8005190 CONSUMERS POWER COMPANY Docket 50-255 Request for Change to the Technical Specifications License DPR-20 For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in the Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972, for the Palisades Plant be changed as described in Section! below:
r., 8005190 CONSUMERS POWER COMPANY Docket 50-255 Request for Change to the Technical Specifications License DPR-20 For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in the Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972, for the Palisades Plant be changed as described in Section! below:
I. Changes A. Change Section 2.3.7 to read:
I.
              "Containment High Pressure - A reactor trip on containment high pressure is provided to assure that the reactor is. shut down upon the initiation of the safety injection system."
Changes A.
B. Delete Reference 2.3(10).
Change Section 2.3.7 to read:  
C. Change Section 3.3.1.b to read:
"Containment High Pressure - A reactor trip on containment high pressure is provided to assure that the reactor is. shut down upon the initiation of the safety injection system."
              "b. All four safety injection tanks are operable and pressurized to at least 200 psig with a tank liquid volume of at least 1103 ft 3 and a maximum liquid volume of 1166 ft 3 with a boron concentration of at least 1720 ppm but not more than 2000 ppm."
B.
D. Change Section 3.3 basis to read:
Delete Reference 2.3(10).
                " ... The minimum 190-inch level corresponds to a liquid volume of 1103 ft 3 and a maximum 202-inch level corresponds to a liquid volume of 1166 ft 3 , , , , II E. Add Section 3.6.4:
C.
                "Two independent containment hydrogen recornbiners shall be operable when the reactor is at power or at hot standby. With one hydrogen recombiner system inoperable, restore the inoperable system to operable status within 30 days or be in at least hot shutdown within the next 6 hours."
Change Section 3.3.1.b to read:  
F. Add the following to Table 3.17.4:
"b.
Minimum   Minimum Operable  Degree of     Permissible No      Functional Unit      Channels  Redundancy   ByPass Conditions "8    Spent FuelPool                        None   Not required if fuel Criticality M6nitors                          is not stored in fuel handling building."
All four safety injection tanks are operable and pressurized to at least 200 psig with a tank liquid volume of at least 1103 ft 3 and a maximum liquid volume of 1166 ft 3 with a boron concentration of at least 1720 ppm but not more than 2000 ppm."
D.
Change Section 3.3 basis to read:  
"... The minimum 190-inch level corresponds to a liquid volume of 1103 ft 3 and a maximum 202-inch level corresponds to a liquid volume of 1166 ft 3,,,, II E.
Add Section 3.6.4:  
"Two independent containment hydrogen recornbiners shall be operable when the reactor is at power or at hot standby.
With one hydrogen recombiner system inoperable, restore the inoperable system to operable status within 30 days or be in at least hot shutdown within the next 6 hours."
F.
Add the following to Table 3.17.4:
No "8
Functional Unit Spent FuelPool Criticality M6nitors Minimum Operable Channels Minimum Degree of Permissible Redundancy ByPass Conditions None Not required if fuel is not stored in fuel handling building."  


  '1
'1  
. t 2
. t 2
G. Add Footnote (e) as follows:
G. Add Footnote (e) as follows:  
        "(e) With the number of channels operable less than required, perform area surveys with portable instrumentation at least once each 24 hours."
"(e)
H. Change Note (1) on Table 4.1.1 to read:
With the number of channels operable less than required, perform area surveys with portable instrumentation at least once each 24 hours."
11 (1) .The bistable trip tester injects a signal into the bistable and provides for a precision readout of the trip set point."
H.
I. Change Note (5) on Table 4.1.l to read:
Change Note (1) on Table 4.1.1 to read:
11 (5) It is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition. If this. occurs, omitted testing will be performed prior to returning the plant to service."
11 (1).The bistable trip tester injects a signal into the bistable and provides for a precision readout of the trip set point."
J. Add.Notes (4) and (5) identification to Table 4.1.2 as follows:
I.
Change Note (5) on Table 4.1.l to read:
11 (5) It is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition.
If this. occurs, omitted testing will be performed prior to returning the plant to service."
J.
Add.Notes (4) and (5) identification to Table 4.1.2 as follows:  


TAl\LE 4.1.2 Minimum Frequencies for Checks, Calibrations and Testi~ of
TAl\\LE 4.1.2 Minimum Frequencies for Checks, Calibrations and Testi~ of
* Engineered Safety Feature Instrumentation Controls~5J Surveillance Channel Description                    Functiou          Frequency                      Surveillance Method
* Engineered Safety Feature Instrumentation Controls~5J
: l. I.ov-Pressure SIS Initiation       a. Check                     s(5)     a. Comparison of four separate pressure Chan11cl8                                                                        indications.
: l.
: b. Test(!)                    R        b. Signal to meter relay adjust vith test device to verify SIS actuation logic. ~*
Channel Description I.ov-Pressure SIS Initiation Chan11cl8
: c.  'l'est                    M(2}(5)  c. Signal to meter relay adjusted vith t~
: 2.
Lo\\1-l'ressure SIS Signal Dlock PermJssive an~ Auto Reset
: 3.
SIS Actuation Belays Containment lligh-Preasure Channels CoutuJ umcnt High Hadiat.ion Churu1els
: a.
: b.
: c.
: a.
: a.
: b.
: a.
: b.
: c.
: u.
: b.
Surveillance Functiou Check Test(!)
'l'est
'l'est
'!'est CalJbrate
*rest*
Test Check Culibrnte Frequency s(5)
R M(2}(5)
R R
R R
R
: a.
: b.
: c.
: a.
: a.
: b.
a *.
- b.
: c.
: a.
: b.
Surveillance Method Comparison of four separate pressure indications.
Signal to meter relay adjust vith test device to verify SIS actuation logic. ~*
Signal to meter relay adjusted vith t~
device.
device.
: 2. Lo\1-l'ressure SIS Signal Dlock    a.                            R        a. Part of l(b) above.
Part of l(b) above.
PermJssive an~ Auto Reset
Simulation of SIS 2/4 logic trip using built:..in testing system.
: 3. SIS Actuation Belays                a.  'l'est                              a. Simulation of SIS 2/4 logic trip using built:..in testing system. Both "standby power" and "no standby pover" circuits vHl be tested for left and right chan-nels. Test wil.l verify functioning of initiation circuits of ull equipment .
Both "standby power" and "no standby pover" circuits vHl be tested for left and right chan-nels.
nonnally operated by ~IS signals* *
Test wil.l verify functioning of initiation circuits of ull equipment.
: b.  '!'est                    R        b. Complete automatic test initiated by srune method us Item l(b) and including all normal nutoma.tic operations.
nonnally operated by ~IS signals*
Containment lligh-Preasure          a. CalJbrate                  R        a *. Known pressure' lipplied to sensors.         A Channels                            b.  *rest*                    R      - b. Simulation of CllP 2/11 logic trip .to
* Complete automatic test initiated by srune method us Item l(b) and including all normal nutoma.tic operations.
* verify*actuution logic for SIS, .con-tuinment isolation and containment spray~
Known pressure' lipplied to sensors.
: c. Test                                c. Pressurc*switch operation simulated by opening or*shorting terminals or pres-sure ~1pplied to the switch.
A Simulation of CllP 2/11 logic trip.to verify*actuution logic for SIS,.con-tuinment isolation and containment spray~
CoutuJ umcnt High Hadiat.ion        u. Check                                a. Coi11par loon of four separate rudlution Churu1els                                                                        leve.L i11Ji.cutions.
Pressurc*switch operation simulated by opening or*shorting terminals or pres-sure ~1pplied to the switch.
: b. Culibrnte                  R        b. Exponure   to known external radiation nourct:.
Coi11par loon of four separate rudlution leve.L i11Ji.cutions.
 
Exponure to known external radiation nourct:.
TAllLE 4 *l . 2 Minimum Frequencies for Checks, Calibrations and Testing 9f Engineered Safety Feature Instrumentation Controls (Contd)~5)
: 5.
Surveillance Channel DescriEtion                   Function             Freguencl                       Surveillance Method
: 6.
: 5. Contuin.ment High Radlation         c. Test                         f.1(2)         c. Remote-operated integral radiation check Channels (Contd}                                                                         source ~sed to verify instrument opera-tion.
: 7.
                                            .d. Test                         R             d. Simulation of CHR 2/4 logic trip v~ th   .
: 8.
test switch to verify actuation rel~y~
i:-*
: 9.
-I
: 10.
: 11.
: 12.
TAllLE 4
* l. 2 Minimum Frequencies for Checks, Calibrations and Testing 9f Engineered Safety Feature Instrumentation Controls (Contd)~5)
Surveillance Channel DescriEtion Function Freguencl Surveillance Method Contuin.ment High Radlation
: c. Test f.1(2)
: c. Remote-operated integral radiation check Channels (Contd}
source ~sed to verify instrument opera-tion.  
.d.
Test R
: d.
Simulation of CHR 2/4 logic trip v~ th test switch to verify actuation rel~y~
including contaii1Illent isolation.
including contaii1Illent isolation.
: 6. Munual SIS Initiation               a. Test                         R             a. Manual push~buttoil test.
Munual SIS Initiation
: 7. f.tanuul Containment Isola-         o.. Test                         R             a. Manual push-button test.
: a. Test R
tion Initiation                   . b. Check                         R             b. Observe isolation val.ves closure.
: a.
: 8. Manuul Initiation Contain-ment Spray Pwnps and Valves         a. Test                         R             a. Mani1al switch operation.
Manual push~buttoil test.
i:-
f.tanuul Containment Isola-o..
-I  9. OBA Dequencers                       a. Test                         Q(~)           a. Proper operation will be verified during SIS o.ctuo.tion test of Item* 3(a) above.
Test R
: 10. Normal Shutdown Sequencers           a. *rest                         R     ***=:. a. Simulate normal actuation vith
: a. Manual push-button test.
                                                                                                                              . . test~
tion Initiation  
. b.
Check R
: b.
Observe isolation val.ves closure.
Manuul Initiation Contain-ment Spray Pwnps and Valves
: a. Test R
: a.
Mani1al switch operation.
OBA Dequencers
: a. Test Q(~)
: a. Proper operation will be verified during SIS o.ctuo.tion test of Item* 3(a) above.
Normal Shutdown Sequencers
: a. *rest R  
***=:.
: a. Simulate normal actuation vith test~
ppei*nte switch and verify equipment slo.rting circuits *.
ppei*nte switch and verify equipment slo.rting circuits *.
: 11. Diesel Start                         a. Test                         M             a. Manual initi&tion followed by synchro-nizing and loo.ding~
Diesel Start
: b. Test                         R             b. Diesel start, loo.d shed, synchronizin~
: a. Test M
: a.
Manual initi&tion followed by synchro-nizing and loo.ding~
: b. Test R
: b.
Diesel start, loo.d shed, synchronizin~
and loading wiil be verified during Item 3( b)
and loading wiil be verified during Item 3( b)
* o.bove.
* o.bove.
: c. Test                         p             c. Diesel auto start initiating circuits.
: c.
: 12. SIRW Tank Level Svltch               a. Test                         R             *a. Level switches removed from fluid to Interlocks                                                                               verity u,ctuation logic~
Test p
: b. 'l'est                       Q{4)(5) b.       Use SIRW tank and containment sump control switch to verify actuation of valves.*
: c.
Diesel auto start initiating circuits.
SIRW Tank Level Svltch
: a. Test R  
*a. Level switches removed from fluid to Interlocks Q{4)(5) verity u,ctuation logic~
: b.  
'l'est
: b. Use SIRW tank and containment sump control switch to verify actuation of valves.*  


                                                                'rAnLE 11.1.2 Minimum Frequencies for Checks, Calibrations and Testing ~S Engineered Safety Feature Instrumentation Controls (Contd) )
s::-
Survelllance Channel DescriEtion                       Function            Freg,uencl              Surveillance Method
I O>
: 13. Safet.y Injection Tank Level           a. Check                       s(5}       a. Verify that level and pressure indica-and Pressure Instruments                                                            tion is between independent high high/
'rAnLE 11.1.2 Minimum Frequencies for Checks, Calibrations and Testing ~S Engineered Safety Feature Instrumentation Controls (Contd)  
)
Channel DescriEtion
: 13.
Safet.y Injection Tank Level and Pressure Instruments 1'4.
Dorlc Acid 'l'unk Level Switches
: 15. lloric /\\ci d Heat Tracing System
: 16.
* Mui n Steam Isolation Valve Circuits
: 17.
SIHW 'l'ank 'l'e1nperature Indication and Alurmfl
: 18.
Low-Pressure Sufety Injection 1"low Control Vulve CV-3006
: 19. Safety Injection Dottle Isol.ntion Valves
: 20. Safely Iujection Mi niflow Vtllvcs CV-302*1. 30'..iG Survelllance Function
: a.
Check
: b.
Calibrate 0..
*.refl t
: a.
Check
: a.
Check
: b.
Test(J)
: a.
Check
: b.
Calibrate
: a.
Check
: a.
Check
: a.
Check Freg,uencl s(5}
n R
D s<5).
R M
R p
p p
: a.
: b.
: a.
. a.
: a.
: b.
: a.
: b.
: a.
: a.
Surveillance Method Verify that level and pressure indica-tion is between independent high high/
low alarms for level and pressure.*
low alarms for level and pressure.*
: b. Calibrate                  n          b. Known pressure and differential pres-sure applied to pressure and level sensors.
Known pressure and differential pres-sure applied to pressure and level sensors.
1'4. Dorlc Acid 'l'unk Level Switches      0.. *.refl t                    R          a. Pump tank below low-level alarm point
Pump tank below low-level alarm point
* to verify switch operation.
* to verify switch operation.
: 15. lloric /\ci d Heat Tracing System      a. Check                      D        . a. Observe temperature recorders for proper rendinc;s.
Observe temperature recorders for proper rendinc;s.
s::- 16.
Compare four independent pressure indi-cutions.
* Mui n Steam Isolation Valve            a. Check                      s<5).      a. Compare four independent pressure indi-I O>          Circuits                                                                            cutions.
Signal to meter relay adjusted vi th test device to verify MSIV circuit logic.
: b. Test(J)                    R          b. Signal to meter relay adjusted vi th test device to verify MSIV circuit logic.
Compure independent temperature readouts.
: 17. SIHW 'l'ank 'l'e1nperature            a. Check                      M          a. Compure independent temperature readouts.
Known resistance applied to indicating loop.
Indication and Alurmfl                b. Calibrate                  R          b. Known resistance applied to indicating loop.
Obflcrve valve is open with ait supp~'
: 18. Low-Pressure Sufety Injection          a. Check                      p          a. Obflcrve valve is open with ait   supp~'
isolated.
1"low Control Vulve CV-3006                                                          isolated.
Ensure each valve open by observing valve position indication nnd valve itself.
: 19. Safety Injection Dottle                a. Check                      p          a. Ensure each valve open by observing valve Isol.ntion Valves                                                                    position indication nnd valve itself.
The11 lock open breakers (at r.iCC-9) and e control power (key svitch in control room).
The11 lock open breakers (at r.iCC-9) and control power (key svitch in control e
: a.
room).
Verify valves open and HS-3027-and 3056 positioned to rnaintain them open~
: 20. Safely Iujection Mi niflow            a. Check                      p          a. Verify valves open and HS-3027- and 3056 Vtllvcs CV-302*1. 30'..iG                                                            positioned to rnaintain them open~
Notes:
Notes:     (1)   Calibl"ation of the sensors iu performed during calibration of Item 5(b), Table 4.1.l.
(1)
(2)    All monthly tests will be done on only one channel at a time to prevent protect.ion system actuation.
(2)
(3)  Calibration of the sensors is performed during calibration of Item 7(b), Table 4.1.1.
(3)
(4)  Perform prior to each start-up, if the plant is in a cold shutdown condition, if not already performed during the previous quarter.                             *
(4)
(5It is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition. If this occurs, omitted testing will be performed prior to returning the plant to service *.
Calibl"ation of the sensors iu performed during calibration of Item 5(b), Table 4.1.l.
(5}
All monthly tests will be done on only one channel at a time to prevent protect.ion system actuation.
Calibration of the sensors is performed during calibration of Item 7(b), Table 4.1.1.
Perform prior to each start-up, if the plant is in a cold shutdown condition, if not already performed during the previous quarter.
It is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition. If this occurs, omitted testing will be performed prior to returning the plant to service *.
 
3 K.
Add Note {4) to Table 4.1.2 to read:
"(4) Performprior to each start~up, if the plant is in a cold shutdown condition, if.not already performed during the previous quarter."
L.
Change Note (5) to Table 4.1.2 to read:
11 (5)
It is not necessary to perform the specified testing dqring prolonged periods in the cold shutdown condition.
If this occurs, omitted testing will be performed prior to returning the plant to service."
M.
Add Note (5) identification to Table 4.1.3 as follows:


3 K. Add Note {4) to Table 4.1.2 to read:
N.
  "(4) Performprior to each start~up, if the plant is in a cold shutdown condition, if.not already performed during the previous quarter."
Change Item 2. in T.able 4.1. 3 to read:
L. Change Note (5) to Table 4.1.2 to read:
112.
11 (5) It is not necessary to perform the specified testing dqring prolonged periods in the cold shutdown condition. If this occurs, omitted testing will be performed prior to returning the plant to service."
Primary Rod Position Indication System
M. Add Note (5) identification to Table 4.1.3 as follows:
: a.
* 4 N. Change Item 2. in T.able 4 .1. 3 to read:
Check
11
: b.
: 2. Primary Rod      a. Check          s(S) a. Comparison of Position                                        output data with Indication
Check
: c.
Calibrate/
Check
: 0.
Change Item 3 in Table 4.1.3 to read:
4 s(S)
: a.
Comparison of output data with
* secondary RPIS.
* secondary RPIS.
System
M(S)
: b. Check          M(S) b. Check of power dependent insertion limits monitoring system.
: b.
: c. Calibrate/    R    c. Physically measure Check                      rod drive position used to verify system accuracy. Check rod posit:i.on interlocks. 11
Check of power dependent insertion limits monitoring system.
: 0. Change Item 3 in Table 4.1.3 to read:
R
113. Secondary Rod   a. Check         s (5) a. Comparison of output Position                                        data with primary RPIS.
: c.
Physically measure rod drive position used to verify system accuracy.
Check rod posit:i.on interlocks.
11 113.
Secondary Rod
: a.
Position Check s (5)
: a.
Comparison of output data with primary RPIS.
Indication System
Indication System
: b. Check               b. Same as 2(b) above, including out-of-sequence alarm functions.
: b.
: c. Calibrate/     R     c. Same as 2(c) above. 11 Check P. D~lete   Item 5 in Table 4.1.3.
Check
Q. Change Item 6 in Table 4.2.l to read:
: b.
11
Same as 2(b) above, including out-of-sequence alarm functions.
: 6. Spent Fuel Pool     Boron Concentration       Monthly(7)                  9 .4 Bulk Water Temperature   Continuously when          None bundles are stored in tilt pit racks with less than one year decay(6)"
: c.
R. Change Item 7 in Table 4.2.1 to read:
Calibrate/
Check R
: c.
Same as 2(c) above.
11 P.
D~lete Item 5 in Table 4.1.3.
Q.
Change Item 6 in Table 4.2.l to read:
116.
Spent Fuel Pool Boron Concentration Bulk Water Temperature R.
Change Item 7 in Table 4.2.1 to read:
117
117
* Secondary Coolant   Gas Radioactivity by       Continuous(S)              None Air Ejector Gas Monitor   during power operation Coolant Gross Radio-       3 times/7* days           None activity                  with a maximum of 72 hours between samples
* Secondary Coolant Gas Radioactivity by Air Ejector Gas Monitor Coolant Gross Radio-activity Monthly(7)
Continuously when bundles are stored in tilt pit racks with less than one year decay(6)"
Continuous(S) during power operation 3 times/7* days with a maximum of 72 hours between samples 9.4 None None None


