ML19341C743: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 2: Line 2:
| number = ML19341C743
| number = ML19341C743
| issue date = 11/26/1980
| issue date = 11/26/1980
| title = Responds to NRC 801026 Ltr Re Violations Noted in IE Insp Repts 50-413/80-23 & 50-414/80-23.Corrective Actions: Verification of Seismic Design Expected from Vendor by 801215.Util Will Submit Final Response After Review
| title = Responds to NRC Re Violations Noted in IE Insp Repts 50-413/80-23 & 50-414/80-23.Corrective Actions: Verification of Seismic Design Expected from Vendor by 801215.Util Will Submit Final Response After Review
| author name = Parker W
| author name = Parker W
| author affiliation = DUKE POWER CO.
| author affiliation = DUKE POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8103040078
| document report number = NUDOCS 8103040078
| title reference date = 10-26-1980
| package number = ML19341C738
| package number = ML19341C738
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:_                     -        -
{{#Wiki_filter:_
DUKE POWER COMPANY Powsm Duitmixo 422 Socin Cuuncu Srazzi, Cruntorrs. N. C. asam 9
DUKE POWER COMPANY Powsm Duitmixo 422 Socin Cuuncu Srazzi, Cruntorrs. N. C. asam 9
i W 8 L LI AM O, PAR M ER J R, VeCf Pettietset                                                            TtitemoN E:Asta 704 Strane Paoowctiose                                                                     373 40e3 il 2
W 8 L LI AM O, PAR M ER J R, i
November 26, 1980 Mr. James P. O'Reilly, Director                                                                 l U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:DKW
TtitemoN E:Asta 704 VeCf Pettietset Strane Paoowctiose 373 40e3 il November 26, 1980 2
!                              50-413/80-23 50-414/80-23 1
Mr. James P. O'Reilly, Director l
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:DKW 50-413/80-23 50-414/80-23 1


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
}
}
Please find attached a response to Infraction No. 413-414/80 23-01 which was identified in the above referenced Inspection Report.
Please find attached a response to Infraction No. 413-414/80 23-01 which was identified in the above referenced Inspection Report.
Duke Power Company does not consider any information contained in this inspection report to be proprietary.
Duke Power Company does not consider any information contained in this inspection report to be proprietary.
V y truly yours,                 7
V y truly yours, 7
: d.                .
d.
i                     William O. Parker, Jr.
i William O. Parker, Jr.
RWO:vr Attachment ec: NRC - Catawba Resident Inspector i
RWO:vr Attachment ec: NRC - Catawba Resident Inspector i
I
I
(
(
l l
l l
181030 4 00'E                                                                                         ,
181030 4 00'E


                                                                                              .- ~ - ___
~
e 1,
e 1,
i DUKE POWER COMPANY CATAWBA NUCLEAR STATION Response to Infraction 50-413-414/80-23-01 Infraction
DUKE POWER COMPANY i
+                  As required by 10CFR50, Appendix B, Criterion VII, and as implemented by Duke Power Company Topical Report Section 17.1.7 which states: Duke's quality assurance program requires the control of safety-related items or services purchased from a vendor, subvendor or consultant. Table 17.0-1
CATAWBA NUCLEAR STATION Response to Infraction 50-413-414/80-23-01 Infraction As required by 10CFR50, Appendix B, Criterion VII, and as implemented by
;                  of Duke Power Company Topical Report commits to the requirements of
+
;                  Regulatory Guide 1.123, Revision 1, which endorses ANSI N45.2.13-1976.
Duke Power Company Topical Report Section 17.1.7 which states: Duke's quality assurance program requires the control of safety-related items or services purchased from a vendor, subvendor or consultant. Table 17.0-1 of Duke Power Company Topical Report commits to the requirements of Regulatory Guide 1.123, Revision 1, which endorses ANSI N45.2.13-1976.
Paragraph 10.1 of ANSI N45.2.13 requires that the supplier verify that j                   the item or service being furnished complies with the procurement require-i                   ments, prior to offering the item or service for acceptance.
Paragraph 10.1 of ANSI N45.2.13 requires that the supplier verify that j
Contrary to the above, diesel generator battery racks 1DGBA, 1DGBB, 2DGBA
the item or service being furnished complies with the procurement require-i ments, prior to offering the item or service for acceptance.
:                  and 2DGBB did not meet the seismic requirements of the procurement documents.
Contrary to the above, diesel generator battery racks 1DGBA, 1DGBB, 2DGBA and 2DGBB did not meet the seismic requirements of the procurement documents.
The battery racks had been receipt inspected, accepted and installed by the licensee.
The battery racks had been receipt inspected, accepted and installed by the licensee.
1
1


===Response===
===Response===
                  ' Verification of the seismic design is expected from the vendor by 12/15/80.
' Verification of the seismic design is expected from the vendor by 12/15/80.
Duke will submit a final response to the NRC by 12/31/80 after a review of 1                   the vendor's records.
Duke will submit a final response to the NRC by 12/31/80 after a review of 1
the vendor's records.
i i
i i
i i
i i
                      -  c--..., -  -  . , - .      _ _ _ . _ , , _ _ _ _ , _ __ _ . _ ,                __}}
c--...,
__}}

Latest revision as of 16:37, 24 December 2024

Responds to NRC Re Violations Noted in IE Insp Repts 50-413/80-23 & 50-414/80-23.Corrective Actions: Verification of Seismic Design Expected from Vendor by 801215.Util Will Submit Final Response After Review
ML19341C743
Person / Time
Site: Catawba  
Issue date: 11/26/1980
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19341C738 List:
References
NUDOCS 8103040078
Download: ML19341C743 (2)


Text

_

DUKE POWER COMPANY Powsm Duitmixo 422 Socin Cuuncu Srazzi, Cruntorrs. N. C. asam 9

W 8 L LI AM O, PAR M ER J R, i

TtitemoN E:Asta 704 VeCf Pettietset Strane Paoowctiose 373 40e3 il November 26, 1980 2

Mr. James P. O'Reilly, Director l

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: RII:DKW 50-413/80-23 50-414/80-23 1

Dear Mr. O'Reilly:

}

Please find attached a response to Infraction No. 413-414/80 23-01 which was identified in the above referenced Inspection Report.

Duke Power Company does not consider any information contained in this inspection report to be proprietary.

V y truly yours, 7

d.

i William O. Parker, Jr.

RWO:vr Attachment ec: NRC - Catawba Resident Inspector i

I

(

l l

181030 4 00'E

~

e 1,

DUKE POWER COMPANY i

CATAWBA NUCLEAR STATION Response to Infraction 50-413-414/80-23-01 Infraction As required by 10CFR50, Appendix B, Criterion VII, and as implemented by

+

Duke Power Company Topical Report Section 17.1.7 which states: Duke's quality assurance program requires the control of safety-related items or services purchased from a vendor, subvendor or consultant. Table 17.0-1 of Duke Power Company Topical Report commits to the requirements of Regulatory Guide 1.123, Revision 1, which endorses ANSI N45.2.13-1976.

Paragraph 10.1 of ANSI N45.2.13 requires that the supplier verify that j

the item or service being furnished complies with the procurement require-i ments, prior to offering the item or service for acceptance.

Contrary to the above, diesel generator battery racks 1DGBA, 1DGBB, 2DGBA and 2DGBB did not meet the seismic requirements of the procurement documents.

The battery racks had been receipt inspected, accepted and installed by the licensee.

1

Response

' Verification of the seismic design is expected from the vendor by 12/15/80.

Duke will submit a final response to the NRC by 12/31/80 after a review of 1

the vendor's records.

i i

i i

c--...,

__