ML20072B026: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.               -
{{#Wiki_filter:.
r                                                                                                                                       .
r t
                                                            .                                                                                                      t ee                       e
ee e
                                                                              ,                                                                                    j.
j.
P OPERATING DATA REPORT H OCKET NO. 50-?A7 DATE 1 - d- A ~t COSIPLETED BY F P4ch TELEPilONE (911)525-5155 OPERATING 5 f ATUS N08'5 Indiani point finit No. 2                                                   Initial criticality for
P OPERATING DATA REPORT H OCKET NO. 50-?A7 DATE 1 - d-A ~t COSIPLETED BY F P4ch TELEPilONE (911)525-5155 OPERATING 5 f ATUS N08'5 Indiani point finit No. 2 Initial criticality for
: 1. Unit Name:                                                                         Cycle 6 was acheived on
: 1. Unit Name:
December 19R2 Cycle 6 was acheived on
: 2. Reporting Period:
: 2. Reporting Period:
December 19R2
2758 December 29, 1982. At the en<1
* 2758                                 December 29, 1982. At the en<1
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):                 1013                                  of the report period, pre-
of the report period, pre-1013
: 4. Namepbte Rating 1 Gross MWe):                                                       parations for returning the
: 4. Namepbte Rating 1 Gross MWe):
: 5. Design Electrical Rating (Net MWe): 8. 7_3                                                                   * **#*
parations for returning the
900
: 5. Design Electrical Rating (Net MWe): 8. 7_3
                                                                                                                  *                    ".ndemay     _
".ndemay 900
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
R64
: 7. Maximum Dependable Capacity (Net MWe):
: 7. Maximum Dependable Capacity (Net MWe):
R64
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
: 9. Power Lesel To bhich Restricted.If Any (Net MWe):
: 9. Power Lesel To bhich Restricted.If Any (Net MWe):
: 10. Reasons For Restrictions.If Any:                                                                                   ,              ,
: 10. Reasons For Restrictions.If Any:
P r
P r
t This Month             Yr..to.Date                 Cumulative                       ,
t This Month Yr..to.Date Cumulative 744 8760 74545
744                       8760                     74545                             ,
: 11. Ilours in Reporting Period
: 11. Ilours in Reporting Period
                                                                          - _ 62.50                       5836.15                   48157.68
- _ 62.50 5836.15 48157.68
: 12. Number 0f Hours Reactor was Critica,                                                                                 1578.51 0                         51.08
: 12. Number 0f Hours Reactor was Critica, 0
: 13. Reactor Resene Shutdown Hours                                   0                         5778.30                   46839.30
51.08 1578.51
: 14. Hours Generater on-Line                                                                   0                         0 0
: 13. Reactor Resene Shutdown Hours 0
: 15. Unit Resene Shutdown Hours
5778.30 46839.30
: 16. Gross Thennal Energy Generated (MWH) 0                         19122101                  121436676                  -
: 14. Hours Generater on-Line 0
l 0                          4663410                   37502726
0 0
: 17. Gross Electrical Energy Generated (MWH)                               . _ . . . .
: 15. Unit Resene Shutdown Hours 0
35732057
19122101 121436676 l
                                                                                -7434                       4447401 I           IS. Net Electrical Energy Generated (MWH)                           U                           65.4                     62.8
: 16. Gross Thennal Energy Generated (MWH) 0 4663410 37502726
: 19. Unit Senice factor                                             D                           65.4                     52.8             -
: 17. Gross Electrical Energy Generated (MWH)
i            20. Unit Availability Factor
-7434 4447401 35732057 I
* 0                          59.3                     55.B
IS. Net Electrical Energy Generated (MWH)
: 21. Unit Capacity Factor (Using MDC Neti                                         _
U 65.4 62.8
54.9 0                          58.2
: 19. Unit Senice factor D
: 22. Unit Capacity FactorlU>ing DER Neti                                                         7.3                     9.8 0
65.4 52.8 i
: 20. Unit Availability Factor 0
59.3 55.B
: 21. Unit Capacity Factor (Using MDC Neti 0
58.2 54.9
: 22. Unit Capacity FactorlU>ing DER Neti 0
7.3 9.8
: 23. Unit Forced Outage Rate
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Eacht:
: 24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Eacht:
Unit presently shutdown for refueling and maintenance.
Unit presently shutdown for refueling and maintenance.
1 B 'l j            25. If Shut Down At End Of Report Period. Estimated Date of Startup:
1 B 'l
!            2ti. Units in Test Status (Prior io Commercial Operationi:                                   Forecast                   Achiesed i                                     INill \L CRITICALITY INill \l.11.I'C I RiflI Y                                                             N/A CO\lMI'RCI \1 OPl R AIlON                                                 \                         \
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
i                             ~
j 2ti. Units in Test Status (Prior io Commercial Operationi:
l 8301250120 B'30115                                                                                                                       08/DI DR ADOCK 05000247                                   l l                                       PDR       _
Forecast Achiesed i
I
INill \\L CRITICALITY INill \\l.11.I'C I RiflI Y N/A CO\\lMI'RCI \\1 OPl R AIlON
\\
\\
i
~
8301250120 B'30115 l
DR ADOCK 05000247 l
08/DI l
PDR I