TABLE 11.1. 3 Minimum Frequencies for Checks, Ca.l.ibrations and Testing of Miscellaneous Instrumentation and <::ontroJ_s{5)
TABLE 11.1. 3 Minimum Frequencies for Checks, Ca.l.ibrations and Testing of Miscellaneous Instrumentation and <::ontroJ_s{5)
Surveillance Channel Description                Function        Freguency                Surveillance Method
: 1.
: 1. Start-Up Ro.np,e Neutron       a. Check                    s      a. Comparison of both channel count rate J.lonitors                                                            indications when in service.
: 2.
: b. Tes.t                   .P      b* Internal te~t signals.
Channel Description Start-Up Ro.np,e Neutron J.lonitors Primary Rod Position Inuico.tion System i:-
: 2. Primary Rod Position Inuico.tion System a.
: 3.
b.
I Secondary Rod Position lndi.co.tion System 0
Check Check s{5)*.
Areu and Process Monitors
M(5) a.
: 5. This item deleted.
b.
* 6.
Environmental Monitors
: 7.
Pressurizer Level Inat rmneuts
: a.
: b.
: a.
: b.
: c.
Surveillance Function Check Tes.t Check Check Ca.l.ibra.te/Ch~ck
: a.
Check
: b.
Check
: c. Calibrate/Check
: a.
Check
: b.
Co.librate
: c.
Test
: a.
Check
: b.
Calibrate
: a.
Checl~
: b.
Calibrate
: c.
'l'est Freguency s  
. P
{5)*
s.
M(5)
R D
M M
A 5(5)
: a.
b *
: a.
: b.
: c.
Surveillance Method Comparison of both channel count rate indications when in service.
Internal te~t signals.
Comparison of output.data vith secondary RPIS.
Comparison of output.data vith secondary RPIS.
Check of power dependent insertion limits monitoring system.
Check of power dependent insertion limits monitoring system.
: c. Ca.l.ibra.te/Ch~ck      R      c. Physically measured rod drive position used to verify system accuracy. Check rod I
Physically measured rod drive position used to verify system accuracy.
position interlocks.     *
Check rod position interlocks.
* i:-    3. Secondary Rod Position        a. Check                            a. Comparison of output data vith primary I
: a.
.....      lndi.co.tion System                                                    RPIS
Comparison of output data vith primary RPIS
* 0
* I
: b. Check                            b. Same as 2(b) above, including out-of-sequence.*
: b.
alann function~     *
Same as 2(b) above, including out-of-sequence.*
: c. Calibrate/Check                c. Same as 2{c) above.
alann function~
Areu and Process Monitors    a. Check                    D      a. tlormal readings observed arid internal test signals used to verify instrument operation.
: c. Same as 2{c) above.
: b. Co.librate                      b. Exposure to known external radiation source.
: a.
: c. Test                      M      c. Detector el!l'osed to remote op~ratcd radiation check source.
tlormal readings observed arid internal test signals used to verify instrument operation.
: 5. This item deleted.
: b.
* 6. Environmental Monitors        a. Check                    M      a. Operational .check.**
Exposure to known external radiation source.
: b. Calibrate                A      b. Verify nirflow indicator.
: c. Detector el!l'osed to remote op~ratcd radiation check source.
: 7. Pressurizer Level              a. Checl~                    5(5)  a. Comparison of six independent level Inat rmneuts                                                            rendings.
: a. Operational.check.**
: b. Calibrate                        b. Known differential pressure applied to sensor.
: b.
: c.   'l'est                          c. Si~nal to meter relay adjusted vith test device.
Verify nirflow indicator.
: a.
Comparison of six independent level rendings.
: b.
Known differential pressure applied to sensor.
: c.
Si~nal to meter relay adjusted vith test device.  


TABLE 11 .1. 3 i-unimum F*t."e<;.uencies for Checka, Ca.libratior!" anrl Testing of Mit1cellwi~ous Instrumentetion and. Controls (Contd)(5)
TABLE 11.1. 3 i-unimum F*t."e<;.uencies for Checka, Ca.libratior!" anrl Testing of Mit1cellwi~ous Instrumentetion and. Controls (Contd)(5)
Surveillance Channel Descri;etion                   Function     1',reguencv                 Surveillance Method
Surveillance Channel Descri;etion Function 1',reguencv Surveillance Method
: o. Control Rod Drive System             a. Test                 R   a. Verify. proper operation of all rod drive Interlocks                                                               control system interlocks, using simulated
: o.
                                                                                *signals vhere necessary.
Control Rod Drive System
: b. Test                 p   b. Same as 8(a) above, if not done vithin three months.
: a.
: 9. Flux-.AT Pover Comparator           a.
Test R
b~
: a.
Calibrate Test                ~(5) a.
Verify. proper operation of all rod drive Interlocks control system interlocks, using simulated  
b.
*signals vhere necessary.
: b.
Test p
: b.
Same as 8(a) above, if not done vithin three months.
: 9.
Flux-.AT Pover Comparator
: a.
Calibrate
~(5)
: a.
Use simulated signals.
Use simulated signals.
b~ Test
: b.
Internal test signal.
Internal test signal.
e
: 10.
: 10. Ca~orimetric     Instrumentation   a. Calibrate           *n   a. Kno'\lll differential pressure applied to feed-vater flov sensors.
Ca~orimetric Instrumentation
Containment Building Humidity       a. . Test                 R   a.
: a.
Expose sensor to high .humidity atmosphere.
Calibrate  
11.
*n
Detectors
: a.
Kno'\\lll differential pressure applied to feed-vater flov sensors.
: 11.
Containment Building Humidity a.. Test R
: a.
Expose sensor to high.humidity atmosphere.
Detectors  
~
~
I
I
: 12. Interlocks - Isolation Valves       a. *Calibrate             R   a. Knovn pressure applied to sensor.
: 12.
~       on Shutdo\lll Cooling Line
Interlocks - Isolation Valves a. *Calibrate R
: 13. Service Water Break Detector         a. Test                 R   a. Known differential pressure hpplied to in Containment                                                         sensors.
: a.
: 14. Cont1*ol Room Ventilation           a. *Test                   R   a. Check damper operation for DBA mode vith HS-1801 and isolation signal.
Knovn pressure applied to sensor.  
: b. Test               *R   b. Check control room for positive pressure.
~
on Shutdo\\lll Cooling Line
: 13.
Service Water Break Detector
: a. Test R
: a.
Known differential pressure hpplied to in Containment sensors.
: 14.
Cont1*ol Room Ventilation
: a. *Test R
: a.
Check damper operation for DBA mode vith HS-1801 and isolation signal.
: b.
Test  
*R
: b.
Check control room for positive pressure.
(5)rt* is not necessary to perform the specified testing during prolonged periods in. the cold shutdo~
(5)rt* is not necessary to perform the specified testing during prolonged periods in. the cold shutdo~
or re.t'ueling conditions~ If this occurs, omitted testing will be performed prior to returning the plant to service.                   *        *
or re.t'ueling conditions~ If this occurs, omitted testing will be performed prior to returning the plant to service.
* 5 "pH and specific         Once/24 hours during.* None conductivity            power operation Sodi&#xb5;m                  3 times/7 days         None during power opera-tion, with a maximum of, 72 hours between samples Isotopic Analysis for. a) 1 per 31 days, when-.
e
Dose Equivalent I.;131      ever the gross Concentration.              activity determina-tion indicates iodine concentrations greater than 10% of the allowable limit b) 1 per 6 months, whenever the gross activity determination indicates iodine con-centrations below 10%
 
of the allowable limit" S. Delete Items 7 and 10 in* Table 4.2.2.
"pH and specific conductivity Sodi&#xb5;m Isotopic Analysis for.
T. Change Note (4) in Table 4.2.1 to read:
Dose Equivalent I.;131 Concentration.
        "(4) When iodine or particulate radioactivity levels exceed 10 percent of limit in Specifications 3.9.11 and 3.9.14, the sampling frequency shall be increased to. a minimum of once each day."
S.
* U. Change Section 4.5 Basis to read:
Delete Items 7 and 10 in* Table 4.2.2.
        " ... The test pressure (255 psig) achieved either by normal system operation or by hydrostatically testing gives an adequate.margin over the highest pressure within the system after a DBA. Similarly, the hydrostatic test pressure for the return lines from the containment to the shutdown cooling system (100 psig) gives an adequate margin over the highest pressure within the lines after a DBA. (5) ... "
T.
Y. Delete Section 4.6.3 ..
Change Note (4) in Table 4.2.1 to read:
W. Delete Section 4.6.4.
5 Once/24 hours during.* None power operation 3 times/7 days None during power opera-tion, with a maximum of, 72 hours between samples a) 1 per 31 days, when-.
X. Delete Note (1) Table 4.1.3.
ever the gross activity determina-tion indicates iodine concentrations greater than 10% of the allowable limit b) 1 per 6 months, whenever the gross activity determination indicates iodine con-centrations below 10%
II. Discussion A. The. present Technical Specifications (Section 2.3.7) contains a.
of the allowable limit"  
statement that the setting of the containment high-pressure trip is identical to that of the containment high-pressure safety injection signal. The reference to this statement is ~he FSAR, Amendment No 17,
"(4)
* 6 Item 4.0. This statement is in error. The FSAR, Amendment No 17, Item 4.0 states that the containment high-pressure setting has been revised to 5 psig. The basis of the 5 psig set point is to establish a s~tting which would be reached immediately in the event of the DBA, cover as much of the break size spectrum as possible, and, yet be sufficiently above the normal operation maxim&#xb5;m internal pressure to prevent spurious high-pressure signals.
When iodine or particulate radioactivity levels exceed 10 percent of limit in Specifications 3.9.11 and 3.9.14, the sampling frequency shall be increased to. a minimum of once each day."
U.
Change Section 4.5 Basis to read:  
"... The test pressure (255 psig) achieved either by normal system operation or by hydrostatically testing gives an adequate.margin over the highest pressure within the system after a DBA.
Similarly, the hydrostatic test pressure for the return lines from the containment to the shutdown cooling system (100 psig) gives an adequate margin over the highest pressure within the lines after a DBA. (5)... "
Y.
Delete Section 4.6.3..
W.
Delete Section 4.6.4.
X.
Delete Note (1) Table 4.1.3.
II.
Discussion A.
The. present Technical Specifications (Section 2.3.7) contains a.
statement that the setting of the containment high-pressure trip is identical to that of the containment high-pressure safety injection signal.
The reference to this statement is ~he FSAR, Amendment No 17,  
 
6 Item 4.0.
This statement is in error.
The FSAR, Amendment No 17, Item 4.0 states that the containment high-pressure setting has been revised to 5 psig.
The basis of the 5 psig set point is to establish a s~tting which would be reached immediately in the event of the DBA, cover as much of the break size spectrum as possible, and, yet be sufficiently above the normal operation maxim&#xb5;m internal pressure to prevent spurious high-pressure signals.
The proposed Technical Specifications change will delete the statement about the containment high-pressure set point being identical to that of the containment high-pressure safety injection signal since it is no longer valid.
The proposed Technical Specifications change will delete the statement about the containment high-pressure set point being identical to that of the containment high-pressure safety injection signal since it is no longer valid.
B. Reference 10 of Section 2:3 was to support the above statement about the setting of the containment high-pressure trip being identical to that containment high-pressure safety injection signal. Therefore, this reference is not needed.
B.
C. The safety injection (SI) tanks contain an upper and lower level tap, located four inches above and below the vessel head tangent line. The present Technical Specifications requires thRt the tank be maintained with a liquid level of at least 186 inches and a maximum level of 198 inches. The lower level tap is not used by the plant and the sensing line terminates in the injection line.
Reference 10 of Section 2:3 was to support the above statement about the setting of the containment high-pressure trip being identical to that containment high-pressure safety injection signal.
Relocation of the transmitter sensing leg resulted in a new "zero" point for the level transmitter that provides liquid level indication for the SI tanks. The proposed Technical Specifications change reflects the current plant design. This change is in agreement with the Exxon LOCA analysis (XN-NF-77-24, July 1977).
Therefore, this reference is not needed.
C.
The safety injection (SI) tanks contain an upper and lower level tap, located four inches above and below the vessel head tangent line.
The present Technical Specifications requires thRt the tank be maintained with a liquid level of at least 186 inches and a maximum level of 198 inches.
The lower level tap is not used by the plant and the sensing line terminates in the injection line.
Relocation of the transmitter sensing leg resulted in a new "zero" point for the level transmitter that provides liquid level indication for the SI tanks.
The proposed Technical Specifications change reflects the current plant design.
This change is in agreement with the Exxon LOCA analysis (XN-NF-77-24, July 1977).
Taking into account the new "zero" point, the proposed Technical*
Taking into account the new "zero" point, the proposed Technical*
Specifications will set a safety injection tank level of at least 190 inches (1103 ft 3 ) and a maximum level of 202 inches (1166 ft 3 ) .
Specifications will set a safety injection tank level of at least 190 inches (1103 ft 3 ) and a maximum level of 202 inches (1166 ft 3 ).
This change does not change the volume of liquid in the tanks.
This change does not change the volume of liquid in the tanks.
D. The proposed Technical Specifications change to the Basis section of 3.6.4 is to provide the correct safety injection tank liquid levels.
D.
The proposed Technical Specifications change to the Basis section of 3.6.4 is to provide the correct safety injection tank liquid levels.
Refer to Item C for more detail.
Refer to Item C for more detail.
E. The present Technical Specifications were written when venting (purging) of hydrogen, that may be built up inside of containment., was an acceptable practice. For this reason, LCOs and Technical Specifications were not written for the hydrogen recombiners.
E.
Since venting is no longer an acceptable method to eliminate hydrogen buildup, the hydrogen recombiners will be used. Therefore, the proposed T.echnical Specifications provides an LCO and guidelines to govern the recombiner operation.
The present Technical Specifications were written when venting (purging) of hydrogen, that may be built up inside of containment., was an acceptable practice.
F. The present Technical .Specifications (Table 3.17.4) does not provide criteria for the spent fuel pool criticality monitors.
For this reason, LCOs and Technical Specifications were not written for the hydrogen recombiners.
Since venting is no longer an acceptable method to eliminate hydrogen buildup, the hydrogen recombiners will be used.
Therefore, the proposed T.echnical Specifications provides an LCO and guidelines to govern the recombiner operation.
F.
The present Technical.Specifications (Table 3.17.4) does not provide criteria for the spent fuel pool criticality monitors.  


7 1.0 CFR 70.24 "Criticality Accident Requirements" requires a monitoring system (radiation detectors) in the area where special nuclear materials are st~red or handled.
7 1.0 CFR 70.24 "Criticality Accident Requirements" requires a monitoring system (radiation detectors) in the area where special nuclear materials are st~red or handled.
The proposed Technical Specifications provides criteria for the spent fuel pool criticality monitors and is in compliance with 10 CFR 70.24 as well as the standard Technical Specifications, Section 3/4.3.3.
The proposed Technical Specifications provides criteria for the spent fuel pool criticality monitors and is in compliance with 10 CFR 70.24 as well as the standard Technical Specifications, Section 3/4.3.3.
G. This proposed addition, Note (e) to Table 3.17.4, is used in support and to clarify the addition of the spent fuel pool criticality monitors to Table 3.17.4.
G.
H. The present Note 1 in Table 4. 1.1 states that the bistable trip tester injects a signal into the bistable and provides a precision readout of the trip set point.
This proposed addition, Note (e) to Table 3.17.4, is used in support and to clarify the addition of the spent fuel pool criticality monitors to Table 3.17.4.
The proposed editorial change states that the bistable .trip tester injects a signal* into the bistable and provides for a precision readout of the trip set point. This change is made to make the sentence read correctly.
H.
I. The present Technical Specifications states that it is not necessary to perform the specified testing during prolonged periods in the refueling shutdown condition.
The present Note 1 in Table 4. 1.1 states that the bistable trip tester injects a signal into the bistable and provides a precision readout of the trip set point.
The proposed editorial change states that the bistable.trip tester injects a signal* into the bistable and provides for a precision readout of the trip set point.
This change is made to make the sentence read correctly.
I.
The present Technical Specifications states that it is not necessary to perform the specified testing during prolonged periods in the refueling shutdown condition.
The proposed Technical Specifications states that it is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition.
The proposed Technical Specifications states that it is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition.
This change does not detract from the intent and purpose of the present Technical Specifications. Testing of a component or piece of equipment during a prolonged cold shutdown condition does not $erve any significant purpose since the test will be conducted prior to the plant start-up. It should aTso be pointed out that this change will maintain the same amount of conservatism since the only difference between the cold shutdown mode and the refueling mode is the boron concentration.
This change does not detract from the intent and purpose of the present Technical Specifications.
J. This Technical Specifications change allows this component not to be tested at the required interval if th.e plant is in a cold shutdoWll condition.for a prolonged period of time. Howev~r, it will be tested prior to start-up (refer to Item I).
Testing of a component or piece of equipment during a prolonged cold shutdown condition does not $erve any significant purpose since the test will be conducted prior to the plant start-up.
K. The present Technical Specifications (Table 4.1.2, Item 12) requires the safety injection and refueling water tank (SIRW) outlet valves to be tested on a quarterly basis. Testing these valves during power operation violates Technical Specification 3.3.2 because flow to a high-pressure safety injection pump arid a low-presure safety injection pump is simultaneously interrupted for a brief period of time.
It should aTso be pointed out that this change will maintain the same amount of conservatism since the only difference between the cold shutdown mode and the refueling mode is the boron concentration.
J.
This Technical Specifications change allows this component not to be tested at the required interval if th.e plant is in a cold shutdoWll condition.for a prolonged period of time.
Howev~r, it will be tested prior to start-up (refer to Item I).
K.
The present Technical Specifications (Table 4.1.2, Item 12) requires the safety injection and refueling water tank (SIRW) outlet valves to be tested on a quarterly basis.
Testing these valves during power operation violates Technical Specification 3.3.2 because flow to a high-pressure safety injection pump arid a low-presure safety injection pump is simultaneously interrupted for a brief period of time.  


