{{#Wiki_filter:V NIAGARA U MOHAWK Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse, New York 13202 Nine Mile Point Nuclear Power Station THIRD INSERVICE INSPECTION INTERVAL TEN-YEAR INSERVICE INSPECTION PLAN AND SCHEDULE Prepared For Nine Mile Point Nuclear Power Station P.O. Box 63 Lycoming, New York 13093 Commercial Service Date:                  December 26, 1969 NRC Docket Number:                        50-220 Document Number:                          NMP1-ISI-003-1 0 Revision Number: 0                        Date: October 15, 1999 Prepared by:                                          /O l~
{{#Wiki_filter:}}
NMP1 - ISI Program Manager Approved by':
Glenn R. erkins -Supervisor ASME Sectio    XI Programs Approved by:
WIJ iam Yae er - Bra ch Manager, Engineerin r/
Services OCR      <<~woigl
                                              ~g  Ilgwu
                                                            'is 5 <iHi)i~Z
 
I NINE MILE POINT                                                NMP1-ISI-003-1 0 Y NIAGARA                                  NUCLEAR POWER STATION N 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL                                      Rev.          0 TEN-YEAR INSERVICE INSPECTION                                      Date:        October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS Table of Contents Record of Revision    .
Abstract  .
1.0      Introduction      .                                                                                                    7 1.1    Inspection      Interval                                                                                  .. 7 1.2    Inspection      Periods .                                                                                .. 7 1.3    Applicable        Documents                                                                                .. 7 1.4    Applicable        Code Edition and Addenda                                                                    10 2.0      Development of Inspection Plan            ...... ~....... ~...........
2.1    Class 1 Systems/Components                                                                                    12 2.2    Class 2 Systems/Components .                                                                                  12 2.3    Class 3 Systems/Components .                                                                                  12 2.4    Class 1, 2, 3 Component Supports                                                                              12 2.5    Substitute Examinations                                                                                        12 2.6    Nondestructive Examinations                                                                                    12 2.7    Weld/Support Location Maps                                                                                    13 2.8    Ultrasonic Calibration Blocks ..                                                                              13 2.9    Weld Identification                                                                                            13 3..0    Records        ~ ~ ~ ~ ~      ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~    1 6 3.1    General                                                                                                        16 3.1.1        Scheduled Examination Tables........                                                              16 3.1.1        Inspection Zones .                                                                                16 3.1.3 Code Item Classification                                                                                16 3.1.4        Inspection/Examination Table Contents                  ..                                        16 3.2    Final Reports                                                                                                  17 3.3      ISI Summary Report .                                                                                          17 File: NMP1ISIPL.wpd
 
0 NINE MILE POINT              NMP1-ISI-003-1 0 hl V NIAGARA                                NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL  Rev.        0 TEN-YEAR INSERVICE INSPECTION    Date:      October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS - Continued 4.0    Class  1  Tables .  ~ .. ~                                                      19 00.0      Reactor Pressure Vessel                  ........... 1thru 83 01.0      Main Steam .                            .......... 84thru90 31.0      Feedwater System .                          ........ 91 thru 97 32.0      Reactor Recirculation System    ..                    . 98thru130 33.0      Reactor Clean Up                          ....... 131 thru 135 36.0      Reactor Instrumentation                  ....... 136 thru 137 37.0      Reactor Drain 8 Vent ..                  ........ 138 thru 143 38.0      Reactor Shutdown Cooling                ........ 144 thru 147 39.0      Emergency Condenser System              ........ 148 thru156 40.0      Reactor Core Spray System .              ....... 157thru171 42.1      Liquid Poison System                    ..... .. 172 thru 173
                                                                            ~
44.1      Control Rod Drive System                ........ 174 thru 177 5.0    Class 2 Tables    ~  ..                              ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~  20 02.0      Main Steam System .                        ......        177thru179 03.0      Main Steam System .                          .....      180  thru    181 39.0      Emergency Condenser System .              ......        182  thru    196 44.2      Control Rod Drive System ..                ......        197  thru    198 80.0      Reactor Containment Spray System    .      ......        199  thru    210 81.0      Reactor Core Spray System                              211 thru      222 93.0      Reactor Containment Spray System    .                  223 thru      225 6.0    Class 3 Tables                                                                    21 38.0      Shutdown Cooling Water System                          226    thru    226 39.0      Emergency Condenser System .                            227    thru    223 54.0      Spent Fuel Pool Cooling System                          228    thru    235 57.0      Spent Fuel Pool Cooling System                          236    thru    236 70.0  'eactor Building Closed Loop Cooling System                237    thru    242 72.0      Emergency Service Water System                          243    thru    244 93.0      Reactor Containment Spray System                        245    thru    248 APPENDICES A      Acceptance Criteria                                                              22 B      Nondestructive Examination Procedure Listing                                      24 C      Ultrasonic Calibration Blocks                                                    26 D      Class 1, 2, and 3 Weld/Support Location Maps                                      33 E      ASME Code Cases ..                                                                38 File: NMP1ISIPL.wpd
 
0 NINE MILE POINT              NMP1-ISI-003-10 El 1 N1AGARA                          NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION  Date:  October 15, 1999 PLAN AND SCHEDULE TABLE OF CONTENTS - Continued LIST OF FIGURES 2-1    Tee Weld ID                                                        14 2-2    Elbow weld ID                                                      14 2-3    Reducer weld ID                                                    15 3-1    Inservice Inspection Schedule .                                    18 LIST OF TABLES 1-2    NMP1 Inservice Inspection Periods                                    7 A-1    Class 1 Acceptance Standards                                        22 A-2 A-3 Class 2 Acceptance Standards    ............                  .... 23 Class 3 Acceptance Standards                                        23 A-4    Component Support Acceptance Standards    .                        23 File: NMP1ISIPL.wpd
 
I NINE MILE POINT                          NMP1-ISI-003-1 0 V NIAGARA                        NUCLEAR POWER STATION N 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL            Rev. 0 TEN-YEAR INSERVICE INSPECTION                Date:  October 15, 1999 PLAN AND SCHEDULE RECORD OF REVISION', ": ;
REVISION          DATE          , 'FFECTED No.                            'PAGES 0      October 15, 1999        Entire    Ten-Year Inservice Inspection Plan and Document    Schedule for the 3" Ten Year Inservice Inspection Interval e
File: NMP1ISIPL.wpd
 
NINE MILE POINT                              N MP1-ISI-003-10 Y NIAGARA                                NUCLEAR POWER STATION N Lf MOHAWK THIRD INSERVICE INSPECTION INTERVAL                    Rev. 0 TEN-YEAR INSERVICE INSPECTION                    Date:  October 15, 1999 PLAN AND SCHEDULE ABSTRACT This document provides the Third Interval Ten-Year Inservice Inspection Plan and Schedule for Nine Mile Point Nuclear Power Station, Unit 1.
The Schedule identifies those components and/or systems (including supports) which are classified Quality Group A, B and C (ASME Code Class 1, 2, and 3, and have been selected for nondestructive examination, as set forth in the ASME Boiler and Pressure Vessel Code, Section XI, 1989 Edition, no Addenda, to the extent practical within the limitations of design, geometry and materials of construction of the components as stated in 10 CFR 50.55a (b)(2).
Where an examination required by Section XI is determined to be impractical, the basis for this determination is included in the Nine Mile Point Insetvice Inspection Program, in the form of a Request for Relief.
Tables for each system subject to examination are included within this document, and provides Code classification, Code examination category, Code item number, component identification and description, examination method, and where within the Third Ten-Year Inspection Interval and period the component is scheduled to be performed.
File: NMP1ISIPL.wpd
 
NINE MILE POINT                                  NMP1-ISI-003-10 El Y NlAGARA                              NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                      Rev. 0 TEN>>YEAR INSERVICE INSPECTION                        Date:    October 15, 1999 PLAN AND SCHEDULE
 
==1.0    INTRODUCTION==
 
This document details the Third Interval, Ten-Year Inservice Inspection Plan and schedule for selected components, welds, supports, bolting, pump casings, valve bodies, and reactor pressure vessel internals for the Nine Mile Point Nuclear Power Station, Unit 1.
Niagara Mohawk Power Corporation (NMPC), is the Owner of Record.
The Commercial Service Date for the Nine Mile Point Nuclear Power Station, Unit 1 is December 26, 1969.
1.1      Inspection Interval The Third Inservice Inspection Interval becomes effective on December 26, 1999 and is scheduled to end on December 25, 2009.
1.2      Inspection Periods The Third lnservice Inspection Interval is divided into three successive inspection periods as determined by calendar years of plant service within the inspection interval. Identified below are the period dates for the third inspection interval as defined by Inspection Program NBN In accordance with IWB-2412(b) the inspection period specified below may be decreased or extended by as much as      1 year to enable inspection to coincide with NMP1's plant outages.
TABLE 1-2 NMP1 INSERVICE INSPECTION PERIODS INSPECTION          PERIOD START              PERIOD END            REFUEL        REFUEL PERIODS              DATES                    'DATES              OUTAGE        OUTAGE YEAR December 26, 1999        December 25, 2002          RFO-16        2001 December 25, 2002        December 26, 2006          RFO-17        2003 RFO-18        2005 December 26, 2006        December 25, 2009          RFO-19        2007 The plant operating license is currently scheduled to expire on August 22, 2009.
1.3    Applicable Documents The Third Inservice Inspection Program for Quality Group A, B, and C (ASME Code Class 1, 2 and 3), systems and components (including their supports) was developed after giving due consideration to the following documents and subject to the limitations and modifications listed File: NMP1ISIPL.wpd
 
NINE MILE POINT                                NMP1-ISI-003-10 H V NIAGARA                              NUCLEAR POWER STATION H V MOHAWK THIRD INSERVICE INSPECTION INTERVAL                    Rev.      0 TEN-YEAR INSERVICE INSPECTION                      Date:    October 15, 1999 PLAN AND SCHEDULE in 10 CFR 50.55a(b), and to the extent practical within the limitations of design, geometry and materials of construction. Specific areas within this document where these document are used in the preparation of this program are addressed within the area affected.
Code of Federal Regulations 10 CFR 50.55(a) Code of Federal Regulations; Federal Register, Volume 64, Number 183, dated September 22, 1999, amendment to the regulation.
ASME Code Editions and Addenda ASME Boiler and Pressure Vessel Code, Sections V, 1989 Edition, "Nondestructive Examination" ASME Boiler and Pressure Vessel Code, Section XI, 1989 Edition, "Rules for Inservice Inspection of Nuclear Power Plant Components" ASME Boiler and Pressure Vessel Code, Section XI, 1992 Edition through the 1992 Addenda, "Rules for Inservice Inspection of Nuclear Power Plant Components",
Subsections IWE and IWL.
USNRC Regulatory Guides The following list of Regulatory Guides are applicable to the Nine Mile Point Nuclear Power Station Third Inservice Inspection Program:
1.26    Quality Group Classifications and Standards for Water-Steam, and Radioactive-Waste-Containing Components of Nuclear Power Plants, Revision 2, June 1975.
1.65    Materials and Inspections for Reactor Vessel Closure Studs, dated October 1973, Regulatory Position C.4.b.
1.84    Design and Fabrication Code Case Acceptability ASME Section III, Division 1, Latest Revision.
1.85      Material Code Case Acceptability ASME Section III, Division 1, Latest Revision.
1.147    Inservice Inspection Code Case Acceptability ASME Section XI, Division 1, Revision 12..
NMP1 Specific Documents Nine Mile Point Unit    1 Updated Final Safety Analysis Report, Sections 1, 5, 7, 9, 12 File: NMP1ISIPL.wpd
 
0 NINE MILE POINT                                NMP1-ISI-003-10 Y NIAGARA                          NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                    Rev. 0 TEN-YEAR INSERVICE INSPECTION                      Date:  October 15, 1999 PLAN AND SCHEDULE and 16.
Nine Mile Point Unit    1 Technical Specifications, USNRC Docket number 50-220, Sections 3.6 and 4.6.
USNRC NUREGS/SRP's USNRC NUREG 0313, Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping, Revision 2.
USNRC NUREG 0619, BWR Feedwater Nozzle and CRD Return Lines.
USNRC Bulletins 82-03    Stress Corrosion Cracking in Thick-Wall, Large-Diameter, Stainless Steel, Recirculation System Piping at BWR Plants, Revision 1, October 28, 1982.
USNRC Generic Letters 88-01    USNRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, January 25, 1988.
88-01    NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping, Supplement 1, February 4, 1992.
81-11    Feedwater and Control Rod Drive Nozzle Cracking, 90-05    Guidance for Performing Temporary Non-Code Repairs to ASME (ISI) Code Class 1, 2 and 3 Piping and Components, June 15, 1990.
90-09    Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions, December 11, 1990.
94-03    Intergranular Stress Corrosion Cracking (IGSCC) of Core Shroud in Boiling Water Reactors, February 1, 1995.
98-05    Boiling Water Reactor Licensees Use of the BWRVIP 05 Report to Request Relief rom Augmented Examination Requirements on Reactor Pressure Vessel Circumferential Shell Welds, December 10, 1998.
Additional References or Commitments Requirements of the complete BWRVIP implementation criteria for the Third Ten Year Inservice Inspection Interval is currently under development. Upon completion of this process the applicable information will be incorporated within ISI Program. General Information pertaining to BWRVIPs implementation is contained in the ISI Program NMP1-ISI-003, Section 6.0 Titled Augmented Examinations.
File: NMP1ISIPL.wpd
 
0 NINE MILE POINT                                NMP1-ISI-003-10 Y NIAGARA                              NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                    Rev.      0 TEN-YEAR INSERVICE INSPECTION                      Date:    October 15, 1999 PLAN AND SCHEDULE USNRC Informational Notices 89-79    Degraded Coatings and Corrosion of Steel Containment Vessels, December 1, 1989.
ASME Code Cases Code Cases approved through Regulatory Guide 1.147 may be proposed for revision to the inspection plan. Specific Code Cases used in the preparation of this document are identified below.
N-460              Alternative Examination Coverage for Class      1  and Class 2 Welds, Section XI, Division 1. RG 1.147, Rev. 12 N-491-1            Alternative Rules for Examination of Class 1, 2, 3 and MC Component Supports of Light Water Cooled Power Plants, Section XI, Division 1.
RG 1.147, Rev. 12.
N-509              Alternative Rules for the Selection and Examination of Class 1, 2 and 3 Integrally Welded Attachments, Section XI, Division 1. RG 1.147, Rev. 12.
N-524              Alternative Examination Requirements for Longitudinal Welds in Class 1 and 2 Piping Section XI, Division 1. RG 1.147, Rev. 12.
Note:    See Appendix E "Code Cases" of the 10 Year Inspection Plan for a complete listing applicable Code Cases.
1.4    Applicable Code Editions and Addenda 1.4.1  Third Inspection Interval Pursuant to Title 10, Part 50, Section 55a(g)(4), of the Code of Federal Regulations, the Inservice Inspection requirements applicable to nondestructive examination and system pressure testing for the Third Inservice Inspection Interval are based on the rules set forth in the 1989 Edition, no Addenda of Section XI, that was endorsed twelve months prior to the start of the Third Inspection Interval.
1.4.2  Subsequent Code Editions and Addenda As permitted by 10 CFR 50.55a(g)(4)(iv), the NMPC may elect to meet the requirements set forth in subsequent Editions and Addenda of Section XI that are incorporated by reference into 10 CFR 50.55a(b)(2), subject to the applicable limitations and modification and subject to USNRC approval.
File: NMP1ISIPL.wpd
 
Ol NINE MILE POINT                              N MP1-ISI-003-10 El V NIAGARA                        NUCLEAR POWER STATION IlU MOHAWK                  THIRD INSERVICE INSPECTION INTERVAL                  Rev. 0 TEN-YEAR INSERVICE INSPECTION                    Date:  October 15, 1999 PLAN AND SCHEDULE Portions of Editions and Addenda may also be used provided that all related requirements to the respective Editions and Addenda are met. NMPC intends to continually evaluate and apply, as appropriate, changes in adopted Code Editions and Addenda which provide the continuing assurance of the quality and safety of pressure retaining components and systems.
File: NMP1ISIPL.wpd
 
0 NINE MILE POINT                              NMP1-Isl-003-1 0 El Y NIAGARA                                NUCLEAR POWER STATION a U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                Rev.      0 TEN-YEAR INSERVICE INSPECTION                    Date:    October 15, 1999 PLAN AND SCHEDULE 2.0  ~  DEVELOPMENT OF INSPECTION PLAN This document provides the component schedule for inservice nondestructive examinations to be performed over the Third Ten-Year Inservice Inspection Interval on Class 1, 2 and 3 components and their supports of the Niagara Mohawk Power Corporation (NMPC), Nine Mile Point Nuclear Power Station (NMP1). Component and/or system selected for nondestructive examination are scheduled in accordance with the requirements of Section XI, to the extent practical.
2.1 CLASS    1  SYSTEMS/COMPONENTS The Class 1 system boundaries subject to examination were developed based upon the requirements of 10 CFR 50.2(v) and NMPC NMP1-FSAR. The Class 1 components and systems (including supports) selected for examination are identified in Section 4.0 of this document.
2.2 CLASS 2 SYSTEMS/COMPONENTS The Class 2 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26 and the NMPC NMP1-FSAR. The Class 2 components and systems (including supports) selected for examination are identified in Section 5.0 of this document.
2.3 CLASS 3 SYSTEMS/COMPONENTS The Class 3 system boundaries subject to examination were developed based upon the requirements of Regulatory Guide 1.26, and the NMPC NMP1-FSAR. The Class 3 components and systems (including supports) selected for examination are identified in Section 6.0 of this document.
2.4      CLASS 1, CLASS 2 AND CLASS 3 COMPONENT SUPPORTS - IWF Component supports selected for examination shall be the supports of those components that are required to be examined under IWB, IWC and IWD, and are included within Sections 4.0, 5.0 and 6.0 as applicable.
2.5      SUBSTITUTE EXAMINATIONS NMPC may substitute components scheduled in this Document for others not previously scheduled when the original selection was part of the additional piping weld selection. This substitution may be done due to such conditions as limited physical access, high radiation levels, inaccessibility etc. Such changes will be noted in the Summary Report Submittal.
Specific examinations that are required, and can not be completed within the periodfinterval will be identified within the Summary Report Submittal, and may be the subject of a request for relief.
2.6      NONDESTRUCTIVE EXAMINATIONS Nondestructive examinations will be performed in accordance with established Niagara File: NMP1ISIPL.wpd
 
NINE MILE POINT                                NMP1-ISI-003-1 0 Y NIAGARA                              NUCLEAR POWER STATION N kJ MOHAWK THIRD INSERVICE INSPECTION INTERVAL                    Rev. 0 TEN-YEAR INSERVICE INSPECTION                        Date:    October 15, 1999 PLAN AND SCHEDULE Mohawk Power Corporation (NMPC) nondestructive examination procedures and/or NMPC approved vendor procedures which conform to the requirements of the NMPC Quality Assurance Program and the applicable sections of the ASME Boiler and Pressure Vessel Code. NMPC approved vendor NDE Procedures will be identified as required, (example, Automated UT of RPV).
2.7    WELD/SUPPORT LOCATION MAPS Weld/Support location maps Listing indicating components, areas, weld locations, and other information pertinent to the performance of the inservice Nondestructive examinations are contained in Appendix C.
2.8    ULTRASONIC CALIBRATIONBLOCKS Ultrasonic calibration blocks for each component subject to volumetric examination are maintained at the plant site. A listing of applicable ultrasonic calibration blocks is included in Appendix B.
2.9    WELD IDENTIFICATION Longitudinal welds in Class 2 piping and pipe fittings do not receive unique identification numbers from the spool fabricators. All longitudinal pipe welds intersecting any of the selected circumferential welds will also be examined. As an alternate to Table IWB-2500-1, ASME Code Case N-524, "Alternative Examination Requirements for Longitudinal Welds in Class 1 Piping Section XI, Division 1", shall be used as defined below:
(A)    When only a surface examination is required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds.
(B)    When both surface and volumetric examinations are required, examination of longitudinal piping welds is not required beyond those portions of the welds within the examination boundaries of intersecting circumferential welds providing the following requirements are met.
(1)      Where longitudinal welds are specified and locations are known, examination requirements shall be met for both transverse and parallel flaws at the intersection of the welds and for that length of longitudinal weld within the circumferential weld examination volume; (2)      Where longitudinal welds are specified but locations are unknown, or the existence of longitudinal welds is uncertain, the examination requirements shall be met for both transverse and parallel flaws within the entire examination volume of intersecting circumferential welds.
File: NMP1ISIPL.wpd
 
NINE MILE POINT                                  NMP1-ISI-003-1 0 El Y NIAGARA                                NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                      Rev. 0 TEN-YEAR INSERVICE INSPECTION                        Date:    October 15, 1999 PLAN AND SCHEDULE Since Class 2 longitudinal welds are required to be examined from the intersecting circumferential weld, they were given unique identification numbers as denoted below.
Fittings:          Longitudinal welds in fittings are identified by adding letter A, B, or C, (1, 2, or 3), as applicable, to the I.D. for the reference weld. The reference weld is defined as the first circumferential weld encountered when entering the fitting on the direction of the flow.
The following figure shows the convention for identifying which weld in a welded fitting receives a particular letter designation.
Tee Case 1: Three welds located as shown in Figure 2-1.
Tee Case 2: If only one weld Figure 2-1 TEE weld ID exists it is identified by the letter A or 1.
Figure 2-1 Tee Weld ID Elbow Case 1: Two welds located as shown in Figure 2-2, one located on the inside radius and the other on the outside radius.
Elbow Case 2: If only one weld exists it is identified by the letter A or 1.
Figure 2-2 Elbow weld ID File: NMP1ISIPL.wpd
 
0 NINE MILE POINT                              NMP1-ISI-003-1 0 V NlAGARA                                NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                  Rev.      0 TEN-YEAR INSERVICE INSPECTION                    Date:    October 15, 1999 PLAN AND SCHEDULE Elbow Case 3: If two welds exist in locations other than Case 1, Weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow. The other weld is identified by B or 2.
Reducer Case 1: If only one weld exists it is identified by the letter A or 1.
Reducer Case 2: If two welds exist, weld A or 1 is the first weld encountered when moving clockwise from the reference weld datum while looking in the direction of flow. The other weld is identified by B or 2. See Figure 2-3.
Figure 2-3 Reducer weld ID Piping: Longitudinal piping welds are not assigned a specific weld identification number. They are identified by reference to the intersecting circumferential weld first encountered when entering the seamed pipe in the direction of flow.
File: NIVIP1ISIPL.wpd
 
0 NINE MILE POINT                                NMP1-ISI-003-1 0 Y NlAGARA                              NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                    Rev. 0 TEN-YEAR INSERVICE INSPECTION                      Date:  October 15, 1999 PLAN AND SCHEDULE 3.0    RECORDS 3.1    General Records and Reports of Inservice Inspection activities (such as Programs, Plans, Schedules, calibration, examination procedures, examination results, reports, equipment and personnel certifications, corrective actions taken or recommended will be developed and maintained in accordance with IWA-6000 of the ASME Boiler and Pressure Vessel Code, Section XI.
3.1.1    SCHEDULED EXAMINATIONTABLES The Scheduled Examination Tables for Inservice examinations of major components of Niagara Mohawk Power Corporation, Nine Mile Point Nuclear Power Station will be in a format similar to Figure 3-1.
3.1.2    INSPECTION ZONES Areas subject to examination have been divided into systems. Each system is defined by a weld/support location map which identifies and locates all welds, supports, and other examination areas subject to and/or selected for examination within each system.
3.1.3    CODE ITEM CLASSIFICATION For the sake of continuity and clarity, all items to which a Code Category and Code Item Number can be applied are identified.
3.1.4    INSPECTION/EXAMINATIONTABLE CONTENTS The Inservice Inspection/Examination Tables provide the following information:
ASME SECTION XI ITEM NUMBER - Listed in this column is the appropriate item number from Table IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8. Pressure Vessel Code, Section XI.
COMPONENT IDENTIFICATION- The examination area identification is the unique component or weld identification number. This number also appears on the applicable ISI Weld/Support Location Map.
COMPONENT DESCRIPTION - The examination area description is a brief description of the component or, in the case of a weld, the parts being joined.
CODE EXAMINATION CATEGORY - Listed in this column are the appropriate examination categories from Tables IWB-2500-1, IWC-2500-1, IWD-2500-1 or IWF-2500-1, as applicable, of the ASME Boiler 8 Pressure Vessel Code, Section XI.
CODE EXAMINATION METHODS - Listed in this column are the appropriate nondestructive examination method(s) to be used for each component or item subject File: NMP1ISIPL.wpd
 
0 NINE MILE POINT                              NMP1-ISI-003-10 El Y NIAGARA                            NUCLEAR POWER STATION H U MOHAlhlK THIRD INSERVICE INSPECTION INTERVAL                  Rev.      0 TEN-YEAR INSERVICE INSPECTION                    Date:    October 15, 1999 PLAN AND SCHEDULE to examination, if applicable.
ISI INTERVAL - Identified in this column are numbers 1, 2, and 3. Each number signitying an inspection period. The current inspection interval relating to this Table is number 3. Within each column a system of codes are entered to define the status of each component or item. For the purpose of providing Tables of components or areas selected for examination during the interval an (X) will be placed on the applicable row. Each row is defined by period, depending on where the (X) is placed, will determine when that item is scheduled to be examined within the interval and period. Additional codes are used to provide a status of examinations conducted during a given period in time. Additional codes such as those identified in Figure 3-1 may also be used.
REMARKS - This column identifies examination note(s) and/or instruction applicable to a particular item.
3.2    FINAL REPORTS Following the completion of the Inservice Inspection Activity, NMPC shall prepare a Inservice Inspection Final Report. The Final Report will be tiled at the Nine Mile Point site Document Control Center. Final Examination Report Tables are included as part of the Final Report along with any additional records and reports in order to provide a documentation of the complete examination activity.
This report shall be made available for review by the Enforcement and Regulatory Authority having jurisdiction at the plant side.
3.3    INSERVICE INSPECTION
 
==SUMMARY==
REPORT Following the units return to service, NMPC shall prepare a Summary Report of the ISI activity.
The Summary Report shall be filed with the Nuclear Regulatory Commission as required by Section XI and/or Code Case N-532.
File: NMP1ISIPL.wpd
 
NINE MILE POINT                                NMP1-ISI-003-10 hl Y NlAGARA                                  NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                      Rev. 0 TEN-YEAR INSERVICE INSPECTION                        Date:  October 15, 1999 PLAN AND SCHEDULE DATE:  (A)                                  Nine Mlle Point Nuclear Plant unit 1                      Page  (C)
Inservlce Inspection Long Term Plan Rev.    (8)                              Class X Section XI Scheduled Components System  (D)
INSPECTION INTERVAI PLAN STATUS Summary    Examination Area      ASME Number      Identiiicatlon        Sec. XI Categy Item No NDE Meth First Period Second Period OUTAGE Third Period Instructions
                                                                                      " Calibration Blocks-1234    1234      1234 DRAWING NUM8ER: (E),        LINE NO. (F)
(G)        (I)              (J)  (H)      (K)                (L)--. - -  - - - - - (K)(M)
(A)    Denotes the date of the inspection plan table (B)    Denotes the current revision number of the plan (C)    Identifies the page number of the table (D)    Identifies the System applicable to this table
    )  Denotes the applicable Drawing number for this table
  )    Identifies the applicable Line for this table
: 6)    Denotes the Summary Number (I)    Denotes the component or weld identification number (J)    Denotes the ASME Code Category (H)    Denotes the ASME Code Item Number (K)    Denotes the NDE Method to be used for the examination (L)    Shows when an item was examined or is scheduled to be examined. Any interval can be shown separately.
X - Scheduled                    P - Partial C Completed                      E - Expanded Scope A - Augmented                    B - Baseline (M)    Denotes specific instruction applicable to the item FIGURE 3-1 lnservice Inspection Plan (also known as Long Term Plan)
File: NMP1ISIPL.wpd
 
NINE MILE POINT                          NMP1-ISI-003-1 0 Y NIAGARA                            NUCLEAR POWER STATION N kJ MOHAWK THIRD INSERVICE INSPECTION INTERVAL              Rev. 0 TEN-YEAR INSERVICE INSPECTION                Date:  October 15, 1999 PLAN AND SCHEDULE 4.0  CLASS  1 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.
00.0        Reactor Pressure Vessel                                                              1 thru 83 01.0        Main Steam                                                                          84 thM 90 31.0        Feedwater System                                                                  . 91 thru97 32.0        Reactor Recirculation System                                                .... 98thru130 33.0        Reactor Clean Up                                                                131 thru 135 36.0        Reactor Instrumentation  .                                                      136 thru 137 37.0        Reactor Drain 8 Vent  .                                                        138 thru 143 38.0        Reactor Shutdown Cooling    .                                                    144 thru 147 39.0        Emergency Condenser System                                                      148 thru 156 40.0        Reactor Core Spray System    ..                                                157 thru 171 42.1        Liquid Poison System  .                                                          172 thru 173 44.1        Control Rod Drive System    .                                                    174 thru 177 File: NMP1 ISIPL.wpd
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 1 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS J Welds NUMBER:  00.0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR AS ME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    ZDENTZFZCATZON            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  + +CALIBRATION BLOCK*+
Control  Rod Drive Housings    (REF. DWG. NO. 28A) 002610    DRV-44-XXXX(NC02)        NCTS        UT                                            Prior to and after each CRDH  Upper- J Weld  &    503783
                                                            - - -                            Roll Repair Drives to Roll                                        3 X            X  X  - -    X Area                                                                          be determined    later
                                                                                              +*LATER**
002620    DRV 44-XXXX(NC02)        NCTS        UT                                            Examine (2)    previously CRDH  to Upper-J Weld    503783                                                    roll-repaired    CRDH, only X            X  X        X if made    availablc thru norm  drive maint., 1" above s below upper-J veld, Drives to bc dctermincd during each outage ~+LATER*w 630    DRV-44-XXXX(NC02)        NCTS        UT                                            Examine (2)    previously CRDH  Roll Repair      503783                                                    rolled areas to include X  - - -    X  X  - -    X Region                                                                              volume of base material of 1" above C beld roll band, only    if made availablc thru norm drive maint., Drives to bc determined    during 1
* LATER* 4
 
0 DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 2 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS ure Head Nuts NUMBER: 00.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERZOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK**
: 00. 0 RPV (REF. DWG. NO. 28A) 002700    CH-01-N                B-G-1      VT-1                                            +AN/A**
Closure Head Flange      B6.10 Nuts                                        X 002800    CH-02-N                  B-G-1      VT-1                                            *~N/A+*
Closure Head Flange      B6.10 3 X Nuts 002900    CH-03-N                  B-G-1                                                      *AN/A%1 Closure Head Flange      B6.10 3 X Nuts 003000    CH-04-N                  B-G-1                                                      a 1N/Aa a Closure Head Flange      B6.10 3 X Nuts 003100    CH-05-N                  B-G-1      VT-1 Closure Head Flange      B6.10 3 X Nuts 003200    CH-06-N                  B-G-1      VT-1                                          ~~N/A~~
Closure Head Flange      B6.10 3 X Nuts 003300    CH-07-N                  B-G-1      VT-1                                          aaN/Aaa Closure Head Flange      B6.10 3 X Nuts 003400    CH-08-N                  B-G-1      VT-1                                          ~+N/A**
Closure Head Flange      B6.10 Nuts                                      3 X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 3 REVISION:        0                            INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS ura Head Nuts NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                - OUTAGE                        INSTRUCTIONS NUMBER    IDENTZFZCATZON            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 +*CALIBRATION BLOCK**
003500    CH-09-N                  B-G-1                                                      ++N/A++
Closure Head Flange      B6. 10 3 X Nuts 003600    CH-10-N                  BG1                                                        **N/A~~
Closure Head Flange      B6. 10 3 X Nuts 003700    CH-11-N                  B-G-1                                                      **N/A**
Closure Head Flange      B6.10 3 X Nuts 003800    CH-12-N                  B G 1                                                      **N/A*~
Closuro Head Flange      B6.10 3 X Nuts 003900    CH-13-N                  B-G-1                                                      *AN/A1*
Closure Head Flange      B6. 10 Nuts                                            X 004000    CH-14-N                    B"G-1                                                      ffN/A*%
Closure Head Flange        B6. 10 3 X Nuts 004100    CH-15-N                    B"G-1                                                      *aN/Aas Closure Head Flange        B6.10
                                'uts                  3 X 004200    CH-16 N                    B-0"1      VT 1                                          **N/A++
Closure Head Flange        B6 10
                                        ~
3 X Nuts
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 4 REVZSZON:        0                          ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER:  00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 e  iCALIBRATION BLOCK**
004300    CH-17-N                  B-G-1        VT-1 Closure Head Flange      B6.10 3 X Nuts 004400    CH  18-N                B G 1      VT 1                                            aeN/As*
Closure Head Flange      B6. 10 3 X Nuts 004500    CH-19-N                  B-G-1                                                        tkN/At1 I
Closure Head Flange      B6. 10 3 X Nuts 004600    CH-20-N                  B-G-1      VT-1                                            e*N/A*a Closure Head Flange      B6. 10 3 X Nuts 004700    CH-21-N                  B-G-1                                                      eaN/A+a Closure Head Flange      B6.10 Nuts                                        3 X 004800    CH-22-N                  B-G-1      VT-1                                            **N/A*%
Closure Head Flange      B6.10 3 X Nuts 004900    CH  23-N                B G-1                                                      *~N/A~~
Closure Head Flange      B6.10 Nuts                                        3              X 005000    CH-24-N                  B-G-1        VT-1                                          **N/A~~
Closure Head Flange      B6 10 F
Nuts                                        3              X
 
DATE: 10/15/99                              NINE MILE POZNT NUCLEAR PLANT UNIT 1                          PAGE: 5 REVISZON:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS ure Head Nuts NUMBER:  00. 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 y yCALIBRATION BLOCKt a 005100    CH-25-N                    B-G-1      VT-1                                            **N/A4*
Closure Head Flange        B6. 10 3              X Nuts 005200    CH-26-N                    B-G-1      VT 1                                            4 4N/Af
* Closure Head Flange        B6. 10 3              X Nuts 005300    CH-27-N                    B  G 1                                                      asN/AP+
Closure Head Flange        B6. 10 3              X Nuts 005400    CH-28-N                    B-G-1      VT 1                                            **N/A**
Closure Head Flange        B6. 10 3              X Nuts 005500    CH-29-N                    B-G-1      VT-1                                            aaN/Ass Closure Head Flange        B6. 10 3              X Nuts 005600    CH-30-N                    B-G-1                                                      **N/As*
Closure Head Flange        B6.10 3              X Nuts 005700    CH-31-N                    B G-1      VT-1                                            1 *'N/A*0 Closure Head Flange        B6. 10
                                'uts                  3              X 005800    CH-32-N                    B-G-1 Closure Head Flange        B6.10 3              X Nuts
 
DATE: 10/15/99                            NINE MZLE POINT NUCLEAR PLANT UNIT 1                          PAGE: 6 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION  XI SCHEDULED COMPONENTS urc Head Nuts NUMBER:  00.0 INSPECTION INTERVAZ                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER    ZDENTIFZCATION          ITEM  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 +~CALIBRATION BLOCK**
005900    CH-33-N                  B-G-1        VT-1                                            **N/A~~
Closure Head Flange      B6. 10 3              X Nuts 006000    CH-34 N                  B-G-1                                                        *~N/A~+
Closure Head Flange      B6.10 3              X Nuts 006100    CH-35-N                  B-G"1                                                        **N/A*I Closure Head Flange      B6. 10 3              X Nuts 006200    CH 36"N                  B-G-1                                                        ~~N/A~*
Closure Head Flange      B6. 10 3              X Nuts 006300    CH-37-N                  B-G-1                                                        a*N/Aa*
Closure Head Flange      B6. 10 3              X Nuts 006400    CH-38-N                  B-G-1        VT-1                                            ~~N/A~~
Closure Head Flange      B6.10 Nuts                                                        X 006500    CH-39-N                  B-G"1                                                        *~N/A++
Closure Head Flange      B6. 10 3              X Nuts 006600    CH-40  N                B G 1        VT-1                                          **N/A*+
Closure Head Flange      B6.10 3              X Nuts
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 7 REVISION:          0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER: l~  00. 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND        THIRD SEC. XI            PERIOD        PERIOD        PERIOD
 
==SUMMARY==
EXAMINATZON AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4    1  2  3  4 **CALIBRATIONBLOCK~*
006700    CH-41 "N                  B-G-1                                                        ttN/Af*
Closure Head Flange        B6. 10 3            X Nuts 006800    CH-42-N                    B G-1                                                        *iN/Af4 Closure Head Flange        B6.10 3            X Nuts 006900    CH-43-N                    B G 1                                                        +sN/A@a Closure Head Flange        B6. 10 3              X Nuts 007000    CH-44-N                    B-G 1                                                        **N/A*+
Closure Head Flange        B6. 10 3                            X Nuts 007100    CH    45-N                B-G-1                                                        **N/A*%
Closure Head Flange        B6. 10 3                            X Nu ts 007200    CH-46-N                    B-G-1                                                        **N/A~*
Closure Head Flange        B6.10 3                            X Nuts 007300    CH-47-'N                    B-G-1      VT 1                                            j*N/A1*
Closure Head Flange        B6.10
                                'uts                  3                            X 007400    CH-48-N                    B-G-l                                                      %AN/A*1 Closure Head Flange        B6. 10 3                            X Nuts
 
DATE: 10/15/99                            NZNE MILE POZNT NUCLEAR PIANT UNIT 1                          PAGE: 8 I
REVISION:        0                          INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS urc Head Nuts NUMBER:  00.0 INSPECTION ZNTERVAI                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND        THIRD SEC. XI            PERIOD        PERIOD        PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4    1-2  3  4 <<*CALIBRATION BLOCK**
007500    CH"49-N                  B-G"1        VT-1                                            ~~N/A~+
Closure Head Flange      B6. 10 3                            X Nuts 007600    CH-50-N                  B-G-1                                                        +*N/A+*
Closure Head Flango      B6. 10 3                            X Nuts 007700    CH-51-N                  B-G-1                                                        f iN/A*1 Closure Head Flange      B6. 10 3                            X Nuts 007800    CH-52-N                  B G-1      VT 1                                            *+N/A~~
Closure Head Flange      B6. 10 3                            X Nuts 007900    CH-53-N                  B-G-1                                                        f4N/A4*
Closure Head Flange      B6. 10 3                            X Nuts 008000    CH-54-N                  B-G-1      VT-1                                            **N/A~~
Closure Head Flange      B6. 10 3                            X Nuts 008100    CH-55-N                  B"G-1      VT-1                                            t*N/A**
Closure Head Flange      B6. 10 3                            X Nuts 008200    CH-56-N                  B-G-1      VT 1                                            ++N/A~+
Closure Head Flange      B6. 10 3                            X Nuts
 
DATE: 10/15/99                                NINE MILE POZNT NUCLEAR PLANT UNIT 1                          PAGE: 9 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Nuts NUMBER:  00.0 INSPECTION INTERVAL                        PIAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND        THIRD SEC. XZ                PERIOD      PERIOD        PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO      METH    1  2  3  4  1  2  3  4    1  2  3  4 ++CALIBRATION BLOCK*~
008300    CH-57-N                    B-G-1        VT 1                                            ++N/A++
Closure Head Flange        B6. 10 3                          X Nuts 008400    CH-58-N                    B-G  1                                                      4*N/At1 Closure Head Flange        B6.10 3                          X Nuts 008500    CH-59-N                    B-G-1        VT-1                                            ~1N/Al*
Closure Head Flange        B6. 10 3                            X Nuts 008600    CH-60"N                    B-G-1                                                        **N/A**
Closure Head Flange        B6. 10 3                            X Nuts 008700    CH-61-N                    B-G-1                                                        ~*N/A**
Closure Head Flange        B6. 10 3                            X Nuts 008800    CH-62  N                  B-G-1                                                        4 %N/At 1 Closure Head Flange        B6. 10 3                            X Nuts 008900    CH-63-N                    B-G-1                                                      +*N/A~~
Closure Head Flange        B6. 10
                                'uts                    3                            X 009000    CH 64 N                    B-G-1        VT 1                                          *IN/A**
Closuro Head Flange        B6. 10 3                            X Nuts
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNZT 1 V
PAGE: 10 REVZSZON:        0                          INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS urc Head Studs NUMBER:    00.0 INSPECTZON ZNTERVAL                      PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                OUTAGE                            INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ +CALIBRATION BLOCK**
: 00. 0 RPV (REF. DWG. NO. 28A) 009100    CH" 01-B                B-G-1        UT                                            Rcg. Guide 1.65, Surface Closure Head Flange      B6.20        MT                                            exam when removed 3 X Studs                                                                                ~ + 6. 25-RPV-STUD+*
009200    CH  02 B                B-G 1        UT                                            Rcg. Guide 1.65, Surface Closure Head Flange      B6.20        MT                                            exam when removed 3 X Studs                                                                                **6.25-RPV-STUD**
009300      CH-03-B                  B-G-1        UT                                            Rcg. Guide 1.65, MT exam Closure Head Flange      B6.20                                                        when removed 3 X Studs                                                                                ~~6.25-RPV-STUD**
009400    CH-04 B                  B-G-1                                                      Rcg. Guide 1.65,Surface Closure Head Flange      B6. 20        MT                                            exam when removed 3 X Studs                                                                                  *+6.25-RPV-STUD*+
009500    CH-05-B                  B-G-1        UT                                            Rcg. Guide 1.65,Surface Closure Head Flange      B6.20        MT                                            exam when removed 3 X Studs                                                                                ~~6.25-RPV-STUD**
009600    CH  06 B                  B-G-1        UT                                            Reg. Guide 1.65,Surface Closure Head Flange      B6 20        MT                                            exam when removed 3 X Studs                                                                                ~~6.25-RPV-STUD**
009700    CH"07-B                    B-G-1        UT                                            Rcg. Guide 1.65; Surface Closure Head Flange        B6.20        MT                                            exam when removed 3 X Studs                                                                                  **6.25    RPV-STUD+~
009800    CH-08-B                    B-G-1                                                      Rcg. Guide 1.65, MT when Closure Head Flango        B6.20                                                      removed 3 X Studs                                                                                  ++6.25-RPV STUD++
 
DATE: 10/15/99                            NINE MZLE POINT NUCLEAR PLAIiT UNIT 1                        PAGE: 11 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Studs NUMBER:  00. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION BLOCK~*
009900    CH-09"B                  B-G-1      UT                                            Rcg. Guide 1.65, MT when Closure Head Flange      B6 20
                                        ~      MT                                            removed 3 X                                    ~~6.25 RPV-STUD++
Studs 010000    CH-10-B                  B G-1                                                    Rcg. Guide 1.65,MT when Closure Head Flange      B6. 20      MT                                            removed 3 X Studs                                                                              ~ +NMP-6. 25-RPV-STUD**
010100    CH-11-B                  B-G-1      UT                                            Rcg. Guide 1.65,    MT when Closure Head Flange      B6.20      MT                                            removed 3 X Studs                                                                              *~6.25 RPV-STUD+*
010200    CH-12-B                  B-G-1      UT                                            Reg. Guide 1.65,MT exam Closure Head Flange      B6.20      MT                                            when removed 3 X Studs                                                                              **6.25  RPV STUD++
010300    CH-13 "B                B-G-1      UT                                            Rcg. Guide 1.65,MT exam Closure Head Flange      B6.20      MT                                            when rcmovcd 3 X Studs                                                                              *~6.25"RPV-STUD**
010400    CH-14-B                  BG1                                                      Rcg. Guide 1.65, MT exam Closure Head Flange      B6. 20      MT                                            when removed 3 X Studs                                                                              ~~6.25 RPV-STUD**
010500    CH-15-B                  B "G-l      UT                                            Rcg. Guide 1.65, MTexam Closure Head Flange      B6.20                                                    when rcmovcd 3 X Studs                                                                              ++6.25"RPV-STUD*~
010600    CH-16-B                  B-G"1                                                    Rcg. Guido 1.65, MT exam Closure Head Flange      B6.20      MT                                            when removed 3 X Studs                                                                              *+6.25-RPV STUD*~
 
DATE: 10/15/99                                NINE MILE POZNT NUCLEAR PLANT UNIT 1                            PAGE: 12 REVISION:        0                              ZNSERVZCE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION  XI SCHEDULED COMPONENTS urc Head Studs NUMBER:  00. 0 INSPECTION INTERVAL                          PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMZNATZON AREA            CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION              ITEM  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ +CALIBRATION BLOCX>> ~
010700    CH-17-B                    B-G-1        UT                                            Rcg. Guide 1.65, MT eaxm Closure Head Flange        B6.20        MT                                            when removed 3 X Studs                                                                                    +*6.25-RPV STUD~~
010800    CH-18-B                    B-G-1        UT                                            Rcg. Guide 1.65, MT exam Closure Head Flange        B6.20        MT                                            when removed 3 X Studs                                                                                  ~~6.25-RPV-STUD~~
010900    CH-19-B                    B-G-1        UT                                            Reg. Guide 1.65,MT exam Closure Head Flango        B6. 20      MT                                            when removed Studs                                                                                  **NMP-6.25-RPV-STUD**
011000    CH-20-B                    B-G 1                                                      Rcg. Guido 1.65,MT exam Closure Head Flange        B6.20        MT                                            when removed 3 X Studs                                                                                  **NMP 6. 25 RPV-STUD++
011100    CH-21-B                    B-G-1        UT                                            Rcg. Guide 1.65,    MT exam Closure Head Flange        B6.20                                                      when removed 3 X Studs                                                                                  ~ ~NMP-6. 25-RPV-STUD~*
011200    CH-22-B                    B-G-1        UT                                            Rcg. Guide 1.65,    MT exam Closure Head Flange          B6. 20                                                      when removed 3 X Studs                                                                                  +~6.25-RPV"STUD**
011300    CH-23-B                      B-G-1        UT                                            Rcg. Guide 1.65,MT exam Closure Head Flange          B6.20                                                      when removed 3              X
                                'tuds
                                                                                                  **NMP 6. 25-RPV-STUD+ +
011400    CH-24-B                      B-G-1        UT                                            Reg. Guide 1.65, MT exam Closuro Hoad Flange          B6. 20      MT                                            when removed 3              X Studs                                                                                    +*NMP-6. 25-RPV-STUD**
 
DATE: 10/15/99                            NZNE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 13 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS ure Head Studs NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCX**
011500    CH-25-B Closure Head Flange Studs B-G-1 B6.20 UT MT 3              X when  r~
Reg. Guide 1.65,MT exam
                                                                                              ~ ~NMP-6 . 25-RPV-STVD**
011600    CH-26-B                  B-G 1      VT                                            Rcg. Guide 1.65,    MT when Closure Head Flange      B6.20      MT                                            removed 3              X Studs                                                                              ~ +NMP-6. 25-RPV-STUD~ +
                                                                                                  'I 011700    CH-27-B                  B-G-1      UT                                            Rcg. Guide 1.65, MT exam Closure Head Flange      B6.20      MT                                            when rcmovcd 3
Studs                                                                              ~~NMP"6.25-RPV-STVD**
011800    CH" 28-B                B-G-1                                                      Rcg. Guide 1.65,    MT exam Closure Head Flango      B6.20      MT                                            when rcmovcd 3              X Studs                                                                              ~ ~NMP-6. 25-RPV-STUD~~
011900    CH-29-B                  BG1        VT                                            Reg. Guide 1.65, MT exam Closuro Head Flange      B6.20      MT                                            when rcmovcd 3
Studs                                                                              ~+6.25-RPV-STUD~~
012000    CH-30-B                  B-G-1      UT                                            Rcg. Guido 1.65, MT exam Closure Head Flange      B6. 20      MT                                            when removed 3              X Studs                                                                              ++6.25-RPV STUD~+
012100    CH-31-B                  B-G-1      UT                                            Rcg. Guide 1.65, MT exam Closure Head Flange      B6.20      MT                                            when removed 3              X Studs                                                                                ~+6.25-RPV STUD~~
012200    CH-32-B                  B-G  1      VT                                            Rcg. Guido 1.65,    MT exam Closure Head Flange      B6.20      MT                                            when rcmovcd 3              X Studs                                                                                **6.25  RPV-STUD++
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 14 REVISION:        0                          INSERVICE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS urc Head Studs NUMBER:  00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION  BLOCK~*
012300    CH-33-B                  B-G  1      UT                                            Reg. Guide 1.65, MT exam Closure Head Flange      B6.20                                                      when rcmovcd 3              X Studs                                                                                ~~6.25"RPV-STUD*~
012400    CH-34-B                  B-G-1        UT                                            Reg. Guide 1.65,    MT exam Closure Head Flange      B6 20
                                      ~        MT                                            when removed 3              X Studs                                                                                **6'5-RPV-STUD**
012500    CH-35-B                  B-G-l        UT                                            Reg. Guide 1.65, MT exam Closure Head Flange      B6. 20      MT                                            when removed 3              X Studs                                                                                ~+6.25-RPV-STUD++
012600    CH 36-B                  B-G-1                                                      Rcg. Guide 1.65,MT exam Closure Head Flange      B6.20                                                      when rcmovcd 3              X Studs                                                                                +*6.25  RPV STUD++
012700    CH-37-B                  B-G-1                                                      Reg. Guide 1.65,MT exam Closure Head Flange      B6.20                                                      when removed Studs                                                        X                        *~6.25  RPV-STUD~~
012800    CH-38-B                  B-G-1        UT                                            Reg. Guide 1.65,MT exam Closure Head Flange      B6.20        MT                                            when rcmovcd 3              X Studs                                                                                ~~6.25-RPV-STUD~~
012900    CH-39-B                  B"G-1        UT                                            Reg. Guide 1.65, MT exam Closure Head Flange      B6. 20      MT                                            when removed Studs                                        3              X                        ~*6.25-RPV-STUD**
013000    CH 40 B                  B-G-1                                                      Rcg. Guide 1.65,MT exam Closure Head Flange      B6. 20                                                      when rcmovcd 3              X Studs                                                                                ~+6.25-RPV STUD**
 
DATE: 10/15/99                            NZNE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 15 REVISION:        0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Studs NUMBER:  00. 0 INSPECTION ZNTERVAI                      PIAN STATUS              PRESERVZCE YEAR ASME                FIRST        SECOND        THIRD SEC. XZ              PERIOD        PERIOD        PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                            INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4    1  2  3  4  **CALIBRATIONBLOCK**
013100    CH-41-B                  B-G-1      UT                                              Reg. Guide 1.65,  MT exam Closure Head Flange      B6.20                                                        when removed 3            X Studs                                                                                a+6.25 RPV STUD*a 013200    CH-42-B                  B-G 1      UT                                              Rcg. Guide 1.65,  MT exam Closure Head Flange      B6.20      MT                                              when removed 3              X Studs                                                                                ~~6.25-RPV-STUD+~
013300    CH-43-B                  B-G-1                                                      Reg. Guide 1.65, MT exam Closure Head Flange      B6. 20                                                      when removed 3              X Studs                                                                                **6.25-RPV-STUD+*
013400    CH-44-B                  B-G-1      UT                                              Reg. Guide 1.65,MT exam Closure Head Flange      B6 20
                                      ~        MT                                              when removed Studs                                                                    X            *+6 25-RPV-STUD*+
                                                                                                    ~
013500    CH-45-B                  B-G-1      UT                                              Reg. Guide 1.65, MT exam Closure Head Flange      B6.20      MT                                              when removed 3                            X Studs                                                                                ~~6.25-RPV-STUD**
013600    CH-46"B                  B-G-1      UT                                              Reg. Guide 1.65, MT exam Closure Head Flange      B6.20      MT                                              when removed 3                            X Studs                                                                                ~*6.25-RPV-STUD**
013700    CH-47-B                  B-G-1                                                      Reg. Guide 1.65,MT exam Closure Head Flange      B6.20                                                      when removed 3                            X Studs                                                                                ~~6.25-RPV-STUD**
013800    CH-48-B                  B-G-1      UT                                              Reg. Guide 1. 65,  MT Closure Head Flange      B6.20      MT                                              exam when removed 3                            X Studs                                                                                ~~6.25-RPV-STUD**
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PIANT UNIT 1                            PAGE: 16 REVISION:        0                            ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Studs NUMBER:  00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                                SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY METH'IRST NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM    NO            1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION BLOCK~~
013900    CH 49 B                  B-G-1        UT                                            Reg. Guide 1.65,    MT exam Closure Head Flange      B6. 20        MT                                            when removed 3                          X          ++6.25 RPV-STUD++
Studs 014000    CH-50-B                  B"G"1        UT                                            Rcg. Guide 1.65, MT exam Closure Head Flange      B6 ~ 20      MT                                            when removed 3                            X Studs                                                                                ++6.25 RPV-STUD++
014100    CH-51-B                  B-G-1        UT                                            Rcg. Guide 1.65, MT exam Closure Head Flange      B6.20        MT                                            when removed 3
Studs                                                                                ~~6.25-RPV-STUD*~
014200    CH-52-B                  B-G-1                                                      Reg. Guide 1.65,      MT Closure Head Flange      B6.20        MT                                            exam when removed 3
Studs                                                                                ~  ~NMP-6. 25-RPV-STUD~ ~
014300    CH-53-B                  B-G  1                                                    Reg. Guide 1.65, MT exam Closure Head Flange      B6.20        MT                                            when removed 3                            X Studs                                                                                ++NMP-6.25 RPV STUD*t 014400    CH-54-B                  B-G-1        UT                                            Rcg. Guide 1.65, MT exam Closure Head Flange      B6.20        MT                                            when removed 3                            X Studs                                                                                ~~6.25 RPV-STUD~~
014500    CH-55-B Closure Head Flange Studs
                                '6  B-G-1
                                      ~ 20 UT 3                            X Rcg. Guide 1.65, MT exam when removed
                                                                                                ~~NMP" 6. 25-RPV-STUD+~
014600    CH"56-B                  B-G-1        UT                                            Rcg. Guide 1.65, MT exam Closure Head Flange      B6 20
                                      ~          MT                                            when rcmovcd 3
Studs                                                                                ~~NMP-6.25-RPV-STUD*>>
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNZT 1                          PAGE: 17 REVZSZON:        0                            INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS urc Head Studs NUMBER:  00. 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA            CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER    ZDENTIFZCATION              ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK~~
014700    CH-57-B                    BG1        UT                                            Reg. Guide 1.65, MT exam Closure Head Flange        B6 20                                                    when removed 3
Studs                                                                                ~~NMP-6.25-RPV-STUD~*
014800    CH-58-B                    B G 1      UT                                            Rcg. Guide 1.65,    MT Closure Head Flange        B6.20      MT                                            exam when removed 3                            X Studs                                                                                ~ ~NMP-6. 25-RPV-STUD~ ~
014900    CH-59-B                    B-G-1      UT                                            Reg. Guide 1.65, MT exam Closure Head Flange        B6.20      MT                                            when removed 3                                        +*6 25-RPV-STUD+*
Studs                                                                                    ~
015000    CH-60-B                    B-G-l                                                    Rcg. Guide 1.65, MT exam Closure Head Flange        B6.20                                                    when removed 3
Studs                                                                                ~~NMP-6.25-RPV-STUD~*
015100    CH-61-B                    BG1                                                      Rcg. Guide 1.65, MT exam Closure Head Flange        B6.20                                                    when removed 3                            X Studs                                                                                aaNMP-6.25-RPV STUDa ~
015200    CH-62-B                    B-G-1      UT                                            Rcg. Guide 1.65, MT Closure Head Flange        B6.20      MT                                            exam when removed 3
Studs                                                                                **NMP-6.25-RPV STUDY' 015300    CH-63-B                    B-G-1                                                    Rcg. Guide 1.65, MT exam Closure Head Flange          B6.20                                                    when removed 3
                                'tuds
                                                                                                ~~NMP-6.25-RPV-STUD**
015400    CH-64-B                      B-G-1      UT                                            Rcg. Guide 1.65,  MT exam Closure Head Flange          B6.20      MT                                            when removed 3                            X Studs                                                                                  ~*6. 25-RPV-STUD~~
 