O b AVERAGE DAILY UNIT POWER I.EVEL DOCKET NO.
AVERAGE DAILY UNIT POWER I.EVEL b
50-247 I.P. Unit No. 2 UNIT DATE l-4-83
O 50-247 DOCKET NO.
                                                                                          . COMPLETED BY           E. F. Eich TELEPilONE        (914)526-5155 MONTH         n oc om bn r. 19g7                             ,
I.P.
DAY         AVERAGE DAILY POWER LEVEL                         DAY       AVERAGE DAILY POWER LEVEL -
Unit No. 2 UNIT DATE l-4-83
(MWe Net)                                                   (MWe Neil
. COMPLETED BY E.
                '                    O 17                       0 0
F.
              ~                                                           18                        0
Eich (914)526-5155 TELEPilONE MONTH n oc om bn r.
      '                                                                    19                        0 4
19g7 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL -
0                                                              0 20 0
(MWe Net)
21                       0 6                     0                                                             0 22
(MWe Neil O
              -                      0                                                              0 23 8                      0                                                             0 24 9
17 0
0 25 10                     0                                                               0 26 33 0
0 18 0
27 f                                    0 12                                                           28                       0-
~
            '                                                            29                         0 14                      0                                                             0         .
19 0
30 0                                                             0 IS                                                           31 0
0 4
i           16 INSTRUCTIONS On t!.is tiirmat.hst the aserage d,a y unit pimer lesel m MWe Net tiir each day in the rerotting inanih. Compute to i           the nearest whole megawatt.
20 0
0 21 0
6 0
0 22 0
0 23 0
0 8
24 0
9 25 10 0
0 26 0
f 33 27 0
12 28 0-29 0
0 0
14 30 0
IS 31 0
0 i
16 INSTRUCTIONS On t!.is tiirmat.hst the aserage d,a y unit pimer lesel m MWe Net tiir each day in the rerotting inanih. Compute to i
the nearest whole megawatt.
(9/77)
(9/77)


UNil Siltrit)OhNS AND POWER MEDUCllONS                  I#UMI I NO- "O-2A7 UNII N AML T_p           rtn i +- A2 DYIE 1./.4/.e 3 DFCEMBFR 198&             COMPLETED BY       3,     ,, gich REPOR T MONTil "IELEPHONE (ni4)5;; ;;33
I#UMI I NO- "O-2A7 UNil Siltrit)OhNS AND POWER MEDUCllONS UNII N AML T_p rtn i +- A2 DYIE 1./.4/.e 3 DFCEMBFR 198&
                                                                                                                                -,          E        3     Yk         Licensee       h         h S.4?
COMPLETED BY 3,
Cause & Correstise N" -                         11830 i       3i         f. 5sE               Event     ti ?
,, gich REPOR T MONTil "IELEPHONE (ni4)5;; ;;33 E
N0 Action to
3 Yk Licensee h
                                                                                                                                        $E          E                  Report #                 50                Present Recurrence Te dj =g                               v Q
h Cause & Correstise S.4 N" -
8                     820918     8     744           C     1                       ZZ       ZZZZZZ     Refueling an'd' Maintenance Outaae WA
11830 i
                                                                                                                                                                                                                                                          ~
3i f.
continued from September.
5sE Event ti ?
?
Action to 0
Report #
N0 5
Present Recurrence
$E E
Te dj =g e
v Q
8 820918 8
744 C
1 ZZ ZZZZZZ Refueling an'd' Maintenance Outaae WA continued from September.
~
i i
i i
1                                                 2                                                   3                             4 F: I%ced                         Reason:                                               Method:                       Exhibit G -Instructinrn S: Scheduled                     A-l'quipment Failure (Explain)                         1-Manual                     for Picparation i.I D.sta B. Maintenance of Test                                 2-Manual Scram.               Entry Shecis f or I.icensee C. Refueling                                         3 Automatic Scram.             Event Report II.I.RI Fih t St:RI G.
1 2
D-Regulator) Restriction                             4-Other (Explain)             01611 E-Operator Training & License Examination F-Administ rative .                                                             5 G-Operational Error (Explain)                                                       Exhibit I - Same Source l                                                                         c8/77)                                               Il-Other (Esplain)                               ,,
3 4
1 l
F: I%ced Reason:
1                                                                                                                                                                                                                                                                 .
Method:
L                                                                                                                                                                                                                                                                  3
Exhibit G -Instructinrn S: Scheduled A-l'quipment Failure (Explain) 1-Manual for Picparation i.I D.sta B. Maintenance of Test 2-Manual Scram.
Entry Shecis f or I.icensee C. Refueling 3 Automatic Scram.
Event Report II.I.RI Fih t St:RI G.
D-Regulator) Restriction 4-Other (Explain) 01611 E-Operator Training & License Examination F-Administ rative.
5 G-Operational Error (Explain)
Exhibit I - Same Source l
c8/77)
Il-Other (Esplain) 1 l
1 L
3


