OPERATINS DATA REPORT DOCKET NO | OPERATINS DATA REPORT DOCKET NO 50-413 DATE December 13. 1996 GPERATING STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 | ||
: 1. Unit Nase: Catawba 1 | : 1. Unit Nase: Catawba 1 | ||
: 2. Reporting Period: November 1, 1996-Novesber 30,1996 | : 2. Reporting Period: November 1, 1996-Novesber 30,1996 | ||
: 3. Licensed Thereal Power (MWt): | : 3. Licensed Thereal Power (MWt): | ||
: 4. Nameplate Rating (Bross NWe): | 3411 | ||
: 3. Design Electrical Rating (Net MWe): | : 4. Nameplate Rating (Bross NWe): | ||
: 6. Maxinus Dependable Capacity (6 toss NWe): | 1305* | ||
: 7. Maximus Dependable Capacity (Net BWe): | Notes aNameplate Rating | ||
: 8. If Changes Dccur in capacity Ratings (Itess Nuaber 3 Through 7) Since Last | : 3. Design Electrical Rating (Net MWe): | ||
!!45 (Bross NWel calculated as | |||
: 6. Maxinus Dependable Capacity (6 toss NWe): | |||
1192 1450.000 MVA x.90 power | |||
: 7. Maximus Dependable Capacity (Net BWe): | |||
1129 factor per Page lit, | |||
: 8. If Changes Dccur in capacity Ratings (Itess Nuaber 3 Through 7) Since Last NURE6-0020. | |||
Report. Give Reasons: | Report. Give Reasons: | ||
: 9. Power Level To Which Restricted, If Any (Net MWe): | : 9. Power Level To Which Restricted, If Any (Net MWe): | ||
: 10. Reason For Restrictions, if any: | : 10. Reason For Restrictions, if any: | ||
This Month | This Month Yr.-to-Date Cuaulative | ||
!!. Hours In Reporting Period 720.0 8040.0 100153.0 | |||
: 12. husber Of Hours Reactor Was Critical | : 12. husber Of Hours Reactor Was Critical 720.0 5246.7 77540.4 | ||
: 13. Reactor Reserve Shutdown Hours | : 13. Reactor Reserve Shutdown Hours | ||
: 14. Hours Generater On-Line | - --0-- | ||
: 15. Unit Reserve Shutdown Hours | --0-- | ||
: 16. Gross Thersal Energy Benerated (MWH) | : 14. Hours Generater On-Line 720.0 5158.2 76246.9 | ||
: 17. Grcss Electrical Energy Generated (MWH) | : 15. Unit Reserve Shutdown Hours - | ||
: 19. Net Electrical Energy Generated (MWH) | --0-- | ||
: 19. Unit Service Factor | --0-- | ||
: 20. Unit Availability Factor | : 16. Gross Thersal Energy Benerated (MWH) 2446374 16595385 248545644 | ||
: 21. Unit Capacity Factor (Using MDC Net) | : 17. Grcss Electrical Energy Generated (MWH) 882695 5944117 87846928 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 19. Net Electrical Energy Generated (MWH) 838082 5500876 B2625965 | ||
: 23. Unit Forced Outage Rate | : 19. Unit Service Factor 100.0 64.2 76.1 | ||
: 20. Unit Availability Factor 100.0 64.2 76.1 | |||
: 21. Unit Capacity Factor (Using MDC Net) 103.1 61.5 72.8 | |||
: 22. Unit Capacity Factor (Using DER Net) 101.7 60.6 72.1 | |||
: 23. Unit Forced Outage Rate 0.0 3.0 7.9 | |||
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh None | : 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh None | ||
: 25. If Shut Down At End Of Report Period. Estinated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estinated Date of Startup: | ||
: 26. Units In Test Status (Prior to Consercial Operation): | : 26. Units In Test Status (Prior to Consercial Operation): | ||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERA'i!0N 9612180040 961213 PDR ADOCK 05000413 R | |||
PDR | |||
OPERAi!NG DATA REPORT DOCKET NO | OPERAi!NG DATA REPORT DOCKET NO 50-413 191[T Catamba i DATE December 13. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH November,1996 | ||
' M1 AVERAGE DAILY POWER LEVEL PAY. | |||
AVERAGE DAILY POWER LEVEL | |||
'(MWe-Net) | |||
(MWe-Net) 1062 17 | |||
3 | !!70 i | ||
s 2 | |||
!!42 18 | |||
8 | !!69 | ||
) | |||
11 | 3 1171 19 | ||
12 | !!67 4 | ||
l | 1171 20 1168 l | ||
i 14 - | 5 1166 21 1168 l | ||
i 6 | |||
1162 22 1171 7 | |||
1157 23 | |||
!!70 l | |||
8 | |||
