ML19317E375: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
UNIT    Oconta Unit 2 DATE 2/10/77 DOCKET NO. 50-270
Oconta Unit 2 UNIT DATE 2/10/77
  )
)
'"                                                                PREPARED BY     L. J. Bare OPERATING STATUS
DOCKET NO.
: 1. REPORTING PERIOD: January 1                   THROUGH     January 31, 1976 GROSS HOURS IN REPORTING PERIOD:             744.0
50-270 PREPARED BY L. J. Bare OPERATING STATUS 1.
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MRe-Net):     860
REPORTING PERIOD: January 1 THROUGH January 31, 1976 GROSS HOURS IN REPORTING PERIOD:
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
744.0 2.
: 4. REASONS FOR RESTRICTION (IF ANY)
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MRe-Net):
This Month     Year to Date       Cumulative
860 3.
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                     744.0           744.0               14971.0
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.
: 6. REACTOR RESERVE SHUTDOWN HOURS
REASONS FOR RESTRICTION (IF ANY)
: 7. HOURS GENERATOR ON-LINE                       744.0           744.0               14509.54
This Month Year to Date Cumulative 5.
: 8. UNIT RESERVE SHUTDOWN HOURS
NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 744.0 14971.0 6.
: 9. GROSS THERMAL ENERGY GENERATED (MWH)1916321                   1916321             34682052
REACTOR RESERVE SHUTDOWN HOURS 7.
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                         652990         652990             11808596
HOURS GENERATOR ON-LINE 744.0 744.0 14509.54 8.
: 11. NET ELECTRICAL ENERGY GENERATED (MWH)                                         626360         626360             11210483
UNIT RESERVE SHUTDOWN HOURS 9.
: 12. REACTOR SERVICE FACTOR                       100.0           100.0               71.2             3
GROSS THERMAL ENERGY GENERATED (MWH)1916321 1916321 34682052 10.
: 13. REACTOR AVAILABILITY FACTOR                   100.0           100.0               69.5
GROSS ELECTRICAL ENERGY GENERATED (MWH) 652990 652990 11808596 11.
: 14. UNIT SERVICE FACTOR                           100.0           100.0               69.0
NET ELECTRICAL ENERGY GENERATED (MWH) 626360 626360 11210483 12.
: 15. UNIT AVAILABILITY FACTOR                     100.0           100.0               69.0
REACTOR SERVICE FACTOR 100.0 100.0 71.2 3
: 16. UNIT CAPACITY FACTOR (Using Net               97.9           97.9               62.0 Capability)
13.
: 17. UNIT CAPACITY FACTOR (Using Design Mwe)                           94.9           94.9               60.1 ~
REACTOR AVAILABILITY FACTOR 100.0 100.0 69.5 14.
: 18. UNIT FORCED OUTAGE RATE                       0               0                   24.4
UNIT SERVICE FACTOR 100.0 100.0 69.0 15.
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
UNIT AVAILABILITY FACTOR 100.0 100.0 69.0 16.
Refueling - July 17, 1977 - 6 weeks
UNIT CAPACITY FACTOR (Using Net 97.9 97.9 62.0 Capability) 17.
: 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT CAPACITY FACTOR (Using Design Mwe) 94.9 94.9 60.1 ~
18.
UNIT FORCED OUTAGE RATE 0
0 24.4 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
Refueling - July 17, 1977 - 6 weeks 20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI' X 100
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI' X 100
                                                  !!OURS IN REPORTING PERLOD REACTOR AVAILABILI'lT FACTOR = HOI?RS REACTOR L'AS AVAILiSLR TO CPERATE X 100 llCURS IN REPORTING PERICD UNIT SERVICE TACTCR       = HOIT A GENERATO? ON LINE           0 IiOURS diYdORYd;G PCliig UNIT AVAII.\BILITY FACTOR = UGURS LINTT WAS AVAIT ABLE TO GENEPATE X 100 HOURS IN REPuk!1NG L'ERIOD UNIT CAPACITY FACTCR     = NET ELECTRICAL P0hER GENERATFD                         _ , , gg (N t Capability or Design mwe-L L).1 X 1100iG IN R & a.'lSO UNIT FORCED OUTACE :tA17.
!!OURS IN REPORTING PERLOD REACTOR AVAILABILI'lT FACTOR = HOI?RS REACTOR L'AS AVAILiSLR TO CPERATE X 100 llCURS IN REPORTING PERICD UNIT SERVICE TACTCR
* P     OUTAGE HOURS   Q 1 f 'I               X 100 HOL*RS GENERATOR ON     NE IFORCED OU CAGE HOURS 1
= HOIT A GENERATO? ON LINE 0
IiOURS diYdORYd;G PCliig UNIT AVAII.\\BILITY FACTOR = UGURS LINTT WAS AVAIT ABLE TO GENEPATE X 100 HOURS IN REPuk!1NG L'ERIOD UNIT CAPACITY FACTCR
= NET ELECTRICAL P0hER GENERATFD
_,, gg (N t Capability or Design mwe-L L).1 X 1100iG IN R & a.'lSO UNIT FORCED OUTACE :tA17.
* P OUTAGE HOURS Q 1 f 'I X 100 HOL*RS GENERATOR ON NE IFORCED OU CAGE HOURS


