SURVSILLANCB REQUIRBMBNTS (Continued) | SURVSILLANCB REQUIRBMBNTS (Continued) | ||
: d. At l ...t once per 18 month* during *hutdown by: | : d. | ||
: 1. | At l... t once per 18 month* during *hutdown by: | ||
: 2. | : 1. | ||
Subjecting the die**l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recoamendation* for thi* cl*** of *tandby **rvice, | |||
: 3. | : 2. | ||
a) | Verifying that, on rejection of a load greater than or equal to | ||
b) | *a20 kw, the voltage and frequency are r**tored to~ 3950 and~ 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*. | ||
energize* the vital bue with ~,rmanently connect*d load* within 13 **cond*, energize* the auto-connected *hutdown load* through the load *equencer and operate* for greater than or equal to S minute* while it* g*nerator i* loaded with the *hutdown load*. The *t*ady *t*t* voltage and frequency of the vital bu* | : 3. | ||
Simulating a lo** of off*ite power by it**lf, and: | |||
: 4. | a) | ||
The generator voltage and frequency *hall be ~ 3950 and s 4580 volts and 60 +/- 1.2 Hz within 13 **cond* after the auto-*tart signal and | Verifying de-energization of the vital bu* and load *bedding from the vital bu*. | ||
b) | |||
S. | Verifying the di***l *tart* on the auto-*tart *ignal*, | ||
6: | energize* the vital bue with ~,rmanently connect*d load* within 13 **cond*, energize* the auto-connected *hutdown load* through the load *equencer and operate* for greater than or equal to S minute* while it* g*nerator i* loaded with the *hutdown load*. | ||
The *t*ady *t*t* voltage and frequency of the vital bu* | |||
*hall be maintained at ~ 3950 and ~ 4580 volt* and 60 +/- 1.2 Hz during thi* t**t. | |||
b) | : 4. | ||
energize* the vital bu* with permanently connected loads within 13 *ec:onda, energize* the auto-connected emergency (accident) load* through the load **quencer and operate* for'greater than | Verifying that on an !SF actuation teat *ignal without lo***of off *ite power the di***l generator *tart* on th* auto-*tart *ignal and operate* on *tandby for greater than or equal to 5 minute*** | ||
The generator voltage and frequency *hall be ~ 3950 and s 4580 volts and 60 +/- 1.2 Hz within 13 **cond* after the auto-*tart signal and | |||
*hall be maintained within the** limit* during thia t**t. | |||
S. | |||
Not Uaed. | |||
6: | |||
Simulating a lo** of off*ite power in conjunction with an ESP actuation teat *ignal, and: | |||
Verifying de-energization of the vital bu* and load *bedding | |||
*~*.iP. | |||
from the vital bua. | |||
9407260210 PDR ADOCK p | |||
b) | |||
Verifying the di***l *tart* on the auto-atart *ignal*, | |||
energize* the vital bu* with permanently connected loads within 13 *ec:onda, energize* the auto-connected emergency (accident) load* through the load **quencer and operate* for'greater than or ~al to S minute* while it* generator i* loaded with the | |||
..e~gency load*. | |||
Th* *~~~~Y *tat* voltage and frequency of the vital bu* *hall be maintained at~ 3950 and~ 458l>volt* and 60 +/- 1.2 Hz during thi* t**t., | |||
940715 05000272 PDR SALEK - | |||
OHI'i' 1 3/4 8-4 Amendment No. | |||
148 | |||
e | -;r:-tJ ~ E RT I | ||
e e | |||
ELEC~RICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) | |||
====2*********3****aa~a=*======2~~z==z======~=-~===ss***2==a*====z*=========== | |||
: f. At least once per 18 months, the foll ing test shall be performed within 5 minutes of diesel hutdown after the diesel has operated for at least '*'~~*¥.I~ at 2500-2600 kw**: | c) | ||
Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*. The generator voltage and frequency shall be ~ 3950 volts and ~ 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal. | Verifying that all nonessential automatic diesel generator trip* (i.e., other than engine overapeed, lube oil preaaure low, 4 KV bua differential and generator differential), are automatically bypa***d upon lo** of voltage on the vital bua concurrent with a *afety injection actuation signal. | ||