!!59 24 1168 9 | |||
1171 25 | |||
!!62 10 | |||
!!71 26 1165 11 1171 27 1170 l. | |||
12 1172 28 1172 l | |||
l 13 | |||
!!71 29 | |||
!!72 l | |||
i l | |||
14 - | |||
!!69 30 1170 l | |||
15 | |||
!!71 I | |||
16 1870 I | |||
i i | i i | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | ||
R | 50-413 UNIT NAME CKrantsa 1 DATE 12/13/36 REPORT MONTH November 1996 COMPLETED BY K. | ||
E | A. | ||
Williams TELEPHONE | |||
F Forced | ( > u s ) - 3 ts 2 - d 3 4 6 (1) | ||
D-Regulatory Restriction | (2) | ||
E-Operator Training & License Examination F-Administrative | (3) | ||
(4) | |||
(5) | |||
___~..._.__.___.__.m__ | R MET-E HOD T | ||
A OF LICENSE N | |||
Y S | |||
SHUT EVENT SYS-CAUSE AND CORRECTIVE O | |||
P DURATION O | |||
l | DOWN REPORT TEM COMPONENT ACTION TO DATE E | ||
} | HOURS N | ||
R/X NO. | |||
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) | |||
(2) | |||
(3) | |||
(4) | |||
F Forced Reason-Method: | |||
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER) | |||
D-Regulatory Restriction 4-Other (Explain) | |||
File (NUREG-0161) | |||
E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain) | |||
G-Operator Error H-Other | |||
c. | |||
___~..._.__.___.__.m__ | |||
..____..__.____.m... | |||
i i | |||
MONTHLY REFUELING INFORMATION REOUEST i | |||
1. | |||
Facility name: | |||
Catawba. Unit 1 2. | |||
Scheduled next refueling shutdown: December 1997 l | |||
l 3. | |||
Scheduled restart following refueling: January 1998 1- | |||
} | |||
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF j | |||
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. | |||
5 i | 5 i | ||
i | i 4. | ||
Will refueling or resumption of operation thereafter require a technical specification change or i | |||
i | other license amendment? | ||
Ifyes, what will these be? | |||
i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? | |||
I. | I. | ||
5. | |||
4 | Scheduled date(s) for submitting proposed licensiag action and supporting information. | ||
4 6. | |||
performance analysis methods, significant changes in design or new operating procedures). | Important licensing considerations (new or different design or supplier, unreviewed design or | ||
j | [ | ||
performance analysis methods, significant changes in design or new operating procedures). | |||
Size of requested or planned increase: - | j 7. | ||
Number of Fuel assemblies (a) in the core: J93 I | |||
1 | (b) in the spent fuel pool: #32 8. | ||
j | Present licensed fuel pool capacity: 1418 Size of requested or planned increase: - | ||
y 9. | |||
Projected date oflast refueling which can be accommodated by present license capacity: | |||
4 1 | |||
Scotember 2009 4 | |||
j DUKE POWER COMPANY DATE: December 13.1996 Name of | |||
==Contact:== | ==Contact:== | ||
R. A. Williams | R. A. Williams Phone: (704)- 382-5346 1 | ||
.I 4 | .I 4 | ||
i 1 | i 1 | ||
i | i | ||
,,_..w-_ | |||
i DOCKET: 50-413 UNIT: Catawba 1 Date: 12/13/96 l | |||
DOCKET: 50-413 UNIT: Catawba 1 Date: 12/13/96 l | |||
l NARRATIVE | l NARRATIVE | ||
==SUMMARY== | ==SUMMARY== | ||
MONTH: November,1996 Catawba Unit I began the month of November operating at approximately 57% full power due to "I A" main transformer maintenance. The unit returned to 100% full power on 11/01/96 at 1445, and operated at or near 100% full power the remainder of the month. | MONTH: November,1996 Catawba Unit I began the month of November operating at approximately 57% full power due to "I A" main transformer maintenance. The unit returned to 100% full power on 11/01/96 at 1445, and operated at or near 100% full power the remainder of the month. | ||
l | l Prepared by: R. A. Williams | ||
Prepared by: R. A. Williams | . Telephone: (704)- 382-5346 | ||
.- ~ | |||