DOCKET NO. 50-270 UNIT Oconee Unit 2 DATE 2/10/77 AVERAGE DAILY UNIT POWER LEVEL MONTH       January, 1977 AVERAGE DAILY POWER LEVEL                           AVERAGE DAILY POWER LEVEL DAY                   (MWe-net)                     DAY                   (MWe-net) 1                     839                           37                   845 838                                                 43 2                                                   18 841                                               847 3                                                   39 844                                               840 4
DOCKET NO. 50-270 UNIT Oconee Unit 2 2/10/77 DATE AVERAGE DAILY UNIT POWER LEVEL MONTH January, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
845                                               849 5                                                   21 6                                                   22 7                     843                           23                   849 845                                               843 8
DAY (MWe-net) 845 1
g                    845                                               844 25
839 37 838 43 2
                            '1 10                                                   26 848                                               836 11                                                   27 833                                               836 12                                                   28 842                                               838 13                                                   29 14                                                   30 15                     843                           31 842 844 16 DAILY UNIT POWER LEVEL FOR.\1 INSTRUCTIONS On this form, list the average daily unit power revel in .1We-net
18 841 847 3
                                                              \        for each day in the reporting month. !
39 844 840 4
Compute to the nearest whole megawatt.
845 849 5
l   These figures will be used to plot a graph for each reporting month. Note that by using maximum l   dependable capacity t'or the net electrical rating of the unit. there mas be .a casions when the daily l   average power level exceeds the 1001 line f or the restricted power lesel hne). in such cases, the average daily unit power output sheet should be footnoted to nplain the :pparent anomaly.               l l
21 6
l l
22 7
843 849 23 845 843 8
845 844 g
25
'1 10 26 848 836 11 27 833 836 12 28 842 838 13 29 14 30 15 843 842 31 844 16 DAILY UNIT POWER LEVEL FOR.\\1 INSTRUCTIONS On this form, list the average daily unit power revel in.1We-net for each day in the reporting month.
\\
r Compute to the nearest whole megawatt.
l These figures will be used to plot a graph for each reporting month. Note that by using maximum l
dependable capacity t'or the net electrical rating of the unit. there mas be.a casions when the daily l
average power level exceeds the 1001 line f or the restricted power lesel hne). in such cases, the average daily unit power output sheet should be footnoted to nplain the :pparent anomaly.


D CKET NO. 50-270 UNIT SHUTDOWNS                                                     UNIT NAMti Oconee Unit 2         .
D CKET NO. 50-270 UNIT SHUTDOWNS UNIT NAMti Oconee Unit 2 2/10/77 DATli REPORT MONTil January, 1977 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.
DATli 2/10/77 REPORT MONTil January, 1977 TYPE                                   METHOD OF F-FORCED   DURATION                   SHUTTING DOWN NO. DATE             S SCHEDULED (HOURS) REASON (1)       THE REACTOR (2)                     CORRECTIVE ACTIONS / COMMENTS rr (1) REASON                                     O) MET 1tOD A EQUIPMENTI ALLURE (EXPLAIN)                   l-MANUAL B- MAINT. OR TEST.                             2-MANUAL
DATE S SCHEDULED (HOURS)
                                                                                                                                                                                          ~
REASON (1)
C- REFUELING                                      SCR AM D-REGULATORY RESTRl(TION                       3-AUTOM ATIC         '    '
THE REACTOR (2)
E-OPERATOR TRAINING AND                         SCR AM LICENSE EXAMINATION                   4-Other F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
CORRECTIVE ACTIONS / COMMENTS rr (1) REASON O) MET 1tOD A EQUIPMENTI ALLURE (EXPLAIN) l-MANUAL B-MAINT. OR TEST.
Il-OlllLR (LXPLAIN)
2-MANUAL C-REFUELING
~
SCR AM D-REGULATORY RESTRl(TION 3-AUTOM ATIC E-OPERATOR TRAINING AND SCR AM LICENSE EXAMINATION 4-Other F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
Il-OlllLR (LXPLAIN) l