* -l:'J 8
-l:'J 8
To avoid this violation, this test will be conducted as follows:
To avoid this violation, this test will be conducted as follows:
Perform the SIRW*valve test prior to each start-up, if the plant is in a cold shutdown condition, if not already performed during the previous quarter.
Perform the SIRW*valve test prior to each start-up, if the plant is in a cold shutdown condition, if not already performed during the previous quarter.
What this means is to conduct the test while the plant is*in a cold shutdown condition. This does not mean bringthe plant to cold shutdown to conduct the test but if, for some other reason, the plant is in cold shutdown and these valves have not been tested in the last three months, they will be tested prior to start-up .. This approach is* also in compliance with ASME Section XI code.
What this means is to conduct the test while the plant is*in a cold shutdown condition.
L. Same as-Item I.
This does not mean bringthe plant to cold shutdown to conduct the test but if, for some other reason, the plant is in cold shutdown and these valves have not been tested in the last three months, they will be tested prior to start-up.. This approach is* also in compliance with ASME Section XI code.
M. Same as Item J.
L.
N. The present Technical Specifications (Table 4.1.3, Item 2.c) requires the primary rod position indication system to be calibrated each refueling outage, If a functional check is performed and no inherent drift in the cam/limit* switch in the control rod drive mechanisms is *detected, then a calibration is. not necessary. Therefore, the proposed Technical Specifications change will allow the primary rod position indication system to be either calibrated or checked (using-Surveillance Test Procedure~ R0-21 and R0-22). If a checking process shows that the primary rod position indication system has *"significantly" drifted, a calibration will be performed.                             *
Same as-Item I.
: 0. Refer to Item N on changing the surveillance function for Item 3.c to calibrate/check.
M.
Same as Item J.
N.
The present Technical Specifications (Table 4.1.3, Item 2.c) requires the primary rod position indication system to be calibrated each refueling outage, If a functional check is performed and no inherent drift in the cam/limit* switch in the control rod drive mechanisms is *detected, then a calibration is. not necessary.
Therefore, the proposed Technical Specifications change will allow the primary rod position indication system to be either calibrated or checked (using-Surveillance Test Procedure~ R0-21 and R0-22).
If a checking process shows that the primary rod position indication system has *"significantly" drifted, a calibration will be performed.
: 0.
Refer to Item N on changing the surveillance function for Item 3.c to calibrate/check.
The present Technical Specifications (Items 3. b and c) states:*
The present Technical Specifications (Items 3. b and c) states:*
: b. Same as 2(b) above.
: b.
: c. Same as 2(c) above, inciuding out-of-sequence *alarm function.
Same as 2(b) above.
The proposed Technical Specifications editorial change states: .
: c.
          . b. Same as 2(b) abov.e, including out-of-sequence alarm function.
Same as 2(c) above, inciuding out-of-sequence *alarm function.
: c. Same as 2(c) above.
The proposed Technical Specifications editorial change states:.  
The out-of-sequence*alarm function should be performed on a monthly basis rather than refueling. This sequence does not require calibration because it is being fed from constants into the secondary computer which are compared to secondary rod position indications.
. b.
P. The present Technical Specifications requires the testing of the emergency plan radiation instrumentation. This item is being deleted.
Same as 2(b) abov.e, including out-of-sequence alarm function.
Permanently installed emergency plan radiation instrumentation is
: c.
Same as 2(c) above.
The out-of-sequence*alarm function should be performed on a monthly basis rather than refueling.
This sequence does not require calibration because it is being fed from constants into the secondary computer which are compared to secondary rod position indications.
P.
The present Technical Specifications requires the testing of the emergency plan radiation instrumentation.
This item is being deleted.
Permanently installed emergency plan radiation instrumentation is  


9
9  
        .covered under Table 4.1.3, Item 4. The *portable emergency plan radiation instruments are calibrated and controlled in accordance with Consumers Power Company QA Program. Therefore, the proposed Technical Specifications will.delete Item 5 of Table 4.1.3.
.covered under Table 4.1.3, Item 4.
Q.. This is an editorial correction, deleting the words "Secondary Coolant" under the. words "Spent Fuel Pool," Item .6 in Table 4. 2 .1.
The *portable emergency plan radiation instruments are calibrated and controlled in accordance with Consumers Power Company QA Program.
R. This is an editorial correction, adding the words "Secondary Coolant" to Item 7 in Table, 4. 2 .1.
Therefore, the proposed Technical Specifications will.delete Item 5 of Table 4.1.3.
S. The. present Technical Specifications (Table 4. 2. 2, Item 7) requires monthly testing of the *fire protection pumps a:nd power supply.
Q.. This is an editorial correction, deleting the words "Secondary Coolant" under the. words "Spent Fuel Pool," Item.6 in Table 4. 2.1.
R.
This is an editorial correction, adding the words "Secondary Coolant" to Item 7 in Table, 4. 2.1.
S.
The.. present Technical Specifications (Table 4. 2. 2, Item 7) requires monthly testing of the *fire protection pumps a:nd power supply.
T.
The proposed Technical Specifications for Table 4.2.2 deletes Item 7.
The proposed Technical Specifications for Table 4.2.2 deletes Item 7.
This is a redundant requirement which is presently being conducted under Technical Specification 4.17.2.1.a~
This is a redundant requirement which is presently being conducted under Technical Specification 4.17.2.1.a~
Technical Specification Section 4.2 requires that certain plant equipment related td safety be tested periodically to verify operability. Part of that equipment is the critical headers of the service.water system which are required to be hydrostatically tested at 150 psig every five years per Table 4. 2. 2, Item 10. This requirement is satisfied by Technical Specifications* Surveillance Procedure F0-1.
Technical Specification Section 4.2 requires that certain plant equipment related td safety be tested periodically to verify operability.
Technical Specification Section 4.3 also requires inservice surveillance of Class 1, Class 2 and Class.3 piping systemsto ensure their integrity
Part of that equipment is the critical headers of the service.water system which are required to be hydrostatically tested at 150 psig every five years per Table 4. 2. 2, Item 10.
        .*and operability. The critical headers of the service water system are part qf the Class 3 systems and their.requirements are satisfied by Special Test Procedure T-115, Tests 9A and 9B of the inservice inspection program.
This requirement is satisfied by Technical Specifications* Surveillance Procedure F0-1.
Technical Specification Section 4.2 was written prior to the evolution of .the inservice inspection program in order to ensure .. safety system integrity. However, since there is now a more* detailed and accepted ISI program to ensure safety *system integrity, the requirements of Technical Specification Sectidn 4.2, Table 4.2.2, Item 10 are to be removed f~om the Technical Specifications.
Technical Specification Section 4.3 also requires inservice surveillance of Class 1, Class 2 and Class.3 piping systemsto ensure their integrity  
T. This is   an editorial change to Technical Specification 4.2.1. The present .Technical Specificatfons refers to limits in Sections 3.9.6 and 3.9.9. Section 3.9.6* refers to. chlorine releases to Lake.Michigan whereas   Section 3.9.9 refers to thermal discharges from blowdo'wn.
.*and operability.
The critical headers of the service water system are part qf the Class 3 systems and their.requirements are satisfied by Special Test Procedure T-115, Tests 9A and 9B of the inservice inspection program.
Technical Specification Section 4.2 was written prior to the evolution of.the inservice inspection program in order to ensure.. safety system integrity.
However, since there is now a more* detailed and accepted ISI program to ensure safety *system integrity, the requirements of Technical Specification Sectidn 4.2, Table 4.2.2, Item 10 are to be removed f~om the Technical Specifications.
This is an editorial change to Technical Specification 4.2.1.
The present.Technical Specificatfons refers to limits in Sections 3.9.6 and 3.9.9.
Section 3.9.6
* refers to. chlorine releases to Lake.Michigan whereas Section 3.9.9 refers to thermal discharges from blowdo'wn.
The correct sections to be referenced are 3.9.11 and 3.9.14.
The correct sections to be referenced are 3.9.11 and 3.9.14.
Section* 3. 9. 11 refers to* annual release rates of gaseous and airborne particulates whereas Section 3.9.14 refers to calculating permissible releases.     *
Section* 3. 9. 11 refers to* annual release rates of gaseous and airborne particulates whereas Section 3.9.14 refers to calculating permissible releases.  
    ~. This is an editoria~ correction to the Basis section of Technical Specification 4.5. The present specification refers to a test pressure of 270 psig .. The proposed specification changes this test pressure to
~.
* 10 255 psig. .This will be in agreement with Technical Specification 4.5.3.a(l).
This is an editoria~ correction to the Basis section of Technical Specification 4.5.
V. The present Technical Specification (4.6.3) requires testing of the safeguards pumps on a quarterly basis.
The present specification refers to a test pressure of 270 psig.. The proposed specification changes this test pressure to  
The testing of safety-related pumps is defined by ASME, Section XI requirements, as iden~ified by Technical Specification 4.3.c. This code provides guidance with respect to measured parameters, test methods, and acceptance criteria. Section XI requirements are more conservative than the present Technical Specification 4.6.3. Therefore, the proposed Technical Specifications is to delete Section 4.6.3.
 
W. The proposed Technical Specifications change will delete Section 4.6.4 for the same reasoning used in Item V. The only difference is that Section 4.6.4 refers to valves.
255 psig.  
.This will be in agreement with Technical Specification 4.5.3.a(l).
10 V.
The present Technical Specification (4.6.3) requires testing of the safeguards pumps on a quarterly basis.
The testing of safety-related pumps is defined by ASME, Section XI requirements, as iden~ified by Technical Specification 4.3.c.
This code provides guidance with respect to measured parameters, test methods, and acceptance criteria.
Section XI requirements are more conservative than the present Technical Specification 4.6.3.
Therefore, the proposed Technical Specifications is to delete Section 4.6.3.
W.
The proposed Technical Specifications change will delete Section 4.6.4 for the same reasoning used in Item V.
The only difference is that Section 4.6.4 refers to valves.
The SIRW and containment sump.valves will be tested in accordance with Note (4) in Table 4.1.2.
The SIRW and containment sump.valves will be tested in accordance with Note (4) in Table 4.1.2.
X. The proposed Technical Specifications (Table 4.1.3 Note (1)) no longer applies and is to be deleted.
X.
III.       Conclusion Based on the foregoing, both the Palisades Plant Review Committee and the Safety and Audit Review Board have concluded that these changes are acceptable.
The proposed Technical Specifications (Table 4.1.3 Note (1)) no longer applies and is to be deleted.
CONSUMERS POWER COMPANY B~~.~~g       Nuclear Operations Sworn and subscribed to before me this 14th day of May 1980.
III.
            } *~ *~*,,
Conclusion Based on the foregoing, both the Palisades Plant Review Committee and the Safety and Audit Review Board have concluded that these changes are acceptable.
                ,. '  . , ' I
CONSUMERS POWER COMPANY B~~.~~g Nuclear Operations Sworn and subscribed to before me this 14th day of May 1980.  
_>~,**~&~
}  
      -<< '-.-. *Lind.~Jackson
*~  
    -- ~ ,:
, ' I
K
*~*,,
* C~rstens, Notary Public County, Michigan f'        --      '
_>~,**~&~  
  .:'.i**-   _My   commiss~_o_n       expires June 10, 1981.
-<<. *Lind.~ K
    ~.
* C~rstens, Notary Public  
-- ~,:
Jackson County, Michigan f'  
.:'.i**-
_My commiss~_o_n expires June 10, 1981.  
~.  


ATTACHMENT PAGE CHANGES FOR PROPOSED TECHNICAL SPECIFICATIONS CHANGES
ATTACHMENT PAGE CHANGES FOR PROPOSED TECHNICAL SPECIFICATIONS CHANGES  
 
* I, 2.3 LIMITING SAFETY SYSTEM SETTINGS - REACTOR.PROTECTIVE SYSTEM (Contd)
* * *I, 2.3 LIMITING SAFETY SYSTEM SETTINGS - REACTOR.PROTECTIVE SYSTEM (Contd)
Basis (Contd)
Basis (Contd)
The s.etting listed in Table 2. 3 .1 assures that the heat transfer surface (tubes) is covered with water when the reactor is.* critical.
The s.etting listed in Table 2. 3.1 assures that the heat transfer surface (tubes) is covered with water when the reactor is.* critical.
: 6. Low Steam Generator Pressure - A reactor trip on low steam generator secondary pressure is .provided to protec.t against an excessive rate of heat extraction from the steam generators and subsequent cooldown of the primary coolant. The setting of 500 psia is sufficiently below the rated load operating point of 739 psia so as not to interfere with normal operation, but still high enough to provide the required protec-tion in the event of excessively high steam flow. This setting was used in the accident.analysis.( 8 )
: 6.
: 7. Containment High Pressure - A reactor trip on containment high pressure is provided to assure that the reactor is shut down upon the initiation of t.he safety injection system.
Low Steam Generator Pressure - A reactor trip on low steam generator secondary pressure is.provided to protec.t against an excessive rate of heat extraction from the steam generators and subsequent cooldown of the primary coolant.
: 8. Low Power Physics Testing - For low power physics tests, certain tests will require the reactor to be critical at low temperature (L 260&deg;F) and low pressure (~ 415 psia). For these certain tests only, the thermal margin/low pressur.e, and low. steam generator pressure trips may be by-passed in order that reactor power can be increased for improved data*
The setting of 500 psia is sufficiently below the rated load operating point of 739 psia so as not to interfere with normal operation, but still high enough to provide the required protec-tion in the event of excessively high steam flow.
acquisition. Special operating precautions will be in effect during these tests in accordance with approved written testing procedures. At reactor power levels be].ow 10"" 1 %of rated power, the thermal margin/low-pressure trip is not required to prevent fuel rod thermal limits from being exceeded. The low steam generator pressure trip is not required because the low steam generator pressure will not allow a severe reactor cooldown, should a steam line break occur during these tests.
This setting was used in the accident.analysis.(8 )
References (1)   FSAR, Section 4.1.
: 7.
( 2) FSAR, Section 7.2.3.2.
Containment High Pressure - A reactor trip on containment high pressure is provided to assure that the reactor is shut down upon the initiation of t.he safety injection system.
(3)   FSAR, Section 7.2.3.3.
: 8.
(4)   XN-NF-77-18, Section 3.3.
Low Power Physics Testing - For low power physics tests, certain tests will require the reactor to be critical at low temperature (L 260&deg;F) and low pressure (~ 415 psia).
( 5) FSAR, Section 3.3.3.
For these certain tests only, the thermal margin/low pressur.e, and low. steam generator pressure trips may be by-passed in order that reactor power can be increased for improved data*
(6)   Deleted.
acquisition.
(7)   FSAR, Section 3.3.6.
Special operating precautions will be in effect during these tests in accordance with approved written testing procedures.
2-9
At reactor power levels be].ow 10""1% of rated power, the thermal margin/low-pressure trip is not required to prevent fuel rod thermal limits from being exceeded.
The low steam generator pressure trip is not required because the low steam generator pressure will not allow a severe reactor cooldown, should a steam line break occur during these tests.
References (1)
FSAR, Section 4.1.
( 2)
FSAR, Section 7.2.3.2.
(3)
FSAR, Section 7.2.3.3.
(4)
XN-NF-77-18, Section 3.3.
( 5)
FSAR, Section 3.3.3.
(6)
Deleted.
(7)
FSAR, Section 3.3.6.
2-9  
* I.
2.3 LIMITING SAFETY.SYSTEM SETTINGS :.:. REACTOR PROTECTIVE SYSTEM (Contd)
. References (Contd)
(8)
XN-NF-.77-18, Section 3.8.
.. * (9). XN-NF.:..77-18, Section 3.. 7.
(10)
Deleted.
(11)
XN-NF-77-18, Section3.6.
. (12)
XN-NF-77-18,.Section 3.1.
(13)
XN-NF~77-22, Section 3.4.
2-10


* *I.
3.3 EMERGENCY CORE COOLING SYSTEM Applicability Applies to the operating status of the emergency core cooling system.
2.3    LIMITING SAFETY .SYSTEM SETTINGS :.:. REACTOR PROTECTIVE SYSTEM (Contd)
          . References (Contd)
(8)  XN-NF-.77-18, Section 3.8 .
          . .* (9) . XN-NF.:..77-18, Section 3.. 7.
(10)    Deleted.
(11)    XN-NF-77-18, Section3.6 .
          . (12)    XN-NF-77-18, .Section 3.1.
(13)    XN-NF~77-22,    Section 3.4.
2-10
 
3.3   EMERGENCY CORE COOLING SYSTEM Applicability Applies to the operating status of the emergency core cooling system.
Objective To assure operability of equipm.ent required to remove decay heat from the core in either emergeI1CY or normal shutdown situations.
Objective To assure operability of equipm.ent required to remove decay heat from the core in either emergeI1CY or normal shutdown situations.
Specifications Safety Injection and Shutdown Cooling Systems 3.3.1 The reactor shall not be made critical, ex~ept for low-temperature physics tests, unless all of the following conditions are met:
Specifications Safety Injection and Shutdown Cooling Systems 3.3.1 The reactor shall not be made critical, ex~ept for low-temperature physics tests, unless all of the following conditions are met:
: a. The SIRW tank contains not less than 250,000 gallons of water with a boron concentration of at least .1720 ppm but not more than 2000 ppm at a temperature not less.than 4o&deg;F.
: a.
: b. All four safety injection tanks are operable and pressurized to at least 200 psig with a tank volume. of at least 1103 ft 3 and a maximum volume of ll66 ft 3 with.a boron concentration of at least.1720 ppm but not more than 2000 ppm.
The SIRW tank contains not less than 250,000 gallons of water with a boron concentration of at least.1720 ppm but not more than 2000 ppm at a temperature not less.than 4o&deg;F.
: c. One low-pressure safety injection pump is operable on each bus.
: b.
: d. One high-pressure safety injection pump is operable on each bus.
All four safety injection tanks are operable and pressurized to at least 200 psig with a tank volume. of at least 1103 ft3 and a maximum volume of ll66 ft 3 with.a boron concentration of at least.1720 ppm but not more than 2000 ppm.
: e. Both shutdown heat exchangers and both component cooling heat exchangers are operable.
: c.
: f. Piping and valves shall be operable to provide two flow paths from the SIRW tank to the primary coolant system.
One low-pressure safety injection pump is operable on each bus.
: g. All valves, piping and interlocks associated with the above components and required to function during accident conditions are operable.
: d.
: h. The Low Pressure Safety Injection Flow Control Valve CV-3006 shall be opened and disabled (by isolating the air supply) to prevent spurious closure.
One high-pressure safety injection pump is operable on each bus.
: e.
Both shutdown heat exchangers and both component cooling heat exchangers are operable.
: f.
Piping and valves shall be operable to provide two flow paths from the SIRW tank to the primary coolant system.
: g.
All valves, piping and interlocks associated with the above components and required to function during accident conditions are operable.
: h.
The Low Pressure Safety Injection Flow Control Valve CV-3006 shall be opened and disabled (by isolating the air supply) to prevent spurious closure.
: i. The Safety Injection bottle motor-operated isolation valves shall be opened with the electric power supply to the valve.
: i. The Safety Injection bottle motor-operated isolation valves shall be opened with the electric power supply to the valve.
motor disconnected.
motor disconnected.
: j. The Safety Injection miniflow valves CV-3027 and 3056 shall be open with HS-3027 and 3056 positioned to maintain them open.
: j. The Safety Injection miniflow valves CV-3027 and 3056 shall be open with HS-3027 and 3056 positioned to maintain them open.
3-29
3-29  