: 7. | |||
Verifying the die**l generator oper.&t** for at lea*t 24 hours*. | |||
During the fir*t 2 hour* of thi* te*t, the di***l generat~~ shall be loaded t.o 2760-2860 kw.** | |||
Dur-inq th* nmaininq 22 hours of thi* | |||
te*t, the di***l generator *hall be loaded to 2500-2600 kw*** | |||
The | |||
*t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and S 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. | |||
Wi~hin S minueee aft*~ 8ompletin9 thi* ~4 heuE te*t, perfal'llll 8Yr9eillanee ReEftiiremeftt 4,a.1.1.2.d.&.aa''' | |||
: 8. | |||
Verifying that the auto-connected load* to each die**l generator do not exceed the two hour rating of 2860 kw. | |||
: 9. | |||
Verifying that with the di***l generator operating in a test mode (connected to ita bu*), a *imuleted *afety injection signal override* the t'"est mode br (1) returning th* di***l generator to standby operation and (2) automatically energizing the emergency load* with offaite power. | |||
: e. | |||
At lea*t once per ten year* or after any modification* which could di***l generator interdependence by *tarting all di***l generators | |||
*imultaneou*ly*, during shutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to 10 *econd*. | |||
affect 4.8.l.l.3 The die*el fuel oil storage and transfer sy*tem shall be demon*trated OPERABLE: | |||
\\ | |||
: a. | |||
At lea*t once per 31 day* by: | |||
: b. | |||
: l. | |||
Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*. | |||
: 2. | |||
Verifying that both fuel tran*f*r pwnp* c~ be *tarted and tran*f*r fuel from the 20,000 gallon *torage tank* to th* day tankm. | |||
At lea*t once per 92 day* by verifying that a *ample of diesel fuel from each of the above required 20,000 gallon fue~ atoraqe tank* i* within th* acceptable limit* *pecified in.Table l of ASTH 0915-77 when checked for vi*co~ity, water and *ediment. | |||
SALEM'-._ UNIT l 3/4 8-5 Amendment No. | |||
~~3 | |||
: f. | |||
Insert 1 At least once per 18 months, the foll ing test shall be performed within 5 minutes of diesel hutdown after the diesel has operated for at least '*'~~*¥.I~ at 2500-2600 kw**: | |||
Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*. | |||
The generator voltage and frequency shall be ~ 3950 volts and ~ 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal. | |||
ELECTRICAL PQW1!jR SYSTEMS SURVBILLAHCZ REQUIREMENTS (Continued) 4.8.1.1.4 89port;1 - All di***l generator failur**, valid or non-valid, shall b* reported to the Commi11ion in a Special Report pur1uant to Specification 6.9.2 within JO day1. Report* of di***l generator failure* 1hall include the information recommended in R*gulatory Po1ition C.J.b of Requlatory Guide 1.108, Revi1ion 1, Auqu1t 1977. If the number of failure* in the la*t 100 valid te*t* (on a per nuclear unit ba*i*) i* greater than or equal to*1, the report *hall be *uppl...nted to include th* additional information recommended in Regulatory Po*ition c.J.b of Requlatory Guide 1.108, Revi*ion l, Auqust 1977. | ELECTRICAL PQW1!jR SYSTEMS SURVBILLAHCZ REQUIREMENTS (Continued) 4.8.1.1.4 89port;1 - All di***l generator failur**, valid or non-valid, shall b* reported to the Commi11ion in a Special Report pur1uant to Specification 6.9.2 within JO day1. | ||
Report* of di***l generator failure* 1hall include the information recommended in R*gulatory Po1ition C.J.b of Requlatory Guide 1.108, Revi1ion 1, Auqu1t 1977. | |||
If the number of failure* in the la*t 100 valid te*t* (on a per nuclear unit ba*i*) i* greater than or equal to*1, the report *hall be *uppl... nted to include th* additional information recommended in Regulatory Po*ition c.J.b of Requlatory Guide 1.108, Revi*ion l, Auqust 1977. | |||
