BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of | |||
NEW YORK POWER AUTHORITY | ) | ||
The New York Power Authority requests an amendment to the Technical Specifications | NEW YORK POWER AUTHORITY | ||
contained in Appendix A to Facility Operating License DPR-59 for the James A. FitzPatrick | ) | ||
Nuclear Regulatory Commission's regulations. | Docket No. 50-333 l | ||
James A. FitzPatrick Nuclear Power Plant | |||
) | |||
i APPLICATION FOR AMENDMENT TO OPERATING LICENSE 1 | |||
The New York Power Authority requests an amendment to the Technical Specifications contained in Appendix A to Facility Operating License DPR-59 for the James A. FitzPatrick Nuclear Power Plant. This application is filed in accordance with Section 10 CFR 50.90 of the Nuclear Regulatory Commission's regulations. | |||
t l | t l | ||
This application for an amendment to the James A. FitzPatrick Technical Specifications (TS) proposes to allow reactor coolant system pressure tests to be performed while remaining in l | |||
proposes to allow reactor coolant system pressure tests to be performed while remaining in | the Cold Shutdown Mode. Primary containment integrity is not required in the Cold Shutdown l | ||
the Cold Shutdown Mode. Primary containment integrity is not required in the Cold Shutdown l | Mode thus allowing unrestricted access to the primary containment for the performance of j | ||
Minor exceptions are required to ensure consistency within FitzPatrick TS, reflect differences l | inspections. The changes will also allow outage activities on other systems to continue. The j | ||
changes, with minor exceptions, adopt Special Operations Section 3.10.1, " Inservice Leak and j | |||
Editorial changes to improve the table of contents, relocate text, use consistent terminology, and reflect the addition of new TS pages are also proposed. | Hydrostatic Testing Operation," from Standard Technical Specifications (STS), NUREG-1433. | ||
Attachment I contains the proposed new Technical Specification pages and Attachment 11 is the Safety Evaluation for the proposed changes. Attachment lll is a markup of the affected pages. | Minor exceptions are required to ensure consistency within FitzPatrick TS, reflect differences l | ||
l | between FitzPatrick TS and STS, and ensure the same level of ECCS redundancy afforded by STS during pressure testing. These exceptions will be eliminated when the FitzPatrick TS are i | ||
converted to STS. | |||
this / s / day of | Editorial changes to improve the table of contents, relocate text, use consistent terminology, and reflect the addition of new TS pages are also proposed. | ||
W. J. Cahill, Jr. | l Attachment I contains the proposed new Technical Specification pages and Attachment 11 is the Safety Evaluation for the proposed changes. Attachment lll is a markup of the affected pages. | ||
l | l New York Power Authority STATE OF NEW YORK COUNTY OF WESTCHESTER l | ||
Subscribed and sworn to before me this / s / day of h/cuu 1996. | |||
/ | |||
Notary Public' | ) | ||
W. J. Cahill, Jr. | |||
F Chief Nuclear Officer Ih h | |||
PDR | *d l | ||
/ | |||
Notary Public' l | |||
l l | |||
GERAl. DINE STRAND Notary Public. State og g,g No. 4991272 E*W 2 | |||
a [7 l | |||
9602050204 960201 t | |||
PDR ADOCK 05000333 l | |||
p PDR | |||
i Attachment I to JPN-96-005 REVISED TECHNICAL SPECIFICATION PAGES INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION (JPTS-95-004) | |||
New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50-333 DPR-59 | |||
1 LIST OF PAGE CHANGES | 1 LIST OF PAGE CHANGES INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION (JPTS-95-004) | ||
INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION (JPTS-95-004) | .i 1 | ||
Revise Appendix A as follows: | |||
Revise Appendix A as follows: | Remove Pages insert Pages i | ||
Remove Pages | i ii ii iil lii 30b 30b i | ||
30e | 30c 30c 30d 30d 30e 30e 30f 30f l | ||
30f | 30g 30g 30h 118 118 120 120 121 121 137 137 143 143 148 148 244a 244a 244b i | ||
l 1 | l 1 | ||
1}} | 1}} | ||
Latest revision as of 07:45, 13 December 2024
| ML20097A192 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 02/01/1996 |
| From: | William Cahill POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | |
| Shared Package | |
| ML20097A185 | List: |
| References | |
| NUDOCS 9602050204 | |
| Download: ML20097A192 (3) | |
Text
..
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of
)
NEW YORK POWER AUTHORITY
)
Docket No. 50-333 l
James A. FitzPatrick Nuclear Power Plant
)
i APPLICATION FOR AMENDMENT TO OPERATING LICENSE 1
The New York Power Authority requests an amendment to the Technical Specifications contained in Appendix A to Facility Operating License DPR-59 for the James A. FitzPatrick Nuclear Power Plant. This application is filed in accordance with Section 10 CFR 50.90 of the Nuclear Regulatory Commission's regulations.
t l
This application for an amendment to the James A. FitzPatrick Technical Specifications (TS) proposes to allow reactor coolant system pressure tests to be performed while remaining in l
the Cold Shutdown Mode. Primary containment integrity is not required in the Cold Shutdown l
Mode thus allowing unrestricted access to the primary containment for the performance of j
inspections. The changes will also allow outage activities on other systems to continue. The j
changes, with minor exceptions, adopt Special Operations Section 3.10.1, " Inservice Leak and j
Hydrostatic Testing Operation," from Standard Technical Specifications (STS), NUREG-1433.
Minor exceptions are required to ensure consistency within FitzPatrick TS, reflect differences l
between FitzPatrick TS and STS, and ensure the same level of ECCS redundancy afforded by STS during pressure testing. These exceptions will be eliminated when the FitzPatrick TS are i
converted to STS.
Editorial changes to improve the table of contents, relocate text, use consistent terminology, and reflect the addition of new TS pages are also proposed.
l Attachment I contains the proposed new Technical Specification pages and Attachment 11 is the Safety Evaluation for the proposed changes. Attachment lll is a markup of the affected pages.
l New York Power Authority STATE OF NEW YORK COUNTY OF WESTCHESTER l
Subscribed and sworn to before me this / s / day of h/cuu 1996.
/
)
W. J. Cahill, Jr.
F Chief Nuclear Officer Ih h
- d l
/
Notary Public' l
l l
GERAl. DINE STRAND Notary Public. State og g,g No. 4991272 E*W 2
a [7 l
9602050204 960201 t
PDR ADOCK 05000333 l
p PDR
i Attachment I to JPN-96-005 REVISED TECHNICAL SPECIFICATION PAGES INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION (JPTS-95-004)
New York Power Authority JAMES A. FITZPATRICK NUCLEAR POWER PLANT Docket No. 50-333 DPR-59
1 LIST OF PAGE CHANGES INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION (JPTS-95-004)
.i 1
Revise Appendix A as follows:
Remove Pages insert Pages i
i ii ii iil lii 30b 30b i
30c 30c 30d 30d 30e 30e 30f 30f l
30g 30g 30h 118 118 120 120 121 121 137 137 143 143 148 148 244a 244a 244b i