ML20003A352: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:--
{{#Wiki_filter:-
                    ~
~
l
Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO.
                                                                                                    . Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO.     50-346                 :
50-346 DATE _May 6, 1980 COMPLETED BY Bilal Sarsour TELEPHONE 419-259-5000, OPERATING STATUS Ext. 251
DATE _May 6, 1980 COMPLETED BY Bilal Sarsour
: 1. Unit Name:
                                                                                    -                  TELEPHONE 419-259-5000, OPERATING STATUS                                                                                               Ext. 251
Davis-Besse Unit 1 Notes
: 1. Unit Name:                   Davis-Besse Unit 1                         Notes
: 2. Reporting Period:
: 2. Reporting Period:           Anril. 1980
Anril. 1980
: 3. Licensed Thermal Power (.\ tWr):             2772
: 3. Licensed Thermal Power (. tWr):
: 4. Nameplate Rating (Gross 31We):               925                                                                 -
2772
: 5. Design Electrical Rating (Net SIWE):         906
\\
: 6. Slaximum Dependable Capacity (Gross SIWE):           934
: 4. Nameplate Rating (Gross 31We):
: 7. blaximum Dependable Capacity (Net SIWE):             890
925
: 5. Design Electrical Rating (Net SIWE):
906
: 6. Slaximum Dependable Capacity (Gross SIWE):
934
: 7. blaximum Dependable Capacity (Net SIWE):
890
: 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Gise Reasons:
: 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Gise Reasons:
: 9. Power Lesel To Which Restricted, if Any (Net MWe):
: 9. Power Lesel To Which Restricted, if Any (Net MWe):
: 10. Reasons For Restrictions,If Any:
: 10. Reasons For Restrictions,If Any:
                                                                  "Ihis Month             Yr.-to-Date           Cumulative II. Hours In Reporting Period                         719                   2,903                   23:428
"Ihis Month Yr.-to-Date Cumulative II. Hours In Reporting Period 719 2,903 23:428
: 12. Number Of Hours Reactor Was Critical               159.3                 2.078                   13.042 1l     13. Reactor Reserve Shutdown Hours                   0                       0                         2,875.8-
: 12. Number Of Hours Reactor Was Critical 159.3 2.078 13.042 1l
: 14. Hours Generator On-Line                           159.3                   2,008.7                 11,883.0
: 13. Reactor Reserve Shutdown Hours 0
: 15. Unit Resene Shutdown Hours                       0                       0                       1.728
0 2,875.8-
: 16. Gross Thermal Energy Generated (31WH)             315,675                 4,687,305               24,886,812             .
: 14. Hours Generator On-Line 159.3 2,008.7 11,883.0
: 17. Gross Electrical Energy Generated t31WH)         104,487         , _ ,
: 15. Unit Resene Shutdown Hours 0
1,583,559               8,307,070
0 1.728
: 18. Net Electrical Energy Generated (SIWH)           94,347                 1,483,787               7,654,365
: 16. Gross Thermal Energy Generated (31WH) 315,675 4,687,305 24,886,812
: 19. Unit Service Factor                               22.2                   69. ?                   59.0
: 17. Gross Electrical Energy Generated t31WH) 104,487 1,583,559 8,307,070
: 20. Unit Asailability Factor                           22.2                   69.2                   60.2
: 18. Net Electrical Energy Generated (SIWH) 94,347 1,483,787 7,654,365
: 31. Unit Capacity Factor (Using SIDC Neti             14.7                   57.4                   39.6
: 19. Unit Service Factor 22.2
: 22. Unit Capacity Factor (Using DER Net)               14.5                   56.4                   38.9
: 69. ?
: 23. Unit Forced Outage Rate                           0                       14.3                   25,6
59.0
: 20. Unit Asailability Factor 22.2 69.2 60.2
: 31. Unit Capacity Factor (Using SIDC Neti 14.7 57.4 39.6
: 22. Unit Capacity Factor (Using DER Net) 14.5 56.4 38.9
: 23. Unit Forced Outage Rate 0
14.3 25,6
: 24. Shutdowns Scheduled Over Ne.st 6 Slonths (Type. Date,and Duration of Eachl:
: 24. Shutdowns Scheduled Over Ne.st 6 Slonths (Type. Date,and Duration of Eachl:
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:                 1Y   '
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                         Forecast         ,  Achieved O                                                                                                               .                  ,
1Y
INITIAL CRITICA LITY                   -
: 26. Units In Test Status (Prior to Commercial Operation):
INITIA L ELECTRICITY                                                                                         ,
Forecast Achieved O
CON!%IERCIAL OPERATION
INITIAL CRITICA LITY INITIA L ELECTRICITY CON!%IERCIAL OPERATION (9/77) 8a02030S h x}}
                                                  .                                                                    (9/77) 8a02030S h                           .
x}}

Latest revision as of 15:04, 23 December 2024

Revised Monthly Operating Rept for Apr 1980
ML20003A352
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/22/1981
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20003A329 List:
References
NUDOCS 8102030542
Download: ML20003A352 (1)


Text

-

~

Rev. 1 - 1/22/81 OPERATING DATA REPORT DOCKET NO.

50-346 DATE _May 6, 1980 COMPLETED BY Bilal Sarsour TELEPHONE 419-259-5000, OPERATING STATUS Ext. 251

1. Unit Name:

Davis-Besse Unit 1 Notes

2. Reporting Period:

Anril. 1980

3. Licensed Thermal Power (. tWr):

2772

\\

4. Nameplate Rating (Gross 31We):

925

5. Design Electrical Rating (Net SIWE):

906

6. Slaximum Dependable Capacity (Gross SIWE):

934

7. blaximum Dependable Capacity (Net SIWE):

890

8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Gise Reasons:
9. Power Lesel To Which Restricted, if Any (Net MWe):
10. Reasons For Restrictions,If Any:

"Ihis Month Yr.-to-Date Cumulative II. Hours In Reporting Period 719 2,903 23:428

12. Number Of Hours Reactor Was Critical 159.3 2.078 13.042 1l
13. Reactor Reserve Shutdown Hours 0

0 2,875.8-

14. Hours Generator On-Line 159.3 2,008.7 11,883.0
15. Unit Resene Shutdown Hours 0

0 1.728

16. Gross Thermal Energy Generated (31WH) 315,675 4,687,305 24,886,812
17. Gross Electrical Energy Generated t31WH) 104,487 1,583,559 8,307,070
18. Net Electrical Energy Generated (SIWH) 94,347 1,483,787 7,654,365
19. Unit Service Factor 22.2
69. ?

59.0

20. Unit Asailability Factor 22.2 69.2 60.2
31. Unit Capacity Factor (Using SIDC Neti 14.7 57.4 39.6
22. Unit Capacity Factor (Using DER Net) 14.5 56.4 38.9
23. Unit Forced Outage Rate 0

14.3 25,6

24. Shutdowns Scheduled Over Ne.st 6 Slonths (Type. Date,and Duration of Eachl:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

1Y

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved O

INITIAL CRITICA LITY INITIA L ELECTRICITY CON!%IERCIAL OPERATION (9/77) 8a02030S h x