELL, now uses the CBDTM, rather than a conservative screening value.

PRA Maintenance This change enhances completeness and utilizes an existing HRA calculation option. No new modeling techniques were used.

Self-Assessment SA14-AS-A1-05 AS-B1 Self-Assessment Model logic was corrected to remove credit for injection post-containment-failure for sequences in which HPCS is unavailable.

PRA Maintenance This change corrected a model error.

This change has no significant impact on risk insights.

Self-Assessment SA14-AS-A3-11 AS-A3 Self-Assessment Model logic was corrected to remove credit HPCS after containment failure for the large LOCA sequence in which HPCS is unavailable.

PRA Maintenance This change corrected a model error.

There was no change to the PRA results.

Self-Assessment SA14-AS-B1-14 AS-B1 Self-Assessment Model logic was corrected to remove credit for power control system (PCS) for the stuck-open safety relief valve anticipated transient without scram (ATWS) event tree.

PRA Maintenance This change corrected a model error.

The same modeling techniques were used.

Self-Assessment SA14-AS-B6-16 AS-B6 Self-Assessment Completeness was enhanced for cutset post-processing for loss of offsite power loss cutsets in which RCIC fails due to failure of emergency diesel generator, (EDG)-1 to start or run. Where offsite power recovery has not be otherwise credited, an offsite power non-recovery term was added.

PRA Maintenance This change enhances completeness.

This change has no significant impact on risk insights.

Page 16 Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source F&O SR Level Model Change Classification Rationale Self-Assessment SA14-HR-G1-29 HR-G3 Self-Assessment The CBDTM HRA Calculator option was selected for 64 HFEs that had previously utilized the combination-sum (ASEP + CBDTM) option.

PRA Maintenance The change removed the use of the HRA Calculator combination-sum option. There are no new techniques involved.

Self-Assessment SA HR-A1-1 HR-G3 Self-Assessment The HCR/ORE HRA Calculator option was selected for 23 HFEs that had previously utilized the combination-sum (ASEP + CBDTM) calculation option.

PRA Maintenance The change involved selecting the HRA Calculator HCR/ORE option for applicable human failure events.

There are no new techniques involved.

Self-Assessment SA14-IE-A1-41 IE-A1 Self-Assessment Loss of HPCS charger was removed from the manual shutdown initiating event logic.

PRA Maintenance This change corrected a modeling error. This change has no significant impact on risk insights.

Self-Assessment SA14-IE-C2-42 IE-C2 Self-Assessment The initiating event Bayesian update evaluations were updated.

PRA Maintenance This change reflects new information on plant performance (new data).

Self-Assessment SA14-IE-C8-52 IE-C8 Self-Assessment Loss of E-PP-7AA was recategorized and modeled as causing a main steam isolation valve (MSIV) closure initiating event, rather than as a manual shutdown.

PRA Maintenance This change corrected a model error.

This change has no significant impact on risk insights.

Self-Assessment SA14-IFSN-A10-59 IFSN-A10 Self-Assessment Corrected the internal flooding logic to fail balance of plant motor control center E-MC-1B for an additional seven flood scenarios.

PRA Maintenance This change corrected a model error.

This change produced no change to the risk results.

Self-Assessment SA14-IFSN-A10-60 IFSN-A10 Self-Assessment Failure probabilities for reactor building basement floor drain isolation valves were changed to utilize appropriate failure data rather than failing with a probability of 1.0.

PRA Maintenance This change was made to address a change of plant procedures. There are no new techniques involved.

Self-Assessment SA14-IFSN-A10-61 IFSN-A10 Self-Assessment The consequential loss of the CST was add to the internal flooding model if the flooding source involves a pipe connected to the CST.

PRA Maintenance This change enhances completeness.

This change has no significant impact on risk insights.

Self-Assessment SA14-SY-A1-111 SY-A1 Self-Assessment Power dependencies were added for reactor building heating ventilation and air conditioning (HVAC) isolation valves.

PRA Maintenance This change corrected a model error.

There was no change to the PRA results.

Self-Assessment SA14-SY-A11-112 SY-A11 Self-Assessment The main steam relief valve nitrogen accumulators were added to the model.

PRA Maintenance This change enhances completeness.

There was no change to the PRA results.

Page 17 Table RAI01-2 Model Changes Performed for PRA Revision 7.2 Source F&O SR Level Model Change Classification Rationale Self-Assessment SA14-SY-A1-93 SY-A1 Self-Assessment The detail of the drywell cooling model was enhanced.

PRA Maintenance This change enhances completeness.

This change has no significant impact on risk insights.

Self-Assessment SA14-SY-A1-94 SY-A1 Self-Assessment The dependency of CRD on the CST was added to the model.

PRA Maintenance This change enhances completeness.

