ML20056C458: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:, - -
{{#Wiki_filter:, - -
June 17, 1993 Docket No. 50-265                                   DISTRIBUTION:   Docket. File NRC & Local PDRs PDIII-2 r/f-Mr. D. L. Farrar                           -J. Roe           J. Zwolinski Manager, Nuclear Regulatory Services         J. Dyer         C. Moore
June 17, 1993 Docket No. 50-265 DISTRIBUTION:
                . Commonwealth Edison Company                 C. Patel         OGC Executive Towers West III, Suite 500         ACRS (10)       8. Clayton RIII 1400 OPUS Place Downers Grove, Illinois 60515
Docket. File NRC & Local PDRs PDIII-2 r/f-Mr. D. L. Farrar
-J.
Roe J. Zwolinski Manager, Nuclear Regulatory Services J. Dyer C. Moore
. Commonwealth Edison Company C. Patel OGC Executive Towers West III, Suite 500 ACRS (10)
: 8. Clayton RIII 1400 OPUS Place Downers Grove, Illinois 60515


==Dear Mr. Farrar:==
==Dear Mr. Farrar:==
==SUBJECT:==
==SUBJECT:==
SAFETY EVALUATION OF WELD OVERLAY REPAIR OF A TWO-INCH LINE IN RECIRCULATION SYSTEM (TAC NO. M86331) i               By the {{letter dated|date=April 19, 1993|text=letter dated April 19, 1993}}, as supplemented April 30, 1993,.
SAFETY EVALUATION OF WELD OVERLAY REPAIR OF A TWO-INCH LINE IN RECIRCULATION SYSTEM (TAC NO. M86331) i By the {{letter dated|date=April 19, 1993|text=letter dated April 19, 1993}}, as supplemented April 30, 1993,.
Commonwealth Edison Company (CECO) requested approval of its proposed repair of a weld (02-F2B)_ in the recirculation piping system at Quad Cities Station, Unit 2. The proposed repair is based on the guidance in Generic Letter 88-01, "NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR-Austenitic Stainless Steel Piping."
Commonwealth Edison Company (CECO) requested approval of its proposed repair of a weld (02-F2B)_ in the recirculation piping system at Quad Cities Station, Unit 2.
The proposed repair is based on the guidance in Generic Letter 88-01, "NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR-Austenitic Stainless Steel Piping."
Based on our review of your request, we have concluded that the proposed repair is acceptable for one cycle of operation. After that period, you.
Based on our review of your request, we have concluded that the proposed repair is acceptable for one cycle of operation. After that period, you.
should either replace the subject weld or perform a-Code repair during the next refueling outage. By {{letter dated|date=May 24, 1993|text=letter dated May 24, 1993}}, _we informed-you about our conclusion 'and we indicated that our detailed safety evaluation would be provided under separate cover.
should either replace the subject weld or perform a-Code repair during the next refueling outage.
Sincerely,                               4 Original Signed By:
By {{letter dated|date=May 24, 1993|text=letter dated May 24, 1993}}, _we informed-you about our conclusion 'and we indicated that our detailed safety evaluation would be provided under separate cover.
Sincerely, 4
Original Signed By:
Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation
Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
As stated cc w/ enclosure:
As stated cc w/ enclosure:
See'next page OFC   lLA:PDIII-2       jPM:PDIII-2       lD:PDIII-2         l                 j.
See'next page OFC lLA:PDIII-2 jPM:PDIII-2 lD:PDIII-2 l
CDP NAME                      jCPATEL:rc         lJDYER plo         j               -l lCM00 reg DATE   j ( //(,/93       l 6//f/93         lC //7/93           l                 l-A
j.
                                                                                                  )
CDP lCM00 reg jCPATEL:rc lJDYER plo j
t i:          9306240165 930617 5                                    # ",* 7 ~ 7 b   -
-l NAME DATE j ( //(,/93 l 6//f/93 lC //7/93 l
g g.         ~- -
l-A
PDR. ADOCK 0500 l
)
ur                                                                                                      (a
t
# ",* 7 ~ 7 b
i:
9306240165 930617 l
PDR. ADOCK 0500 5
g g.
~- -
_; ( a ur


e
c UNITED STATES NUCLEAR REGULATORY COMMISSION e
      ,,c ! *
, v.
              , v.
e g' $
                    $e UNITED STATES NUCLEAR REGULATORY COMMISSION g' $         **-
E WASHINGTON, D. C. 20555 June 17, 1993 Docket No. 50-265 Mr. D. L. Farrar Manager, Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III, Suite 500 1400 OPUS Place Downers Grove, Illinois 60515
E                       WASHINGTON, D. C. 20555 June 17, 1993                           ,
Docket No. 50-265 Mr. D. L. Farrar Manager, Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III, Suite 500 1400 OPUS Place Downers Grove, Illinois 60515