Surveillance te*tinq 1hall be conducted in accordance with the manufacturer'* recCX11Dendation1 reqarding engine prelube, warm-up and l~a~ing (unl*** loading time* are 1pecif ied in the individual surveillance Requiremen~*>* | |||
Tb~band i*.. ant a* quidance to preclude routine exceedance* of the di-..& 99nerator manufacturer'* de*ign rating*. | |||
Load* in exc*** of th~* | |||
band for mpec:ial t**ting or momentary variation* du"* to changing bu* | band for mpec:ial t**ting or momentary variation* du"* to changing bu* | ||
loadll 9ball not invalidate the t**t. | loadll 9ball not invalidate the t**t. | ||
*** Pailaee ef a ce1c pes luF1se111ance a.qu1s. .ene | *** Pailaee ef a ce1c pes luF1se111ance a.qu1s.. ene 4.1.1.1.a.d.i.~, fQllQIWLA9 peefaeeanae et luFl>'*illanae R*ll'!ie.-*ft45 4,a.1.1.a.d.7, d***~n*c *efifW*F* | ||
*ha* *he 34 heur ***e ef 4w8olalw2ada7 ~- repeabed1 Al an albernatt*** | |||
*h~~BDG *h*lk ~*loaded co 3i00=3i00 kw ~os one hous, es une11 operag*R~ | |||
bemperaeur** ha9e 1eabilimed, peiel"::::~e eepeat.l~9 8uF11eill*~* ReEfW*F.,,*ng 4,9,1,1.2.d.61!91 SALEM - UNIT 1 | bemperaeur** ha9e 1eabilimed, peiel"::::~e eepeat.l~9 8uF11eill*~* ReEfW*F.,,*ng 4,9,1,1.2.d.61!91 SALEM - UNIT 1 3/4 8-Sa Amendment No. | ||
~.!3 | |||
NG Ja~s +o fit,'5 pq~e - | ELEc*;RICAL PQWER SYSTEMS NG Ja~s +o fit,'5 pq~e - | ||
:r:f1 -F-o 0 YI I y. | :r:f1 -F-o 0 YI I y. | ||
SURVJ:ILLAHCB REQUIREMENTS (Continued) | SURVJ:ILLAHCB REQUIREMENTS (Continued) | ||
: d. At lea*t onee per | : d. | ||
: 1. | At lea*t onee per lS month* during shutdown by: | ||
: 2. | : 1. | ||
: 3. | Subj*cting the di***l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recommendations for thi* cl*** of *tandby **rvice, | ||
b) | : 2. | ||
energize* the vital bu* with permanently connected loada within 13 **cond*, energize* the auto~connected *hutdown load* through the load **quencer and operate* for greater than or equal to 5 minute* while it* generator i* loaded with the shutdown load*. Th* *t*ady *tat* voltage and frequency of the vital bu* | verifying that, on rejection of a load of greater than or equal to 820 kw, th* voltage and frequency ar* r**tored to ~ 3950 and s. 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*. | ||
: 3. | |||
: 4. | Simulating a lo** of off*ite power by it*elf, ands a) | ||
Verifying de-energization of the vital bu* and load *hedding from the vital bu*. | |||
b) | |||
Verifying the die*el *tart* on the auto-*tart *ignal*, | |||
energize* the vital bu* with permanently connected loada within 13 **cond*, energize* the auto~connected *hutdown load* through the load **quencer and operate* for greater than or equal to 5 minute* while it* generator i* loaded with the shutdown load*. | |||
Th* *t*ady *tat* voltage and frequency of the vital bu* | |||
*hall be maintained at ~ 3950 and S. 4580 volt* and 60 +/- 1.2 Hz during thi* t**t. | |||
: 4. | |||
Verifying that on an ESF actuation te*t *ignal without leas of off*it* power the di***l generator *tart* on th* auto-*tart aignal and operate* on *tandby for greater than or equal to 5 minutes*. | |||
Th* g*n*rator voltage and frequency *hall be ~ 3950 and S. 4580 volts and 60 +/- 1.2 Hz within 13 seconde after the auto-start signal and shall be maintained within the** limit* during this test. | Th* g*n*rator voltage and frequency *hall be ~ 3950 and S. 4580 volts and 60 +/- 1.2 Hz within 13 seconde after the auto-start signal and shall be maintained within the** limit* during this test. | ||
: 5. | : 5. | ||
: 6. | Deleted | ||
: 6. | |||
* actuation t**t *ignal, and a) | Simulating a lo** of off*ite power in conjunction with an ESF | ||
b) | - | ||
* actuation t**t *ignal, and a) | |||
Verifying de-energization of the vital bu* and load shedding frcm the vital bu*. | |||
b) | |||
Verifying the di***l *tart* on the auto-*tart *ignal*, | |||
energize* th* vital bu* with permanently connected load* within *** | energize* th* vital bu* with permanently connected load* within *** | ||