This change has no significant impact on risk insights.

Self-Assessment SA14-SY-A1-99 SY-A1 Self-Assessment The conditional probability (0.5) that plant service water pump A or B is running was added to the model.

PRA Maintenance This change enhances completeness.

There was no change to core damage frequency (CDF) and LERF.

Self-Assessment SA14-SY-A3-120 SY-A3 Self-Assessment The possibility for plant service water (TSW) backflow through a failed TSW pump was added to the model.

PRA Maintenance This change enhances completeness.

This change has no significant impact on risk insights.

Self-Assessment SA14-SY-A3-122 SY-A3 Self-Assessment HVAC dependencies were added for E-MC-7BB and E-MC-8BB.

PRA Maintenance This change corrected a model error.

This change has no significant impact on risk insights.

Self-Assessment SA14-SY-A6-126 SY-A6 Self-Assessment Modeling of the RCIC lube oil system was removed. The lube oil system is now part of the RCIC pump system boundary.

PRA Maintenance This change corrected a model error.

This change has no significant impact on risk insights.

Self-Assessment SA14-SY-A17-1 SY-A17 Self-Assessment Credit for local alignment of containment venting was added to the model.

PRA Maintenance This change addresses a plant procedure change. There were no new methods involved.

Self-Assessment SA14-SY-B1-127 SY-B1 Self-Assessment Failure modes were corrected for the plant service water (balance of plant) discharge valves.

PRA Maintenance This change corrected a model error.

This change has no significant impact on risk insights.

Self-Assessment SA14-SY-C1-128 SY-C1 Self-Assessment The HPCS model was corrected to credit pump suction from the CST for LOCAs.

PRA Maintenance This change corrected a model error.

This change has no significant impact on risk insights.

Self-Assessment SWC-HVAC SY-A1 Self-Assessment The dependency of HPCS-P-2 on pump house cooling was removed.

PRA Maintenance This change corrected a model error.

This change has no significant impact on risk insights.

Page 18 Table RAI01-3 Model Change Performed for PRA Revision 7.2.1 Source F&O SR Level Model Change Classification Rationale Self-Assessment SA QU-A1 Self-Assessment Selected dependent HEP values were modified for use in the non-LERF Level 2 release term quantification and separate recovery files were constituted to implement these recoveries.

PRA Maintenance The changes associated with this model release had no impact on the CDF or LERF (only on non-LERF Level 2 release terms) modeling or quantitative solutions.

Page 19 PRA RAI 2 - Internal Events F&Os A summary of the F&Os from the 2009 peer review were provided in Table A-1 of Enclosure 3 to the LAR. Address the following:

a. F&O 1-42 related to SR HR-I2 found that Human Reliability Analysis (HRA) Dependency Analysis has not been conducted for the Level 2 model. In resolution to this F&O, the licensee stated that the Level 2 HRA dependency analysis has been performed and documented. Confirm that the Level 2 dependent Human Error Probabilities (HEPs) meet the HR supporting requirements in the PRA Standard ASME/ANS RA-Sa-2009 and justify why no focused-scope peer review is required.
b. F&O 2-17 related to SY-A14 identified inadequate consideration of system operational history in the PRA system models. In resolution to this F&O the licensee stated that operational history has been collected and will be added to the PRA documentation. Confirm that the system operational history has been reflected in the PRA models, or alternatively, justify why exclusion of operational history has no impact on the application.

Response

a. This change corrected a PRA model omission and employs no new methodologies. To resolve this peer review finding for PRA update 7.1, a Level II HEP dependency analysis was performed and documented in Section 5 and Appendix D of the HRA Notebook, PSA-2-HR-0001. The HEP dependency analysis utilizes the same methodology to develop joint HEPs, NUREG/CR-1278, utilized for the Rev. 7.0 PRA, which was peer reviewed. As the level II HEP dependency analysis, utilized the same methodologies in the level I HEP dependency analysis, the level II HEP dependency analysis meets the HR supporting requirements in the PRA Standard ASME/ANS RA-Sa-2009 and no focused-scope peer review is required or recommended.
b. Actual system operational history, including industry significant operating experience and plant-specific operational history was collected and has been added to the system notebooks as part of the 7.1 PRA update. No PRA model changes were necessary to resolve F&O 2-17.

PRA RAI 3 - Seismic In Section 3.2.4.2, "Scope of the PRA," of the SE for EPRI TR-1009325, Revision 2, the NRC staff stated that:

Although the emphasis of the quantitative evaluation is on the risk impact from internal events, the guidance in EPRI Report No. 1009325, Revision 2, Section 4.2.7, "External Events," states that: "Where possible, the analysis should include a quantitative assessment of the contribution of external events (e.g., fire and seismic) in the risk impact assessment for extended ILRT intervals." This section also states that: "If the external event analysis is not of sufficient quality or detail to directly apply the methodology provided in this document [(i.e., EPRI Report No.