3.3   EMERGENCY CORE COOLING SYSTEM (Contd) severity to the design basis accident is.not possible and the engineered safeguards' systems are not required.
3.3 EMERGENCY CORE COOLING SYSTEM (Contd) severity to the design basis accident is.not possible and the engineered safeguards' systems are not required.
The SIRW tank contains a minimum of 250,000 gal.lens of water con-taining 1720 ppm boron.     This is sufficient boron concentration to provide a 5% shutdown margin with all control rods withdrawn and a new core at a temperature of 6o&deg;F.
The SIRW tank contains a minimum of 250,000 gal.lens of water con-taining 1720 ppm boron.
Heating steam is provided to maintain the .. tank above 4o&deg;F to pre-vent freezing. The 1% bo.ron (1720 ppm) solution will not precipi-tate out.above 32&deg;F.     The source of steam during normal plant operation is extraction steam line in the turbine cycle.
This is sufficient boron concentration to provide a 5% shutdown margin with all control rods withdrawn and a new core at a temperature of 6o&deg;F.
The limits for the safety injection tank pressure and volume assure the required amount of water injection during an accident and are based on values used for the accident analyses. The minimum 190-inch level corresponds to a volume of ll03 rt 3 and the maximum 202-inch 1 eve1 correspond s. t o a vo1 ume o f 1166 rt 3 .
Heating steam is provided to maintain the.. tank above 4o&deg;F to pre-vent freezing.
Prior to the time the reactor is brought critic.al, the valving of the safety injection system must be checked for correct alignment and appropriate valves locked.       Since. the. system is used for shut-down cooling, the valving will be changed and must be properly aligned prior to start-up of the reactor.
The 1% bo.ron (1720 ppm) solution will not precipi-tate out.above 32&deg;F.
The operable status of the various systems and components is to be demonstrated by periodic tests.       A large fraction of these tests will be performed while the reactor is operating in the power range.
The source of steam during normal plant operation is extraction steam line in the turbine cycle.
If a component is found to be inoperable, it will be possible in most cases to effect repairs* and restore the system to full operability within a relatively short time.       For a single component to be in-operable does not .negate the ability of the system to perform its function, but* it reduces the redundancy provided in the reactor design and thereby limits the. ability to tolerate additional equip-ment failures. To provide maximum assurance that the redundant component(s) will operate if required to do so,. the redundant com-
The limits for the safety injection tank pressure and volume assure the required amount of water injection during an accident and are based on values used for the accident analyses.
      . ponent(s) is to be tested prior to initiating repair of the inop-erable component.     If it develops that (a) the inoperable component is not repaired within the specified allowable time period; or (b) a second component in the same or related system is found to be inoperable, the reactor will initially be put in the hot shutdown 3-31
The minimum 190-inch level corresponds to a volume of ll03 rt3 and the maximum 202-inch 1
1 d
t 1
f 1166 rt3.
eve correspon s. o a vo ume o Prior to the time the reactor is brought critic.al, the valving of the safety injection system must be checked for correct alignment and appropriate valves locked.
Since. the. system is used for shut-down cooling, the valving will be changed and must be properly aligned prior to start-up of the reactor.
The operable status of the various systems and components is to be demonstrated by periodic tests.
A large fraction of these tests will be performed while the reactor is operating in the power range.
If a component is found to be inoperable, it will be possible in most cases to effect repairs* and restore the system to full operability within a relatively short time.
For a single component to be in-operable does not.negate the ability of the system to perform its function, but* it reduces the redundancy provided in the reactor design and thereby limits the. ability to tolerate additional equip-ment failures.
To provide maximum assurance that the redundant component(s) will operate if required to do so,. the redundant com-
. ponent(s) is to be tested prior to initiating repair of the inop-erable component.
If it develops that (a) the inoperable component is not repaired within the specified allowable time period; or (b) a second component in the same or related system is found to be inoperable, the reactor will initially be put in the hot shutdown 3-31  


3.6.4' Two independent containment hydrogen recombiners shall be operable when the reactor is.at power or at hot standby.
3.6.4' Two independent containment hydrogen recombiners shall be operable when the reactor is.at power or at hot standby.
With one hydrogen recombiner system inoperable, restore the* inoperable system to operable status within 30 days or be in at least hot shutdown within the next 6 hours *
With one hydrogen recombiner system inoperable, restore the* inoperable system to operable status within 30 days or be in at least hot shutdown within the next 6 hours *  
                              .. '.1*
.. '.1*
3-4oa
3-4oa  


Table 3.IJ.4 Instrumentation OperatingRequirements.for Other Safety Feature Functions *
Table 3.IJ.4 Instrumentation OperatingRequirements.for Other Safety Feature Functions *  
                                    . Minimum       Minimum         Permissible Operable     Degree of         Bypass No       Functional Unit         Channels     Reduridanc;y     Conditions
. Minimum Minimum Operable Degree of No Functional Unit Channels Reduridanc;y Permissible Bypass Conditions
  *l       SIRW tow-Level             2(b)               l             None Switches 2       L::.T - Power             3(c)              l              None Comparator 3       High-Pressure             4               None              None Safety Injection Flow Instruments 4      Air Cooler Service         l              None              None Water Flow Instr 5      Primary and               l              None              NA Secondary Rod Insertion and Out:..
* l SIRW tow-Level Switches 2(b) l None 2
of-Sequence Monitors 6      Fuel Pool Bldg             l               None     As Requested Under Crane Interlocks                                    Adminis1;r~t ive Control~a) 1      Start-Up                    2                        Not Required Above Channels                                            io-4% of Rated Power 8      Spent Fuel Pool            l(e)            None      Not Required if Fuel Is Criticality                                          Not Stored in Fuel Monitors                                            Handling Building (a) . Crane shall not be used to move material past the t:uel storage pool unless the interlocks are available.
L::.T - Power Comparator 3
High-Pressure 4
5 6
1 8
Safety Injection Flow Instruments Air Cooler Service Water Flow Instr Primary and Secondary Rod Insertion and Out:..
of-Sequence Monitors Fuel Pool Bldg Crane Interlocks Start-Up Channels Spent Fuel Pool Criticality Monitors 3(c) 4 l
l l
2 l(e) l None None None None None None None None NA As Requested Under Adminis1;r~t ive Control~a)
Not Required Above io-4% of Rated Power Not Required if Fuel Is Not Stored in Fuel Handling Building (a). Crane shall not be used to move material past the t:uel storage pool unless the interlocks are available.
(b). One of the inoperable channels must. be.in the tripped condition.
(b). One of the inoperable channels must. be.in the tripped condition.
(c-) If only 2 channels*are operable, load* shall be reduced to 70% or less of rated power.
(c-)
(d) Minimum operable channels shall be one (l) and minimum degree of redundancy is zero (0) if shutdown neutron power levels indicated on the log range channels are greater than 3 times the lowest decade in which neutron visibility can be confirmed. Neutron visibility will be confirmed through observation of reactivity changes on neutron power level (including a l/M plot during reactor start-up) and comparing the observed changes to the changes noted on previous similar start-ups. Instrumentation operability will also be verified by comparison among the three operable channels to ensure their individual responses are in agreement.
If only 2 channels*are operable, load* shall be reduced to 70% or less of rated power.
(e) With the number of channels operable less than required, perform area surveys with portable instrumentation at least once each 24 hours.
(d)
3-81
Minimum operable channels shall be one (l) and minimum degree of redundancy is zero (0) if shutdown neutron power levels indicated on the log range channels are greater than 3 times the lowest decade in which neutron visibility can be confirmed.
Neutron visibility will be confirmed through observation of reactivity changes on neutron power level (including a l/M plot during reactor start-up) and comparing the observed changes to the changes noted on previous similar start-ups.
Instrumentation operability will also be verified by comparison among the three operable channels to ensure their individual responses are in agreement.
(e)
With the number of channels operable less than required, perform area surveys with portable instrumentation at least once each 24 hours.
3-81  


_J TABLE 11 .1.1 Minimum Frequencies for Checks, Calibrations and 'l'esting of Reactor Protective System{ 5 ) (Contd)
_J TABLE 11.1.1 Minimum Frequencies for Checks, Calibrations and 'l'esting of Reactor Protective System{5) (Contd)
Surveillunce
Surveillunce  
          ---~Chunnel       Description                   1''unction         Jt'requency                 Surveillance Method
---~Chunnel Description 1''unction Jt'requency Surveillance Method
: 6. Steam Geneqitor Level*               a. Check                       s     a. Comparison of four level indications per generator.
: 6.
: b. Calib:rate                   R     b. Known different.ial pressure applied to sensors.             (1)
Steam Geneqitor Level*
M(2)
: a.
: 7. Steam Generator Pressure c.
Check s
a.
: a.
                                                        'l'est Check                        s.
Comparison of four level indications per generator.
: b.
Calib:rate R
: b.
Known different.ial pressure applied to M(2) sensors.
(1)
: c.  
'l'est
: c. Bistable trip tester.
: c. Bistable trip tester.
: 7.
Steam Generator Pressure
: a.
Check
: s.
a *. Comparisons of four pressure indications per generator.
a *. Comparisons of four pressure indications per generator.
e
: b.
: b. Calibrate                   R(2)   b. Known pressure applie? jo sensors.
Calibrate R(2)
: c. 'l'est                       M     c. Bistable trip tester. 1         *
: b.
: 8. Containment *Pressure                a. Calibrate*                   R(2)   a. Known pressure applied to sensors.
Known pressure applie? jo sensors.
: b. Test                         M     b. Simulate pressure switch action.
: c. 'l'est M
  .i:--
: c. Bistable trip tester. 1
1    9. Loss of Load                        a. Test                         p     a*   Manually trip turbine auto-stop oil relays.
: a.
  .r--
Calibrate*
: 10. Munuul Tripa                         a. Test                         p     a. Manually test both circ\li ts.
R(2)
: 11. Heuctor Protection System           a. 'l'es t                     i2)   a. Internal test circuits.
: a.
Logh: Uni ts Hot es: ( l) The bistable trip tester injects a signal into the bistable and provides for a precision readout of the trip set point.
Known pressure applied to sensors.
(2) All monthly tests will be done on only one of four channels at a time to prevent reactor trip.
: b.
(3)  Adjust tlie nuclear gain pot on the hT cabinet until readout agrees vi th. heat balance calculations *.
Test M
Trip setting for operating pump combination only. Settings for other tha~ operating pump combinations must be tested during routJne lnonthly testing performed when shut down anci within four hours. after resLUning operatlon wi tli a. different pump combination if the setting for that combination has not been te!.ited wlthi.n the p1*evious month .. *         *                              .
: b.
(5)   It is not necessary to perform the specified testing during" prolonged periods in the cold shutdown condition *. If this occurs, omitted testing will be performed prior to returning the plant to service.
Simulate pressure switch action.
: 8.
Containment *Pressure
: a.
Test p
a
* Manually trip turbine auto-stop oil relays.  
.i:--
1
: 9.
Loss of Load
.r--
: 10.
Munuul Tripa
: a.
Test p
: a.
Manually test both circ\\li ts.
: 11.
Heuctor Protection System Logh: Uni ts
: a.  
'l'es t i2)
: a.
Internal test circuits.
Hot es:
( l) The bistable trip tester injects a signal into the bistable and provides for a precision readout of the trip set point.
(2)
(3)
All monthly tests will be done on only one of four channels at a time to prevent reactor trip.
Adjust tlie nuclear gain pot on the hT cabinet until readout agrees vi th. heat balance calculations *.
Trip setting for operating pump combination only.
Settings for other tha~ operating pump combinations must be tested during routJne lnonthly testing performed when shut down anci within four hours. after resLUning operatlon wi tli a. different pump combination if the setting for that combination has not been te!.ited wlthi.n the p1*evious month.. *
(5) It is not necessary to perform the specified testing during" prolonged periods in the cold shutdown condition *. If this occurs, omitted testing will be performed prior to returning the plant to service.
e


..J 1, .
..J
TAHLE li .1. 2 Mininnun Frequencies for Checks, Calibrations and Testt*~ of                                              .f Engineered Safety Feature Instrumentation Controls 5)          .
Surveillo.nce Channel DescriEtion                    Function            Freguenci                  Surveillance Method
: 1.
: 1.
* I.ow-Pressure SIS Initiation Chan11cls
: 2.
: a. Check                       s(5)     a. Comparison of four separate pressure indications.
.i::-
L
: 3.
: b. Test(l)                      R         b. Signal to meter relay adjust with test
I
: c. 'l'est                       M(2)(5) . c.
&deg;'
device t.o verify SIS actuation logic Signal to meter relay adjusted with t
11 *
                                                                                                                                      *9 I device *.
: 5.
: 2. Lov-l'ressure SIS Signal Dlock     a. Test(!)                     R         a. )?art of l(h) above.
1,.
TAHLE li.1. 2 Mininnun Frequencies for Checks, Calibrations and Testt*~ of Engineered Safety Feature Instrumentation Controls 5)
. f Surveillo.nce Channel DescriEtion Function Freguenci Surveillance Method
* I.ow-Pressure SIS Initiation
: a.
Check s(5)
: a.
Comparison of four separate pressure L
Chan11cls Test(l) indications.
: b.
R
: b.
Signal to meter relay adjust with test
: c.  
'l'est M(2)(5). c.
device t.o verify SIS actuation logic *9 I Signal to meter relay adjusted with t device *.
Lov-l'ressure SIS Signal Dlock
: a. Test(!)
R
: a.  
)?art of l(h) above.
Permlssive and Auto Reset*
Permlssive and Auto Reset*
SIS Actuation Relays                                                 Q(5)
SIS Actuation Relays
    .i::-
: a.  
: 3.                                      a. 'l'est                                 a* Simulation of SIS 2/4 logic trip using I                                                                                          built-in testing system *. Both "standby
'l'est Q(5) a
    &deg;'                                                                                          power" and "no standby power" circuits vill be tested for left and right chan-nels. . Test will verify functioning of initiation circuits of all equipment normally operated by SIS signals.
* Simulation of SIS 2/4 logic trip using built-in testing system *. Both "standby power" and "no standby power" circuits vill be tested for left and right chan-nels.. Test will verify functioning of initiation circuits of all equipment normally operated by SIS signals.
: b. Test                         R         b. Complete o.utomatictest initiated by same method as Item. l(b) and including 0.11 normal automatic operations.
: b.
11
Test R
* Containment High-Pressure Channels a.
: b.
b.
Complete o.utomatictest initiated by same method as Item. l(b) and including 0.11 normal automatic operations.
Callbrate
Containment High-Pressure
                                                      *rest R
: a.
R a.
Callbrate R
b.
: a.
Known pressure appliei;l to sensor*s.
Known pressure appliei;l to sensor*s.
Simulation of CllP.2/4 logic trip to   e
Channels
: c. Test                       M(2)(5) c.
: b.
verify actuation logic for SIS, con-tainment isolation* and containment spray Pressure switch operation simulated by
*rest R
                                                                                                                                                *I
: b.
* opening or shorting terminals or pres-s~re applied to the switch.
Simulation of CllP.2/4 logic trip to e verify actuation logic for SIS, con-tainment isolation* and containment spray *I *
: 5. Contujnm0.nt High Hadiution         a. Clieck                       D(5)     a. Comparlson of four separate radltttion Chur111els                                                                       level indi.cations.
: c.
: b. Cu.librate                   R ..     b. Exposure to known external radiation source.
Test M(2)(5)
: c.
Pressure switch operation simulated by opening or shorting terminals or pres-s~re applied to the switch.
Contujnm0.nt High Hadiution
: a.
Clieck D(5)
: a.
Comparlson of four separate radltttion Chur111els level indi.cations.
: b.
Cu.librate R..
: b.
Exposure to known external radiation source.  


r-*
..)
TADJ..E 4.1.2 Min_imum Frequencies for Checks, Calibrations and Testing 9f Engineered Safety Feature Instrumentation Controls (Contd)~5)
: 5.
Surveillance Channel DescriEtion                    Function            Freguenc;y:                            Surveillance Method
: 6.
: 5. Containment. High Radlation          c. Test                        ri 2 >          c. Remote-opernted integral radiation check Channels (Contd)                                                                            sourc.e used to verify instrument opera-tion.    *
: 1.
                                              .d. Test                        R              d. Simulation of CHR 2/4 logic trip with test switch to verify actuation relays~
B.
including containment isolation.    .  ..
i:.-
: 6. Munuul SIS Initiation                a. Test                        R              a. Manual push-button test.
: 1. t.tanuul Containment Isol,a-          a.. Test                        R              a. Manual push-button test.
tion Initiution                      b. Check                      R              b. Observe isolation valves closure.
B. Manual Initiation Contain-i:.-
111ent Spro.y Pumps and Valves        a. Test                        R              a. Manual switch operation.
I
I
: 9. DBA Gequencers                            Test                        Q(5)            a ..
: 9.  
-.:a
-.:a
: 10. Normal Shutdown Sequencers a.
: 10.
: a. *rest                       R               a.
: 11.
: 12.
r-*
TADJ.. E 4.1.2 Min_imum Frequencies for Checks, Calibrations and Testing 9f Engineered Safety Feature Instrumentation Controls (Contd)~5)
Surveillance Channel DescriEtion Function Containment. High Radlation
: c. Test Channels (Contd)
.d.
Test Munuul SIS Initiation
: a.
Test t.tanuul Containment Isol,a-a..
Test tion Initiution
: b.
Check Manual Initiation Contain-111ent Spro.y Pumps and Valves
: a.
Test DBA Gequencers
: a.
Test Normal Shutdown Sequencers
: a. *rest Diesel Start
: a.
Test
: b.
Test
: c.
*rest SIRW Tank Level Switch
: a. Test Interlocks Freguenc;y:
ri 2>
: c.
R
: d.
R
: a.
R
: a.
R
: b.
R
: a.
Q(5) a..
R
: a.
M
. a.
R
: b.
p
: c.
n
: a.
Surveillance Method Remote-opernted integral radiation check sourc.e used to verify instrument opera-tion.
Simulation of CHR 2/4 logic trip with test switch to verify actuation relays~
including containment isolation.
Manual push-button test.
Manual push-button test.
Observe isolation valves closure.
Manual switch operation.
Proper operation will be verified during SIS actuation test of Item 3(a) abOve.
Proper operation will be verified during SIS actuation test of Item 3(a) abOve.
Simulate normal actuation with test...:
Simulate normal actuation with test...:
I operate switch and verify equipment starting circuits.
operate switch and verify equipment starting circuits.
: 11. Diesel Start                          a. Test                        M            . a. Manual initiation followed by synchro-nizing and loading.
Manual initiation followed by synchro-nizing and loading.
: b. Test                        R              b. Diesel start, load shed, synchronizing-o.nd loading will be verified during Item 3(b) above.
Diesel start, load shed, synchronizing-o.nd loading will be verified during Item 3(b) above.
: c.  *rest                      p              c. Diesel'.auto start initiating circuits.
Diesel'.auto start initiating circuits.
: 12. SIRW  Tank Level Switch              a. Test                      n                a. Level switches removed from fluid to Interlocks                                                                                . _verify actuation logic.
Level switches removed from fluid to  
: b.  *rest                      Q(4}(5)         b. Use SIRW tank and contairim.ent sump control r switch to verify actuation of valves.
. _verify actuation logic.
I Q(4}(5)
: b.
*rest
: b. Use SIRW tank and contairim.ent sump control r switch to verify actuation of valves.  