13 **cond*, energize* the auto-connected emergency (accident) load* through th* load **qu*ncer and operate* for greater than or oqual to 5 minute* while it* generator i* load9d with the | 13 **cond*, energize* the auto-connected emergency (accident) load* through th* load **qu*ncer and operate* for greater than or oqual to 5 minute* while it* generator i* load9d with the emergency load*. | ||
Th* *t*ady *tat* voltage and frequency of the vital bu* *hall be maiot_a_ined at ~ 3950 and S. 4580 volte and 60 +/- 1.2 Hz during thi* te*t. | |||
SALEK - UHIT 2 | SALEK - UHIT 2 3/4 8-4 Amendment No. 126 | ||
lU&.f.TRICAL POWER SYSTEMS SURVl:ILLAHCB REQUIREMENTS (Continued) c) | lU&.f.TRICAL POWER SYSTEMS SURVl:ILLAHCB REQUIREMENTS (Continued) c) | ||
Verifying that all noneaeential automatic dieael generator trip* (i.e., other than engine overnpeed, lube oil pr**oure low, 4 "KV Bu* differential and generator differential) are automatically bypa***d upon lo** of voltage on the vital bu* | |||
concurrent with a *afety injection actuation *ignal. | concurrent with a *afety injection actuation *ignal. | ||
: 7. Verifying the di***l generator operate* for at lea*t 24 houra*. | : 7. | ||
During the fir*t 2 hour* of thi* t**t, the di***l generator shall be loaded to 2760-2860 kw*** During the remaining 22 hour9--of thi* | Verifying the di***l generator operate* for at lea*t 24 houra*. | ||
t**t, th* di***l generator *hall be loaded to 2500-2600 kw*** The | During the fir*t 2 hour* of thi* t**t, the di***l generator shall be loaded to 2760-2860 kw*** | ||
During the remaining 22 hour9--of thi* | |||
t**t, th* di***l generator *hall be loaded to 2500-2600 kw*** | |||
The | |||
*t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and s 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Within i minute& | |||
aftes Gca11pletin9 chi* 24-hous t**t, pe~folR9 lpeoifigation 4.8.1.1.2.d.6.b.*** | aftes Gca11pletin9 chi* 24-hous t**t, pe~folR9 lpeoifigation 4.8.1.1.2.d.6.b.*** | ||
: 8. Verifying that th* auto-connected load* to each di***l generator do not exceed the two hour rating of 2860 kw~ | : 8. | ||
: 9. Verifying that with the di***l geperator operating in a te*t mode (connected to it* bu*), a *imulated *afety injection signal override* the- t**t mode by (l) returning the di***l generator to | Verifying that th* auto-connected load* to each di***l generator do not exceed the two hour rating of 2860 kw~ | ||
: 9. | |||
Verifying that with the di***l geperator operating in a te*t mode (connected to it* bu*), a *imulated *afety injection signal override* the-t**t mode by (l) returning the di***l generator to | |||
*tandby operation and (2) automatically enerqizing th* emergency load* with off*it* power. | |||
At l*a*t once per 10 year* or after any modification* which could affect di***l generator interdependence by *tarting all di***l generators | |||
*imultaneou*ly*, during *hutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to 10 **cond*. | |||
4.8.1.1.3 Th* di***l fuel oil storage and transfer ey*tem shall be demon*trated OPBRABLB: | 4.8.1.1.3 Th* di***l fuel oil storage and transfer ey*tem shall be demon*trated OPBRABLB: | ||
: a. At l*a*t once per 31 day* by: | : a. | ||
: 1. Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*. | At l*a*t once per 31 day* by: | ||
: 2. Verifying that both fuel tran*f*r pump* can be *tarted and tran*f*r fuel from th* 20,000 gallon *torage tank* to the day tankm. | : b. | ||
: 1. | |||
SALsH - | Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*. | ||
: 2. | |||
Verifying that both fuel tran*f*r pump* can be *tarted and tran*f*r fuel from th* 20,000 gallon *torage tank* to the day tankm. | |||
At l***t once per 92 day* by verifying that a *ample of diesel fuel frcm each of the above required 20,000 gallon fuel *torage tank* i* within th* acceptable limit* *pecif ied in Tlabl* 1 of AS~_p975-77 when checked for vi*co*ity, water and *ediment. | |||