DATE: 10/15/99                          NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 18 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Studs NUMBER:  00. 0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTZPZCATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 +'~CALIBRATION BLOCK++
015500    CH-XX-B                B-G-1      MT                                            Per  RG  1.65, a minimum Closure Head Plangc    B6.30                                                    of  4  studs vill be Studs                                    3 X  - - -    X            X          examLncd each period for a  total of  12. **N/A*~
 
DATE: 10/15/99                            NZNE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 19 REVISION:        0                        INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER:  00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK**
: 00. 0 RPV (REF. DWG. NO. 28) 015600    RV-01-TA                B-G 1        VT-1 Reactor Vessel Flange  B6.50 3 X Washer 015700    RV-01-TB                BG-1VT1 Reactor Vcsscl Flange  B6 50~
3 X Washer 015800    RV-02"TA                B-G 1      VT 1 Reactor Vessel Flange  B6 50 F
3 X Washer 015900    RV-02"TB                B-G-1      VT-1 Reactor Vessel Flange  B6.50 3 X Washer 016000    RV-03-TA                B-G-1      VT-1 Reactor Vcsscl Flange  B6 50 F
3 X Washer 016100    RV TB                B-G"1 Reactor Vcsscl Flange    B6 50
                                      ~
3 X Washer 016200    RV-04 TA                B-G-1      VT-1 Reactor Vcsscl Flange    B6 50
                                      ~
3 X Washer 016300    RV-04 TB                B-G-1 Reactor Vcsscl Flange    B6.50 3 X Washer
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PZANT UNIT 1                          PAGE: 20 N.
REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION    XI SCHEDULED COMPONENTS ure Head Washers NUMBER:  00.0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                  OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK~ ~
016400    RV-05-TA                BG1VT1 Reactor Vessel Flange  B6.50 3 X Washer 016500    RV-05-TB                B  G-l      VT-1 Reactor Vessel Flange  B6 50~
3 X Washer 016600    RV-06-TA                B-G-1 Reactor Vessel Flange  B6. 50 3 X Washer 016700    RV-06-TB                B-G-1 Reactor Vessel Flange  B6 50
                                      ~
3 X Washer 016800    RV-07-TA                B G-1        VT-1 Reactor Vessel Flange  B6 50
                                      ~
3 X Washer 016900    RV-07-TB                B-G-1 Reactor Vessel Flange    B6.50 3 X Washer 017000    RV-08-TA                B-G 1        VT 1 Reactor Vessel Flange    B6 50 3 X Washer 017100    RV-08-TB                B-G-1      VT-1 Reactor Vessel Flange    B6 50
                                      ~
Washer                                        X
 
DATE: 10/15/99                            NZNE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 21 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        ZNSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~~CALIBRATION BLOCK~~
017200    RV TA              B-G 1      VT-1 Reactor Vcsscl Flange  B6 50
                                      ~
X Washer 017300    RV-09-TB                B G 1      VT 1 Reactor Vessel Flange 3 X Washer 017400    RV-10 "TA              B-G-1      VT-1 Reactor Vessel Flange  B6.50 3 X Washer 017500    RV-10 TB                B-G-1      VT 1 Reactor Vessel Flange  B6.50 3 X washer 017600    RV-11-TA                B"G  1      VT-1 Reactor Vcsscl Flange  B6.50 3 X Washer 017700    RV-11-TB                B-G-1      VT-1 Reactor Vessel Flange  B6.50 3 X Washer 017800    RV-12-TA                B-G-1 Reactor Vessel Flange  B6.50 3 X Washer 017900    RV-12-TB                B-G-1      VT 1 Reactor Vcsscl Flange    B6.50 3 X Washer
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 22 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER:  00.0 INSPECTION ZNTERVAZ                      PIJN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                -OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~*CALIBRATION BLOCK**
018000    RV-13-TA                B-G-1        VT-1 Reactor Vessel Flange  B6.50 3 X Washer 018100    RV-13-TB                BG1 Reactor Vessel Flange  B6 50
                                      ~
3 X Washer 018200    RV-14-TA                B-G-1 Reactor Vessel Flange  B6.50 3 X Washer 018300    RV-14 TB                B G-1        VT 1 Reactor Vessel Flange  B6 50 F
3 X Washer 018400    RV-15-TA                B-G-1        VT-1 Reactor Vcsscl Flange  B6.50 3 X Washer 018500    RV-15 TB                B-G-1        VT 1 Reactor Vessel Flange    B6.50 3 X washer 018600    RV-16-TA                B-G-1        VT-1 Reactor Vcsscl Flange 3 X Washer 018700    RV-16-TB                BG1VT1 Reactor Vessel Flange    B6 ~ 50 3 X Washer
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 23 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                -OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK>>~
018800    RV-17-TA                B-G-l      VT-1 Reactor Vessel Flange  B6 50~
3 X Washer 018900    RV-17-TB                B-G-1 Reactor Vessel Flange  B6.50 3 X Washer 019000    RV  18-TA              B-G-1 Reactor Vessel Flange  B6.50 3 X Washer 019100    RV-18-TB                B-G-1 Reactor Vessel Flange  B6 50 F
3 X Washer 019200    RV-19-TA                B-G-1      VT-1 Reactor Vessel Flange  B6.50 3 X Washer 019300    RV-19-TB                B G 1      VT 1 Reactor Vessel Flange  B6 50
                                      ~
3 X Washer 019400    RV TA              B-G-l Reactor Vessel Flange  B6.50 3 X Washer 019500    RV-20-TB                B-G-1 Reactor Vessel Flange    B6 50
                                      ~
3 X Washer
 
DATE: 10/15/99                          NINE MZLE POZNT NUCLEAR PLANT UNIT 1                        PAGE: 24 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 ~*CALIBRATION BLOCK+*
019600    RV-21-TA                B-G-1      VT-1 Reactor Vessel Flange  B6 50
                                      ~
3 X Washer 019700    RV-21-TB                B-G-1 Reactor Vcsscl Flange  B6 50 F
3 X Washer 019800    RV-22-TA                B"G-1      VT-1 Reactor Vessel Flange  B6.50 3 X Washer 019900    RV-22-TB                B-G-1 Reactor Vcsscl Flange  B6.50 3 X Washer 020000    RV-23-TA                B-G-1      VT-1 Reactor Vessel Flange  B6.50 3              X Washer 020100    RV-23-TB                B-G-1 Reactor Vessel Flange    B6.50 3              X Washer 020200    RV 24 TA                B-G-1      VT-1 Reactor Vessel Flange    B6.50 3              X Washer 020300    RV-24-TB                B-G"1      VT-1 Reactor Vessel Flange    B6.50 3              X Washer
 
DATE: 10/15/99                          NINE MIIE POINT NUCLEAR PLANT UNIT 1                        PAGE: 25 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER: 00.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERZOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 ~*CALIBRATION BLOCK*~
020400    RV-25-TA                B-G-1      VT-1 Reactor Vessel Flange  B6 50 F
3              X Washer 020500    RV-25-TB                BG1 Reactor Vessel Flange  B6.50 3              X Washer 020600    RV-26-TA                B-G-1      VT 1 Reactor Vessel Flange  B6.50 3              X Washer 020700    RV-26-TB                B-G-1 Reactor Vessel Flange  B6 50 F
3              X Washer 020800    RV-27-TA                B-G-1      VT 1 Reactor Vessel Flange 3              X Washer 020900    RV-27-TB                B-G-1      VT 1 Reactor Vcsscl Flange  B6.50 3              X Washer 021000    RV-28-TA                B-G-1      VT 1 Reactor Vcsscl Flange  B6.50 3              X Washer 021100    RV-28-TB                B-G-1      VT-1 Reactor Vessel Flange  B6.50 3              X Washer
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                        PAGE: 26 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washcrs NUMBER:  00.0 ZNSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FZRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *~CALIBRATION BLOCK**
021200    RV-29-TA                B-G-1 Reactor Vessel Flange  B6.50 3              X Washer 021300    RV-29-TB                B"G-1 Reactor Vessel Flange  B6.50 3              X Washer 021400    RV-30-TA                B-G-1 Roactor Vcsscl Flango  B6.50 3              X Washer 021500    RV-30-TB                B-G-1 Reactor Vessel Flange  B6.50 3              X Washer 021600    RV"31- TA              B-G-1 Reactor Vessel Flange  B6.50 3              X Washer 021700    RV-31-TB                B-G-1      VT-1 Reactor Vessel Flange    B6.50 3              X Washer 021800    RV-32-TA                B "G-1      VT 1 Reactor Vessel Flange    B6.50 3              X Washer 021900    RV-32-TB                B-G-1 Reactor Vessel Flange    B6.50 3              X Washer
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 27 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washers NUMBER:  00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERZOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATE GY      NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4 +*CALIBRATION BLOCK**
022000    RV-33-TA                B-G-1 Reactor Vessel Flange  B6 ~ 50 3              X Washer 022100    RV-33-TB                B-G-1        VT 1 Reactor Vessel Flange  B6.50 3              X Washer 022200    RV-34-TA                B G 1 Reactor Vessel Flange  B6 50
                                      ~
3              X Washer 022300    RV 34 TB                B-G  1 Reactor Vessel Flange  B6.50 3              X Washer 022400    RV-35-TA                B-G 1 Reactor Vessel Flange  B6. 50 3              X Washer 022500    RV-35-TB                B-G-1 Reactor Vcsscl Flange  B6.50 3              X Washer 022600    RV-36-TA                B-G-1        VT"1 Reactor Vcsscl Flange    B6.50 3              X Washer 022700    RV-36-TB                B-G-1        VT-1 Reactor Vessel Flange    B6.50 3              X Washer
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 28 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS ure Head Washers NUMBER:  00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD SUHHARY    EXAHINATZON AREA        CATEGY                            OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEH    NO            1  2  3  4  1  2  3  4  1  2  3  4 ~*CALIBRATION BLOCK~ ~
022800    RV-37-TA                B G 1 Reactor Vessel Flange  B6.50 3              X Washer 022900    RV-37-TB                B-G-1        VT-1 Reactor Vessel Flange  B6.50 3              X Washer 023000    RV-38-TA                B-G-1        VT-1 Reactor Vessel Flange  B6.50 3              X Washer 023100    RV-38-TB                B"G-1 Reactor Vessel Flange  B6.50 3              X Washer 023200    RV 39 TA                B-G-1 Reactor Vessel Flange  B6.50 3              X Washer 023300    RV-39-TB                B-G-1 Reactor Vessel Flange  B6 ~ 50 3              X Washer 023400    RV-40-TA                B G 1 Reactor Vcsscl Flange  B6.50 3              X Washer 023500    RV-40-TB                B-G-1 Reactor Vessel Flange  B6.50 3              X Washer
 
DATE:  10/15/99                            NINE MILE POZNT NUCLEAR PIANT UNIT 1                        PAGE: 29 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER:  00.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THZRD SEC. XI            PERIOD      PERIOD      PERZOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~~CALIBRATION BLOCK~~
023600    RV-41-TA                BG1        VT-1 Reactor Vessel Flange  B6.50 X
Washer 023700    RV TB              B-G-1 Reactor Vcsscl Flange  B6.50 3              X Washer 023800    RV-42-TA                B-G-1 Reactor Vessel Flange  B6.50 3              X Washer 023900    RV-42-TB                B-G-1 Reactor Vcsscl Flange  B6.50 3              X Washer 024000    RV 43 TA                B-G"1      VT-1 Reactor Vessel Flange  B6 50
                                      ~
3              X Washor 024100    RV-43-TB                B-G-1      VT-1 Reactor Vessel Flange  B6.50 3              X Washer 024200    RV-44-TA                B G 1 Reactor Vessel Flange  B6 50 F
3                            X Washer 024300    RV-44-TB                B-0" 1      VT-1 Reactor Vcssol Flange  B6 50
                                      ~
3                            X Washer
 
DATE:  10/15/99                          NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 30 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS urc Head Washcrs NUMBER:  00.0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERZOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ +CALIBRATION BLOCK*'~
024400    RV 45 TA                BG1 Reactor Vessel Flange  B6 50
                                      ~
3                            X Washer 024500    RV-45-TB                B-G-1 Reactor Vcsscl Flange  B6.50 3                            X Washer 024600    RV-46-TA                B-G-1      VT-1                                          +*N/A++
Reactor Vessel Flange  B6 50
                                      ~
3                            X Washer 024700    RV-46-TB                B G-1                                                    **N/A*+
Reactor Vcsscl Flange  B6 50
                                      ~
3                            X Washer 024800    RV-47-TA                B-G-1 Reactor Vcsscl Flange  B6 50 F
3                            X Washer 024900    RV-47-TB                B-G-1      VT 1 Reactor Vcsscl Flange  B6.50 3                            X Washer 025000    RV-48-TA                B-G 1 Reactor Vessel Flangh  B6.50 3                            X Washer 025100    RV-48-TB                B-G-1      VT-1 Roactor Vcsscl Flange  B6.50 3                            X Washer
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 31 REVISION:        0                            ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washers NUMBER:  00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                OUTAGE                        INSTRUCTIONS NUMBER      ZDENTZFZCATZON          ITEM    NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK~~
025200    RV-49"TA                B-G-1 Reactor Vcsscl Flange  B6.50 3                            X Washer 025300    RV-49-TB                B-G-1        VT 1 Reactor Vessel Flange  B6.50 3
Washer 025400    RV-50-TA                B  G-l Reactor Vcsscl Flange  B6 ~ 50 3                            X Washer 025500    RV-50-TB                B-G-l        VT-1 Reactor Vessel Flange  B6.50 3                            X Washer 025600    RV-51-TA                B-G-1        VT 1                                          +*N/A**
Reactor Vessel Flange  B6.50 3                            X Washer 025700    RV-51-TB                B-G-1        VT-1                                          *~N/A*~
Reactor Vessel Flange  B6.50 3                            X Washer 025800    RV-52-TA                B-G "1                                                      **N/A%*
Reactor Vcsscl Flange  B6.50 3                            X Washer 025900    RV 52 TB                B-G-1                                                        ~*N/A**
Reactor Vessel Flange  B6.50 3                            X Washer
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 32 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ure Head Washers NUMBER:  00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                -OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM  NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 *~CALIBRATION BLOCKi~
026000    RV-53-TA                B-G-1                                                        eaN/Aaa Reactor Vessel Flange  B6.50 3                            X Washer 026100    RV-53-TB                B-G-l        VT-1                                            ++N/A*+
Reactor Vessel Flange  B6.50 3                            X Washer 026200    RV-54-TA                B-G-1                                                        ++N/PPa Reactor Vcsscl Flange  B6.50 3                            X Washer 026300    RV-54-TB                B G 1                                                        **N/A*~
Reactor Vessel Flange  B6 50
                                      ~
3                            X Washer 026400    RV-55-TA                B"G"1                                                        ktN/Akk Reactor Vessel Flange  B6.50 3                            X Washer 026500    RV-55-TB                BG1          VT-1                                            ~iN/A+*
Reactor Vessel Flange  B6. 50 3                            X Washer 026600    RV-56-TA                B-G-1                                                        *tN/Aft Reactor Vessel Flange  B6.50 3                            X Washer 026700    RV-56-TB                B"G-1        VT-1                                            *ON/A**
Reactor Vessel Flange  B6. 50 3                            X Washer
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 33 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ure Head Washcrs NUMBER:  00.0 INSPECTION INTERVAL                    PLAN STATUS            PRE SERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMZNATZON AREA        CATEGY    NDE                -OUTAGE                          ZNSTRUCTIONS NUMBER    IDENTIFICATION          ZTEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 yqCALIBRATZON BLOCKte 026800    RV-57-TA                B-G-1      VT-1                                            ~*N/A~*
Reactor Vessel Flange  B6 50
                                      ~
3                            X Washer 026900    RV-57-TB                B-G-1                                                      4kN/Ak*
Reactor Vessel Flange    B6.50 3                            X Washer 027000    RV-58"TA                B-G-1      VT-1                                            ~+N/A~~
Reactor Vessel Flange    B6.50 3                            X Washer 027100    RV-58-TB                B-G-1                                                      **N/A~~
Reactor Vcsscl Flange    B6.50 3                            X Washer 027200    RV-59-TA                B-G-1                                                      *+N/A**
Reactor Vessel Flange    B6 50
                                      ~
3                            X Washer 027300    RV-59-TB                B-G-1                                                      **N/A**
Reactor Vessel Flange    B6 50
                                      ~
3                            X Washer 027400    RV-60-TA                B"G-1      VT-1                                            **N/Aaa Reactor Vcsscl Flange    B6.50 3                            X Washer 027500    RV-60-TB                B-G-1      VT 1                                            **N/A**
Reactor Vessel Flange    B6.50 3                            X Washer
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 34 REVISION:        0                          ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS urc Head Washers NUMBER:  00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER    IDENTZFZCATION          ZTEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK~i 027600    RV-61-TA                B G-1        VT-1                                            ION/A*f Reactor Vessel Flange  B6 ~ 50 3                            X Washer 027700    RV-61-TB                B-G-1        VT-1                                            **N/A+~
Reactor Vcsscl Flange  B6. 50 3                            X Washer 027800    RV-62-TA                B-G"1        VT-1                                            **N/A*%
Reactor Vessel Flange  B6 50 F
3                            X Washer 027900    RV 62 TB                B-G-1                                                        **N/A**
Reactor Vessel Flange  B6.50 3                            X Washer 028000    RV-63-TA                B-G-1                                                        ~~N/A~~
Reactor Vcsscl Flange  B6.50 3                            X Washer 028100    RV-63-TB                B-G  1      VT-1                                            *AN/A**
Reactor Vessel Flange    B6.50 3                            X Washer 028200    RV-64-TA                BG-1        VT 1                                            **N/Af*
Reactor Vessel Flange    B6 ~ 50 3                            X Washer 028300    RV-64 TB                B-G-1        VT-1                                          *AN/AOt Reactor Vcsscl Flange    B6.50 3                            X Washer
 
DATE: 10/15/99                            NZNE HIIE  POINT NUCLEAR PLANT UNIT 1                          PAGE: 35 REVISION:        0                          ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS rol Rod  Drive Housings NUMBER:  00.0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR ASHE                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAHINATZON AREA          CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4  + ~CALIBRATION BLOCK**
: 00. 0  RPV (REF. DWG. NO. 28A) 041300    CRD  XX-X                B-G 2                                                      Only when disassembled, Capscrcws  (8) 8  (      B7.80 To be  identified  as X            X    X        X          disassembled during each
          )
outage ~~N/A+~
041400    NCTS503783 1 AZZSRDH      NOTS      VT-2                                            All CRD  Housings, CRD CRDH Exterior e Rx        503783                                                    pcn. leakage req'd 3 X    - - -    X    X  - -    X Bottom Head                                                                          during RFO a Maint 4 Mid-cycle shutdown      when drywcll De-inerted.
0 1 N/A**
041500    RV-CRD-Rl                B"0                                                        Examine  outer  180 CRD  Housing-to-Flange    B14.10                                                    degrccs of circufercnce 3
weld                                                                                pcr RR-ISZ-9 **N/A*+
041600    RV-CRD-RS                B 0                                                        Examine  outer  180 CRD  Housing-to-Flange    B14. 10                                                    degrees of circumfcrencc 3              X weld                                                                                pcr RR-ZSI-9 i~N/Ai+
041700    RV-CRD-Sl                  B-0                                                        Examine  outcr  180 CRD  Housing-to-Flange    B14. 10                                                    degrees of circumfcrencc 3 X weld                                                                                  per RR-ZSI-9 **N/A~~
041800    RV"CRD-S3                  B-0                                                        Examine  outer  180 CRD  Housing-to-Flange    B14.10                                                    degrccs of circumference 3              X weld                                                                                  per RR-ISZ-9 *~N/A**
041900    RV-CRD-T3                  B-0                                                        Examine  outer  180 CRD  Housing-to-Flange    B14.10                                                    dcgrccs of circumference 3
weld                                                                                  pcr RR-ISZ-9    ~~N/A+~
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 36 REVZSZON:        0                          ZNSERVZCE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS rol Rod  Drive Housings NUMBER:  00. 0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATZON AREA        CATEGY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~+CAIIBRATZON BLOCK**
042000    RV-CRD-T7                B-0                                                      Examine  outer  180 CRD  Housing-to-Flange  B14.10                                                    degrees  of circumfcrcncc weld                                                                              pcr RR-ZSZ-9 ~~N/A~*
042100    RV CRD U2                B-0                                                      Examine  outer  180 CRD  Housing-to-Flange  B14. 10                                                  dcgrecs of circumference 3                            X weld                                                                              pcr RR-ISI-9 *~N/A~~
042200    RV-CRD-U6                B-0                                                      Examine  outer  180 CRD  Housing-to-Flange  B14. 10                                                  dcgrecs of circumfcrcnce 3 X weld                                                                              pcr RR-ZSZ-9 *~N/A~~
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 37 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vassal Flange NUMBER:  00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMZNATZON AREA        CATEGY      NDE                  OUTAGE                        ZNSTRUCTZONS NUMSER      IDENTIFICATION          ZTEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK**
: 00. 0 RPV (REF. DWG. NO. 28) 042300    RV-01-L                  B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                        **Pl LF 1*a 3 X in Flange 042400    RV-01-T                  B"G-1      VT-1                                          Only when disassembled.
Reactor Vessel          B6.50                                                      **N/A*~
3 X Bushings in Flange 042500    RV  02-L                B-G-1                                                      Only when disassembled.
Reactor Vessel Threads B6.40                                                        **Pl-LF-lai 3 X in Flange 042600    RV-02-T                  B-G-1                                                      Only when disassembled.
Reactor Vessel          B6. 50                                                    ++N/A++
3 X Bushings in Flange 042700    RV-03-L                  B-G-1      UT                                            Only when disassembled.
Reactor Vcsscl Threads  B6.40                                                      **Pl LF  1++
3 X in Flange 042800    RV-03-T                  B-G-1                                                      Only when disassembled.
Reactor Vessel          B6.50                                                      44N/A4 l 3 X Bushings in Flange 042900    RV-04-L                  B-G-l      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                        **Pl LF 1**
3 X in Flange 043000    RV-04-T                  B-G-1                                                      Only when disasscmblcd.
Reactor Vessel            B6.50 3 X Bushings in Flange
 
F DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 38 REVISZON:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vessel  Flange NUMBER:  00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  a yCALIBRATION BLOCKt s 043100    RV-05-L                B-G-1        UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                        tfP]  LF  ]1l 3 X in Flange 043200    RV 05 T                B-G-1        VT"1                                          Only when disassembled.
Reactor Vessel          B6.50                                                      ~*N/A**
3 X Bushings in Flange 043300    RV-06-L                B-G-l        UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                        **Pl-LF-I~~
3 X in Flange 043400    RV-06-T                B-G-l        VT-1                                          Only when disassembled.
Reactor Vessel          B6.50                                                      +~N/A~~
3 X Bushings in Flange 043500    RV-07-L                B-G-1        UT                                            Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                        +~Pl-LF-I++
3 X in Flange 043600    RV-07-T                B-G-1                                                      Only when disassembled.
Reactor Vcsscl          B6. 50                                                      **N/A**
3 X Bushings in Flange 043700    RV-08-L                B G  1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                        *~ Pl-LF-1**
3 X in Flange 043800    RV-08 T                B G-1                                                      Only when disassembled.
Reactor Vessel          B6.50                                                      *AN/AJ*
3 X Bushings in Flange
 
DATE: 10/15/99                          NZNE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 39 REVISION:        0                        ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Flange NUMBER:  00.0 INSPECTION ZNTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                            ZNSTRUCTZONS NUMBER      IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4  w wCALZBRATION BLOCK*s 043900    RV-09-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      eePZ LF Zaa 3 X in Flange 044000    RV-09-T                B-G-1                                                    Only when disassembled.
Reactor Vessel          B6.50
* 1 'N/A**
3 X Bushings in Flange 044100    RV-10-L                B-G-1      UT                                            Only when disassembled.
Reactor Vcsscl Threads B6.40                                                      *~Pl-LF-l~~
3 X in Flange 044200    RV-10-T                B-G-l      VT-1                                          Only when disassembled.,
Reactor Vessel          B6.50 3 X Bushings in Flange 044300    RV-11-I                B G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6 40                                                      +*Pl LF-I++
3 X in Flange 044400    RV-11-T                B-G-1      VT 1                                          Only when disassembled.
Reactor Vessel          B6.50                                                    %AN/A%*
3 X Bushings in Flange 044500    RV-12-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      <<*Pl-LF-I**
3 X in Flange 044600    RV-12-T                  B-G-1      VT-1                                          Only when disassembled.
Reactor Vessel          B6.50                                                    *ON/A**
3 X Bushings in Flange
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 40 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Flange NUMBER:  00. 0 ZNSPECTZON INTERVAL                      PLAN STATUS              PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                -OUTAGE                            INSTRUCTIONS NUMBER      ZDENTZFZCATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  *~CALIBRATION BLOCK**
044700    RV-13-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      ~~PI-LF-I~*
3 X in Flange 044800    RV-13-T                B-G-1      VT-1                                          Only when disassembled.
Reactor Vessel          B6.50                                                      '
                                                                                                +N/A~+
3 X Bushings in Flange 044900    RV-14-L                B-G-l      UT                                            Only when disassembled.
Reactor Vcsscl Threads B6.40                                                      ~~  Pl-LF-1+ ~
3 X in Flange 045000    RV-14-T                B-G-1                                                      Only when disasscmblcd.
Reactor Vessel          B6. 50                                                    ~~N/A~~
3 X Bushings in Flange 045100    RV-15-L                B"G-1      UT                                            Only when disassembled.
Reactor Vcsscl Threads  B6.40                                                      41P]  IF 1*4 3 X in Flange 045200    RV-15 T                B-G-1      VT-1                                          Only when disassembled.
Reactor Vessel          B6. 50                                                    ttN/A4*
3 X Bushings in Flange 045300    RV-16-L                B-G-1      UT                                            Only when disassembled.
Reactor Vcsscl Threads B6.40                                                      **Pl-Z,F-1**
3 X in Flange 045400    RV-16-T                B G-1                                                      Only when disassembled.
Reactor Vessel          B6. 50                                                    **N/A~~
3 X Bushings in Flange
 
a DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 41 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUHBER:  00. 0 INSPECTION ZNTERVAZ                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERZOD SUHHARY    EXAHZNATZON AREA        CATEGY      NDE                OUTAGE                          ZNSTRUCTIONS NUHBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ ~CALIBRATION BLOCX~ ~
045500    RV-17-L                B-G-1                                                      Only when disassembled.
Reactor Vcsscl Threads B6.40                                                      ++Pl-LF-1*~
X in Flange 045600    RV-17-T                B-G 1                                                      Only when disassembled.
Reactor Vassal          B6.50                                                      *~N/A~~
3 X Bushings in Flange 045700    RV 18  L                B-G 1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      *~PI-LF-1*~
3 X in Flange 045800    RV T                B-G-1      VT-1                                          Only when disasscmblcd.
Reactor Vessel          B6.50                                                      ~*N/A**
3 X Bushings in Flango 045900    RV 19 L                B G-1      UT                                            Only when disasscmblcd.
Reactor Vcsscl Threads B6.40                                                      **Pl LF-1**
3 X in Flange 046000    RV-19-T                BG1                                                        Only when disasscmblcd.
Reactor Vessel          B6. 50 3 X Bushings in Flange 046100    RV-20-L                  B-G 1      UT                                            Only when disassembled.
Reactor Vessel Thrca'ds B6.40                                                      ++Pl-LF-I++
3 X in Flange 046200    RV-20-T                  B-G-1      VT"1                                          Only when disasscmblcd.
Reactor Vcsscl          B6. 50 3 X Bushings in Flango
 
DATE:  10/15/99                            NZNE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 42 REVZSZON:        0                          ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER:  00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMZNATZON AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ZTEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK**
046300    RV-21-L                B-G-1                                                      Only when disassembled.
Reactor Vessel Threads B6.40                                                      ttP] LF ]tt 3 X in Flange 046400    RV-21-T                B-G-1      VT-1                                          Only when disassembled.
Reactor Vcsscl          B6.50 3 X Bushings in Flange 046500    RV-22-L                B-G-1      UT                                            Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                      ~~Pl-LF-1*~
3 X in Flange 046600    RV-22-T                BG1                                                        Only when disasscmblcd.
Reactor Vessel          B6.50                                                      **N/A~~
3 X Bushings in Flange 046700    RV-23-L                B G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      +*Pl-LF-1*~
3              X in Flange 046800    RV-23-T                B-G"1                                                      Only when disassembled.
Reactor Vessel          B6. 50 3              X Bushings in Flange 046900    RV 24-L                B-G-1      UT                                            Only when disasscmblcd.
Reactor Vcsscl Threads B6.40                                                      **Pi-LF-1~*
3              X in Flange 047000    RV-24-T                B G-1                                                      Only when disassembled.
Reactor Vcsscl          B6.50 3              X Bushings in Flange
 
0 4 'I
 
DATE:  10/15/99                            NINE MILE POZNT NUCLEAR PLANT UNIT 1                        PAGE: 43 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Flange NUMBER:  00. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTZFICATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ ~CALIBRATION  BLOCK~ ~
047100    RV-25-L                B-G-1                                                    Only when disassembled.
Reactor Vessel Threads  B6 40                                                    ~+Pl-LF-I**
3              X in Flange 047200    RV-25 T                B-G-l                                                    Only when disasscmblcd.
Reactor Vessel          B6.50 3              X Bushings in Flange 047300    RV-26-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      *~PI-LF-I+~
3              X in  Flange 047400    RV 26 T                B-G"1                                                    Only when disassembled.
Reactor Vessel          B6. 50 3              X Bushings in Flange 047500    RV-27-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      ~*Pi-LF-I~+
3              X in Flange 047600    RV-27-T                B-G 1                                                    Only when disassembled.
Reactor Vessel          B6.50 3              X Bushings in Flange 047700    RV  28-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      **Pl-LF-I++
3              X in Flange 047800    RV-28-T                  B-G-1                                                    Only when disassembled.
Reactor Vessel          B6. 50 3              X Bushings in Flange
 
lq DATE:  10/15/99                          NINE MILE POZNT NUCLEAR PLANT UNIT 1                              PAGE: 44 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vessel  Flange NUMBER:  00.0 ZNSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THZRD SEC. XZ              PERZOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY ITEM NO NDE            ---OUTAGE--                          ZNSTRUCTZONS NUMBER      IDENTIFICATION                    METH    1  2  3  4  1  2  3  4  1  2  3  4 1 rCALIBRATION BLOCK+ ~
047900    RV-29-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      0IP] LF ]**
3              X in Flange 048000    RV 29 T                B-G-1      VT-1                                          Only when disassembled.
Reactor Vessel          B6.50                                                    ~+N/A++
3              X Bushings in Flange 048100    RV-30-L                B-G-l      UT                                            Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                      ~ ~ Pl-LF-1 ~ ~
3              X in Flange 048200    RV-30-T                B G-1                                                    Only when disasscmblcd.
Reactor Vcsscl          B6.50                                                    *'~N/A~*
3              X Bushings in Flange 048300    RV-31-L                B-G-l      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      ~~Pl-LF-1~~
3              X in Flange 048400    RV-31-T                B G"1                                                    Only when disassembled.
Reactor Vessel          B6.50                                                    1 O'/A1 0 3              X Bushings in Flange 048500    RV-32-L                B-G-l      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      ~~Pl-LF-I**
3              X in Flange 048600    RV-32-T                B G-1                                                    Only when disassembled.
Reactor Vessel          B6.50                                                    *IN/A4*
3              X Bushings in Flange
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 45 REVZSZON:        0                            ZNSERVICE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Flange NUMBER:  00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERZOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK*~
048700    RV-33-L                B-G-1        UT                                            Only when disassembled.
Reactor Vcsscl Threads B6.40                                                        a+PI-LF-Iae 3              X in Flange 048800    RV"33-T                B-G-l                                                      Only when disassembled.
Reactor Vessel          B6.50                                                      4 1N/A**
3              X Bushings in Flange 048900    RV-34-L                B-G"1        UT                                            Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                        ~ +Pl-LF-1 ~ +
3              X in Flange 049000    RV 34 T                B G  '1                                                    Only when disassembled.
Reactor Vcsscl          B6. 50                                                      **N/Af*
3              X Bushings in Flange 049100    RV-35-L                B-G-1        UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                        *+Pl-LF-I++
3              X in Flange 049200    RV-35-T                BG1                                                        Only when disassembled.
Reactor Vessel          B6. 50                                                      l*N/A11 3              X Bushings in Flange 049300    RV-36-L                BG1UT                                                      Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                        aaPI LF 1**
3              X in Flange 049400    RV-36-T                  B-G-1                                                      Only when disasscmblcd.
Reactor Vessel          B6.50                                                      t 1N/Ak*
3              X Bushings in Flange
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                              PAGE: 46 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vcsscl  Flange NUMBER:  00. 0 ZNSPECTZON ZNTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTZFZCATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  + +CALIBRATION    BLOCK+ +
049500    RV-37-L                B-G-l                                                      Only when disassembled.
Reactor Vessel Threads B6.40                                                      ~+  Pl-LF-1 ~ ~
in Flange                                  3 - - - -      X 049600    RV-37-T                B-G-l                                                      Only when disassembled.
Reactor Vessel          B6.50                                                      ~kN/Af4 3              X Bushings in Flange 049700    RV-38-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      ~~Pl-LF-l~~
in Flange                                                X 049800    RV-38-T                B-G-1                                                      Only when disassembled Reactor Vcsscl          B6. 50                                                    ~~N/A+*
3              X Bushings in Flange 049900    RV-39-L                B-G-1      UT                                            Only when disassembled.
Reactor Vcsscl Threads B6.40                                                      ~~Pl-LF-I**
3              X in Flange 050000    RV-39-T                B-G-1      VT-1                                          Only when disassembled.
Reactor Vessel          B6.50                                                      *+N/A+*
3              X Bushings in Flange 050100    RV-40-L                  B G-l      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                        **Pl-LF-1*~
3              X in Flange 050200    RV-40-T                  B G 1                                                      Only when disassembled.
Reactor Vessel          B6.50                                                      k4N/A*4 3              X Bushings in Flange
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 47 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Flange NUMBER:  00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ZTEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK~~
050300    RV-41-L                B-G 1                                                      Only when disassembled.
Reactor Vessel Threads B6.40                                                      ++Pl-LF-1~~
3              X in Flange 050400    RV-41-T                B-G-1                                                      Only when disassembled.
Reactor Vessel          B6.50                                                      +AN/A+a 3              X Bushings in Flange 050500    RV-42-L                B-G-1      UT                                            Only when disassembled.
Reactor Vcsscl Threads  B6.40                                                      **Pl-LF-1**
in Flange                                3  - " - -    X 050600    RV 42 T                B G-1                                                      Only when disassembled.
Reactor Vessel          B6. 50                                                    t*N/A*4 3              X Bushings in Flange 050700    RV-43-I                B-G-1      UT                                            Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                      + +Pl-LF-1*~,
3              X in Flange 050800    RV 43 T                B-G-1      VT-1                                          Only when disasscmblcd.
Reactor Vessel          B6.50                                                      1 O'/A**
3              X Bushings in Flange 050900    RV-44-L                  B G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                        **Pl-I,F-1**
3 in Flange                                                              X 051000    RV-44-T                  B-G-1                                                      Only when disasscmblcd.
Reactor Vessel          B6. 50                                                    *~N/A~~
3                            X Bushings in Flange
 
4 DATE: 10/15/99                          NINE MZLE POINT NUCLEAR PLANT UNIT 1                            PAGE: 48 REVISION:        0                        INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Flange NUMBER:  00. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER      ZDENTZFZCATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *+CALIBRATIONBLOCK~+
051100    RV-45-L                B-G-l                                                    Only when disassembled.
Reactor Vessel Threads B6.40                                                    aaP1  IF 3                            X in Flange 051200    RV-45-T                B-G-l      VT-1                                        Only when disassembled.
Reactor Vessel          B6.50                                                    **N/A+i 3                            X Bushings in Flange 051300    RV-46-L                BG1UT                                                    Only when disassembled.
Reactor Vessel Threads B6.40                                                    ~+ Pl-LF-1 ~ ~
3                            X in Flange 051400    RV-46-T                B-G-1                                                    Only when disassembled.
Reactor Vessel          B6.50                                                    ~+N/A++
3                            X Bushings in Flange 051500    RV-47-L                B-G-1                                                    Only when disassembled.
Reactor Vessel Threads  B6.40                                                    *~PI-LF-l~~
3                            X in Flange 051600    RV-47-T                B-G-1                                                    Only when disassembled.
Reactor Vessel          B6.50                                                    f 4N/Alt 3                            X Bushings in Flange 051700    RV-48-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                    **Pl-IF-1**
3                            X in Flange 051800    RV-48-T                  B-G-1                                                    Only when disasscmblcd.
Reactor Vessel          B6.50                                                    ~~N/Ai~
3                            X Bushings in Flange
 
0
~ },
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                        PAGE: 49 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vcsscl  Flange NUMBER:  00.0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK+*
051900    RV-49-L                B-G-l      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40 3
toPI LF  Itf in Flange                                                              X 052000    RV-49-T                B-G-1                                                    Only when disassembled.
Reactor Vessel          B6.50                                                    **N/A*~
3                            X Bushings in Flango 052100    RV-50-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      **Pl-LF-1*~
3                            X in Flange 052200    RV-50-T                B-G-1                                                    Only when disassembled.
Reactor Vessel          B6.50                                                    *iN/A*%
3                            X Bushings in Flange 052300    RV-51-L                B-G-1      UT                                            Only when disassembled.
Reactor vcsscl Threads B6.40                                                      +*Pl-LF-1**
3                            X in Flange 052400    RV-51-T                B"G  1                                                    Only when disassembled.
Reactor Vcsscl          B6.50                                                    +*N/A*+
3                            X Bushings in Flange 052500    RV-52-L                B"G-1      UT                                            Only when disassembled.
Reactor Vessel Threads  B6.40                                                    **Pl-LF-1**
3                            X in Flange 052600    RV-52-T                  B-G-1                                                    Only when disassembled.
Reactor Vessel          86.50                                                    **N/A**
3                            X Bushings in Flange
 
DATE:  10/15/99                            NZNE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 50 REVISION:        0                        ~ INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Flange NUMBER:  00. 0 ZNSPECTION ZNTERVAL                      PZAN STATUS            PRESERVICE YEAR I
ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4 ~*CALIBRATION BLOCK**
052700    RV-53-L                B-G-1                                                      Only when disassembled.
Reactor Vessel Threads B6.40 3
4%PI LF  Ilt X
in Flange 052800    RV-53-T                B-G-1                                                      Only when disassembled.
Reactor Vessel          B6.50                                                      ~~N/A++
3                            X Bushings in Flange 052900    RV-54-L                B-G-1        UT                                            Only when disassembled.
Reactor Vcsscl Threads B6.40                                                      ~~PI-LF-I++
3                            X in Flange 053000    RV-54-T                B-G-1                                                      Only when disassembled.
Reactor Vessel          B6.50                                                      *ON/A*%
3 Bushings in Flange 053100    RV 55 L                B-G-1        UT                                            Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                      ++Pl-LF-1~~
3                            X in Flange 053200    RV-55-T                B-G-1                                                      Only when disassembled.
Reactor Vessel          B6.50                                                      ++N/A++
3                            X Bushings in Flange 053300    RV-56-L                B-G-l        UT                                            Only when disassembled.
Reactor Vcsscl Threads  B6 40                                                      **Pl-LF-1**
3                            X in Flange 053400    RV 56 T                B"G  1                                                    Only when disassembled.
Reactor Vessel          B6.50                                                      *ON/At1 3                            X Bushings in Flange
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                              PAGE: 51 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel    Flange NUMBER:    00.0 INSPECTZON INTERVAL                      PLAN STATUS            PRESERVZCE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                            INSTRUCTIONS NUMBER      IDENTIFICATION        ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  t t CALIBRATION BLOCKtt 053500    RV-57-L                BG1UT                                                      Only when disassembled.
Reactor Vessel Threads B6.40                                                      "tPl -IF-It ~
3                            X in Flange 053600    RV-57-T                B-G-1                                                      Only when disasscmblcd.
Reactor Vessel          B6. 50                                                    *'tN/A' t 3                            X Bushings in Flange 053700    RV-58-L                B-G-1      UT                                            Only when disasscmblcd.
Reactor Vessel Threads B6.40                                                      t*Pl-LF-ltt 3                            X in Flange 053800    RV 58 T                B G-1                                                      Only when disassembled.
Reactor Vcsscl          B6.50                                                      *tN/A**
3                            X Bushings in Flange 053900    RV"59-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      t t Pl-LF-1 t t 3                            X in Flange 054000    RV-59-T                BG1        VT 1                                          Only when disassembled.
Reactor Vessel          B6. 50                                                    ttN/Att 3                            X Bushings in Flange 054100    RV  60-L              B-G-1      UT                                            Only when disassembled.
Reactor Vcsscl Threads B6.40                                                      ttpl-LF-ltt 3                            X in Flange 054200    RV-60-T                B-G-1      VT 1                                          Only when disasscmblcd.
Reactor Vessel          B6.50                                                      t tN/At1 3                            X Bushings in Flange
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNZT 1                          PAGE: 52 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vcsscl  Flange NUMBER:  00.0 ZNSPECTION INTERVAL                      PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERZOD      PERZOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER      ZDENTZFZCATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ++CALIBRATION BLOCK~'~
054300      RV-61-L                B-.G-1                                                    Only when disassembled.
Reactor Vessel Threads B6.40                                                      i*Pl-LF-1~~
3                            X in Flange 054400      RV-61-T                B-G  1                                                    Only when disassembled.
Reactor Vessel          B6.50                                                      *+N/A+*
3                            X Bushings in Flange 054500      RV-62-L                B-G-1      UT                                            Only when disassembled.
Reactor Vcsscl Threads  B6 40
                                      ~                                                      ~~PI-LF-I~~
3                            X in Flange 054600      RV-62-T                B-G-1      VT-1                                          Only when disasscmblcd.
Reactor Vessel          B6.50                                                      ~~N/A~~
3                            X Bushings in Flange
      '*        W 054700      RV-63-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      ++PI-LF-1*~
3                            X in Flange 054800      RV-63-T                B-G"1                                                      Only when disassembled.
Reactor Vcsscl          B6.50 3                            X Bushings in Flange 054900      RV 64-L                B-G-1      UT                                            Only when disassembled.
Reactor Vessel Threads B6.40                                                      **PI-LF-I**
3                            X in Flange 055000      RV-64-T                B-G-1                                                      Only when disassembled Reactor Vessel          B6.50                                                      tAN/Atf 3                            X Bushings in Flange
 
DATE:  10/15/99                          NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 53 REVZSION:        0                        ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vcsscl Interior NUMBER:  00. 0 ZNSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATION BLOCK**
RPV (REF. DWG. NO. 28A) 056100    HS                      B-N-2                                                    USNRC  GL94-03,  USNRC SER Shroud Support  skirt  B13.40    VT-3                                          3/24/99  RFO16 scope to 3 X H8 Weld                            UT*                                            be defined, EVT1 top surface  6 Locations of prior indications;    UT  to be determined.    **LATER**
056200    H9                      B-N-2      EVT1                                          Scope  to be dcfincd, Shroud Support Skirt    B13.40                                                    BWRVZP-38 Exam 0    to 180 H9 Weld                                                                          degrees  ~~N/A~~
056300    H9                      B N 2      EVT1                                          Scope  to bc dcfincd, Shroud Support Skirt    B13.40                                                    BWRVZP-38 Exam 180    to 3                            X H9 Weld                                                                          360 dcgrccs ~~N/A**
056400    H9-166                  B"N-2                                                    USNRC  GL94-03,  USNRC SER Shroud Support Skirt    B13.40    VT-3                                          3/24/99 RF016 scope to 3 X H9 Weld Repair Anch                                                              bc defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-166. for  a min. 26" ad)accnt to two togg ~~N/A~~
056500    H9-270                  B-N-2      EVT1                                          USNRC  GL94"03,  USNRC SER Shroud Support Skirt    B13.40    VT-3                                          3/24/99 RFO16 scope to H9 Wold Repair Anch                                                              bc dcfincd, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-270 foc a min. 26" ad)accnt to two toggl  ~~N/A~~
 
DATE: 10/15/99                          NZNE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 54 REVISION:        0                        ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Interior NUMBER:  00. 0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMZNATZON AREA        CATEGY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4  ~+CALIBRATION BLOCK~+
056600    H9-350                  B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Shroud Support Skirt    B13.40    VT-3                                          3/24/99 RF016 scope to H9 Weld Repair Anch                                                              be defined, EVT1 top surface of shroud support skirt to RPV H9 weld ad)accnt to TIEROD-RXVE-350    for  26" adjacent to two toggles..  ~~N/A*~
056700    H9-90                  B"N"2      EVT1                                          USNRC  GL94"03,  USNRC SER Shroud Support Skirt    B13.40    VT-3                                          3/24/99 RFO16 scopo to 3 X H9 Weld Repair Anch                                                              be defined, EVT1 of top surface of shroud support skirt to RPV H9 wold ad)accnt to TIEROD-RXVE-90    for  a min. of 26" adjacent to two ~~N/A~~
056900    RV-01-Z                SZL                                                      Once  every inspection Stcam Dryer Drain      474                                                      period  ~~N/A~~
Cracking                                  X  - - -    X    - - -    X 057000    RV 01  I                B"N-1                                                    Once cvcry inspection Stcam Dryer            B13.10                                                    period ~~N/A~~
3 X  - - -    X    - - -    X 057100    RV-02-I                B-N-1      VT-3                                          Once  every inspection Stcam Separator        B13. 10                                                  period  ~~N/A~~
3 X  - - -    X    - - -    X 057200    RV-05-I                NUREG      VT 3                                          Exam  required cvcry four Fccdwatcr Sparger      0619                                                      outages,  commencing in 3                            X RF08,  (1981),  Examine flow holes    a welds  in sparger arms 6 tees and FW nozzle ~~N/AP~
 
DATE: 10/15/99                            NINE MZLE POINT NUCLEAR PZANT UNIT 1                          PAGE: 55 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER:  00.0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  +*CALIBRATION BLOCK**
057300    RV-06-I                  BNRVIP    VT-3                                          Examine pcr Memo Core Spray Sparger      18                                                        NMP1-M99-018. + +N/A+ ~
3 X  - - -    X    X  - -    X 057400    RV-07-I                  BWRVZP    VT 1                                          Examine per Memo Core Spray Lines        18                                                        NMP1-M99-018. ~*N/A~~
3 X  - - -    X    X  - -    X 057500    RV-08-Z                  B-N-2      VT-1                                          Examine once pcr Dryer Support Brackets B13.20                                                      interval *+N/A+*
3 X (bcltlino) 057600    RV-09-Z                  B-N-2      VT 1                                          Examine once  pcr Feedvater Sparger        B13. 20                                                  interval  ++N/A++
3              X Brackets (bcltline) 00    RV-10-I                  B-N-2      VT-1                                          Examine once per Guide Rod Support        B13.20                                                    interval ++N/A**
3              X Brackets  (bcltlinc) 057800    RV-11-I                  B-N-2      VT-1                                          hei tlinc, Examine once Upper Survicllancc      B13. 20                                                  pcr interval *~N/A*+
3                            X Specimen Holder 057900    RV-12-Z                  B-N-2      VT-1                                          bcltlinc,  Examine once Lower Survicllancc      B13.20                                                    pcr interval  +~N/A+~
3                            X Specimen Holder 058000    RV-13-I                  B-N-2      VT-3                                          Examine once  pcr Upper Ccrc Grid          B13.40                                                    Znspection Interval 3 X
                                                                                              *fN/A*0 058100    RV-13-I                  SZL                                                      RFO-16 scope to bc Upper Core Grid          554                                                      defined.. +~N/A++
3 X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 56 REVZSZON:        0                          ZNSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER:    00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATZON AREA          CATEGY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ +CALIBRATION BLOCK**
058300    RV-14-I                  B-N-2      VT 3                                          Examine accessible Core Shroud              B13.40                                                    surface's each interval.
X          %*N/At0 058400    RV-15-Z                  B-N-2      VT-3                                          Examine once  pcr Core Shroud Support      B13.40                                                    Inspection Interval 3              X                        aaN/A*t Ring 059000    SZL409-ZDTC1245          SZL                                                      EVT1  every other even IRM  Incorc Dry Tube      409R1                                                    numbcrcd outage ++N/A~~
4 3 X                X Assembly 059900    SZI 409-IDTC3645          SIL        EVT1                                          EVT1  cvcry other even IRM Zncoro Dry Tube      409R1                                                    numbcrcd outage ++N/A++
3 X                X Assembly 060100    Shroud Head Bolts        B-N-2      VT-3                                          UT cxams  to bc Shroud Head Bolts (36) B13.40        UT                                            identified later    pending 3 X final results of    BWR Owner's Group. ~~LATER~~
060200    Skirt-166                B-N-2      EVT1                                          USNRC  GL94-03, USNRC SER Shroud Support  Skirt    B13.40                                                    3/24/99, EVT1 top 3 X Surface                                                                            surface of inconel srd.
sprt. skirt  where accessible around intcrfacc of lower stablizcr sprt. pedestal to conical sprt. 8 166 dcg  ticrod  ~+N/A~~
 
DATE: 10/15/99                            NINE HYLE POINT NUCLEAR PLANT UNIT 1                          PAGE: 57 REVZ SION:        0                        INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COHPONENTS tor Vessel Interior NUMBER:  00.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FZRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAHINATZON AREA        CATEGY    NDE                -OUTAGE                          ZNSTRUCTIONS NUHBER      ZDENTZFZCATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  +~CALIBRATION BLOCK~~
060300      Skirt-270              B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Shroud Support  Skirt  B13.40                                                    3/24/99, EVT1 top 3 X Surface                                                                          surface of inconcl srd.
sprt. skirt whcrc accessible around interface of lower stablizer suppt pedestal to conical sprt 6 270 dcg ticrod ~~N/A~~
060400      Skirt-350              B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Shroud Support  Skirt  B13.40                                                    3/24/99, EVT1 top 3 X Surface                                                                          surface of inconcl srd.
sprt. skirt  where accessible around interface of lower stablizcr supt. pcdcstal to conical sprt 6 350 deg  tierod  <<~N/A**
060500      Skirt-90                B-N-2      EVT1                                          USNRC GL94  03,  USNRC SER Shroud Support  Skirt  B13.40                                                    3/24/99, EVT1 top 3 X Surface                                                                          surface of inconcl srd sprt skirt  when accessible around interface of lower stablizcr supt pedestal to conical sprt 6 90 dcg ticrod locat    **N/A~~
060600      Spaccr-RXVE-168        B-N-2      VT-3                                          USNRC  GL94-03,    USNRC SER Shroud Stabilizer      B13. 40                                                  3/24/99,  BWRVIP 3 X Assembly (Spacer)                                                                  rcccommends  exam  of shroud assembly core plate clamp/spaccr assembly located bctwcen ZD  of shroud  6  core support plate    8  168 dcg.
11N/Alt
 
DATE: 10/15/99                          NZNE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 58 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER:  00.0 ZNSPECTZON INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA      CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION        ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ +CALIBRATION  BLOCK+ +
060700    Spacer-RXVE-276        B-N-2      VT-3                                          USNRC  GL94"03,  USNRC SER Shroud Stabilizer      B13. 40                                                    3/24/99,  BWRVIP 3 X Assembly (Spacer)                                                                reccommends  exam  of shroud assembly coro plate clamp/spaccr assembly located bctwccn ZD of shroud support plate 8 276 deg. ~~N/A~~
060800    Spacer-RXVE-348        B-N-2      VT-3                                          USNRC  GL94-03,  USNRC SER Shroud Stabilizer      B13.40                                                    3/24/99,  BWRVIP 3 X            X Assembly (Spaccr)                                                                rcccommcnds exam    of shroud assembly core plate clamp/spcccr assembly located between ID of shroud 6 core support plate 8 348 dcg.
                                                                                            **N/At*
060900    Spaccr-RXVE-96        B-N-2      VT 3                                          USNRC GI 94-03,  USNRC SER Shroud Stabilizer      B13.40                                                    3/24/99,  BWRVIP 3 X  - - -    X Assembly (Spaccr)                                                                rcccommcnds exam    of shroud assembly core plate clamp/spaccr assembly located bctwccn ZD of shroud 4 core support plate 896 dcg.
t4N/Att 061000    Tiorod-RXVE-166        B-N-2      VT-3                                          USNRC  GL94-03'SNRC SER Shroud Stabilizer      B13. 40                                                    3/24/99, BWRVZP Assembly (Tic Rod) 3 X  - - -    X rcccommcndcd **N/A**
061100    Ticrod-RXVE-270        B "N-2      VT-3                                          USNRC  GL94-03,  USNRC SER Shroud Stabilizer      B13. 40                                                    3/24/99,  BWRVIP 3 X            X Assembly (Tic Rod)                                                                rcccommcndcd **N/A**
 
