ENS 42656: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 06/20/2006 16:30 EDT
| event date = 06/20/2006 16:30 EDT
| last update date = 06/20/2006
| last update date = 06/20/2006
| title = Unusual Event Declared Due To A Seismic Event
| title = Unusual Event Declared Due to a Seismic Event
| event text = Emergency plan unusual event entered due to a seismic event (LU-1). No equipment damage has been identified.
| event text = Emergency plan unusual event entered due to a seismic event (LU-1). No equipment damage has been identified.
The seismic event occurred at 1611hrs and tremors were felt in the Control Room.  Unit 1 remained at full power and initial plant walkdown identified no safety equipment damage.  Plant instrumentation indicated an acceleration of 0.005 Gs.  Per U.S. Geological Survey website the quake was a 3.4 on the Richter scale and occurred NNW of the site. There is a small likelihood of after shocks.  No radioactive releases have occurred.
The seismic event occurred at 1611hrs and tremors were felt in the Control Room.  Unit 1 remained at full power and initial plant walkdown identified no safety equipment damage.  Plant instrumentation indicated an acceleration of 0.005 Gs.  Per U.S. Geological Survey website the quake was a 3.4 on the Richter scale and occurred NNW of the site. There is a small likelihood of after shocks.  No radioactive releases have occurred.

Latest revision as of 22:18, 1 March 2018

ENS 42656 +/-
Where
Perry FirstEnergy icon.png
Ohio (NRC Region 3)
Reporting
Emergency class: Unusual Event
10 CFR 50.72(a) (1) (i), Emergency Class Declaration
Time - Person (Reporting Time:+-3.6 h-0.15 days <br />-0.0214 weeks <br />-0.00493 months <br />)
Opened: Douglas D. Farren
16:54 Jun 20, 2006
NRC Officer: Arlon Costa
Last Updated: Jun 20, 2006
42656 - NRC Website
Loading map...