SALsH - UNIT 2 3/4 8-5 Amendment No. 126 | |||
: f. | |||
Insert 1 | |||
~ | |||
~ | |||
At least once per 18 months, the follc/wing test shall be performed within 5 minutes of diesel~~utdown after the diesel has operated for at least oBe aour at 2500-2600 kw**: | |||
Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*. | |||
The generator voltage and frequency shall be ~ 3950 volts and 5 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal. | |||
. -*~ | |||
e e | |||
ELECTRICAL POWER SYSTEMS SURVZILLANCX REQUIREMENTS (Continued) | |||
********---*********************3*****2******a***~***********************2aaa2 4.8.1.1.4 BeP9rt* - All diesel generator failures, valid or non-valid, ahall be reported to the cemmi11ion in a Special Report purauant to Specification 6.9.2 within 30 day1. | |||
Report* of di***l generator failure* 1hall in~lude the information recoanended in RequlAtory Po1ition C.3.b of Regulatory Guide 1.108, Revi1ion 1, Auqu1t 1977. | |||
If the number of failure* in the laat 100 valid te1t1 (on a per nuclear unit ba1i1) i1 greater than or equal to 7, the report *hall be 1upplmnented to include the additional information recommended in Regulatory Po1ition C.3.b of Requlatory Guide l.108, R*vi1.ion 1,.-. | |||
Auqu1t 1977. | Auqu1t 1977. | ||
Surveillance te1ting *hall be conducted in accordance with the manufacturer'* recoanendation* reqarding engine prelube, warm-up and loading (unle11 loading time* are 1pecified in the individual | |||
*surveillance Requirement*)* | |||
Thia band i* meant a1 guidance to preclude routine exceedance1 of the di... l generator manufacturer'* de1ign rating*. | |||
Load* in exc*** of thia band for 1pecial te1ting or momentary variation* due to changing bua loade *hall not invalidate th* te1t. | |||
*** Pailwr* ef a **** per Sur\\~eillanee R*~ir.. | |||
th** eh* 24 heur ee1e ef 4,9,1,1,2.*.1 ~* r*pe***** A* aft aleerftaei~e, ehe~BDG 1na1} ~. leaded sa 25QO 2&00 kw fer an* naur, er unsil gpe*a~iRq | *~ 4.1.1.1.~.~.&.b, fellewiRq perfeJRBaRe* ef Su!A"eillanee Re~irement 4.9.1.1.2.d.1, does. not reqnire. | ||
~ | |||
th** eh* 24 heur ee1e ef 4,9,1,1,2.*.1 ~* r*pe***** | |||
A* aft aleerftaei~e, ehe~BDG 1na1} ~. leaded sa 25QO 2&00 kw fer an* naur, er unsil gpe*a~iRq | |||
*empe*a*u*** ha¥* **&aailiaed, pri~*e rep*a*in9 lurveill~~* R*~iEemeR~ | |||
£A '-'-'-~-~-h-SALEM - | |||
UHIT 2 3/4 8-6 Amendment No. 126}} | |||
Latest revision as of 01:34, 6 January 2025
| ML18100B221 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 07/15/1994 |
| From: | Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML18100B220 | List: |
| References | |
| NUDOCS 9407260210 | |
| Download: ML18100B221 (8) | |
Text
ELICTBI¢AL PQWIR SY~
f\\)0 0k11f/A fa. -tl,0 fa[JG? -
-r11 -fc; 0 /l ly.
SURVSILLANCB REQUIRBMBNTS (Continued)
- d.
At l... t once per 18 month* during *hutdown by:
- 1.
Subjecting the die**l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recoamendation* for thi* cl*** of *tandby **rvice,
- 2.
Verifying that, on rejection of a load greater than or equal to
- a20 kw, the voltage and frequency are r**tored to~ 3950 and~ 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*.
- 3.
Simulating a lo** of off*ite power by it**lf, and:
a)
Verifying de-energization of the vital bu* and load *bedding from the vital bu*.
b)
Verifying the di***l *tart* on the auto-*tart *ignal*,
energize* the vital bue with ~,rmanently connect*d load* within 13 **cond*, energize* the auto-connected *hutdown load* through the load *equencer and operate* for greater than or equal to S minute* while it* g*nerator i* loaded with the *hutdown load*.
The *t*ady *t*t* voltage and frequency of the vital bu*
- hall be maintained at ~ 3950 and ~ 4580 volt* and 60 +/- 1.2 Hz during thi* t**t.
- 4.