                                                                'fABLE 11.1.2                                                           (J
'fABLE 11.1.2 Minimwn Frequencies for Checks, Calibrations and Testing ~S Engineered Safety Feature Instrumentation Controls (Contd)  
* Minimwn Frequencies for Checks, Calibrations and Testing ~S Engineered Safety Feature Instrumentation Controls (Contd) )                                     '*.
)
Surveillance Ct~nnel     Description                   FWlction            Frequency              S~r~eill~nce Method 13~   Safet.y Injection Tnnk Leve.L             a. Check                       s(5)     a. Verify that level and pressure indica-and Pressure Instrwnents                                                              tion is between independent high high/
(J Ct~nnel Description 13~ Safet.y Injection Tnnk Leve.L and Pressure Instrwnents
: 14.
Dor iC Acid 'l'unk Level Switches
: 15.
Uoric Add Heat Tracing System f
: 16.
* M1:1.in Ste1:1.m Isolation Valve
&deg;'
Ci re 11i ts
: 17.
SIRW 'l'ank 'l'emperature Indication and Alarms
: 10.
Low-Pres.nure Safety Injection Flow Control Valve CV-3006
: 19.
Surety Injection Dottle Isolntion*valves
: 20.
Safely Injection Miniflow Valves CV-3021, 3056 Surveillance FWlction
: a.
Check
: b.
Calibrate
: 11.
*rest
: a.
: a.
: b.
Check Check Test( 3)
: a.
Check
: b.
Calibrate
: a.
Check
: a.
Check
: a.
Check Frequency s(5)
R R
D (5 )~
s.
R M
R p
p p
S~r~eill~nce Method
: a.
Verify that level and pressure indica-tion is between independent high high/
low alarms for level and pressure.
low alarms for level and pressure.
: b. Calibrate                  R        b. Known pressure and differential pres-sure applied to pressure and level sensors.
: b.
: 14. Dor iC Acid 'l'unk Level Switches        11. *rest                      R        a. Pump tank below low-level alarm point A to verify switch operation.             ~
Known pressure and differential pres-sure applied to pressure and level sensors.
: 15. Uoric Add Heat Tracing System            a. Check                      D        a. Observe temperature recorders for proper readings.
: a.
f  16.
: a.
* M1:1.in Ste1:1.m Isolation Valve          a. Check                      s (5 )~. a. Compare four independent pressure indi-
: a.
&deg;'      Ci re 11i ts                                                                          cations.
: b.
: b. Test( 3 )                  R        b. Signal to meter relay adjusted with test device to verify MSIV circuit logic.
Pump tank below low-level alarm point A to verify switch operation.  
: 17. SIRW 'l'ank 'l'emperature                a. Check                      M        a. Compure independent temperature readouts.
~
Indication and Alarms                    b. Calibrate                  R        b. Known resistance applied to indicating loop.                             .,
Observe temperature recorders for proper readings.
: 10. Low-Pres.nure Safety Injection            a. Check                      p        a. Observe valve is open with air suppl!'
Compare four independent pressure indi-cations.
Flow Control Valve CV-3006                                                            isolated.
Signal to meter relay adjusted with test device to verify MSIV circuit logic.
: 19. Surety Injection Dottle                  a. Check                      p        a. Ensure each valve open by observing valve Isolntion*valves                                                                      posltion indication o.nd valve itself.
: a.
Compure independent temperature readouts.
: b.
Known resistance applied to indicating loop.
: a.
Observe valve is open with air suppl!'
isolated.
: a.
Ensure each valve open by observing valve posltion indication o.nd valve itself.
Then lOck open breakers (atMCC-9) and.A.
Then lOck open breakers (atMCC-9) and.A.
control power (key switch in control * .,_,
control power (key switch in control *.,_,
room).
room).
: 20. Safely Injection Miniflow                a. Check                      p        a. Verify valves open and HS-:-3027 and 3056 Valves CV-3021, 3056                                                                  positioned to maintain them open.
: a.
Notes: . ( J.)     Calibration of the sensors is performed during calibration of Item 5(b). Table 4.1.1.
Verify valves open and HS-:-3027 and 3056 positioned to maintain them open.
(2)     J\ll monthly test!'> wgJ b~do~~ on only one chann~l at a time to prevent protection system actuation.
Notes:. ( J.)
(3)    Calibration of the sensors is performed durinS cB.iibration of Item. 7(b), Table 4.1.l .....
(2)
(4)    Perform prior to each start-up, .if the plant is in a cold shutdown condition, if not already performed during the previous quarter.
(3)
(5)    It is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition. If this occurs, omitted testing will be performed prior to returning the plant to service.
(4)
Calibration of the sensors is performed during calibration of Item 5(b). Table 4.1.1.
(5)
J\\ll monthly test!'> wgJ b~do~~ on only one chann~l at a time to prevent protection system actuation.
Calibration of the sensors is performed durinS cB.iibration of Item. 7(b), Table 4.1.l.....
Perform prior to each start-up,.if the plant is in a cold shutdown condition, if not already performed during the previous quarter.
It is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition. If this occurs, omitted testing will be performed prior to returning the plant to service.  


I TABLE Ii .1. 3                                         *    (
I TABLE Ii.1. 3
(
Minimum Frequencies for Checks, Calibrations and ~estins. of Miscellaneous Instrumentation and Controls 5)
Minimum Frequencies for Checks, Calibrations and ~estins. of Miscellaneous Instrumentation and Controls 5)
I Surveillance Channel Description                 Function          Freguency                  Surveillance Method
Channel Description
: 1. Start-Up Range Neutron         a. Check                     s     a. Comparison of both channel count rate Monitors                                                                indications when in service.*
: 1.
: b. Test                            b. Internal test signals.
Start-Up Range Neutron Monitors
: 2. Primary Rod Position          a. Check                          a. Comparison of output data with Indication System                                                        secondary RPIS.
: 2.
: b. Check.                          b. Check of power dependent inse1tion limits monitoring system.
Primary Rod Position Indication System
: c. Calibrate/Check          R    c. Physically measured rod drive position used to verify system accuracy. Check re>d position interlocks.
: 3.
: 3. Secondary Rod Position        a. Check.                          a. Comparison of output data with primary Indication System                                                        RPIS.
Secondary Rod Position Indication System
: b. Check                          b. Same as 2(b) above, including out-of-sequence alarm function.
: 11.
                                    ,c-.---Calibrate/Check                c. Same as 2(c) above.
Area and Process Monitors
: 11. Area and Process Monitors      a. Check                    D    a. Normal readings observed and internal*
: 5.
This item deleted.
* 6.
Environmental Monitor-a
: 7.
Pressurizer Level Irwt nunents Surveillance Function
: a.
Check
: b.
Test
: a.
Check
: b.
Check.
: c.
Calibrate/Check
: a.
Check.
: b.
Check
, c -.---Calibrate/Check
: a.
Check
: b.
Calibrate
: c.
Test
: a.
Check
: b.
Calibrate
: a. *Chect
: b.
Calibrate
: c.
'l'est Freguency s
R D
R M
M A
8 (5)
R
~(5)
Surveillance Method
: a.
Comparison of both channel count rate indications when in service.*
: b.
: a.
: b.
: c.
: a.
: b.
: c.
Internal test signals.
Comparison of output data with secondary RPIS.
Check of power dependent inse1tion limits monitoring system.
Physically measured rod drive position used to verify system accuracy.
Check re>d position interlocks.
Comparison of output data with primary RPIS.
Same as 2(b) above, including out-of-sequence alarm function.
Same as 2(c) above.
: a.
Normal readings observed and internal*
test signals used to verify instrument operation.
test signals used to verify instrument operation.
: b. Calibrate                R    b. Exposure to known extei*nal radiation source.
: b.
: c. Test                      M    c. Detector exposed to remote operated radiation check source.
Exposure to known extei*nal radiation source.
: 5. This item deleted.
: c.
* 6. Environmental Monitor-a        a. Check                    M    a.*
Detector exposed to remote operated radiation check source.
* Operatfoijal .check.
a.*
: b. Calibrate                A    b. Verify airflow indicator.
* Operatfoijal.check.
: 7. Pressurizer Level              a. *Chect                      8 (5) a. Comparison of six independent level Irwt nunents                                                              readings.
: b.
: b. Calibrate                R    b. Known differential pressure applied to sensor.*
Verify airflow indicator.
: c.   'l'est                    ~(5)  c. Si~nul to meter relay adjusted with test device.
: a.
Comparison of six independent level readings.
: b.
Known differential pressure applied to sensor.*
: c.
Si~nul to meter relay adjusted with test device.
I


F; .
F;.  
                                                                                                                                        ~.
~.
1 i>i.lnimutn F*t"e<i_uencies for Checks, Caiibratior!;; anrlT:~~i~~ ~.~ Miaceli~<:ous   Iristrumentecion and. Controls (Contd)(5)   *I Surveillance Channel DescriEtion                   Function     Freguenc!                   Surveillance .Method
i>i.lnimutn F*t"e<i_uencies for Checks, Caiibratior!;; anrlT:~~i~~
: 0. Control Rod Drive System             a. Test               R     a. Verify proper operation of all rod drive Interlocks                                                               control system interlocks, using simulated
1
                                                                                        *signals vhere necessary.
~.~ Miaceli~<:ous Iristrumentecion and. Controls (Contd)(5)  
                                                  . b. Test               p     b. Same as 8(a) above, if not done within three months.
*I Surveillance Channel DescriEtion Function Freguenc!
                                                                                                                                        ~
Surveillance.Method
: 9. Flux-AT Pover Comparator             a. Calibrate.         R     a. Use simulated signals.
: 0.
: b. Test               M(5)   b. Internal test signal.
Control Rod Drive System
: 10. Calorimetric Instrumentation         a. Calibrate         R     a. Kriown differential pressure applied to feed-vater flov sensors.
: a.
: 11. Containment Building llwnidity       a. Test               R     a. Expose sensor to high humidity atmosphere.
Test R
: a. Verify proper operation of all rod drive Interlocks control system interlocks, using simulated  
*signals vhere necessary.  
. b.
Test p
: b.
Same as 8(a) above, if not done within three months.
: 9.
Flux-AT Pover Comparator
: a.
Calibrate.
R
: a.
Use simulated signals.
: b.
Test M(5)
: b.
Internal test signal.
: 10.
Calorimetric Instrumentation
: a.
Calibrate R
: a.
Kriown differential pressure applied to feed-vater flov sensors.
: 11.
Containment Building llwnidity a.
Test R
: a.
Expose sensor to high humidity atmosphere.
Detectors l='
Detectors l='
I
I
....... 12. Interlocks - Isolation Valves       a. Calibrate         R     a*  Known pressure applied. to sensor.
: 12.
on Shutdown Cooling Line
Interlocks - Isolation Valves Calibrate R
: 13. Service Water Break Detector         a. Test               R     a. Known differential press':lre applied to in Containment~                                                         sensors.
Known pressure applied. to sensor.
lli. Control R.oom Ventilation           a. Test               R     a*   Check damper operation for DBA mode v:l,th
: a.
                                                                                      . HS-1801 and isolation signal.
a
: b. Test             *R     b. Check control room for positive pressure.
* on Shutdown Cooling Line
( 5 )rt is not nec~ssary to perform the specified--~~~-ti~g .durl~~ ~~olonged periods in the cold shutdown                 \
: 13.
or refueling conditions. If this occurs, omitted testing will be performed prior to returning the plant to service.
Service Water Break Detector
: a.
Test R
: a.
Known differential press':lre applied to in Containment~
sensors.
lli.
Control R.oom Ventilation
: a.
Test R
a
* Check damper operation for DBA mode v:l,th  
. HS-1801 and isolation signal.
: b.
Test  
*R
: b.
Check control room for positive pressure.
(5)rt is not nec~ssary to perform the specified--~~~-ti~g.durl~~ ~~olonged periods in the cold shutdown  
\\
or refueling conditions. If this occurs, omitted testing will be performed prior to returning the plant to service.  
~


Table 4.2.1 Minimum Freouencies for Sa.nroling Tests
Table 4.2.1 Minimum Freouencies for Sa.nroling Tests
                                                                                    *FSAR Section
: 6.
                                      . Test                    Frequency          Reference
Spent Fuel Pool
: 6. Spent Fuel Pool           Boron Concentration         Monthly ( 7 )               9.4 Bulk Water Temperature      Continuously when         None bundles. are stored in tilt pit racks with less 1;~~ one.
: 7.
year decayl J
Secondary Coolant
: 7. Secondary Coolant        Gas Radioactivity by        Continuous(S)             None
: 8.
* Air Ejector Gas Mon~tor      during power operation Coolant Gross Radio-        3 times/7 days             None activity                    with a ina.ximum of 72 hours between samples pH and specific              Once/24*hours during       None conductivity*                power operation Sodium                      3 times/7 days             None
Liquid Rad waste
* during power opera-tion, with a maximum of 72 hours between samples Isotopic Analysis for        a) 1 per 31 days, when-Dose E~uivalent I-131            ever the gross Concentration                    activity determina-tion indicates iodine concentrations greater than 10% of the .allowable limit b) 1 per'6 months, when-ever the gross activity determinatio~ incicates iodine concentrations below 10% of the allowable limit
: 9.
: 8. Liquid Radwaste          Radioactivity Analysis      Prior to release           11.l of each batch
Radioactive Gas Decay*
: 9. Radioactive Gas Decay*    Radioactivity Analysis      Prior to release           11.l of each batch*
: 10. Stact-Gas Monitor Particulate Samples
: 10. Stact-Gas Monitor        Iodine 131 ana Partic-      weekly <4 )                 11.1 Particulate Samples      ulate Radioactivity
. Test Boron Concentration Bulk Water Temperature Gas Radioactivity by
                                        ~-14a
* Air Ejector Gas Mon~tor Coolant Gross Radio-activity pH and specific conductivity*
Sodium Isotopic Analysis for Dose E~uivalent I-131 Concentration Radioactivity Analysis Radioactivity Analysis Iodine 131 ana Partic-ulate Radioactivity
~-14a Frequency
*FSAR Section Reference Monthly ( 7)
Continuously when bundles. are stored in tilt pit racks with less 1;~~ one.
year decayl J Continuous(S) during power operation 9.4 None None 3 times/7 days None with a ina.ximum of 72 hours between samples Once/24*hours during None power operation 3 times/7 days None
* during power opera-tion, with a maximum of 72 hours between samples a) 1 per 31 days, when-ever the gross activity determina-tion indicates iodine concentrations greater than 10% of the.allowable limit b) 1 per'6 months, when-ever the gross activity determinatio~ incicates iodine concentrations below 10% of the allowable limit Prior to release 11.l of each batch Prior to release 11.l of each batch*
w kl <4) ee y 11.1  


Table 4.2.2 Minimum Frequencies for F.quipment Tests FSAR Section Test          Frequency    Reference l *. Control Rods                      Drop Times of All Full*   Each Re-     7.4.l.3 length Rods              tueling Sbutdovn
l *.
: 2. Control Rods                    Partial Movement of All Every Two       7.4.l.3 Rods (Minimum of 6 In)    Weeks
: 2.
: 3. Pressurizer Safety                  Set Point                One Each       7 .3. 7
: 3.
      *Valves                                                    Retueling Shutdovn
: 4.
: 4. Main Steam Safety Valves            Set Point*                Five F.ach     4.3.4 Retuellng Sbutdovn
: 5.
: 5. Retue~ng  System Interlocks    P\mctioning            *Prior to       9.1i.3 Retueling.
: 6.
Operations
: 7.
: 6. Service Water* System            . P\mctioning              Each Re-       9.i.2 Valve Actuation (SIS-CRP)                                *rueling Operation
: 8.
: 7. This item deleted.
: 9.
: 8. Primary System leakage              Evaluate                  D'aily           4 Amend 15, Ques 4.3.7
: 10.
: 9. Diesel Fuel Supply                  1\1.~l Inventory          Deily          8.4.1
: 11.
: 10. This item deleted.
Table 4.2.2 Minimum Frequencies for F.quipment Tests Control Rods Control Rods Pressurizer Safety
Years
*Valves Main Steam Safety Valves Retue~ng System Interlocks Service Water* System Valve Actuation (SIS-CRP)
: 11. Charcoal & R1 Efficiency        Charcoal fiiters          Each Re-    Amend 14, Filters for Control Room        checked ~ 99% effi-      fueling    Ques 14.19-1 F\tel Storage Building and      ciency per Freon 112      Shutdovn      6.5 .1 Containment    Purge System    test (ORNL).
This item deleted.
* HEPA      and at        *9.8.3 (containment post-              tilters checked ~        any time accident filter).              99% efficiency per        work on
Primary System leakage Diesel Fuel Supply This item deleted.
                                        >..NSI NlJl.l-1972        filters rould alter
Charcoal & R1 Efficiency Filters for Control Room F\\tel Storage Building and Containment Purge System (containment post-accident filter).
                                                                *~heir in-
Test Drop Times of All Full*
                                                                *~.egrity.
length Rods Partial Movement of All Rods (Minimum of 6 In)
1'-15
Set Point Set Point*
P\\mctioning
. P\\mctioning Evaluate 1\\1.~l Inventory Charcoal fiiters checked ~ 99% effi-ciency per Freon 112 test (ORNL).
* HEPA tilters checked ~
99% efficiency per
>..NSI NlJl.l-1972 1'-15 FSAR Section Frequency Reference Each Re-7.4.l.3 tueling Sbutdovn Every Two 7.4.l.3 Weeks One Each 7.3. 7 Retueling Shutdovn Five F.ach 4.3.4 Retuellng Sbutdovn  
*Prior to 9.1i.3 Retueling.
Operations Each Re-9.i.2  
*rueling Operation D'aily 4
Amend 15, Deily Years Each Re-fueling Shutdovn and at any time work on filters rould alter
*~heir in-
*~.egrity.
Ques 4.3.7 8.4.1 Amend 14, Ques 14.19-1 6.5.1  
*9.8.3  


Table. 4.2.1 Minimum Frequencies*for Sampling Tests (l)A daily sample shall be obtained and analyzed if fission product monitor is out of service.
Table. 4.2.1 Minimum Frequencies*for Sampling Tests (l)A daily sample shall be obtained and analyzed if fission product monitor is out of service.
2
(2)After at least 48 hours.
( )After at least 2 EFPD and at least 20 days since the last shutdown of longer than 48 hours.
2 EFPD and at least 20 days since the last shutdown of longer than (4 )When iodine.or particulate radioactivity levels exceed 10 percent oflimit in Specification 3.9.11 and 3.9.14, the sampling frequency shall be increased to a minimum of one e each day.
( 4 )When iodine.or particulate radioactivity levels exceed 10 percent oflimit in Specification 3.9.11 and 3.9.14, the sampling frequency shall be increased to a minimum of one e each day.                     *
( 5) If the a.ir ejector gas monitor is out of service, the secondary coolant gross radioactivity shall be measured once per day ~o evaluate steam generator leak tightness.
( 5 ) If the a.ir ejector gas monitor is out of service, the secondary coolant gross radioactivity shall be measured once per day ~o evaluate steam generator leak tightness.
(6)Reference Specification 3.8.5 for* maximum bulk water temperature and monitoring  
( 6 )Reference Specification 3.8.5 for* maximum bulk water temperature and monitoring
. requirements.
  . requirements.
C7 )Reference Bases section of Specification 3.8 for minimum boron concentration.
7 C )Reference Bases section of Specification 3.8 for minimum boron concentration.
(~1720ppm) 4-14b  
(~1720ppm) 4-14b