DATE:  10/15/99                          NINE MILE POZNT NUCLEAR PLANT UNIT 1                          PAGE: 59 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vessel Interior NUHBER:  00.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAHZNATZON AREA        CATEGY    NDE                  OUTAGE                        INSTRUCTZONS NUMBER      ZDENTZPZCATZON          ITEH  NO  HETH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK*n 061200    Tierod-RXVE-350        B-N-2      VT-3                                          USNRC  GL94-03,  USNRC SER Shroud Stabilizer      B13.40                                                    3/24/99,  BWRVIP 3 X            X                                      n*N/A**
Assembly (Tic Rod)                                                                reccommended 061300    Tierod-RXVE-90          B-N 2      VT 3                                          USNRC GL94  03,  USNRC SER Shroud Stabilizer      B13. 40                                                  3/24/99,  BWRVIP Assembly (Tic Rod)                          X  - - -    X                        reccommcnded  *nN/A*i 061400    Vl                      B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Core Shroud Vertical  B13. 40    UT                                            3/24/99,  BWRVZP 3 X            X Wclds                                                                            rcccommondcd EVT1  of ZD/OD, 25%  of total length, UT contgcncy only, **LATERnn 00    V10                    B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Core Shroud  Vertical  B13. 40    UT                                            3/24/99,  EVT1  of ID/OD 3 X            X Wclds                                                                            25%  of total length,  UT contgy only,  BWRVZP roccommendcd *~LATER*i 061600    V11                    B-N-2      EVT1                                          USNRC GL94  03,  USNRC SER Core Shroud  Vortical  B13.40    UT                                            3/24/99,  BWRVIP 3 X  - - -    X Wclds                                                                            recommended EVT1 of ID/OD 25% of total length,  UT contgy only.
                                                                                            ~~LATER~~
061700    V12                    B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Core Shroud  Vertical  B13.40    UT                                            3/24/99,  BWRVZP 3 X            X Wclds                                                                              roccommcndod EVTl of ID/OD 25% of total length,  UT contgy only
                                                                                            ~+LATER+~
 
DATE:  10/15/99                          NINE MILE POINT NUCLEAR PIANT UNIT 1                            PAGE: 60 REVISION:        0                        ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vessel Interior NUMBER:  00.0 ZNSPECTZON INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA      CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION        ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK~*
061800    V13                    B-N-2      EVT1                                          USNRC GL94    03,  USNRC SER Core Shroud Vertical  B13 40
                                      ~      UT 3/24/99,  BWRVZP 3 X            X Wclds                                                                            reccommcndcd EVT1      of ZD/OD 25%    of total length,  UT  contgy only.
                                                                                            *+LATER+*
061900    V14                    B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Core Shroud Vertical  B13.40    UT
                                                        - - -    - - - -                  3/24/99,  BWRVZP 3 X                          X Wclds                                                                            reccommcndcd EVT1 of ID/OD 25% of total length,  UT  contgy only.
                                                                                            %*LATER**
062000    V15                    B-N-2                                                    USNRC  GL94-03,  USNRC SER Core Shroud Vertical  B13.40    UT                                            3/24/99,  BWRVIP 3 X                          X Wclds                                                                            reccommended,    EVT11  of ZD/OD 25%    of total length,  UT  contgy only.
                                                                                            ~ ~ LATER**
C 062100    V16                    B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Core Shroud Vertical  B13.40    UT                                            3/24/99,  BWRVIP 3 X                          X Wclds                                                                            reccommcnded,    EVT1  of ZD/OD 25%    of total length,  UT  contgy only.
                                                                                            ~~LATER**
062200    V2                    B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Core Shroud Vertical  B13.40    UT                                            3/24/99 i  BWRVIP Welds                                      X                          X          reccommcndcd,    EVT1  of ZD/OD 225%    of total length,  UT  contgy only.
                                                                                            **LATER**
 
DATE:  10/15/99                          NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 61 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Interior NUMBER:  00.0 INSPECTION ZNTERVAL                    PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERZOD
 
==SUMMARY==
EXAMINATZON AREA        CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATZONBLOCK~*
062300    V3                      B-N-2      EVT1                                        USNRC  GL94-03,  USNRC SER Core Shroud Vertical    B13.40    UT                                            3/24/99,  BWRVIP 3 X                          X Welds                                                                            reccommcndcd EVT1 of ID/OD 25% of total length,  UT  contgy only.
                                                                                            ~~LATER~+
062400    V4                      B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Core Shroud Vertical    B13.40    UT                                            3/24/99,  BWRVIP 3 X                          X Wclds                                                                            reccommcndcd,  EVT1  of ID/OD 25% of  total length,  UT  contgy only.
                                                                                            ++LATER*+
062500    V5                      B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Coro Shroud Vertical    B13.40                                                  3/24/99,  BWRVZP 3 X                          X Wclds-Ring Support                                                              rcccommended,  EVT1  of ZD/OD 25%  of total length,  ~~N/A~*
062600    V6                      B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Core Shroud Vertical    B13.40                                                  3/24/99,  BWRVIP 3 X                          X Welds-Ring Support                                                              rcccommended,  EVT1  of ZD/OD 25%  of total length,  ~~N/A~~
062700    V7                      B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Core Shroud Vertical    B13.40    UT                                            3/24/99,  BWRVIP 3 X                          X Wclds                                                                            reccommended,  EVT1  of ID/OD 25% of  total length,  UT  contgy only.
ssLATERei
 
DATE: 10/15/99                          NINE HYLE POINT NUCLEAR PLANT UNIT 1                            PAGE: 62 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS tor Vessel Interior NUMBER:  00.0 ZNSPECTZON INTERVAL                    PLAN STATUS            PRESERVZCE YEAR FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION        ZTEH NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 ~*CALIBRATION BLOCX**
062800    VS                    B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Core Shroud Vertical  B13.40    UT                                            3/24/99,    BWRVZP 3 X                          X Welds                                                                            reccommcnded,    EVT1  of ID/OD 25% of    total length,  UT  contgy only.
                                                                                          ~~LATER~~
062900    V9                    B-N-2      EVT1                                          USNRC  GL94-03,  USNRC SER Core Shroud Vertical  B13 40
                                    ~      UT                                            3/24/99,    BWRVIP 3 X Welds                                                                            reccommended,    EVT1  of ID/OD 25% of    total length,  UT  contgy only.
t 1 LATER*4
 
0 DATE: 10/15/99                              NINE MZLE POINT NUCLEAR PIANT UNIT 1                        PAGE: 63 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Nozzles NUMBER:  00. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTZFZCATZON            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK~*
Instrument Nozzles    (REF. DWG. NO. 14) 063000    SIL571-N12                SII        VT-2                                        VT-2  after vessel RPV N12    Instr          571                                                      flood-up (static Nozzle-to-Safe End                          3 X  - - -    X  X  - -    X prcssure, no hold time) at start of  each  RFO 4 during System Leakage each RFO. +iN/A~~
Safety Valve Nozzles    (REF. DWG. NO. 28) 063100    CH-576-07A-B              B"G-2                                                    R33 ~*N/A*+
Nozzle  N7N  Flange      B7. 10 3              X Bolting 063200    CH-576-07B-B              B"G-2                                                    R34  ~iN/Aii Nozzle  N7P  Flange      Bj. 10 3              X Bolting 063300    CH-576-07C-B              B-G-2                                                    Group R35 ~*N/A**
Nozzle  N7R  Flange      B7.10 3              X Bolting 063400    CH-576-07D-B              B-G-2                                                    Group R36 *~N/A*+
Nozzle  N7S  Flange      B7.10 3                            X Bolting 063500    CH-576-07E-B              B-G-2      VT 1                                          Group R37 ~~N/A~~
Nozzle N7T Flange          B7. 10 3                            X Bolting 063600    CH-576-07F-B              B-G-2                                                    Group R38 ~~N/A~~
Nozzle    N7U Flange      B7.10 3                            X Bolting
 
0 DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNZT 1                        PAGE: 64 REVISION:        0                          ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER:  00. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 +*CALIBRATION BLOCK*~
063700    CH-576-12A-B            B-G-2                                                    Group R21 +~N/A~~
Nozzle N7A Flange        B7. 10 3 X Bolting 063800    CH-576-12B-B            B-G-2                                                    Group R22 ~*N/A~~
No  zlc N7B Flange      B7.10 3 X Bolting 063900    CH-576-12C-B            B-G-2                                                    Group R23 **N/A~*
Nozzle  N7C Flange      B7. 10 3 X Bolting 064000    CH-576-12D-B            B"G-2                                                    Group R24 **N/A**
Nozzle  N7D Flange      B7.10 3 X Bolting 064100    CH-576-12E-B            B G 2                                                    Group R25 ~+N/A++
No  zlc N7E Flange      B7. 10 X
Bolting 064200    CH-576-12F-B            B-G-2                                                    Group R26 ~~N/A~~
Nozzle N7F Flange        B7. 10 3              X Bolting 064300    CH"576-12G-B              B-G-2      VT-1                                          Group R27 ~~N/A~~
Nozzle    N7G Flange      B7.10 3                            X Bolting 064400    CH-576-12H-B              B-G-2                                                    Group R28 **N/A~~
Nozzle    N7H Flange      B7.10 3              X Bolting
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 65 REVZSZON:                                  ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vcsscl Nozzlcs NUMBER:  00. 0 INSPECTION ZNTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMZNATZON AREA        CATEGY      NDE                0 U T AG E                    INSTRUCTZONS NUMBER      ZDENTZFICATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~~CALIBRATION BLOCK~'~
064500    CH-576-12 J-B          B-G-2                                                    Group R29 ~~N/A**
Nozzle N7J Flange      B7.10 3                            X Bolting 064600    CH-576-12K-B            B-G-2                                                    Group R30 +~N/A++
Nozzle  N7K Flange      B7.10 3                            X Bolting 064700    CH-576-12L-B            B-G-2      VT-1                                          Group R31 ~~N/A~ ~
Nozzle N7L Flange      Bj. 10 3                            X Bolting 064800    CH-576-12M-B            B-G-2      VT-1                                          Group R32 *+N/A**
Nozzle  N7M Flange      B7.10 3                            X Bolting 064900    RV-WD 011              B-F        UT                                            Group R21 **LATER**
Nozzle N7A-to-Flange    B5.10      PT 3 X 065000    RV-WD-Oll              SZL                                                      Group R21, Inconcl 1S2 Nozzle N7A-to-Flange    455R1S1                                                  butter expansion from 3 X nozzle side of weld.
                                                                                            **LATERI*
065100    RV-WD-012                B-D                                                      Group R21, **LATER**
Closure Head-to N7A      B3.90 3 X Nozzle 065200    RV-WD-012-IR            B-D                                                      Group R21, **LATER~~
N7A  Nozzle Inner        B3.100 3 X Radius Section
 
DATE:  10/15/99                          NINE MILE POINT NUCLEAR PIANT UNIT 1                        PAGE: 66 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Nozzles z
NUMBER:  00. 0 INSPECTION INTERVAL                    PZAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ttCALIBRATION BLOCK~'
065300    RV WD 013              SIL                                                      Group R22, Znconel 182 Nozzle N7B-to-Flange    455R1S1                                                  butter expansion from 3                            X          nozzle side of weld.
                                                                                            ~~LATER~~
065400    RV WD 013              B-F        UT                                            GrouP R22 ++ZATER~~
Nozzle N7B-to-Flange    B5 10
                                      ~
3              X 065500    RV-WD-014              B-D                                                      Group R22, ~~IATER~~
Closure Head-to-Nozzle  B3 90
                                      ~
3 X N7B 065600    RV"WD"014-IR            B-D                                                      Group R22, ~~IATER~~
Nozzle N7B Znner        B3. 100 3 X Radius Section 065700    RV-WD-015              B-F        UT                                            Group R23, ~~LATER~~
Nozzle N7C-to-Flange    B5 10
                                      ~      PT 3              X 065800    RV-WD-015              SZL                                                      Group R23, Inconel 182 Nozzle N7C-to-Flange    455R1S1                                                  butter expansion from 3                            X nozzle side of weld
                                                                                            **ZATER**
065900    RV WD 016              B-D                                                      Group R23, +*ZATER**
Closure Head-to-Nozzle B3.90 3 X Njc 066000    RV-WD-016 ZR            B-D        UT                                            Group R23, ++LATER~+
Nozzle N7C Inner        B3. 100 X
Radius Section
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 67 REVISION:        0                          ZNSERVICE ZNSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Nozzles NUMBER:  00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST      SECOND      THIRD SEC. XZ                PERZOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH      1  2  3  4 1  2  3  4  1  2  3  4 ilCALIBRATZON BLOCK>>~
066100    RV-WD-017                B-F        UT                                            Group R24 ~~LATER~~
Nozzle N7D-to-Flange    B5. 10      PT 3                          X 066200    RV-WD-017                SZL        UT                                            Group R24, Inconel 182 Nozzle N7D-to-Flange    455R1S1                                                  butter expansion from 3                          X          nozzle side of weld
                                                                                              +~LATER~~
066300    RV-WD-018                B"D        UT                                            Group R24, ~~LATER' Closure Head-to-Nozzle  B3 90
                                      ~
3 X N7D 066400    RV-WD-018-ZR            B-D        UT                                            Group R24, **LATER~~
Nozzle N7D Inner        B3.100 3 X Radius Section t
066500    RV-WD-019                B-F        UT                                            Group R25, +~ZATER+~
Nozzle N7E-to-Flange    B5.10      PT 3                          X 066600    RV-WD-019              . SZL        UT                                            Group R25, Inconel 182 Nozzle N7E-to-Flange    455R1S1                                                  butter expansion from 3 X nozzle side of weld.
                                                                                              **LATER~*
066700    RV"WD-020                B-D                                                      Group R25, ~~LATER~~
Closure Head-to-Noz"lc B3.90 3 X N7E 066800    RV"WD"020-ZR            B-D                                                      Group R25, **LATER**
Nozzle N7E Inner        B3.100 3 X Radius Section n>
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 68 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Vessel Nozzles NUMBER:  00. 0 ZNSPECTZON ZNTERVAL                    PZAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  >>>>CALIBRATION BLOCK>>>>
066900    RV-WD-021              B-F        UT                                            Group R26>>>>LATER>>>>
Nozzle N7F-to-Flange    B5. 10      PT 3                            X 067000    RV-WD-021              SIL        UT                                            Group R26, Inconel 182 Nozzle N7F-to-Flange    455R1S1                                                  butter expansion from nozzle side of weld
                                                                                            **IATER>>*
067100    RV-WD-022                B-D        UT                                            Group R26, >>>>ZATER*>>
Closure Head-to-Nozzle B3.90 3              X 067200    RV-WD-022-ZR            B-D        UT                                            Group R26, **ZATER>>*
Nozzle N7F Inner        B3. 100 3              X Radius Section 067300    RV-WD-023                B-F        UT                                            Group R27 **ZATER**
Nozzle N7G-to-Flange    B5.10      PT 3                            X 067400    RV-WD-023                SZL        UT                                            Group R27, Inconcl 182 Nozzle N7G-to-Flange    455R1S1                                                  butter expansion from 3                            X thc nozzle side of weld
                                                                                            >>>>LATER>>>>
067500    RV-WD-024                B D        UT                                            Group R27, **ZATER>>>>
Closure Head-to-Nozzle B3. 90 3                            X N7G 067600    RV-WD-024-ZR            B-D        UT                                            Group R27, >>>>LATER>>>>
Nozzle N7G Inner        B3. 100 3                            X Radius Section
 
0 DATE: 10/15/99                            NZNE MILE POINT NUCLEAR PIANT UNIT 1                        PAGE: 69 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Nozzlcs NUMBER:  00.0 ZNSPECTZON INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~*CALIBRATION BLOCK~~
067700    RV-WD"025              B F          UT                                            Group R28 +~LATER**
Nozzle N7H-to-Flange    BS. 10      PT 3                            X 067800    RV-WD-025              SZL                                                        Group R28, Znconcl 182 Nozzle N7H-to-Flange    455R1S1                                                    butter expansion from 3                            X          nozzle side of weld
                                                                                              **LATER**
067900    RV-WD"026              B-D          UT                                            Group R28, ~~LATER+~
Closure Head-to-Nozzle B3. 90 3              X N7H 068000    RV-WD-026-ZR            B-D          UT                                            Group R28, **LATER~*
Nozzle N7H Inner        B3.100 3              X Radius Section 068100    RV-WD-027              B-F          UT                                            Group R29 **LATER++
Nozzle N7J-to-Flange    B5.10        PT 3 X 068200    RV-WD"027              SIL          UT                                            Group R29, Inconcl 182 Nozzle N7J-to-Flange    455R1S1                                                    butter expansion from 3 X nozzle side of weld.
                                                                                              ~~LATER**
068300    RV-WD"028              B D          UT                                            Group R29, **LATER+~
Closure Head-to-Nozzle B3  ~ 90 3                            X N7J 068400    RV-WD-028 IR            B-D                                                        Group R29, *~LATER~~
Nozzle N7J Inner        B3. 100 3                            X Radius Section
 
DATE:  10/15/99                          NINE MILE POINT NUCLEAR PIANT UNIT 1                        PAGE: 70 REVISZON:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Nozzles z
NUMBER:  00. 0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK~~
068500    RV-WD-029              B-F        UT                                            Group R30, ~~LATER'*
Nozzle N7K-to-Flange    B5.10      PT 3 X 068600    RV-WD-029              SZL        UT                                            Group R30, Znconcl 182 Nozzle N7K-to-Flange    455R1S1                                                  butter expansion from 3 X nozzle siCk of weld.
                                                                                            ~ ~LATER+ +
068700    RV-WD-030              B-D                                                      Group R30, iiZATER+~
Closure Head-to-No zlc B3.90 3                            X N7K 068800    RV-WD-030-ZR            B-D                                                      Group R30, **LATER~*
Nozzle N7K Inner        B3. 100 3                            X Radius Section 068900    RV-WD-031              B-F        UT                                            Group R32 ++LATER~i Nozzle N7M-to-Flange    B5 10      PT 3 X 069000    RV-WD"031              SIL                                                      Group R32, Znconcl Nozzle N7M-to-Flange    455R1S1                                                  butter expansion from X
the nozzle side of thc weld  ~~LATER~~
069100    RV-WD-032              B-D                                                      Group R32, ~PLATER*~
Closure Head-to-Noz"lc B3.90 3                            X N7M 069200    RV-WD-032-IR            B-D                                                      Group R32, i~LATER~~
Nozzle N7M Inner        B3.100 3                            X Radius Section
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 71 REVZSZON:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Nozzles NUMBER:  00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                -OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK~+
069300    RV-WD-033              B-F        UT                                            Group R33 +~LATER~+
Nozzle N7N-to-Flange    B5.10      PT 3                            X 069400    RV-WD-033              SZL                                                        Group R33, Znconcl 182 Nozzle N7N-to-Flange    455R1S1                                                    butter expansion from 3                            X          nozzle side of weld.
                                                                                              ~ ~LATER~*
069500    RV-WD-034              B-D        UT                                            Group R33, **LATER~~
Closure Head-to-Nozzle B3.90 3              X N7N 069600    RV"WD-034-ZR            B-D        UT                                            Group R33, *~LATER~~
Nozzle N7N Inner        B3.100 3              X Radius Section 069700    RV-WD-035              B-F        UT                                            Group R34 *~IATER~~
Nozzle N7P-to-Flange    BED 10      PT 3              X 069800    RV-WD-035              SZI        UT                                            R34  , Znconel 182 butter Nozzle N7P-to-Flango    455R1S1                                                    expansion from thc 3
nozzle side of thc weld.
                                                                                              +~LATER+*
069900    RV-WD-036              B-D        UT                                            R34 +~LATER~*
Closure Head-to-Nozzle B3. 90 3              X N7P 070000    RV-WD-036-ZR            B-D                                                        R34 ~~LATER~~
Nozzle N7P Inner        B3.100 3              X Radius Section
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PZANT UNIT 1                          PAGE: 72 REVZ S ZON:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel    Nozzles NUMBER:    00. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ++CALIBRATION BLOCK~~
070100      RV-WD-037              B-F        UT                                            Group R35, **LATER**
Nozzle N7R-to-Flange    B5. 10      PT 3              X 070200      RV-WD-037              SZL                                                        Group R35, Inconcl 182 Nozzle N7R-to-Flange    455R1S1                                                    butter expansion from X          thc nozzlo sido of the weld. i*IATERi~
070300      RV-WD-038                B-D                                                        GrouP R35, 44LATER4~
Closure Head-to-Nozzle B3. 90 3              X N7R 070400      RV-WD-038-ZR            B-D                                                        Group R35, ~iLATERi~
Nozzlo N7R Inner        B3.100 3              X Radius Section 070500      RV-WD-039                B-F        UT                                            Group R36 **IATERii Nozzlo N7S-to-Flange    B5.10 3              X 070600      RV-WD-039                SZL                                                        Group R36, Inconcl 182 Nozzle N7S-to-Flange    455R1S1                                                    butter expansion from 3                            X the nozzle side of thc weld. **IATER~~
070700      RV-WD-040                B-D                                                        Group R36, Closure Head-to-Nozzle B3.90 3                            X N78                                                                                            +~IATERi'70800 RV-WD-040-ZR            B-D                                                        Group R36, <<~IATER~*
Nozzle N7S Inner        B3. 100 3                            X Radius Section
 
DATE:  10/15/99                              NINE MZIE POINT NUCLEAR PLANT UNIT 1                          PAGE: 73 REVISION:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Nozzlcs NUMBER:  00. 0 INSPECTION ZNTERVAL                        PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                -OUTAGE                          INSTRUCTIONS NUMBER      ZDENTZFICATZON          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK++
070900    RV  WD  041              B F          UT                                            Group R37 **LATER~i Nozzle N7T-to-Flange    B5 10
                                        ~        PT X
071000    RV-WD-041                SZL                                                          Group R37, Inconel N
Nozzle N7T-to-Flange    455R1S1                                                      butter expansion from 3 X the noz le side of thc weld. **IATER**
071100    RV WD-042                B-D                                                          Group R37, **LATER+*
Closure Head-to-Nozzle B3. 90 3                            X N7T 071200    RV-WD-042 ZR            B-D                                                          Group R37, ~iLATERi~
No zlc N7T Inner        B3. 100 3                            X Radius Section 071300    RV  WD 043                                                                            Group R38 ~~IATER*+
No" zle N7U-to-Flange    B5.10        PT 3 X 071400    RV-WD-043                SIL                                                          Group R38, Inconcl 182 Nozzle N7U-to-Flange    455R1S1                                                      butter expansion from 3 X the nozzle side of the weld.  ~ ~IATER~ ~
071500    RV-WD-044                B-D                                                          Group R38
* PLATER~~
Closure Head-to-Nozzle B3  ~  90 3                            X N7U 071600    RV-WD-044-ZR            B-D                                                          Group R38 **LATER**
Nozzle N7U Inner        B3. 100 3                            X Radius Section
 
DATE: 10/15/99                                  NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 74 REVISION:        0                              INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER:    00. 0 INSPECTION INTERVAL                        PLAN SIATUS            PRESERVICE YEAR ASHE                  FIRST        SECOND      THIRD SEC. XI              PERZOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA            CATEGY        NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION              ITEH    NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK~*
6.0" Safety Relief Valve        (REF. DWG. NO. 28) 071700    V-BK-01-119A                B-M-2          VT-3                                          V09, Examine when Safety Valve Zntcrior      B12.50                                                      disassembled  +~N/A~~
X Surface Control    Rod Drive Nozzles      (REF. DWG. NO. 28A) 073500    CRD NOEELES                B"E            VT-2                                          129 CRD Nozzlcs, 25% or Partial Penetration        B4 12
                                          ~                                                        32 required, included in Wclds                                                                                    system pressure test program **N/A**
Instrumentation Nor zlcs      (REF. DWG. NO. 28A) 073600    INST-NOEELES                              VT"2                                          64 IFH's, 25% or 16 Incore Flux Honitors        B4.13                                                        repaired, included in 3                            X          system pressure test program *~N/A**
Instrument Worries    (REF. DWG. NO. 8) 073900    SZL571-N13A                  SZL          VT 2                                          VT-2  after vessel RPV N13A    Instr          571                                                          flood-up (static ic-to-Safe                                  X  - - -    X  X  - -    X prcssure, no hold time)
No                End at start of  each  RFO f during System Lcakagc each RFO. ~~N/A~*
074000    SZL571-N13B                  SZL          VT-2                                          VT-2  after vessel RPV N13B    Instr          571                                                          flood-up (static Nozzle-to-Safe End                                X  - - -    X  X  - -    X prcssure, no hold time) at start of  each  RFO 4 during System Leakage each RFO. **N/A~*
 
DATE:  10/15/99                              NINE MILE POZNT NUCLEAR PLANT UNIT 1                          PAGE: 75 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Vessel Nozzlas NUMBER:  00. 0 INSPECTION ZNTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FZRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK+'~
Znstrumcnt Nozzles (REF.      DWG. NO. SA) 074100    SZL571-N14A                SIL        VT-2                                          VT-2  after vessel RPV N14A  Instr          571                                                      flood-up (static Nozzle-to-Safe End                          3 X  - - -    X    X  - -    X pressure, no hold time) at start of  each  RFO a during System Lcakagc each RFO. ~~N/A~~
074200    SIL571-N14B                SZL        VT"2                                          VT-2  after vessel RPV N14B  Znstr          571                                                      flood-up (static Nozzle-to-Safe End                            X  - - -    X    X  - -    X prcssure, no hold time) at start of  each  RFO a during System Leakage each RFO. ~~N/A~+
Instrument Nozzles    (REF. DWG. NO. SB) 00    SZL571-N15A                SIL        VT-2                                          VT-2  after vcsscl RPV N15A  Instr          571
                                                            - - -            - -              flood-up (static X            X    X        X Nozzle-to-Safe End                                                                  prcssure, no hold time) at start of  each  RFO a during System Leakage each RFO. **N/A*~
074400    SIL571 N15B                SIL        VT-2                                          VT-2  after vessel RPV N15B  Znstr          571                                                      flood-up (static 3 X  - - -    X    X  - -    X Nozzle-to-Safe  End                                                                pressure, no hold time) at start of  each  RFO 6 during System Leakage each RFO. ~+N/A~~
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PZANT UNIT 1                          PAGE: 76 REVISION:        0                          INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vessel Nozzles NUMBER:    00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 atCALIBRATZON BLOCK+a Instrument Nozzles    (REF. DWG. NO. BC) 074500    SZL571 N16A                SZL        VT-2                                          VT-2  after vessel RPV N16A  Instr            571                                                      flood-up (static Nozzle-to-Safe End                          3 X  - - -    X  X  - -    X pressure, no hold tine) at start of  each  RFO 6 during System Leakage each RFO. ~~N/A~~
074600    SZL571-N168                SIL        VT 2                                          VT-2  after vessel RPV N16B  Instr            571                                                      flood-up (static Nozzle-to-Safe End                          3 X  - - -    X  X  - -    X          pressure, no hold tine) at start of  each  RFO a during System Lcakagc each RFO. ~*N/A*+
Instrument  No  zlcs  (REF. DWG. NO. SD) 00    SZL571-N17A                SZL        VT-2                                          VT-2  after vessel RPV N17A  Instr            571                                                      flood-up (static Nozzle-to-Safe End                            X  - - -    X  X  - -    X          pressure, no hold time) at start of  each  RFO C during System Leakage each RFO. **N/A+~
074800    SIL571-N17B                SZL        VT 2                                          VT-2  after vessel RPV N17B  Instr            571                                                      flood-up (static 3 X  - - -    X  X  - -    X Nozzle-to-Safe End                                                                    prcssure, no hold time) at start of  each  RFO 6 during System Leakage each RFO. **N/A~~
 
'ATE: 10/15/99                                  NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 77 REVI SION:        0                            INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Supports NUMBER:  00.0 ZNSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE              --OUTAGE--                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  4 lCALIBRATION BLOCK~ ~
Stabilizers  (REF. DWG. NO. 28) 074900    RV-SB-1A                  F-A          VT 3                                          Code Case N-491-1 RPV Stabilizer Strut      F1.40                                                        ~+N/A+~
3 X 075000      RV SB-1B                                                                              Code Case N-491-1 RPV Stabilizer Strut    F1.40                                                        *AN/Alt 3 X 075100      RV SB-2A                                                                              Coda Case N-491-1 RPV Stabilizer Strut    F1.40                                                        ++N/A~+
3 075200      RV-SB-2B                F-A            VT-3                                          Code Case N 491 1 RPV Stabilizer Strut    F1.40                                                        +*N/A+*
3                            X 00    RV-SB-3A                F-A          VT 3                                          Code Case N-491-1 RPV stabilizer Strut    F1.40                                                        ~~N/A~*
3              X 075400      RV-SB-3B                              VT 3                                          Code Case N-491-1 RPV Stabilizer Strut    Fl  ~ 40                                                    aeN/Aee 3              X 075500      RV-SB-4A                F-A          VT"3                                          Code Case N-491-1 RPV Stabilizer Strut    F1.40                                                        +~N/A++
3                            X 075600    RV-SB-4B                  F-A          VT-3                                          Code Casa N-491-1 RPV  Stabilizer Strut    F1.40                                                        i*N/A%*
3                            X Integral Attachments  (REF. DWG. NO. 2S) 075700    RV-SB1-ZA-371/372        B-K          MT                                            WRA 50%,  Examine Stabilizer Integral      B10. 10                                                      accessible length of 3              X Woldcd Lug  8  22.5                                                                  attachment weld., Coda Caso N-509. ~*N/A*~
 
DATE:  10/15/99                                NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 78 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel  Supports NUMBER:  00.0 ZNSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA            CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION              ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 +*CALIBRATION BLOCK~~
075800    RV-SB2-ZA-373/374          B-K          MT                                            WRA  50%, Examine Stabilircr Integral        B10. 10                                                    accessible length of 3                            X Welded Lug  8  112.5                                                                  welded attachment, Code Casa N-509. ~~N/A~~
Zntcgral Attachments      (REF. DWG. NO. 28A) 076200    RV"WD"356-OD                B-K          PT                                            100%  of attachment weld SuPport Skirt Integral B10.10                                                          length,  Code Case N-509 3 X                                      aaN/Aaa Attachment Weld Support  Skirt  (REFT  DWG. NO. N/A) 076300    RPV-NR02 SKT/BLT            F-A          VT-3                                            +*N/A*+
Support  Skirt            F1. 40 3                            X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                            PAGE: 79 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PZAN
                                                                                  .I CLASS 1 SECTZON  XI SCHEDULED COMPONENTS tor Vessel Welds NUMBER:  00.0 INSPECTION ZNTERVAL                      PLAN STATUS              PRESERVICE YEAR ASME                  FIRST        SECOND        THIRD SEC. XZ                PERIOD        PERIOD        PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          ZNSTRUCTZONS NUMBER      ZDENTZFICATZON          ITEM NO    METH    1  2  3  4  1  2  3  4    1  2  3  4  ~ ~CALIBRATION  BLOCK**
Closure Head Wclds (REF. DWG. NO. 28) 076500    RV-WD-001              B-A          UT                                              Examine 100%    of weld Closure Head-to-Flange  Bl. 40      MT                                              length, 1/3 each Wold                                          X  - - -    X  - - -      X          inspection period
                                                                                                **IATER**
076600    RV-WD"002              B-A          UT                                              Removable    steal Closure Hcad-          Bl. 21                                                      insulation platform, 50%
3              X Circumferential Weld                                                                CRV achieved, Dollar Plate)  +~ IATERi i 076700    RV-WD-003              B-A          UT                                              Examine accessible Closure Hcad-          Bl. 22                                                      length of weld.
3 X Mcridional Weld                                                                      **IATER**
00    RV-WD-004              B-A          UT                                              Examine accessible Closure Head-          B1.22                                                        length of wold.
3 X Mcridional Weld                                                                      ~~IATER~*
076900    RV-WD-005              B-A          UT                                              Examine accessible Closure Head-          B1.22                                                        length of weld    ~~IATER~~
3              X Mcridional Weld 077000    RV-WD-006              B-A          UT                                              Examine accessible Closure Hcad-          B1.22                                                        length of wold.
3 Meridional Weld                                                                      **LATER~~
077100    RV-WD-007                B-A          UT                                              Examine accessible Closure Head-            Bl . 22                                                      length of weld.
3 X Mcridional Weld                                                                      **ZATER~+
 
DATE:  10/15/99                              NZNE MILE POINT NUCLEAR PLANT UNZT 1                          PAGE: 80 REVISION:          0                        ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vessel    Welds NUMBER:    00.0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK**
077200    RV-WD-008                  B A        UT                                            Examine accessible Closure Head-              B1.22                                                    length of weld    *~IATER~~
3 X Meridional Weld 077300    RV-WD-009                  B-A        UT                                            Examine accessible Closure Head-              B1.22                                                      length of weld.
3 X Mcridional Weld                                                                      + ~LATER~ ~
077400    RV-WD-010                  B"A        UT                                            Examine accessible Closure Head-              B1.22                                                    length of weld    ~~LATER~~
3 X Mcridional Weld Shell Wclds    (REF. DWG. NO. 28)
RV-WD-099                  B-A        AUT                                            100%  of weld length from Shell-to-Flange weld      B1.30                                                    thc shell side *~LATER**
3                            X 077600    RV-WD-099                                                                            100%  of wold length from Shell-to-Flange weld      Bl 30
                                        ~                                                      the seal surface 3 X                                      **LATER*+
077900    RV-WD-130                  B-A        AUT                                            100% of weld length,    and Upper Shell Long Weld      B1.12                                                    intersection of 3
15                                                                              circumferential    weld RV-WD 100 *+LATER+*
078000    RV-WD 131                  B-A                                                      100%  of weld length  and Upper Shell Long Weld      B1.12                                                    intersection of 3                            X 8  135                                                                              RV WD  100. +*LATER*+
078100    RV-WD-132                  B-A        AUT                                            100%  of weld length and Upper Shell Long Weld      B1.12                                                    intersecting 3                            X 8  255                                                                              circumfcrcntial weld RV-WD-100. ~~LATER~~
 
DATE:  10/15/99                              NINE MZZE POINT NUCLEAR PLANT UNZT 1                            PAGE: 81 REVISION:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vassal  Welds NUMBER:  00.0 INSPECTZON ZNTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          ZNSTRUCTZONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  + +CALIBRATION BLOCK>> ~
078200    RV-WD-133                B-A                                                        100%  of weld length and Upper Intermediate        B1.12                                                      intersecting 3                            X Shell Long Weld 8 90                                                                  circumferential weld RV-WD-100  C  RV-WD-101.
                                                                                                ++IATER~+
078300    RV-WD-134                B-A                                                        100%  of weld length and Upper Intermedi ate      Bl . 12                                                    intcrsccting 3                            X Shell Long Weld 8 210                                                                circumferential weld RV-WD-100  C  RV-WD-101.
                                                                                                **LATER+~
078400    RV-WD-135                B-A                                                        100%  of weld length and Upper Intermediate        Bl. 12                                                      intcrsccting 3                            X Shell Long Weld 8 330                                                                circumferential weld Rv wD 100 a Rv-wD 101.
                                                                                                ~+LATER**
078700    RV-WD-139                B-A                                                        100% of weld length and Lower Intcrmediatc        B1.12                                                      intersecting 3                            X Shell Long Weld  8  105                                                              circumfcrcntial weld RV-WD-101 4 RV-WD-137.
                                                                                                + ~IATER~ +
078800    RV-WD 140                B-A                                                        100% of weld length and Lower Zntcrmcdiatc        B1.12                                                      intersecting 3
Shell Long Weld 8 225                                                                circumferential weld RV-WD-101 6 RV-WD-137.
                                                                                                **LATER**
078900    RV-WD-141                B A                                                        100%  of weld length and Lower Intermediate        Bl. 12                                                      intersecting X
Shell Long Weld 8 345                                                                circumferential weld RV-WD-101  S  RV-WD-137.
                                                                                                **LATER**
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNZT 1                          PAGE: 82 REVISION:          0                        INSERVICE INSPECTION TEN-YEAR PLAN lI CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Vessel Wclds NUMBER:    00. 0 INSPECTZON INTERVAL                    PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                -OUTAGE-                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION BLOCK~ +
079000    RV-WD-142                B-A        AUT                                          100%  of weld length and Lower Shell Long Weld    B1.12                                                    intersecting 3                            X 8  18                                                                            circumf crential weld RV-WD-101 6 RV-WD-137.
                                                                                              *+LATER'~'
079100    RV-WD-143                B-A        AUT                                          100%  of weld length and Lower Shell Long Weld    B1.12                                                    intersecting 3                            X 138                                                                            circumferential weld RV-WD-137 6 RV-WD-138.
                                                                                              *+LATER*+
079200    RV-WD-144                B-A        AUT                                          100%  of weld length and Lower Shell Long Weld    B1.12                                                    intersecting 3                            X e  258                                                                            circumforontial wclds RV-WD 137 6 RV"WD-138.
                                                                                              +iLATER+*
Bottom Head Wclds (REF. DWG. NO. 28A) 079300    RV-WD-147                B A        UT                                            Accessible length of Bottom Head Dollar      B1.21                                                    weld **LATER*~
3 Plate Circ. Weld 079400    RV-WD-148                B-A        UT                                            Accessible length of Bottom Head Meridional B1.22                                                        wold +*LATER~~
3                            X Weld 079500    RV-WD-149                B A                                                      Accessible length of Bottom Head  Meridional B1.22                                                      weld **LATER'~
3                            X Weld 079600    RV-WD-150                B-A                                                      Acccssiblc length of Bottom Head Meridional B1.22                                                        weld ~~LATER**
3                            X Weld
 
DATE: 10/15/99                            NINE MZLE POINT NUCLEAR PLANT UNIT 1                          PAGE: 83 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vessel  Wclds NUMBER:  00.0 INSPECTION INTERVAL                    PLAN STATUS            XRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER    ZDENTIPICATZON          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 ~~CALIBRATION BLOCK+~
079700    RV-WD-151                B A                                                      Accessible length of Bottom Head Meridional B1.22                                                      weld **LATER+a 3                            X Weld 079800    RV-WD-152                B-A        UT                                            Accessible length of Bottom Head  Meridional B1.22                                                      weld **LATER*~
3                            X Weld 079900    RV-WD-153                B A        UT                                            Acccssiblc length of Bottom Head  Meridional B1.22                                                      weld +PLATER**
3                            X Weld 080000    RV-WD-154                B-A        UT                                            Accessible length of Bottom Head Meridional B1.22                                                      weld ~~LATER++
3                            X Weld 080100    RV-WD-155                B-A        UT                                            Accessible length of Bottom Head Meridional B1.22                                                      weld ~*LATER'*
3                            X Weld 080200    RV-WD-156                                                                          Accessible length of Bottom Head  Meridional B1.22                                                      weld **LATER*~
3                            X Weld 080300    RV-WD-157                                                                          Accessible length of Bottom Head Meridional B1.22                                                        weld **LATER~~
3                            X Weld 080400    RV WD-158                                                                          Acccssiblc length of Bottom Head Meridional B1.22                                                        weld ~*LATER**
3                            X Weld
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 84 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Vessel Welds
  ~  NUMBER: 00.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION        ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ ~CALIBRATION  BLOCK~ ~
080500    RV-WD-159              B-A                                                        Accessible length of Bottom Head Meridional Bl. 22                                                      weld  ~~LATER~~
3                            X Weld 080600    RV-WD-160              B-A          UT                                            Acccssiblc length of Bottom Head Meridional Bl. 22                                                      weld  ~~LATER~+
3                            X Weld 080700    RV-WD-161              B-A          UT                                            Accessible length of Bottom Head Meridional B1.22                                                      weld ++LATER**
3                            X Weld 080800    RV-WD-162              B A          UT                                            Accessible length of Bottom Head            Bl . 21                                                    weld ~~LATER~~
3                            X Circumfcrcntial Weld
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 85 REVISION:          0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 01 . 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAHZNATZON AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUHBER      IDENTIFICATION            ITEH  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  +*CALIBRATION BLOCK+*
: 24. 0"  HSB (REF. DWG. NO. 2) 080900    01-01-VB                  B-G-2                                                      V01,  Limited to valve Globe Valve 01-01        B7.70                                                      selected under B-M-2 Bolting                                                                              SAN/At+
081000    01-01-VBY                B-M-2                                                      V01, Only when Globe Valve 01-01        B12.50                                                    disassembled, onc valve 3              X Interior  Surface                                                                  in a group of valves.
                                                                                                  %*N/A+*
6.0"  HSB Relief  (REF. DWG. NO. 2) 081900    01-07-VB                  B-G-2                                                      V02,  Limited to valve Gate Valve 01-07          B7.70                                                      selected under B-M-2 3              X Bolting                                                                              14N/At%
000    01-07-VBY                B-M-2        VT-3                                          V02, Only when Gate Valve 01-07          B12.50                                                    disassembled, one valve X                        in a group of valves.
Interior  Surface
                                                                                                  **N/A**
: 6. 0" MSB (REF. DWG. NO. 2) 082700    01-102-A-SVB              B-G-2                                                      V03, 12  Bolts, Limited Relief SV 01-102A        B7,70                                                      to valve selected under 3              X Bolting                                                                              B-H-2 ~*N/A**
~ 082800    01-102-A-SVBY            B"M-2                                                      V03, Only when Rclicf SV 01-102A        B12. 50                                                    disassembled, one valve 3              X Interior Surface                                                                    in a group of valves
                                                                                                  %*N/A%4 082900    01-102-A-WD-001          B "M-1      UT                                            V03,  Limited to one Relief  SV 01 102A      B12. 40                                                    valve in a group of 3              X Valve Body Weld                                                                      valves. ~~LATER*~
 
DATE:  10/15/99                              NINE MILE POINT NUCZEAR PIANT UNIT 1                        PAGE: 86 REVISION:          0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS Steam System NUMBER:    01. 0 INSPECTION INTERVAL                      PLAN STATOS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *~CALIBRATION BLOCK**
2.0"  MSA  Vent Line (REF. DWG. NO. 2) 084900    01-120-VB                B-G-2      VT-1                                          2 Bolts ~*N/A~*
Valve 01-120 Bolting      B7. 70 3              X 24 . 0" MSA (REF. DWG. NO. 2) 086600    01 MSH 21    WD 001      B-K                                                        Code Case N-509, Welded Integral Attachment      B10. 20                                                    on 3 sides ~~N/A~~
3              X Lug    1 086700    01-MSH-21-WD-002          B-K                                                        Code Case N-509, Welded Integral Attachment      B10. 20                                                    on 3 sides **N/A~*
3              X Lug    2 6800    01-MSH-21    WD 003      B-K        PT                                            Code Case N-509, Welded Integral Attachment      B10. 20                                                    on 3 sides ~~N/Ai*
3              X Lug    3 086900    01 MSH-21-WD-004          B-K                                                        Code Case N-509, Welded Integral Attachment      B10. 20                                                    on 3 sides ~*N/A~~
3              X Lug    4 087000    01-MSH-21A                F-A        VT-3                                          Code Case N-491-1,  4 Spring Hanger            F1.10                                                      Integrally Welded Lugs 3
                                                                                                **N/Af4 087100    01-MSH 21B                            VT-3                                          Code Casa N-491-1 Spring Hanger            Fl. 10                                                    ++N/A~~
3                            X
 
0 DATE:  10/15/99                                NZNE MZLE POINT NUCLEAR PIANT UNIT 1                          PAGE: 87 REVISION:          0                            INSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS Stcam System NUMBER:    01. 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA            CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION              ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION BLOCK**
24 . 0" MSB (REF. DWG. NO. 2) 087600    01-MSH-22A                  F-A          VT-3                                          Code Case N-491-1.
Spring Hanger              Fl . 10                                                    ~~N/A~~
3 X 24 . 0" MSA (REF. DWG. NO. 2) 087800    01-MSH-23                  F A          VT-3                                          Code Case N-491-1 Pipe Stanchion              Fl. 10                                                    saN/A+a 3                            X
: 32. 0"  MSA (REF. DWG. NO. 2) 088200    01-WD-001                  B-D                                                        Group  Rll, 87% CRV, Nozzle N3A-to-Vessel        B3.90                                                      Limitation  due  to 3 X ad)accnt nozzle and Bioshicld.  ~ ~IATER+ +
00    01-WD 001 IR                B D          UT                                            Group  Rll, 54% CRV, Nozzle z    N3A Inner        B3. 100                                                    Limitation  duc  to 3 X Radius Section                                                                        ad)accnt nozzle and Bioshicld.  ~~LATER~~
24 . 0" MSA (REF. DWG. NO. 2) 088400    01-WD-002                  B-J                                                        Group  Rll, *~LATER~~
Nozzle N3A -to-Safe        B9.11 3 X End 088500    01-WD 003                  B-J          UT                                            Terminal End, Examine Nozzle N3A Safe            B9.11        MT                                            100% of weld length 3 X End-to-Elbow                                                                          ~~NMPI-24-080-CS~~
088700    01-WD-006                  B-J          MT                                            To Vent  Line, Examine Branch Connection          B9.32                                                      100%  of weld length 3              X (24"x2" WOL)                                                                          a sN/AP a
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 88 REVISION:          0                        INSERVICE ZNSPECTZON TEN YEAR PZAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System NE NUMBER:    01.0                                                                          PRESERVICE YEAR INSPECTION INTERVAL                      PZAN STATUS ASHE                FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD SUHMARY    EXAHINATZON AREA          CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTZFZCATZON            ITEM NO    HETH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK**
089800    01-WD-016                B-J        UT                                            Examine 100% of weld Branch Connection        B9. 31      HT                                            length i~NHP1-24-080-CS, 3 X                                            6-80 **
(24"X6" WOL)                                                                      NMP1 090400    01-WD-019                B-J          UT                                            Terminal End, High Pipo-to-Valvo 01-02      B9. 11      HT                                            Stross Wold, Examine 3                            X          100% of weld length
                                                                                              +~NMPI-24-080"CS**
090500    01-WD-020                B-J          UT                                            Terminal End, High Valve 01-02 -to-Pipe    B9.11        HT                                            Stress Weld, Examine 3              X                        100% of weld length.
                                                                                              **NMPI-24-080-CS~*
: 32. 0"  HSB (REF. DWG. NO. 2) 0800    01 "WD-033              B-D                                                        Group R12,    91% CRV Nozzle N3B-to-Vessel    B3.90                                                      Limitation  duc to 3                            X          ad)acent nozzle and Bioshicld  ~*LATER+*
090900    01-WD-033-ZR            B-D                                                        Group R12,    78% CRV Nozzle N3B Inner        B3.100                                                    Limitation  due to 3                            X Radius Section                                                                      ad)accnt nozzlo and Bioshi old **LATER~~
24 . 0" HSB (REF. DWG. NO. 2) 091000    01 WD-034                B-J        MT                                            Group R12, Nozzle N3B-to-Safe End B9.11                                                        *ePIR-l. 475-1++
3                            X 091100    01-WD-035                B-J        UT                                            Tarnd.nal End, Examine Nozzlo N3B Safe          B9. 11                                                    100%  of wold length.
3                            X          **NHP1-24-080-CSs*
End-to-Elbow
 
DATE: 10/15/99                                  NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 89 REVISION:          0                              ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS Steam System E NUMBER:    01.0 INSPECTION INTERVAL                      PZAN STATUS            PRESERVICE 1'EAR ASHE                FIRST        SECOND      THZRD SEC. XZ              PERIOD        PERZOD      PERIOD SUMHARY    EXAMINATION AREA              CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION                ZTEH NO    HETH    1  2  3  4  1  2  3  4  1  2  3  4 ~*CALIBRATION BLOCK*+
: 2. 5"  MSB (REP. DWG. NO. 2) 091600    01-WD-042                    B-J        HT                                            Cont. on sht. 2A, Reducer                      B9. 21                                                    Examine 100% of weld 3            X (2. 5" x2. 0" ) -to-Pipe                                                                length **N/A+a
: 6. 0"  HSB (REF. DWG. NO. 2) 092100    01-WD-046-A                  B-J        UT                                            Terminal End, High Branch                        B9.11      HT                                            Stress Weld, Examine 3                            X Connection-to-Valve                                                                      100% of weld length.
01-08                                                                                    +~NMPZ-6-80-CS~~
: 24. 0"  MSB (REP. DWG. NO. 2) 092600    01"WD-048                    B-J        HT                                            Examine 100% of weld Branch Connection            B9.31      UT                                            length +~PZR-1.219-1, X
{24 "x6" WOL)                                                                          94-6007+*
6 . 0" MSB (REF . DWG. NO. 2) 092700    01-WD"048-A                  B-J        UT                                            Terminal End, High Branch                        B9. 11      HT                                            Stress Weld, Examine 3                            X Connection-to-Valve                                                                      100% of weld length 01-12                                                                                    +*NHPZ-6-80-CS~+
092800    01-WD-048-B                  B-J        UT                                            Terminal End, High Valve 01-12 -Plangc          B9.11      MT                                            Stress Weld, Examine 3                            X 01-102E                                                                                  100% of wold length
                                                                                                    **NMP1-6"80-CS~~
: 24. 0"  MSB (REP. DWG. NO. 2) 092900    01-WD-050                    B"J        UT                                            Terminal End, High Pipe-to-Valve 01-01          B9. 11                                                    Stress Weld, Examine 3                            X          100% of weld length
                                                                                                    **NMP1-24-080-CS~ ~
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 90 REVISZON:        0                          ZNSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS Steam System NUMBER: 01 . 0                                                                          PRESERVICE YEAR INSPECTION INTERVAL                      PZAN STATUS ASME                FIRST        SECOND      THZRD PERIOD        PERIOD      PERZOD SEC. XZ
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK~~
093000    01-WD-051              B-J        UT                                            Terminal End, High Valve 01-01-to-Pipe    B9. 11      MT                                            Stress Weld, Examine 3                            X          100% of weld length.
                                                                                            +*NMP1-24-080-CS(
P1R-1. 219-~ ~
2.0"  MSA Vent Linc (REF. DWG. NO. 2) 093300    01-WD-448                B-J        PT                                            Examino 100% of weld Sock-0-Lct -to-Pipe      B9.21                                                    length ++N/A+*
3 X 093500    01-WD-450                B  J                                                      Examino 100% of weld Elbow-to-Pipe            B9. 21                                                    length ~*N/A~~
3 X 800    01-WD-453                B-J                                                      Examine 100% of weld Pipe-to-Valve 01-120    B9. 21                                                    length. *~N/A~~
3                            X 2.0"  MSA Valve By-Pass Line (REF. DWG. NO. 2B) 094300    01-WD-454                B-J        MT                                            Examino 100%  of weld Pipe-to-Coupling        B9. 40                                                    length.  ~~N/A++
3              X
 
DATE:  10/26/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 91 REVISION:          0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS water System NUMBER: 31 . 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
 
NUHBER EXAMINATION AREA          CATEGY      NDE                  OUTAGE                          INSTRUCTIONS ZDENTIFZCATION            ITEH  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK+ +
: 18. 0"  FWA  (REF. DWG. NO. 5) 095900      31-01R-FLG                B-G-1      VT-1                                            V04, Limited to valve Check Valve 31-01R        B6.220                                                      selected under B-M-2 Flange Surface                                3              X                        *IN/Ak l 096000      31-01R-VB                  BG1        UT                                              Limited to valve Check Valve 31-01          B6. 210                                                    selected under B-M-2 3              X Studs (18)                                                                            +*LATER**
096100      31-01R-VBY                B-M-2                                                      V04, Only when Check Valve 31-01R        B12. 50                                                    disassembled, one valve Interior                                      3              X Surface                                                                  among group of valves
                                                                                                    %IN/A% 1 0    31 01R-VNW                B-G-1      VT-1                                          V04, Limited to valve Check Valve 31-01R          B6.230                                                    selected under B-M-2 Nuts and Washers                                                                      **N/A*~
096700      31-07-VB                    B-G-2                                                      V05,  Limited to valve Gate Valve 31-07            B7.70                                                      selected under B-M-2.
Bolting                                      3 X 096800      31-07 VBY                  B-H-2      VT-3                                          V05, Only when Gate Valve 31-07            B12.50                                                    disassembled,  Limited Interior                                      3 X Surface                                                                  onc valve among group  of valves. **N/A**
: 18. 0"  FWD  (REF. DWG. NO. 5) 098000      31-A2                      F-A        VT 3                                            Code Case N-491-1 Anchor                      Fl . 10                                                    **N/A~*
3 X
 
DATE: 10/26/99                            NZNE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 92 REVISZON:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ater  System ZONE NUMBER:    31.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 t tCALZBRATION BLOCKtt
: 10. 0" FWC {REF. DWG. NO. 5) 099900    31-HS-A                  F-A          VT 3                                          4 Lugs welded 3 sides, Spring Hanger            F1.10                                                      Code Case N-491-1.
3                            X          **N/Att 100000    31-HS-B                  F-A          VT 3                                          4 lugs, woldcd 3 sides, Spring Hanger            Fl. 10                                                    Codo Case N-491-1 3                            X          **N/At*
100100    31-H5-WD-001            B"K          MT                                            CRA 90%, Code Case  N-509 Zntcgral Attachment      B10. 20                                                    ttN/A**
3                            X 31-HS-WD-002            B-K          MT                                            CRA 90%, Code Case  N-509 Integral Attachment      B10. 20                                                    ttN/At*
3                            X 100300    31 "HS-WD-003            B-K          MT                                            CRA 90%,  4 Lugs, pipe Integral Attachment      B10. 20                                                    clamp contacts one side 3                            X          of lug. Code Case N-509
                                                                                              *t'N/Att 100400    31-H5 WD-004            B-K          MT                                            CRA 90%,  4 Lugs, pipe Integral Attachment      B10. 20                                                    clamp contacts ono side 3
of lug,  Codo Case N-509
                                                                                              *t'N/A**
10 0"  FWD {REF. DWG. NO, 5) 100500    31-H6                    F-A          VT 3                                          Code Case N 491-1 Spring Support          F1.10                                                      ttN/A*i 3              X Stanchion
 