Verifying that on an !SF actuation teat *ignal without lo***of off *ite power the di***l generator *tart* on th* auto-*tart *ignal and operate* on *tandby for greater than or equal to 5 minute***
The generator voltage and frequency *hall be ~ 3950 and s 4580 volts and 60 +/- 1.2 Hz within 13 **cond* after the auto-*tart signal and
- hall be maintained within the** limit* during thia t**t.
S.
Not Uaed.
6:
Simulating a lo** of off*ite power in conjunction with an ESP actuation teat *ignal, and:
Verifying de-energization of the vital bu* and load *bedding
- ~*.iP.
from the vital bua.
9407260210 PDR ADOCK p
b)
Verifying the di***l *tart* on the auto-atart *ignal*,
energize* the vital bu* with permanently connected loads within 13 *ec:onda, energize* the auto-connected emergency (accident) load* through the load **quencer and operate* for'greater than or ~al to S minute* while it* generator i* loaded with the
..e~gency load*.
Th* *~~~~Y *tat* voltage and frequency of the vital bu* *hall be maintained at~ 3950 and~ 458l>volt* and 60 +/- 1.2 Hz during thi* t**t.,
940715 05000272 PDR SALEK -
OHI'i' 1 3/4 8-4 Amendment No.
148
-;r:-tJ ~ E RT I
e e
ELEC~RICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
2*********3****aa~a=*======2~~z==z======~=-~===ss***2==a*====z*=======
c)
Verifying that all nonessential automatic diesel generator trip* (i.e., other than engine overapeed, lube oil preaaure low, 4 KV bua differential and generator differential), are automatically bypa***d upon lo** of voltage on the vital bua concurrent with a *afety injection actuation signal.
- 7.
Verifying the die**l generator oper.&t** for at lea*t 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s*.
During the fir*t 2 hour* of thi* te*t, the di***l generat~~ shall be loaded t.o 2760-2860 kw.**
Dur-inq th* nmaininq 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of thi*
te*t, the di***l generator *hall be loaded to 2500-2600 kw***
The
- t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and S 4580 volt* and 60 +/- 1.2 Hz during thi* te*t.
Wi~hin S minueee aft*~ 8ompletin9 thi* ~4 heuE te*t, perfal'llll 8Yr9eillanee ReEftiiremeftt 4,a.1.1.2.d.&.aa
- 8.
Verifying that the auto-connected load* to each die**l generator do not exceed the two hour rating of 2860 kw.
- 9.
Verifying that with the di***l generator operating in a test mode (connected to ita bu*), a *imuleted *afety injection signal override* the t'"est mode br (1) returning th* di***l generator to standby operation and (2) automatically energizing the emergency load* with offaite power.
- e.
At lea*t once per ten year* or after any modification* which could di***l generator interdependence by *tarting all di***l generators
- imultaneou*ly*, during shutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to 10 *econd*.
affect 4.8.l.l.3 The die*el fuel oil storage and transfer sy*tem shall be demon*trated OPERABLE:
\\
- a.
At lea*t once per 31 day* by:
- b.
- l.
Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*.
- 2.
Verifying that both fuel tran*f*r pwnp* c~ be *tarted and tran*f*r fuel from the 20,000 gallon *torage tank* to th* day tankm.
At lea*t once per 92 day* by verifying that a *ample of diesel fuel from each of the above required 20,000 gallon fue~ atoraqe tank* i* within th* acceptable limit* *pecified in.Table l of ASTH 0915-77 when checked for vi*co~ity, water and *ediment.
SALEM'-._ UNIT l 3/4 8-5 Amendment No.
~~3
- f.
Insert 1 At least once per 18 months, the foll ing test shall be performed within 5 minutes of diesel hutdown after the diesel has operated for at least '*'~~*¥.I~ at 2500-2600 kw**:
Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*.
The generator voltage and frequency shall be ~ 3950 volts and ~ 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal.
ELECTRICAL PQW1!jR SYSTEMS SURVBILLAHCZ REQUIREMENTS (Continued) 4.8.1.1.4 89port;1 - All di***l generator failur**, valid or non-valid, shall b* reported to the Commi11ion in a Special Report pur1uant to Specification 6.9.2 within JO day1.
Report* of di***l generator failure* 1hall include the information recommended in R*gulatory Po1ition C.J.b of Requlatory Guide 1.108, Revi1ion 1, Auqu1t 1977.
If the number of failure* in the la*t 100 valid te*t* (on a per nuclear unit ba*i*) i* greater than or equal to*1, the report *hall be *uppl... nted to include th* additional information recommended in Regulatory Po*ition c.J.b of Requlatory Guide 1.108, Revi*ion l, Auqust 1977.
