ENS 45617: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 01/09/2010 10:28 CST
| event date = 01/09/2010 10:28 CST
| last update date = 01/09/2010
| last update date = 01/09/2010
| title = Automatic Reactor Trip Due To Turbine Trip On Sudden Pressure In Output Transformer
| title = Automatic Reactor Trip Due to Turbine Trip on Sudden Pressure in Output Transformer
| event text = At 1028 CST on the 9th of January, Unit 1 tripped due to turbine trip greater than 50% reactor power.  The turbine trip was caused by a sudden pressure fault of the Unit 1 main generator output transformer (1MT1).
| event text = At 1028 CST on the 9th of January, Unit 1 tripped due to turbine trip greater than 50% reactor power.  The turbine trip was caused by a sudden pressure fault of the Unit 1 main generator output transformer (1MT1).
All systems operated as designed.  All three auxiliary feedwater pumps auto-started as required.  There were no complications noted on the reactor trip.
All systems operated as designed.  All three auxiliary feedwater pumps auto-started as required.  There were no complications noted on the reactor trip.

Latest revision as of 21:10, 1 March 2018

ENS 45617 +/-
Where
Comanche Peak Luminant icon.png
Texas (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-4.23 h-0.176 days <br />-0.0252 weeks <br />-0.00579 months <br />)
Opened: Ed Lessmann
12:14 Jan 9, 2010
NRC Officer: Howie Crouch
Last Updated: Jan 9, 2010
45617 - NRC Website
Loading map...