DATE: 10/26/99                              NINE HILE POINT NUCLEAR PIANT UNIT 1                            PAGE: 93 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COHPONENTS water System E NUMBER: 31.0 INSPECTION INTERVAI                    PLAN STATUS            PRESERVICE YEAR ASHE                FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAHINATION AREA          CATEGY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEH  NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK*~
: 18. 0" FWA (REF. DWG. NO. 5) 101300    31-HS                    F-A                                                      Code Case N-491-1 Spring Support            F1.10                                                    *AN/A*4 X
w/welded stanchion
: 18. 0" FWB  (REF. DWG. NO. 5) 101900    31-WD-001                B-J        HT                                            Terminal End, High Valve 31-02R-to-Valve    B9.11      UT                                            Stress Weld, Examine 3                            X          100% of weld length.
Extension
                                                                                              ~ ~ P1R-1 . 156-1*'~
102500    31-WD-015                B-J        UT                                            Examine 100%      of weld Pipe-to-Tee              B9.11      HT                                            length. ~~PIR-1.156-1**
3 - - - -      X
: 10. 0" FWB  (REF. DWG. NO. 5) 103000    31-WD-019                B-J        UT                                            Terminal End, Examine Pipe-to-Nozzle  N4B      B9. 11      HT                                            100$ of weld length 3                            X          ~ ~ PIR-1 . 156-1* ~
Safe End 103100    31-WD-020                B-J        UT                                            Group R14, ~~LATER~~
Safe End-to Nozzle    N4B B9.11      HT 3
103300  . 31-WD-021                B-D                                                      Group R14,      78% CRV Nozzle N4B-to-Vcsscl      B3.90                                                    Limitation duc to 3                            X          ad)accnt nozzle and Bioshield    ~~LATER~~
103400    31-WD-021                NUREG      UT                                            Group R14, Auto UT Nozzle  N4B  Bore (Zone  0619                                                      Gene-Gcris 2000 system
: 3)                                                                                  ~~LATER+~
 
DATE: 10/26/99                              NZNE MILE POINT NUCLEAR PIANT UNIT 1                            PAGE: 94 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS water System NUMBER: 31.0 INSPECTION INTERVAL                    PLAN STATUS              PRESERVICE YEAR ASME                FIRST        SECOND        THIRD SEC. XI            PERIOD      PERIOD        PERZOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                            INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4    1  2  3  4  + +CALIBRATION BLOCK*+
103500    31-WD-021-ZR              B D        UT                                            Group    Rli, Auto UT Noz. N4B Inner Radius    B3 100                                                    Gene-Gcris 2000 system, 3                            X Section (zone 1/2)                                                      ,
Frequency per NUREG 0619, 47% CRV Limitation due to ad)acent nozzle and  ioshield.  ~ ~LATER~ +
: 10. 0" FWA (REF. DWG. NO. 5) 104300    31-WD-028                B-J        UT                                            Terminal End *~LATER**
Pipe" to "Nozzle N4A      B9 11
                                        ~        MT 3                            X Safe End 104400    31 WD-029                  B J        UT                                            Group R13,    99% CRV Safe End-to-Nozzle N4A B9.11          PT                                            Limitation duc to 3                            X thermocouplc lugs
                                                                                                ++LATER'~~
104600    31"WD-030                  B D        UT                                            Group R13,    94% CRV N4A  Nozzle-to-Vessel    B3. 90                                                    Limitation    due  to 3                            X ad)acent nozzle and Bioshicld,    ~~IATER~~
104700    31-WD-030                  NUREG      UT                                            Group R13,    Auto UT N4A  Nozzle Bore (Zone    0619                                                      Gene-Geris 2000 system 3
: 3)                                                                                    **LATER**
104800    31-WD-030-ZR              B"D                                                        Group R13,    82% CRV, N4A Noz. Inner Radius    B3.100                                                    Limitation duc to 3                            X Section(zone 1/2)                                                                    ad)acent nozzle and Bioshield, Auto      UT Gene-Gcris 2000 system        ,
Frequency by NUREG 0619
                                                                                                **LATER**
 
DATE: 10/26/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 95 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS water System NUMBER:  31. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASHE                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERZOD SUHMARY    EXAMINATION AREA          CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ++CALIBRATION BLOCK~~
18.0"  FWA (REF. DWG. NO. 5) 10490031-WD-031                    B"J          MT                                          Torminal End, High Valve 31-01-to-Valve      B9. 11      UT                                          Stress Weld, Examine 31-07 Extension                                                                      100% of weld length.
                                                                                                **P1R-1. 156-1**
: 18. 0" FWB  (REF. DWG. NO. 5) 105500    31-WD"045                  B-J          UT                                          Examine 100% of weld Pipe-to-Tcc                B9.11                                                    length +*PZR-1.156-1~~
3                            X
: 10. 0" FWC  (REF. DWG. NO. 5) 106000    31-WD-049                  B  J        HT                                            Torad.nal End, Examine Pipo-to-Nozzle    N4C      B9.11                                                    100%  of weld length.
3 Safe End                                                                            ++PZR-. 75-2++
106100    31 WD-050                  B-J        UT                                            Group R15,    86% CRV, 99%
N4C  Nozzlo-to-Safe End B9.11          HT                                            for  UT ~*PIR-1.156-1*~
3                            X 106300    31-WD-051                  B D        UT                                            Group R15,    84% CRV.
N4C  Nozzle-to-Vessel      B3 90
                                        ~                                                      Limitation duc to 3                            X ad)acent nozzle and Bioshicld  ~~ZATERi~
106400    31  WD 051                NUREG      UT                                            Group R15,    Frequency N4C  Nozzle Bore (Zone    0619                                                      pcr  NUREG-0619 **LATER+a 3                            X 3) 106500    31-WD-051-ZR                B-D                                                      Group R15,  (Zone  1 4 2)
N4C Noz. Inner Radius      B3.100                                                    Frequency per 3                            X Section (Zones 1/2                                                                    NUREG-0619, 86% CRV, Limitation duc to ad)acent nozzle and Bioshield.  ~~LATER~~
 
DATE: 10/26/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 96 REVISZON:        0                            ZNSERVZCE INSPECTION TEN-YEAR PIAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS water System ZONE NUMBER:    31.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~*CALIBRATION BLOCK~ ~
: 10. 0" FWD  (REF. DWG. NO. 5) 107300    31 WD-058                B-J                                                        Terminal End Pipe-to-Nozzle  N4D      B9.11                                                      ~*FIR-.75-2~*
X Safe End 107400    31-WD-059                B  J        UT                                            Group R16, ~*LATER++
N4D  Safe End-to-Nozzle B9.11 3                            X 107600    31 "WD-060                B-D                                                        Group R16, 82% CRV N4D  Nozzle-to-Vessel    B3. 90                                                    Limitation due to 3                            X          Bioshield **IATER*~
107700    31-WD-060                                                                            Group R16, Frequency per N4D  Nozzle Bore (Zone    0619                                                      NUREG-0619 **N/A~+
3                            X 3) 107800    31-WD" 060-ZR              B D                                                        Group R16, Zone  1 4 2, N4D  Noz. Inner radius    B3.100                                                    59% CRV Limitation duc 3                            X Section (zones 1/2                                                                    to Bioshield, Frcqucncy by NUREG-0619 ~~LATER~~
 
Page 97 Left Blank Intentionally
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNZT 1                        PAGE: 98 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Recirculation Discharge E NUMBER:  32.0                                                                            PRESERVICE YEAR INSPECTION INTERVAL                      PIAN STATUS ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~~CALIBRATION BLOCK~*
28.0" Discharge  12D (REF. DWG. NO. 7) 109200    32-12-H4A                F-A          VT-3                                          Removed verify, Code Spring Hanger            Fl. 10                                                      Case N-491-1 *~N/A~~
3 X 109300    32-12-H4B                                                                            Removed verify,  Code Spring Hanger            Fl. 10                                                      Caso N-491-1 ~~N/A~+
3 X 28.0" Discharge  13D (REF. DWG. NO. 7) 109600    32-13-H4  WD 001        B K          PT                                            (32-13-H-4-A), Code Case Integral Attachment      B10. 20                                                    N-509 **N/A**
3 X Lug 109700    32-13"H4"WD-002          B-K                                                        (32-13-H-4-A), Code Case Integral Attachment      B10.20                                                      N-509 **N/A**
X Lug 109800    32-13-H4-WD-003          B K                                                        (32-13-H-4-B),  Code Case Zntcgral Attachment      B10. 20                                                    N-509 ~*N/A~*
X Lug 109900    32-13-H4-WD-004          B-K                                                        (32-13-H-4-B),  Code Case Integral Attachment      B10. 20                                                    N-509 ~*N/A~*
3 X Lug 110000    32-13-H4A                                                                            Code Case N-491-1 Spring Hanger            Fl . 10                                                    ++N/A+*
3              X 110100    32-13-H4B                                                                            Code Case N-491-1 Spring Hanger            Fl. 10                                                      **N/A**
3  - - - -      X
 
DATE:  10/15/99                              NINE MZLE POINT NUCLEAR PLANT UNIT 1                          PAGE: 99 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER:    32.0 ZNSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ ~CALIBRATION BLOCK~*
28.0" Discharge  15D (REF. DWG. NO. 7) 112000    32-15-H4A                F-A          VT-3                                          Code Case N-491-1 Spring Hanger            Fl. 10                                                      *~N/A~*
3                            X 112100    32-15 "H4B              F-A                                                        Code Case N-491-1 Spring Hanger            Pl. 10                                                      +*N/A++
3                            X 2.0" Discharge  11D (REF. DWG. NO. 7) 113900    32-385-VB                B-G-2        VT-1                                          2.0" Valve By-pass Linc Valve 32-385  Bolting    B'7. 70                                                    **N/At1 3                            X 2.0" Discharge  12D (REP. DWG. NO. 7) 000    32-386-VB                B-G-2        VT-1                                          2.0" Valve by-pass  linc Valve 32-386  Bolting    B7. 70 3                            X 2.0" Discharge  13D (REF. DWG. NO. 7) 114100    32 "387 VB              B-G-2        VT"1                                          2.0" Valve by-pass  linc Valve 32-387 Bolting    B7.70                                                      ~*N/A*+
3              X 2.0" Discharge  14D (REP. DWG. NO. 7) 114200    32-388-VB                B-G 2        VT-1                                          2.0" Valve by-pass line Valve 32-388 Bolting    B7.70                                                      **N/A+~
3              X 2.0" Discharge  15D (REF. DWG. NO. 7) 114300    32-389  VB              B-G 2        VT 1                                          2.0" Valve by-pass line Valve 32-389 Bolting    B7.70                                                      %AN/A*t 3 X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                              PAGE: 100 REVISION:        0                          ZNSERVICE INSPECTZON TEN-YEAR PLAN CZASS 1 SECTION  XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER:  32.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  + +CALIBRATION BLOCK**
: 28. 0" Discharge 13D (REF. DWG.      NO. 7) 115000    32-SB-6A                  F-A                                                        Code Case N-491-1 Sway Brace                Fl. 10                                                    *+N/A**
3              X 115100    32-SB-6B                                                                            Code Case N-491"1 Sway Brace                Fl. 10                                                    eaN/Ate 3              X 28.0" Discharge  11D (REF. DWG. NO. 7) 115400    32-WD "017                B-J          UT                                            Terminal End, High Pump 11                  B9. 11                                                    Stress Wold, Examine 3              X Discharge-to-Elbow                                                                    100% of weld length.
                                                                                                ~~PSR-Z.2*~
00  32-WD"017-Dl              B-J          UT                                            Code Case N-524 Elbow-Long Scam  OR      B9.12        PT                                            ~*PSR-Z.2~~
3              X 115700    32"WD-017-D2              B-J          UT                                            Code Casa N-524 Elbow-Long Seam  ZR      B9. 12      PT                                            e t PER-1 . 2*a 3              X 3.0" Dischargo  11D (REF. DWG. NO. 7) 115900    32-WD-020                  B-J          PT                                              **N/A~*
Branch Connection          B9.32 3              X
          -Dccon 116000    32-WD"020-FB              B-G-2      VT"1                                          Examine    in place, when 11D Dccon Flango          B7.50                                                      removed    or disasscmblcd.
3              X Bolting                                                                              *+N/A**
 
DATE:  10/15/99                            NINE MZLE POINT NUCLEAR PIANT UNIT 1                          PAGE: 101 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDUZED COMPONENTS or Recirculation Discharge NUMBER:  32. 0                                                                          PRESERVICE YEAR INSPECTION INTERVAL                      PIAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ ~CALIBRATION  BLOCK~ ~
28.0" Discharge  llD  (REF. DWG. NO. 7) 116600    32"WD-022                B-J        UT                                            Terminal End, High Pipe-to-Gate Valve      B9. 11      PT                                            Stress Weld, Examine 3            X 32-380                                                                              100% of weld length.
                                                                                              *+PSR-1 . 2 +*
116700    32-WD-022                GL A                                                        +*PSR-1. 109-l~~
Pipe-to-Gate Valve      88-01 3            X 32"380 116800    32-WD-022-U              B-J                                                        Code Case N-524 Pipe-Long  Seam          B9.12                                                      <<~PSR-1. 2**
3 - - - -      X 2.0" Discharge  11D (REF. DWG. NO. 7) 32-WD-023                B"J        PT                                              **N/A**
Coupling-to-Pipe        B9.40 H                    3              X 118000    32-WD-034                B  J        PT                                              4*N/A*1 Pipe-to-Coupling        B9. 40 3              X 28.0" Discharge  11D (REF. DWG. NO. 7) 118100    32-WD-035                B-J        UT                                              **PSR-1. 2*~
Gate Valve              B9. 11      PT 32-380-to-Pipe 118200    32-WD-035                GL-A        UT                                              ~*PSR-I . 109-1*~
Gate Valve              88 01 3                            X 32-380-to-Pipe 119300    32-WD-040                GL-A        UT                                              **PSR-1.109-1)
Elhow-to-Pipe            88-01                                                      PSR-1 . 260**
3              X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 102 REVISZON:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Recirculation Discharge NUMBER:  32.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATE GY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTZFZCATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 +~CALIBRATION BLOCK+~
119800    32-WD-041                B-J          PT                                            Examine 100%  of weld Pipe-to-Nozzle  N2A      B9. 11      UT                                            length.
3  - - - -    X                        ~~PSR-l. 655/1. 150-1,PSR-Safe End 119900    32-WD-041                GL-A        UT                                              +*PSR-1. 655/1. 150**
Pipe-to-Nozzle  N2A      88-01 3              X Safo End 120000    32-WD-041-U              B-J                                                        Code Case N-524 Pipe-Long  Seam          B9.12                                                      ~~PSR-l. 2~~
3              X 120100    32-WD-042                GL A        UT                                            Group R06 ~~LATER~~
N2A  Nozzle-to-Safe End 88-01 X
120200    32-WD-042                B-F        UT                                            Group R06, ~~IATER~~
NPA  Nozzle-to-Safe End B5.10        PT 3              X 120300    32-WD-042                SZL                                                        Group R06, Incolal 182 N2A  Nozzle-to-Safe End  455R1S1                                                    butter expansion from 3              X                        nozzle side of weld
                                                                                              *+ZATER+*
120400    32-WD-043                B-D        AUT                                            Group R06,  75% CRV N2A No" zle-to-Vessel    B3. 90                                                    Limitation  due to bottom 3              X                        head taper  of shell thickness +~N/A**
120500    32"WD-043-ZR              B-D        AUT                                            Group R06,  60% CRV N2A  Nozzle Inner        B3.100                                                    Limitation  due to bottom 3              X Radius Section                                                                      head taper  of shell thickness *~N/A+~
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                              PAGE: 103 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER:  32.0 INSPECTION INTERVAI                      PLAN STATUS            PRESERVZCE YEAR ASME                FZRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATZON AREA          CATEGY      NDE                  OUTAGE                          ZNSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK~*
28.0" Discharge  12D (REF. DWG. NO. 7) 120600    32-WD"057                B J        PT                                            Terminal End, High Pump 12                  B9 11
                                        ~      UT                                            Stress Weld, Examine 3
Discharge-to-Elbow                                                                  100% of weld length.
                                                                                                **PSR-1. 260a    m 120800    32-WD-057"Dl              B-J        PT                                            Code Case N-524 Elbow-Long Seam  OR      B9.12      UT                                            ++PSR-1.260**
3                            X 120900    32-WD-057-D2              B-J        PT                                            Code Case N-524 Elbow-Long Seam  ZR      B9 12
                                        ~        UT                                            **PSR-1.260**
3                            X 3.0" Discharge  12D (REF. DWG. NO. 7) 00  32 WD 060-FB              BG2        VT-1                                          Examine    in place,  when Dccon Flange  Bolting    B7.50                                                      removed    or  when 3              X                        disasscmblcd. ~*N/A~~
2S.O" Discharge 12D (REF.      DWG. NO. 7) 121300    32-WD-061                  GL-A        UT                                              ~ ~ PER" 1 . 109-1 + ~
Elbow-to-Pipe              88 "01 3                            X 121400    32-WD-061                  B-J        UT                                              ~~PSR-1. 2**
Elbow-to-Pipe              B9. 11      PT 3                            X 121900    32-WD"062                  GL-A        UT                                              ~~PSR-1. 109-1*+
Pipe-to-Gate Valve        88-01 3                            X 32-381
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                              PAGE: 104 REVISZON:          0                        INSERVZCE INSPECTION TEN-YEAR PLAN 1 SECTION XZ SCHEDULED COMPONENTS
                                                                                'ZASS r  Recirculation Discharge NUMBER:l 32 . 0 INSPECTION INTERVAL                    PLAN STATUS                PRESERVICE YEAR ASME                FIRST        SECOND          THIRD SEC. XZ              PERIOD      PERIOD          PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                  OUTAGE                            ZNSTRUCTZONS NUMBER      IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4      1  2  3  4 + +CALIBRATION BLOCX**
2.0" Discharge  12D (REF. DWG. NO. 7) 122100      32-WD-063                B-J        PT                                                Examine 100% of weld Coupling-to-Pipe        B9. 40                                                      length. ~~N/A~*
3                              X 123200      32-WD-074                B-J                                                          Examino 100% of weld Pipo-to-Coupling        B9.40                                                        length. ~~N/A*~
3                                X 28.0" Discharge  12D (REF. DWG. NO. 7) 123300      32-WD-075                B-J        UT                                                Examine 100%  of weld Gate Valve              B9. 11    PT                                                length. *~PBR-1.109-1**
3                                X 32-381-to-Pipe 32-WD-075-D              B  J                                                        Code Case N-524.
Pipe-Long  Scam          B9.12                                                        **PBR-1.109-1~~
3                                X 124000  ,  32-WD-079                GL A      UT Pipe-to-Elbow            88-01                                                        ~ ~PBR-1. 260/PSR-1. 109-1*
3                                X 124800      32 "WD-081              B-J        UT                                                Examine 100% of weld Pipe-to-Nozzle  N2B      B9. 11    PT                                                length +~PBR-1.109-1+~
3                                X Safe End 125000      32-WD-081-U              B-J        UT                                                Code Case N-524 Pipe-Long Weld          B9. 12    FT                                                **PBR-1.109-1**
3                                X 125100      32-WD-082                SIL        UT                                                Group R07, Znconel 182 N2B  Safe End-to-Nozzle 455R1S1                                                      buttor oxpansion from 3                                X          nozzle sido of weld t1LATERft
 
DATE: 10/15/99                            NINE MZIE POINT NUCLEAR PIANT UNZT 1                          PAGE: 105 REVISION:        0                          INSERVICE ZNSPECTZON TEN-YEAR PIAN CZASS 1 SECTION  XI SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER:  32. 0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
 
NUMBER EXAMINATION AREA        CATEGY    NDE                  OUTAGE                        INSTRUCTIONS IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  *~CALIBRATION BLOCK~ ~
125200    32-WD-082                B-F                                                        Group R07 *~LATER~~
N2B Safe End-to-Nozzle B5.10 3                            X 125300    32-WD-082                GL-A                                                      Group R07 +*LATER~~
N2B Safe End-to-Nozzle SS-01 3                            X 125400    32-WD-083                B-D        AUT                                            Group R07, 75.4% CRV N2B Nozzle-to<<Vcsscl    B3 90
                                        ~
Limitation duc to bottom 3                            X head taper of shell weld. **LATER**
125500    32-WD-083-IR            B-D                                                      Group R07, 608 CRV N2B  Nozzle Inner        B3.100                                                    Limitation duc to bottom 3                            X radius Section                                                                      head taper of shell weld. +*LATER~*
28.0" Discharge  13D (REF. DWG. NO. 7) 125600    32"WD-097                B-J        UT                                            Terminal End, High Pump 13                  B9.11      PT                                            Stress Wold, Examine Discharge-to-Elbow                        3 X 100% of weld length
                                                                                              **PSR-1. 109-1*+
125800    32-WD-097-Dl              B-J        UT                                            Formerly LW-032-A, Code Elbow-Long Scam  OR      B9.12      PT                                            Case N-524 3 X
                                                                                              *~PSR-1.109-1~~
125900    32"WD-097-D2            B-J        UT                                            Formerly LW-032-B, Code Elbow-Long Seam  ZR      B9.12      PT                                            Caso N-524 3 X saPSR  1.109  la*
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 106 REVISION:      0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER:  32. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER    ZDENTZFZCATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK~ ~
2.5" Dischargo  13D (REF. DWG. NO. 7) 126000    32-WD"099                B-J        PT                                            Examine 1008    of weld Branch                  B9.32                                                    length  +~N/AP~
3 X Connection-Thermowcll 3.0" Discharge  13D (REF. DWG. NO. 7) 126200    32-WD-100-FB            B-G-2      VT-1                                          Examine  in place,  when Decon Flange  Bolting    B7.50                                                    removed  or when 3 X disassembled. ~~N/A~+
28.0" Discharge  13D (REF. DWG. NO. 7) 126300    32-WD-101                GL-A        UT Pipe-to-Pipe              88-01                                                    **PBR-1. 109-1, PBR-1. 260*
X 126800    32-WD-102                GL-A        UT                                              ~~PBR-1.109-1+*
Pipe-to-Gate Valve        88 01 32-382                                      3                            X 126900    32-WD-102                B-J                                                      Terminal End, High Pipe-to-Gate Valve        B9. 11                                                    Stress Weld, Limitation 3 X 32-382                                                                              588 CRV, Examine 1008    of wold length
                                                                                              ~~PBR-1. 109-1**
127000    32-WD-102-U              B-J                                                      Code Case N-524 Pipe-Long  Seam          B9. 12                                                    +*PBR-I . 109-1 +*
3 X
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 107 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Recirculation Discharge NUMBER:  32.0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  >>>>CALIBRATION BLOCK>>>>
2.0" Discharge  13D (REF. DWG. NO. 7) 127200    32-WD-104                B-J          PT                                            Examine 100$ of weld Pipe-to-Coupling          B9. 40                                                    length >>>>N/A>>>>
3                            X 127400    32-WD-106                B  J        PT                                            Examine 100% of weld Pipe- to-Elbow            B9. 21                                                    length >>>>N/A>>*
3                            X 127900    32-WD-111                B-J          PT                                            Examine 100%  of weld Elbow-to-Pipe            B9.21                                                      length **N/A**
3                            X 128200    32-WD-114                B-J          PT                                            Examine 100%  of weld Pipe-to-Coupling        B9. 40                                                      length **N/A**
3                            X 28.0" Discharge  13D (REF. DWG. NO. 7) 128400    32-WD-115                B"J          UT                                            Terminal End, High Gate Valve                B9. 11      PT                                            Stross Wold, Examine 32-382-to-Pipe                              3 X 100% of weld length
                                                                                                >>>>PSR-1 . 109-1*>>
128500    32-WD-115-D              B-J          UT                                            Formerly LW-034, Codo Pipo-Long  Scam          B9. 12      PT                                            Caso N-524 3 X
                                                                                                *>>PSR-1. 109-1*>>
129000    32-WD-119                B  J                                                          <<<<P8R-1. 109-1*>>
Pipe-to-Elbow            B9. 11 3 X 129100    32-WD-119                GL-A        UT                                              >>>>P8R-1. 109-1)
Pipe-to-Elbow            88-01                                                      PSR-1. 260<<>>
3 X 129600    32-WD-120                GL-A        UT                                              >>>>PSR-1. 109-1, Elbow-to-Pipo            88 01                                                      PSR-1. 260>>*
3 X
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 108 REVIS ZON:        0                        ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER:    32.0                                                                          PRESERVICE YEAR INSPECTION INTERVAL                    PZAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 <<<<CAI,ZBRATION BLOCK>>>>
130000      32-WD-121                B-J        UT                                            Examine 100%  of weld Pipe-to-Nozzle  N2C      B9 11
                                        ~      PT                                            length >>*PBR-1.109-1**
X Safe End 130100      32-WD-121                GL-A      UT                                              >><<PBR-1. 109-1>>>>
Pipe-to"Nozzle  N2C      88-01 3 X Safe End 130200      32-WD "121-U            B-J                                                      Code Case N-524 Pipe-Long Soam          B9.12                                                    <<*PER-1.109-1*>>
3 X 130300      32-WD-122                B F        UT                                            Group ROB, <<>>LATER>>>>
N2C  Safo End-to-Nozzlo B5 10
                                        ~
3 X 30400      32-WD"122                SIL                                                      Group ROB, Inconcl 182 N2C  Safe End-to-Nozzle 455R1S1                                                    butter expansion from 3 X nozzle side of weld,
                                                                                              <<<<LATER>>*
130500      32 WD-122                GL-A      UT                                            GrouP  ROB **ZATER>>>>
N2C  Safe End-to-Nozzle 88-01 X
130600      32-WD-123                B D                                                      Group ROB, 75.4%  CRV N2C  Nozzle-to-Vessel    B3.90                                                    **ZATER>>>>
3 X 130700      32-WD "123-IR            B D                                                      Group ROB,  82% CRV N2C  Nozzle Innor        B3.100                                                    <<>>LATER*>>
3 X Radius Section
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 109 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Recirculation Discharge E NUMBER:  32.0                                                                          PRESERVZCE YEAR INSPECTION INTERVAL                    PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 +*CALIBRATIONBLOCK+ +
: 3. 0" Discharge 14D (REF. DWG. NO. 7) 131400    32-WD-142-FB            B-G-2      VT-1                                          Examine  in place,  when 14D Dccon Flange        B7.50                                                    removed  or  when 3 X                                    disassembled    *~N/A+~
Bolting 2.0" Discharge  14D (REF. DWG. NO. 7) 132300    32-WD-145                B-J        PT                                            Examine 100%    of weld Coupling-to-Pipe        B9. 40                                                    length  ~~N/A~+
3              X 133400    32-WD-156                B-J                                                      Examine 1008    of weld Pipe-to-Coupling        B9.40                                                    length  ~~N/A+~
3              X 28.0" Discharge  14D (REF. DWG. NO. 7) 00    32-WD-157                GL A        UT                                              ~'~PSR-1. 109-1*+
Valve 32-383-to-Pipe    88-01 3                            X 134900    32-WD-163                B  J        UT                                            Examine 100%    of weld Pipe-to-Nozzle  N2D      B9. 11      PT                                            length  ~~PSR-1.109-1**
3              X Safe End 135100    32-WD-163-U              B  J        UT                                            Code Case N-524 Pipe-Long  Seam          B9. 12      PT                                            ++PER-1.109-1++
3              X 135200    32-WD-164                B F        UT                                            Group R09 ~+LATER'+
N2D  Safe End-to-Nozzle B5.10 X
135300    32-WD-164                SIL                                                      Group R09, Inconcl 182 N2D  Safe End-to-Nozzle  455R1S1                                                  butter expansion from 3              X                        nozzle side of weld
                                                                                              ~ ~LATER~ ~
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 110 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS or Recirculation Discharge NUMBER:  32.0 ZNSPECTION INTERVAI                      PZAN STATUS              PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMZNATZON AREA        CATEGY      NDE                  OUTAGE                            INSTRUCTIONS NUMBER      ZDENTZFICATION          ZTEM NO    METH      2  3            3                    ~+CALIBRATION BLOCK**
1        4  1  2    4  1  2  3  4 135400    32-WD-164                GL-A                                                        Group R09, ~+LATER~~
N2D Safe End-to-Nozzle 88-01 3              X 135500    32-WD-165                B-D                                                          Group R09, 75.4% CRV N2D Nozzle-to-Vessel    B3. 90                                                      Limitation due to bottom 3              X                        "
head taper of shell thickness **LATER**
135600      32-WD-165-ZR            B-D                                                          Group R09,    82% CRV N2D Nozzle Inner        B3. 100                                                      Limitation duc to bottom 3              X Radius Section                                                                        head taper of shell thickness  *~LATER*~
28.0" Discharge  15D (REF. DWG. NO. 7) 0    32-WD-181                B-J        UT                                              Terminal End, High Pump 15                  B9. 11      PT                                              Stress Weld, Examine 3
Discharge-to-Elbow                                                                    100% of weld length stPSR-1.109 lao 135900    32-WD-181-Dl              B-J                                                          Formerly LW-OSS-A, Code Elbow-Long Scam          B9. 12                                                      Case N-524 3                            X            *aPSR 1. 109 Zest 136000    32-WD-181-D2              B-J        UT                                              Formerly LW-058-B, Code Elbow-Long Scam  ZR      B9. 12      PT                                              Case N-524 3
                                                                                                  **P8R-1. 109-1*~
3.0" Discharge  15D (REF. DWG. NO. 7) 136300    32-WD-184-FB            B"G-2        VT 1                                            Examine  in place,  when 15D Decon Flange        B7.50                                                        rcmcnrcd,  or  when 3                            X Bolting                                                                                disassembled    **N/A*~
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 111 REVISION:        0                          INSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Recirculation Discharge NUMBER:    32.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          ZNSTRUCTZONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  *+CALIBRATION BLOCK**
28.0" Discharge  15D (REF. DWG. NO. 7) 136700    32 "WD-186              B-J          UT                                            Terminal End, High PiPc-to-Valve 32-384    B9. 11      PT                                            Stress Weld, Examine 3
100% of weld length
                                                                                                ~~PER-1.109-1~~
136900    32 "WD-186-U              B-J                                                        Code Case N-524 Pipe-Long  Seam          B9. 12                                                    ~~PSR-1. 109-1~~
3                            X 2.0" Discharge  15D (REF. DWG. NO. 7) 137000    32-WD-187                B-J          PT                                            Examine 100%  of weld Coupling-to-Pipe          B9.'40                                                    length **N/A~*
3                            X 00    32-WD-193                B-J                                                        Examine 100% of weld Valve 32-389-to-Pipe      B9.21                                                      length +*N/A+~
3                            X 137700    32-WD-194                B-J                                                        Examine 100% of weld Pipe-to-Elbow            B9. 21                                                    length *~N/A~~
3                            X 137800    32-WD-195                  B-J                                                        Examine 100%  of weld Elbow-to-Pipe              B9.21                                                      length **N/A**
3                            X 14.0" Discharge    15D (REF. DWG. NO. 7) 139700    32-WD-204-MT              ZNPO        UT                                            100% of base material, Mixing Tcc-Base Metal      5-85                                                      each RFO.
3 X  - - -    X    X  - -    X          ~*PSR-2. 055-1 + +
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 112 REVISION:        0                          INSERVICE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Recirculation Discharge ZONE NUMBER:  32.0                                                                            PRESERVICE YEAR INSPECTION INTERVAL                      PLAN STATUS ASME                PIRST        SECOND      THIRD SEC. XZ              PERIOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~*CALIBRATION BLOCK+~
28.0" Discharge  15D (REF. DWG. NO. 7) 141400    32-WD-207                B-J                                                        Examine 100%    of weld Pipo-to-Nozzle  N2E      B9. 11                                                    length 3                            X Safe End                                                                            + *P8R-1 . 655/1 . 150-1**
141500    32-WD-207 "U            B-J                                                        former LW-064, Code Case Pipe-Long Weld          B9.12                                                      N-524 ~~PSR-I.I09-1+~
3                            X 141600    32-WD-208                B-F          UT                                            Group R10 ++LATER~+
N2E Safe End-to-Nozzle B5.10          PT 3
t 141700    32-WD "208              SIL                                                        Group R10, Znconel 182 N2E  Safe End-to-Nozzle 455R1S1                                                      buttor expansion from 3
nozzle sido of weld
                                                                                                *+LATER**
141800    32 WD-208                                                                            Group R10, ~*LATER~~
N2E  Safe End-to-Nozzle 88-01 3                            X 141900    32-WD 209                B"D                                                        Group R10, 74.5% CRV N2E  Nozzlo-to-Vessel    B3. 90                                                    Limitation duc to bottom 3                            X          head taper of shell thickness. *+IATER**
142000    32-WD-209-IR              B-D                                                        Group R10,    82% CRV N2E  Nozzle Inner        B3. 100                                                    Limitation    due  to bottom 3                            X Radius Section                                                                      head taper    of shell thickness.    *+LATER~*
 
DATE: 10/15/99                                NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 113 REVISION:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation    Pump NUMBER:  32.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK e 32-187 (REF. DWG. NO. 7A) 142900    32-187                    F-A          VT 3                                          Code Case N-491-1 Pump 11  Support          Fl . 40                                                      *~N/A~~
3            X 143000    32-187-PBB                B-G-l        VT-1                                          One pump in a group    of Pump 11  Busihings (1    B6.200                                                      pumps, only when 3              X thru  16)                                                                              disassembled.    ~~N/A~~
143100    32-187-PBN                B G-l        VT-1                                          Liad.tcd to pump selected Pump 11  Nuts, (1 thru    B6 ~ 200                                                    under B-L-2, One pump in 3              X
: 16)                                                                                    a group of pumps ++N/A++
143200    32-187-PBS                  B-G-1        UT                                            Limited to pump selected Pump 11    Flange Studs    B6.180                                                      under B-L-2, Onc pump in 3              X (1  thru  16)                                                                          a group  of pumps.
                                                                                                  ++NMP1  2.75-RCP-STUD**
143300    32-187-PBW                  B-G-1                                                      Limited to    pump sclcctcd Pump 11 Washcrs    (1      B6.200                                                      under B-L-2, One pump 3              X thru 16)                                                                                among a group of pumps k*N/A%4 143400    32-187-PBY                  B-L-2        VT 3                                          When  disasscmblcd, one Pump 11    Interior        B12. 20                                                    pump among a group of 3              X Surface                                                                                pumps ~*N/A~*
143500    32-187-PFS                  B-G-1        VT-1                                          Limited to    pump selected Pump 11 Flange Surface B6.190                                                          under B-L-2, Examine    1 3              X in. annular surface oi flange surrounding each stud ~*N/A+~
 
DATE:  10/15/99                            NINE MZLE POINT NUCLEAR PZANT UNIT 1                        PAGE: 114 REVIS ZON:        0                        INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation    Pump NUMBER:    32.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                PIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
 
NUMBER EXAMINATION AREA        CATEGY    NDE                OUTAGE                        INSTRUCTIONS IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK~+
143700      32-187-SHB              B-G-2      VT-1                                          P01, Limited to pump Pump 11 Seal Housing    B7.60                                                    selected under B-L-2, Bolting (I thru 16)                                                              one pump among group  of pumps. ~~N/A*~
 
DATE: 10/15/99                            NZNE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 115 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation  Pump 15 NUMBER:  32. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD
 
==SUMMARY==
 
NUMBER EXAMINATION AREA          CATEGY    NDE                OUTAGE                        INSTRUCTIONS IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *iCALIBRATIONBLOCK+
32-191 (REF. DWG. NO. 7) 148900    32-15-H1                  F A                                                      Code Case N-491-1 Spring Hanger            F1. 40                                                    **N/A*i 3              X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PIANT UNZT 1                          PAGE: 116 REVISZON:        0                        INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS or Recirculation Suction NUMBER:  32. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 i~CALIBRATION BLOCK~~
28.0" Suction 11S (REF. DWG. NO. 7) 151000    32-11-H3A              F-A        VT-3                                          Code Case N-491-1 Spring Hanger          Fl. 10                                                    *AN/A**
3              X 151100    32-11-H3B              F A        VT-3                                          Code Case N-491-1 Spring Hanger          F1.10                                                      eaN/A*a 3              X 28.0" Suction 12S (REF. DWG. NO. 7) 151300    32-12-H3-WD-001        B-K          PT                                            (32-12-H-3-A),  Code Case Integral Welded Lug    B10.20                                                    N"509 *~N/A~~
3                            X 151400    32-12-H3-WD-002        B-K        PT                                            (32-12-H-3-A),  Code Case Integral Welded Lug    B10.20                                                    N-509 **N/A~*
3                            X 1  1500    32-12-H3-WD-003        B"K                                                        (32-12-H-3-B),  Code Case Integral Welded Lug    B10.20                                                    N-509 **N/A~*
3                            X 151600    32-12-H3-WD-004        B-K                                                        (32-12-H-3-B),  Code Case Integral Wcldcd Lug    B10.20                                                    N-509 ~+N/A~*
3                            X 28.0" Suction 14S (REF. DWG. NO. 7) 153100    32-14-H3A              F A                                                        Code Case N-491-1 Spring Hanger          F1.10                                                      1 O'/A1 t 3                            X 153200    32-14-H3B                F-A                                                        Code Case N-491-1 Spring Hanger            Fl. 10                                                    **'N/A**
3                            X
 
DATE: 10/15/99                              NINE HILE POZNT NUCLEAR PIANT UNIT 1                          PAGE: 117 REVISION:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZONE NUHBER:  32.0          INSPECTION INTERVAL                                              PRESERVICE YEAR PLAN STATUS ASHE                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD SUHHARY    EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4 >>*CAZ,IBRATZON BLOCK>>>>
28.0" Suction 11S (REF. DWG. NO. 7) 155600    32-375-VB                B-G-2                                                      V06,  Limited to valve Gate Valve 32-375        B7.70                                                      selected under B-M-2 3            X                        >>>>N/A>>*
Bolting 155700    32-375-VBY              B"H-2        VT-3                                          V06,Only whe'n Gate Valve 32-375        B12.50                                                      disassembled, one valvo 3            X Interior  Surface                                                                    among group of valves
                                                                                                >>*N/A>>>>
28.0" Suction 12S  (REP. DWG. NO. 7) 156800    32-SB"3A                P-A          VT-3                                          Code Case N-491-1 Sway Brace              F1. 10                                                      *>>N/A>>>>
3    - - -    - - - -      X 6900    32-SB-3B                F-A                                                        Code Case N-491-1 Sway Brace                F1.10                                                      >>>>N/A*>>
3 28.0" Suction 13S (REF. DWG. NO. 7) 157000    32-SB-5A                  F-A          VT-3                                          Code Case N-491"1 sway Brace                Fl . 10                                                    >>>>N/A>>*
3 X 157100    32-SB-5B                  P-A          VT 3                                          Code Case N-491-1 Sway Brace                Fl. 10                                                      *>>N/A>>>>
3 X 28.0" Suction 11S (REP. DWG. NO. 7) 157600    32-WD-001                B D          AUT                                            Group R01,  65% CRV N1A  Nozzle-to-Vessel    B3. 90                                                      Limitation duc to lug, 3              X ad)acent nozzle and Bioshicld  >>>>LATER>>>>
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNZT 1                            PAGE: 118 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER:  32.0 INSPECTION INTERVAL                      PLAN STATUS              PRESERVICE YEAR ASME                FIRST        SECOND        THZRD SEC. XZ              PERIOD        PERIOD        PERZOD
 
==SUMMARY==
 
NUMBER EXAMINATION AREA          CATEGY    NDE                  OUTAGE                          INSTRUCTIONS IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3 4    1  2  3  4  **CALIBRATIONBLOCK*~
157700    32-WD-001-IR              B-D                                                        Group R01,  73% CRV N1A Nozzle Inner          B3. 100                                                    Limitation  due to lug, 3              X Radius Section                                                                        ad)accnt nozzle and Bioshield  ~iLATER~i 157800    32-WD-002                  GL-A      UT                                              Group R01 +*LATER*~
N1A  Nozzle-to-Safe End 88-01 3              X 157900    32-WD-002                  SIL                                                        Group R01, Inconcl 182 N1A  Nozzle-to-Safe End    455R1S1                                                    butter expansion from X
nozzle side of weld
                                                                                                  **LATER~*
158000      32-WD"002                                                                            Group R01 **LATER~~
N1A  Nozzle-to-Safe End B5.10 3              X 158200    32 WD-003                  B  J                                                          ++PSR  1.2++
Nozzle N1A Safe            B9. 11 End-to-Elbow                                3              X 158300    32-WD-003-Dl                                                                          formerly LW-001-A,    Coda Elbow-OR Long Scam        B9.12      PT                                              Case N-524 **PSR-1.2~~
3              X 158400    32-WD-003-D2              B-J        UT                                              formerly LW-001-B, Code Elbow-IR Long  Scam      B9. 12      PT                                              Case N-524 **PSR 1.2++
3              X 12.0" Suction  11S  (REF. DWG. NO. 7) 159400    32  WD 004A-MT            ZNPO      UT                                              UT  Only, every rcfucling Mixing Tee -Base Metal 5-85                                                            outage, 100% asc Exams                                        3 X  - - -    X  X  - -    X Material +~PSR-2.055-1**
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNZT 1                          PAGE: 119 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER:  32. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERZOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          ZNSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 +~CALIBRATION BLOCK~~
28.0" Suction 11S (REF. DWG. NO. 7) 160800    32-WD-007                B-J          UT                                            Examine 100% of weld Branch Connection        B9.31        PT                                            length. ~~PSR-1.2~~
3              X 161800    32-WD-009                B  J                                                      Terminal End, High Pipe-Valve 32-375        B9.11        PT                                            Stress Weld, Examine 3              X                        100% of weld length.
                                                                                                *+LATER**
161900    32-WD-009-U              B-J        UT                                            Formerly LW-004,  Code Pipe-Long  Seam          B9. 12      PT                                            Case N-524 *~LATER**
3              X 3.0" Suction  11S (REF. DWG. NO. 7) 00    32-WD-011-FB              B-G 2                                                      Examine  in place,  when 11S Decon Flange          B7.50                                                      removed,  or Bolting                                                                  X disassembled.  ~+N/A++
: 28. 0" Suction 11S (REF. DWG. NO. 7) 162500    32-WD-012                B-J        UT                                            Examine 100%  of weld Pipe-to-Elbow            B9. 11      PT                                            length. +~P8R-1.2**
3              X 162700    32-WD-012"Dl                                                                          Code Case N-524 Elbow-Long Scam    OR      B9.12      PT                                            ~~PSR-I.2~~
3              X 162800    32-WD-012-D2                                                                          Code Case N-524 Elbow-Long Seam IR        B9.12      PT                                            ~+PSR-1.2~~
3              X 162900    32-WD-012-U                B-J        UT                                            Code Case N-524 Pipe-Long  Seam          B9. 12      PT                                            **PSR-1. 2**
3              X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 120 REVISION:        0                            INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUHBER:  32.0 INSPECTZON INTERVAL                      PLAN STATUS              PRESERVZCE YEAR ASME                FIRST        SECOND        THIRD SEC. XZ                PERIOD      PERIOD        PERIOD SUHHARY    EXAMINATION AREA        CATEGY        NDE                OUTAGE                          INSTRUCTIONS NUHBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4    1  2  3  4  ~ ~CALIBRATION BLOCK~ ~
163100    32-WD-015                B-J                                                        Examine 100% of weld Elbow-to-Elbow            B9. 11                                                      length. +~PSR-1.2**
3            X 163500    32-WD-015-Ul              B-J          UT                                            Formally LW-006-A,  Code Elbow>>Long Seam  OR      B9.12        PT                                            Casa N-524. ~*PSR-1.2~*
3            X 163600    32-WD-015-U2            B-J          UT                                              Formally LW-006-B, Coda Elbow-Long Scam IR      B9.12        PT                                            Case N-524 ~+PSR-1.2~*
3            X 28.0" Suction  12S (REF. DWG. NO. 7) 163700    32-WD-044                B-D          UT                                            Group R02,  65% CRV N1B  Nozzle-to-Vessel    B3.90                                                      Limitation duc to 3                            X          Bioshield ~+LATER**
00    32-WD"044-ZR              B D                                                        Group R02,  73% CRV N1B  Nozzle Inner        B3. 100                                                    Limitation  duo to Radius Section                              3                            X          Bioshield
                                                                                                **NHP1-GE-7875~~
163900    32-WD-045                SZL                                                        Group R02, Inconcl 1S2 N1B  Nozzle-to-Safe End  455R1S1                                                    butter expansion from 3                            X nozzle side i*LATER*~
164000    32-WD-045                                                                            Group R02, i+LATER++
N1B  Nozzle-to-Safe End B5.10          PT 3                            X 164100    32"WD-045                GL-A        UT                                            Group R02, **LATER~*
N1B  Nozzle-to-Safe End 88-01 3                            X 164200    32"WD-046                B-J                                                        Examine 100%  of weld Nozzle N1B Safe          B9.11                                                      length, **PSR-1.2~*
3                            X End-to-Elbow
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 121 REVISION:        0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Recirculation Suction E NUMBER:  32.0                                                                          PRESERVZCE YEAR INSPECTION ZNTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER    ZDENTIFZCATION          ITEM NO    METH    1  2  3  4  1  2  3 4  1  2  3  4 ~+CALIBRATION BLOCK++
164300    32-WD-046              N/A                                                        IWB-2420 (b) Exaad.nc  flaw Nozzle N1B Safe        N/A                                                        growth area next 3 3 X  - - -    X  - - -    X          periods. ~*PSR-1.2+~
End-to-Elbow 164400    32-WD-046              GL F        UT                                            Examine each  refueling Nozzle N1B Safe        88-01                                                      outage flaw growth.
3 X  - - -    X  X  - -  X          **P8R-1. 260++
End-to-Elbow 164500    32-WD-046-Dl            B-J        UT                                            Code Case N-524 Elbow-Long Seam OR      B9. 12                                                    ++PSR-1.260*~
3                            X 164600    32-WD-046-D2            B-J        UT                                            Coda Case N-524 Elbow-Long Scam ZR      B9.12      PT                                            **PSR-1.260+*
3 00    32-WD-049              B- J        UT                                            Terminal End, High Pipe-to-Gate Valve  . B9. 11      PT                                            Stress Weld, Examine 3                            X          100% of weld length 32-376
                                                                                            *+PSR-1.2+~
165700    32-WD-049-U            B  J        UT                                            Code Case N-524 Pipe-Long Scam          B9. 12      PT                                            ++PSR-1.2++
3                            X 165800    32-WD-050              B-J                                                        Tarad.nal End,  Limitation Gate Valve              B9. 11                                                    58% CRV, ~~PSR-1.2~~
3                            X 32-376-to-Pipe 165900    32-WD-050              N/A                                                        Re-cxaminc pcr Gate Valve              N/A                                                        IWB-2420 (b) Flaw growth 3 X  - - -    X  - - -    X area next 3 periods, 32-376-to-Pipe acceptable  USNRC TAC No.
MA5696.  . ++PSR 1.2*+
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNZT 1                            PAGE: 122 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Recirculation Suction INSPECTION INTERVAL                      PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
 
NUMBER EXAMINATION AREA          CATEGY      NDE                OUTAGE                        INSTRUCTIONS IDENTZFZCATION            ZTEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK~ ~
166100    32-WD-050"D              B-J                                                        Code Case N-524 Pipe-Long  Seam          B9.12                                                      +*PSR-1 . 2**
3                            X 166200    32-WD-051                B-J          PT                                            Examine 100&    of weld Branch Connection        B9.32                                                      length. +*N/A**
            -Decon                                      3                            X 3.0" Suction  12S  (REF. DWG. NO. 7) 166300    32-WD-051-FB              B-G-2                                                      Examine    in place, when Dccon Flange  Bolting    B7.50                                                      removed    or disassembled.
3              X                        ~~N/A+~
2.5" Suction  12S (REF. DWG. NO. 7) 00    32-WD-053                  B-J        PT                                            Examine 100% of weld Thcrmowel 1                B9. 21                                                    length *~N/A~*
3                            X 28.0" Suction 13S (REF. DWG. NO. 7) 167400    32-WD-084                  B-D        UT                                            Group R03,    65% CRV N1C  Nozzle-to-Vessel      B3.90                                                      Limitation    due  to lug, 3 X ad)accnt nozzle and bioshicld    **LATER~>>
167500    32-WD-084-IR              B-D                                                        Group R03,    73% CRV N1C  Nozzle Inner          B3.100                                                    Limitation duc to lug, 3 X Radius Section                                                                        ad)acent nozzle and bioshicld
                                                                                                ~~NMP1-GE-7875+~
167600    32-WD"085                B-F          UT                                            Group R03, ~~LATER~*
N1C  No"zlc-to-Safe  End B5.10        PT 3 X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 123 REVZSZON:        0                          ZNSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER:  32.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THZRD SEC. XI              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
 
NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH
                                                          ------OUTAGE------                        INSTRUCTIONS 1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATZONBLOCK*+
167700    32-WD-085              SZL                                                        Group R03, Inconel 182 N1C Nozzle-to-Safo End 455R1Sl                                                    butter expansion from 3 X nozzle side of weld,
                                                                                              *+ ZATER**
167800    32-WD-085              GL A        UT                                            Group R03 **IATER*~
N1C Nozzle-to-Safe End 88-01 3 X 167900    32-WD-086              B-8                                                        Examine 100% of weld Nozzle N1C Safe        B9. 11                                                    length, ~~PSR-1.109-1*~
3 X End-to-Elbow 168000    32-WD-086              N/A                                                        IWB-2420 (b) Examine  flaw Nozzle N1C Safe        N/A                                                        growth area next 3 3 X End-to-Elbow                                                                      periods. ~*PSR-1.109-1**
168100    32-WD-086              GL-F        UT                                            Examine each  refueling Nozzle N1C Safe          88-01                                                      outage flaw growth.
End-to-Elbow                              3 X    - - -  X    X  - -    X          ++PSR-1. 260, PSR-l. 655/1.
150-~~
168200    32-WD-086-Dl            B  a7      UT                                            Formerly LW-026-A,    Code Elbow-Long Seam  OR      B9.12      PT                                            Case N-524 **PSR-1.260~~
3 X 168300    32-WD-086-D2            B-J        UT                                            Formerly LW-026-A,    Code Elbow-Long Seam IR      B9.12                                                      Case N-524 **PSR-1.260~*
3 X 169300    32-WD-089                                                                          Terminal End, High Pipe-to-Valve 32-377    B9.11      PT                                            Stress Weld, Examine 3 X 100% of weld length
                                                                                              ~~PSR-1.109-1**
 
DATE: 10/15/99                              NINE MZLE POINT NUCLEAR PLANT UNIT 1                          PAGE: 124 REVISION:        0                          ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZNSPFCTION INTERVAL                      PZAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 yyCALIBRATION BLOCKa~
169500    32-WD-089-U              B-J                                                        Formerly I.W-028, Code Pipe-Long  Scam          B9.12                                                      Case N-524 3 X                                      **PSR-1. 109-1**
169600    32-WD-090                B-J        UT                                            Terminal End, High Valve 32-377-to-Pipe      B9. 11      PT                                            Stress Weld, Limitation 3 X duc  to configuration    58%
CRV, Examine 100%    of weld length.
                                                                                                +*PSR-I . 109-1**
169800    32-WD-090-D              B-J                                                        Formally LW-029,    Code Pipe-Long  Seam          B9. 12                                                    Case N-524 X                                    **P8R-1. 109-1*~
3.0" Suction  13S (REF. DWG. NO. 7) 170000    32-WD-091-FB          ~  B-G-2                                                      Examine  in place,  when 13S Dccon Flange          B7.50                                                      removed  or  when Bolting                                                                  X          disassembled.    <<*N/A~*
28.0" Suction  13S (REF. DWG. NO. 7) 170100    32-WD-092                B-J        UT                                              **PSR-1 ..109-1**
Pipe-to-Elbow            B9.11 3 X 170200    32-WD-092                GL-A        UT Pipe-to-Elbow            88-01                                                      ++PSR  1. 109-1 ) PSR-1. 260~
3 X
 
DATE: 10/15/99                            NINE MZIE POZNT NUCLEAR PLANT UNIT 1                          PAGE: 125 REVISION:      0                          ZNSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Recirculation Suction NUMBER:  32. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM  NO  METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK~~
28.0" Suction 14S (REF. DWG. NO. 7) 171300    32-WD-124              B D          UT                                            Group R04,  65% CRV N1D Nozzle-to-Vessel    B3. 90                                                      Limitation duc to Bioshield + <<LATER~>>
171400    32-WD-124-IR            B D                                                        Group R04, 73&  CRV N1D Nozzle Znner        B3. 100                                                    Limitation duc  to 3                            X radius Section                                                                      Bioshield
                                                                                              *+NMP1-GE-7875~+
171500    32-WD-125              SII                                                        Group R04, Znconel 182 N1D Nozzle-to-Safe End  455R1S1                                                    butter expansion from 3
nozzle side of weld
                                                                                              ~~LATER~*
00  32-WD-125                B-F          UT                                            Group R04 +~LATER~+
N1D  Nozzle-to-Safe End B5.10        PT 3                            X 171700    32-WD-125                GL A        UT                                            Group R04 ~*LATER~~
N1D  Nozzle<<to-Safe End 88-01 3                            X 171800    32-WD-126                B-J                                                        Examine 100% of weld Nozzle N1D Safe          B9. 11                                                      length, +~PSR-I 109-1~*
3              X End-to-Elbow 171900    32-WD-126                N/A          UT                                            IWB-2420 (b) Examine flaw Nozzle N1D Safe          N/A                                                        growth area next 3 End-to-Elbow                                3 X            X periods. ~~P8R-1.109-1*~
172000    32-WD-126                GL-F        UT                                            Examine each  rcfucling Nozzle N1D Safe          88-01                                                      outage flaw growth.
3 X End-to-Elbow                                                                        **PSR-1.655/1.150"1~~
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 126 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Recirculation Suction INSPECTION ZNTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERZOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATZONBLOCK*+
172100    32-WD-126-Dl            B-J        UT                                            Code Case N-524 Elbow-Long Seam  OR      B9.12      PT                                            **PSR-1 . 109-1 +*
3              X 172200    32"WD-126-D2            B-J        UT                                            Code Case N-524 Elbow-Long Scam  ZR      B9. 12      PT                                            ~ ~PSR-1. 109-1**
3              X 14.0" Suction 14S (REF. DWG. NO. 7) 173200    32-WD-128A              GL A        UT                                            Removablc  pipe clamp Pipe-to-Gate Valve      88-01                                                      **PSR-.935-1**
3              X 38-01 173300    32-WD-128A              B  J                                                      Terminal End, High Pipe-to-Gate Valve      B9. 11                                                    Stress Wold, Removablc X
38-01                                                                              pipe clamp, Examine 100%
of weld length.
                                                                                              ~+PSR-l. 109-l~~
173400    32-WD-128A-U            B-J        UT                                            Code Case N-524 Pipe-Long Seam          B9.12      PT                                            ~~PSR-1.109-1~~
3              X 28.0" Suction  14S (REF. DWG. NO. 7) 174300    32-WD-131                B-J        UT                                            Terminal End, High PiPe-to-Valve 32-378    B9. 11      PT                                            Stress Weld, Examine 3              X                        100% of weld length e*PSR 1.109-1*a 174500    32-WD-131-U              B-J                                                        Rcmovablc pipe clamp, Pipe-Long Seam          B9. 12                                                    Coda Case N-524 3              X                        *~PSR" 1. 109-1**
 