4.5
4.5 CONTAINMENT. TESTS (Contd) an impor*tant part of the structural integrity of the containment is  
* CONTAINMENT. TESTS (Contd) an impor*tant part of the structural integrity of the containment is i*
~
  ~ maintained.
maintained.
The basis for specification of.a total leakage rate of o.601     from a
The basis for specification of.a total leakage rate of o.601 from a
penetrations and isolation valves is specified to provide assurance that the integrated leak rate would remain within .the specified
penetrations and isolation valves is specified to provide assurance that the integrated leak rate would remain within.the specified  
    . liinits during the intervals between integrated leak rate tests.
. liinits during the intervals between integrated leak rate tests.
This value allows for possible deteriorat*ion in the intervals be-
This value allows for possible deteriorat*ion in the intervals be-
      .tween tests. The limiting. leakage rates from the shutdown cooling system are judgment values ba*sed primarily on assuring* that the components could operate without mechanic.al failure for a period on the order of 200 days. after a   DBA~ The test pressure (255 psig)
.tween tests.
* achieved either by normal system operation or by hydrostatically testing gives an adequate margin over the highest pressure within the system after a DBA. Similarly, the hydrostatic test pressure for the return lines from the containment to the shutdown cooling system (100 psig) gives an adequate margin over the highest pressure within the lines after a DBA. ( 5)
The limiting. leakage rates from the shutdown cooling system are judgment values ba*sed primarily on assuring* that the components could operate without mechanic.al failure for a period on the order of 200 days. after a DBA~ The test pressure (255 psig)
* achieved either by normal system operation or by hydrostatically testing gives an adequate margin over the highest pressure within the system after a DBA.
Similarly, the hydrostatic test pressure for the return lines from the containment to the shutdown cooling system (100 psig) gives an adequate margin over the highest pressure within the lines after a DBA. ( 5)
(
(
A shutdown cooling system leakage of 1/5 gpm will limit off-site expo-sures due to leakage to insignificant.levels relative to those calculated for leakage directly from the containment in the DBA. The engineered safeguards room ventilation system is equipped with isolation valves which close upon a high radiation signal from a local radiation detector.
A shutdown cooling system leakage of 1/5 gpm will limit off-site expo-sures due to leakage to insignificant.levels relative to those calculated for leakage directly from the containment in the DBA.
These*monitors shall be set at 2.2 x 10 5 cpm, which is well below the expected level, following a loss-of-coolant accident (LOCA), even with-out clad failure ... The 1/5 gpm leak rate is sufficiently high to permit prompt detection and to allow for reasonable leakage through the pump seals and valve packings, and yet small enough to be readily handled by the sumps and radioactive waste system. Leakage to the engineered safeguards .!
The engineered safeguards room ventilation system is equipped with isolation valves which close upon a high radiation signal from a local radiation detector.
I room sumps will be returned to the containment clean water receiver fol-lowing an LOCA, via the equipment drain tank and pumps. Additional makeup 1.
These*monitors shall be set at 2.2 x 105 cpm, which is well below the expected level, following a loss-of-coolant accident (LOCA), even with-out clad failure... The 1/5 gpm leak rate is sufficiently high to permit prompt detection and to allow for reasonable leakage through the pump seals and valve packings, and yet small enough to be readily handled by the sumps and radioactive waste system.
4-:35
Leakage to the engineered safeguards room sumps will be returned to the containment clean water receiver fol-lowing an LOCA, via the equipment drain tank and pumps.
: 4. 6   SAFETY INJECTION AND CONTAINMENT SPRAY SYSTEMS TESTS Applicability Applies to the safety injection system, the containment spraysysterc, chemical inJection system and the containment cooling system tests.
Additional makeup 4-:35 i*
Objective To verify that the subject systems will respond promptly and perform
I
      .their intended functions, if*required.
: 1.
Specifications 4.6.1   Safety Injection System
: 4. 6 SAFETY INJECTION AND CONTAINMENT SPRAY SYSTEMS TESTS Applicability Applies to the safety injection system, the containment spraysysterc, chemical inJection system and the containment cooling system tests.
: a. System tests shall be. performed at. each reactor* refueling interval.
Objective To verify that the subject systems will respond promptly and perform  
* A test safety injection signal will be applied to* initiate operation of the system. The safety injection-and shutdown cooling
.their intended functions, if*required.
Specifications 4.6.1 Safety Injection System
: a.
System tests shall be. performed at. each reactor* refueling interval.
* A test safety injection signal will be applied to* initiate operation of the system.
The safety injection-and shutdown cooling
(
(
system pump motors may be. de-energized for this test.
system pump motors may be. de-energized for this test.
: b. The system test will be considered satisfactory if control board indication and visual observations indicate that all components have received the safety injection signal in the proper sequence and.timing (ie, the appropriate pump breakers *shall have opened and closed, and all valves shall have_ completed their travel).
: b.
: c. All high-pressure safety injection pumps except those otherwise required to*be operable shall be demonstrated inoperable at least once per 12 hours whenever the temperature of one or more of the PCS cold legs is   250&deg;F by verifying that the control system fuses
The system test will be considered satisfactory if control board indication and visual observations indicate that all components have received the safety injection signal in the proper sequence and.timing (ie, the appropriate pump breakers *shall have opened and closed, and all valves shall have_ completed their travel).
          * . and their fuse holders for the HPSI pumps (P66A, P66B and P66C) have been removed from the circuit.
: c.
4.6.2   Containment Spray System
All high-pressure safety injection pumps except those otherwise required to*be operable shall be demonstrated inoperable at least once per 12 hours whenever the temperature of one or more of the PCS cold legs is 250&deg;F by verifying that the control system fuses  
: a. System tests shall be performed at each reactor refueling interval.
*. and their fuse holders for the HPSI pumps (P66A, P66B and P66C) have been removed from the circuit.
The test shall be performed with the isolation valves.in the spray supply lines at the containment blocked closed. Operation of the*
4.6.2 Containment Spray System
: a.
System tests shall be performed at each reactor refueling interval.
The test shall be performed with the isolation valves.in the spray supply lines at the containment blocked closed.
Operation of the*
system is initiated by tripping the normal actuation instrumentation~
system is initiated by tripping the normal actuation instrumentation~
* b. At. least every five years, the spray nozzles shall be verified to be open.
* b.
: c. The test will be considered* satisfactory if visual observations indicate all components have operated satisfactorily.
At. least every five years, the spray nozzles shall be verified to be open.
4.6.3. Pumps - Deleted 4.6.4   Valves     ~Deleted 4-39
: c.
The test will be considered* satisfactory if visual observations indicate all components have operated satisfactorily.
4.6.3. Pumps - Deleted 4.6.4 Valves ~Deleted 4-39  


1, 4.6.5 Containment Air Cooling System
1, 4.6.5 Containment Air Cooling System
: a. Emergency mode,automatic valve and fan operation will be checked for operability during each refueling shutdown.
: a.
: b. Each fan and valve required to function during accident conditions will .be exercised at intervals not to exceed three months.
Emergency mode,automatic valve and fan operation will be checked for operability during each refueling shutdown.
Basis The safety injection system and the containment spray .. system are princi-pal plant safety features that are normally *inoperative during reactor operation.
: b.
Complete systems tests cannot be performed when the reactor is operating because a safety injection signal causes containment isolation and a containment spray system test requires the system tO be. temporarily disabled. The method of assuring operability of these systems is there-fore to combine systems tests to be performed during annual plant shut-downs, with more frequent component tests, which can be performed during reactor operation.
Each fan and valve required to function during accident conditions will.be exercised at intervals not to exceed three months.
The annual systems tests demonstrate proper automatic operation of the safety injection and containment spray systems. A test signal is applied*to initiate automatic action and verification made.that the components receive the safety injection in the proper sequence. The test demonstrates the operation of the valves, pump circuit breakers, and automatic circuitry. (l, 2 )
Basis The safety injection system and the containment spray.. system are princi-pal plant safety features that are normally *inoperative during reactor operation.
4-40}}
Complete systems tests cannot be performed when the reactor is operating because a safety injection signal causes containment isolation and a containment spray system test requires the system tO be. temporarily disabled.
The method of assuring operability of these systems is there-fore to combine systems tests to be performed during annual plant shut-downs, with more frequent component tests, which can be performed during reactor operation.
The annual systems tests demonstrate proper automatic operation of the safety injection and containment spray systems.
A test signal is applied*to initiate automatic action and verification made.that the components receive the safety injection in the proper sequence.
The test demonstrates the operation of the valves, pump circuit breakers, and automatic circuitry. (l, 2) 4-40}}

Latest revision as of 10:33, 6 January 2025

Tech Spec Change Request,Clarifying Implementation,Providing Editorial Changes & Deleting Redundant Requirements.Proposed Revised Pages to Sections 2.3.7,2.3,3.3,4.6,3.17 & Revised Tables 3.17.4,4.1.1 & 4.1.2 Encl
ML18044A898
Person / Time
Site: Palisades 
Issue date: 05/14/1980
From: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18044A897 List:
References
NUDOCS 8005190418
Download: ML18044A898 (34)


Text

',,

r., 8005190 CONSUMERS POWER COMPANY Docket 50-255 Request for Change to the Technical Specifications License DPR-20 For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in the Provisional Operating License DPR-20, Docket 50-255, issued to Consumers Power Company on October 16, 1972, for the Palisades Plant be changed as described in Section! below:

I.

Changes A.

Change Section 2.3.7 to read:

"Containment High Pressure - A reactor trip on containment high pressure is provided to assure that the reactor is. shut down upon the initiation of the safety injection system."

B.

Delete Reference 2.3(10).

C.

Change Section 3.3.1.b to read:

"b.

All four safety injection tanks are operable and pressurized to at least 200 psig with a tank liquid volume of at least 1103 ft 3 and a maximum liquid volume of 1166 ft 3 with a boron concentration of at least 1720 ppm but not more than 2000 ppm."

D.

Change Section 3.3 basis to read:

"... The minimum 190-inch level corresponds to a liquid volume of 1103 ft 3 and a maximum 202-inch level corresponds to a liquid volume of 1166 ft 3,,,, II E.

Add Section 3.6.4:

"Two independent containment hydrogen recornbiners shall be operable when the reactor is at power or at hot standby.

With one hydrogen recombiner system inoperable, restore the inoperable system to operable status within 30 days or be in at least hot shutdown within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />."

F.

Add the following to Table 3.17.4:

No "8

Functional Unit Spent FuelPool Criticality M6nitors Minimum Operable Channels Minimum Degree of Permissible Redundancy ByPass Conditions None Not required if fuel is not stored in fuel handling building."

'1

. t 2

G. Add Footnote (e) as follows:

"(e)

With the number of channels operable less than required, perform area surveys with portable instrumentation at least once each 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />."

H.

Change Note (1) on Table 4.1.1 to read:

11 (1).The bistable trip tester injects a signal into the bistable and provides for a precision readout of the trip set point."

I.

Change Note (5) on Table 4.1.l to read:

11 (5) It is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition.

If this. occurs, omitted testing will be performed prior to returning the plant to service."

J.

Add.Notes (4) and (5) identification to Table 4.1.2 as follows:

TAl\\LE 4.1.2 Minimum Frequencies for Checks, Calibrations and Testi~ of

  • Engineered Safety Feature Instrumentation Controls~5J
l.

Channel Description I.ov-Pressure SIS Initiation Chan11cl8

2.

Lo\\1-l'ressure SIS Signal Dlock PermJssive an~ Auto Reset

3.

SIS Actuation Belays Containment lligh-Preasure Channels CoutuJ umcnt High Hadiat.ion Churu1els

a.
b.
c.
a.
a.
b.
a.
b.
c.
u.
b.

Surveillance Functiou Check Test(!)

'l'est

'l'est

'!'est CalJbrate

  • rest*

Test Check Culibrnte Frequency s(5)

R M(2}(5)

R R

R R

R

a.
b.
c.
a.
a.
b.

a *.

- b.

c.
a.
b.

Surveillance Method Comparison of four separate pressure indications.

Signal to meter relay adjust vith test device to verify SIS actuation logic. ~*

Signal to meter relay adjusted vith t~

device.

Part of l(b) above.

Simulation of SIS 2/4 logic trip using built:..in testing system.

Both "standby power" and "no standby pover" circuits vHl be tested for left and right chan-nels.

Test wil.l verify functioning of initiation circuits of ull equipment.

nonnally operated by ~IS signals*

  • Complete automatic test initiated by srune method us Item l(b) and including all normal nutoma.tic operations.

Known pressure' lipplied to sensors.

A Simulation of CllP 2/11 logic trip.to verify*actuution logic for SIS,.con-tuinment isolation and containment spray~

Pressurc*switch operation simulated by opening or*shorting terminals or pres-sure ~1pplied to the switch.

Coi11par loon of four separate rudlution leve.L i11Ji.cutions.

Exponure to known external radiation nourct:.

5.
6.
7.
8.

i:-*

9.

-I

10.
11.
12.

TAllLE 4

  • l. 2 Minimum Frequencies for Checks, Calibrations and Testing 9f Engineered Safety Feature Instrumentation Controls (Contd)~5)

Surveillance Channel DescriEtion Function Freguencl Surveillance Method Contuin.ment High Radlation

c. Test f.1(2)
c. Remote-operated integral radiation check Channels (Contd}

source ~sed to verify instrument opera-tion.

.d.

Test R

d.

Simulation of CHR 2/4 logic trip v~ th test switch to verify actuation rel~y~

including contaii1Illent isolation.

Munual SIS Initiation

a. Test R
a.

Manual push~buttoil test.

f.tanuul Containment Isola-o..

Test R

a. Manual push-button test.

tion Initiation

. b.

Check R

b.

Observe isolation val.ves closure.

Manuul Initiation Contain-ment Spray Pwnps and Valves

a. Test R
a.

Mani1al switch operation.

OBA Dequencers

a. Test Q(~)
a. Proper operation will be verified during SIS o.ctuo.tion test of Item* 3(a) above.

Normal Shutdown Sequencers

a. *rest R
      • =:.
a. Simulate normal actuation vith test~

ppei*nte switch and verify equipment slo.rting circuits *.

Diesel Start

a. Test M
a.

Manual initi&tion followed by synchro-nizing and loo.ding~

b. Test R
b.

Diesel start, loo.d shed, synchronizin~

and loading wiil be verified during Item 3( b)

  • o.bove.
c.

Test p

c.

Diesel auto start initiating circuits.

SIRW Tank Level Svltch

a. Test R
  • a. Level switches removed from fluid to Interlocks Q{4)(5) verity u,ctuation logic~
b.

'l'est

b. Use SIRW tank and containment sump control switch to verify actuation of valves.*

s::-

I O>

'rAnLE 11.1.2 Minimum Frequencies for Checks, Calibrations and Testing ~S Engineered Safety Feature Instrumentation Controls (Contd)

)

Channel DescriEtion

13.

Safet.y Injection Tank Level and Pressure Instruments 1'4.

Dorlc Acid 'l'unk Level Switches

15. lloric /\\ci d Heat Tracing System
16.
  • Mui n Steam Isolation Valve Circuits
17.

SIHW 'l'ank 'l'e1nperature Indication and Alurmfl

18.

Low-Pressure Sufety Injection 1"low Control Vulve CV-3006

19. Safety Injection Dottle Isol.ntion Valves
20. Safely Iujection Mi niflow Vtllvcs CV-302*1. 30'..iG Survelllance Function
a.

Check

b.

Calibrate 0..

  • .refl t
a.

Check

a.

Check

b.

Test(J)

a.

Check

b.

Calibrate

a.

Check

a.

Check

a.

Check Freg,uencl s(5}

n R

D s<5).

R M

R p

p p

a.
b.
a.

. a.

a.
b.
a.
b.
a.
a.

Surveillance Method Verify that level and pressure indica-tion is between independent high high/

low alarms for level and pressure.*

Known pressure and differential pres-sure applied to pressure and level sensors.

Pump tank below low-level alarm point

  • to verify switch operation.

Observe temperature recorders for proper rendinc;s.

Compare four independent pressure indi-cutions.

Signal to meter relay adjusted vi th test device to verify MSIV circuit logic.

Compure independent temperature readouts.

Known resistance applied to indicating loop.

Obflcrve valve is open with ait supp~'

isolated.

Ensure each valve open by observing valve position indication nnd valve itself.

The11 lock open breakers (at r.iCC-9) and e control power (key svitch in control room).

a.

Verify valves open and HS-3027-and 3056 positioned to rnaintain them open~

Notes:

(1)

(2)

(3)

(4)

Calibl"ation of the sensors iu performed during calibration of Item 5(b), Table 4.1.l.

(5}

All monthly tests will be done on only one channel at a time to prevent protect.ion system actuation.

Calibration of the sensors is performed during calibration of Item 7(b), Table 4.1.1.

Perform prior to each start-up, if the plant is in a cold shutdown condition, if not already performed during the previous quarter.

It is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition. If this occurs, omitted testing will be performed prior to returning the plant to service *.

3 K.

Add Note {4) to Table 4.1.2 to read:

"(4) Performprior to each start~up, if the plant is in a cold shutdown condition, if.not already performed during the previous quarter."

L.

Change Note (5) to Table 4.1.2 to read:

11 (5)

It is not necessary to perform the specified testing dqring prolonged periods in the cold shutdown condition.

If this occurs, omitted testing will be performed prior to returning the plant to service."

M.

Add Note (5) identification to Table 4.1.3 as follows:

N.

Change Item 2. in T.able 4.1. 3 to read:

112.

Primary Rod Position Indication System

a.

Check

b.

Check

c.

Calibrate/

Check

0.

Change Item 3 in Table 4.1.3 to read:

4 s(S)

a.

Comparison of output data with

M(S)

b.

Check of power dependent insertion limits monitoring system.

R

c.

Physically measure rod drive position used to verify system accuracy.

Check rod posit:i.on interlocks.

11 113.

Secondary Rod

a.

Position Check s (5)

a.

Comparison of output data with primary RPIS.

Indication System

b.

Check

b.

Same as 2(b) above, including out-of-sequence alarm functions.

c.

Calibrate/

Check R

c.

Same as 2(c) above.

11 P.

D~lete Item 5 in Table 4.1.3.

Q.

Change Item 6 in Table 4.2.l to read:

116.

Spent Fuel Pool Boron Concentration Bulk Water Temperature R.

Change Item 7 in Table 4.2.1 to read:

117

  • Secondary Coolant Gas Radioactivity by Air Ejector Gas Monitor Coolant Gross Radio-activity Monthly(7)

Continuously when bundles are stored in tilt pit racks with less than one year decay(6)"

Continuous(S) during power operation 3 times/7* days with a maximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> between samples 9.4 None None None

TABLE 11.1. 3 Minimum Frequencies for Checks, Ca.l.ibrations and Testing of Miscellaneous Instrumentation and <::ontroJ_s{5)

1.
2.

Channel Description Start-Up Ro.np,e Neutron J.lonitors Primary Rod Position Inuico.tion System i:-

3.

I Secondary Rod Position lndi.co.tion System 0

Areu and Process Monitors

5. This item deleted.
  • 6.

Environmental Monitors

7.

Pressurizer Level Inat rmneuts

a.
b.
a.
b.
c.

Surveillance Function Check Tes.t Check Check Ca.l.ibra.te/Ch~ck

a.

Check

b.

Check

c. Calibrate/Check
a.

Check

b.

Co.librate

c.

Test

a.

Check

b.

Calibrate

a.

Checl~

b.

Calibrate

c.

'l'est Freguency s

. P

{5)*

s.

M(5)

R D

M M

A 5(5)

a.

b *

a.
b.
c.

Surveillance Method Comparison of both channel count rate indications when in service.

Internal te~t signals.

Comparison of output.data vith secondary RPIS.

Check of power dependent insertion limits monitoring system.

Physically measured rod drive position used to verify system accuracy.

Check rod position interlocks.

a.

Comparison of output data vith primary RPIS

  • I
b.

Same as 2(b) above, including out-of-sequence.*

alann function~

c. Same as 2{c) above.
a.

tlormal readings observed arid internal test signals used to verify instrument operation.

b.

Exposure to known external radiation source.

c. Detector el!l'osed to remote op~ratcd radiation check source.
a. Operational.check.**
b.

Verify nirflow indicator.

a.

Comparison of six independent level rendings.

b.

Known differential pressure applied to sensor.

c.

Si~nal to meter relay adjusted vith test device.

TABLE 11.1. 3 i-unimum F*t."e<;.uencies for Checka, Ca.libratior!" anrl Testing of Mit1cellwi~ous Instrumentetion and. Controls (Contd)(5)

Surveillance Channel Descri;etion Function 1',reguencv Surveillance Method

o.

