| event date = 02/15/2005 20:55 EST | | event date = 02/15/2005 20:55 EST | ||
| last update date = 03/30/2005 | | last update date = 03/30/2005 | ||
| title = Possible Failure | | title = Possible Failure to Meet Design Basis Requirements of Positive Pressure in the Control Tower Envelope Following a Design Basis Accident. | ||
| event text = The licensee provided the following information: | | event text = The licensee provided the following information: | ||
During operator rounds it was discovered that a double door for the control tower habitability envelope was propped open [from painting earlier in the day]. This condition would have resulted in not meeting the design basis requirements of maintaining a positive pressure inside the control tower envelope following a design basis accident. The doors were immediately closed. | During operator rounds it was discovered that a double door for the control tower habitability envelope was propped open [from painting earlier in the day]. This condition would have resulted in not meeting the design basis requirements of maintaining a positive pressure inside the control tower envelope following a design basis accident. The doors were immediately closed. |
Latest revision as of 21:21, 1 March 2018
Where | |
---|---|
Three Mile Island Pennsylvania (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+239.07 h9.961 days <br />1.423 weeks <br />0.327 months <br />) | |
Opened: | Randy Campbell 00:59 Feb 26, 2005 |
NRC Officer: | Chauncey Gould |
Last Updated: | Mar 30, 2005 |
41444 - NRC Website
| |