DATE:  10/15/99                            NINE MILE POZNT NUCLEAR PIANT UNIT 1                            PAGE: 127 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS or Recirculation Suction NUMBER:  32. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  + +CALIBRATION BLOCK**
3.0" Suction  14S  (REF. DWG. NO. 7) 175000    32-WD-133-FB              B G-2                                                    Examine  in place,  when Decon Flange  Bolting    B7.50                                                    removed  or  when 3              X disassembled.    ~ ~N/A~~
2.5" Suction  14S (REF. DWG. NO. 7) 175600    32 "WD-135                B-J        PT                                            Examine 100%    of weld Branch Connection-        B9.32                                                    length  +~N/A~~
3              X Thcrmowell 28.0" Suction  15S (REF. DWG. NO. 7) 176300    32-WD-166                  B-D        AUT                                            Group R05, 33.8% CRV N1E  Nozzle-to-Vessel    B3.90                                                    Limitation duc to lug, 3 X thermocouple and bioshicld    *~LATER*~
176400    32-WD-166-IR              B-D                                                      Group R05,    73% CRV N1E  Nozzle Znncr        B3. 100                                                  Limitation    due to  lug, 3 X Radius Section                                                                      thermocouplc and bioshicld    ~~ZATER~~
176500    32-WD-167                  B-F        UT                                            GrouP R05 ++LATER~~
N1E  Nozzle-to-Safe End B5.10        PT 3 X 176600    32-WD-167                  SII                                                      Group R05, Znconcl 182 N1E  Nozzle-to-Safe End    455R1S1                                                  butter expansion from 3 X nozzle side of weld
                                                                                                *+LATER+~
176700    32-WD-167                  GL-A      UT                                            Group R05 ~~LATER*~
N1E  Nozzle-to-Safe End 88-01 3 X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PIANT UNZT 1                          PAGE: 128 REVIS ZON:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER:  32. 0 INSPECTION INTERVAL                    PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          ZNSTRUCTIONS NUMBER      IDENTIFICATION          ZTEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION BLOCK**
176800      32-WD-168              B-J                                                      Examine 100% of weld Nozzle N1E Safe        B9.11                                                    length, ++PSR-1.260~~
3                          X End-to-Elbow 176900    32-WD-168                N/A                                                      WB-2420 (b) Examine flaw Nozzle N1E Safe          N/A                                                      growth area next 3 End-to-Elbow                              3 X            X  - - -    X periods. **PSR-1. 260~*
177000    32 "WD-168              GL"F        UT                                            Examine each  rcfucling Nozzle N1E Safe          88"01                                                    outage flaw growth.
End-to-Elbow                              3 X  -        X  X    -  X          stPSR-1.260,PSR-1.655/1.
150-~*
177100      32-WD-168 "Dl            B-J                                                      Formerly LW-051-A, Code Elbow-Long Seam  OR      B9.12                                                    Case N-524 ~*P8R-1.260*~
3                            X 177200    32-WD-168-D2                                                                        Formerly IW-051-B, Coda Elbow-Long Seam  ZR      B9. 12      PT                                            Case N-524 ++P8R-1.260*~
3                            X 178600    32-WD-171-MT              ZNPO        UT                                            Base metal scans Mixing Tee Base Metal    5-85                                                      required each Refueling X  - - -    X  X Outage **PSR-1.109-1*~
178SOO    32-WD-171A                B-J                                                      Examine 100% of weld Reducer-to-Pipe          B9. 11                                                    length ++PSR-1.109-1~*
3              X 179000    32 WD-171A-D              B-J        UT                                            Code Case N-524 Pipe-Long  Seam          B9. 12      PT                                            ~+PSR-I . 109-1**
3              X
 
DATE: 10/15/99                              NINE MILE POZNT NUCLEAR PLANT UNIT 1                            PAGE: 129 REVISION:        0                          ZNSERVZCE ZNSPECTZON TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction ZONE NUMBER:  32.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERZOD        PERIOD      PERZOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 +*CALIBRATION BLOCK*~
10.0" Suction 15S (REF. DWG. NO. 7) 179200    32-WD" 171BR            GL A        UT                                              ~*NMP-10-XX1-SS**
Valve 39-01-to-Reducer    88>>01 3                            X 179300    32-WD-171BR              B-J                                                        Tcrnd.nal End, High Valve 39-01-to-Reducer    B9. 11                                                    Stress Weld 3                            X          ~iNMP-10"XXI-SSi~
28.0" Suction  15S (REF. DWG. NO. 7) 179400    32-WD-172                                                                          Limitation duc to Tee-to-Pipo              B9. 11                                                    fitting configuration, 3                            X          and material 58%
CRV.Examine 100% of weld length. ~~PSR-1.109-1~~
179700    32"WD-172-D              B-J                                                        (CW172, 173), Code Case Pipe-Long Scam          B9. 12                                                    N-524 **P8R-1. 109 1**
3                            X 179800    32-WD-172-U              B-J        UT                                            Coda Case N-524 Tee - Long Seam          B9. 12      PT                                            *+PSR-l. 109-1*+
3                            X 180200    32-WD-174                B-J        UT                                            Terminal End, High Valve 32-379-to-Pipe      B9. 11      PT                                            Stress Weld, Examine 3
100% of weld length
                                                                                              ++PSR 1.109 I+*
180400    32-WD-174-D              B"J                                                        Code Case N-524 Pipe Long Scam            B9.12                                                      + *PER-1 . 109 1 ~ ~
3                            X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 130 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Recirculation Suction NUMBER:  32. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEOY    NDE                -OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK*~
3.0" Suction 15S (REF. DWO. NO. 7) 150600    32-WD-175-FB            B-6-2      VT-1                                          Examine  in place,  when Decon Flange  Bolting    BI 50
                                      ~                                                      removed  or when 3              X                        disassembled.  *~N/A**
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE  131 REVISZON:          0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTZON XZ SCHEDULED COMPONENTS r Clean Up NUMBER: 33. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                          ZNSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4  *~CALIBRATION BLOCK**
6.0" Line  (REF. DWG. NO. 20) 181900    33 01R VBY              B-M-2      VT"3                                          V07, Onlc when Valve 33-01R Znterior    B12.50                                                    disassenbled,  one valve X                                      of valves.
Suriace                                                                            among group
                                                                                              ~~N/A~~
182300      33-03-VB                B-G-2                                                    V13,  Limited to valve Valvo 33-03  Bolting    B7.70                                                    sclcctcd under B-M-2.
3              X                        <<*N/A~~
182400      33"03-VBY                B-M"2      VT-3                                          V13, Only when Valve 33-03  Interior    B12.50                                                    disassembled, onc valve X
Surface                                                                            among group of valves.
eaN/Aea 00    33"03-WD-001            B-K        PT                                            Code Case N-509, Examine Valve 33-03 Integral    ~ B10. 40                                                  100%  of wold length Attachment                                                              X          +~N/A*+
183700      33-WD" 001              B"J        PT                                            Examine 100%  of weld Branch Connection        B9.32                                                    length. **N/A~*
3 X 183800    33-WD-002                B J        UT                                            Terminal End, High Pipe-to-Valve 33-02      B9.11      PT                                            Stress Weld, Limitation 3
duo  to fitting configuration 62% CRV, Examine 100% of weld length. **LATER**
184000    33-WD-003                                                                          Terminal End, High Valve 33-02R-to-Pipe      B9.11      PT                                            Stress Weld, Limitation 3
duc  to fitting configuration 62% CRV, Examine 100% of wold length. *~LATER*~
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 132 REVZSION:        0                          INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS or Clean  Up NUMBER:  33. 0 INSPECTION INTERVAL                      PZAN STATUS            PRESERVICE YEAR ASME                PIRST        SECOND      THIRD SEC. XZ                PERZOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~*CALIBRATION BLOCK*~
184300    33-WD-004              GL-D Pipe-to-Pipe Bend        88-01 3 X                X 184900    33-WD-014              GL-G        VT-2                                          Inaccessible,  inside Pen Pipe-to-Pipe            88-01                                                      X"9, Visual VT-2 each X  - - -    X  X  - -    X outage for evidence of leakage. +~N/A++
185100    33-WD" 015              GL-A                                                        Znaccossible inside Pen Pipe-to-Valve 33"04    88-01                                                      X-9. Visual VT-2 each 3 X  -  - -    X  X  " -    X          outage for cvidcnce of leakage. i~N/A~i 185500      33-WD-035                            VT-2                                          Znaccossible located Valvo 33-03-to-Pipe      88-01                                                      inside pen X-154, VT-2 X  - - -    X  X  - -    X          Each Rcfucling Outage for evidence of leakage
                                                                                                ~*N/A~~
185700    33"WD-036                GL-G                                                        Inaccessible located Pipe-to-Elbow            88-01                                                      inside pcn X-154, VT-2 X  - - -    X  X  - -    X          Each Rcfucling Outage for evidcncc of leakage
                                                                                                ~~N/A*+
185900    33"WD-046                B-J                                                        Bimettalic weld, Examine Pipe-to-Pipe            B9. 11                                                      100% of weld length.
3              X                        ++IATER+*
186000    33 "WD-046              GL-D        UT                                            Bimettalic weld Pipe-to-Pipe            88-01                                                      ~~LATER~+
3 X                X 186300    33-WD-047C1              B-J                                                        Examine 100% of weld Pipe-to-Valve 33-01R1    B9.11                                                      length *~PER-.432-2~~
3                            X
 
DATE: 10/15/99                              NINE MILE POZNT NUCLEAR PLANT UNIT 1                          PAGE: 133 REVISION:        0                            INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS or Clean  Up NUMBER:  33. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER    ZDENTIFZCATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ++CALIBRATION BLOCK*+
186700    33-WD-048C1              B  J        UT                                              ~*PSR-.432-2~*
Valve 33"01R  to Pipe    B9.11        PT 3
186900    33-WD"049                B-J                                                        BiMattalic weld, Limited Pipe-to-Elbow            B9. 11                                                    duc to pcrmn't hanger 3              X attach. 90% CRV, 90%
CRA. Exam 100% of weld length. **IATER**
1S7000    33-WD-049                GL D        UT                                              +~LATER~+
Pipe-to-Elbow            88 01 3 X                X 187500    33-WD-054                B  J        UT                                            Examine 100% of weld Pipe-to-Tcc              B9. 11                                                    length +*LATER**
3                            X 187600    33-WD-055                B-J                                                        Examine 100% of weld Tee-to-Reducer            B9. 11                                                    length **LATER**
3                            X 4.0" Line  (REF. DWG. NO. 20) 187700    33-WD-056                B  J        UT                                            Examine 100%  of weld Reducer-to-Pipe            B9. 11      PT                                            length.  **LATER~~
3                            X 6.0" Line  (REF. DWG. NO. 20) 188200    33-WD-061                  B-J        UT                                            Examine 100%  of weld Tcc-to-Reducer            B9. 11      PT                                            length  ~+IATER~~
3                            X 4.0" Linc  (REF. DWG. NO. 20) 188700    33-WD"066                  B-J        UT                                            Examino 100%  of weld Pipe-to-Reducer            B9. 11      PT                                            length  '
                                                                                                          ~LATER~~
3 - - - -      X
 
DATE:  10/15/99                            NZNE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 134 REVISION:        0                          INSERVZCE ZNSPECTZON TEN-YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Clean  Up NUMBER:  33.0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERZOD      PERIOD      PERZOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS IDENTIFICATION            ITEM NO    METH    1  2 3  4  1  2  3  4  1  2  3  4  ++CALIBRATION BLOCK~~
6.0" Lino  (REF. DWG. NO. 20) 189900    33.2-6-R5                F-A                                                      Code Case N 491 1,    4 Seismic Restraint        F1.10                                                    Lugs **N/A~+
3                            X 190000    33.2-6-R5-WD-001          B K        PT                                            Code Case N-509, Examine Integral Attachment      B10 20
                                          ~                                                    100%  of wold length X                        *ON/A4*
190100    33.2-6"R5-WD-004        B-K                                                        Code Caso N-509, Examine Integral Attachment      B10.20                                                    100%  of wold length 3              X                        **N/A~*
6.0" Line Outside  CZV (REF. DWG. NO. C26852-1) 00    33-FW-22                GL-E        UT                                            Outside CIV, 10% each Pipe-to-SS Nozzle        88-01                                                      refueling, weld overlay/
3              X    - - -    X          Examine once cvcry 2 RFO's. ~~SK"JAF-88-006**
190300    33-FW-22"R                GL-G        UT                                            Outside  CZV, 10% each Pipe-to-SS Nozzle        88-01                                                      rcfucling, weld overlay 3              X              X          ~~8K-JAF-88-006+*
190800    33-FW-35                  GL S        UT                                            Terminal End, Outside Elbow-to-Nozzle          88 01                                                      CIV, 10% each refueling 3 X    - - -  X    X                    ~~PSR-.432"2**
190900    33-FW-36                  GL-8        UT                                            Terminal End, Outside Nozzle" to-Elbow          88 01                                                      CIV, 10% each  rcfucling X  - - -  X  X  - -    X          ~~PSR-.432-2*~
191000    33-FW" 37                GL-S        UT                                            Terminal End, Outside Elbow-to-Nozzle          88 "01                                                    CZV, 10% each  refueling 3 X  - - -    X  X                    ~~PSR-.432-2'~*
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 135 REVISION:        0                          ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 1 SECTION XI SCHEDULED COMPONENTS tor Clean Up NUMBER:  33. 2 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER    ZDENTZFZCATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~~CALIBRATION BLOCK~~
6.0" Line  (REF. DWG. NO. 20) 195100    33-32                  F-A        VT 3                                          Code Case N-491 ++N/A+~
Pipe Stanchion          F1. 10 3 X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 136 REVISION:        0                        INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Instrumentation NUMBER:  36. 0                                                                        PRESERVICE YEAR INSPECTION INTERVAL                    PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTZFZCATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 >><<CALIBRATION BLOCK>><<
2.0" Linc  (REF. DWG. NO. 28) 195200    36-WD-1073              B-D        UT                                            Group R31, *>>ZATER>>*
N7L Closure              B3.90 3                            X Head-to-Nozzle 195300    36-WD-1073-IR            B-D        UT                                            Group R31, **ZATER*>>
N7L Closure Head        B3.100 3                            X Nozzle Inner Radiu 195400    36-WD-1074              B"F        UT                                            Group R31>>*LATER*>>
N7L Closure Head        B5. 10      PT 3                            X Nozzle-to-Flange 500    36 "WD"1074              SZL        UT                                            Group R31, Znconel 182 N7L Closure Head        455R1S1                                                  butter expansion from 3                            X          nozzlo side of weld.
Nozzle'-to-Flange
                                                                                            >> <<LATER>> '>>
2.0" Linc  (REF. DWG. NO. 8) 195800    36-R12-A                F-A        VT-3                                          Code Case N-491-1 Spring Hanger            Fl. 10                                                    >>*N/A>>>>
3                            X 196000    36-WD 003                B-F                                                      Group R42, Examine 100%
Nozzle N13A-to-Safe      B5.20                                                    of weld length. *<<N/A<<>>
3 End 196050    36-WD-003                SIL        PT                                            Group R42, Examine 100%
Nozzle N13A-to-Safe      571                                                      of weld length.    <<>>N/A>>>>
3                            X End 196100    36  WD  004              B  J                                                      Terminal End, Examine Safe End-to-Coupling    B9.21                                                    100% of weld length.
3                            X          **N/A**
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 137 REVISION:        0                          INSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS or Instrumentation NUMBER:  36.0                                                                            PRESERVZCE YEAR INSPECTION INTERVAL                    PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK++
2.0" Linc  (REF. DWG. NO. SC) 196500    36-WD-924                                                                          Group R43, iiN/A++
N16A Nozzle-to-Safe      BS. 20 X
End 196600    36-WD-924                SZL                                                      Group R43, Determine  if N16A  Nozzle-to-Safe      571        PT                                            Aug. Sur/Vol on nozzle 3                            X End                                                                                and safe cnd is required, SIL  571 ?
s*N/Aaa 196700    36-WD-925                B-J                                                      Terminal End Nozzle Safe End-to-Coupling      B9. 21                                                    N16A, Examine 100%  of 3                                      weld length +~N/Ai*
00    36-WD-932                B-J                                                      Examine 100%  of  weld Elbow-to<<Coupling      "  B9.40                                                    length **N/A**
3                            X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 138 REVISION:                                  ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS or Drain NUMBER:  37. 0                                                                          PRESERVICE YEAR INSPECTION INTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ +CALIBRATION BLOCK~*
2.0" Line  (REF. DWG. NO. 9) 197600    37-WD-030              B-J        PT                                            Examine 100%  of weld Pipe-to-Elbow          B9. 21                                                    length  ++N/A+~
3 - -          X
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 139 REVISION:        0                            INSERVZCE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Head Vent NUMBER:  37.0 INSPECTION ZNTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION  BLOCK**
2.0" Line  (REF. DWG. NO. 9) 197800    37-01-VB                  B-G-2        VT-1                                            ~~N/A~~
Valve 37-01 Bolting      B7.70 3 X 197900    37-02-VB                B G-2                                                        4 lN/A**
Valve 37-02 Bolting      B7.70 3 X 198000    37-06-VB                B G-2        VT 1                                            t tN/At1 Valve 37-06 Bolting      B7. 70 3 X 198200      37-R11                  F-A                                                        Code Case N"491-1 Spring Hanger            Fl. 10                                                    **N/A+*
3 X 0    37-R12                    F A          VT-3                                          Code Case N-491-1 Spring Hanger            Fl . 10                                                    ktN/Atf 3              X 4.0" Zine  (REF. DWG. NO. 9) 199100    37-WD-001                B D          UT                                            Group R39, ~*LATER~~
NS  Nozzle-to-Head        B3.90 3              X 199200    37-WD-001-ZR              B-D          UT                                            Group R39,    ~ +LATER**
N8  Nozzle Znner Radius 3              X Section 199300    37-WD-002                B-F          UT                                            Group R39, Examine 100%
Nozzle N8-to-Flange      BS. 10      PT                                            of weld length      ++IATER++
3              X 199400    37-WD-002                SZL          UT                                            Inconel 182 Butter Nozzle NS-to-Flango      455R1S1                                                    Expansion from Nozzle 3
side.  ~ ~IATER~ +
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 140 REVISZON:        0                          INSERVICE INSPECTION TEN YEAR PIAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS or Head Vent NUMBER:  37.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 >>>>CALIBRATION BLOCK<<>>
199500    37-WD-002-FB            B-G-2                                                      Examine  in place,  when Flange Bolting          B7.50                                                      removed,  or  when 3 X                                                      >>*N/A*>>
disassembled.
199700    37-WD-003              GL-D        UT                                            <<>>4-A396-.337>>>>
Flange-to-Rcduccr      88-01 3              X            X 199710    37-WD-003              N/A                                                        VT-2 each outage  for Flange-to-Rcduccr      N/A                                                        cvidcncc of leakage 3 X  - " -    X  X  - -    X          >>>>4-A396-.337>>>>
2.0" Linc  (REF. DWG. NO. 9) 199800    37-WD-004              B-J                                                        Examine 100% of weld Rcduccr to Pipe        B9.40                                                      length <<<<N/A<<>>
3 X 200000    37-WD-006              B-J                                                        Examino 100% of weld Elbow-to-Pipe          B9. 21                                                    length >>>>N/A>>>>
3 X 200100    37-WD-007              B-J                                                        Examine 100%  of weld Pipe-to-Flange          B9.40                                                      length >>*N/A**
3 X 200200    37-WD-007-FB            B-G-2      VT-1                                          Examine  in place,  when Refueling Platform      B7.50                                                      removed,  or  when 3 X Flange Bolting                                                                    disassembled >>>>N/A>>>>
200500    37-WD-010              B-J                                                        Examine 100%  of weld Tcc to Pipo            B9. 21                                                    length **N/A*>>
3 X 201000    37-WD-015              B-J                                                        Terminal End, High Pipe-to-Valvo 37-01    B9.40                                                      Stress Weld, Examine 3 X 100% of weld length
                                                                                              **N/A**
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 141 REVISION:        0                        ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Head Vent E NUMBER:  37.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE,                OUTAGE                          INSTRUCTIONS NUMBER      ZDENTIPZCATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK~*
201300    37-WD-018              B"J                                                      Examine 100%  oi'eld Tee-to-Pipe              B9.21                                                    length.  ~+N/A~+
X 201700    37-WD-022              B  J                                                      Examine 100% of weld Elbow-to-Pipe            B9.21                                                    length *~N/A*~
3 X 202200    37-WD-027                B  J                                                      Terminal End, High Pipe-to-Valve 37-02    B9.40                                                    Stress Wclds, Examine X
100% of wold length arN/Aaa
 
DATE: 10/15/99                                NINE MILE POINT NUCLEAR PIANT UNZT 1                          PAGE: 142 REVISION:        0                            INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS or Drain NUMBER:  37. 1 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THZRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER    ZDENTZFICATZON              ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK~~
2.0" Linc  (REF. DWG. NO. 9) 202700    37-Hl                      F-A          VT-3                                          Code Case N-491-1 Spring Hanger              Fl . 10                                                      ++N/A+*
3 X 203100    37-SC-2                                                                                Code Casa N-491-1 Box  Restraint            Fl . 10                                                      **N/A**
3                            X 203300    37. 1 "07R-VB              B-G-2        VT-1                                          Examine  in place,  when Valve 37-07R    Bolting                                                                disassembled  or  when X                                  +*N/A~+
removed.
203400    37.1-37-08R-VB            B G 2                                                      Examine  in place,  when Valve 37-08R Bolting        B7 ~ 70                                                    removed,  or when 3
disassembled. ++N/A~~
203500    37. 1-37-10-VB              B-G-2        VT 1                                          Examine  in place,  when Valve 37-10 Bolting        B7.70                                                      removed,  or when 3                            X          disassembled  +*N/A**
203600    37. 1-37-11-VB              B-G-2        VT-1                                          Examine  in place,  when Valve 37-11 Bolting        B7.70                                                      removed  or when 3              X disassembled.  **N/A*+
203900    37.1-WD-003                B  J                                                        Terminal End, High Pipe-to-Valve 37-10        B9.40                                                      Stress Weld, Examine 3                            X 100% of weld length
                                                                                                  ~*N/A**
204500    37.1-WD-009                B  J                                                        Terminal End, High PiPc to-Valve 37 07R        B9. 40                                                      Stress Weld, Examine 3                            X 100% of wold length
                                                                                                  ~~N/A~~
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 143 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Drain NUMBER:    37.1 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 ~'iCALIBRATION BLOCK~~
204900    37. 1-WD-013            B-J                                                      Examine 100%  of weld Pipe-to-Coupling        B9.40                                                    length  +iN/Aii 3              X 205100    37. 1-WD-015            B-J                                                      Terminal End, High Pipe-to-Valve 37-11      B9.40                                                    Stress Weld, Examine X
100% of wold length.
                                                                                            ~~N/A~~
205300    37. 1-WD-017            B-J                                                      Terminal End, High Pipe-to-Valve  37-OSR    B9.40                                                    Stress Weld, Examine 3                            X 100% of wold length.
ikN/A%0
 
DATE:  10/15/99                            NZNE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 144 REVISION:          0                          INSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Shutdown Cooling NUMBER:    38. 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERV ICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAHINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM  NO    HETH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK~ ~
14.0"  SDC Line (REF. DWG. NO. 10) 205600    38-01-VB                  B G-2      VT-1                                          V07, Limited    to valve Valve 38-01 Bolting      B7.70                                                      selcctcd under B-M-2 3                                        ++N/A++
205700    38-01-VBY                B"H-2      VT-3                                          V07, Only when Valve 38-01  Interior    B12.50                                                    disassembled, One valve 3                            X Surf aco                                                                            among a group of valves.
                                                                                                  ~~N/A~~
1 206100      38-12-FLG                B-G-1      VT 1                                          Vlo,  When connection is Valve 38-12 Flange        B6.220                                                    disasscmblcd,      Examine Surface                                                                  X          1.0" annular surface of flange surrounding each stud.  ~~N/A~~
206200      38-12-NBW                B G-1      VT 1                                          V10 ( ~ <<N/A>> ~
Valve 38-12 Nuts,          B6.230 3                            X Bushing, Washers 206300    38-12-VB                  B-G-1      UT                                            V10, 16 studs,    Examine Valve 38-12 Bolting        B6.210                                                    inplacc,    when 3                            X disasscmblcd,    or  when removed.
                                                                                                  + ~NM1-2 . 50-Bl 6-1 ~ +
206400    38 "12-VBY                B-H-2      VT-3                                          V10, Only when Valve 38-12 Zntcrior      B12.50                                                    disassembled, Onc valve Surface                                                                    X among a group of valves tfN/At*
206500    38-12-WD-003              B K                                                        Code Case N-509 ~~N/A~+
Valve 38-12 Integral      B10.40 3                            X Attachment
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 145 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS or Shutdown Cooling NUMBER:  38. 0                                                                          PRESERVICE YEAR ZNSPECTZON INTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~~CALIBRATION BLOCX~~
207300    38-H1                  F-A                                                        Code Case N-491-1 Spring Hanger          Fl . 10                                                    1 fN/Afi 3  - - - -      - - - -      X 208100    38-WD-001              GL-D        UT                                            Requires 38-H-1 Clamp to Valve 38-01-to-Pipe      88-01                                                      be removed. ~~PSR-.760~~
3  - -    -  X  - - -    X 208200    38-WD-001              B-J        UT                                            Support 38-Hl support Valve 38-01-to-Pipe    B9. 11      PT                                            clamp is required to bc 3                            X          removed prior to pcrformanco. ~*LATER**
208300    38"WD-002              B-J        UT                                            Examine 100%  of weld Pipe-to-Elbow          B9. 11      PT                                            length  ~*LATER~+
3              X 00    38-WD-002              GL D        UT                                              **LATER**
Pipe" to-Elbow          88-01 3 X            X 208500    38-WD-002-Dl            B-J        UT                                            Code Case N-524 Elbow-hong Seams  OR    B9.12                                                      ~~LATER++
3              X 208600    38-WD-002-D2            B-J        UT                                            Code Case N-524 Elbow-Long Seams IR    B9 12
                                      ~        PT                                            **IATER++
208800    38-WD-003              GL D        UT                                              *~LATER~~
Elbow-to-Elbow          88-01 3 X            X 209400    38-WD"004              GL-D        UT                                              +~IATER~+
Elbow-to-Pipe            88-01 3 X            X 209900    38-WD-005                GL D        UT                                              **PSR-.760**
Pipe-to-Elbow            88 "01 X            X
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 146 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS r Shutdown Cooling NUMBER:  38.0 INSPECTION INTERVAL                    PLAN STATUS              PRESERVICE YEAR ASME                FIRST      SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                            INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2 3  4 1  2  3  4  1  2  3  4  *<<CALIBRATION BLOCK<<<<
210400      38-WD-006                GL-D        UT                                              *<<PSR-.760<<<<
Elbow-to-Pipe            88-01 3            X            X 210900      38-WD-007                GL-G                                                      Inaccessible inside pen.
Pipe-to-Pipe            88 01                                                    X-S, Examine area each 3 X  - - -  X  X  - -    X outage for evidence of leakage. **N/A**
211200      38-WD-008                GL-G      VT-2                                          Inaccessible inside Pipe-to-Valve 38-02      88-01                                                    pcnctration X-8, Examine 3 X    - - -  X  X  -    X each outage    for  evidence of leakage. **N/A*<<
211400      38-WD-087              GL-G                                                      Inaccessible inside pen.
Valve 38-12-to-Pipe      88-01                                                    X-7. Examine area each X  - " -  X  X  - -    X outage for cvidcncc of leakage. <<<<N/A**
211500      38 WD-088                GL G                                                      Inaccessible inside pen.
Pipe-to-Pipe            88-01                                                    X-7. Examine area each X  - - -  X  X  - -    X outage for evidence of leakage. <<*N/A<<<<
211700      38-WD-089                B  J                                                      Examine 100%    of weld Pipe-to-Elbow            B9.11                                                    length    *<<LATER<<<<
3 X 211800      38-WD-089                GL-D        UT                                                <<<<LATER<<<<
Pipe-to-Elbow            88-01 3 X              X 212200      38-WD-090                GL D        UT                                              '
                                                                                                    *LATER<<<<
Elbow-to" Pipe          88-01 X              X
 
DATE:  10/15/99                            NINE HILE POZNT NUCLEAR PLANT UNIT 1                        PAGE: 147 REVISION:        0                        ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Shutdown Cooling NUMBER:    38. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD SUMHARY    EXAHINATION AREA        CATE GY    NDE                OUTAGE                        INSTRUCTIONS NUHBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~+CALIBRATION BLOCK~~
212700    38 "WD-091              GL-D        UT                                              ~~PBR-.760~*
Pipe- to-Pipe          88-01 3              X 212800    38-WD-092              GL"D        UT                                              +*P8R-.760~*
Pipe-to-Pipe            88-01 3              X              X 213100    38-WD-093              GL-D        UT                                              **LATER**
Pi pe-to-Elbow          88-01 3 X                X 213500    38-WD-094              GL-D        UT                                              +*PBR .760+*
Elbow-to-Valve 38-13    88-01 3              X              X
 
DATE:  10/15/99                            NINE HZLE POINT NUCLEAR PZANT UNIT 1                          PAGE: 148 REVISION:        0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COHPONENTS cncy Condenser Return HUHBER:  39.0                                                                            PRESERVZCE YEAR INSPECTION INTERVAL                      PLAN STATUS ASHE                FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                  OUTAGE                          ZNSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *+CALIBRATIONBLOCK*
10.0"  ECC I ine (REF. DWG. NO. 11A) 213800    39-01R-VB                B G-2                                                      V15, Limited  to valve Valve 39-01 Bolting      B7.70                                                      selected under B-M-2 X                                    ~~N/A+~
213900    39-01R-VBY              BH2                                                        V15, Only when Valve 39-01  Interior  B12.50 3 X disassembled,  One valve Surface                                                                            among a group  of valves.
1tN/Af*
214200    39-03-VB                B-G-2      VT-1                                          V12, Limited  to valve Valve 39-03 Bolting      B7. 70                                                    selected under B-H-2.
3              X                        ++N/A**
0    39-03-VBY                B-H-2      VT-3                                          V12, Only when Valve 39-03  Interior  B12.50                                                    di.assembled,, One valve 3              X Surface                                                                            among a group of valves.
                                                                                              **N/A0f 214600    39-05 "VB                B-G-2      VT-1                                          V09,  Limited to valvo Valve 39-05  Bolting    B7.70                                                      selected under B-M-2 3 X                                    %*N/A**
214700    39-05-VBY                B-M-2      VT 3                                          V09, Only when Valve 39-05  Interior  B12. 50                                                    disassembled, Onc valve 3 X Surface                                                                            among a group of valves.
esN/Aaa 215200    39-A2                    F-A                                                        Code Case N-491-1 Anchor                  Fl. 10                                                    tiN/Aft 3 X
 
DATE:  10/15/99                            NZNE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 149 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS ency Condenser Return NUMBER: 39.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                OUTAGE                          INSTRUCTIONS NUMBER      ZDENTZFZCATION          ITEM    NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ +CALIBRATION BLOCK**
215300    39-A2-WD-001            B-K                                                        Code Case N-509    **N/Ai~
Anchor Integral        B10. 20 3 X Attachment 215400    39-A2-WD-002            B-K          PT                                            Code Case N-509 +*N/A**
Anchor Integral        B10. 20 3 X Attachment 215900    39-H16                                VT-3                                          Code Case N-491-1.
Spring Hanger          Fl . 10                                                    *AN/Af*
3                            X 217200      39-H9                                VT-3                                          Code Case N-4 91-1  .
Spring Hanger          Fl . 10                                                    e*N/A+a 3                            X 0    39-WD-194                GL-G                                                        Examine each outage    for Valvo 39-05-to-Pipe  . 88-01                                                      evidence of leakage.
X  - -    X  X                    *~N/A~~
218000    39-WD-194A              GL-G                                                        Inaccessible inside Pipe-to-Pipe            88-01                                                      penetration X-5B, 3 X  - - -    X  X  - -    X Examine each outage    for evidence of leakage
* 0 N/Al*
218400    39-WD-195                GL-D          UT                                              +*NMP-10 XX1 SS*+
Pipe-to-Elbow            88 01 3              X            X 218800    39-WD-196                GL-D          UT                                            Removal of pipe support Elbow-to-Pipe            88-01                                                      clamp 39-HS-12 6 16 3              X      - -    X required.
                                                                                                ++NMP 10  XX1-SS**
 
DATE:  10/15/99                          NINE MILE POINT NUCLEAR PZANT UNIT 1                          PAGE: 150 REVZSZON:        0                        INSERVICE INSPECTION TEN-YEAR PIAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS eney Condenser Return NUMBER:  39.0 INSPECTION ZNTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  +~CALIBRATION BLOCK+~
219200    39-WD-197              GL D                                                      Remove Clamps on Pipe-to-Elbow          88-01                                                    39-HS-12 6 16.
3            X              X          ~ ~NMP-10-XXI-SS**
219600    39-WD-198              GL-D        UT                                              ~ ~NMP-10-XX1-SS**
Elbow-to-Pipe          88"01 3 - - - -    X              X 220000    39-WD-199              GL-D        UT                                              **NMP-10-XX1 SS**
Pipe-to-Elbow          88-01 3            X              X 220400      39-WD-200              GL-D        UT                                            UT exams  every  2  RFO's.
Elbow-to-Pipe          88-01                                                      *+NMP 10-XX1-SS++
3            X              X 0    39-WD-201              GL-D        UT                                            UT cxams  cvcry  2  RFQ'.
Pipe-to-Elbow          88-01 3 X                X 221100    39-WD "202              GL-D        UT                                            UT cxams  cvry  2 RFO '
Elbow-to-Pipe          88 01                                                      +*LATER++
X  - - -  -    X 221600    39 "WD-203R            GL-D        UT                                              ++NMP-10 XX1-SS**
Pipe-to-Elbow          88 01 3              X              X 222000    39-WD-204A              GL-D        UT                                            Sensitized, UT    exams Pipe-to-Pipe            88-01                                                      cvcry 2 RFO's, 3              X    - - -    X          ~ <<NMP-10-XXI-SS>> ~
222400    39-WD-204R              GL-D        UT                                            Sensitized,  UT cxams Elbow-to-Pipe          88-01                                                      every  2 RFO's 3              X              X
                                                                                              ~+NMP-10-XXI-SS"
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 151 REVISION:        0                        ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Return NUMBER: 39.0 ZNSPECTZON ZNTERVAL                    PZAN STATUS            PRESERVICE YEAR ASHE                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERZOD      PERIOD
 
==SUMMARY==
 
NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH
                                                          ------OUTAGE------                        INSTRUCTIONS 1  2  3  4  1  2  3  4  1  2  3  4 +~CALIBRATION BLOCK**
223200    39-WD-226              GL G                                                      VT-2 exam each    RFO for Valve 39-06-to-Pipe      88 01                                                    evidence of leakage 3 X                                      4 1N/At*
223400    39-WD-226A              GL-G                                                      Inaccessible inside pen.
Pipe-to-Pipe            88-01                                                    X-SA, VT-2 exam each    RFO 3 X    - - -  X    X  - -    X for  evidence  of leakage.
                                                                                              ++N/A+*
223900    39-WD-226B              GL-D      UT                                            UT exam  every  2 RFO's Pipe-to-Pipe            88-01                                                    *+ LATER**
3 X    - - -  -    X 224300    39-WD-227                GL D      UT                                            UT exam  every 2 RFO's Pipe-to-Elbow            88-01                                                    **NMP-10-XX1-SS**
3              X              X 224500    39-WD-228                GL-D      UT                                            UT exam cvcry 2 RFO's Pipe-to-Elbow            88 01                                                    + +ZATER*+
3 X                X 225000    39-WD-229                GL-D      UT                                            UT exam  every  2  RFO's, Pipe-to-Elbow            88 01                                                    Rcmove clamps on    support 3              X              X          39-H9, HS-9 and 10.
                                                                                              **NMP-10-XX1-SS**
225300    39-WD-230                GL-D      UT                                            UT exam  every  2 RFO's Elbow-to-Pipo            88-01                                                    **NHP-10-XX1-SS**
3              X 225800    39-WD-231                GL D      UT                                            UT exam  every  2 RFO's Pipe-to-Pipe              88-01                                                    IfLATER* t 3 X                X 226200    39-WD"232                GL-D      UT                                            UT exam  every 2 RFO's Pipe-to-Elbow            88-01                                                    +*NHP-10-XX1-SS+*
3              X              X
 
DATE:  10/15/99                          NZNE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 152 REVISION:        0                        INSERVZCE INSPECTION TEN YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cney Condenser Return NUMBER:  39.0 INSPECTION ZNTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASHE                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAHZNATZON AREA      CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      ZDENTZFZCATION        ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 + +CALIBRATION BLOCX+ +
226500    39-WD-233              GL D        UT                                            UT  cx~  every 2 RFO's Elbow-to-Pipe          88-01                                                      **NHP-10-XXZ-SS~~
3              X 226900    39-WD-233A            GL-D        UT                                            Sensitized,  UT exalts Pipe-to-Elbow          88 01                                                      every  2 RFO's 3              X              X          **NHP-10-XX1-SS**
227300    39-WD-234A            GL-D        UT                                            Sensitized Pipe- to-Elbow        88" 01                                                    +'~NHP 10 XX1 SS++
3              X 227800    39-WD-235R            GL D                                                      Sensitized Elbow-to-Pipe          88-01                                                      ~+NMP-10-XX1-SS**
3              X              X
 
DATE: 10/15/99                            NINE HYLE POINT NUCLEAR PIANT UNIT 1                          PAGE: 153 REVISZON:        0                          ZNSERVZCE INSPECTZON TEN YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS cncy Condenser Supply NUMBER:  39.0 INSPECTION INTERVAL                      PLAN STATUS              PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
 
NUHBER EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK>> t 10.0"  ECC Line  (REF. DWG. NO. 11) 229800    39-07R-VB                B-G-2      VT 1                                          V16, Limited    to valve Valve 39-07R Bolting      B7.70                                                      selected under B-H-2 3
t*N/A**
229900    39-07R-VBY              B-M-2      VT 3                                          V16, Only when Valve 39-07R  Interior  B12.50                                                    disassembled, one valve 3                            X Surface                                                                              among a group of valves.
                                                                                                **N/Att 230500    39-09R-WD-001            GL-G        VT-2                                          VT-2 exam each    RFO for Valve 39-09R              88-01                                                      cvidcncc of leakage Body-to-Extension Weld                      3 X  - - -    X    X  - -    X          ~ >>N/Att 0    39 "10R-WD-001            GL-G        VT 2                                          VT-2 exam each    RFO for Valve 39-10R              88-01                                                      cvidcnce of leakage Body-to-Extension                          3 X  - - -    X    X                    t>>N/A>>*
18.0"  ECC  Nozzlcs (REF. DWG. NO. 11) 231000    39-WD-001                B-D        UT                                            Group R17,  65% CRV N5A  Nozzle-to-Vessel    B3.90                                                      Limitation duc to 3 X ad)accnt nozzle and bioshield t >>LATER**
231100    39-WD-001-ZR              B D        UT                                            Group R17, 55% CRV NSA  Nozzle Incr Radius B3.100                                                      limitation due to Section                                    3 X ad)accnt nozzle and bioshicld **ZATER>>t 231200    39-WD-002                GL-A        UT                                            Group R17, t*ZATER>>>>
NSA  Nozzle-to-Safe End 88-01 3 X
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 154 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS ency Condenser Supply NUMBER:  39.0 ZNSPECTZON INTERVAL                      PZAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  4*CALIBRATION BLOCK~~
10.0" ECC Nozzlcs (REF. DWG. NO. 11) 231300      39-WD-002                B-F          PT                                            Group R17, +~LATER~~
N5A Nozzle-to-Safe End B5.10        UT 3 X 231400      39-WD-002                SZL        UT                                            Znconel 182 Butter NSA  Nozzle-to-Safe End    455R1S1                                                  Expansion from nozzle side of weld. ++IATER++
10.0" ECC Line  (REF. DWG. NO. 11) 231500      39-WD-003                B  J      UT                                            Terminal End, High Nozzle N5A Safe          B9. 11      PT                                            Stress Weld +~LATER~~
End-to-Pipe                                3 X 00    39-WD-003                GL-A        UT                                              +*LATER**
Nozzle NSA Safe          88-01 3 X End-to-Pipe
                                  ~~
231900      39-WD-006                GL-A        UT                                              ~*ZATER*~
Pipe-to-Pipe              88-01 3 X 232700      39-WD-008                GL-A        UT                                              ~~LATER~*
Pipe-to-Pipe              88 01 3 X 233100      39 WD-009                GL-A        VT-2                                          Inaccessible inside Pipe-to-Valve 39-09R      88-01                                                      penetration X-3A, VT-2 3 X  - - -    X  X  - -    X exam each RFO  for evidence of leakage,
                                                                                                **N/A**
233500    . 39-WD-011                B J        UT                                            Terminal End, High Valve                    B9. 11      PT                                            Stress Weld, Examine 3 X 39-07R-to-Reducer                                                                    100% of weld length
                                                                                                **ZATER**
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 155 REVISION:    =  0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL                      PLAN STATUS            ZRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATE GY    NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 <<<<CALIBRATION BLOCK**
18.0"  ECC Nozzles (REF. DWG. NO. 11) 233800    39-WD-089                B-D        UT                                            Group R18,  73% CRV NSB  Nozzle-to-Vessel    B3.90                                                      Limitation  due  to ad)acent nozzle and bioshield  **LATER*<<
233900    39-WD-089-IR            B-D                                                        Group R18,  75% CRV N5B  Nozzle Inner        B3.100                                                    Limitation  duc  to 3                            X Radius Section                                                                      ad)accnt nozzle and bioshield  *<<ZATER**
10.0"  ECC Nozzles (REF. DWG. NO. 11) 234000    39-WD-090                B F        UT                                            Group R18, 91.02%    CRV NSB  Nozzle-to-Safe End B5.10        PT                                            *<<LATER<<<<
3                            X 2 4100    39-WD-090                GL-D        UT                                            Group R18, 91.02%    CRV NSB  Nozzle-to-Safe End 88-01                                                      <<<<LATER<<<<
3 - - - -      X  - - -    X 234200    39-WD-090                SIL                                                        Group R18, Znconcl 182 NSB  Nozzle-to-Safe End  455R1S1                                                    Butter Expansion from 3                            X          nozzle side of weld
                                                                                              <<<<LATER<<<<
10.0"  ECC Linc  (REF. DWG. NO. 11) 234300    39-WD"091                B-J        UT                                            Terminal End, High Nozzle  N5B Safe        B9. 11      PT                                            Stress Weld, Examine 3 X End-to-Pipe                                                                        100% of weld length
                                                                                              <<*LATER<<<<
235500    39-WD-096                B-J                                                        Examine 100%    of weld Elbow-to-Pipe            B9.11                                                      length  *<<ZATER<<*
3 X
 
DATE: 10/15/99                          NINE MILE POZNT NUCLEAR PLANT UNIT 1                          PAGE: 156 REVISZON:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS ency Condenser Supply NUMBER: 39. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK**
235900    39-WD-097              GL-A                                                      VT-2 exam each  RFO  for PiPe-to-Valve 39-10R    88-01                                                    evidence  of leakage X  - - -    X  X  - -  X          iiN/At1 236300    39-WD-099              B-J                                                      Terminal End, High Valve                  B9.11                                                    Stress Weld, Examine 3 X 39-OSR-to-Reducer                                                                100% of weld length
                                                                                            **LATER*~
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                            PAGE: 157 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:  40.0                                                                            IRESERVZCE YEAR INSPECTION INTERVAL                      PLAN STATUS ASME                FIRST          SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMZNATZON AREA        CATEGY      NDE            - ~
OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3    4 1  2  3  4  1  2  3  4 t tCAI.IBRATION BLOCKt t
: 12. 0" CSA (REF. DWG. NO. 12) 236700    40-01"VB                B-G-2      VT-1                                            V14, Limited  to valve Valve 40-01 Bolting      B7.70                                                      sclectcd under B-M-2 3 X                                      *tN/A**
236SOO    40-01-VBY                B-M"2      VT-3                                            V14, Only when Valvo 40-01  Interior    B12.50                                                      disasscmblcd, onc valve 3 X Surface                                                                              among group of valves t*N/Att 237100    40-03-FLG                B-G-1      VT"1                                            Vll, Examine  1.0" Valve 40-03 Flange      B6.220                                                      annular surface of 3 X Surface                                                                              flange surrounding each stud **N/At*
00    40 03 NBB                B-G-1      VT-1                                            Vll,  Only when Valve 40-03 Bushings  ~ B6. 230                                                    disassembled t*N/A**
3 X 237300    40-03-NBN                B G 1      VT 1                                            Vl1, Examine inplacc, Valve 40-03 Nuts        B6.230                                                      when removed or 3 X disassembled **N/A**
237400    40-03-NBW                B-G-l      VT-1                                            Vll, Examino    inplaco, Valve 40-03 Washers      B6.230                                                      when rcmovcd  or 3 X disassembled ttN/A*t 237500    40-03-VB                B-G-1      UT                                              Vll, Limited to    valve Valve 40-03 Bolting      B6.210                                                      sclcctcd under    B-M-2 3 X                                      ttLATERtt
 
DATE:  10/15/99                              NZNE MILE POINT NUCLEAR PLANT UNZT 1                          PAGE: 158 REVISION:          0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XI SCHEDULED COMPONENTS or Core Spray NUMBER:    40.0 ZNSPECTZON INTERVAL                      PLAN STATUS              PRESERVZCE YEAR ASME                FIRST        SECOND        THIRD SEC. XZ                PERIOD      PERIOD        PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO      METH    1  2  3  4  1  2  3  4    1  2  3  4  *+CALIBRATIONBLOCK~*
237600    40-03-VBY                  B-M-2                                                      Vll, Only  when Valve 40-03  Interior    B12.50                                                      disassembled, one valve Surface                                      3 X among group of valves
                                                                                                  +*N/A*+
: 2. 0"  CSB (REF. DWG. NO. 12) 239500    40"20-VB                  B-G-2                                                      Examine  in place,  when Valve 40-20 Bolting      B7.70                                                      removed  or when X
disassembled.  **N/A~~
: 12. 0"  CSA (REF. DWG. NO. 12) 239600      40-Al                    F-A          VT-3                                          Code Case N-491-1 Anchor                    Fl . 10                                                    ++N/A++
3              X 12.0"    CSB (REF. DWG. NO. 12) 240200    40-H17                    F-A                                                        Code Case N-491-1 Spring Hanger              Fl . 10                                                    ~~N/Ai~
3              X 240600    40-H21-A                  F-A          VT-3                                          Code Case N-491-1 Constant Spring Hanger F1.10                                                          **N/A~~
3                            X 240700    40"H21-A-WD-001            B"K                                                        Code Case N-509 ++N/A~~
Integral Attachment        B10.20 3                            X 240800    40-H21-A-WD-004                        PT                                            Code Case N-509  **N/A**
Integral Attachment        B10. 20 3                            X 240900    40-H21-A-WD-007            B-K          PT                                            Code Case N-509 +~N/A+a Integral Attachment        B10.20 3                            X
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 159 REVZSION:          0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS J
or Cora Spray E NUMBER:    40.0                                                                            PRESERVICE YEAR INSPECTION ZNTERVAL                      PLAN STATUS ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATE GY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK**
241000    40 "H21-A-WD-010          B K          PT                                            Code Case N-509 **N/A*~
Integral Attachment      B10. 20 3
241100    40-H21-B                  F A          VT 3                                          Code Case N-491-1 Constant Spring Hangar F1.10                                                            N/Aff 3                            X
: 12. 0"  CSA (REF. DWG. NO. 12) 241700    40-H54                    F-A          VT 3                                          Code Case N-491-1 Spring Support            Fl . 10                                                    **N/At%
3 X 243100    40-H57-B                  F-A                                                        Code Case N-491-1 Constant Weight hanger F1.10                                                          **N/A+~
X 00    40-WD-001                GL-D          UT                                            UT exams  every  2 RFO '
Valve 40-03-to-Pipe      88-01                                                      *~NMP-12-XXI-SS~~
3              X
: 2. 0"  CSA (REF. DWG. NO. 12) 245900    40-WD 002                B-J                                                        Examine 100% of weld Branch Connection        B9.32                                                      length *~N/A~*
3              X
: 6. 0"  CSA (REF. DWG. NO. 12) 246100    40-WD-003                GL D          UT                                            UT exams  every  2 RFO's.
Branch Connection        88-01                                                      **PSR-1. 5-2~ ~
3  - - - -    X 246300    40-WD-004                GL"D          UT                                            UT exams  cvcry  2 RFO's.
Pi pc- to-Elbow          88-01                                                      **PSR-.42-2~~
3              X              X 246500    40-WD-005                GL-D          UT                                            UT exams  cvcry  2 RFO's Elbow-to-Pipe            88-01                                                      to the extent practical 3              X              X          **PSR".432-2i~
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 160 REVZSZON:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:  40.0 INSPECTION INTERVAL                      PLAN STATUS              PRESERVZCE YEAR ASME                FIRST        SECOND        THIRD SEC. XI              PERIOD      PERIOD        PERIOD
 
==SUMMARY==
 
NUHBER EXAHINATION AREA          CATEGY    NDE                OUTAGE                            INSTRUCTIONS IDENTIFICATION            ITEM NO    HETH    1  2  3 4  1  2  3  4    1  2  3  4  **CALIBRATIONBLOCK'>>~
246510    40-WD-005                N/A        VT 2                                            VT-2 each outage,    for Elbow-to-Pipe            N/A                                                        evidence of leakage 3 X            X  X  - -    X          **PSR-.432-2i~
246700    40-WD-006                GL-D      UT                                              UT cxams  every  2 RFO's.
Pipe-to-Pipe              88-01                                                      **LATER++
3              X            X 246710    40-WD-006                N/A        VT-2                                            VT-2 exam each outage Pipo-to-Pipe            N/A                                                          for evidence of leakage 3 X  - - -  X    X 246900    40-WD-007                GI -D      UT                                              UT cxams  every  2 RFO's.
Pipe-to-Valve 40-05      88-01                                                        *~PSR-.432-2**
3            X              X
: 12. 0"  CSA (REF. DWG. NO. 12) 247100    40 WD-008                GL-D        UT                                              UT exams  every 2 RFO's.
Pipe-to-Elbow            88-01                                                      +*NMP-12-XX1-SS**
3              X              X 247300    40-WD-009                GL"D        UT                                              UT exams  cvcry 2 RFO's Elbow-to-Valve 40-02      88-01                                                      **NMP-12-XXI-SS++
3              X              X 247700    40-WD-010A                GL-G        VT 2                                            Inaccessible inside pen.
Valve 40-02-to-Pipe      88-01                                                      X-13A, VT-2 exam each X      -    X  X RFO  for  evidence of leakage.  **N/A~i 248000    40-WD-011                GL-D        UT                                              UT exams  cvcry 2 RFO's.
Pipe-to-Elbow            88-01                                                      *~NHP-12-XX1-SS**
3              X              X 248010    40-WD-011                N/A                                                          VT-2 each outage    for Pipe- to-Elbow          N/A                                                          evidence of leakage 3 X  - - -    X  X          X
                                                                                                ~~NHP-12-XX1-SS~  ~
 
DATE: 10/15/99                          NINE HYLE POINT NUCLEAR PIANT UNIT 1                          PAGE: 161 REVISION:        0                        INSERVICE INSPECTION TEN-.YEAR PIAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS tor Core Spray E NUMBER:  40.0        INSPECTZON INTERVAL                                            PRESERVZCE YEAR PLAN STATUS ASHE                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD SUHMARY  EXAMINATION AREA      CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION        ITEM  NO  HETH    1  2  3  4  1  2  3  4  1  2  3  4 *+CALIBRATION BLOCK~~
248300    40-WD-012              GL-D                                                      UT cxams  every 2 RFO's.
Elbow-to-Pipe          88-01                                                    ++NHP-12 XX1-SS**
3  - - - -      X 248600    40"WD"013              GL D        UT                                            UT exam  every 2 RFO's.
Pipe-to-Pipe          88 "01                                                    **NMP-12-XXI-SS'~+
3  - - - -      X 249000    40-WD-014              GL D        UT                                            UT exams  every  2 RFO's.
Pipe-to-Pipe          88-01                                                    ++NMP-12 XX1 SS**
3 -  - - -    X            X 249400    40 WD-015              GL-D        UT                                            UT cxams  every  2  RFO's.
Pipe-to-Elbow          88-01                                                    '~ ~NMP-12-XX1-SS~ ~
3              X            X 9700    40-WD-016              GL-D                                                      UT cxams  every 2 RFO's.
Elbow-to-Pipe          88-01                                                    **NMP-12-XXI-SS+~
X 249900    40-WD-017            GL-D        UT                                            UT exams  every 2 RFO's.
Pipe-to-Elbow          88-01                                                    +*NMP-12-XX1-SS**
X  - - -    X 250000    40-WD-018            GL D        UT                                            UT exam  every  2  RFO's.
Elbow-to-Pipo          88-01                                                    ~ ~NMP-12-XXI-SS~ ~
3 - - - -      X            X 250400    40-WD-020              GL D        UT                                            UT exams  every  2 RFO's.
Pipe to Tcc            88-01                                                      + +NMP-12-XX1-SS*+
3              X            X 250600    40 WD-021              GL-D        UT                                            UT exam  every  2 RFO~s.
Tcc-to-Pipe            88-01                                                      **NHP-12-XXZ-SS**
X  - - -    X 250900    40-WD-022              GL D        UT                                            UT cxams every 2 RFO's.
Pipe-to-Elbow          88 01                                                      *+NMP 12 XX1 SS+*
X
 
