Line 16: | Line 16: | ||
| event date = 12/06/2007 20:44 CST | | event date = 12/06/2007 20:44 CST | ||
| last update date = 12/07/2007 | | last update date = 12/07/2007 | ||
| title = Unplanned Safety System Actuation | | title = Unplanned Safety System Actuation and Contamination Event | ||
| event text = On 12/06/2007 at 2042 [CST] C-337 unit 5 cell 5 was being charged and placed on stream and had just gone above atmospheric pressure. At 2044 hours two PGLD (process gas leak detection) heads in the C-337 unit 5 cell 5 actuated and would not clear indicating a potential UF6 release. To stop the release the cell was immediately taken back below atmospheric pressure. Investigation revealed that a UF6 release had occurred causing the PGLD actuation. The amount of material released has not yet been determined. | | event text = On 12/06/2007 at 2042 [CST] C-337 unit 5 cell 5 was being charged and placed on stream and had just gone above atmospheric pressure. At 2044 hours two PGLD (process gas leak detection) heads in the C-337 unit 5 cell 5 actuated and would not clear indicating a potential UF6 release. To stop the release the cell was immediately taken back below atmospheric pressure. Investigation revealed that a UF6 release had occurred causing the PGLD actuation. The amount of material released has not yet been determined. | ||
The PGLD heads are Q safety system components. At the time of the incident the cell was operating in a mode which required the system to be operational. This is being reported based on SAR 6.9 Table 1, J2 (unplanned actuation of a Q safety system) and 10 CFR 76.120 (c) (1) (i) (unplanned contamination event). | The PGLD heads are Q safety system components. At the time of the incident the cell was operating in a mode which required the system to be operational. This is being reported based on SAR 6.9 Table 1, J2 (unplanned actuation of a Q safety system) and 10 CFR 76.120 (c) (1) (i) (unplanned contamination event). |
Revision as of 21:15, 1 March 2018
Where | |
---|---|
Paducah Gaseous Diffusion Plant Paducah, Kentucky (NRC Region 2) | |
License number: | Gdp-1 |
Reporting | |
10 CFR 76.120(c)(1) Other Unspec Reqmnt | |
Time - Person (Reporting Time:+13.05 h0.544 days <br />0.0777 weeks <br />0.0179 months <br />) | |
Opened: | Billy Wallace 15:47 Dec 7, 2007 |
NRC Officer: | Howie Crouch |
Last Updated: | Dec 7, 2007 |