5 | 5 | ||
) | ) | ||
OPERATING DATA REPORT DOCKET NO 50-414 I | |||
DOCKET NO | DATE Deceeber 13. 1996 OPERATIN6 STATUS COMPLETED BY R.A. Willians | ||
~ | |||
OPERATIN6 STATUS | c TELEPHONE 704-382-5346 | ||
: l. Unit Nase: Catawba 2 | : l. Unit Nase: Catawba 2 | ||
: 2. Reporting Period: November 1, 1996-November 30,1996 | : 2. Reporting Period: November 1, 1996-November 30,1996 | ||
: 3. Licensed Thereal Power (Mti: | : 3. Licensed Thereal Power (Mti: | ||
3411 | |||
: 4. Naseplate Rating (Bross We): | |||
1305e Notes ~ eNaseplate Rating | |||
~ | ~ | ||
: 5. Design Electrical Rating (Net Hel | |||
: 5. Design Electrical Rating (Net Hel | !!45 (6tess MWe) calculated as | ||
: 6. Maxieue Dependable Capacity (Gross MWel | : 6. Maxieue Dependable Capacity (Gross MWel 1192 1450.000 MA.90 power | ||
: 7. Maxieue Dependable Capacity (Net Me): | : 7. Maxieue Dependable Capacity (Net Me): | ||
factor per Page 111, | !!29 factor per Page 111, | ||
: 8. If Changes occur in Capacity Ratings (itses Nueber 3 Through 7) Since Last | : 8. If Changes occur in Capacity Ratings (itses Nueber 3 Through 7) Since Last HUREB-0020. | ||
Report. Give Reasons: | Report. Give Reasons: | ||
: 9. Power Lsvol To Which Restricted, If Any (Net We): | : 9. Power Lsvol To Which Restricted, If Any (Net We): | ||
j | j | ||
2 This Month | : 10. Reason For Restrictions, if'any: | ||
2 This Month Yr.-to-Date Cueulative | |||
: 12. Nueber Of Hours Reactor Was Critical | !!. Hours In Reporting Period 720.0 8040.0 90169.0 | ||
: 12. Nueber Of Hours Reactor Was Critical 720.0 7592.8 71758.9 | |||
: 14. Hours Benerator On-Line | -13. Reactor Reserve Shutdown Hours - | ||
: 16. Gross Thereal Energy Generated ( WH1 | --0-- | ||
: 17. Gross Electrical Energy Generated (MWH) | --0-- | ||
: 18. Net Electrical Energy Generated (MH) | : 14. Hours Benerator On-Line 720.0 7538.9 70676.6 15.UnitReserveShutdownHours - | ||
: 19. Unit Service Factor | - --0-- | ||
: 20. Unit Availability Factor | : 16. Gross Thereal Energy Generated ( WH1 2411461 25391975 | ||
: 21. Unit Capacity Factor (Using MDC Net) | .229808513 | ||
: 22. Unit Capacity Factor (Using DER Net) | : 17. Gross Electrical Energy Generated (MWH) 865900 9069281 81173648 | ||
: 18. Net Electrical Energy Generated (MH) 823825 8598405 | |||
_76510662 | |||
: 19. Unit Service Factor 100.0 93.8 78.4' | |||
: 20. Unit Availability Factor 100.0 93.8 78.4 | |||
: 21. Unit Capacity Factor (Using MDC Net) | |||
-101.4 94.7 75.0 | |||
: 22. Unit Capacity Factor (Using DER Net) 99.9 93.4 74.1 | |||
'23. Unit Forced Outage Rate 0.0 6.2 8.6 | |||
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | : 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | ||
Refueling - March 14, 1997 - 45 days | Refueling - March 14, 1997 - 45 days | ||
: 25. If Shut Down At End Of Report Period. Estiaated Date of Startup: | : 25. If Shut Down At End Of Report Period. Estiaated Date of Startup: | ||
: 26. Units In Test Status (Prior to Coseercial Operation): | : 26. Units In Test Status (Prior to Coseercial Operation): | ||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERAi!ON l | |||
.. ~ _... | |||
4 | .. ~.. -.. - ~ - | ||
4 T | |||
OPERAi!NG DATA REPORT 4 | 4 OPERAi!NG DATA REPORT 4 | ||
DOCKET NO | DOCKET NO 50-4!4 tlNIT _ | ||
C?+ aba 2 DATE Dvaber 13. 1996 COMPLETED BY R.A. Willines TELEPHONE 704-382-5346-MONTH November. 1996 4 | |||
-E AVERA6E DAILY POWER LEVEL M | |||
AVERA6E DAILY POWER LEVEL 4' | |||
3 | (MWe-Net) | ||
1 | (MWe-Net) i 1162 17' | ||
!!68 2 | |||
1165 18 - | |||
1165 i | |||
3 1168 19 | |||
!!66 4 | |||
1169 20 1167 l | |||
3 | |||
!!67 21 | |||
!!67 1 | |||
-6 | |||
!!62 22 | |||
!!69 7 | |||
!!56 23 | |||
!!63 4 | |||
i 1 | i 1 | ||
8 | 8 1139 24 1152 9 | ||