==Dear Mr. Farrar:==
==Dear Mr. Farrar:==
==SUBJECT:==
==SUBJECT:==
SAFETY EVALUATION OF WELD OVERLAY REPAIR OF A TWO-INCH LINE IN RECIRCULATION SYSTEM (TAC NO. M86331)
SAFETY EVALUATION OF WELD OVERLAY REPAIR OF A TWO-INCH LINE IN RECIRCULATION SYSTEM (TAC NO. M86331)
By the {{letter dated|date=April 19, 1993|text=letter dated April 19, 1993}}, as supplemented April 30, 1993, Commonwealth Edison Company (CECO) requested approval of its proposed repair of a weld (02-F2B) in the recirculation piping system at Quad Cities Station, Unit 2. The proposed repair is based on the guidance in Generic Letter 88-01, "NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping."
By the {{letter dated|date=April 19, 1993|text=letter dated April 19, 1993}}, as supplemented April 30, 1993, Commonwealth Edison Company (CECO) requested approval of its proposed repair of a weld (02-F2B) in the recirculation piping system at Quad Cities Station, Unit 2.
Based on our review of your request, we have concluded that the proposed repair is acceptable for one cycle of operation. After that period, you should either replace the subject weld or perform a Code repair during the next refueling outage. By {{letter dated|date=May 24, 1993|text=letter dated May 24, 1993}}, we informed you about our conclusion and we indicated that our detailed safety evaluation would be provided under separate cover. Our safety evaluation is enclosed.
The proposed repair is based on the guidance in Generic Letter 88-01, "NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping."
1 Sincerely,
Based on our review of your request, we have concluded that the proposed repair is acceptable for one cycle of operation. After that period, you should either replace the subject weld or perform a Code repair during the next refueling outage.
                                                    $wylbl4 fkh Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V   l Office of Nuclear Reactor Regulation       ;
By {{letter dated|date=May 24, 1993|text=letter dated May 24, 1993}}, we informed you about our conclusion and we indicated that our detailed safety evaluation would be provided under separate cover.
Our safety evaluation is enclosed.
Sincerely,
$wylbl4 fkh Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
As stated cc w/ enclosure:
As stated cc w/ enclosure:
See next page I
See next page


4e
4e
  ~.*
~.*
4   ~
4
~ L,. -
~ L,.
Mr. D. L. Farrar                     Quad Cities Nuclear Power' Station-Commonwealth Edison Company         Unit Nos. I and 2 CC:                                                                         ;
~
Mr.. Stephen E. Shelton                                                     .
Mr. D. L. Farrar Quad Cities Nuclear Power' Station-Commonwealth Edison Company Unit Nos. I and 2 CC:
Vice President                                                             4 Iowa-Illinois Gas and Electric Company                                                         ,-
Mr.. Stephen E. Shelton Vice President 4
P. O. Box 4350 Davenport, Iowa 52808 Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60690-Mr. Richard Bax                                                               ,
Iowa-Illinois Gas and Electric Company P. O. Box 4350 Davenport, Iowa 52808 Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60690-Mr. Richard Bax Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North Cordova, Illinois 61242 Resident _ Inspector U. S. Nuclear Regulatory Commission 22712 206th Avenue North Cordova, Illinois 61242 Chairman Rock Island County Board of Supervisors-1504 3rd Avenue Rock Island County Office Bldg.
Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North                                                     <
Cordova, Illinois 61242 Resident _ Inspector U. S. Nuclear Regulatory Commission 22712 206th Avenue North Cordova, Illinois 61242 Chairman Rock Island County Board of Supervisors-                                                           ,
1504 3rd Avenue Rock Island County Office Bldg.
Rock Island, Illinois 61201 Illinois Department of Nuclear Safety Office of Nuclear facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Regional Administrator, Region III
Rock Island, Illinois 61201 Illinois Department of Nuclear Safety Office of Nuclear facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Regional Administrator, Region III
                .U. S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4-                                                   .
.U. S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4-
                . Glen Ellyn,- Illinois 60137                                                   ,
. Glen Ellyn,- Illinois 60137 Robert Neumann-Office of Public Counsel State ofl Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 u
Robert Neumann-Office of Public Counsel State ofl Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 u
-_}}
_        -_}}

Latest revision as of 14:39, 17 December 2024

Forwards SE Accepting Proposed Repair of Weld in Recirculation Piping Sys for One Cycle of Operation
ML20056C458
Person / Time
Site: Quad Cities 
Issue date: 06/17/1993
From: Chandu Patel
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20056C459 List:
References
TAC-M86331, NUDOCS 9306240165
Download: ML20056C458 (3)


Text

, - -

June 17, 1993 Docket No. 50-265 DISTRIBUTION:

Docket. File NRC & Local PDRs PDIII-2 r/f-Mr. D. L. Farrar

-J.