DATE:  10/15/99                          NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 162 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION  XI SCHEDULED COMPONENTS tor Core Spray NUMBER:  40.0 ZNSPECTION INTERVAZ                    PLAN STATUS              PRESERVICE YEAR FIRST        SECOND        THIRD SEC. XZ              PERIOD        PERIOD        PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                  OUTAGE                            INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4    1  2  3  4  ~~CALIBRATION BLOCK~"
251200    40-WD-023              GL-D                                                      UT exams    every  2  RFO's.
Elbow-to-Pipe          88-01                                                      ++NMP 12 XXZ-SS+*
3              X            X 251500    40-WD-024              GL-D      UT                                              UT exams    every  2 RFO's.
Pipe-to-Valve 40-09    88-01                                                      ~ ~NMP-12-XXl-SS~*
3              X 251800    40-WD"025              GL D      UT                                              UT exams    cvcry 2 RFO's.
Valve 40-09-to-Elbow    88-01                                                      ~~NMP"12-XX1-SS**
X            X 252000    40-WD-026              GL-D      UT                                              UT exams    every 2 RFO'st Elbow-to-Pipe          88 01                                                      ~+NMP-12-XXI-SS**
3              X            X 2 2200    40-WD-027                GL-D      UT                                              UT  every 2 RFO's Pipe-to-Tee              88-01                                                      ~~NMP-12-XX1-SS~~
3              X            X 252500    40-WD-028                GL D      UT                                              UT    exams  cvcry  2 RFO's.
Tcc-to-Valve 40-01      88-01                                                      **NMP-12-XXI-SS~~
3              X            X 252800    40-WD-029              GL"D        UT                                              UT cxams    cvcry 2 RFO's.
Valve 40-01-to-Pipe      88-01                                                      ~~NMP-12-XXZ-SS**
3              X            X 253100    40-WD-030              GL-D        UT                                              UT exams    every 2  RFO's.
Pipe-to- Tec            88 01                                                      ~ ~NMP-12-XX1-SS*~
3              X            X 253400    40-WD-031              GL-D        UT                                              UT exams    every 2 RFO's.
Tec-to-Pipe            88 "01                                                      **NMP-12-XX1-SS*~
3              X 253800    40-WD-032              GL-D        UT                                              UT  cvcry  2 RFO's Pipe- to-Elbow          88-01                                                      ~ ~NMP-12-XX1-SS**
3              X              X
 
DATE: 10/15/99                              NINE MZLE POINT NUCLEAR PLANT UNIT 1                          PAGE: 163 REVISION:        0                            ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:  40.0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERZOD SUHHARY    EXAHINATION AREA          CATEGY      NDE                OUTAGE                        ZNSTRUCTZONS NUMBER    IDENTIFICATION            ITEM  NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK*~
254100    40-WD-033                GL D                                                      UT exams  every    2 RFO's.
Elbow-to-Elbow            88-01                                                      ~~NHP-12-XXZ-SS~~
3              X            X 254300    40"WD"034                GL-D        UT                                            UT cxams  avery 2 RFO's.
Pipe- to-Elbow            88 01                                                      **NMP-12-XX1-SS~~
3              X            X 254400    40-WD"035                GL-D        UT                                            UT exams  cvcry    2 RFO's.
Elbow-to-Reducer          88-01                                                      *~NHP-12-XX1-SS~ ~
3              X            X 6.0"  CSA (REF. DWG. NO. 12) 254600    40-WD"036                B-J          UT                                            Examine 100%    of weld Reducer-to-Pipe          B9. 11      PT                                            length  ~*LATER*~
3                            X 0    40-WD-036                GL-D        UT                                            UT exams  every    2 RFO ',
Rcducor-to-Pipo          88-01                                                      **PSR-.432-2*~
3              X            X 254800    40-WD-038                GL-D        UT                                            UT exam  every,  2  RFO's Nozzle N6A Outcr Safe    88-01                                                      **PSR-.75-3~*
3              X End-to-Elbow 254900    40-WD-038                B  J        PT                                            Terminal End, Nozzlo N6A Outcr Safe      B9.11        UT                                            **PSR-.75-3**
3              X End-to-Elbow 255000    40-WD-038A                B"J          UT                                            Examine 100% of weld Nozzle N6A Znnor Safe      B9.11        PT                                            length ~*IATER**
3 X End-to-Outcr Safe 255100    40-WD-038A                GL-D        UT                                            UT cxams  evory    2 RFO's.
Nozzle  N6A, Inner Safe  88-01                                                      ~~LATER*~
3              X            X End-to-Outcr Safe
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 164 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:  40.0                                                                            PRESERVICE YEAR INSPECTION INTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA            CATEGY      NDE                -OUTAGE                          INSTRUCTIONS NVMBER    IDENTIFICATION            ITEM  NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ +CALIBRATION BLOCK*~
255200    40-WD-039                B F                                                        Group R19, UT 28.4%    CRV Nozzle N6A-to-Inner      BS. 10                                                      **LATER**
3              X Safe End 255300    40-WD-039                SZL          UT                                            Znconel 182 Butter Nozzle N6A-to-Inner      455R181                                                    Expansion from nozzle Safe End                                                                              side of weld    ~~N/A+~
255400    40-WD-039                GL D          UT                                            UT exams    every  2 RFO's.
Nozzle N6A-to-Inner      88-01                                                      etN/Aee 3 - - - -      X            X Safe End 255500    40-WD-040                B-D          VT                                            Group R19,    66% CRV N6A  Nozzle-to-Vessel    B3.90                                                      ,Limitation duc to X                        ad)accnt nozzle and bioshiold    **IATER+s 255600    40-WD-040-ZR              B-D          UT                                            Group R19,    66% CRV N6A  Nozzle Inner        B3.100                                                      ,Limitation duc to 3              X                        ad)accnt nozzle and Radius Section bioshicld    ~~LATER~~
: 12. 0"  CSB (REF. DWG. NO. 12) 255800    40-WD-041                GL-D          VT                                            UT exams every 2 RFO's Valve 40-13-to-Pipe      88-01                                                      ~ +LATER~ ~
3 X  - - -    -  X
: 6. 0"  CSB (REF. DWG. NO. 12) 256200    40-WD"043                GL-D          UT                                            UT exam  every    2  RFO's.
Branch Connection        88-01                                                      ~+LATER~~
3 X                X 256400    40-WD-043A                GL D          UT                                            UT exam  cvcry  2 RFO's Pipe-to-BR Stub Nozzle 88-01                                                          ++LATER*+
X        -  -  X
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNZT 1                          PAGE: 165 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTZON XI SCHEDULED COMPONENTS or Core Spray NUMBER:    40.0                                                                          PRESERVICE YEAR INSPECTION ZNTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      ZDENTZFZCATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 >>>>CALIBRATION BLOCK>>>>
256600    40-WD-044                GL-D                                                      UT cxams  every  2 RFO's.
Pipe-to-Elbow            88 01                                                      **LATER>>>>
3 X                X 256800    40  WD 045              GL-D        UT                                            UT cxams  every  2 RFO's.
Elbow-to-Pipe            88-01                                                      >>>>LATER>>*
3 X                X
: 12. 0" CSB (REF. DWG. NO. 12) 257100    40-WD-047                GL D        UT                                            UT cxams every 2 RFO's.
Pipe-to-Valve 40-06      88-01                                                      >>>>LATER>>>>
X  - - -    -  X 257300    40-WD-048                GL-D        UT                                            UT cxams  every  2 RFO's Pipe-to-Elbow            88 01                                                      **LATER**
3 X                X 0    40-WD-049                GL D        UT                                            UT cxams  every  2 RFO's Elbow-to-Valve 40-12    88-01                                                      >>>>LATER>>>>
3 X                X 257900    40-WD-050A              GL G        VT-2                                          VT-2 exam each  RFO  for Valve 40-12-to-Pipe      88-01                                                      cvidcnco of leakage.
X  - - -    X  X  - -  X          >>>>N/A>> ~
258100    40-WD-051                GL-D        UT                                            UT cxams  cvcry  2 RFO's Pipe-to-Elbow            88-01                                                      >>>>LATER>>>>
X                X 258110    40-WD-051                N/A        VT-2                                          VT-2 each outage  for Pipe-to-Elbow            N/A                                                        evidence of leakage 3 X  - - -    X  X  - -  X          >>>>IATER>>>>
258500    40  WD 052              GL-D        UT                                            UT cxams  every  2 RFO's.
Elbow-to-Pipe            88-01                                                      **LATER>>>>
3 X                X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNZT 1                            PAGE: 166 REVISION:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NVMBER:  40.0 INSPECTZON INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMZ NATION AREA      CATEGY      NDE                OUTAGE                          INSTRUCTIONS NVMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  *>>CALIBRATION BLOCK>> t 258800    40-WD-053              GL-D                                                    UT cxams    every  2 RFO's.
Pipe-to-Elbow          88-01                                                    **LATER**
3 X        -  -  X 259100    40-WD-054              GL-D        UT                                            UT exams    every  2 RFO's.
Elbow-to-Pipe          88-01                                                    t >>LATER>>t X              X 259300    40-WD-055              GL D        VT                                            UT exam    every  2 RFO's Pipe-to-Elbow          88-01                                                    t*ZATER**
3 X                X 259700    40-WD-056              GL-D        UT                                            UT cxams    every  2 RFO's.
Elbow-to-Pipe          88-01                                                    <<*LATER>>>>
3 X                X 2  200    40-WD-058              GL-D        UT                                            UT exams    every  2 RFO'.
Pipe-to-Tcc            88-01                                                    t t LATER>> t 3 X                X 260500    40-WD-059                GL-D        VT                                            UT cxams    every  2 RFO's.
Tcc-to-Valve 40-10      88-01                                                    t>>IATER>>t X              X 260900    40-WD-060                GL-D        UT                                            UT exams    every  2 RFO's.
Valve 40-10-to-Pipe      88-01                                                    t>>LATER>>t 3 X                X 261200    40-WD-061                GL-D        UT                                            UT  cvcry  2 RFO's.
Pipe- to-Elbow          88-01                                                    t>>LATER>>t X              X 261400    40-WD-062                GL"D        VT                                            VT  every  2 RFO's.
Elbow-to-Pipe            88-01                                                    t<<LATER>>t X              X 261800    40-WD-063                GL-D        VT                                            UT exams    cvcry  2 RFO's.
Pipe-to-Elbow            88-01                                                    **LATER>>t 3 X                X
 
DATE: 10/15/99                          NINE MILE POINT NUCLEAR PIANT UNZT 1                              PAGE: 167 REVISION:        0                        INSERVZCE ZNSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray E NUMBER:  40.0                                                                          PRESERVZCE YEAR INSPECTION INTERVAL                    PZAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                            INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ ~CALIBRATION      BLOCK~ ~
262200    40-WD-064              GL-D                                                      UT exams      every  2 RFO's.
                                                                                            ~ '~ IATER~ ~
Elbow-to-Pipe          88 01 3 X                X 262500    40-WD-065              GL D        UT                                            UT exams      every  2 RFO's.
Pipe-to-Elbow          88-01                                                    **ZATER**
3 X                X 263000    40-WD-066              GL-D        UT                                            UT cxams      every  2 RFO's.
Elbow-to-Pipe          88-01                                                    ~~LATER~~
X                X 263400    40-WD-067              GL-D        UT                                            UT    cvcry  2 RFO's Pipe-to-Tce            88"01                                                    ~*LATER**
3 X                X 600    40-WD 068              GL-D        UT                                            UT exams      every  2 RFO's.
Tce to-Pipe            88-01                                                    **IATER1*
3 X                X 264000    40-WD-069              GL-D        UT                                            UT exams      every  2 RFO's.
Pipe-to-Valve 40-11    88-01                                                    ~~LATER**
X  - - -    -  X 264300    40-WD-070              GL-D        UT                                            UT exams every 2 RFO>s.
88-01                                                    ~ ~ZATER~ ~
Valve 40-11-to-Pipe 3 X                X 264600    40-WD"072              GL-D        UT                                            UT exams      every    2 RFO's.
Elbow-to-Pipe          88-01                                                    ~+IATER++
3 X                X 265000    40"WD-073              GL-D        UT                                            UT cxams      every    2 RFO's.
Pipe-to-Tcc            88-01                                                      **IATER**
X  - - -      -  X 265400    40-WD"074              GL-D        UT                                            UT    every  2  RFO's.
Tec-to-Pipe            88-01                                                      ~~ZATER~~
3 X                X
 
DATE: 10/15/99                              NINE MZI E POINT NUCLEAR PLANT UNIT 1                            PAGE: 168 REVISION:          0                        INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COHPONENTS or Core Spray NUHBER:    40.0                                                                          PRESERVICE YEAR ZNSPECTION INTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEH  NO  HETH    1  2  3  4  1  2  3  4  1  2  3  4 +~CALIBRATION BLOCK*+
265800    40"WD-075                GL-D                                                      UT exams    every  2 RFO's.
Pipe-to-Pipe              88 01                                                      ~ ~LATER*~
3 X  - - -    -  X 266100    40-WD-076                GL-D        VT                                            UT axams    every  2 RFO's.
Pipe-to-Reducer          88-01                                                      **LATER++
3 X  - - -    "  X (12'x6")
266400    40-WD-077                GL D        UT                                            UT exams    every  2 RFO's.
Reducer                  88-01                                                      ~ + ZATER+ +
3 X  - - -    -  X (12" x6" )  to Pipe 266500    40-WD-077                B"J        VT                                            Examine 100%    of  weld Reducer                  B9.11      PT                                            length  ~+LATER~~
3                  X (12" x6" ) -to-Pipe
: 6. 0"  CSB (REF. DWG. NO. 12) 266600    40-WD-079                B-J        UT                                            Terminal End      ~*LATER~+
Nozzle N6B Outer Safe    B9.11      PT 3 X End-to-Elbow 266700    40-WD-079                GL-D        VT                                            Terminal End, UT exam Nozzle N6B Outcr Safe    88-01                                                      every 2 RFO's. ~*LATER~*
End-to-Elbow                                3 X  - - -    -  X 266800    40-WD-079A                GL-D        UT                                            UT exam    every  2 RFO's Nozzle    N6B Inner Safe  88-01                                                      ~~IATER+*
3 X                X End-to-Outcr Safe 266900    40-WD"079A                B-J        VT                                            Examine 100%      of weld Nozzle    N6B Znncr Safe  B9.11                                                      length  **ZATER~~
3 X End-to-Outer Safe
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 169 REVISION:        0                          ZNSERVZCE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:  40.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                -OUTAGE                          INSTRUCTIONS NUMBER      ZDENTZFICATION            ITEM  NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK+*
267000    40-WD-080                B-F                                                        Group R20, Examine 100%
Nozzle N6B-to-Inner      B5. 10                                                    of weld length **LATER**
X Safe End 267100    40-WD-080                SIL                                                        182  Butter Expansion No" zlc N6B-to-Inner      455R1S1                                                    from nozzle sido  of 3 X Safe End                                                                            weld. aaLATER+a 267200    40-WD-080                GL-D                                                      UT exams  cvcry  2 RFO's Nozzle N6B-to-Inner      88-01                                                      **LATER+*
3 X                X Safe End 267300    40-WD-081                B-D                                                        Group R20,  56% CRV N6B  Nozzle-to-Vcsscl    B3. 90                                                    ,Limitation  due  to 3 X ad)acent nozzle and bioshield
                                                                                                ~~NMPI-GE-7.875~~
267400    40-WD-081-ZR              B-D                                                        Group R20,  54% CRV N6B  Nozzle Znner        B3. 100                                                    ,Limitation  duc  to 3 X Radius Section                                                                      ad)accnt nozzle and bioshicld
                                                                                                +*NMP1 GE 7.875++
2.0"  CSS  (REF. DWG. NO. 12) 267500    40-23"VB                  B-G-2                                                      Examine  in place,  when Valve 40-23 Bolting        B7.70                                                      removed  or when 3              X disasscmblcd *~N/A~*
267600    40-24-VB                  B-G-2                                                      Examine  in place,  when Valve 40-24 Bolting        B7.70                                                      removed  or when X
disassembled ~~N/A~*
 
DATE:  10/15/99                            NZNE MZLE POINT NUCLEAR PIANT UNIT 1                          PAGE: 170 REVISION:        0                          ZNSERVZCE ZNSPECTION TEN YEAR PLAN CIASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:  40. 1 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATE GY    NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK**
267700    40. 1-25-VB              B-G-2                                                      Removed Crom schedule  as Valve 40-25              B7.70                                                      Class 2, and less than 2.0~ diameter.  *~N/A~*
267800    40. 1-WD-001            B  J                                                        *AN/Al0 Sock-0-let -to-Pipe      B9. 21 3 X 267900    40. 1-WD-002            B-J                                                        Terminal End, +*N/A++
Pipe-to-Valve 40-19      B9.21 X
268600    40.1-WD"009              B-J                                                        Terminal End <<*N/A*>>
Valve 40-22-to-Pipe      B9. 21 3              X 0    40. 1-WD-011            B-J                                                        ~+N/A~*
Tce-to-Pipe              B9. 21 3              X 268900    40. 1-WD-012            B-J                                                        Terminal End iiN/A++
Pipe-to-Valve 40-23      B9.21 3              X 270300    40.1-WD-026              B-J                                                        f*N/A%1 Tec-to-Pipe              B9.21 3                            X 270400    40.1-WD-027              B-J                                                        +*N/A**
Pipe<<to-Elbov            B9. 21 3                            X 271200    40. 1-WD-035            B-J                                                        Tcrmnal End **N/A~~
Pipe-to-Valve 40-20      B9.21 3                            X
 
DATE: 10/15/99                                NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 171 REVISION:          0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS or Core Spray NUMBER:    40.1 INSPECTION INTERVAL                      PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA            CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK**
1 . 0" CSS  (REF. DWG. NO. 12) 271400    40.1  WD  037            B-J        PT                                            Terminal End *~N/A~~
Pipe-to-Valve 40-24        B9. 21 3
271500    40. 1-WD-038                B-J        PT                                            Terminal End ~~N/Ai~
Valve 40-24 -to-Pipe        B9. 21 3                            X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 172 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PZAN CLASS 1 SECTION XZ SCHEDULED COMPONENTS d Poison NUMBER:  42. 1 ZNSPECTZON INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 >>*CALIBRATION BLOCK>>>>
1.5" Liquid Poison Line  (REF. DWG. NO. 14) 271700    42. 1-02-VB            B-G-2        VT-1                                            >>>>N/A>>>>
Valve 42. 1-02 Bolting  B7. 70 3 X 271800    42. 1-03-VB            B-G-2        VT-1                                            **'N/A>>*
Valve 42.1-02 Bolting  B7.70 3              X 271900    42. 1-R1-A                          VT 3                                          Code Caso N-491-1 Spring Hanger          Fl. 10                                                    >>>>N/A>>>>
3 X 272800    42. 1-WD-005            B-J                                                        Examine 100%  of weld Pipe- to-Elbow          B9. 21                                                    length **N/A**
3                            X 0    42. 1-WD-006            B"J          PT                                            Examine 100% of wold Elbow-to-Pipe          B9. 21                                                    length **N/A>>>>
3 X 273500    42.1-WD-017            B-J          PT                                            Terminal End >>>>N/A>>>>
Valve                    B9. 21 3 X 42.1-02-to-Reducer 273800    42.1-WD-026              B-J          PT                                            Terminal End, Examine Valve 42.1-01-to-Pipe    B9.21                                                      100% of weld length 3 X
                                                                                              >>>>N/A>>>>
274100    42.1-WD-029              B-J          PT                                            Examino 100% of weld Pipe-to-Elbow            B9. 21                                                    length >>>>N/A>>>>
3 X 274600    42. 1-WD-034            SZL                                                        Augmcnetd UT and PT    to Safe End-to-Nozzle N12 571                                                          dotermincd>>>>IATER>>>>
3                            X
 
DATE:  10/15/99                          NINE MILE POZNT NUCLEAR PLANT UNIT 1                          PAGE: 173 REVZSZON:        0                        INSERVICE INSPECTION TEN YEAR PLAN I      CLASS 1 SECTION XZ SCHEDULED COMPONENTS d Poison NUMBER:    42. 1 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD
 
==SUMMARY==
 
NUMBER EXAMINATION AREA        CATEGY    NDE                OUTAGE                          INSTRUCTIONS IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK~~
274700    42. I-WD-034            B-F                                                      Group R41, Terminal End Safe End-to-Nozzle N12 B5.20                                                        Examine 100% of weld 3 X length ~~N/A**
274800    X-131 Penetration        F-A        VT-3                                          Code Casa N-491-1 System Anchor Point    F1.10                                                    1 tN/A1*
3              X
 
DATE: 10/15/99                            NINE MILE POZNT NUCLEAR PIANT UNIT 1                          PAGE: 174 REVISION:        0                        INSERVZCE INSPECTION TEN-YEAR PZAN CZASS 1 SECTION  XI SCHEDULED COMPONENTS ol Rod  Drive NUMBER:    44. 1 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        ZNSTRUCTZONS NUMBER    IDENTIFICATION          ZTEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK**
3.0" Control  Rod Drive Line  (REF. DWG. NO. 18) 275000    44.1-H1                F-A          VT-3                                          Code Case N-491-1 Spring Hanger            Fl. 10                                                    +*N/A+*
3                            X 275300    44. 1-SC-1              F-A        VT-3                                          Code Casa N-491-1 Pipe Clamp              F1.10                                                      1tN/Ait 3 X 275500    44.1-WD-001              B"J                                                        Terminal End, Examine Valve 44-189 -to-Pipe    B9 21
                                        ~                                                      100% of wold length 3 X
                                                                                              **N/A+*
275600    44.1-WD-002              B-J          PT                                            Examine 100%  of weld Pipe-to-Elbow            B9. 21                                                    length ~*N/A**
3 X 00    44. 1-WD-003            B-J                                                        Examine 100% of weld Elbow-to-Pipe            B9. 21                                                    length. ~~N/A**
3 X 275900    44.1-WD-005              B-J                                                        Examino 100%  of wold Elbow-to-Pipe            B9. 21                                                    length. **N/A**
3 X 276900    44.1-WD-015              B-J                                                        Examine 100% of weld Pipe-to-Elbow            B9.21                                                      length ~+N/A*~
3 X 277000    44.1-WD-016              B-J        PT                                            Terminal End ++N/A++
Elbow-to-Safe End (N9) B9.21 X
277100    44. 1-WD-017              B-F        PT                                            Group R40, Examine 100%
N9  Safe End -to-Nozrlc  B5 20
                                      ~                                                      of weld length ~*N/A**
3 X 277200    44.1-WD-017                                                                          Group R40 ~+ZATER*~
N9  Safe End -to-No""lc  0619 3 X
 
DATE: 10/15/99                              NINE MZLE POINT NUCLEAR PLANT UNIT 1                            PAGE: 175 REVISION:            0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CZASS 1 SECTION XZ SCHEDULED COMPONENTS ol Rod  Drive NUMBER:    44. 1 INSPECTION INTERVAL                    PLAN STATUS              PRESERVZCE YEAR ASME                PIRST        SECOND        THIRD SEC. XZ              PERIOD      PERIOD        PERIOD
 
==SUMMARY==
EXAMINATION AREA            CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      ZDENTIFICATION              ITEM NO    METH    1  2  3  4  1  2  3  4    1  2  3  4  +~CALIBRATION BLOCK*~
277300    44. 1-WD-017                SZL                                                      Group R40, Inconel 182 N9  Safe End -to-Noz  lc  455R1S1                                                  Butter Expansion from 3 X nozzle side of weld.
                                                                                                  **LATER**
277400    44.1-WD-018                B-D        UT                                            Group R40,    63% CRV N9  Nozzle-to-Vcssol      B3.90                                                    Limitation duc to 3 X bioshicld ~+LATER*~
277500    44 . 1 "WD-018-IR          NUREG        UT                                            Group R40, ~iIATERii N9    Nozzle-to-Vessel      0619        RUT X
277600    44. 1-WD-018-ZR            B-D                                                        Group R40,    48% CRV, N9    Nozzle Inner Radius B3.100                                                      I imitation due to 3 X Section                                                                                bioshicld    ~iLATERi+
3.0" Control    Rod Drive Line    (REF. DWG. NO. 19) 277800    44.3-12-VB                  B-G-2      VT 1                                          10 Studs 20 Nuts, Valvo 44-3-12 Bolting      B7.70                                                      Examine  in place,  when removed  or  when disassembled    **N/A**
277900    44.3-13-VB                  B-G-2      VT-1                                          Examine  in place,  when Valve 44-3-13 Bolting      B7. 70                                                    removed  or  when 3 X disasscmblcd. ~*N/A~~
278000    44.3-189-VB                B  G-2      VT-1                                          Examine 10 studs and 20 Valve 44-189 Bolting        B7.70                                                      nuts, in place,    when 3                            X removed  or  when disassembled ~~N/A++
278100    44. 3-WD-093                B-J                                                        Terminal End ~~N/Ai~
Pipe-to-Valve 44-3-12      B9 21
                                          ~
3                            X
 
DATE: 10/15/99                            NINE MZLE POINT NUCLEAR PLANT UNIT 1                          PAGE: 176 REVISION:        0                        INSERVICE INSPECTION TEN YEAR PIAN CIASS 1 SECTION XI SCHEDULED COMPONENTS ol Rod  Drive NUMBER:  44. 3                                                                        PRESERVICE YEAR INSPECTION ZNTERVAL                      PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          ZNSTRUCTIONS NUMBER    ZDENTIFICATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~~CALIBRATION BLOCK~*
278200    44.3-WD"094            B-K          PT                                            Code Case N-509 ~~N/A'~
Valve 44.3-12 Integral B10 40~
3              X AttachrN:nt 278500    44.3-WD-111            B  J                                                      Examfne 100%  of weld Valve 44.3-13 -to-Pipe B9.21                                                      length  ~~N/A~+
X
 
NINE MILE POINT                            NMP1-ISI-003-10 Y NIAGARA                            NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL              Rev. 0 TEN-YEAR INSERVICE INSPECTION                Date:  October 15, 1999 PLAN AND SCHEDULE 5.0  CLASS 2 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.
02.0        Main Steam System                                                                177 thru 179 03.0        Main Steam System                                                              .. 180thru181 39.0        Emergency Condenser System                                                    .. 182 thru 196 44.2        Control Rod Drive System                                                      .. 197 thru198 80.0        Reactor Containment Spray System                                              .. 199 thru 210 81.0        Reactor Core Spray System  ~                                                      211 thru 222 93.0        Reactor Containment Spray System                                                  223 thru 225 File: NMP1ISIPL.wpd
 
f, DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 177 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 02. 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
 
NUMBER EXAMZNATZON AREA          CATE  GY    NDE                  OUTAGE                        INSTRUCTIONS ZDENTZFZCATZON          ZTEM NO      METH    1  2  3            3 4  1  2    4  1  2  3  4  4*CALIBRATION BLOCK~*
: 18. 0" MSA (REF. DWG. NO. 3) 284000      02-MS-H10                F-A          VT-3                                            Code Case N-491-1 Spring Hanger            Fl. 20                                                      ++N/A~*
3              X 284100    02-MS-Hll                              VT 3                                            Code Case N-491-1 Spring Hanger            Fl . 20                                                      41N/AI4 3              X
: 24. 0"  MSB (REF. DWG. NO. 3) 286400    02-SR-1A                  F-A          VT-3                                          Code Case N-491-1 Seismic Restraint        Fl . 20                                                      ~~N/A~*
3            X 286500    02 "SR-1A-WD-001. 1      C C                                                          1-1/4"x 14xl'-4"  Lug ,
Integral Attachment      C3. 20                                                      Code Case N-509  **N/A**
3            X 286600      02-SR-1A-WD-001. 11      C-C                                                          Code Case N-509  **N/A**
Integral Attachment      C3.20 3              X 286700    02-SR-1A-WD-001 . 13      C-C                                                          Code Case N-509 +AN/Aee Integral Attachment      C3.20 3              X 286800    02-SR-1A-WD-001.15        C-C          MT                                            Code case N-509 ~~N/A~~
Integral Attachment      C3. 20 3              X 286900    02-SR-1A-WD-001.3        C C          MT                                              Code Case N-509 +~N/A~~
Integral Attachment      C3. 20 3              X 287000    02-SR-1A-WD-001.5        C-C          MT                                              Code Case N-509 ~+N/A++
Integral Attachment      C3. 20 3              X
 
DATE:  10/15/99                              NINE HZLE POZNT NUCLEAR PLANT UNIT 1                          PAGE: 178 REVISION:          0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS Steam System NUHBER:    02. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASHE                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUHBER      IDENTIFICATION            ZTEH NO    METH          3                              4 4CALZBRATION BLOCK~ ~
1  2    4  1  2  3  4  1  2  3  4 287100      02-SR-1A-WD-001. 7      C-C          HT                                            Code Case N-509 ++N/Ai+
Integral Attachment      C3.20 3            X 287200    02-SR-1A-WD-001. 9      C C          MT                                            Code Case N-509  **N/A**
Zntegral Attachment      C3.20 3            X
: 24. 0" HSA (REF. DWG. NO. 3) 290800    02"WD-041                C-F-2        PT                                            **N/A%*
Branch Connection        C5. 81 3              X (24 "x18" Header)
: 24. 0"  HSB (REF. DWG. NO. 3) 02-WD-073                C-F-2        UT                                              **NMP1-24-080-CS*~
Tcc-to-Pipe              C5.51        HT 3              X 293400      02"WD-078                C-F-2        UT                                              ~'~NMP1-24-080-CS~*
Pipe-to-Elbow            C5.51 3              X
: 18. 0"  MSA (REF. DWG. NO. 3) 294000      02-WD-182                C" F-2      UT                                              ~~NMPI-18-. 937-CS-106*~
Rct-to-Pipe                C5. 51 3                            X 294100    02-WD-190                  C-F-2        UT                                              ++NHP1-18-.937-CS-106**
Pipe-to-180 dcg Ret        C5.51        HT 3
294500    02-WD-329                  CF2UT                                                      Terminal End Pipe-to-Turbine Stop      C5 ~ 51      PT                                            ~+NHP1-18-.937-CS-106**
3 X Valve
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 179 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam System NUMBER: 02'.0 INSPECTION INTERVAL                    PLAN STATUS            PRE SERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD
 
==SUMMARY==
 
NUMBER EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK*'~
294600    02-WD-330              C-F-2                                                    Terminal End Pipe-to-Turbine Stop    C5. 51                                                    ~ ~NMP1-18". 937-CS-106**
3 X Valve
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 180 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Stcam NUMBER:  03. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    ZDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  ++CALIBRATION BLOCK~*
: 16. 0" MSS  (REF. DWG. NO. 4) 294900    03-H1                                  VT 3                                          Code Case N-491-1 Pipe Anchor              Fl . 20                                                    *+N/A+'
3 X 295000    03-Hl-WD-001. 1          C-C                                                        Code Case N-509 *~N/A+*
Integrally Welded        C3.20 3 X Attachment 295100    03-Hl WD-001.2          C C                                                        Code Caso N-509 ~~N/A~~
Integrally  Welded      C3. 20 3 X Attachment 295200    03-H1-WD-001.3          C C                                                        Code Case N-509 ~~N/A~~
Integrally Welded        C3.20 3 X Attachment 295300    03-Hl-WD-001. 4          C-C                                                        Coda Case N-509 ++N/A++
Integrally Welded        C3.20 3 X Attachment 295700    03-H3                    F-A                                                        Coda Case N-491-1 Rod Hanger              F1.20                                                      ftN/Att 3 X 297800    03-WD-001                CF2UT                                                      Examine 100%  of weld Tec-to-Pipe              C5.51        MT                                            length  ~ *PZR-I . 24-1 ~ ~
3              X 299400    03-WD-020                C-F-2        UT                                            Examine 100% of weld Pipe-to-Elbow            C5.51        MT                                            length * ~ PZR-1 . 24-1**
3 X
 
DATE: 10/15/99                            NINE HZLE POINT NUCLEAR PIANT UNIT 1                        PAGE: 181 REVISION:        0                          ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS Steam NUMBER:  03. 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVZCE YEAR ASHE                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
 
NUMBER EXAHINATION AREA IDENTIFICATION CATEGY ZTEH NO NDE METH
                                                          ------OUTAGE------                      ZNSTRUCTIONS 1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK*~
299700    03-ND-023              C-F-2        MT                                            Terminal End, Examine Tee-to-Valve Hanifold  C5 ~ 51      UT                                            100% of weld length 3                            X          **NMP ISW 1020 CSiPIR-1.
24-1**
300800    Valve Manifold 03-1    F-A          VT-3                                          Tuxbine By-Pass Valve Hanifold 03-1    F1.40                                                      Hanifold, Code Case X          N-491-1 ~~N/A~i
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 182 REVISION:        0                          ZNSERVZCE INSPECTION TEN"YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ency Condenser Heat Exchanger 122 NUMBER:    39.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 + +CALIBRATION BLOCK*~
EC  Heat Exchanger 60-42 (REF. DWG. NO. 11) 303300    60-42-WD-001            N/A        UT                                            This weld was replaced Hx 60-42                N/A        PT                                            by 60-42-WD-001 Nozzle-to-Inlet  Head                                                              **LATER**
303400    60-42-WD-001C1          C-B                                                        **IATER**
Hx 60-42                C2.21 3              X Nozzle-to-Inlet  Head 303600    60"42"WD-002C1          C-A                                                          ~~LATER~~
Hx 60-42  Inlet          C1.30 3              X Head-to Tube Shcct 800    60-42-WD-005C1          C-A Hx 60-42 Tube            C1. 30 X
Sheet-to-Outlet  Head 303900    60-42-WD-006C1          C-B        UT                                              ~~LATER~~
Hx 60-42 Outlet          C2.21      PT 3 X Head-Nozzle
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 183 REVISION:        0                            ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Return NUMBER:  39.0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                -OUTAGE                          INSTRUCTZONS NUMBER      IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK++
10.0"  ECC Line (REF. DWG. NO. 11A) 305500    39"H2                    F A          VT-3                                          Code Case N-491-1 Spring Support            Fl . 20                                                    i 0 N/Al0 3                            X 305600    39-H2-WD"001C1          C-C                                                          Code Case N-509 **N/A~~
Integral Attachment      C3.20 3                            X 305700      39-H2-WD-003C1          C C                                                          Code Case N-509 ~*N/A*~
Integral Attachment      C3.20 3                            X 305800      39-H2"WD-005C1          C-C                                                          Code Case N-509 +*N/A++
Integral Attachment      C3.20 3                            X 0    39-H2-WD-007C1          C C                                                          Code Case N-509.~*N/A~i Integral Attachment      C3.20 3                            X 306000    39-H27                    F A          VT-3                                          Code Case N-491-1 Spring Hanger            F1. 20                                                      ++N/A+*
3              X 307300    39-H4                                                                                  Code Case N-491-1 Spring Hanger            F1.20                                                        ~~N/A~~
3                            X 307400    39-H4-WD-001C1            C-C                                                          Code Case N-509 +~N/Ai~
Integral Attachment      C3.20 3                            X 307500    39-H4-WD-004C1            C"C                                                          Code Case N-509 ++N/A++
Integral Attachment      C3.20 3                            X 307600    39-H4-WD-007C1            C C          PT                                            Code Case N-509    **N/A**
Integral Attachment      C3. 20 3                            X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 184 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ancy Condenser Return NUMBER: 39. 0 INSPECTION INTERVAL                      PLAN STATUS            FRESERVICE YEAR ASME                FIRST        SECOND      THZRD SEC. XI              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
 
NVMBER EXAMINATION AREA IDENTIFICATION CATEOY ITEM NO NDE METH
                                                          ------OUTAOE------                        INSTRUCTIONS 1  2  3  4  1  2  3  4  1  2  3  4  ~+CALIBRATION BLOCK~*
307700    39-H4-WD-010C1          C-C                                                        Code Case N-509 ~*N/A~*
Integral Attachment      C3.20 3                            X 313500    39-WD-178-D            C-F-1                                                      Code Casa N-524 Pipe-Long  Seam        C5. 12                                                      **ZATER*~
3 X 313600    39-WD-178C1            C-F-1        UT                                            Examine 100%  of weld Hx 60-46 Outlet        C5. 11      pT                                            length  ~~ZATER~+
3 X Nozzle-to-Pipe 313800    39"WD-179-D            C-F 1      VT                                            Code Casa N-524 Elbow-Long Scam (60    C5.12        pT                                            +~ZATER*~
3                            X dcg. LR) 0    39-WD-179-U              CF1                                                        Code Casa N-524 Pipe-Long  Seam          C5. 12                                                    ~*LATER~+
3                            X 314000    39-WD-179C1              C-F 1                                                        +~LATER*~
Pipe-to-Elbow            C5. 11 3                            X 314500    39-WD-181                C-F-1      VT                                            Examine 100%  of weld Pipe-to-Tcc              C5. 11      PT                                            length  ~~ZATER~~
3 X 314600    39-WD-181-D              C-F-1                                                      Coda Case N-524 Pipe>>Long Seam          C5. 12                                                    **IATER**
3 X 314700    39-WD-181-U              C-F-1      VT                                            Code Case N-524 Teo-Long Seam            C5.12      pT                                            *+LATER+'~
3 X 315200    39-WD-183-D            C-F-1        UT                                            Code Case N-524 Pipe-Long  Seam        C5. 12      pT                                            *~LATER~~
3              X
 
0 DATE: 10/15/99                          NINE MIIE POINT NUCLEAR PLANT UNIT 1                          PAGE: 185 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS gency Condenser Return E NUMBER:  39.0          INSPECTION INTERVAL                                            PRESERVZCE YEAR PLAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERZOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFZCATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK*+
315300    39-WD-183-U            C-F-1                                                    Code Case N-524 Elbow-Long Seam (60    C5.12                                                    *~LATER~*
X deg LR) 315400    39-WD-183C1            C-F" 1      UT                                            Examine 100%    of weld Elbow-to-Pipe          CS. 11      PT                                            length  +~LATER+~
3 - - - -      X 315700    39-WD-184-D            C-F-1                                                    Code Case N-524 1 t LATER' Elbow-Long Seam (60deg  CS. 12 3 X LR) 315800    39-WD-184-U            C-F-1      UT                                            Code Case N-524 Pipe-Long  Seam        CS. 12      PT                                            **IATER~~
3 X 900    39-WD-184C1            C-F-1                                                    Examine 100%    of weld Pipe-to-Elbow          CS. 11                                                    length  ~~ZOSTER~*
3 X 316100    39-WD 185 D            C F 1                                                    Code Caso N-524 Pipe-Long Weld          C5.12                                                    **LATER**
3                            X 316200    39-WD-185C1            C-F-1      UT                                            Examine 100% of weld Hx 60-45 Nozrlc        C5. 11      PT                                            length **LATER**
3                            X Outlet-to-Pipe 319300    39-WD-211C1            GL-A        UT                                            Examined 100%    of weld Pipe-to-Elbow (60dcg    88-01                                                    length    ~~LATER**
X LR) 319900    39-WD-213              C-F-1      UT                                            Examine 100%    of weld Pipe-to- Tec            CS. 11      PT                                            length    *~LATER~*
3 X
 
DATE:  10/15/99                          NINE MZLE POINT NUCLEAR PIANT UNZT 1                          PAGE: 186 REVZSZON:        0                        ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condcnscr Return INSPECTION INTERVAL                      PIAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA      CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION        ITEM NO    METH    1  2  3 4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK~+
320000    39-WD-213-D            C  F1                                                      Coda Casa N-524 Tcc-Long  Seam        C5.12                                                      ~+IATER++
3 X 320100    39-WD-213-U            CF1                                                        Code Casa N-524 Pipe-Long Scam        C5. 12                                                    111ATERA*
3 X 321400    39-WD-217-D            C-F-1      UT                                            Codo Casa N-524 Pipe-Long  Scam        C5. 12      PT                                            ~~LATER**
3              X 321500    39-WD-217C1            C-F-1                                                      Examine 100% of weld Hx 60-42 No@tie        C5.11                                                      length ~+IATERi~
3              X Outlet-to-Pipe 0    39-WD-224-D            C-F-1      UT                                            Code Case N-524 Pipe-Long  Seam        C5. 12      PT                                            **LATER**
3                            X 323600    39-WD-224-U            C-F 1                                                      Code Case N-524 Pipe-Long  Seam        C5. 12                                                    *~LATER~~
3                            X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 187 REVISION:        0                        INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS cncy Condenser Supply NUMBER:  39.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD SVMMARY    EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTZFICATZON          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *~CALIBRATION BLOCK~ ~
12.0"  ECC Linc (REF. DWG. NO. 11) 323900    39-WD-012              CF1UT                                                      Examine 100%  of weld Reducer-to-Pipe        CS. 11      PT                                            length **IATER**
3 X 324400    39-WD-014              GL-D        VT                                              **IATER~*
Pipe-to-Pipe            88-01 3 X  - - -    -  X 324700    39"WD-016              GL-D        VT                                              <<~IATER**
Pipe-to-Pipe            88 01 3 X                X 325100    39-WD-017              GL-D        UT                                            UT exam  every  2 RFO's.
Pipe-to-Pipe            88-01                                                      i~ZATER~~
X                X 0    39 WD-020              GL D        UT                                            UT exam  cvcry  2 RFOis.
Pipe-to-Pipe            88-01                                                      +~IATER*~
3 X                X 325900    39-WD-021              C-F 1        VT                                            Examine 100%  of weld Pipe-to-Tee            C5.11        PT                                            length  ~~LATER*~
3                            X 326000    39-WD-021              GL-D        UT                                            UT exam  avery  2 RFO's Pipe-to-Tee            88-01                                                      ~*NMP-12-XXI-SS**
3              X              X 326100    39-WD-021-D              C-F-1        UT                                            Code Case N-524 Tcc-Long Scam            C5.12                                                      ++IATER~~
3                            X 326200    39-WD-021-U              C-F-1      VT                                            Code Case N-524 Pipe-Long  Seam        C5.12        PT                                            **IATER**
3                            X 326300    39-WD-022                C-F-1                                                      Examine 100%  of wold Tcc-to-Pipe              CS. 11      PT                                            length **IATER**
3              X
 
0 DATE: 10/15/99                          NINE MIZE POINT NUCLEAR PLANT UNIT 1                          PAGE: 188 REVZSZON:        0                        INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA      CATEGY      NDE                OUTAGE                          ZNSTRUCTIONS NUMBER    IDENTIFICATION        ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK**
326400    39-WD-022              GL-D                                                      UT exam every 2 RFO's Tcc-to-Pipe            88-01                                                      ++LATER++
X                X 326500    39-WD-022-D            C-F-1        UT                                            Code Case N-524 Pipe-Long  Seam        C5.12        PT                                            **LATER*l 3              X 326600    39-WD-022-U            C-F-1                                                      Code Case N-524 Tcc-Long  Seam        C5.12                                                      **IATER++
3              X 326700    39-WD-024              C-F-1                                                      Examine 100%    of weld Tcc-to-Pipe            C5. 11                                                    length  ~~LATER~~
3              X 326800    39-WD-024              GL-D        UT                                            UT exam  every  2 RFO's Tcc-to-Pipe            88-01                                                      **LATER**
3 X                X 326900    39-WD-024-U            C-F-1                                                      Code Case N-524 Tcc-Long  Seam        C5. 12                                                    **ZATER**
3              X 327000    39"WD-025              GL-D        UT                                            UT exam every 2 RFO~s Elbow-to-Pipe          88-01                                                      ~~LATER~~
3 X      - -  -    X 327100    39-WD-025              C-F-1                                                      Examine 100%    of weld Elbow-to-Pipe          C5. 11                                                    length  ~+ZATER~~
3              X 327200    39-WD-025-D            C-F-1                                                      Code Case N-524 Pipe-Long  Seam        C5.12                                                      **LATER**
3              X 327400    39-WD-026              GL-D        UT                                            UT exam  every  2 RFO's Pipe-to-Pipe            88-01                                                      + + LATER~ +
3 X                X
 
NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 189 DATE: 10/15/99 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION  XI SCHEDULED COMPONENTS cncy Condenser Supply E NUMBER: 39.0                                                                              PRESERVZCE YEAR INSPECTION ZNTERVAL                      PZAN STATUS ASME                FIRST          SECOND      THZRD PERIOD        PERIOD      PERIOD SEC. XZ
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                  OUTAGE                          ZNSTRUCTZONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1    2  3  4  1  2  3  4 ~*CALIBRATION BLOCK**
327800    39-WD-027                GL D      UT                                              UT exam cvcry 2 RFO's 88-01                                                      +~LATER~~
Pipe-to-Pipe 3 X                  X 328300    39-WD"029-D              C-F-1      UT                                            Code Case N-524 Elbow-Long Seam          C5. 12      PT                                            ~*LATER**
3                            X 328400    39-WD-029-U              C-F-1                                                      Code Case N-524 C5. 12                                                    ++LATER*+
Pipe-Long  Seam 3                            X 328500    39-WD-029C1              C  F1                                                      Examine 100%    of weld Pipe-to-Elbow            C5.11                                                      length  ~~LATER~*
3                            X 800    39-WD-030                  GL-D      UT                                            UT exam    every  2 RFO's Elbow-to-Pipe              88-01                                                    **LATER*~
3 X                  X 329200    39-WD-033                  N/A                                                      UT  every 2 RFO's, This Pipe-to 60-46    EC Hx    N/A                                                      weld no longer exists, 3                X            X          Thcrcforc ZGSCC Category Nozzle Znlct D  no longer  applicable.
                                                                                                *+LATER**
329700    39-WD-034                  GL-D      UT                                              Examine cvcry 2 RFO's
                                                                                                ~ ~ZATER~ ~
Pipe-to-Pipe              88 01 3 X                  X 330000    39-WD-035                GI-D      UT                                              UT exam  every  2 RFO's Pipe-to-Pipe              88-01                                                      +~LATER+*
3 X                  X 330500    39"WD-037                N/A                                                        UT exam  cvcry 2 RFO's, Pipe-to-Elbow            N/A                                                        This weld no longer 3 X  - - -      -  X                  exists  *~LATER**
 
DATE:  10/15/99                            NZNE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 190 REVISION:        0                        INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION  XI SCHEDULED COMPONENTS cncy Condenser Supply NUMBER:  39.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA      CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION        ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK>>>>
330600    39-WD-037-D            C-F-1                                                      Code Case N-524 Elbow-Long Seam        CS. 12                                                      >>>>LATER>>>>
3                  X 330700    39-WD-037-U            C-F  1      UT                                            Coda Case N-524 Pipe-Long Scam        C5. 12      PT                                            >>*LATER>>>>
3                  X 330800    39-WD-037C1            CF1UT                                                      Examine 100% of weld Pipe-to-Elbow          C5. 11                                                      length >>*IATER*>>
3                  X 330900      39-WD-037C1            GL-A        UT                                              **LATER>>>>
Pipe-to-Elbow          88-01 3                  X 3  000    39-WD-038              C-F-1        UT                                            Examine 100%  of weld Elbow- to-Pipe          C5. 11      PT                                            length  >>>>LATER>>>>
3                  X 331100    39-WD-038              GL-D        UT                                            UT exam  every  2 RFO's Elbow-to-Pipe          88-01                                                      >>*LATER**
3 X  - - -    -  X 331300    39-WD-038-U            C" F-1      UT                                            Code Case N-524 Elbow-Long Scam        C5. 12      PT                                            >>>>LATER>>>>
3                  X 331400    39-WD-041              N/A                                                        UT exam  cvcry 2 RFO's, Pipe-to-Hx 60-45        N/A                                                        This weld was cut out, 3
Nozzle  Inlet                                            X            X ZGSCC Cat. D no longer applies **LATER>>>>
331500    39-WD-041              N/A                                                        This weld was cut out, Pipe-to-Hx  60 45      N/A                                                        Replaced by 39-WD-041C1 3
Nozzle  Inlet                                                          X          *>>LATER>>>>
 
DATE: 10/15/99                          NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 191 REVISION:        0                        ZNSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS ency Condenser Supply E NUMBER:  39.0        INSPECTION INTERVAL                                            PRESERVZCE YEAR PLAN STATUS ASME                  FIRST        SECOND      THIRD PERIOD      PERIOD      PERIOD XI
 
==SUMMARY==
EXAMINATION AREA SEC.
CATEGY ITEM NO NDE METH
                                                      ------OUTAGE------                        INSTRUCTIONS
                                                                                          >><<CALIBRATION BLOCK>>>>
NUMBER    IDENTIFICATION                            1  2  3  4  1  2  3  4  1  2  3  4 331700    39-WD-041C1          C  F-1                                                    Examine 100% of weld Pipe-to-Hx 60-45      CS. 11                                                    length >>*LATER**
3                            X Nozzle  Inlet 331800    39-WD-041C1          GL-A        UT                                              **LATER>><<
Pipe-to-Hx 60-45      88-01 3                            X Nozzle  Inlet 331900    39-WD-100            C-F-1                                                      Examine 100%    of weld Reducer to-Pipe      C5. 11                                                    length  >>>>ZATER>>>>
3 X 332000    39-WD-100            GL A        UT                                              **LATER>>>>
Reducer-to-Pipe      88-01 3 X 00    39-WD-102            GL-D        UT                                            VT exam  every  2 RFO's Pipe-to-Pipe          88-01                                                      >>*LATER**
3 X                X 332800    39-WD" 104            GL D        VT                                            VT cvcry 2 RFO's Pipe-to-Pipe          88-01                                                      >>>>LATER>><<
3 X                X 333200    39-WD-105            GL-D        UT                                            UT exam  every  2 RFO's Pipe-to-Pipe          88-01                                                      **LATER**
3 X                X 333600    39 "WD-108            GL-D        UT                                            UT exam  cvcry  2 RFO's Pipe-to-Pipe          88-01                                                      **LATER>>>>
3 X                X 334000    39-WD-109            GL-D        UT                                            VT exam every 2 RFO's Pipe-to-Tec          88-01                                                      >>>>LATER>><<
3 X                X 334300    39"WD-110            C-F-1                                                      Examine 100%  of weld Tce-to-Pipe          C5. 11                                                      length  >>>>LATER>>>>
3 X
 
DATE: 10/15/99                        NINE MILE POZNT NUCLEAR PLANT UNIT 1                          PAGE: 192 REVISION:        0                      ZNSERVZCE INSPECTION TEN-YEAR PLAN CZASS 2 SECTION  XI SCHEDULED COMPONENTS cncy Condenser Supply E NUMBER: 39.0                                                                        PRESERVICE YEAR ZNSPECTION INTERVAL                    PZAN STATUS ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA      CATEGY      NDE                  OUTAGE                        ZNSTRUCI'ZONS NUMBER    IDENTIFZCATZON        ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~*CALIBRATION BLOCK~~
334400    39-WD-110            GL-D      UT                                            UT exam every 2 RFO's Tcc-to-Pipe          88"01                                                    ~+LATER~+
3 X                X 334500    39-WD-110-D          C-F-1                                                    Coda Case N-524 Pipe-Long  Seam      C5. 12                                                    ~~ZATER~~
3 X 334600    39-WD-110-U          C-F-1                                                    Code Case N-524 Tco-Long Scam        C5.12                                                    4*IATERt*
3 X 334800    39"WD"112            GL D        UT                                            UT exam  cvcry  2 RFO's Tec-to-Elbow          88-01                                                    *OIATER**
3 X                X 100    39-WD-113            C-F-1                                                    Examine 100%    of weld Elbow-to-Pipe        C5. 11                                                    length  ~~LATER**
X 335200    39-WD-113            GL-D        UT                                            UT exam  every  2 RFO's Elbow-to-Pipe        88-01                                                    ~ ~ZATER~ ~
3 X                X 335300    39-WD-113-D          C  F-1                                                    Code Case N-524 Pipe-Long  Scam      C5. 12                                                    **ZATER*~
3                  X 335400    39-WD-113-U          C  F-1                                                    Code Case N-524 Elbow-Long Scam      C5. 12                                                    ~~LATER~~
3                  X 335600    39-WD-114            GL-D        UT                                            UT exam  every  2 RFO's Pipe-to-Pipe          88-01                                                    **ZATER*+
3 X                X 336000    39-WD-115            GL-D        UT                                            UT exam  cvcry  2 RFO's Pipe-to-Elbow        88-01                                                    **LATER+*
3 X                X
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PZANT UNIT 1                          PAGE: 193 REVISION:        0                          ZNSERVICE ZNSPECTION TEN YEAR PLAN CIASS 2 SECTION XI SCHEDULED COMPONENTS ency Condcnscr Supply NUMBER:    39.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XZ,            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  +~CALIBRATION BLOCK+~
336300    39-WD-117              N/A                                                        This weld was cut out, Pipe"to-Elbow          N/A                                                        Replaced by 39-WD-117C1 3                            X          **ZATER**
336400      39-WD-117              N/A                                                        VT exam  every 2 RFO's.
Pipe-to-Elbow          N/A                                                        This weld no longer 3              X              X exists,  ZGSCC Cat. D no longer applies **LATER~*
336500      39-WD-117-D            C-F-1        UT                                            Code Case N-524 Elbow-Long Scam        C5. 12      PT                                            ~~LATER*i 3                            X 336600      39-WD-117-U            CF1                                                        Code Case N-524 Pipe-Long  Seam        C5. 12                                                      ~+IATER++
3                            X 336700    39-WD-117C1              C  F-1                                                      ++LATER+*
Pipe- to-Elbow          C5. 11 3                            X 336800    39-WD-117C1              GL-A        VT                                              ~*LATER**
Pipo-to-Elbow            88-01 3                            X 337000    39-WD-118                GL"D        VT                                            VT  every  2 RFO's Elbow-to-Pipe            88-01                                                      4 PLATER**
3 X  - - -    -    X 337500    39-WD-121-U              C-F"1        UT                                            Coda Case N-524 Pipe-Long    Seam        C5. 12                                                      *+IATER**
3 337600    39-WD-121C1              C  F-1      VT                                            Examine 100% of weld Pipe-to    Hx 60-42      C5. 11      PT                                            length i+LATER~i 3
Nozzle  Inlet                                                            X
 