1160 25 1137 10 1168 26 1147 11 1170 27 | |||
11 | !!63 4 | ||
13 - | i-4 12 1170 28 1165 i | ||
14 | 13 - | ||
1170 29 1166 14 836 30 1167 | |||
f | . 13 942 4 | ||
la 1161 f | |||
f g | |||
r. | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS | UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. | ||
50-414 UNIT NAME tA1:awna z DATE-12/13/96 REPORT MONTH November 1996 COMPLETED BY x. | |||
a. | |||
A | william's TELEPHONE. | ||
EB | (eve)-Juz-das6 (1) | ||
F Forced | (2) | ||
E-Operator Training & License Examination F-Administrative | (3) | ||
(4) | |||
(5) | |||
R MET-E HOD T | |||
A OF LICENSE S | |||
SHUT EVENT SYS-CAUSE AND CORRECTIVE N | |||
Y O | |||
DOWN REPORT TEM COMPONENT ACTION TO O | |||
P DURATION DATE E | |||
HOURS N | |||
R/X NO. | |||
CODE CODE PREVENT RECURRENCE 8-P 96-11-14 F | |||
A EB ELECON "2A" MAIN POWER SWITCHYARD CONNECTOR REPAIR (1) | |||
(2) | |||
(3) | |||
(4) | |||
F Forced Reason: | |||
Method: | |||
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain)' | |||
1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee Event Report (LER (NUREG-0161)) | |||
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain) | |||
File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same source (Explain) (Explain) | |||
G-Operator Error H-Other | |||
- ~. - -. | |||
~ - -.- | |||
\\ | |||
I 4 | I 4 | ||
) | |||
MONTHLY REFUELING INFORMATION REOUEST | MONTHLY REFUELING INFORMATION REOUEST 1. | ||
Facility name: | |||
Catawba. Unit 2 | |||
] | |||
2. | |||
Scheduled next refueling shutdown: March 1997 j | |||
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. | 3. | ||
l | Scheduled restart following refueling: April 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i | ||
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. | |||
i Ifyes, what will these be? | l 4. | ||
If no, has reload design and core configuration been reviewed by Safety Review Committee | Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? | ||
i Ifyes, what will these be? | |||
i If no, has reload design and core configuration been reviewed by Safety Review Committee I | |||
1 | regarding unreviewed safety questions? | ||
) | |||
I | S. | ||
Scheduled date(s) for submitting proposed licensing action and supporting information. | |||
l l | |||
September 2011 DUKE POWER COMPANY | 6. | ||
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). | |||
1 7. | |||
Number of Fuel assemblies (a) in the core: J_3 j | |||
3 (b) in the spent fuel pool: 124 I | |||
8. | |||
Present licensed fuel pool capacity: 1418 i | |||
Size of requested or planned increase: - | |||
J l | |||
9. | |||
Projected date oflast refueling which can be accommodated by present license capacity: | |||
September 2011 DUKE POWER COMPANY DATE: December 13.1996 Name of | |||
==Contact:== | ==Contact:== | ||
R. A. Williams | R. A. Williams Phone: (704)- 382-5346 1 | ||
1 | |||
3 DOCKET: 50-414 UNIT: Catawba 2 | 3 DOCKET: 50-414 UNIT: Catawba 2 | ||
[ | [ | ||
Date: 12/13/96 | Date: 12/13/96 | ||
+ | |||
NARRATIVE | NARRATIVE | ||
==SUMMARY== | ==SUMMARY== | ||
~ | ~ | ||
i MONTH: November,1996 | i MONTH: November,1996 i | ||
100% fullpower until 11/14/96 at 1000, when the unit began decreasing power due to "2A" main power - | Catawba Unit 2 began the month of November operating at 100% full power. The unit operated at or near l | ||
switchyard connector repair. The unit held at 47% power from 11/14/96 at 1520 to 11/15/96 at 0300 due to j "2A" main power switchyard connector repair. The unit returned to 100% full power on 11/15/96 at 1453, | 100% fullpower until 11/14/96 at 1000, when the unit began decreasing power due to "2A" main power - | ||