Roe J. Zwolinski Manager, Nuclear Regulatory Services J. Dyer C. Moore

. Commonwealth Edison Company C. Patel OGC Executive Towers West III, Suite 500 ACRS (10)

8. Clayton RIII 1400 OPUS Place Downers Grove, Illinois 60515

Dear Mr. Farrar:

SUBJECT:

SAFETY EVALUATION OF WELD OVERLAY REPAIR OF A TWO-INCH LINE IN RECIRCULATION SYSTEM (TAC NO. M86331) i By the letter dated April 19, 1993, as supplemented April 30, 1993,.

Commonwealth Edison Company (CECO) requested approval of its proposed repair of a weld (02-F2B)_ in the recirculation piping system at Quad Cities Station, Unit 2.

The proposed repair is based on the guidance in Generic Letter 88-01, "NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR-Austenitic Stainless Steel Piping."

Based on our review of your request, we have concluded that the proposed repair is acceptable for one cycle of operation. After that period, you.

should either replace the subject weld or perform a-Code repair during the next refueling outage.

By letter dated May 24, 1993, _we informed-you about our conclusion 'and we indicated that our detailed safety evaluation would be provided under separate cover.

Sincerely, 4

Original Signed By:

Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See'next page OFC lLA:PDIII-2 jPM:PDIII-2 lD:PDIII-2 l

j.

CDP lCM00 reg jCPATEL:rc lJDYER plo j

-l NAME DATE j ( //(,/93 l 6//f/93 lC //7/93 l

l-A

)

t

  1. ",* 7 ~ 7 b

i:

9306240165 930617 l

PDR. ADOCK 0500 5

g g.

~- -

_; ( a ur

c UNITED STATES NUCLEAR REGULATORY COMMISSION e

, v.

e g' $

E WASHINGTON, D. C. 20555 June 17, 1993 Docket No. 50-265 Mr. D. L. Farrar Manager, Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III, Suite 500 1400 OPUS Place Downers Grove, Illinois 60515

Dear Mr. Farrar:

SUBJECT:

SAFETY EVALUATION OF WELD OVERLAY REPAIR OF A TWO-INCH LINE IN RECIRCULATION SYSTEM (TAC NO. M86331)

By the letter dated April 19, 1993, as supplemented April 30, 1993, Commonwealth Edison Company (CECO) requested approval of its proposed repair of a weld (02-F2B) in the recirculation piping system at Quad Cities Station, Unit 2.

The proposed repair is based on the guidance in Generic Letter 88-01, "NRC Position on Intergranular Stress Corrosion Cracking (IGSCC) in BWR Austenitic Stainless Steel Piping."

Based on our review of your request, we have concluded that the proposed repair is acceptable for one cycle of operation. After that period, you should either replace the subject weld or perform a Code repair during the next refueling outage.

By letter dated May 24, 1993, we informed you about our conclusion and we indicated that our detailed safety evaluation would be provided under separate cover.

Our safety evaluation is enclosed.

Sincerely,

$wylbl4 fkh Chandu P. Patel, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page

4e

~.*

4

~ L,.

~

Mr. D. L. Farrar Quad Cities Nuclear Power' Station-Commonwealth Edison Company Unit Nos. I and 2 CC:

Mr.. Stephen E. Shelton Vice President 4

Iowa-Illinois Gas and Electric Company P. O. Box 4350 Davenport, Iowa 52808 Michael I. Miller, Esquire Sidley and Austin One First National Plaza Chicago, Illinois 60690-Mr. Richard Bax Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North Cordova, Illinois 61242 Resident _ Inspector U. S. Nuclear Regulatory Commission 22712 206th Avenue North Cordova, Illinois 61242 Chairman Rock Island County Board of Supervisors-1504 3rd Avenue Rock Island County Office Bldg.

Rock Island, Illinois 61201 Illinois Department of Nuclear Safety Office of Nuclear facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Regional Administrator, Region III

.U. S. Nuclear Regulatory Commission 799 Roosevelt Road, Bldg. #4-

. Glen Ellyn,- Illinois 60137 Robert Neumann-Office of Public Counsel State ofl Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 u

-_