NINE MILE POINT NUCLEAR PIANT UNIT 1                            PAGE: 194 DATE:  10/15/99 REVISION:        0                        INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION    XI SCHEDULED COMPONENTS cncy Condensor Supply NUMBER: 39. 0                                                                            PRESERVICE YEAR INSPECTION INTERVAL                      PIAN STATUS ASME                  FIRST        SECOND        THIRD PERIOD        PERIOD        PERIOD SEC. XI
 
==SUMMARY==
EXAMINATION AREA      CATEGY      NDE                  OUTAGE                          INSTRUCTZONS NUMBER      IDENTIFICATION        ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *~CALIBRATION BLOCK~~
GL-A                                                          ~+LATER*~
337700    39-WD-121C1 Pipo-to-Hx 60-42      88-01 3                            X Nozzle  Inlet 337800    39-WD-122              C-F-1        UT                                              Examine 100%    of weld Pipe- to-Elbow        C5. 11      PT                                              length  +'~LATER+*
3  - - - -      - - - -      X 39-WD-122              GL-D        UT                                              UT exam    every  2 RFO's 337900 88-01                                                        ~ ~ LATER**
Pipe- to-Elbow 3 X                X 338300    39-WD" 123            GL-D        UT                                              UT exam    every  2  RFO's Pipe-to-Pipe            88-01                                                      **LATER~+
3 X  - - -      -  X 0    39-WD-124              GL-D        UT                                              UT exams    every  2 RFO's 88-01                                                      ~ ~IATER*+
Pipe-to-Elbow 3 X                  X 339000    39-WD-125              C-F-1                                                      Examine 100%    of weld Elbow-to-Pipe          C5.11                                                      length    ~+LATER~+
3                X 339100      39-WD-125              GL-D        UT                                              UT  every 2 RFO's Elbow-to" Pipe          88 01      PT                                              ~~NMP-12-XX1-SS**
3  - - - -      X            X 339200      39-WD 125-D            C-F-1                                                        Coda Case N-524 Pipe-Long Seam        C5.12                                                        ~~LATER~~
3              X 339300      39-WD-125"U            CF1                                                          Codo Case N-524 Elbow-hong Scam        CS. 12                                                      ~~LATER*+
3              X 339600      39-WD-127-D            C-F-1                                                        Code Case N-524 Elbow-Long Scam        C5. 12                                                      ~~IATER~~
3 X
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 1 95 REVISION:          0                          ZNSERVICE INSPECTION TEN YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS gcncy Condenser Supply NUMBER: 39.0 INSPECTION INTERVAL                      PZAN STATUS              PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
 
NUMBFR EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK~*
339700      39-WD" 127-U              C-F"1                                                      Coda Case N-524 Elbow-Long Seam          C5.12                                                      *~LATER*~
X 339800      39-WD-127C1              C-F  1                                                      Examine 100%  of weld Pipe-to-Elbow            CS. 11                                                      length  ~~ZATER~~
3 X 340100      39-WD-128                GL-D        UT                                            UT  cvcry 2 RFO's Elbow-to-Pipe            88 "01                                                      +*IATER++
3 X                X 340500      39-WD-129                GL-D        UT                                            UT exam  every  2 RFO's Pipe-to-Pipe              88-01                                                        **LATER*4 3 X                X
: 12. 0"  ECC Linc (REF. DWG. NO. 11A) 0    39-H21                    F-A          VT-3                                          Codo Case N-491-1 Spring Hanger            Pl. 20                                                      *AN/A4*
3 X 341800      39 "H22                  F-A          VT-3                                          Coda Case N-491-1, 4 Spring Hanger              F1. 20                                                      Lugs ~~N/A~*
3 X 341900      39-H22-WD-001              C-C                                                        Code Case N-509 +~N/A**
Integral Attachment        C3.20 3 X 342000      39-H22-WD-004            C-C                                                          Coda Casa N-509    **N/A**
Integral Attachment      C3.20 3 X 342100      39-H22-WD-007            C C                                                          Code Case N-509 ++N/A**
Integral Attachment      C3. 20 3 X 342200    39-H22-WD-010              C-C                                                          Code Case N-509 **N/A~~
Integral Attachment      C3.20 3 X
 
DATE: 10/15/99                        NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 196 REVISION:        0                      INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION  XI SCHEDULED COMPONENTS ency Condenser Supply NUMBER:  39.0 INSPECTZON INTERVAL                    PLAN STATUS            PRESERVZCE YEAR FIRST        SECOND      THIRD SEC. XI            PERIOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA      CATEGY    NDE                  OUTAGE                        ZNSTRUCTIONS NUMBER    IDENTZFZCATZON        ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 e eCALIBRATION BLOCK*a 342300    39-H25                F A        VT 3                                          Code Case N 491  1 Spring Hanger        F1.20                                                    l 4N/A1
* 3 X
 
DATE:  10/15/99                                NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 197 REVISION:          0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS ol Rod  Drive NUMBER: 44 . 2 INSPECTION INTERVAL                        PLAN STATUS              PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
 
NUMBER EXAMINATION AREA          CATEGY        NDE                OUTAGE                            INSTRUCTIONS IDENTIFICATION              ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  ++CALIBRATION BLOCK~*
10.0"  CRD Line  (REF. DWG. NO. 17) 346400    44.2-H2                    F-A          VT-3                                            Code Case N-491-1 Sway Brace                  Fl. 20                                                        *ON/A**
3 X 347000      44.2-H9                                                                                  Code case N-491-1 Spring Hanger              Fl  ~ 20                                                      t 1N/A1 t 3 X 350200      44.2-SB-1                                                                                Code Case N-491-1 Sway Brace                F1.20                                                        **N/A*+
3 X 350700      44.2-SB-6                  F-A                                                          Code Casa N 491-1 Sway Brace                Fl . 20                                                      *+N/A+~
3                            X 6.0"  CRD  Line  (REF. DWG. NO. 17) 352500    44.2-WD-045                C-F-2        UT                                              Examine 100% of weld Pipe-to<<Cap                C5. 51        PT                                              length **IATER~~
3              X 10.0"  CRD  Zinc  (REF. DWG. NO. 17) 353000      44.2-WD-085                C-F-2        MT                                            Examine 100%    of weld Elbow-to-Reducer            C5.51        UT                                            length 3
                                                                                                    **NMP 1SW-1020-CS, P1R- . 6 00-1~~
353100      44.2-WD-086                C-F-2          UT                                            Examine 100%    of weld Pipe-to-Elbow              C5.51          PT                                            length    **LATER~~
3 X 353600    44.2-WD-092                C-F-2          MT                                            Examine 100%    of weld Pipe-to-Tcc                CS. 51        UT                                            length 3
                                                                                                    ~+NMP-1SW 1020 CS, P1R-. 6 00-1~*
 
DATE: 10/15/99                            NINE HZLE POINT NUCLEAR PIANT UNIT 1                          PAGE: 198 REVISION:        0                        ZNSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION  XI SCHEDULED COMPONENTS ol Rod  Drive NUHBER:    44.2 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD SUHHARY NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEM NO NDE METH
                                                          ------OUTAGE------                        ZNSTRUCTIONS 1  2  3  4  1  2  3  4  1  2  3  4 *+CALIBRATIONBLOCK~+
8.0"  CRD Line (REF. DWG. NO. 17) 353900    44.2-WD-096              C-F-2      UT                                            Examine 100% of weld Reducer-to-Elbow          C5.51      PT                                            length **LATER**
3 X 8.0"  CRD Line (REF. DWG. NO. 17A) 357500    44.2-WD"432              C-F-2      UT                                            Examine 100%  of weld Pipe-to-Elbow            C5.51      PT                                            length  ~~LATER~~
3                X
 
DATE:  10/15/99                              NINE MILE POZNT NUCLEAR PLANT UNZT 1                          PAGE: 199 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS or Containment Spray NUMBER:  80.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THZRD SEC. XZ                PERZOD        PERZOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  +*CALIBRATION BLOCK+ +
16.0"  RCS Line (REF. DWG. NO. 15) 358000    80-09                    ZEB          VT-3                                          Examine  strainer for CTMT. Spray Suction      96-03                                                      debris every outage.
Strainer                                    3 X  - - -    X    X                    *+N/A+*
12.0"  RCS Line (REF. DWG. NO. 15) 358600    80-H12                  F A          VT-3                                          Code Case N-491-1 Seismic Restraint        Fl . 20                                                    *+N/A++
3 X 358700    80-H12-WD-001            C-C          MT                                            Code Case N-509 ~*N/A**
Integral Attachment      C3. 20 3 X 80-H12-WD-004            C C          MT                                            Code Case N-509 ~~N/A~~
Integral Attachment      C3.20 3 X 358900    80-H12-WD-007            C-C          MT                                            Code Case N-509 **N/A~~
Integral Attachment      C3.20 3 X 359000    80-H12-WD-010            C-C                                                        Code Case N-509 ~~N/A~~
Integral Attachment      C3 ~ 20 3 X 359100    80-H14                    F-A                                                        4 Lugs, Code Casa Spring Hanger            F1.20                                                      N-491-1 *+N/A+~
3 X 359200    80-H14-WD-001            C-C                                                        Code Case N-509 ~~N/A+~
Integral Attachment      C3.20 3 X 359300    80-H14-WD"004            C-C                                                        Code Case N-509 ~*N/A~*
Zntegral Attachment      C3.20 3 X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 200 REVISION:        0                          ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER:  80. 0 ZNSPECTZON INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK**
359400    80-H14-WD-007            C-C        MT                                            Code Case N-509 +~N/Aii Integral Attachment      C3.20 3 X 359500    80-H14-WD-010            C-C                                                      Code Case N-509 ~*N/A+*
Integral Attachment      C3.20 3 X 359900    80-H20                  F A                                                      Code Case N-491-1 Rod Hanger              F1.20                                                    f%N/A**
3 X 360500    80-H46                  F-A                                                      Code Case N-491-1 Rod Hanger              Fl. 20                                                    ++N/A+~
3 X 360600    80-H46-WD-001            C-C                                                      Code Case N-509  **N/A**
Integral Attachment      C3. 20 3 X 362800    80-SC-14                            VT-3                                          Code Case N-491-1 Seismic Restraint        F1.20                                                    1*N/A*4 3                            X 362900    80-SC-14-WD-001          C-C                                                      Code Case N-509 ~~N/A~~
Integrally Welded Lug    C3 20
                                      ~
3                            X 363000    80-SC-14-WD-002          C-C                                                      Code Case N-509 ~~N/A~~
Integrally Wcldcd Lug    C3.20 3                            X 363100    80-SC-14-WD-003          C-C                                                      Code Case N-509 ~~N/A*~
Integrally Welded Lug    C3.20 3                            X 363200    80-SC-14-WD-004          C-C                                                      Code Case N-509 ~~N/A**
Integrally Welded Lug    C3.20 3                            X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 201 REVISION:        0                        INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER:  80. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ++CALIBRATION BLOCK*~
363300    80-SC-14-WD-005        C-C                                                        Code Case N-509 ~~N/A~~
Integrally Welded Lug  C3. 20 3                            X 363400    80-SC-14-WD-006        C-C                                                        Code Case N-509 ~iN/A++
Integrally Welded Lug  C3.20 3                            X 363500    80-SC-14-WD-007        C-C                                                        Code Case N-509 *+N/A*+
Integrally Welded Lug  C3.20 3                            X 363600    80-SC-14-WD-008        C C                                                        Code Case N-509 ++N/A+<
Integrally Welded Lug  C3. 20 3                            X 80 SR 47                                                                          Code Case N-491-1 Seismic Pipe Restraint F1.20                                                        0 1M/A1 1 3 X 367100    80-88-1                            VT-3                                          Code Case N-491-1 Sway  Strut            F1.20                                                      ~~N/A~~
3 X 367200    80-SS-2                            VT-3                                          Code Case N-491-1 Sway  Strut            F1.20                                                      t*N/A*I 3 X 367800    80-WD-008              C-F"2                                                      Examine 100%    of weld Flange-to-Pipe          C5.51                                                      length    ~*LATER~~
3              X 368300    80-WD-017                C-F 2      UT                                            Examine 100%    of weld Pipe-to-Elhow            C5. 51      MT                                            length    ~~LATER~~
3              X 368400    80-WD-019                C-F-2                                                      Examine 100% of weld Pipe-to-Flange          C5.51                                                      length ~~IATER~*
3              X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 202 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER: 80.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION  BLOCK~ '~
369000    80-WD-026                C-F-2                                                      Examine 100% of weld Pipe- to-Elbow            C5. 51                                                    length **LATER**
3            X 370800    80-WD-046                C-F-2                                                      Examine 100%    of weld FE-to-Pipe                C5. 51                                                    length  +~ZATER~~
3            X 372200    80-WD-062                C-F-2        UT                                            Examine 100%    of weld Reducer-to-Nozrle        C5. 51      MT                                            length  ~~LATER~~
3              X 373700    80-WD-082                C-F-2                                                      Examine 100% of weld Pipe-to-Elbow            C5.51                                                      length 1tLATERt1 3              X 16.0"  RCS Linc (REF. DWG. NO. 15A)
II oo          80-30 CTMT. Spray Suction IEB 96-03 VT-3                                          Examine    strainer outage for debris each Strainer                                    3 X  - - -    X    X  - -    X          t*N/A*4 12.0"  RCS Linc (REF. DWG. NO. 15A) 374900    80-H30                                                                              Code Case N-491-1 Spring Support            Fl. 20                                                    **N/A*~
3              X 375000    80-H30-WD-001            C-C                                                        Code Case N-509 +~N/A~*
Integral Attachment      C3.20 3              X 375100    80 H30 WD-004              C-C                                                        Code Case N-509 +iN/A+i Integral Attachment        C3.20 3              X 375200    80-H30-WD-007              C-C                                                        Code Case N-509 +AN/Ate Integral Attachment        C3.20 3              X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 203 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containmcnt Spray NUMBER:  80.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK'~~
375300    80-H30-WD-010          C-C          MT                                            Code Case N-509  +~N/Aii Integral Attachment    C3. 20 X
375600    80-H34                                                                              Code Case N 491 1 Spring Hanger          F1.20                                                      *~N/A+*
3            X 375700    80-H34-WD-001          C-C          MT                                            Code Case N-509 *~N/A~*
Integral Attachment    C3.20 3              X 375800    80-H34-WD-004          C-C          MT                                            Code Case N-509  **N/A*t Integral Attachment    C3. 20 3              X 80-H34-WD-007          C-C          MT                                            Code Case N-509 *wN/A+~
Integral Attachment    C3. 20 3              X 376000    80-H34-WD-010          C-C          MT                                            Code Case N-509 ~+N/A~~
Integral Attachment    C3. 20 3              X 376100    80-H36                  F A                                                        Code Case N 491 1 Spring Hanger          F1. 20                                                      ktN/A4t 3              X 376200    80-H36-WD-001          C-C                                                        Code Case N-509 *~N/A*~
Integral Attachment    C3.20 3              X (West Side) 376300    80-H36-WD-002          C-C                                                        Code Case N-509 ~~N/A~~
Zntegral Attachment    C3.20 3              X (East Side) 376800    80-H59                  F-A          VT 3                                          Code Case N-491-1 Spring Hanger            Fl . 20                                                    1 *N/A1*
3              X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 204 REVISION:        0                          INSERVICE INSPECTION TEN YEAR PLAN CLASS 2 SECTION  XI SCHEDULED COMPONENTS tor Containment Spray NUMBER:  80.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTZFZCATZON          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK++
376900    80-H59-WD-001          C C          MT                                            Code Case N-509 +~N/A~~
Integral Attachment    C3. 20 3              X 377000    80-H60                  F-A          VT 3                                          Code Case N-491-1 Spring Hanger          Fl . 20                                                      ~~N/A~~
3              X 377100    80-H60-WD-001          C C                                                        Code Case N-509 **N/A**
Integral Attachment    C3.20 3              X 388900    80-WD-144              C-F-2        UT                                            Examine 100%  of weld Pipe-to-Rcduccr        C5.51        MT                                            length **P1R-.375-2' 3                            X 391100    80-WD-169              C-F"2                                                      Terminal End, Examine Valve 80-31            C5.51                                                      100% of weld length 3
          -to-Reducer                                                                        ~ ~NMP-ISW-1020-CS
                                                                                                                  )
PIR-.375-ae 391300    80-WD-171              C-F-2        MT                                            Terminal End, located No""le-to-Reducer      C5.51        UT                                            inside floor grating, 3                            X          Examine 100% of weld length
                                                                                              "~NMP-ISW-1020-CS,NMP2-2 0  5%*
391400    80-WD-172              C-F-2        UT                                            located inside floor Reducer-to-Pipe          C5.51        MT                                            grating    Examine 100% of X
weld length
                                                                                              ~~PZR-.375-2++
391800    80-WD-176              C-F-2                                                      Examine 100%  of weld Pipe-to-Tcc            C5.51                                                      length 3                            X          ~~NMP-ZSW-1020-CS)
P1R  .375-~i
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PIANT UNIT 1                          PAGE: 205 REVISION:        0                            ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION  XI SCHEDULED COHPONENTS tor Containmcnt Spray NUMBER:  80.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAHZNATION AREA          CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUHBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  +*CALIBRATION BLOCK*'~
392000    80-WD-178                C-F 2                                                      Examine 100%    of weld Pipe-to-Elbow            C5.51        MT                                            length ~~PZR-.375-2, NHP-ZSW-1020-C~~
393100    80-WD-194                C-F-2                                                      Examine 100% of weld Elbow-to-Pipe            C5.51                                                      length ~~PZR-.375-2~~
3                            X 16.0"  RCS Linc (REF. DWG. NO. 15B) 393300    80-10                    ZEB          VT-3                                          Examine  strainer  each CTHT. Spray  Suction      96-03                                                      outage for debris Strainer                                    3 X  - - -    X  X  - -    X          r*N/A+a 12.0"  RCS Linc (REF. DWG. NO. 15B) 00    SO-SC-20                  F-A          VT-3                                          2  Lugs , Coda Case Seismic Box Restraint    Fl ~ 20                                                    N-491-1 ~+N/A~~
3              X 400200    80-SC-20-WD-001          C C                                                        Code Case N-509 ~~N/A+*
Integral Attachment,      C3. 20 3              X 400300    80-SC-20-WD-004          C"C                                                        Coda Caso N-509 ~~N/A~~
Integral Attachment      C3.20 3              X 400400    80-SC-20-WD-007            C-C          MT                                            Coda Caso N-509 ~~N/A~i Integral Attachment      C3.20 3              X 400500    80 SC-20-WD-011            C C          MT                                            Code Case N-509 ~~N/Ai~
Integral Attachment        C3. 20 3              X 400600    80-SC"20-WD-015            C-C          MT                                            Code Case N-509 *~N/A*+
Integral Attachment        C3. 20 3              X
 
DATE:  10/15/99                              NINE MILE POINT NUCLZAR PLANT UNIT 1                            PAGE: 206 REVZSZON:        0                            ZNSERVZCE ZNSPECTION TEN YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS tor Containment    Spray NUMBER:  80. 0 INSPECTZON INTERVAL                      PLAN STATUS            PRESERVICE YEAR AS ME                FIRST        SECOND      THIRD SEC. XZ              PERI OD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION  BLOCK~ ~
405200    80-SR-50                  F-A        VT-3                                          Code Case N-491-1 Seismic Pipe Restraint F1.20                                                          a aN/PP t X
406500    80-WD-233                  C-F-2                                                      Examine 100%    of weld Elbow-to-Pipe              C5.51                                                      length ~~PIR-.375-2~*
3 X 407500    80-WD-245                  C-F-2      UT                                            Examine 100%    of weld Elbow-to-Pipe              C5. 51      HT                                            length ~~PIR-.375-2~~
3 X 408100    80-WD-251                  C-F-2                                                      Examine 100%    of weld Pipe-to-Reducer            C5.51                                                      length ~~PIR-.375-2~~
3 X 80-WD-281                  C-F-2      UT                                            Examine 100%    of weld Pipe-to-Tce                C5. 51      HT                                            length ~~PIR-.375-2~~
X 411400    80-WD-287                  C-F 2                                                      Examine 100%    of weld Tcc-to-Pipe                C5.51                                                      length ++PIR-.375-2++
3                            X 6.0"  RCS  Linc  (REF. DWG. NO. 15B) 411500    80 "WD-290-A              C F-2      MT                                            Examine 100%    of wold 6.0~ Branch Connection C5.81                                                          length    ~~N/A~~
3 X 16.0"  RCS  Linc  (REF. DWG. NO. 15C)
'412700      80-29                      IEB                                                        Examine    strainer  Each CTMT. Spray Suction      96-03
                                                                - - -            - -              outage  for debris Strainer                                      X            X    X        X          eeN/Aea
 
DATE:  10/15/99                              NINE HYLE POINT NUCLEAR PLANT UNIT 1                        PAGE: 207 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER:  80.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASHE                  FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD SUHHARY    EXAHZNATZON AREA          CATEGY        NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCKi i 12.0"  RCS  Line (REF. DWG. NO. 15C) 413200    80-H28                                VT-3                                          4 Lugs, Code Case Spring Support            Fl. 20                                                    N-491-1 ++N/A**
3                            X 413300    80-H28-WD-001            C-C                                                        Code Case N-509 ~~N/A~*
Integral Attachment      C3.20 3                            X 413400    80-H28-WD-004            C-C                                                        Code Case N-509 +~N/Ai+
Integral Attachment      C3.20 3                            X 413500    80-H28-WD-007            C-C          MT                                            Code Case N-509 ~*N/A~i Integral Attachment      C3. 20 3                            X 00    80-H28-WD-010            C-C          MT                                            Code Case N-509 i~N/A~~
Integral Attachment      C3.20 3                            X 419400    80 SS 3                  F-A          VT"3                                          Code Case N-491-1 Sway  Strut              Fl . 20                                                    t*N/Atf 3                            X A
419900    80 WD"338                C-F-2                                                      Examine 100%  of wold Pipe-to-Flange            C5. 51                                                    length ~~PIR-.375-2**
3 X 422100    8()-WD-363                C-F-2                                                      Examine 100%  of weld Pipe-to-Elbow            C5.51                                                      length **PZR-.375-2*i 3 X 12.0"  RCS  Line (REF. DWG. NO. 15D) 427600    80-H88                    F A          VT 3                                          Code Caso N-491-1 Spring Support            Fl . 20                                                    *+N/A++
3                            X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 208 REVISION:                                    INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION  XI SCHEDULED COHPONENTS tor Containmcnt  Spray NUMBER:  80.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ZTEH NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 '~ +CALIBRATION BLOCK*'~
6.0"  RCS Line  (REF. DWG. NO. 15D) 433400    80-SS-15                  F-A                                                        Code Case N-491-1 Sway  Strut              F1.20                                                      +*N/A**
3 X 433600    80-88-6                                                                              Code Case N-491-1 Sway  Strut              F1.20                                                      lkN/Aft 3 X 433700    80-88-7                                                                              Code Case N-491-1 Sway  Strut              F1. 20                                                    eeN/Aea 3 X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 209 REVZSION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTZON XZ SCHEDULED COMPONENTS tor Containment Spray Heat Exchanger 122
  ~ NUMBER:    80.0 INSPECTION ZNTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *4CALIBRATION BLOCK**
RCSHE  80-13 (REF. DWG. NO. 15A) 438500    80-13                    F A          VT 3                                        Coda Casa N-491-1 Hx Support              F1. 40                                                    *+N/A++
3 X 438600    80-13-WD-001            C-B          MT                                          H02 ++N/A++
Hx 80-13                C2. 11 3
Nozzle-to-Vessel 438700    80-13-WD"002            C-C          MT                                          H02, Coda Casa N-509 Hx  80-13 Integral      C3.10                                                      +*N/A*+
3                            X Attachment Inlet 80-13-WD-004            C-B          MT                                          H02 s+N/A+a Hx 80-13                C2.11 3                            X Vessel-to-Noz le 439000    80-13-WD-005            C-A          UT                                          H02 **NMP2-24-.500-CS*i Hx  80-13                C1.30 3                            X Tubcshcct-to-Shell Inlet 439100    80-13-WD-006            C-A          UT                                          H02 ~~NMP2-24-.500"CS~+
Hx  80-13                C1. 30 3                            X Tubcshcct-to-Shell Outlet
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 210 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XI SCHEDULED COMPONENTS tor Containment Spray    Pump 121 NUMBER:  80. 0 INSPECTION ZNTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ ~CALIBRATION BLOCK~ ~
RCSP  80-03 (REF. DWG. NO. 15) 442600    80-03                    F-A        VT-3                                          Code Case N-491-1 Pump  Support            F1. 40                                                    1tN/At%
3 X 442900    80-03-WD-003              C-F-2      MT                                            Terminal End ~~N/A~~
Pipe-to-Casing            CS. 81 3                            X 443100    80-03-WD-005              C-G          PT                                            0 lN/A**
Upper Head-to-Shaft      C6.10 3              X Channel 443200    80-03-WD-006                                                                          **N/A*t t
Shaf Channel-to-Shaf    t C6.10 3              X Guide 443300    80-03-WD-007              C"G                                                        P03 ~*N/A~~
Upper Casing-to-Head      C6.10 X
443400    80-03-WD-008              C-G                                                        P03 +~N/A**
Upper Casing-to-Flange    C6.10 3 X 443900    80-03-WD-013              C-G                                                        P03 atN/Aas Upper Casing Long Weld C6.10 3              X
 
DATE: 10/15/99                                  NINE MILE POINT NUCLEAR PLANT UNIT 1                                    PAGE: 211 REVISION:        0                                      ZNSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COHPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION    INTERVAL'SME PLAN STATUS            PRESERVICE YEAR FIRST      SECOND      THIRD SEC. XZ                          PERIOD      PERIOD      PERIOD SUMHARY NUMBER EXAMINATION AREA IDENTIFICATION CATEGY ITEH  NO NDE METH
                                                                      ------OUTAGE------                          INSTRUCTIONS 1    2  3 4 1  2  3  4  1  2  3  4  +~CALIBRATION BLOCK**
12.0"  CS Line (REF. DWG. NO. 13) 446000    58-SC-1                    F A                                                                Code Case N-491-1 Pipe Restraint            Fl. 20                                                              aaN/Ant 3 X 446100    58-SC-1-WD-001            C C                    MT                                            Code Case N-509 ~~N/Ai~
Integral Attachment      C3.20 3 X 446200    58-SC-1-WD-002            C-C                    MT                                            Code Case N-509 ~~N/A~~
Integral Attachment      C3. 20 3 X 446300    58 SC-1-WD-003            C C                    MT                                            Code Case N-509 ~~N/A+*
Integral Attachment      C3. 20 3 X 00    58-SC-1-WD-004            C-C                                                                  Code Case N-509 ~~N/A~+
Integral Attachment      C3. 20 3 X 16.0"  CS Line (REF. DWG. NO. 13) 447000    81-05                    IEB                    VT-3                                          Examine      strainer  each Suction Strainer          96-03                                                                outage      for debris X            X  X        X          i IN/AIi 447100    81-06                    ZEB                    VT-3                                          Examine      strainer  each Suction Strainer          96-03 outage      for debris X            X  X        X          1 0 'N/AP +
447200    81"24                      ZEB                    VT 3                                          Examine      strainer  each Suction Strainer          96-03
                                                                        - - -                            outage      for debris X            X  X        X          ++N/A++
447300    81-25                      IEB                    VT-3                                          Examine      strainer  each Suction Strainer          96-03
                                                                        -  - -        - -              outage      for debris 3 X            X  X        X          i~N/A~~
 
DATE: 10/15/99                                NINE MZLE POINT NUCLEAR PIANT UNIT 1                        PAGE: 212 REVISION:        0                              INSERVZCE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER:  81. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERZOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA            CATEGY      NDE                OUTAGE                        ZNSTRUCTZONS NUMBER      IDENTIFICATION              ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  *>>CALIBRATION BLOCK>>>>
12.0"  CS Li.nc (REF. DWG. NO. 13) 453900    81-H10                      F-A          VT-3                                        Coda Case N-491-1 Spring Hanger              Fl . 20                                                    *>>N/A**
3 X 454000    81-H10-WD-001              C-C          MT                                          Coda Case N-509 >>>>N/A>>>>
Spring Hanger    Integral  C3.20 3 X Attachment 454300    81-H12                      F-A                                                        Code Case N-491-1 Pipe Stanchion              F1.20                                                      **N/A**
3                            X 454400    81-H12-WD-001              C-C                                                        Coda Casa N-509 >>>>N/A>>>>
Pipe Stanchion              C3.20 3                            X 00    81 H14                                                                                Code Case N 491-1 Rod Hanger                  F1.20                                                      **N/A>>>>
3                            X 454800    81-H15                                  VT 3                                          Code Caso N-491-1 Rod Hanger                  Fl. 20                                                    **N/A*>>
3 X 455000    81-H15-WD-001              C-C                                                        Coda Case N-509 >>>>N/A>>>>
Rod Hangar Integral          C3.20 3 X Attachment 455100    81-H15 "WD-002              C-C                                                        Code Case N-509 >>>>N/A>>>>
Rod Hanger Zntcgral          C3.20 3 X Attachment 455200    81-H15-WD-003                C-C                                                        Code Case N-509 >>>>N/A>>>>
Rod Hanger    Integral      C3.20 3 X Attachment
 
DATE:  10/15/99                              NZNE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 213 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Cora Spray NUMBER: 81 . 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  >>>>CALIBRATION BLOCK>>>>
455300    81-H15-WD-004            C-C          MT                                            Code Case N-509 >>>>N/A**
Rod Hanger Integral      C3.20 3 X Attachment 455400    81-H15-WD 005            C-C          MT                                            Code Case N-509 >>>>N/A*>>
Rod Hanger Integral      C3.20 3 X Attachment 455500    81-H15-WD-006            C C          MT                                            Code Case N-509 >>>>N/A>> ~
Rod Hanger Zntegral      C3.20 3 X Attachment 456200    81-H34                  F"A                                                        Code Case N-491-1 Pipe Stanchion          F1.20                                                      >>*N/A**
3 X 456700    81-H34-WD-001            C-C          MT                                            Code Case N-509 >>>>N/A>>>>
Pipe Stanchion          C3.20 3 X 458700    81"H37                                VT-3                                          Code Case N-491-1 Spring Hanger            Fl . 20                                                    >>>>N/A>>>>
3              X 458800    81-H37-WD-001            C-C                                                        Code Case N-509 >>>>N/A>>>>
Integral Attachment      C3.20 3              X 458900    81-H38                  F A                                                        CoCk Case N-491-1 Spring Hanger            Fl. 20                                                      >>>>'N/A>>>>
3              X 459000    81-H38-WD-001            C-C                                                        Code Case N-509 >>>>N/A>>>>
Integral Attachment      C3.20 3              X
 
DATE:  10/15/99                                NZNE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 214 REVISION:        0                              INSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVZCE YEAR FIRST        SECOND      THIRD SEC. XZ                  PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY        NDE                OUTAGE                        INSTRUCTIONS NUMBER      ZDENTZFZCATION            ITEM    NO    METH    1  2  3  4  1  2  3 4  1  2  3  4  +*CALIBRATION BLOCK++
460100    81-H5                      F-A                                                        Code Case N-491-1 Pipe Stanchion              Fl . 20                                                    ~~N/A~~
3                            X 460600    81-H5-WD-001              C-C            MT                                            Code Case N-509 +iN/A+~
Pipe Stanchion              C3.20 3                            X 6.0"  CS  I.ine (REF. DWG. NO. 13) 460700    81-H50                    F"A            VT-3                                          Code Case N-491-1 Rod Hanger                F1.20                                                        **N/A*~
3              X 12.0"  CS  Line  (REF. DWG. NO. 13) 461600    81-Hj                      F-A            VT-3                                          Code Case N-491-1 Spring Hanger              Fl. 20                                                      +AN/Ass 3                            X 1700    81-H7-WD-001              C-C                                                          Code Case N-509 +*N/A~+
Spring Hanger Integral C3.20 3                            X Attachment 461800    81-H7-WD-002              C-C                                                          Coda Case N-509 ~~N/A++
Spring Hanger    Integral  C3.20 3                            X Attachment 461900    81-H7-WD-003              C-C                                                          Code Case N-509 ~*N/A**
Spring Hanger    Integral  C3.20 3                            X Attachment 462000    81-H7-WD-004              C C                                                          Code Case N-509 ++N/A++
Spring Hanger Zntegral C3.20 3                            X Attachment
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 215 REVISZON:        0                            ZNSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  +~CALIBRATION BLOCK~~
462100    81-H7-WD-005              C-C        MT                                            Code Case N-509 **N/A~*
Spring Hanger  Integral  C3.20 3                            X Attachment 462200    81 H7-WD-006              C-C                                                        Code Case N-509 ~~N/A~~
Spring Hanger Integral C3.20 3                            X Attachment 462300    81-H7-WD-007              C-C        MT                                            Code Case N-509 ~~N/A++
Spring Hanger  Integral  C3.20 3                            X Attachment 462500    81-HB                                  VT"3                                          Code Case N-491-1 Spring Hanger              Fl. 20                                                    **N/Ak*
3                            X 462600    81-HB-WD-001              C-C        MT                                            Code Case N-509 ~+N/A~i Zntegral Attachment        C3.20 3                            X 471300    81 "SC-21                              VT-3                                          Code Case N-491-1 S~ay Brace                F1.20                                                      ~*N/A~~
3 X 6.0"  CS  Line (REF. DWG. NO. 13) 483200    81-SC-45                  F-A          VT 3                                          Code Case N-491-1 Seismic Restraint        F1. 20                                                      esN/Aas 3                            X 483300    81-SC-46                                                                              Code Case N-491-1 Seismic Restraint        F1.20                                                      **N/A+*
3              X 483400    81-SC-47                  F-A          VT 3                                          Code Casa N-491-1 Seismic Restraint        F1.20                                                      l4N/Af4 3                            X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 216 REVISION:        0                            INSERVZCE INSPECTION TEN YEAR PLAN CLASS 2 SECTION  XI SCHEDULED COMPONENTS tor Core Spray NUMBER:  81.0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA            CATEGY    NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATZON              ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK~~
12.0"  CS  Linc  (REF. DWG. NO. 13) 484700    81 SC-51                    F-A                                                      Code Case N-491-1 Seismic Restraint          F1.20                                                    **N/A~~
3                            X 6.0"  CS  Linc  (REF. DWG. NO. 13) 486100    81-SR-4                                                                              Code Case N-491-1 Seismic Restraint          F1.20                                                    **N/A++
3              X 14.0"  CS  Line (REF. DWG. NO. 13) 487300    81-88-1                    F-A                                                      Code Case N-491-1 Sway  Strut                F1.20                                                    saN/Ate 3                            X 487400    81-SS-1-WD-001              C C                                                      Code Case N-509 aeN/Ass Sway  Strut Integral        C3.20 3                            X Attachment 487700    81-88-11                                                                              Code Case N-491-1 Sway  Strut                F1.20                                                    1*N/A4*
3 X 6.0"  CS  Lino  (REF. DWG. NO. 13) 487900    81"88-13                    F-A        VT 3                                          Code Case N-491-1 Sway  Strut                F1.20                                                    f 1N/A*t 3              X 14.0"  CS  Linc  (REF. DWG. NO. 13) 490400    81-SS 8                    F-A                                                      Code Case N-491-1 Sway  Strut                F1.20                                                    tf N/A*%
3 X 490500    81-SS-8 "WD-001              C-C                                                      Code Case N-509 ~~N/A~*
Sway  Strut Integral        C3.20 3 X Attachment
 
DATE:  10/15/99                                NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 217 A
REVISION:        0                            ZNSERVZCE INSPECTION TEN YEAR PIAN CIASS 2 SECTION XI SCHEDUZED COMPONENTS tor Core Spray NUMBER: 81 . 0 ZNSPECTZON INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAHZNATZON AREA          CATEGY      NDE                OUTAGE                            INSTRUCTIONS NUMBER      ZDENTIFZCATION            ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION    BLOCK~ ~
4 91300    81-WD-006                  C-F-2        UT                                            Terminal End, Examine Valve 81-01-to-Pipe        C5. 51      HT                                            100% of weld length 3 X                                      + ~ NHP-1 SW-1 020-CS ~ ~
492000    81-WD-013                  C-F  2                                                    Examine 100%      of weld Pipe-to-Elbow              C5. 51                                                      length 3 X                                      ~ *NMP-1SW-1020-CS~    ~
492200    81-WD-016                  C-F-2                                                      Examine 100%      of wold Pipe-to-Rcduccr            C5.51        HT                                            length 3 X (14x12")                                                                              ~*NMP-1SW-1020-CS**
12.0~  CS  Linc  (REF. DWG. NO. 13) 493000    81-WD-024                  C-F" 2      UT                                            Examine 100%      of weld Elbow-to-Pipe              C5.51                                                      length
                                                                                                  **NMP-1SW 1020"CS**
16.0"  CS  I inc (REF. DWG. NO. 13) 493300    81-WD-028                  C-F-2        UT                                            Examine 100%      of weld 81-05                      C5. 51      HT                                            length 3              X STRT-to-Reducer(12"x16                                                                +*NMP-ISW-1020-CS+~
12.0"  CS  Linc  (REF. DWG. NO. 13) 494000    81  WD 035                C-F-2        UT                                            Examine 100%      of weld Pipe-to-Reducer            C5.51        MT                                            length (12" x10")                                                                  X          ~  ~NMP-1SW-1020-CS*~
494500    81-WD-040                  C-F-2        UT                                            Examine 100%      of weld Pipe-to-Rcduccr            C5.51        HT                                            length (12" x14")                                                                            **NMP-1SW-1020-CS*+
 
DATE:  10/15/99                              NZNE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 218 REVISION:          0                          INSERVZCE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION  XI SCHEDULED COMPONENTS
    .tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALZBRATION BLOCK*~
14.0"  CS  Linc (REF. DWG. NO. 13) 494900      81  WD 044                C-F-2        UT                                            Examine 100%  of weld Pipe-to-Elbow            C5.51        MT                                            length 3 X                                      ~ +NMP-ISW-1020 "CS~ ~
12.0"  CS  Linc (REF. DWG. NO. 13) 4 96200    81-WD-058                C-F-2        UT                                            Terminal End, Examine Pipe-to-Valve 81-37      C5. 51                                                    100% of weld length 3              X                        **NMP-ISW-1020-CS*~
496600      81-WD-065                C-F-2                                                      Examine 100%  of weld Tcc-to-Flange            C5.51      MT                                            length eeNMP 1SW 1020 CS*e 00    81-WD-125                C-F-2                                                      Examine 100%  of weld Reducer-to-Flange        CS. 51                                                    length 3 X (14'x12")                                                                            **NMP-1SW-1020-CS~~
501200      81-WD-136                C-F-2      UT                                            Examine 100%  of weld Pipe-to-Reducer          C5.51                                                      length 3 X (12"x16~)                                                                            ~ ~NMP-1SW-1020-CS~*
502400      81-WD-149                CF2                                                        Examine 100%  of  weld Pipe-to-Elbow            C5.51                                                      length 3 X
                                                                                                **NMP-1SW 1020 CS++
502600    81  WD  151                C-F-2      UT                                            Terminal End, Examine Reducer-to-Pump    81-50  C5.51      MT                                            100% of weld length 3              X                        ~~NMP-ISW-1020-CS**
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 219 REVISION:        0                            ZNSERVZCE ZNSPECTION TEN-YEAR PIAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray NUMBER: 81 . 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR ASHE                  FIRST        SECOND      THIRD SEC. XI                PERZOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATZON            ITEH  NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 ~ ~CALIBRATION BLOCK*>>
14.0"  CS  Zine (REF. DWG. NO. 13) 504200    81-WD-167                C-F-2        UT                                            Examine 100%  of weld Elbow-to-Pipe            CS. 51      HT                                            length 3  - - - -    X                        ~~NMP 1SW 1020-CS~~
12.0"  CS  Linc (REF. DWG. NO. 13) 504600    81  WD 172                C-F-2        UT                                            Examine 100%  of weld Tee-to-Pipe                CS. 51      HT                                            length 3 X
                                                                                                ~~NMP-ISW-1020-CS~*
506000    81 WD-189                  C-F-2        UT                                            Examine 100%  of weld Pipe-to-Reducer          C5.51                                                      length 3                                      ~ ~NMP-1 SW-1020-CS**
 
DATE: 10/15/99                              NINE MZLE POINT NUCLEAR PLANT UNIT 1                          PAGE: 220 L
REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray Pump 121 NUMBER: 81 . 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THZRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK~~
CSP  81-03 (REF. DWG. NO. 13) 511200    81-03-WD-005            C-G                                                        P03 **N/A**
Upper Head-to-Shaf t    C6.10 3                            X Channel 511300    81-03-WD-006            C-G                                                        P03 **N/A**
Shaft Channel-to-Shaf  t C6.10 3                            X Guide 511500    81 03 WD"008            C-G                                                        P03 ~*N/A+~
Upper Casing-to-Flange  C6. 10 3                            X 512000    81-03-WD-013            C-G                                                        P03 +'~N/A++
Lower Casing Long Weld C6.10
 
DATE: 10/15/99                          NINE MILE POZNT NUCLEAR PIANT UNIT 1                        PAGE: 221
~ REVISION:                                  INSERVICE INSPECTION TEN-YEAR PLAN CIASS 2 SECTION XZ SCHEDULED COMPONENTS tor Core Spray Topping Pump 111 NUMBER: 81. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *+CALIBRATION BLOCK+ ~
CSTP  81-50 (REF. DNG. NO. 13) 514100    81-50                  F-A                                                      Code Case N-491-1 Purap Support          F1.40                                                    +AN/Ant 3 X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 222 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION  XI SCHEDULED COMPONENTS tor Core Spray NUMBER:    81. 1 INSPECTION INTERVAL                      PLAN STATUS            PRE SERVICE YEAR AS ME                FIRST        SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION            ITEH  NO  HETH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK*~
12.0"  CS Linc (REF. DWG. NO. 13) 516200    81. 1-WD-023              C-F-2        UT                                            Examine 100$  of weld Pipe-to-Flange            C5. 51      HT                                            length 3
                                                                                                **NHP 1SW-1020-CS++
517000    81.1-WD-031              C  F-2                                                      Examine 100$  of weld Elbow-to Pipe              C5. 51                                                      length 3                            X          *~ NHP-1 SW-1020-CS ~ i 518400    81. 1-WD-047              C-F-2        MT                                            Terminal End, Examine Tee-to-Valve 81-30        C5. 51      UT                                            100$ of weld length X          ~ ~NHP-1SW-1020-CS**
519400    81.1 WD-059                C-F 2                                                      Examine 100$  of weld Pipe-to-Tcc                CS. 51                                                      length 3                            X          *~NHP-ISW-1020-CS~~
 
0 0
 
DATE: 10/15/99                              NINE MIZE POINT NUCLEAR PLANT UNIT 1                          PAGE: 223 REVISION:        0                            ZNSERVICE INSPECTION TEN YEAR PZAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER:  93.0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM    NO  METH    1  2  3  4  1  2  3  4  1  2  3  4  **CALIBRATIONBLOCK+ +
12.0"  Raw Water Line (REF. DWG. NO. 16) 521400    93-R23-A                              VT-3                                          Code Case N-491-1 Rod Hanger              Fl. 20                                                      ~~N/A~+
X 521800    93-R23-E                F-A                                                          Code Case N 491-1 Rod Hanger              Fl . 20                                                      **N/A**
3            X 522000    93-R24-A                F-A          VT 3                                          Code Case N-491-1 Anchor                  Fl . 20                                                      eaN/A@a 3 X 529600    93"R27"F                F-A                                                          Code Case N-491-1 Dead Weight Support      F1.20                                                        ~~N/A**
3 X 00    93"R30                                                                                Code Case N-491-1 Rod Hanger              Fl. 20                                                      t 1N/A1k X
533400    93-SCR-9E                F A                                                          Code Case N-491-1 Seismic Box Restraint    Fl 20
                                      ~                                                        ++N/A++
3                            X 533500    93-SCR-9E-WD-001        C-C                                                          Coda Case N-509 +iN/A~+
Integral Attachment      C3.20 3                            X 533600    93-SCR-9E-WD-002        C C                                                          Code Case N-509 +*N/A++
Integral Attachment      C3. 20 3                            X 533700    93-SCR-9E-WD-003        C-C                                                          Code Case N-509 *~N/A*t Integral Attachment      C3.20 3                            X 533800    93-SCR-9E-WD-004        C-C          MT                                            Coda Case N-509 **N/A~*
Integral Attachment      C3.20 3                            X
 
0 0
 
DATE:  10/15/99                            NINE  HII E POINT NUCLEAR PLANT UNIT 1                          PAGE: 224 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 2 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER:  93.0 INSPECTION ZNTERVAL                        PIAN STATUS            PRESERVZCE YEAR ASHE                    FIRST        SECOND      THIRD SEC. XI                  PERIOD        PERIOD      PERIOD SUHMARY    EXAHINATZON AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER      ZDENTIFZCATION          ITEH  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~+CALIBRATION BLOCK' ~
533900    93-SCR-9E-WD-005        C-C          HT                                              Code Case N-509 **N/A~*
Integral Attachment      C3.20 3                            X 534000    93-SCR-9E-WD"006        C C          HT                                              Code Case N-509 *~N/A~*
Integral Attachment      C3. 20 3                            X 534100    93-SCR-9E-WD-007        C-C          HT                                              Code Case N-509 <<N/A4~
Integral Attachment      C3. 20 3                            X 534200    93"SCR"9E-WD-008        C-C                                                          Code Case N-509 ~+N/Art Integral Attachment      C3.20 3                            X 535200    93-SCR-9G                            VT 3                                            Code Case N-491-1 Seismic Box Restraint    F1.20                                                        a+N/Ate 3              X 535300    93-SCR-9G-WD-001        C-C                                                          Code Case N-509 *~N/A~~
Integral Attachment      C3.20 3              X 535400    93-SCR-9G-WD-002        C-C                                                          Code case N-509 ++N/A%a Integral Attachment      C3.20 3              X 535500    93-SCR-9G-WD-003        C-C                                                          Code Case N-509 ~~N/A~*
Integral Attachment      C3.20 3              X 535600    93 SCR 9G-WD-004        C-C                                                          Code Case N-509 <<~N/A**
Integral Attachment      C3.20 3              X 535700    93-SCR-9G"WD-005        C-C                                                          Code Case N-509 ~~N/A~*
Integral Attachment      C3.20 3              X
 
DATE: 10/15/99                            NINE MILE POZNT NUCLEAR PIANT UNZT 1                          PAGE: 225 REVISION:          0                        INSERVICE INSPECTION TEN-YEAR PIAN CLASS 2 SECTION  XI SCHEDULED COMPONENTS tor Containmcnt Spray NUMBER:    93.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD SUMHARY    EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION BLOCK~ ~
535800    93-SCR-9G-WD-006        C-C        MT                                            Code Case N-509 *~N/A~~
Integral Attachment    C3.20 3              X 535900    93-SCR-9G-WD"007        C C        MT                                            Code Case N-509 ~*N/A~i Integral Attachment    C3. 20 3              X 536000    93-SCR-9G-WD"008        C-C                                                        Code Case N-509 ~*N/A~*
Integral Attachment    C3.20 3              X 542200    93-WD-055              C-F-2      UT                                            Examine 100%  of weld Valve 93-72 -to-Pipe    C5.51      HT                                            length 3 X
                                                                                              **NHP 1SW 1020-CS++
    ~00    93. 1-WD-005            C-F-2                                                      ExamLnc 100%  of weld Elbow-to-Pipe          CS. 51                                                    length i~PZRP.375-2**
3 543900    93.1-WD-012            C-F-2      UT                                            Examine 100%  of weld Pipe-to-Elbow          C5.51      MT                                            length 3                                        + ~NMP-ISW-1020-CS*~
544700    93.1-WD-020            C-F-2                                                      Examine 100%  of weld Pipe-to-Elbow          C5.51                                                      length ~*PZR-.375-2, 3                            X          94-6007+~
544900    93. 1-WD-022            C-F-2      HT                                            Pipe  restraint Elbow-to-Valve 93-52    CS. 51                                                    interfercncc, scan in 3                            X both directions to achieve 100% CRV.
                                                                                              *~94-6007iPZR-.375-2~*
545200    93.1-WD-028              CF2UT                                                      Examine 100%  of weld Pipe-to-Valve 93-71      C5.51      HT                                            length *~PZR-.375-2*~
3                            X
 
NINE MILE POINT                            NMP1-ISI-003-10 EI T NIAGARA                            NUCLEAR POWER STATION H kJ MOHAWK THIRD INSERVICEINSPECTIONINTERVAL                Rev. 0 TEN-YEAR INSERVICE INSPECTION                Date:  October 15, 1999 PLAN AND SCHEDULE 6.0  CLASS 3 INSERVICE INSPECTION PLAN TABLES This section contains the Long Term Ten-Year Inservice Inspection Examination Tables for nondestructive examinations of selected systems and components for the Second Inservice Inspection Interval.
38.0        Shutdown Cooling Water System                                                  226 thru 226 39.0        Emergency Condenser System                                                    227 thru 227 54.0        Spent Fuel Pool Cooling System                                                228 thru 235 57.0        Spent Fuel Pool Cooling System                                                236 thru 236 70.0        Reactor Building Closed Loop Cooling System                                    237 thru 242 72.0        Emergency Service Water System                                                243 thru 244 93.0        Reactor Containment Spray System                                              245 thru 248 File: NMP1ISIPL.wpd
 
0 DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNZT 1                        PAGE: 226 REVISION:        0                          INSERVICE INSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS down Cooling Water Heat Exchanger      11 NUMBER:  38.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ++CALIBRATION BLOCK'~+
SDCW HX  38-129 (REF. DWG. NO. C-26855-C7) 548000    38-129-WD-001            D-A        VT-1                                          Code Case N-509, Examine SDC Hx  Front Support    D1.10                                                      100% of weld length 3                            X          ~~N/A+~
548100    38-129-WD-002            D-A                                                        Code case N<<509, Examine SDC Hx Roar Support      D1. 10                                                    100% of weld'ength X          ttN/Ail SDCW HX  38-135 (REF. DWG. NO. C-26855-C7) 548200    38-SDC-HX-11                                                                        Code Case N-491-1 SDC  Heat Exchanger      F1.40                                                      +~N/A~~
3                            X Support
 
DATE: 10/15/99                              NINE MILE POZNT NUCLEAR PLANT UNIT 1                        PAGE: 227 REVISION:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS gency Condenser Heat Exchanger 122 NUMBER:  39.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4 i*CALIBRATIONBLOCK**
ECHE  60-42 (REF. DWG. NO. 11A) 550100    60-42-WD-007                          VT 1                                          Code Case N-509 ~~N/A~~
North Saddle-to-Shell    Dl. 10 3                            X Weld 550200    60-42-WD-008            D-A                                                        Code Case N-509 ~~N/A+*
Center Saddle-to-Shell  D1.10 3                            X Weld 550300    60-42-WD-009            D-A          VT-1                                          Code Case N-509 **N/A**
South Saddle-to-Shell    Dl . 10 3                            X Weld 550400    HX-60-42                                                                            Code Case N-491"1 Heat Exchanger Support Fl 40 ~                                                      **N/A*~
X
 
DATE: 10/15/99                              NINE MILE POZNT NUCLEAR PLANT UNIT 1                          PAGE: 228 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel  Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVICE YEAR FIRST          SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2 3  4    1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK~ ~
6.0" Spent Fuel Pool Cooling Line      (REF. DWG. NO. C-27171-C) 551200    54-R1-B                  F A                                                          Code Case N-491-1 Rod Hanger              F1. 30                                                      iON/Afk 3              X 551600    54-R1"D                  F-A          VT 3                                            Code Case N-491-1 Rod Hanger              F1.30                                                        +~N/A++
3 X 552000    54-R1-H                  F A          VT-3                                            Code Case N-491-1 Rod Hanger              Fl . 30                                                      *AN/A*~
3              X 552900    54-Rll-A                F-A                                                          Includes U-Bolt and Pipe Stanchion          Fl. 30                                                      protection saddle,  Code Case N-491-1 ~~N/A+~
00    54 R13-A                                                                              Code Case N-491-1 Spring Hanger            F1. 30                                                      ~~N/A~+
3              X 555000    54-R2-BA                F-A          VT-3                                            Code Case N-491-1 Rod Hanger              F1.30                                                        %AN/A**
3              X 55S100    54-SCR-1E                            VT-3                                            Code Case N-491-1 Seismic Box  Restraint  F1.30                                                        ~~N/A~+
3              X 558200    54-SCR" 1E"WD-001        D-A                                                          Code Case N-509  **N/A**
Integrally Welded Lug    Dl 20
                                      ~
3              X 1
55S300    54-SCR-1E-WD-002                                                                      Code Case N-509 **N/A~~
Integrally Welded Lug    D1.20 3              X 2
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                            PAGE: 229 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t Fuel  Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL                        PLAN STATUS            PRESERVZCE YEAR ASME                    FIRST        SECOND      THIRD SEC. XI              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY        NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO      METH      1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION BLOCK~*
558400    54 SCR 1E-WD-003        D-A                                                          Code Case N-509 ~*N/A*~
Zntdgrally Welded Lug D1.20 3              X 3
558500    54-SCR-1E-WD-004        D-A          VT-1                                            Code Case N-509 **N/A~*
Integrally  Wcldcd Lug  Dl. 20 3              X 8.0" Spent Fuel Pool Cooling Line        (REF. DWG. NO. C-27171-C) 563700    54-SCR-1N                                                                              Code Case N-491-1 Seismic Box  Restraint  Fl  ~ 30                                                      eaN/Ass 3                            X 563800    54-SCR-1N-WD-001        D-A                                                          Code Case N 509 ~+N/A++
Integrally  Welded I.ug  D1.20 3                            X 1
563900    54-SCR-1N-WD-002        D-A          VT-1                                            Code Case N-509  +iN/Aii Integrally Welded Lug    D1.20 3                            X 2
564000    54"SCR-1N-WD-003        D-A                                                          Code Casa N-509 ~~N/Ai~
Integrally Welded Lug    D1.20 3                            X 3
564100    54"SCR-1N-WD-004        D-A          VT-1                                            Code Case N-509 ~~N/Ai~
Integrally  Welded Lug  Dl 20
                                      ~
3                            X 4
 