and operated at or near 100% full power the remainder of the month. | switchyard connector repair. The unit held at 47% power from 11/14/96 at 1520 to 11/15/96 at 0300 due to j | ||
"2A" main power switchyard connector repair. The unit returned to 100% full power on 11/15/96 at 1453, and operated at or near 100% full power the remainder of the month. | |||
I l | I l | ||
i i | i i | ||
i Prepared by: R. A. Williams Telephone: (704)- 382-5346 i | i Prepared by: R. A. Williams Telephone: (704)- 382-5346 i | ||
i}} | |||
Latest revision as of 11:18, 12 December 2024
| ML20132B962 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/30/1996 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20132B958 | List: |
| References | |
| NUDOCS 9612180040 | |
| Download: ML20132B962 (10) | |
Text
OPERATINS DATA REPORT DOCKET NO 50-413 DATE December 13. 1996 GPERATING STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346
- 1. Unit Nase: Catawba 1
- 2. Reporting Period: November 1, 1996-Novesber 30,1996
- 3. Licensed Thereal Power (MWt):
3411
- 4. Nameplate Rating (Bross NWe):
1305*
Notes aNameplate Rating
- 3. Design Electrical Rating (Net MWe):
!!45 (Bross NWel calculated as
- 6. Maxinus Dependable Capacity (6 toss NWe):
1192 1450.000 MVA x.90 power
- 7. Maximus Dependable Capacity (Net BWe):
1129 factor per Page lit,
- 8. If Changes Dccur in capacity Ratings (Itess Nuaber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cuaulative
!!. Hours In Reporting Period 720.0 8040.0 100153.0
- 12. husber Of Hours Reactor Was Critical 720.0 5246.7 77540.4
- 13. Reactor Reserve Shutdown Hours
- --0--
--0--
- 14. Hours Generater On-Line 720.0 5158.2 76246.9
- 15. Unit Reserve Shutdown Hours -
--0--
--0--
- 16. Gross Thersal Energy Benerated (MWH) 2446374 16595385 248545644
- 17. Grcss Electrical Energy Generated (MWH) 882695 5944117 87846928
- 19. Net Electrical Energy Generated (MWH) 838082 5500876 B2625965
- 19. Unit Service Factor 100.0 64.2 76.1
- 20. Unit Availability Factor 100.0 64.2 76.1
- 21. Unit Capacity Factor (Using MDC Net) 103.1 61.5 72.8
- 22. Unit Capacity Factor (Using DER Net) 101.7 60.6 72.1
- 23. Unit Forced Outage Rate 0.0 3.0 7.9
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh None
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units In Test Status (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERA'i!0N 9612180040 961213 PDR ADOCK 05000413 R
OPERAi!NG DATA REPORT DOCKET NO 50-413 191[T Catamba i DATE December 13. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH November,1996
' M1 AVERAGE DAILY POWER LEVEL PAY.
AVERAGE DAILY POWER LEVEL
'(MWe-Net)
(MWe-Net) 1062 17
!!70 i
s 2
!!42 18
!!69
)
3 1171 19
!!67 4
1171 20 1168 l
5 1166 21 1168 l
i 6
1162 22 1171 7
1157 23
!!70 l
8
!!59 24 1168 9
1171 25
!!62 10
!!71 26 1165 11 1171 27 1170 l.
12 1172 28 1172 l
l 13
!!71 29
!!72 l
i l
14 -
!!69 30 1170 l
15
!!71 I
16 1870 I
i i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME CKrantsa 1 DATE 12/13/36 REPORT MONTH November 1996 COMPLETED BY K.
A.
Williams TELEPHONE
( > u s ) - 3 ts 2 - d 3 4 6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
c.
___~..._.__.___.__.m__
..____..__.____.m...
i i
MONTHLY REFUELING INFORMATION REOUEST i
1.
Facility name:
Catawba. Unit 1 2.
Scheduled next refueling shutdown: December 1997 l
l 3.
Scheduled restart following refueling: January 1998 1-
}
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF j
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
5 i
i 4.
Will refueling or resumption of operation thereafter require a technical specification change or i
other license amendment?
Ifyes, what will these be?
i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
I.
5.
Scheduled date(s) for submitting proposed licensiag action and supporting information.
4 6.