Control Rod Drive System

a.

Test R

a.

Verify. proper operation of all rod drive Interlocks control system interlocks, using simulated

  • signals vhere necessary.
b.

Test p

b.

Same as 8(a) above, if not done vithin three months.

9.

Flux-.AT Pover Comparator

a.

Calibrate

~(5)

a.

Use simulated signals.

b~ Test

b.

Internal test signal.

10.

Ca~orimetric Instrumentation

a.

Calibrate

  • n
a.

Kno'\\lll differential pressure applied to feed-vater flov sensors.

11.

Containment Building Humidity a.. Test R

a.

Expose sensor to high.humidity atmosphere.

Detectors

~

I

12.

Interlocks - Isolation Valves a. *Calibrate R

a.

Knovn pressure applied to sensor.

~

on Shutdo\\lll Cooling Line

13.

Service Water Break Detector

a. Test R
a.

Known differential pressure hpplied to in Containment sensors.

14.

Cont1*ol Room Ventilation

a. *Test R
a.

Check damper operation for DBA mode vith HS-1801 and isolation signal.

b.

Test

  • R
b.

Check control room for positive pressure.

(5)rt* is not necessary to perform the specified testing during prolonged periods in. the cold shutdo~

or re.t'ueling conditions~ If this occurs, omitted testing will be performed prior to returning the plant to service.

e

"pH and specific conductivity Sodiµm Isotopic Analysis for.

Dose Equivalent I.;131 Concentration.

S.

Delete Items 7 and 10 in* Table 4.2.2.

T.

Change Note (4) in Table 4.2.1 to read:

5 Once/24 hours during.* None power operation 3 times/7 days None during power opera-tion, with a maximum of, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> between samples a) 1 per 31 days, when-.

ever the gross activity determina-tion indicates iodine concentrations greater than 10% of the allowable limit b) 1 per 6 months, whenever the gross activity determination indicates iodine con-centrations below 10%

of the allowable limit"

"(4)

When iodine or particulate radioactivity levels exceed 10 percent of limit in Specifications 3.9.11 and 3.9.14, the sampling frequency shall be increased to. a minimum of once each day."

U.

Change Section 4.5 Basis to read:

"... The test pressure (255 psig) achieved either by normal system operation or by hydrostatically testing gives an adequate.margin over the highest pressure within the system after a DBA.

Similarly, the hydrostatic test pressure for the return lines from the containment to the shutdown cooling system (100 psig) gives an adequate margin over the highest pressure within the lines after a DBA. (5)... "

Y.

Delete Section 4.6.3..

W.

Delete Section 4.6.4.

X.

Delete Note (1) Table 4.1.3.

II.

Discussion A.

The. present Technical Specifications (Section 2.3.7) contains a.

statement that the setting of the containment high-pressure trip is identical to that of the containment high-pressure safety injection signal.

The reference to this statement is ~he FSAR, Amendment No 17,

6 Item 4.0.

This statement is in error.

The FSAR, Amendment No 17, Item 4.0 states that the containment high-pressure setting has been revised to 5 psig.

The basis of the 5 psig set point is to establish a s~tting which would be reached immediately in the event of the DBA, cover as much of the break size spectrum as possible, and, yet be sufficiently above the normal operation maximµm internal pressure to prevent spurious high-pressure signals.

The proposed Technical Specifications change will delete the statement about the containment high-pressure set point being identical to that of the containment high-pressure safety injection signal since it is no longer valid.

B.

Reference 10 of Section 2:3 was to support the above statement about the setting of the containment high-pressure trip being identical to that containment high-pressure safety injection signal.

Therefore, this reference is not needed.

C.

The safety injection (SI) tanks contain an upper and lower level tap, located four inches above and below the vessel head tangent line.

The present Technical Specifications requires thRt the tank be maintained with a liquid level of at least 186 inches and a maximum level of 198 inches.

The lower level tap is not used by the plant and the sensing line terminates in the injection line.

Relocation of the transmitter sensing leg resulted in a new "zero" point for the level transmitter that provides liquid level indication for the SI tanks.

The proposed Technical Specifications change reflects the current plant design.

This change is in agreement with the Exxon LOCA analysis (XN-NF-77-24, July 1977).

Taking into account the new "zero" point, the proposed Technical*

Specifications will set a safety injection tank level of at least 190 inches (1103 ft 3 ) and a maximum level of 202 inches (1166 ft 3 ).

This change does not change the volume of liquid in the tanks.

D.

The proposed Technical Specifications change to the Basis section of 3.6.4 is to provide the correct safety injection tank liquid levels.

Refer to Item C for more detail.

E.

The present Technical Specifications were written when venting (purging) of hydrogen, that may be built up inside of containment., was an acceptable practice.

For this reason, LCOs and Technical Specifications were not written for the hydrogen recombiners.

Since venting is no longer an acceptable method to eliminate hydrogen buildup, the hydrogen recombiners will be used.

Therefore, the proposed T.echnical Specifications provides an LCO and guidelines to govern the recombiner operation.

F.

The present Technical.Specifications (Table 3.17.4) does not provide criteria for the spent fuel pool criticality monitors.

7 1.0 CFR 70.24 "Criticality Accident Requirements" requires a monitoring system (radiation detectors) in the area where special nuclear materials are st~red or handled.

The proposed Technical Specifications provides criteria for the spent fuel pool criticality monitors and is in compliance with 10 CFR 70.24 as well as the standard Technical Specifications, Section 3/4.3.3.

G.

This proposed addition, Note (e) to Table 3.17.4, is used in support and to clarify the addition of the spent fuel pool criticality monitors to Table 3.17.4.

H.

The present Note 1 in Table 4. 1.1 states that the bistable trip tester injects a signal into the bistable and provides a precision readout of the trip set point.

The proposed editorial change states that the bistable.trip tester injects a signal* into the bistable and provides for a precision readout of the trip set point.

This change is made to make the sentence read correctly.

I.

The present Technical Specifications states that it is not necessary to perform the specified testing during prolonged periods in the refueling shutdown condition.

The proposed Technical Specifications states that it is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition.

This change does not detract from the intent and purpose of the present Technical Specifications.

Testing of a component or piece of equipment during a prolonged cold shutdown condition does not $erve any significant purpose since the test will be conducted prior to the plant start-up.

It should aTso be pointed out that this change will maintain the same amount of conservatism since the only difference between the cold shutdown mode and the refueling mode is the boron concentration.

J.

This Technical Specifications change allows this component not to be tested at the required interval if th.e plant is in a cold shutdoWll condition.for a prolonged period of time.

Howev~r, it will be tested prior to start-up (refer to Item I).

K.

The present Technical Specifications (Table 4.1.2, Item 12) requires the safety injection and refueling water tank (SIRW) outlet valves to be tested on a quarterly basis.

Testing these valves during power operation violates Technical Specification 3.3.2 because flow to a high-pressure safety injection pump arid a low-presure safety injection pump is simultaneously interrupted for a brief period of time.

-l:'J 8

To avoid this violation, this test will be conducted as follows:

Perform the SIRW*valve test prior to each start-up, if the plant is in a cold shutdown condition, if not already performed during the previous quarter.

What this means is to conduct the test while the plant is*in a cold shutdown condition.

This does not mean bringthe plant to cold shutdown to conduct the test but if, for some other reason, the plant is in cold shutdown and these valves have not been tested in the last three months, they will be tested prior to start-up.. This approach is* also in compliance with ASME Section XI code.

L.

Same as-Item I.

M.

Same as Item J.

N.

The present Technical Specifications (Table 4.1.3, Item 2.c) requires the primary rod position indication system to be calibrated each refueling outage, If a functional check is performed and no inherent drift in the cam/limit* switch in the control rod drive mechanisms is *detected, then a calibration is. not necessary.

Therefore, the proposed Technical Specifications change will allow the primary rod position indication system to be either calibrated or checked (using-Surveillance Test Procedure~ R0-21 and R0-22).

If a checking process shows that the primary rod position indication system has *"significantly" drifted, a calibration will be performed.

0.

Refer to Item N on changing the surveillance function for Item 3.c to calibrate/check.

The present Technical Specifications (Items 3. b and c) states:*

b.

Same as 2(b) above.

c.

Same as 2(c) above, inciuding out-of-sequence *alarm function.

The proposed Technical Specifications editorial change states:.

. b.

Same as 2(b) abov.e, including out-of-sequence alarm function.

c.

Same as 2(c) above.

The out-of-sequence*alarm function should be performed on a monthly basis rather than refueling.

This sequence does not require calibration because it is being fed from constants into the secondary computer which are compared to secondary rod position indications.

P.

The present Technical Specifications requires the testing of the emergency plan radiation instrumentation.

This item is being deleted.

Permanently installed emergency plan radiation instrumentation is

9

.covered under Table 4.1.3, Item 4.

The *portable emergency plan radiation instruments are calibrated and controlled in accordance with Consumers Power Company QA Program.

Therefore, the proposed Technical Specifications will.delete Item 5 of Table 4.1.3.

Q.. This is an editorial correction, deleting the words "Secondary Coolant" under the. words "Spent Fuel Pool," Item.6 in Table 4. 2.1.

R.

This is an editorial correction, adding the words "Secondary Coolant" to Item 7 in Table, 4. 2.1.

S.

The.. present Technical Specifications (Table 4. 2. 2, Item 7) requires monthly testing of the *fire protection pumps a:nd power supply.

T.

The proposed Technical Specifications for Table 4.2.2 deletes Item 7.

This is a redundant requirement which is presently being conducted under Technical Specification 4.17.2.1.a~

Technical Specification Section 4.2 requires that certain plant equipment related td safety be tested periodically to verify operability.

Part of that equipment is the critical headers of the service.water system which are required to be hydrostatically tested at 150 psig every five years per Table 4. 2. 2, Item 10.

This requirement is satisfied by Technical Specifications* Surveillance Procedure F0-1.

Technical Specification Section 4.3 also requires inservice surveillance of Class 1, Class 2 and Class.3 piping systemsto ensure their integrity

.*and operability.

The critical headers of the service water system are part qf the Class 3 systems and their.requirements are satisfied by Special Test Procedure T-115, Tests 9A and 9B of the inservice inspection program.

Technical Specification Section 4.2 was written prior to the evolution of.the inservice inspection program in order to ensure.. safety system integrity.

However, since there is now a more* detailed and accepted ISI program to ensure safety *system integrity, the requirements of Technical Specification Sectidn 4.2, Table 4.2.2, Item 10 are to be removed f~om the Technical Specifications.

This is an editorial change to Technical Specification 4.2.1.

The present.Technical Specificatfons refers to limits in Sections 3.9.6 and 3.9.9.

Section 3.9.6

  • refers to. chlorine releases to Lake.Michigan whereas Section 3.9.9 refers to thermal discharges from blowdo'wn.

The correct sections to be referenced are 3.9.11 and 3.9.14.

Section* 3. 9. 11 refers to* annual release rates of gaseous and airborne particulates whereas Section 3.9.14 refers to calculating permissible releases.

~.

This is an editoria~ correction to the Basis section of Technical Specification 4.5.

The present specification refers to a test pressure of 270 psig.. The proposed specification changes this test pressure to

255 psig.

.This will be in agreement with Technical Specification 4.5.3.a(l).

10 V.

The present Technical Specification (4.6.3) requires testing of the safeguards pumps on a quarterly basis.

The testing of safety-related pumps is defined by ASME,Section XI requirements, as iden~ified by Technical Specification 4.3.c.

This code provides guidance with respect to measured parameters, test methods, and acceptance criteria.

Section XI requirements are more conservative than the present Technical Specification 4.6.3.

Therefore, the proposed Technical Specifications is to delete Section 4.6.3.

W.

The proposed Technical Specifications change will delete Section 4.6.4 for the same reasoning used in Item V.

The only difference is that Section 4.6.4 refers to valves.

The SIRW and containment sump.valves will be tested in accordance with Note (4) in Table 4.1.2.

X.

The proposed Technical Specifications (Table 4.1.3 Note (1)) no longer applies and is to be deleted.

III.

Conclusion Based on the foregoing, both the Palisades Plant Review Committee and the Safety and Audit Review Board have concluded that these changes are acceptable.

CONSUMERS POWER COMPANY B~~.~~g Nuclear Operations Sworn and subscribed to before me this 14th day of May 1980.

}

  • ~

, ' I

  • ~*,,

_>~,**~&~

-<<. *Lind.~ K

  • C~rstens, Notary Public

-- ~,:

Jackson County, Michigan f'

.:'.i**-

_My commiss~_o_n expires June 10, 1981.

~.

ATTACHMENT PAGE CHANGES FOR PROPOSED TECHNICAL SPECIFICATIONS CHANGES

  • I, 2.3 LIMITING SAFETY SYSTEM SETTINGS - REACTOR.PROTECTIVE SYSTEM (Contd)

Basis (Contd)

The s.etting listed in Table 2. 3.1 assures that the heat transfer surface (tubes) is covered with water when the reactor is.* critical.

6.

Low Steam Generator Pressure - A reactor trip on low steam generator secondary pressure is.provided to protec.t against an excessive rate of heat extraction from the steam generators and subsequent cooldown of the primary coolant.

The setting of 500 psia is sufficiently below the rated load operating point of 739 psia so as not to interfere with normal operation, but still high enough to provide the required protec-tion in the event of excessively high steam flow.

This setting was used in the accident.analysis.(8 )

7.

Containment High Pressure - A reactor trip on containment high pressure is provided to assure that the reactor is shut down upon the initiation of t.he safety injection system.

8.

Low Power Physics Testing - For low power physics tests, certain tests will require the reactor to be critical at low temperature (L 260°F) and low pressure (~ 415 psia).

For these certain tests only, the thermal margin/low pressur.e, and low. steam generator pressure trips may be by-passed in order that reactor power can be increased for improved data*

acquisition.

Special operating precautions will be in effect during these tests in accordance with approved written testing procedures.

At reactor power levels be].ow 10""1% of rated power, the thermal margin/low-pressure trip is not required to prevent fuel rod thermal limits from being exceeded.

The low steam generator pressure trip is not required because the low steam generator pressure will not allow a severe reactor cooldown, should a steam line break occur during these tests.

References (1)

FSAR, Section 4.1.

( 2)

FSAR, Section 7.2.3.2.

(3)

FSAR, Section 7.2.3.3.

(4)

XN-NF-77-18, Section 3.3.

( 5)

FSAR, Section 3.3.3.

(6)

Deleted.

(7)

FSAR, Section 3.3.6.

2-9

  • I.

2.3 LIMITING SAFETY.SYSTEM SETTINGS :.:. REACTOR PROTECTIVE SYSTEM (Contd)

. References (Contd)

(8)

XN-NF-.77-18, Section 3.8.

.. * (9). XN-NF.:..77-18, Section 3.. 7.

(10)

Deleted.

(11)

XN-NF-77-18, Section3.6.

. (12)

XN-NF-77-18,.Section 3.1.

(13)

XN-NF~77-22, Section 3.4.

2-10

3.3 EMERGENCY CORE COOLING SYSTEM Applicability Applies to the operating status of the emergency core cooling system.

Objective To assure operability of equipm.ent required to remove decay heat from the core in either emergeI1CY or normal shutdown situations.

Specifications Safety Injection and Shutdown Cooling Systems 3.3.1 The reactor shall not be made critical, ex~ept for low-temperature physics tests, unless all of the following conditions are met:

a.

The SIRW tank contains not less than 250,000 gallons of water with a boron concentration of at least.1720 ppm but not more than 2000 ppm at a temperature not less.than 4o°F.

b.

All four safety injection tanks are operable and pressurized to at least 200 psig with a tank volume. of at least 1103 ft3 and a maximum volume of ll66 ft 3 with.a boron concentration of at least.1720 ppm but not more than 2000 ppm.

c.

One low-pressure safety injection pump is operable on each bus.

d.

One high-pressure safety injection pump is operable on each bus.

e.

Both shutdown heat exchangers and both component cooling heat exchangers are operable.

f.

Piping and valves shall be operable to provide two flow paths from the SIRW tank to the primary coolant system.

g.

All valves, piping and interlocks associated with the above components and required to function during accident conditions are operable.

h.

The Low Pressure Safety Injection Flow Control Valve CV-3006 shall be opened and disabled (by isolating the air supply) to prevent spurious closure.

i. The Safety Injection bottle motor-operated isolation valves shall be opened with the electric power supply to the valve.

motor disconnected.

j. The Safety Injection miniflow valves CV-3027 and 3056 shall be open with HS-3027 and 3056 positioned to maintain them open.

3-29

3.3 EMERGENCY CORE COOLING SYSTEM (Contd) severity to the design basis accident is.not possible and the engineered safeguards' systems are not required.

The SIRW tank contains a minimum of 250,000 gal.lens of water con-taining 1720 ppm boron.

This is sufficient boron concentration to provide a 5% shutdown margin with all control rods withdrawn and a new core at a temperature of 6o°F.

Heating steam is provided to maintain the.. tank above 4o°F to pre-vent freezing.

The 1% bo.ron (1720 ppm) solution will not precipi-tate out.above 32°F.

The source of steam during normal plant operation is extraction steam line in the turbine cycle.

The limits for the safety injection tank pressure and volume assure the required amount of water injection during an accident and are based on values used for the accident analyses.

The minimum 190-inch level corresponds to a volume of ll03 rt3 and the maximum 202-inch 1

1 d

t 1

f 1166 rt3.

eve correspon s. o a vo ume o Prior to the time the reactor is brought critic.al, the valving of the safety injection system must be checked for correct alignment and appropriate valves locked.

Since. the. system is used for shut-down cooling, the valving will be changed and must be properly aligned prior to start-up of the reactor.

The operable status of the various systems and components is to be demonstrated by periodic tests.

A large fraction of these tests will be performed while the reactor is operating in the power range.

If a component is found to be inoperable, it will be possible in most cases to effect repairs* and restore the system to full operability within a relatively short time.

For a single component to be in-operable does not.negate the ability of the system to perform its function, but* it reduces the redundancy provided in the reactor design and thereby limits the. ability to tolerate additional equip-ment failures.

To provide maximum assurance that the redundant component(s) will operate if required to do so,. the redundant com-

. ponent(s) is to be tested prior to initiating repair of the inop-erable component.

If it develops that (a) the inoperable component is not repaired within the specified allowable time period; or (b) a second component in the same or related system is found to be inoperable, the reactor will initially be put in the hot shutdown 3-31

3.6.4' Two independent containment hydrogen recombiners shall be operable when the reactor is.at power or at hot standby.

With one hydrogen recombiner system inoperable, restore the* inoperable system to operable status within 30 days or be in at least hot shutdown within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> *

.. '.1*

3-4oa

Table 3.IJ.4 Instrumentation OperatingRequirements.for Other Safety Feature Functions *

. Minimum Minimum Operable Degree of No Functional Unit Channels Reduridanc;y Permissible Bypass Conditions

  • l SIRW tow-Level Switches 2(b) l None 2

L::.T - Power Comparator 3

High-Pressure 4

5 6

1 8

Safety Injection Flow Instruments Air Cooler Service Water Flow Instr Primary and Secondary Rod Insertion and Out:..

of-Sequence Monitors Fuel Pool Bldg Crane Interlocks Start-Up Channels Spent Fuel Pool Criticality Monitors 3(c) 4 l

l l

2 l(e) l None None None None None None None None NA As Requested Under Adminis1;r~t ive Control~a)

Not Required Above io-4% of Rated Power Not Required if Fuel Is Not Stored in Fuel Handling Building (a). Crane shall not be used to move material past the t:uel storage pool unless the interlocks are available.