DATE: 10/15/99                              NINE HYLE POINT NUCLEAR PLANT UNIT 1                            PAGE: 230 REVISION:        0                            INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS t Fuel  Pool Cooling NUMBER: 54 . 0 INSPECTION ZNTERVAL                        PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST          SECOND      THIRD SEC. XZ                PERIOD        PERIOD      PERIOD SUHHARY    EXAHZNATZON AREA          CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER      IDENTIFICATION          ITEH  NO    METH    1  2 3  4    1  2  3  4  1  2  3  4  ~ ~CALIBRATION BLOCK~ ~
6.0" Spent Fuel Pool Cooling Line      (REF. DWG. NO. C-27171-C) 567100    54-SCR-3BA                F-A                                                          Code Case N-491-1 Seismic Box  Restraint  F1.30                                                        ktN/A%4 3              X 567200    54-SCR-3BA-WD-001                                                                      Code Case N-509 ++N/A~~
Integrally  Welded Lug    D1.20 3              X 1
567300    54-SCR-3BA-WD-002                      VT 1                                          Code Case N-509 +*N/A**
Integrally  Welded I.ug  Dl. 20 3              X 2
567400    54-SCR" 3BA-WD-003        D  A                                                        Code Case N 509 *+N/A++
Integrally Welded Lug    D1.20 3              X 3
567500    54-SCR-3BA  WD  004      D-A                                                          Code Case N-509 **N/A~*
Integrally  Woldcd Lug    D1.20 3              X 4
567600    54-SCR-3BA-WD-005        D-A          VT-1                                            Code Case N-509 *~N/A~~
Integrally  Welded Lug    D1.20 3              X 5
567700    54"SCR-3BA-WD-006        D-A          VT"1                                            Code Case N-509 ++N/A++
Integrally  Welded Lug    D1.20 3              X 6
567800    54-SCR-3BA-WD-007                      VT 1                                            Code Case N-509 ++N/Ai+
Integrally  Welded Lug    D1.20 3              X 7
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 231 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel  Pool Cooling NUMBER: 54 . 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERV ICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO    METH    1  2  3 4    1  2  3  4  1  2  3  4 +~CALIBRATION BLOCK~~
567900    54-SCR-3BA-WD-008        D-A                                                        Code Case N-509 <<*N/A~~
Integrally  Welded Lug  Dl. 20 3              X 8
8.0" Spent Fuel Pool Cooling Line      (REF. DWG. NO. C-27171-C) 571500    54-SCR-5F                F"A                                                        Code Case N-491-1 Seismic Box Restraint    F1.30                                                      **N/A**
3              X 571600    54-SCR-5F-WD-001        D-A                                                        Code Case N-509 ~~N/A~~
Integrally Welded Lug    D1.20 3              X 1
571700    54-SCR-5F-WD-002        D-A                                                        Code Case N-509 ~~N/A~~
Integrally  Wcldcd Lug  D1.20 X
2 571800    54-SCR-5F-WD-003        D-A                                                        Code Case N-509 ~*N/A~i Integrally  welded Lug  D1.20 3              X 3
571900    54-SCR-5F-WD-004        D-A                                                        Code Case N-509 ~~N/A*~
Integrally Welded Lug    D1.20 3              X 4
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 232 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel  Pool Cooling Filter  11 NUMBER: 54 . 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~~CALIBRATION BLOCK~>
SFPCF  54-03 (REF. DWG. NO. C-27171-C) 574800    FP-54-03                  F A        VT-3                                          Coda Case N-491-1 FP  Filter 11 Support    F1.40                                                    +~N/A~~
3              X
 
DATE: 10/15/99                                NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 233 REVISION:        0                            INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel  Pool Cooling Heat Exchanger 12 NUMBER: 54 . 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY        NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4 t +CALIBRATION BLOCK**
SFPCHE  54-04 (REF. DWG. NO. C-27171-C) 575300    FP 54-04                                                                            Code Case N-491-1 FP Hx 12  Support        Fl . 40                                                    e*N/Ase 3              X 575400    FP-54-04-WD-001          D  A                                                        Code Case N-509 **N/A~*
FP Hx 12  Front          D1. 10 3                            X Integral Attachment 575500    FP-54-04-WD-002                                                                      Code Case N-509 **N/A*~
FP Hx 12 Roar Integral D1.10 3                            X Attachment
 
E DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 234 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS t Fuel  Pool Cooling  Pump 11 NUMBER: 54 . 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 ~~CALIBRATZON BLOCK**
SFPCCP  54-01 (REF. DWG. NO. C-27171-C) 575600    FP-54-01                                                                          Code Case N-491-1 Pump  Support            F1.40                                                    ~+N/A~~
3                            X
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 235 REVISION:        0                          ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t  Fuel Pool Cooling Surge Tank NUMBER: 54 . 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERZOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM NO  METH    1  2  3  4  1  2  3  4  1  2  3  4 +*CALIBRATION BLOCK**
SFPCST 54 68  (REF. DWG. NO. C-27171 C) 575800    TK-54-68                            VT 3                                          Code Casa N-491-1 Surge TK Support        F1.40                                                    aaN/Awe 3              X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PZANT UNIT 1                          PAGE: 236 REVISION:                                    INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS t Fuel  Pool Cooling System NUMBER:  57. 0 INSPECTION INTERVAL                      PIAN STATUS            PRESERVICE YEAR ASME                FIRST          SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATZON AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ZTEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 **CALIBRATIONBLOCK~*
Spent Fuel Pool Cooling Linc (REF. DWG. NO. C-27172-C) 576000    57-R3-C                              VT 3                                          U Bolt, Code Case Pipe Stanchion          Fl. 30                                                      N 491 1 ~~N/A++
X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 237 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS tor Building    Closed Loop Cooling NUMBER:  70.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  11CALZBRATZON BLOCK11 RBCLC  Line  (REF. DWG. NO. C-26855-C) 582900    70-R17-D                  F-A          VT-3                                          Code Case N-491-1 Rod Hanger                F1.30                                                        11N/A11 3                            X 583200    70-R17-I                              VT-3                                          Code Case N-491-1 Rod Hanger                Fl . 30                                                      **N/A1*
3                            X 583700    70-Rl 7-N                F-A          VT-3                                          Code Case N-491-1 Rod Hanger                Fl. 30                                                      11N/A11 3                            X 584000    70-R19-A                  F-A                                                        Code Case N-491-1 Pipe Stanchion            Fl . 30                                                    1 1N/A1 1 3                            X 00    70-R19-B                  F-A                                                        Code Case N-491-1 Pipe Stanchion            F1.30                                                      *1N/A*1 3                            X 584200    70-R19-C                  F-A                                                        Code Case N-491-1 Pipe Stanchion            F1.30                                                      11N/A11 3                            X 588400    70 R7  G                  F-A                                                        Code Case N-491-1 Rod Hanger                Fl. 30                                                      11N/A1 1 3                            X 588500    70-Rj-H                  F-A                                                        Code Case N-491-1 Rod Hanger                Fl . 30                                                    11'N/A1*
3                            X 588600    70-R7-I                                                                              Code Case N-491-1 Rod Hanger                Fl . 30                                                    11N/A11 3                            X 590700    70 R9 A                    F-A                                                        Code Case N-491-1 Pipe Stanchion            F1. 30                                                      1 1N/A1 1 3              X
 
DATE:  10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 238 REVZSZON:        0                          ZNSERVZCE ZNSPECTZON TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Buf.lding  Closed Loop Cooling NUMBER:  70. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATZON AREA          CATEGY      NDE                OUTAGE                          INSTRUCTIONS NUMBER      ZDENTZFZCATZON            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~ ~CALIBRATION BLOCK**
590800    70 R9 A    WD 001        D  A        VT-1                                          Code Case N 509 ++N/A~~
Pipe Stanchion            D1.20 3              X 591700    70-R9-F                  F-A        VT-3                                          Code Case N-491-1 Pipe Stanchion            F1.30                                                      ++N/A++
3              X 591800    70-R9-F-WD-001            D-A        VT-1                                          Code Case N-509 a*N/Ass Pipe Stanchion            D1.20 3              X 592300    70-83                    F"A                                                        Code Case N-491-1 Pipe Stanchion            Fl. 30                                                    ssN/A*a 3                            X 70 "S3-WD-001                        VT"1                                          Code Case N-509 +~N/A~+
Pipe Stanchion            Dl. 20 3                            X 594500    70-SC-3                              VT 3                                          Code Case N-491-1 Seismic Box Restraint    F1.30                                                      aaN/Att 3                            X 597200    70-SC-8                  F A                                                        Code Case N-491-1 Seismic Box Restraint    F1.30                                                      ~~N/A**
3              X 597300    70-SC-9                  F-A                                                        Code Case N-491-1 Seismic Pipe Restraint F1.30                                                        aaN/Aea 3              X 599900    70 SCR-SA                F A                                                        Code Case N-491-1 Box Restraint            F1.30                                                      **N/A**
3                            X 600000    70 SCR SA    WD 001      D-A                                                        Code Case N-509 +~N/A++
Integral Attachment      D1.20 3                            X
 
DATE: 10/15/99                            NINE HZLE POINT NUCLEAR PLANT UNIT 1                          PAGE: 239 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COHPONENTS tor Building Closed  Loop Cooling NUMBER:  70. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERZOD        PERIOD      PERZOD SUHMARY  EXAMINATION AREA        CATEGY      NDE                  OUTAGE                          INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  '1  2  3  4  1  2  3  4 ~ ~CALIBRATION  BLOCK~*
600100    70-SCR-BA-WD-002        D-A        VT  1                                          Code Case N-509 ++N/A++
Integral Attachment    D1.20 3                            X 600200    70-SCR-BA-WD-003        D  A                                                      Code Case N-509 i~N/A~~
Integral Attachment    D1.20 3                            X 600300    70-SCR-BA-WD-004        D-A                                                        Coda Case N-509 *~N/A*~
Integral Attachment    Dl. 20 3                            X A        ~
601800    70-SR-23                                                                          Code Case N-491-1 Seismic Box Restraint  F1.30                                                      *I'N/At*
3                            X 70-SR-24                            VT-3                                          Code Case N-491-1 Seismic Box Restraint  F1.30                                                      +AN/Ate 3
602200    70-SR-27                            VT 3                                          Codo Case N-491-1 Seismic Box Restraint  F1.30                                                          /AP a 3                            X
 
DATE: 10/15/99                              NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 240 REVISION:        0                            ZNSERVICE INSPECTION TEN-YEAR PLAN CIASS 3 SECTION XI SCHEDULED COMPONENTS tor Building Closed    Loop Cooling Heat Exchange NUMBER:  70. 0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 *+CALIBRATION BLOCK~~
RBCLCHE    70-13R (REF. DWG. NO. C-26855-C) 603400    70-13R                    F-A        VT-3                                          Code Case N-491-1 RBCLCHE    Support        Fl. 40                                                    ~~N/A~~
3 X 603500    70 13R-WD-001              D-A                                                        Code Case N-509 ~~N/A~~
RBCLCHE    Front Integral D1.10 3 X Attachment 603600    70-13R-WD-002                                                                        Code Case N-509 ++N/A~~
RBCLCHE    Rear Integral  D1.10 3 X Attachment
 
DATE: 10/15/99                              NINE MILE POZNT NUCLEAR PLANT UNIT 1                        PAGE: 241 REVISZON:        0                            INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Building Closed  Loop Cooling  MU  Tank NUMBER:  70.0 INSPECTION INTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST      SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO      METH    1  2  3 4 1  2  3  4  1  2  3  4 ~~CALIBRATION BLOCK*~
RBCLC M.U. Tank  71-126 (REF. DNG. NO. C-26855-C) 604300    71-126                  F-A          VT-3                                        Code Case N-491-1 CLC M.U. Tank            Fi . 40                                                    1 4N/A1 4 3                          X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 242 REVZSZON:        0                          INSERVICE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Building  Closed Loop Cooling  Pump NUMBER: 70 . 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                OUTAGE                          INSTRUCTIONS IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 '~
                                                                                                ~CALIBRATION BLOCK*+
RBCLCP  70-01 (REF. DWG. NO. C-26855-C) 604400    70-01                                                                              Coda Case N-491-1 RBCLC Pump  Support      F1.40                                                    eeN/Ate 3                            X
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 243 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS gency Service Water NUMBER:  72.0 ZNSPECTION ZNTERVAL                      PLAN STATUS            PRESERVZCE YEAR ASME                  FIRST        SECOND      THIRD SEC. XZ                PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM  NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  ~~CALIBRATION BLOCK~~
ESW  Line (REF. DWG. NO. F-45235-C) 604700    72-Al                    F-A                                                        Code Case N-491-1 Pipe Stanchion          F1.30                                                      ++N/A++
3                            X 604800    72-Al-WD-001            D-A                                                        Code Case N-509  **N/A**
Pipe Stanchion          D1.20 3
604900    72-A2                    F-A                                                        Code Case N-491-1 Pipe Stanchion          F1.30                                                      ++N/A++
3                            X 605000    72-A2-WD-001            D-A          VT 1                                          Code Case N-509 ~~N/A++
Pipe Stanchion          D1.20 3                            X 00    72-H159                              VT-3                                          Code Case N-491-1 Rod Hanger              F1.30                                                      @AN/Aea 3 X 607600    72-H162                              VT-3                                          Code Case N-491-1 Rod Hanger              F1.30                                                      +~N/A++
3 X 607700    72-H163                                                                            Code Case N-491-1 Rod Hanger                Fl. 30                                                    *~N/A~*
3 X 608700    72-SC-4                  F-A                                                        Code Case N-491-1 Seismic Restraint        F1.30                                                      i*N/Aff 3              X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 244 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION  XI SCHEDULED COMPONENTS gcncy Service Water Pump 11 INSPECTION ZNTERVAI                      PLAN STATUS            PRESERVZCE YEAR ASME                FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERZOD
 
==SUMMARY==
EXAMINATION AREA        CATEGY      NDE                  OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION          ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 +~CALIBRATION BLOCK~~
ESWP  72-04 (REF. DWG. NO. F-45235-C) 613300    72-04                                                                              Code Casa N-491-1 Pump  Support          F1. 40                                                    %AN/APk 3
1
 
DATE:  10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 245 REVISION:        0                          INSERVZCE INSPECTION TEN-YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUMBER:  93.0                                                                            PRESERVZCE YEAR INSPECTION ZNTERVAL                      PLAN STATUS ASME                  FIRST        SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD
 
==SUMMARY==
EXAMZNATZON AREA        CATEGY      NDE                OUTAGE                          INSTRUCTZONS NUMBER      IDENTIFICATION          ITEM NO      METH    1  2  3  4  1  2  3  4  1  2  3  4 >>>>CALIBRATION BLOCK>>>>
12.0"  Raw Water Linc (REF. DWG. NO. 16) 613700    93-H3                  F A          VT-3                                          Code Case N-491-1 Gravity Support        Fl . 30                                    I                *>>N/A>>>>
3 X 613900    93-HS                  F A          VT 3                                          Code Case N-491-1 Gravity Support        F1.30                                                      **N/A>>*
3 X 614100    93-H7                                                                              Code Case N-491-1 Gravity Support        F1.30                                                      **N/A*>>
3 X 615100    93-R10-A                              VT 3                                          Code Case N-491-1 Rod Hanger              Fl . 30                                                    **N/A>>*
3            X 00    93 Rll A2                            VT-3                                          Code Case N-491-1 Rod Hanger              F1.30                                                      >>>>N/A>>>>
3            X 616400    93-R13-B                F-A          VT 3                                          Code Case N-491-1 Rod Hanger              F1.30                                                      >>>>N/A>>>>
3            X 617500    93-R16-A                F-A                                                        Code Case N-491-1 Pipe Stanchion          Fl. 30                                                      >>>>N/A>>>>
3 X 617600    93-R16-A-WD-001        D-A          VT-1                                          Code Case N-509 **N/A>>>>
Pipe Stanchion          Dl . 20 3 X 617700    93-R16-B                F-A                                                        Code Case N-491-1 Pipe Stanchion          F1.30                                                      >>>>'N/A>>>>
3 X 617900    93-R16-C                F-A          VT-3                                          Code Case N-491-1 Pipe Stanchion          F1.30                                                      **N/A**
3 X
 
DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                          PAGE: 246 REVISION:        0                          ZNSERVICE ZNSPECTION TEN-YEAR PLAN CLASS 3 SECTION XI SCHEDULED COMPONENTS tor Containment Spray NUMBER:  93.0 INSPECTION ZNTERVAZ                      PLAN STATUS            PRESERVICE YEAR FIRST        SECOND      THIRD SEC. XI            PERIOD        PERIOD      PERIOD
 
==SUMMARY==
EXAMINATION AREA        CATE GY      NDE                OUTAGE                        INSTRUCTIONS NUMBER      IDENTIFICATION          ITEM  NO  METH    1  2  3  4  1  2  3  4  1  2  3  4  saCALIBRATION BLOCK+ t 618000    93 R16-C-WD-001          D-A                                                        Code Case N-509 ~*N/A*~
Pipe Stanchion          Dl. 20 3 X 621000    93-R2-C                  F-A                                                        Code Case N-491-1 Spring Hanger            F1.30                                                      4 fN/A4 1 3 X 621100    93-R2-C"WD-001          D-A                                                        Code Case N-509 ~~N/A~~
Integral Attachment      Dl. 20 3 X 628300    93-SCR-10A              F-A                                                        Code Case N-491-1 Seismic Restraint        F1.30                                                      *~N/A~~
3              X 93-SCR 10B              F-A                                                        Code Case N-491-1 Seismic Restraint        F1.30                                                      **N/A**
3              X 637000    93-SCR-4A                F"A          VT-3                                          Code Case N-491-1 Seismic Box Restraint    F1.30                                                      **N/Aff 3 X 637100    93-SCR-4A-WD-001        D-A          VT-1                                          Code Case N-509 ~*N/A~~
Integral Attachment      D1.20 3 X 637200    93-SCR-4A-WD-002                                                                    Code Case N-509 +~N/A~~
Integral Attachment      D1.20 3 X 637300    93-SCR-4A-WD-003        D-A          VT-1                                          Code Case N-509 ~*N/A~*
Zntcgral Attachment      D1.20 3 X 637400    93-SCR-4A-WD-004        D-A          VT 1                                          Code Case N-509 +*N/A~~
Zntegral Attachment      D1.20 3 X
 
DATE: 10/15/99                              NINE HII E POINT NUCLEAR PLANT UNIT 1                        PAGE: 247 REVISION:        0                          INSERVICE ZNSPECTION TEN YEAR PLAN CLASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray NUHBER: 93.0 INSPECTION INTERVAI                      PLAN STATUS            PRESERVICE YEAR ASME                  FIRST        SECOND      THIRD SEC. XI              PERIOD      PERIOD      PERIOD SUHHARY    EXAHI NATION AREA        CATEGY      NDE                  OUTAGE                        ZNSTRUCTZONS NUMBER      IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4  +*CALIBRATION BLOCK+*
642000    93-SCR-7A1                F A        VT-3                                          Code Case N-491-1 Seismic Box  Restraint  F1.30                                                      +*N/A*~
3 X 642100    93-SCR-7A1-WD-001                                                                    Code Case N 509 *+N/A*+
Integral Attachment      Dl. 20 3 X 642200    93-SCR-7A1-WD-002        D-A                                                        Code Case N-509 ++N/A++
Integral Attachment      D1.20 3 X 642300    93 SCR 7A1-WD-003                    VT 1                                          Code Case N-509 ~~N/A~~
Integral Attachment      D1.20 3 X 93-SCR-7A1 "WD-004        D  A        VT-1                                          Code Case N-509 4wN/Aiw Integral Attachment      D1.20 3 X 648000    93-SCR-9A                                                                            Code Case N-491-1 Seismic Box Restraint    F1.30                                                      ~+N/A+~
3 X 648100    93-SCR-9A-WD-001          D-A                                                        Code Case N-509 ~~N/A~+
Integral Attachment      Dl. 20 3 X 648200    93-SCR-9A"WD-002                      VT-1                                          Code Case N-509 +~N/A++
Integral Attachment      D1. 20 3 X 648300    93-SCR-9A-WD-003          D-A                                                        Code Case N-509 ~*N/A**
Integral Attachment        D1.20 3 X 648400    93 SCR-9A-WD-004                      VT-1                                          Code Case N-509 ++N/A~+
Integral Attachment        D1.20 3 X
 
4 DATE: 10/15/99                            NINE MILE POINT NUCLEAR PLANT UNIT 1                        PAGE: 248 REVISION:        0                          INSERVICE INSPECTION TEN-YEAR PZAN CZASS 3 SECTION XZ SCHEDULED COMPONENTS tor Containment Spray    Raw Water  Pump 111 NUMBER: 93. 0 INSPECTION INTERVAL                    PLAN STATUS            PRESERVICE YEAR ASME                FIRST        SECOND      THIRD SEC. XZ              PERIOD      PERIOD      PERZOD
 
==SUMMARY==
EXAMINATION AREA          CATEGY    NDE                OUTAGE                        INSTRUCTIONS NUMBER    IDENTIFICATION            ITEM NO    METH    1  2  3  4  1  2  3  4  1  2  3  4 ~*CALIBRATION BLOCK~ ~
RCSRWP 111  (REF. DWG. NO. 16) 649500    RWP-111                  F-A        VT-3                                          Code Case N-491-1 Pump  Support            F1.40                                                    ~~N/A~+
X
 
NINE MILE POINT                                        NMP1-ISI-003-1 0 V NlAGARA                                  NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                              Rev.      0 TEN-YEAR INSERVICE INSPECTION                                Date:    October 15, 1999 PLAN AND SCHEDULE APPENDIXA ACCEPTANCE CRITERIA Indications detected by inservice examinations, shall be compared against the acceptance criteria of Section XI as defined in Tables A-1 through A-4.).
                                                              'ABLEA-1 CLASS::1:ACCEPTANCE STANDARDS EXAMINATION:
                            "                ,, COMPONENT;.,OR    PART EXAMINED",-      ,,-:,j-;gg '"ACCEPTANCE STANDARD CATEGORY 8-A                                Welds In Reactor Vessels                                  IW84510 B-B                                  Welds in Other Vessels                                  IW84510 8-D                                  Vessel Nozzle Wolds                                    IW84512 8-E                          Partial Penetration welds In Vessels                          IW84522 B-F, 84                    Dissimilar and Similar Metal Welds In Pl !n                        IW84514 8-G-1                                    Boltln > 2" dia.                                IW8451 5/3517 8-G-2                                    Boltin < 2" dla.                                    IW84517 B-H, 8-K-1          Into ralAttachmentsforPI      in, Valves  Pum s & Vessels                  IW84516 B-L-1, 8-M-1                            Welds In Pum s & Valves                                  IW84518 B-L-2, 8-M-2                        Pum    Casln s & Valvo Bodies                              IW8<519 8-N-1 8-N-2        Interior Surfaces & Internal Components of Reactor Vessels                  IW84520.1 8-N4                                                                                        IW84520.2 B-O                            Control Rod Drive Housln Welds                                IW84523 8-P                              Pressure Rotainin  Bounda                                  IW84522 8-0                                Steam Generator Tubln                                    IW84521 File: NMP1ISIPL.wpd
 
NINE MILE POINT                                      NMP1-ISI-003-1 0 V NIAGARA                                      NUCLEAR POWER STATION N UmomwK THIRD INSERVICE INSPECTION INTERVAL                          Rev.      0 TEN-YEAR INSERVICE INSPECTION                            Date:    October 15, 1999 PLAN AND SCHEDULE TABLE A-2 CLASS 2 ACCEPTANCE STANDARDS EXAMINATION                                                                                  ACCEPTANCE COMPONENT OR PART EXAMINED CATEGORY                                                                                    STANDARD C-A                            Welds In Pressure Vessels                                IWC4510 C-B                              Nozzle Welds In Vessels                                  IWC4511 C-C            Inte raIAttachmentsfor Vessels Pi In    Pum sand Valves                  IWC4512 C-D                                        Boltln                                        IWC4513 C-F-1, C-F-2                              Weids in Pi in                                      IWC4514 Welds In Pum s and Valves                                  IWC4515 C-H                          Pressure Retainln    Com onents                            IWC4516 TABLE AN CLASS 3 ACCEPTANCE STANDARDS EXAMINATION                      COMPONENT OR PART EXAMINED                                  ACCEPTANCE CATEGORY                                                                                    STANDARD D-A                              Pressure Boundary (VT-2)                      "No Leakage 'Mfg. Code &
Inte ral Attachments VTQ                              llcablo Standards D-B                              Pressure Boundary (VT-2)                      "No Leakage    'Mfg. Codo &
Inte ralAttachments VTQ                                llcablo Standards D-C                              Pressure Boundary (VT-2)                        IWA-5250 'Mfg. Code &
Into ral Attachments VTN                          A Ilcablo Standards ASME Section XI Acceptanco Standard in course of preparation.
Defined as no leakago from the pressure boundary, in excess of that which is expected and determined to bo within acceptablo limits, l.e., at valve packing, bolted connections, pump seals, etc.
TABLE A-4 COMPONENT SUPPORT ACCEPTANCE STANDARDS EXAMINATION                    COMPONENT OR PART EXAMINED                                ACCEPTANCE CATEGORY                                                                                  , STANDARD F-A                                      Su    rts                                    IWF-3410 File: NMP1ISIPL.wpd
 
NINE MILE POINT                              NMP1-ISI-003-1 0 El Y NIAGARA                        NUCLEAR POWER STATION H kl MOHAWK THIRD INSERVICE INSPECTION INTERVAL                Rev. 0 TEN-YEAR INSERVICE INSPECTION                    Date:  October 15, 1999 PLAN AND SCHEDULE APPENDIX B NONDESTRUCTIVE EXAMINATIONPROCEDURE LISTING NDEP      REVISION                                      TITLE VT 2.01      Note  1    "ASME XI Visual Examination Procedure" PT 3.00      Note  1    "Li uid Penetrant Examination Procedure" MT 4.00      Note  1    "Ma netic Particle Examination Procedure" RT 5.00      Note  1    "Radio ra hic Examination" UT 6.01      Note  1    "Ultrasonic Linearit Verification" UT 6.04      Note  1    "Ultrasonic Examination of Bolts, Studs, Nuts and Cylindrical Com onents" UT 6.05      Note  1    "Ultrasonic Thickness Measurement" UT 6.06      Note  1    "Ultrasonic IGSCC Sizin Procedure" Manual UT 6.07      Note  1    "Ultrasonic Examination of Nozzle Inner Radii" UT 6.09      Note  1  "Ultrasonic Examination Procedure for RPV Flange Weld and Stud Hole Threads in the RPV Flan e" UT 6.10      Note  1  "S stem Performance Checks" UT 6.13      Note  1    "Ultrasonic Examination of Bi-Metallic Pi in Welds" UT 6.15      Note  1    "Ultrasonic Examination to Determine Water Level" UT 6.16      Note  1    "Ultrasonic Thickness Measurement Utilizin Di ital E ui ment" UT 6.19      Note  1    "Freeze Seal Ultrasonic Examination Procedure for Ferritic Pipe and Fittin s" UT 6.20      Note  1    "Ultrasonic Examination of Reactor CRD Housin s" UT 6.21      Note  1    "Ultrasonic Examination Procedure for Vessel Welds 2" Thick or Less and Associated Nozzle Inner Radius Areas" UT 6.23      Note  1    "Ultrasonic Examination of Ferritic Pi e Welds" UT 6.24      Note  1    "Ultrasonic Examination of Austenitic Pi e Welds" UT 6.25      Note  1    "Strai ht Beam Ultrasonic Examination of Bolts and Studs" File: NMP1ISIPL.wpd
 
NINE MILE POINT                          NMP1-ISI-003-10 LI V NIAGARA                                        NUCLEAR POWER STATION a U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                Rev. 0 TEN-YEAR INSERVICE INSPECTION                  Date:    October 15, 1999 PLAN AND SCHEDULE
                                              .." ';,",',: AP.P...END)X-:B
                        ': NONDESTRUCTIV.E'.EXAMlNATlON;PROCEDU,RE L'ISTING REVlSfON
                                        'P 7.00            Note 1        "Standard Method for Etchin Metals and Allo s" SP 7.01                Note 1        "Hardness Testin of Metals" SP 7.02                Note 1        "Visual Examination of Weldin      0 erations" SP 7.03                Note 1        "Visual Examination of Brazed Joints" SP 7.04                Note 1        "Measurin        Coatin Thickness b Use of Edd Current" SP 7.05                Note 1        "Weld Detection b Use of Edd Currents" ET 8.00                Note 1        "Eddy Current Examination of Nonferromagnetic Heat Exchange Tubing" See controlled copy of NDE Procedures for latest approved revision.
File: NMP1ISIPL.wpd
 
NINE MILE POINT                                            NMP1-ISI-003-10 hl Y NIAGARA                          NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL              Rev.                    0 TEN-YEAR INSERVICE INSPECTION                Date:                  October 15, 1999 PLAN AND SCHEDULE
                                        -APPENDIX C '.'-
                    '  ': 'ULTRASONIC.'CALIBRATIONBL'GCKS':,'.            '.  ";;,
                            *;  " '.", BL'OCK.;  ':::"'.""':: ':-    .THICKNESS:
                                                                  ";-"            ''ITEMNUMBER,.:,-,
1-2            NMP1-29-SE-1                                1.655/1.1501.151.11 1-3            NMP1-28-2.00-SS                                                              2.055 1-4            NMP-28-1.200-SS                                                              1.109 1-6            NMP1-24-SE-1                                                                1.475 1-7            NMP1-24-080-CS                                                              1.219 1-8            NMP.1-20-1.500-CS                                                              1.63 1-12            NMP1-18-1.375-CS                                                            1.375 1-13            NMP1-18-1.156-CS                                                            1.156 1-14            NMP1-18-.937-CS-106                                                            .937 1-16            NMP-18-120-CS                                                              1.375 1-17            NMP-18-100-CS                                                              1.156 1-21            NMP1-16-120-CS                                                                1.24 1-22            NMP-16-100-CS                                                              1.031 1-23            NMP1-16-.375-CS-106                                                          .375 1-25            NMP1-14-120-CS                                                              1.219 1-28            NMP1-14-XX2-SS                                                                .935 1-29            NMP-14-XX1-SS                                                                .760 1-30            NMP-14-STD-CS                                                                .375 1-32            NMP1-12-1.44-CS-105                                                          1.44 1-33            NMP1-12-.688-SS                                                              .688 1-36            NMP1-12-XX2-SS                                                                .855 1-37            NMP-12-XX1-SS                                                                .720 1-38            NMP-12-STD-CS                                                                .375 File: NMP1ISIPL.wpd
 
NINE MILE POINT              NMP1-ISI-003-1 0 El Y NIAGARA                          NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION    Date:  October 15, 1999 PLAN AND SCHEDULE
                                        'PPENDIX C
                      "- 'UL''FRASONIC:CALIBRATIONBLot:-KS-: "-'- '- .''-    --:-:--:
v ITEM NUMBER                      B LO Q Kg <~~<i< c~,.
                        "'-40 NMP1-10-.594-CS                                .700 1-42            NMP1-10-.522-SS-F2                              ~ 522 1-43            NMP1-10-.500-SS-403                            .500 1-44            NMP1-10-160-SS                                1.141 1-47            NMP1-10-100-CS                                    .75 1-49            NMP1-10-80-CS                                  .600 1-50              NMP-10-XX1-SS                                  .727 1-51              NMP1-10-XX1-SS-358                              .591 1-52              NMP1-1 0-SE-1                                  .900 1-55              NMP1-8-120-CS                                  .720 1-56              NMP1-8-80-CS                                  .495 1-61              NMP1-6.25-RPV-STUD                            2.72 1-62              NMP1-6-.596-SS                                .596 1-64              NMP1-6-160-CS                                  .720 1-65              NMP1-6-80-SS                                  .432 1-66              NMP-6-080-CS                                  .432 1-68              NMP1-6-80-SS-312                              .432 1-69              NMP1-6-SE-2                                      1.5 1-70              NMP1-6-SE-1                                      .75 1-77              NMP1-4-80-CS                                  .337 1-81              NMP1-2.75-RCP-STUD 1-82              NM1-2.50-B16-1 1-83              NM1-2.50-B16-2 1-84              NM1-2.25-B16 File: NMP1ISIPL.wpd
 
NINE MILE POINT                  NMP1-ISI-003-10 Y NIAGARA                        NUCLEAR POWER STATION kL MOHAWK THIRD INSERVICE INSPECTION INTERVAL    Rev. 0 TEN-YEAR INSERVICE INSPECTION      Date:  October 15, 1999 PLAN AND SCHEDULE APPENDIX C Uk.TRASONlt CALIBRATIONBLOCKS ITEM NUMBER                  BLOCK                    THICKNESS.
1-92        NMP1-FW-1.50-CS-516 1-94        FWMU-N1-P3-8.1-RV 1-96      NMP1-IR-9 1-97      NMP1-IR-7.5 1-98      NMP1-IR-5.5 1-99      NMP1-IR-3.3 1-1 00      NMP1-IR-1.7                                            1.7 1-108      NMP-80XI-N278-ALT-BL1                              10.75 NMP1-SW-1020-CS                                  .1-3.00 1-113      NMP1-SW-304-SS                                  .1-3.00 1-114      NMP1-SW-600-IN                                    .1-1.0 1-128      P8R-1.260                                          1.260 1-130      P8R-.75-1                                            .75 1-133      P8R-.3-1 1-137      PIS-6.25                                            2.72 1-138      PIS-2.5                                              16.7 1-140      P IR-1.5-1                                            1.5 1-143      PIN-6.25                                            1.62 1-146      PIF-1.5C                                              1.5 1-158      NMP1-RPV-4                                          27.0 1-159      NMP1-RPV-1                                          4.60 1-165        NMP-EPRI-CS 1-166        NMP-EPRI-SS 2-1        NMP2-48-3.50-CS                                    3.50 File: NMP1ISIPL.wpd
 
NINE MILE POINT                NMP1-ISI-003-1 0 V NIAGARA                    NUCLEAR POWER STATION 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL  Rev. 0 TEN-YEAR INSERVICE INSPECTION      Date:  October 15, 1999 PLAN AND SCHEDULE APPENDlX C ULTRASONlC CAL1BRATION BLOCKS lTEM NUMBER                  BLOCK                  THlCKNESS 2-2        NMP2-30-2.90-CS                                  2.90 2-3        NMP2-28-2.60-CS                                  2.60 2-4        NMP2-28-1.34-CS                                  1.34 2-5        NMP2-27-1.57-CS                                  1.57 2-6        NMP2-26-1.26-CS                                  1.26 2-7        NMP2-25-1 .84-NOZ                                1.84 2-8        NMP2-24-2.469-CS                                2.469 2-9        NMP2-24-2.06-CS                                  2.06 2-10        NMP2-24-1.317-SS                                1.317 2-11        NMP2-24-1.234-SS                                1.234 2-12        NMP2-24-1.219-CS                                1.219 2-13        NMP2-24-1.002-SS                                1.002 2-14        NMP2-24-.500-SS                                  .500 2-15        NMP2-24-.500-CS                                  .500 2-16        NMP2-24-.375-CS                                  .375 2-17        NMP2-20-1.031-SS                                1.031 2-18        NMP2-20-1.031-CS                                1.031 2-19        NMP2-20-.84-SS                                    .84 2-20        NMP2-20-.812-CS                                  .812 2-21        NMP2-20-.594-CS                                  .594 2-22        NMP2-20-.500-CS                                  .500 2-23        NMP2-20-.375-CS                                  .375 2-24        NMP2-20-.375-SS                                  .375 2-25        NMP2-18-.938-CS                                  .938 File: NMP1ISIPL.wpd
 
NINE MILE POINT              NMP1-ISI-003-1 0 V NIAGARA                      NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL  Rev. 0 TEN-YEAR INSERVICE INSPECTION      Date:  October 15, 1999 PLAN AND SCHEDULE APPEND)X C ULTRASONlC CALlBRATlQNBLOCKS 1TEM NUMBER                  BLOCK                THlCKNESS 2-26      NMP2-18-.500-CS                                  .500 2-27      NMP2-18-.375-CS                                  .375 2-28      NMP2-18-.375-SS                                  .375 2-29      NMP2-16-1.031-CS                                1.031 2-30      NMP2-16-.822-SS                                  .822 2-31      NMP2-16-.500-CS                                  .500 2-32      NMP2-16-.375-SS                                  .375 2-33        NMP2-16-.375-CS                                  .375 2-34        NMP2-14-.375-CS                                  .375 2-35        NMP2-12-1.00-SS                                  1.00 2-36        NMP2-12-.844-SS                                  .844 2-37        NMP2-12-.844-CS                                  .844 2-38        NMP2-12-.688-CS                                  .688 2-39        NMP2-12-.688-SS                                  .688 2-40        NMP2-12-.657-SS                                  .657 2-41        NMP2-12-.375-SS                                  .375 2-42        NMP2-12-.375-CS                                  .375 2-43        NMP2-11.625-1.125-CS                          1.125 2-44        NMP2-10-1.00-CS                                  1.00 2-45        NMP2-10-.719-CS                                  .719 2-46        NMP2-10-.594-CS                                  .594 2-47        NMP2-1 0-.365-CS                                .365 2-48        NMP2-9.3-1.77-CS                                1.77 2-49        NMP2-8-.906-CS                                  .906 File: NMP1ISIPL.wpd
 
NINE MILE POINT                                            NMP1-ISI-003-1 0 V NIAGARA                                NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                                  Rev. 0 TEN-YEAR INSERVICE INSPECTION                                  Date:  October 15, 1999 PLAN AND SCHEDULE
                                                            '  "'>>', '>> 'w 'w                '*",
PENDIX Q
                  ,',',ULTR'A'SONIC CAL'IBRATION'BLOCKS.
                                                                                ':".'-,.'"'TEM NUMBER ';    . -'.", "..'"".'-".""'":BLOCK 2-50              NMP2-8-.718-CS                                                                    .718 2-51              NMP2-8-.594-CS                                                                    .594 2-52              NMP2-8-.500-CS                                                                    .500 2-53              NMP2-8-.322-SS                                                                    .322 2-54              NMP2-8-.322-CS                                                                    .322 2-55              NMP2-6.3-1.24-CS                                                                  .562 2-57              NMP2-6-.432-CS                                                                    .432 2-58              NMP2-6-.280-CS                                                                    .280 2-59              NMP2-5.8-.365-SS                                                                  .365 2-60              NMP2-5.25-.69-NOZ                                                                  .69 2-61              NMP2-5-.78-CS                                                                      .78 2-62              NMP2-4-.337-SS                                                                    .337 2-63              NMP2-4-.337-SS-182                                                                .337 2-64              NMP2-4-.337-CS                                                                    .337 2-65              NMP2-4-.250-CS                                                                    .250 2-66              NMP2-4-.250-SS                                                                    .250 2-67              NMP2-3.25-23.5-STUD                                                              23.5 2-68              NMP2-2.25-10-STUD                                                                10.0 2-69              NMP2-IR-9-CS                                                                        9.0 2-70              NMP2-IR-7.5-CS                                                                      7.5 2-71              NMP2-IR-4-CS                                                                        4.0 2-72              NMP2-RHS-.75-CS                                                                      .75 2-73              NMP2-RHS-IR-3.75-CS                                                                3.75 2-74              NMP2-FLG-RPV                                                                      38.0 File: NMP1ISIPL.wpd
 
NINE MILE POINT                                NMP1-ISI-003-1 0 Y NIAGARA                        NUCLEAR POWER STATION N @MOHAWK THIRD INSERVICEINSPECTIONINTERVAL                    Rev.      0 TEN-YEAR INSERVICE INSPECTION                    Date:    October 15, 1999 PLAN AND SCHEDULE
                                '," "APPENDIX:C;:; '; ',";,"',:~~," -;:. "."' '  ..."
ULTRASONIC CALIBRATIONBLOCKS;::,':: '::
                              ': ":i; BLOCK."".                  ".
                                                                    ",THICKNESS,'.69 2-75      NMP2-RPV-STUD-1 2-76      NMP2-RPV-NUT-1                                                      7.125 2-77      NMP2-128-1-RPV                                                        5.25 2-78      NMP2-127-1-RPV                                                        3.18 2-79      NMP2-126-1-RPV                                                        7.90 2-80      NMP2-1 25-1-RPV                                                      6.80 2-81      NMP2-124-1-RPV                                                        6.68 2-82      NMP2-123-1-RPV                                                        8.11 2-900      GE795E254G3 2-84      NMP2-2.24-15.88-STUD                                              15.88 1-95      H JT-6-13-A                                                            .55 File: NMP1ISIPL.wpd
 
NINE MILE POINT                      NMP1-ISI-003-10 hl Y NIAGARA                          NUCLEAR POWER STATION H V MOHAWK THIRD INSERVICE INSPECTION INTERVAL          Rev. 0 TEN-YEAR INSERVICE INSPECTION          Date:  October 15, 1999 PLAN AND SCHEDULE
                                          ,,APPENDIX D CL'ASS 1, 2 and 3 WELDlSUPPORT LOCATION QAPS-DRAWING NUMBER        SYSTEM            TITLE C-26830-C              01              Main Steam C-26831-C              02              Main Steam C-26832-C              03              Main Steam C-27165-C              05              Emergency Condenser Vent C-27165-C            05.1              Emergency Condenser Vent C-27165-C            05.2              Emergency Condenser Vent C-26839-C            31                High Pressure Reactor Feedwater C-26846-C            32                Reactor Recirculation C-26852-C            33                Reactor Clean UP C-26852-C            33.1              Reactor Clean UP C-26839-C            33.2              Reactor Clean UP C-26839-C            33.3              Reactor Clean UP C-26851-C            34                Reactor Head Spray F-45028-C            36                Reactor Instrumentation C-26852-C            37                Reactor Drain C-45060-C            37                Reactor Head Vent C-26852-C            37.1              Reactor Drain C-26847-C            38              Reactor Shutdown Cooling C-26843-C            39              Emergency Condenser C-26844-C            40              Reactor Core Spray C-35682-C              40.1            Reactor Core Spray C-27168-C              41              Liquid Poison C-27168-C              42              Liquid Poison File: NMP1ISIPL.wpd
 
0 NINE MILE POINT                            NMP1-ISI-003-10 El Y NIAGARA                          NUCLEAR POWER STATION H 4 MOHAWK THIRD INSERVICE INSPECTION INTERVAL            Rev. 0 TEN-YEAR INSERVICE INSPECTION                Date:  October 15, 1999 PLAN AND SCHEDULE APPENDIX D CLASS 1, 2 and 3 VlELNSUPPORT LOCATION MAPS DRAY/ING NUMBER        SYSTEM          TITLE C-27168-C              42.1            Liquid Poison C-26849-C              44.1            Control Rod Drive Hydraulic C-34124-C              44.2            Control Rod Drive Hydraulic C-27171-C              54              Fuel Pool Cooling C-27178-C              66              Main Steam Line C-26855-C            70              Reactor Building Closed Loop Cooling C-39816-C            70              Closed Loop Cooling C-27179-C            72              Service Water System F-45236-C            72              Service Water System C-26848-C            80              Reactor Containment Spray C-27181-C            80.1            Reactor Containment Spray C-26845-C            81              Reactor Core Spray C-26845-C            81.1            Reactor Core Spray C-27183-C            93              Containment Spray Cooling Raw Water N/A              Weld Map Index 01              Main Steam 2A                    01              Main Steam 2B                    01              Main Steam 02              Main Steam 3A                    02              Main Steam 03              Main Steam Turbine By Pass to Condenser 31              Reactor Feedwater 5A                                    Reactor Feedwater 34              Reactor Head Spray File: NMP1ISIPL.wpd
 
NINE MILE POINT                              NMP1-ISI-003-10 hl Y NIAGARA                              NUCLEAR POWER STATION H U MOHAWK THIRD INSERVICE INSPECTION INTERVAL              Rev. 0 TEN-YEAR INSERVICE INSPECTION                  Date:  October 15, 1999 PLAN AND SCHEDULE
:-'- CLASS 1, 2 an'd,3 WELD/SUPPORT,L'OCATfON IIIIAPS;:      -;
J      F DRAW!NG":NUMBER,- ;SY'TEM'=,"",''-,.",
32              Reactor Recirculation 7A                        32              Reactor Recirculation 7B                        32              Reactor Recirculation Pump Discharge Instrumentation 7C                        32              Reactor Recirculation Pump Instrumentation 7D                      36                Reactor Recirculation Pump Seal Cavity Instrumentation 36                Reactor Instrumentation Level Protection System 8A                      36                Reactor Instrumentation Level Control Range 8B                      36                Reactor Instrumentation Level Control Range 8C                      36                Reactor Instrumentation Level Protection System 8D                      36                Reactor Instrumentation Wide Range Level 8E                      36                Reactor Instrumentation Seal Leak Detection 8F                      36                Reactor Instrumentation Level Triple Low 8G                      36                Reactor Instrumentation Level Triple Low 8H                      36                Reactor Instrumentation Emergency Condenser Steam 8J                      36                Reactor Instrumentation Emergency Condenser Steam 37, 37.1          Reactor Head Vent and Drain 10                      38                Reactor Shutdown Cooling 10A                      38                Reactor Shutdown Cooling 39              Emergency Condenser Steam Supply 11A                      39              Emergency Condenser Steam Return 11B                      39              Emergency Condenser Drain and Overflow Lines 12                        40, 40.1        Reactor Core Spray 12A                        40,40.1          Reactor Core Spray 13                        80,80.1          Reactor Core Spray File: NMP1ISIPL.wpd
 
NINE MILE POINT                          NMP1-ISI-003-1 0 V NlAGARA                                      NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL          Rev. 0 TEN-YEAR INSERVICE INSPECTION            Date:  October 15, 1999 PLAN AND SCHEDULE
            '"" -:" ":;=';"""CLASS"1"2and 3 WELDtSUPPQRT,.:LOCATION MAPS""-"""'"':,"
DRAWING NUMBER, SYSTEM'-'0,80.1 13A                                              Reactor Core Spray 13B                        80,80.1                Reactor Core Spray 13C                        80,80.1                Reactor Core Spray 14                        42.1                  Liquid Poison 15                        80                    Reactor Containment Spray 15A                        80                    Reactor Containment Spray 15B                        80                    Reactor Containment Spray 15C                        80                    Reactor Containment Spray 15D                        80                    Reactor Containment Spray 16                          93,93.1                Reactor Containment Spray 16A                        93,93.1                Reactor Containment Spray 16B                        93,93.1                Reactor Containment Spray 16C                        93,93.1                Reactor Containment Spray 17                          44.2                  Control Rod Drive 17A                        44.2                  Control Rod Drive 18                          44.1                  Control Rod Drive 19                          44.3                  Control Rod Drive 20                          33332333              Reactor Clean Up 21                          27                    Reactor Head Spray 22                          05,05.1,05.2          Emergency Condenser Vent 22A                        05,05.1,05.2          Emergency Condenser Vent 23                        23                    Main Steam Line Drain 24                          66                    Main Steam Power Operated Relief Valve Discharge 24A                        66                    Main Steam Power Operated Relief Valve Discharge File: NMP1ISIPL.wpd
 
NINE MILE POINT                                                                                NMP1-ISI-003-1 0 4Y NIAGARA NUCLEAR POWER STATION MOHAWK THIRD INSERVICE INSPECTION INTERVAL                                                          Rev.                  0 TEN-YEAR INSERVICE INSPECTION                                                              Date:            October 15, 1999 PLAN AND SCHEDULE
          . ': ~';",- "'::, - ":-CLASSi1'2 and'3'-"~VfFL'DISUPPORT LQCATjON'',MAPS:.:::,'; -";"':;i": ':::':--':,9!-"::.
'DRAWING NUMBER'SYSTEM,.'',".;r",,%w TlTL'E:,'
                                                    -            " ';, ',','i'i ',
z '<'P 'ill'qg~P~;, "'j;"l'P,",.;,ii," .i'~! .'""s ',~;> j;", '"~ ',  '; ', .'...r.': ~":,.;"".".',
25                              80.1                Reactor Containment Spray 25A                              80.1                Reactor Containment Spray 26                              41,42              Liquid Poison 28                              00.0                Reactor Vessel 28A                              00.0                Reactor Vessel File: NMP1ISIPL.wpd
 
NINE MILE POINT                                NMP1-ISI-003-1 0 Y NIAGARA                                NUCLEAR POWER STATION N U MOHAWK THIRD INSERVICE INSPECTION INTERVAL                    Rev.      0 TEN-YEAR INSERVICE INSPECTION                      Date:    October 15, 1999 PLAN AND SCHEDULE APPENDIX E ASME CODE CASES The following ASME Code Cases have been reviewed for possible use during the Third Inservice Inspection Interval. Code Cases used during the inspection interval shall be identified with the specific component within the Inspection/ Examination Tables.
ASME CODE CASE LISTING CODE CASE      TITLE                                                                    RG 1.147        IMPLEMENTED NUMBER                                                                                  Revision        IN PROGRAM N-236-1      Repair and Replacement of Class MC Vessels, Section XI,                    Rev. 12              No Division 1.
N-355        Calibration Block for Angle Beam Ultrasonic Examination of                Rev. 12 Large Fittings in accordance with Appendix III-3410, Section XI, Division 1.
N-389-1      Alternative Rules for Repairs, Replacements, or Modifications,            Rev. 12              No Section XI, Division 1 N-416-1      Alternative Pressure Test Requirement for Welded Repairs or              Rev. 12              Yes Installation of Replacement Items by Welding, Class 1, 2 and 3, Section XI, Division 1.
N-432        Repair Welding Using Automatic or Machine Gas Tungsten-Arc                Rev. 12              No Welding (GTAW) Temper Bead Technique, Section XI, Division 1.
N-457        Qualification Specimen Notch Location for Ultrasonic                      Rev. 12 Examination of Bolts and Studs, Section XI, Division 1.
N-458-1      Magnetic Particle Examination of Coated Materials, Section XI,              None                No Division 1.
N-460        Alternative Examination Coverage for Class      1 and Class 2            Rev. 12              Yes Welds, Section XI, Division 1 N-461        Alternative Rules For Piping Calibration Block Thickness, Section        Rev. 12              No XI, Division 1 N-472        Use of Digital Readout and Digital Measurement Devises for                Rev. 12              No performing Pump Vibration Testing, Section XI, Division 1.
N-485-1      Eddy Current Examination of Coated Ferritic Surfaces as an                Rev. 12              No alternative to Surface Examination, Section XI, Division 1.
N-490-1 E,            S  t'I Alternative Vision Test Requirements for Nondestructive Division 1 Rev. 12              No File: NMP1ISIPL.wpd
 
NINE MILE POINT                          NMP1-ISI-003-10 V NlAGARA                              NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL              Rev. 0 TEN-YEAR INSERVICE INSPECTION                Date:  October 15, 1999 PLAN AND SCHEDULE ASME CODE CASE LISTING CODE CASE      TITLE                                                              RG 1.147    IMPLEMENTED NUMBER                                                                          Revision    IN PROGRAM N-491-1      Alternative Rules for Examination of Class 1, 2, 3, and MC          Rev. 12          Yes Component Supports, Section XI, Division N-496-1      Helical Coil Threaded Inserts, Section XI, Division 1              Rev. 12 N-498-1      Alternative Rules for 10-Year System Hydrostatic Testing for        Rev. 12 Class 1, 2 and 3 Systems, Section XI, Division 1 N-504-1      Alternative Rules for Repair of Class 1, 2 and 3 Austenitic        Rev. 12          No Stainless Steel Piping, Section XI, Division 1 N-509      Alternative Rules for the Selection and Examination of Class 1, 2  Rev. 12          Yes and 3 Integrally Welded Attachments, Section XI, Division 1 N-516      Underwater Welding, Section XI, Division 1                          Rev. 12          No Pressure Testing of Containment Penetration Piping, Section XI, Division 1 N-523      Mechanical Clamping Devices for Class 2 and 3 piping, Section        None            No XI, Division 1.
N-524      Alternative Examination Requirements for Longitudinal Welds in    Rev. 12          Yes Class 1 and Class 2 Piping, Section XI, Division 1 N-526      Alternative Requirements for Successive Inspection of Class  1      None            Yes and 2 Vessels, Section XI, Division 1 N-532      Alternative Requirements to Repair and Replacement                  None            Yes Documentation Requirements and Inservice Summary Report Preparation and Submission as required by IWA-4000 and IWA-6000, Section XI, Division 1.
N-534        Alternative Requirements for Pneumatic Pressure Testing,            None            No Section XI, Division 1 N-537        Location of Ultrasonic Depth Sizing Flaws, Section XI, Division 1. Rev. 12          No N-554      Alternative Requirements for Reconciliation of Replacement            None            No Items, Section XI, Division 1.
N-573      Transfer of Procedure Qualification Records Between Owners,          None          Yes Section XI, Division 1.
File: NMP1ISIPL.wpd
 
NINE MILE POINT                NMP1-ISI-003-1 0 V NIAG'AHA                NUCLEAR POWER STATION U MOHAWK THIRD INSERVICE INSPECTION INTERVAL Rev. 0 TEN-YEAR INSERVICE INSPECTION    Date:  October 15, 1999 PLAN AND SCHEDULE END OF DOCUMENT File: NMP1ISIPL.wpd
 
W1lh'
  'tigl ~
0 i
k
'I}}

Latest revision as of 05:20, 7 January 2025

Third Inservice Inspection Interval - Ten-Year Inservice Inspection Plan and Schedule
ML18018B053
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/15/1999
From:
Niagara Mohawk Power Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18018B053 (576)


Text