4 o
4 o


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Docket No. 50-247 Date:     1/6/83 Completed by: J. Curry Telephone No. (914) 526-5235 At the beginning of the December report period, India Point Unit No. 2 was in the cold shutdown condition for the Cycle 5/6 refueling and maintenance outage.
OF OPERATING EXPERIENCE Docket No. 50-247 Date:
1/6/83 Completed by:
J.
Curry Telephone No. (914) 526-5235 At the beginning of the December report period, India Point Unit No. 2 was in the cold shutdown condition for the Cycle 5/6 refueling and maintenance outage.
The following significant outage tasks were addressed during the period.
The following significant outage tasks were addressed during the period.
o   Tensioning of the reactor vessel studs was completed on December 5.
o Tensioning of the reactor vessel studs was completed on December 5.
o   The connection of the piping to the new moisture separator reheater tube bundles was completed. Reassembly of the high and low pressure turbines and connection of associated piping were completed.
o The connection of the piping to the new moisture separator reheater tube bundles was completed.
o   The containment equipment hatch was reinstalled.       Calibration ' and the placing into service of the new digital metal impact monitoring system were completed.
Reassembly of the high and low pressure turbines and connection of associated piping were completed.
o   Modification of the reactor vessel head vent was completed.
o The containment equipment hatch was reinstalled.
o   Prerequisites   for   leaving   the   cold shutdown condition were completed. A successful reactor coolant system hydrostatic test (performed at 340 0F and 2385 psig) was completed on December 22.
Calibration ' and the placing into service of the new digital metal impact monitoring system were completed.
Control rod drop tests and a control rod position indication system calibration were performed.
o Modification of the reactor vessel head vent was completed.
Steam generator secondary safety valve settings were verified.
o Prerequisites for leaving the cold shutdown condition were completed.
o   On December 29, the containment building was closed and control rods withdrawn to their " full out" position. Boron dilution to critical conditions was completed December 29 with a measured boron concentration of 1398 ppm.
A successful reactor coolant system hydrostatic test 0
o   The low power physics test program was completed on December 30.
(performed at 340 F and 2385 psig) was completed on December 22.
Control rod drop tests and a control rod position indication system o
calibration were performed.
Steam generator secondary safety valve settings were verified.
o o
On December 29, the containment building was closed and control rods withdrawn to their " full out" position.
Boron dilution to critical conditions was completed December 29 with a
measured boron concentration of 1398 ppm.
o The low power physics test program was completed on December 30.
At the close of the report period, steam was introduced to the secondary side and the turbine rolled in preparation for returning Unit 2 to service.
At the close of the report period, steam was introduced to the secondary side and the turbine rolled in preparation for returning Unit 2 to service.