==SUMMARY==
==SUMMARY==
l                                                           No outages this month.
l No outages this month.
                                                                                                                                                                                                            . - _ - - _ - ,}}
. - _ - - _ -,}}

Latest revision as of 21:57, 1 January 2025

Monthly Operating Rept for Jan 1977
ML19317E375
Person / Time
Site: Oconee  
Issue date: 02/10/1977
From: Bare L
DUKE POWER CO.
To:
Shared Package
ML19317E369 List:
References
NUDOCS 7912170573
Download: ML19317E375 (3)


Text

-

Oconta Unit 2 UNIT DATE 2/10/77

)

DOCKET NO.

50-270 PREPARED BY L. J. Bare OPERATING STATUS 1.

REPORTING PERIOD: January 1 THROUGH January 31, 1976 GROSS HOURS IN REPORTING PERIOD:

744.0 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MRe-Net):

860 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.

REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 744.0 14971.0 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 744.0 744.0 14509.54 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH)1916321 1916321 34682052 10.

GROSS ELECTRICAL ENERGY GENERATED (MWH) 652990 652990 11808596 11.

NET ELECTRICAL ENERGY GENERATED (MWH) 626360 626360 11210483 12.

REACTOR SERVICE FACTOR 100.0 100.0 71.2 3

13.

REACTOR AVAILABILITY FACTOR 100.0 100.0 69.5 14.

UNIT SERVICE FACTOR 100.0 100.0 69.0 15.

UNIT AVAILABILITY FACTOR 100.0 100.0 69.0 16.

UNIT CAPACITY FACTOR (Using Net 97.9 97.9 62.0 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 94.9 94.9 60.1 ~

18.

UNIT FORCED OUTAGE RATE 0

0 24.4 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

Refueling - July 17, 1977 - 6 weeks 20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI' X 100

!!OURS IN REPORTING PERLOD REACTOR AVAILABILI'lT FACTOR = HOI?RS REACTOR L'AS AVAILiSLR TO CPERATE X 100 llCURS IN REPORTING PERICD UNIT SERVICE TACTCR

= HOIT A GENERATO? ON LINE 0

IiOURS diYdORYd;G PCliig UNIT AVAII.\\BILITY FACTOR = UGURS LINTT WAS AVAIT ABLE TO GENEPATE X 100 HOURS IN REPuk!1NG L'ERIOD UNIT CAPACITY FACTCR

= NET ELECTRICAL P0hER GENERATFD

_,, gg (N t Capability or Design mwe-L L).1 X 1100iG IN R & a.'lSO UNIT FORCED OUTACE :tA17.

  • P OUTAGE HOURS Q 1 f 'I X 100 HOL*RS GENERATOR ON NE IFORCED OU CAGE HOURS

DOCKET NO. 50-270 UNIT Oconee Unit 2 2/10/77 DATE AVERAGE DAILY UNIT POWER LEVEL MONTH January, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 845 1

839 37 838 43 2

18 841 847 3

39 844 840 4

845 849 5

21 6

22 7

843 849 23 845 843 8

845 844 g

25

'1 10 26 848 836 11 27 833 836 12 28 842 838 13 29 14 30 15 843 842 31 844 16 DAILY UNIT POWER LEVEL FOR.\\1 INSTRUCTIONS On this form, list the average daily unit power revel in.1We-net for each day in the reporting month.

\\

r Compute to the nearest whole megawatt.

l These figures will be used to plot a graph for each reporting month. Note that by using maximum l

dependable capacity t'or the net electrical rating of the unit. there mas be.a casions when the daily l

average power level exceeds the 1001 line f or the restricted power lesel hne). in such cases, the average daily unit power output sheet should be footnoted to nplain the :pparent anomaly.

D CKET NO. 50-270 UNIT SHUTDOWNS UNIT NAMti Oconee Unit 2 2/10/77 DATli REPORT MONTil January, 1977 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS rr (1) REASON O) MET 1tOD A EQUIPMENTI ALLURE (EXPLAIN) l-MANUAL B-MAINT. OR TEST.

2-MANUAL C-REFUELING

~

SCR AM D-REGULATORY RESTRl(TION 3-AUTOM ATIC E-OPERATOR TRAINING AND SCR AM LICENSE EXAMINATION 4-Other F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

Il-OlllLR (LXPLAIN) l

SUMMARY

l No outages this month.

. - _ - - _ -,