Surveillance te*tinq 1hall be conducted in accordance with the manufacturer'* recCX11Dendation1 reqarding engine prelube, warm-up and l~a~ing (unl*** loading time* are 1pecif ied in the individual surveillance Requiremen~*>*
Tb~band i*.. ant a* quidance to preclude routine exceedance* of the di-..& 99nerator manufacturer'* de*ign rating*.
Load* in exc*** of th~*
band for mpec:ial t**ting or momentary variation* du"* to changing bu*
loadll 9ball not invalidate the t**t.
- Pailaee ef a ce1c pes luF1se111ance a.qu1s.. ene 4.1.1.1.a.d.i.~, fQllQIWLA9 peefaeeanae et luFl>'*illanae R*ll'!ie.-*ft45 4,a.1.1.a.d.7, d***~n*c *efifW*F*
- ha* *he 34 heur ***e ef 4w8olalw2ada7 ~- repeabed1 Al an albernatt***
- h~~BDG *h*lk ~*loaded co 3i00=3i00 kw ~os one hous, es une11 operag*R~
bemperaeur** ha9e 1eabilimed, peiel"::::~e eepeat.l~9 8uF11eill*~* ReEfW*F.,,*ng 4,9,1,1.2.d.61!91 SALEM - UNIT 1 3/4 8-Sa Amendment No.
~.!3
ELEc*;RICAL PQWER SYSTEMS NG Ja~s +o fit,'5 pq~e -
- r:f1 -F-o 0 YI I y.
SURVJ:ILLAHCB REQUIREMENTS (Continued)
- d.
At lea*t onee per lS month* during shutdown by:
- 1.
Subj*cting the di***l to an in*pection in accordance with procedures prepared in conjunction with it* manufacturer'* recommendations for thi* cl*** of *tandby **rvice,
- 2.
verifying that, on rejection of a load of greater than or equal to 820 kw, th* voltage and frequency ar* r**tored to ~ 3950 and s. 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*.
- 3.
Simulating a lo** of off*ite power by it*elf, ands a)
Verifying de-energization of the vital bu* and load *hedding from the vital bu*.
b)
Verifying the die*el *tart* on the auto-*tart *ignal*,
energize* the vital bu* with permanently connected loada within 13 **cond*, energize* the auto~connected *hutdown load* through the load **quencer and operate* for greater than or equal to 5 minute* while it* generator i* loaded with the shutdown load*.
Th* *t*ady *tat* voltage and frequency of the vital bu*
- hall be maintained at ~ 3950 and S. 4580 volt* and 60 +/- 1.2 Hz during thi* t**t.
- 4.
Verifying that on an ESF actuation te*t *ignal without leas of off*it* power the di***l generator *tart* on th* auto-*tart aignal and operate* on *tandby for greater than or equal to 5 minutes*.
Th* g*n*rator voltage and frequency *hall be ~ 3950 and S. 4580 volts and 60 +/- 1.2 Hz within 13 seconde after the auto-start signal and shall be maintained within the** limit* during this test.
- 5.
Deleted
- 6.
Simulating a lo** of off*ite power in conjunction with an ESF
-
- actuation t**t *ignal, and a)
Verifying de-energization of the vital bu* and load shedding frcm the vital bu*.
b)
Verifying the di***l *tart* on the auto-*tart *ignal*,
energize* th* vital bu* with permanently connected load* within ***
13 **cond*, energize* the auto-connected emergency (accident) load* through th* load **qu*ncer and operate* for greater than or oqual to 5 minute* while it* generator i* load9d with the emergency load*.
Th* *t*ady *tat* voltage and frequency of the vital bu* *hall be maiot_a_ined at ~ 3950 and S. 4580 volte and 60 +/- 1.2 Hz during thi* te*t.
SALEK - UHIT 2 3/4 8-4 Amendment No. 126
lU&.f.TRICAL POWER SYSTEMS SURVl:ILLAHCB REQUIREMENTS (Continued) c)
Verifying that all noneaeential automatic dieael generator trip* (i.e., other than engine overnpeed, lube oil pr**oure low, 4 "KV Bu* differential and generator differential) are automatically bypa***d upon lo** of voltage on the vital bu*
concurrent with a *afety injection actuation *ignal.
- 7.