Docket No. 50-247 Date 1/11/83 Completed by J. Bahr December, 1982 Mechanical and Electrical Maintenance Indian Point Unit No. 2 Date     Component           MWR           Malfunction     Corrective Action 7/18/82   Feedwater control 3386 & 3387 Nos. 23 and 22 Replace failed Valves FCV-437,                 Feedwater Reg- activator bolting 427                             gulating Valves activator failure 7/23/82   No. 21 Diesel       3221         Low fuel oil     Regulator adjusted Generator                       pressure on No. 21 Diesel Generator 8/12/82   No. 24 Service     3815         Pump failed     New pump installed Water Pump                       surveillance test 8/14/82   No. 26 Fan Cooler 4107           0.3GPM leak     Two hoses replaced Unit Motor Cooler               on hose to-motor cooler i
Docket No. 50-247 Date 1/11/83 Completed by J. Bahr December, 1982 Mechanical and Electrical Maintenance Indian Point Unit No. 2 Date Component MWR Malfunction Corrective Action 7/18/82 Feedwater control 3386 & 3387 Nos. 23 and 22 Replace failed Valves FCV-437, Feedwater Reg-activator bolting 427 gulating Valves activator failure 7/23/82 No. 21 Diesel 3221 Low fuel oil Regulator adjusted Generator pressure on No. 21 Diesel Generator 8/12/82 No. 24 Service 3815 Pump failed New pump installed Water Pump surveillance test 8/14/82 No. 26 Fan Cooler 4107 0.3GPM leak Two hoses replaced Unit Motor Cooler on hose to-motor cooler i
8/6/82   No. 22 Charging     3803         Head flange     Replaced No. 4 Pump                             gasket leak     cylinder cover on No. 4 piston gasket from motor 8/11/82   No. 22 Auxiliary   3960         Leak in cooling Tightened loose Boiler Feed Pump                 line             fitting
8/6/82 No. 22 Charging 3803 Head flange Replaced No. 4 Pump gasket leak cylinder cover on No. 4 piston gasket from motor 8/11/82 No. 22 Auxiliary 3960 Leak in cooling Tightened loose Boiler Feed Pump line fitting 8/15/82 Nos. 25 and 23 4153 and Leak in hoses Hoses replaced Fan Cooler Units 4154 to motor coolers Motor Coolers
;    8/15/82   Nos. 25 and 23     4153 and     Leak in hoses   Hoses replaced Fan Cooler Units   4154         to motor coolers Motor Coolers
..-}}
                                                  . . - .         _ - _ _ .}}

Latest revision as of 05:50, 15 December 2024

Monthly Operating Rept for Dec 1982
ML20072B026
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/11/1983
From: Bahr J, Jeanette Curry, Eich E
CONSOLIDATED EDISON CO. OF NEW YORK, INC.
To:
Shared Package
ML20072B027 List:
References
NUDOCS 8301250128
Download: ML20072B026 (5)


Text

.

r t

ee e

j.

P OPERATING DATA REPORT H OCKET NO. 50-?A7 DATE 1 - d-A ~t COSIPLETED BY F P4ch TELEPilONE (911)525-5155 OPERATING 5 f ATUS N08'5 Indiani point finit No. 2 Initial criticality for

1. Unit Name:

December 19R2 Cycle 6 was acheived on

2. Reporting Period:

2758 December 29, 1982. At the en<1

3. Licensed Thermal Power (MWt):

of the report period, pre-1013

4. Namepbte Rating 1 Gross MWe):

parations for returning the

5. Design Electrical Rating (Net MWe): 8. 7_3

".ndemay 900

6. Maximum Dependable Capacity (Gross MWe):

R64

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
9. Power Lesel To bhich Restricted.If Any (Net MWe):
10. Reasons For Restrictions.If Any:

P r

t This Month Yr..to.Date Cumulative 744 8760 74545

11. Ilours in Reporting Period

- _ 62.50 5836.15 48157.68

12. Number 0f Hours Reactor was Critica, 0

51.08 1578.51

13. Reactor Resene Shutdown Hours 0

5778.30 46839.30

14. Hours Generater on-Line 0

0 0

15. Unit Resene Shutdown Hours 0

19122101 121436676 l

16. Gross Thennal Energy Generated (MWH) 0 4663410 37502726
17. Gross Electrical Energy Generated (MWH)

-7434 4447401 35732057 I

IS. Net Electrical Energy Generated (MWH)

U 65.4 62.8

19. Unit Senice factor D

65.4 52.8 i

20. Unit Availability Factor 0

59.3 55.B

21. Unit Capacity Factor (Using MDC Neti 0

58.2 54.9

22. Unit Capacity FactorlU>ing DER Neti 0

7.3 9.8

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months (Type.Date,and Duration of Eacht:

Unit presently shutdown for refueling and maintenance.

1 B 'l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

j 2ti. Units in Test Status (Prior io Commercial Operationi:

Forecast Achiesed i

INill \\L CRITICALITY INill \\l.11.I'C I RiflI Y N/A CO\\lMI'RCI \\1 OPl R AIlON

\\

\\

i

~

8301250120 B'30115 l

DR ADOCK 05000247 l

08/DI l

PDR I

AVERAGE DAILY UNIT POWER I.EVEL b

O 50-247 DOCKET NO.

I.P.

