UNIT Oconte Unit 3 DATE 2/10/77
().
DOCKET NO. 50-287 PREPARED BY L. J. Bare
,0PERATING STATUS l.
REPORTING PERIOD:
January 1 THROUGH January 31, 1977 GROSS HOURS IN REPORTING PZRIOD:
744.0 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
860 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.
REASONS FOR RESTRICTION (IF ANY)
This Month Year to Date Cumulative 5.
NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 744.0 14146.7 6.
REACTOR RESERVE SHUTDOWN HOURS 7.
HOURS GENERATOR ON-LINE 744.0 74ho 13767.5 8.
UNIT RESERVE SHUTDOWN HOURS 9.
GROSS THERMAL ENERGY GENERATED (Mha) 1940591 1940591 32308808 10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 673290 673290 11112734 11.
NET ELECTRICAL ENERGY GENERATED 646466 646466 10580108 (MWH) 12.
REACTOR SERVICE FACTOR 100.0 100.0 75.8 13.
REACTOR AVAIIABILITY FACTOR 100.0 100.0 76.4 14.
UNIT SERVICE FACTOR 100.0 100.0 73.7 15.
UNIT AVAILABILITY FACTOR 100.0 100.0 73.7 16.
UNIT CAPACITY FACTOR (Using Net 101.0 101.0 65.9 Capability) 17.
UNIT CAPACITY FACTOR 98.0 98.0 63.9*
(Using Design Mwe) 0 0
13.3 18.
UNIT FORCED OUTAGE RATE 19.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100 HOURS IN REPORTING PERLOD REACTOR AVAILtBILIn* FACTOR = Hol!RS REACTOR 'QAl\\IL\\GLE TO OPERATE X 100 HOURS IN REFORTING PERIOD UNIT SERVICE FACTO;1
= H0t!P9 CEMERAT09 ON LINE y y gg HOURS
.N REPORIING PERIOD UNIT AVAIL \\BILITY FACTOR = UOUP,S tfNTT WAS AVATI.\\0lE TO CENERATE X 100 HOURS IN REPukTING PEll10D
= NET ELF.rTRICAL PChER CINERATED y
UNIT CAPACITY FACTOR (Net Capatsility or Design (S 2-?k t)) X 110t% LN REL%rMdpq PERIOD UNIT FCRCID OUTACE RATE e F0ECrD OUTAGE HOU::s 7912_110
. wo HOURS GENERATOR ON 1.INE + FORCED OUTAG htX i
DOCKET NO. 50-287 UNIT oconee Unit 3 DATE 2/10/77 AVERAGE DAILY UNIT POWER LEVEL MONTH January, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe-net) 1 871 37 870 870 0
2 18 870 870 3
1g 870 4
20 873 869 5
21 6
22 867 7
869 23 866 64 8
24 863 864 9
25 866 867 10 26 867 870 867 869 12 28 13 870 29 870 871 872 14 30 872 871 15 31 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity I'or the net electrical ratin.; of the unit. there may be t easions when the daily average power level exceeds the 100'i line f or the restricted power lesel line). In such c.ises. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
DdCKET NO. 50-287 UNIT SHUTDOWNS UNIT NAMli Oconee Unit 3 DATl! 2/10/77 REPORT MONTII January, 1977 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.
DATE S SCHE DULED (HOURS)
REASON (1)
THE REACTOR (2)
CORRECTIVE ACTIONS / COMMENTS (1) REASON (2) METHOD A -EQUIPMENT F AILURE (EXPLAIN) 1-MANUAL B - MAINT. OR TEST.
2-MANUAL C-REI UELING SCRAM D-REGULATORY RESTRICTION 3-AUTOM ATIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINAllON 4-Other F-ADMINISTR ATIVE G-OPER ATION AL ERROR (EXPLAIN)
Il-OTilLR (EXPLAIN)
SUMMARY
No outages this month.
--