1009325, Revision 2)], the quality or detail will be increased or a suitable estimate of the risk impact from the external events should be performed." This assessment can be taken from

Page 20 existing, previously submitted and approved analyses or other alternate method of assessing an order of magnitude estimate for contribution of the external event to the impact of the changed interval.

In Section 5.4.2 of Enclosure 4 to the LAR, the licensee performed an analysis of the external events contributions. The licensee stated that the seismic CDF and LERF risk estimates were taken from the Individual Plant Examination for External Events (IPEEE), with periodic updates to reflect the as-built and as-operated plant. This estimate does not appear to take into account the re-evaluated seismic hazard for Columbia, obtained in response to the Near-Term Task Force (NTTF) recommendation 2.1. Justify, preferably quantitatively, why the seismic estimate provided in the LAR is a bounding estimate of seismic risk given the re-evaluated seismic hazard, or, alternatively, provide with justification, a conservative or bounding estimate of seismic risk that takes into account the new re-evaluated seismic hazard, and assess its impact on the application.

Response

Columbia is upgrading its seismic PRA (SPRA) in response to Fukushima Near Term Task Force Recommendation 2.1. The SPRA upgrade is underway and has performed the tasks below. The tasks that are not complete are the detailed fragility development and the detailed human reliability assessment.

1. Incorporation of the updated hazard curve The re-evaluated seismic hazard has been developed in response to NTTF recommendation 2.1 and incorporated into the SPRA. This information is complete with respect to the SPRA development; therefore, the current state of knowledge will not change between now and the time the finalized SPRA is released.
2. Seismic equipment list The seismic equipment list has been developed and added to the plant response model. This task is complete pending final review and acceptance.
3. SPRA walkdown Seismic PRA walkdowns have been performed. This task is complete pending final review and acceptance.
4. Draft representative fragilities The SPRA model uses draft representative fragilities for structures, components and contact chatter. The SPRA representative fragilities are developed based on the new Columbia seismic hazard, available plant specific information, and plant walk downs.

These representative fragilities have a conservative bias. Detailed fragility analyses still need to be performed. Refinements to the draft representative fragilities will produce higher seismic capacities. Therefore, the seismic CDF and LERF are not

Page 21 expected to increase beyond the magnitudes listed in this RAI response as a result of further refinements to seismic fragilities.

5. Contact chatter assessment Contact chatter assessment has been performed and added to the plant response model. This task is complete pending final review and acceptance.
6. Draft human reliability assessment The seismic HRA uses conservative screening human error probabilities (HEPs) for all post-initiator human failure events (HFEs) modeled in the SPRA, including the HFEs carried over from the internal events PRA. A post-initiator HEP dependency analysis has been performed to assess the degree of dependency between the HFEs and these dependencies are addressed in the SPRA quantification. Detailed HEP analyses still need to be performed. The HEPs for HFEs included in the SPRA are expected to decrease when the HRA guidance is applied (EPRI 3002008093). The seismic CDF and LERF are not expected to increase as a result of further refinements to the HEPs.
7. Seismic -induced fire and flooding The SPRA includes modeling of seismic-induced fire and seismic-induced flooding.
8. Plant response model The plant response model is based upon a robust, peer reviewed internal events PRA model. The modeling changes necessary to introduce the seismic hazard, fragility values, contact chatter, and the human reliability assessment have been integrated into the seismic plant response model. Correlated failures of like components during the earthquake are modeled. Therefore, the seismic CDF and LERF are not expected to increase beyond the magnitudes listed in this RAI response as a result of further refinements to the seismic plant response model.

The quantitative estimates provided in response to this RAI are based upon the current working SPRA model being produced as a result of that project. The seismic CDF and LERF are not expected to increase beyond the magnitudes listed in this RAI response as a result of further refinements to the SPRA model due to the conservatism in the current model.

The quantified CDF and LERF has been updated for revision 2 of this document to reflect work that has been completed on the SPRA since revision 0. The quantified CDF for the interim SPRA model is 1.88E-5/yr. This value is used to calculate an estimate for the LERF increase associated with the integrated leak rate test (ILRT) frequency extension. Equation RAI3-1 below (Equation 5-3 in the risk assessment for the regulatory submittal) is used as the basis for the calculation of the LERF increase.

FClass 3b = (CDFtotal - CDFAONL)

  • PROBClass 3b (Equation RAI3-1)

Page 22

Where, FClass 3b is the Class 3b release frequency.

CDFtotal is the total seismic hazard CDF.

CDFAONL is the portion of the CDF that is always or never LERF.

PROBClass 3b is the Class 3b failure probability.