Verifying the di***l generator operate* for at lea*t 24 houra*.
During the fir*t 2 hour* of thi* t**t, the di***l generator shall be loaded to 2760-2860 kw***
During the remaining 22 hour9--of thi*
t**t, th* di***l generator *hall be loaded to 2500-2600 kw***
The
- t*ady *tat* voltage and frequency *hall be maintained at ~ 3950 and s 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. Within i minute&
aftes Gca11pletin9 chi* 24-hous t**t, pe~folR9 lpeoifigation 4.8.1.1.2.d.6.b.***
- 8.
Verifying that th* auto-connected load* to each di***l generator do not exceed the two hour rating of 2860 kw~
- 9.
Verifying that with the di***l geperator operating in a te*t mode (connected to it* bu*), a *imulated *afety injection signal override* the-t**t mode by (l) returning the di***l generator to
- tandby operation and (2) automatically enerqizing th* emergency load* with off*it* power.
At l*a*t once per 10 year* or after any modification* which could affect di***l generator interdependence by *tarting all di***l generators
- imultaneou*ly*, during *hutdown, and verifying that all diesel generator* accelerate to at l*a*t 900 rpn in l*** than or equal to 10 **cond*.
4.8.1.1.3 Th* di***l fuel oil storage and transfer ey*tem shall be demon*trated OPBRABLB:
- a.
At l*a*t once per 31 day* by:
- b.
- 1.
Verifying th* level in each of the above required 20,000 gallon fuel *torage tank*.
- 2.
Verifying that both fuel tran*f*r pump* can be *tarted and tran*f*r fuel from th* 20,000 gallon *torage tank* to the day tankm.
At l***t once per 92 day* by verifying that a *ample of diesel fuel frcm each of the above required 20,000 gallon fuel *torage tank* i* within th* acceptable limit* *pecif ied in Tlabl* 1 of AS~_p975-77 when checked for vi*co*ity, water and *ediment.
SALsH - UNIT 2 3/4 8-5 Amendment No. 126
- f.
Insert 1
~
~
At least once per 18 months, the follc/wing test shall be performed within 5 minutes of diesel~~utdown after the diesel has operated for at least oBe aour at 2500-2600 kw**:
Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*.
The generator voltage and frequency shall be ~ 3950 volts and 5 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal.
. -*~
e e
ELECTRICAL POWER SYSTEMS SURVZILLANCX REQUIREMENTS (Continued)
- ---*********************3*****2******a***~***********************2aaa2 4.8.1.1.4 BeP9rt* - All diesel generator failures, valid or non-valid, ahall be reported to the cemmi11ion in a Special Report purauant to Specification 6.9.2 within 30 day1.
Report* of di***l generator failure* 1hall in~lude the information recoanended in RequlAtory Po1ition C.3.b of Regulatory Guide 1.108, Revi1ion 1, Auqu1t 1977.
If the number of failure* in the laat 100 valid te1t1 (on a per nuclear unit ba1i1) i1 greater than or equal to 7, the report *hall be 1upplmnented to include the additional information recommended in Regulatory Po1ition C.3.b of Requlatory Guide l.108, R*vi1.ion 1,.-.
Auqu1t 1977.
Surveillance te1ting *hall be conducted in accordance with the manufacturer'* recoanendation* reqarding engine prelube, warm-up and loading (unle11 loading time* are 1pecified in the individual
- surveillance Requirement*)*
Thia band i* meant a1 guidance to preclude routine exceedance1 of the di... l generator manufacturer'* de1ign rating*.
Load* in exc*** of thia band for 1pecial te1ting or momentary variation* due to changing bua loade *hall not invalidate th* te1t.
- Pailwr* ef a **** per Sur\\~eillanee R*~ir..
- ~ 4.1.1.1.~.~.&.b, fellewiRq perfeJRBaRe* ef Su!A"eillanee Re~irement 4.9.1.1.2.d.1, does. not reqnire.
~
th** eh* 24 heur ee1e ef 4,9,1,1,2.*.1 ~* r*pe*****
A* aft aleerftaei~e, ehe~BDG 1na1} ~. leaded sa 25QO 2&00 kw fer an* naur, er unsil gpe*a~iRq
- empe*a*u*** ha¥* **&aailiaed, pri~*e rep*a*in9 lurveill~~* R*~iEemeR~
£A '-'-'-~-~-h-SALEM -
UHIT 2 3/4 8-6 Amendment No. 126