(b). One of the inoperable channels must. be.in the tripped condition.

(c-)

If only 2 channels*are operable, load* shall be reduced to 70% or less of rated power.

(d)

Minimum operable channels shall be one (l) and minimum degree of redundancy is zero (0) if shutdown neutron power levels indicated on the log range channels are greater than 3 times the lowest decade in which neutron visibility can be confirmed.

Neutron visibility will be confirmed through observation of reactivity changes on neutron power level (including a l/M plot during reactor start-up) and comparing the observed changes to the changes noted on previous similar start-ups.

Instrumentation operability will also be verified by comparison among the three operable channels to ensure their individual responses are in agreement.

(e)

With the number of channels operable less than required, perform area surveys with portable instrumentation at least once each 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3-81

_J TABLE 11.1.1 Minimum Frequencies for Checks, Calibrations and 'l'esting of Reactor Protective System{5) (Contd)

Surveillunce

---~Chunnel Description 1unction Jt'requency Surveillance Method

6.

Steam Geneqitor Level*

a.

Check s

a.

Comparison of four level indications per generator.

b.

Calib:rate R

b.

Known different.ial pressure applied to M(2) sensors.

(1)

c.

'l'est

c. Bistable trip tester.
7.

Steam Generator Pressure

a.

Check

s.

a *. Comparisons of four pressure indications per generator.

b.

Calibrate R(2)

b.

Known pressure applie? jo sensors.

c. 'l'est M
c. Bistable trip tester. 1
a.

Calibrate*

R(2)

a.

Known pressure applied to sensors.

b.

Test M

b.

Simulate pressure switch action.

8.

Containment *Pressure

a.

Test p

a

  • Manually trip turbine auto-stop oil relays.

.i:--

1

9.

Loss of Load

.r--

10.

Munuul Tripa

a.

Test p

a.

Manually test both circ\\li ts.

11.

Heuctor Protection System Logh: Uni ts

a.

'l'es t i2)

a.

Internal test circuits.

Hot es:

( l) The bistable trip tester injects a signal into the bistable and provides for a precision readout of the trip set point.

(2)

(3)

All monthly tests will be done on only one of four channels at a time to prevent reactor trip.

Adjust tlie nuclear gain pot on the hT cabinet until readout agrees vi th. heat balance calculations *.

Trip setting for operating pump combination only.

Settings for other tha~ operating pump combinations must be tested during routJne lnonthly testing performed when shut down anci within four hours. after resLUning operatlon wi tli a. different pump combination if the setting for that combination has not been te!.ited wlthi.n the p1*evious month.. *

(5) It is not necessary to perform the specified testing during" prolonged periods in the cold shutdown condition *. If this occurs, omitted testing will be performed prior to returning the plant to service.

e

..J

1.
2.

.i::-

3.

I

°'

11 *

5.

1,.

TAHLE li.1. 2 Mininnun Frequencies for Checks, Calibrations and Testt*~ of Engineered Safety Feature Instrumentation Controls 5)

. f Surveillo.nce Channel DescriEtion Function Freguenci Surveillance Method

  • I.ow-Pressure SIS Initiation
a.

Check s(5)

a.

Comparison of four separate pressure L

Chan11cls Test(l) indications.

b.

R

b.

Signal to meter relay adjust with test

c.

'l'est M(2)(5). c.

device t.o verify SIS actuation logic *9 I Signal to meter relay adjusted with t device *.

Lov-l'ressure SIS Signal Dlock

a. Test(!)

R

a.

)?art of l(h) above.

Permlssive and Auto Reset*

SIS Actuation Relays

a.

'l'est Q(5) a

  • Simulation of SIS 2/4 logic trip using built-in testing system *. Both "standby power" and "no standby power" circuits vill be tested for left and right chan-nels.. Test will verify functioning of initiation circuits of all equipment normally operated by SIS signals.
b.

Test R

b.

Complete o.utomatictest initiated by same method as Item. l(b) and including 0.11 normal automatic operations.

Containment High-Pressure

a.

Callbrate R

a.

Known pressure appliei;l to sensor*s.

Channels

b.
  • rest R
b.

Simulation of CllP.2/4 logic trip to e verify actuation logic for SIS, con-tainment isolation* and containment spray *I *

c.

Test M(2)(5)

c.

Pressure switch operation simulated by opening or shorting terminals or pres-s~re applied to the switch.

Contujnm0.nt High Hadiution

a.

Clieck D(5)

a.

Comparlson of four separate radltttion Chur111els level indi.cations.

b.

Cu.librate R..

b.

Exposure to known external radiation source.

..)

5.
6.
1.

B.

i:.-

I

9.

-.:a

10.
11.
12.

r-*

TADJ.. E 4.1.2 Min_imum Frequencies for Checks, Calibrations and Testing 9f Engineered Safety Feature Instrumentation Controls (Contd)~5)

Surveillance Channel DescriEtion Function Containment. High Radlation

c. Test Channels (Contd)

.d.

Test Munuul SIS Initiation

a.

Test t.tanuul Containment Isol,a-a..

Test tion Initiution

b.

Check Manual Initiation Contain-111ent Spro.y Pumps and Valves

a.

Test DBA Gequencers

a.

Test Normal Shutdown Sequencers

a. *rest Diesel Start
a.

Test

b.

Test

c.
  • rest SIRW Tank Level Switch
a. Test Interlocks Freguenc;y:

ri 2>

c.

R

d.

R

a.

R

a.

R

b.

R

a.

Q(5) a..

R

a.

M

. a.

R

b.

p

c.

n

a.

Surveillance Method Remote-opernted integral radiation check sourc.e used to verify instrument opera-tion.

Simulation of CHR 2/4 logic trip with test switch to verify actuation relays~

including containment isolation.

Manual push-button test.

Manual push-button test.

Observe isolation valves closure.

Manual switch operation.

Proper operation will be verified during SIS actuation test of Item 3(a) abOve.

Simulate normal actuation with test...:

operate switch and verify equipment starting circuits.

Manual initiation followed by synchro-nizing and loading.

Diesel start, load shed, synchronizing-o.nd loading will be verified during Item 3(b) above.

Diesel'.auto start initiating circuits.

Level switches removed from fluid to

. _verify actuation logic.

I Q(4}(5)

b.
  • rest
b. Use SIRW tank and contairim.ent sump control r switch to verify actuation of valves.

'fABLE 11.1.2 Minimwn Frequencies for Checks, Calibrations and Testing ~S Engineered Safety Feature Instrumentation Controls (Contd)

)

(J Ct~nnel Description 13~ Safet.y Injection Tnnk Leve.L and Pressure Instrwnents

14.

Dor iC Acid 'l'unk Level Switches

15.

Uoric Add Heat Tracing System f

16.
  • M1:1.in Ste1:1.m Isolation Valve

°'

Ci re 11i ts

17.

SIRW 'l'ank 'l'emperature Indication and Alarms

10.

Low-Pres.nure Safety Injection Flow Control Valve CV-3006

19.

Surety Injection Dottle Isolntion*valves

20.

Safely Injection Miniflow Valves CV-3021, 3056 Surveillance FWlction

a.

Check

b.

Calibrate

11.
  • rest
a.
a.
b.

Check Check Test( 3)

a.

Check

b.

Calibrate

a.

Check

a.

Check

a.

Check Frequency s(5)

R R

D (5 )~

s.

R M

R p

p p

S~r~eill~nce Method

a.

Verify that level and pressure indica-tion is between independent high high/

low alarms for level and pressure.

b.

Known pressure and differential pres-sure applied to pressure and level sensors.

a.
a.
a.
b.

Pump tank below low-level alarm point A to verify switch operation.

~

Observe temperature recorders for proper readings.

Compare four independent pressure indi-cations.

Signal to meter relay adjusted with test device to verify MSIV circuit logic.

a.

Compure independent temperature readouts.

b.

Known resistance applied to indicating loop.

a.

Observe valve is open with air suppl!'

isolated.

a.

Ensure each valve open by observing valve posltion indication o.nd valve itself.

Then lOck open breakers (atMCC-9) and.A.

control power (key switch in control *.,_,

room).

a.

Verify valves open and HS-:-3027 and 3056 positioned to maintain them open.

Notes:. ( J.)

(2)

(3)

(4)

Calibration of the sensors is performed during calibration of Item 5(b). Table 4.1.1.

(5)

J\\ll monthly test!'> wgJ b~do~~ on only one chann~l at a time to prevent protection system actuation.

Calibration of the sensors is performed durinS cB.iibration of Item. 7(b), Table 4.1.l.....

Perform prior to each start-up,.if the plant is in a cold shutdown condition, if not already performed during the previous quarter.

It is not necessary to perform the specified testing during prolonged periods in the cold shutdown condition. If this occurs, omitted testing will be performed prior to returning the plant to service.

I TABLE Ii.1. 3

(

Minimum Frequencies for Checks, Calibrations and ~estins. of Miscellaneous Instrumentation and Controls 5)

Channel Description

1.

Start-Up Range Neutron Monitors

2.

Primary Rod Position Indication System

3.

Secondary Rod Position Indication System

11.

Area and Process Monitors

5.

This item deleted.

  • 6.

Environmental Monitor-a

7.

Pressurizer Level Irwt nunents Surveillance Function

a.

Check

b.

Test

a.

Check

b.

Check.

c.

Calibrate/Check

a.

Check.

b.

Check

, c -.---Calibrate/Check

a.

Check

b.

Calibrate

c.

Test

a.

Check

b.

Calibrate

a. *Chect
b.

Calibrate

c.

'l'est Freguency s

R D

R M

M A

8 (5)

R

~(5)

Surveillance Method

a.

Comparison of both channel count rate indications when in service.*

b.
a.
b.
c.
a.
b.
c.

Internal test signals.

Comparison of output data with secondary RPIS.

Check of power dependent inse1tion limits monitoring system.

Physically measured rod drive position used to verify system accuracy.

Check re>d position interlocks.

Comparison of output data with primary RPIS.

Same as 2(b) above, including out-of-sequence alarm function.

Same as 2(c) above.

a.

Normal readings observed and internal*

test signals used to verify instrument operation.

b.

Exposure to known extei*nal radiation source.

c.

Detector exposed to remote operated radiation check source.

a.*

  • Operatfoijal.check.
b.

Verify airflow indicator.

a.

Comparison of six independent level readings.

b.

Known differential pressure applied to sensor.*

c.

Si~nul to meter relay adjusted with test device.

I

F;.

~.

i>i.lnimutn F*t"e<i_uencies for Checks, Caiibratior!;; anrlT:~~i~~

1

~.~ Miaceli~<:ous Iristrumentecion and. Controls (Contd)(5)

  • I Surveillance Channel DescriEtion Function Freguenc!

Surveillance.Method

0.

Control Rod Drive System

a.

Test R

a. Verify proper operation of all rod drive Interlocks control system interlocks, using simulated
  • signals vhere necessary.

. b.

Test p

b.

Same as 8(a) above, if not done within three months.

9.

Flux-AT Pover Comparator

a.

Calibrate.

R

a.

Use simulated signals.

b.

Test M(5)

b.

Internal test signal.

10.

Calorimetric Instrumentation

a.

Calibrate R

a.

Kriown differential pressure applied to feed-vater flov sensors.

11.

Containment Building llwnidity a.

Test R

a.

Expose sensor to high humidity atmosphere.

Detectors l='

I

12.

Interlocks - Isolation Valves Calibrate R

Known pressure applied. to sensor.

a.

a

13.

Service Water Break Detector

a.

Test R

a.

Known differential press':lre applied to in Containment~

sensors.

lli.

Control R.oom Ventilation

a.

Test R

a

. HS-1801 and isolation signal.

b.

Test

  • R
b.

Check control room for positive pressure.

(5)rt is not nec~ssary to perform the specified--~~~-ti~g.durl~~ ~~olonged periods in the cold shutdown

\\

or refueling conditions. If this occurs, omitted testing will be performed prior to returning the plant to service.

~

Table 4.2.1 Minimum Freouencies for Sa.nroling Tests

6.

Spent Fuel Pool

7.

Secondary Coolant

8.

Liquid Rad waste

9.

Radioactive Gas Decay*

10. Stact-Gas Monitor Particulate Samples

. Test Boron Concentration Bulk Water Temperature Gas Radioactivity by

  • Air Ejector Gas Mon~tor Coolant Gross Radio-activity pH and specific conductivity*

Sodium Isotopic Analysis for Dose E~uivalent I-131 Concentration Radioactivity Analysis Radioactivity Analysis Iodine 131 ana Partic-ulate Radioactivity

~-14a Frequency

  • FSAR Section Reference Monthly ( 7)

Continuously when bundles. are stored in tilt pit racks with less 1;~~ one.

year decayl J Continuous(S) during power operation 9.4 None None 3 times/7 days None with a ina.ximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> between samples Once/24*hours during None power operation 3 times/7 days None

  • during power opera-tion, with a maximum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> between samples a) 1 per 31 days, when-ever the gross activity determina-tion indicates iodine concentrations greater than 10% of the.allowable limit b) 1 per'6 months, when-ever the gross activity determinatio~ incicates iodine concentrations below 10% of the allowable limit Prior to release 11.l of each batch Prior to release 11.l of each batch*

w kl <4) ee y 11.1

l *.

2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Table 4.2.2 Minimum Frequencies for F.quipment Tests Control Rods Control Rods Pressurizer Safety

This item deleted.

Primary System leakage Diesel Fuel Supply This item deleted.

Charcoal & R1 Efficiency Filters for Control Room F\\tel Storage Building and Containment Purge System (containment post-accident filter).

Test Drop Times of All Full*

length Rods Partial Movement of All Rods (Minimum of 6 In)

Set Point Set Point*

P\\mctioning

. P\\mctioning Evaluate 1\\1.~l Inventory Charcoal fiiters checked ~ 99% effi-ciency per Freon 112 test (ORNL).

  • HEPA tilters checked ~

99% efficiency per

>..NSI NlJl.l-1972 1'-15 FSAR Section Frequency Reference Each Re-7.4.l.3 tueling Sbutdovn Every Two 7.4.l.3 Weeks One Each 7.3. 7 Retueling Shutdovn Five F.ach 4.3.4 Retuellng Sbutdovn

  • Prior to 9.1i.3 Retueling.

Operations Each Re-9.i.2

  • rueling Operation D'aily 4

Amend 15, Deily Years Each Re-fueling Shutdovn and at any time work on filters rould alter

  • ~heir in-
  • ~.egrity.

Ques 4.3.7 8.4.1 Amend 14, Ques 14.19-1 6.5.1

  • 9.8.3

Table. 4.2.1 Minimum Frequencies*for Sampling Tests (l)A daily sample shall be obtained and analyzed if fission product monitor is out of service.

(2)After at least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

2 EFPD and at least 20 days since the last shutdown of longer than (4 )When iodine.or particulate radioactivity levels exceed 10 percent oflimit in Specification 3.9.11 and 3.9.14, the sampling frequency shall be increased to a minimum of one e each day.

( 5) If the a.ir ejector gas monitor is out of service, the secondary coolant gross radioactivity shall be measured once per day ~o evaluate steam generator leak tightness.

(6)Reference Specification 3.8.5 for* maximum bulk water temperature and monitoring

. requirements.

C7 )Reference Bases section of Specification 3.8 for minimum boron concentration.

(~1720ppm) 4-14b

4.5 CONTAINMENT. TESTS (Contd) an impor*tant part of the structural integrity of the containment is

~

maintained.

The basis for specification of.a total leakage rate of o.601 from a

penetrations and isolation valves is specified to provide assurance that the integrated leak rate would remain within.the specified

. liinits during the intervals between integrated leak rate tests.

This value allows for possible deteriorat*ion in the intervals be-

.tween tests.

The limiting. leakage rates from the shutdown cooling system are judgment values ba*sed primarily on assuring* that the components could operate without mechanic.al failure for a period on the order of 200 days. after a DBA~ The test pressure (255 psig)

  • achieved either by normal system operation or by hydrostatically testing gives an adequate margin over the highest pressure within the system after a DBA.

Similarly, the hydrostatic test pressure for the return lines from the containment to the shutdown cooling system (100 psig) gives an adequate margin over the highest pressure within the lines after a DBA. ( 5)

(

A shutdown cooling system leakage of 1/5 gpm will limit off-site expo-sures due to leakage to insignificant.levels relative to those calculated for leakage directly from the containment in the DBA.

The engineered safeguards room ventilation system is equipped with isolation valves which close upon a high radiation signal from a local radiation detector.

These*monitors shall be set at 2.2 x 105 cpm, which is well below the expected level, following a loss-of-coolant accident (LOCA), even with-out clad failure... The 1/5 gpm leak rate is sufficiently high to permit prompt detection and to allow for reasonable leakage through the pump seals and valve packings, and yet small enough to be readily handled by the sumps and radioactive waste system.

Leakage to the engineered safeguards room sumps will be returned to the containment clean water receiver fol-lowing an LOCA, via the equipment drain tank and pumps.

Additional makeup 4-:35 i*

I

1.
4. 6 SAFETY INJECTION AND CONTAINMENT SPRAY SYSTEMS TESTS Applicability Applies to the safety injection system, the containment spraysysterc, chemical inJection system and the containment cooling system tests.

Objective To verify that the subject systems will respond promptly and perform

.their intended functions, if*required.

Specifications 4.6.1 Safety Injection System

a.

System tests shall be. performed at. each reactor* refueling interval.

  • A test safety injection signal will be applied to* initiate operation of the system.

The safety injection-and shutdown cooling

(

system pump motors may be. de-energized for this test.

b.

The system test will be considered satisfactory if control board indication and visual observations indicate that all components have received the safety injection signal in the proper sequence and.timing (ie, the appropriate pump breakers *shall have opened and closed, and all valves shall have_ completed their travel).

c.

All high-pressure safety injection pumps except those otherwise required to*be operable shall be demonstrated inoperable at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> whenever the temperature of one or more of the PCS cold legs is 250°F by verifying that the control system fuses

  • . and their fuse holders for the HPSI pumps (P66A, P66B and P66C) have been removed from the circuit.

4.6.2 Containment Spray System

a.

System tests shall be performed at each reactor refueling interval.

The test shall be performed with the isolation valves.in the spray supply lines at the containment blocked closed.

Operation of the*

system is initiated by tripping the normal actuation instrumentation~

  • b.

At. least every five years, the spray nozzles shall be verified to be open.

c.

The test will be considered* satisfactory if visual observations indicate all components have operated satisfactorily.

4.6.3. Pumps - Deleted 4.6.4 Valves ~Deleted 4-39

1, 4.6.5 Containment Air Cooling System

a.

Emergency mode,automatic valve and fan operation will be checked for operability during each refueling shutdown.

b.

Each fan and valve required to function during accident conditions will.be exercised at intervals not to exceed three months.

Basis The safety injection system and the containment spray.. system are princi-pal plant safety features that are normally *inoperative during reactor operation.

Complete systems tests cannot be performed when the reactor is operating because a safety injection signal causes containment isolation and a containment spray system test requires the system tO be. temporarily disabled.

The method of assuring operability of these systems is there-fore to combine systems tests to be performed during annual plant shut-downs, with more frequent component tests, which can be performed during reactor operation.

The annual systems tests demonstrate proper automatic operation of the safety injection and containment spray systems.

A test signal is applied*to initiate automatic action and verification made.that the components receive the safety injection in the proper sequence.

The test demonstrates the operation of the valves, pump circuit breakers, and automatic circuitry. (l, 2) 4-40