Unit No. 2 UNIT DATE l-4-83

. COMPLETED BY E.

F.

Eich (914)526-5155 TELEPilONE MONTH n oc om bn r.

19g7 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL -

(MWe Net)

(MWe Neil O

17 0

0 18 0

~

19 0

0 4

20 0

0 21 0

6 0

0 22 0

0 23 0

0 8

24 0

9 25 10 0

0 26 0

f 33 27 0

12 28 0-29 0

0 0

14 30 0

IS 31 0

0 i

16 INSTRUCTIONS On t!.is tiirmat.hst the aserage d,a y unit pimer lesel m MWe Net tiir each day in the rerotting inanih. Compute to i

the nearest whole megawatt.

(9/77)

I#UMI I NO- "O-2A7 UNil Siltrit)OhNS AND POWER MEDUCllONS UNII N AML T_p rtn i +- A2 DYIE 1./.4/.e 3 DFCEMBFR 198&

COMPLETED BY 3,

,, gich REPOR T MONTil "IELEPHONE (ni4)5;; ;;33 E

3 Yk Licensee h

h Cause & Correstise S.4 N" -

11830 i

3i f.

5sE Event ti ?

?

Action to 0

Report #

N0 5

Present Recurrence

$E E

Te dj =g e

v Q

8 820918 8

744 C

1 ZZ ZZZZZZ Refueling an'd' Maintenance Outaae WA continued from September.

~

i i

1 2

3 4

F: I%ced Reason:

Method:

Exhibit G -Instructinrn S: Scheduled A-l'quipment Failure (Explain) 1-Manual for Picparation i.I D.sta B. Maintenance of Test 2-Manual Scram.

Entry Shecis f or I.icensee C. Refueling 3 Automatic Scram.

Event Report II.I.RI Fih t St:RI G.

D-Regulator) Restriction 4-Other (Explain) 01611 E-Operator Training & License Examination F-Administ rative.

5 G-Operational Error (Explain)

Exhibit I - Same Source l

c8/77)

Il-Other (Esplain) 1 l

1 L

3

4 o

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-247 Date:

1/6/83 Completed by:

J.

Curry Telephone No. (914) 526-5235 At the beginning of the December report period, India Point Unit No. 2 was in the cold shutdown condition for the Cycle 5/6 refueling and maintenance outage.

The following significant outage tasks were addressed during the period.

o Tensioning of the reactor vessel studs was completed on December 5.

o The connection of the piping to the new moisture separator reheater tube bundles was completed.

Reassembly of the high and low pressure turbines and connection of associated piping were completed.

o The containment equipment hatch was reinstalled.

Calibration ' and the placing into service of the new digital metal impact monitoring system were completed.

o Modification of the reactor vessel head vent was completed.

o Prerequisites for leaving the cold shutdown condition were completed.

A successful reactor coolant system hydrostatic test 0

(performed at 340 F and 2385 psig) was completed on December 22.

Control rod drop tests and a control rod position indication system o

calibration were performed.

Steam generator secondary safety valve settings were verified.

o o

On December 29, the containment building was closed and control rods withdrawn to their " full out" position.

Boron dilution to critical conditions was completed December 29 with a

measured boron concentration of 1398 ppm.

o The low power physics test program was completed on December 30.

At the close of the report period, steam was introduced to the secondary side and the turbine rolled in preparation for returning Unit 2 to service.

Docket No. 50-247 Date 1/11/83 Completed by J. Bahr December, 1982 Mechanical and Electrical Maintenance Indian Point Unit No. 2 Date Component MWR Malfunction Corrective Action 7/18/82 Feedwater control 3386 & 3387 Nos. 23 and 22 Replace failed Valves FCV-437, Feedwater Reg-activator bolting 427 gulating Valves activator failure 7/23/82 No. 21 Diesel 3221 Low fuel oil Regulator adjusted Generator pressure on No. 21 Diesel Generator 8/12/82 No. 24 Service 3815 Pump failed New pump installed Water Pump surveillance test 8/14/82 No. 26 Fan Cooler 4107 0.3GPM leak Two hoses replaced Unit Motor Cooler on hose to-motor cooler i

8/6/82 No. 22 Charging 3803 Head flange Replaced No. 4 Pump gasket leak cylinder cover on No. 4 piston gasket from motor 8/11/82 No. 22 Auxiliary 3960 Leak in cooling Tightened loose Boiler Feed Pump line fitting 8/15/82 Nos. 25 and 23 4153 and Leak in hoses Hoses replaced Fan Cooler Units 4154 to motor coolers Motor Coolers

..-