ML19317E375

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1977
ML19317E375
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/10/1977
From: Bare L
DUKE POWER CO.
To:
Shared Package
ML19317E369 List:
References
NUDOCS 7912170573
Download: ML19317E375 (3)


Text

-

UNIT Oconta Unit 2 DATE 2/10/77 DOCKET NO. 50-270

)

'" PREPARED BY L. J. Bare OPERATING STATUS

1. REPORTING PERIOD: January 1 THROUGH January 31, 1976 GROSS HOURS IN REPORTING PERIOD: 744.0
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MRe-Net): 860
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 744.0 14971.0
6. REACTOR RESERVE SHUTDOWN HOURS
7. HOURS GENERATOR ON-LINE 744.0 744.0 14509.54
8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH)1916321 1916321 34682052
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 652990 652990 11808596
11. NET ELECTRICAL ENERGY GENERATED (MWH) 626360 626360 11210483
12. REACTOR SERVICE FACTOR 100.0 100.0 71.2 3
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 69.5
14. UNIT SERVICE FACTOR 100.0 100.0 69.0
15. UNIT AVAILABILITY FACTOR 100.0 100.0 69.0
16. UNIT CAPACITY FACTOR (Using Net 97.9 97.9 62.0 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 94.9 94.9 60.1 ~
18. UNIT FORCED OUTAGE RATE 0 0 24.4
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

Refueling - July 17, 1977 - 6 weeks

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI' X 100

!!OURS IN REPORTING PERLOD REACTOR AVAILABILI'lT FACTOR = HOI?RS REACTOR L'AS AVAILiSLR TO CPERATE X 100 llCURS IN REPORTING PERICD UNIT SERVICE TACTCR = HOIT A GENERATO? ON LINE 0 IiOURS diYdORYd;G PCliig UNIT AVAII.\BILITY FACTOR = UGURS LINTT WAS AVAIT ABLE TO GENEPATE X 100 HOURS IN REPuk!1NG L'ERIOD UNIT CAPACITY FACTCR = NET ELECTRICAL P0hER GENERATFD _ , , gg (N t Capability or Design mwe-L L).1 X 1100iG IN R & a.'lSO UNIT FORCED OUTACE :tA17.

  • P OUTAGE HOURS Q 1 f 'I X 100 HOL*RS GENERATOR ON NE IFORCED OU CAGE HOURS 1

DOCKET NO. 50-270 UNIT Oconee Unit 2 DATE 2/10/77 AVERAGE DAILY UNIT POWER LEVEL MONTH January, 1977 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 1 839 37 845 838 43 2 18 841 847 3 39 844 840 4

845 849 5 21 6 22 7 843 23 849 845 843 8

g 845 844 25

'1 10 26 848 836 11 27 833 836 12 28 842 838 13 29 14 30 15 843 31 842 844 16 DAILY UNIT POWER LEVEL FOR.\1 INSTRUCTIONS r On this form, list the average daily unit power revel in .1We-net

\ for each day in the reporting month. !

! Compute to the nearest whole megawatt.

l These figures will be used to plot a graph for each reporting month. Note that by using maximum l dependable capacity t'or the net electrical rating of the unit. there mas be .a casions when the daily l average power level exceeds the 1001 line f or the restricted power lesel hne). in such cases, the average daily unit power output sheet should be footnoted to nplain the :pparent anomaly. l l

l l

D CKET NO. 50-270 UNIT SHUTDOWNS UNIT NAMti Oconee Unit 2 .

DATli 2/10/77 REPORT MONTil January, 1977 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS rr (1) REASON O) MET 1tOD A EQUIPMENTI ALLURE (EXPLAIN) l-MANUAL B- MAINT. OR TEST. 2-MANUAL

~

C- REFUELING SCR AM D-REGULATORY RESTRl(TION 3-AUTOM ATIC ' '

E-OPERATOR TRAINING AND SCR AM LICENSE EXAMINATION 4-Other F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

Il-OlllLR (LXPLAIN)

SUMMARY

l No outages this month.

. - _ - - _ - ,