Based on the Jeffreys Non-Informative Prior, the Class 3b failure probability is equal to 0.0023 for ILRT testing frequency of 3 in 10 years.

To simplify the evaluation and to ensure that there is a conservative bias in the treatment of the seismic hazard, CDFAONL is set to zero and Equation RAI3-1 simplifies to:

FClass 3b = CDFtotal

  • PROBClass 3b.

(Equation RAI3-2)

Numerically, FClass 3b = 1.88E-5/yr

  • 0.0023 = 4.32E-8/yr.

Per the methodology in the risk evaluation for the regulatory submittal, the Class 3b failure probability for ILRT testing frequency of one in 15 years increases by a factor of 5.0. The Class 3b release frequency for the ILRT testing interval of once per fifteen years is 2.16E-7/yr. The increase in LERF from the base interval frequency to the once in 15 year frequency, therefore, is 2.16E-7/yr - 4.32E-8/yr = 1.73E-7/yr.

The baseline seismic LERF is quantified as 8.41E-6/yr.

The combined results for internal events, fire, and seismic hazards are summarized in Table RAI03-1. The 1E-6/yr LERF acceptance threshold (based upon the baseline LERF value being between 1.0E-6/yr to 1.0E-5/yr) is met with large margins to that threshold.

Table RAI03-1: External Events LERF Summary Hazard LERF (yr-1)

LERF (yr-1) (3)

Internal Events 3.28E-07 3.07E-08 Fire 2.69E-07 6.79E-08 Seismic 8.41E-06 1.73E-07 Total 9.01E-06 2.72E-07 Threshold 1.00E-05 (1) 1.00E-06 (2)

(1) Threshold based upon the RG 1.174 (Reference 12) maximum LERF for Region II as illustrated in Figure 5-1 of the risk evaluation for the submittal.

(2) Threshold based upon the RG 1.174 (Reference 12) maximum LERF for Region II as illustrated in Figure 5-1 of the risk evaluation for the submittal.

Page 23 (3) Columbia internal fire and seismic model results are presented to provide qualitative insights into the risk associated with these hazards, as well as to provide an order of magnitude estimate for the increase in LERF attributable to these hazards.

PRA RAI 4 Section 5.4.2 of Enclosure 3 to the LAR states that external hazards other than fire and seismic (e.g., high winds and tornadoes, external floods, transportation accidents, and nearby facility accidents) were not considered because of their negligible contribution to overall plant risk. This conclusion was reached based on the IPEEE.

a. Since the IPEEE studies were performed in 1994 and have not been updated, discuss, in the context of the current plant and its environs, the applicability of the IPEEE conclusions for the current LAR.
b. In light of recent external flooding re-evaluation performed in response to the NTTF recommendations, provide technical justification for why the risk from external flooding is negligible, or provide, with justification, a conservative or bounding estimate of the impact of external flooding risk for the current application.

Response

a. A re-examination of the external events evaluation in the internal plant examination of external events (IPEEE) was performed in early 2017 and is documented in Reference 11.

This examination assessed the applicability of the information presented in Section 5 of the IPEEE (which addresses external events excluding seismic and internal fire hazard) to the current as-built, as-operated plant. Updated information (where applicable) was presented in the analysis for the hazards discussed in Section 5 of the IPEEE. This evaluation looked at the following areas to identify hazards whose IPEEE disposition might need to be updated:

1) Results of new research on the topics in question.
2) Data revisions.
3) New measures for risk management.
4) Revised procedures for addressing external hazards.

The re-examination concluded that the risk associated with each of the external hazards was qualitatively similar or lower in magnitude to that portrayed in the IPEEE. Based upon this evaluation, the conclusion for the ILRT that these hazards pose a negligible contribution to risk remains appropriate.

b. The Flood Hazard Reevaluation Report reevaluated all appropriate external flooding sources at Columbia Generating Station, including the effects of local intense precipitation (LIP) on the site, probable maximum flood (PMF) on streams and rivers, storm surges, seiches, tsunamis, and dam failures (as applicable).

The reevaluated maximum water surface elevations validate the current flood mitigation strategy of the current license basis, which states that the site can be maintained in a safe condition for water levels up to 441 ft mean sea level (MSL). The reevaluated LIP maximum water surface elevations at Columbia vary between 435.14 ft and 443.27 ft. The calculated

Page 24 maximum water depths vary between 0.03 ft and 0.79 ft. Although the water surface elevations exceed 441 ft, MSL, the results indicate no flooding of site safety-related SSCs.

The addition of a site procedure, ABN-FLOODING, several years after the issuance of the IPEEE and the continued refinement of that procedure have enhanced the sites ability to mitigate this hazard.

Based upon this evaluation, the conclusion for the ILRT that the external flooding hazard poses a negligible contribution to risk remains appropriate.