Semantic search

Jump to navigation Jump to search
 Entered dateEvent description
ENS 4265620 June 2006 16:54:00

Emergency plan unusual event entered due to a seismic event (LU-1). No equipment damage has been identified. The seismic event occurred at 1611hrs and tremors were felt in the Control Room. Unit 1 remained at full power and initial plant walkdown identified no safety equipment damage. Plant instrumentation indicated an acceleration of 0.005 Gs. Per U.S. Geological Survey website the quake was a 3.4 on the Richter scale and occurred NNW of the site. There is a small likelihood of after shocks. No radioactive releases have occurred.

  • * * UPDATE ON 06/20/06 AT 2019 EDT FROM JEFFREY D. ANDERSON TO M. RIPLEY * * *

Perry Plant has completed walkdowns from the Seismic Event that occurred at 1611. No Plant problems identified from walkdowns. Unusual Event has been terminated at 2000 on 6/20/06. The licensee notified the NRC Resident Inspector, State and local officials. Notified NRR (M. Case), IRD (Wilson), R3DO (O'Brien), DHS (Fite) and FEMA (Casto).