Important licensing considerations (new or different design or supplier, unreviewed design or
[
performance analysis methods, significant changes in design or new operating procedures).
j 7.
Number of Fuel assemblies (a) in the core: J93 I
(b) in the spent fuel pool: #32 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
y 9.
Projected date oflast refueling which can be accommodated by present license capacity:
4 1
Scotember 2009 4
j DUKE POWER COMPANY DATE: December 13.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 1
.I 4
i 1
i
,,_..w-_
i DOCKET: 50-413 UNIT: Catawba 1 Date: 12/13/96 l
l NARRATIVE
SUMMARY
MONTH: November,1996 Catawba Unit I began the month of November operating at approximately 57% full power due to "I A" main transformer maintenance. The unit returned to 100% full power on 11/01/96 at 1445, and operated at or near 100% full power the remainder of the month.
l Prepared by: R. A. Williams
. Telephone: (704)- 382-5346
.- ~
5
)
OPERATING DATA REPORT DOCKET NO 50-414 I
DATE Deceeber 13. 1996 OPERATIN6 STATUS COMPLETED BY R.A. Willians
~
c TELEPHONE 704-382-5346
- l. Unit Nase: Catawba 2
- 2. Reporting Period: November 1, 1996-November 30,1996
- 3. Licensed Thereal Power (Mti:
3411
- 4. Naseplate Rating (Bross We):
1305e Notes ~ eNaseplate Rating
~
- 5. Design Electrical Rating (Net Hel
!!45 (6tess MWe) calculated as
- 6. Maxieue Dependable Capacity (Gross MWel 1192 1450.000 MA.90 power
- 7. Maxieue Dependable Capacity (Net Me):
!!29 factor per Page 111,
- 8. If Changes occur in Capacity Ratings (itses Nueber 3 Through 7) Since Last HUREB-0020.
Report. Give Reasons:
- 9. Power Lsvol To Which Restricted, If Any (Net We):
j
- 10. Reason For Restrictions, if'any:
2 This Month Yr.-to-Date Cueulative
!!. Hours In Reporting Period 720.0 8040.0 90169.0
- 12. Nueber Of Hours Reactor Was Critical 720.0 7592.8 71758.9
-13. Reactor Reserve Shutdown Hours -
--0--
--0--
- 14. Hours Benerator On-Line 720.0 7538.9 70676.6 15.UnitReserveShutdownHours -
- --0--
- 16. Gross Thereal Energy Generated ( WH1 2411461 25391975
.229808513
- 17. Gross Electrical Energy Generated (MWH) 865900 9069281 81173648
- 18. Net Electrical Energy Generated (MH) 823825 8598405
_76510662
- 19. Unit Service Factor 100.0 93.8 78.4'
- 20. Unit Availability Factor 100.0 93.8 78.4
- 21. Unit Capacity Factor (Using MDC Net)
-101.4 94.7 75.0
- 22. Unit Capacity Factor (Using DER Net) 99.9 93.4 74.1
'23. Unit Forced Outage Rate 0.0 6.2 8.6
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling - March 14, 1997 - 45 days
- 25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
- 26. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERAi!ON l
.. ~ _...
.. ~.. -.. - ~ -
4 T
4 OPERAi!NG DATA REPORT 4
DOCKET NO 50-4!4 tlNIT _
C?+ aba 2 DATE Dvaber 13. 1996 COMPLETED BY R.A. Willines TELEPHONE 704-382-5346-MONTH November. 1996 4
-E AVERA6E DAILY POWER LEVEL M
AVERA6E DAILY POWER LEVEL 4'
(MWe-Net)
(MWe-Net) i 1162 17'
!!68 2
1165 18 -
1165 i
3 1168 19
!!66 4
1169 20 1167 l
3
!!67 21
!!67 1
-6
!!62 22
!!69 7
!!56 23
!!63 4
i 1
8 1139 24 1152 9
1160 25 1137 10 1168 26 1147 11 1170 27
!!63 4
i-4 12 1170 28 1165 i
13 -
1170 29 1166 14 836 30 1167
. 13 942 4
la 1161 f
f g
r.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME tA1:awna z DATE-12/13/96 REPORT MONTH November 1996 COMPLETED BY x.
a.
william's TELEPHONE.
(eve)-Juz-das6 (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE S
SHUT EVENT SYS-CAUSE AND CORRECTIVE N
Y O
DOWN REPORT TEM COMPONENT ACTION TO O
P DURATION DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 8-P 96-11-14 F
A EB ELECON "2A" MAIN POWER SWITCHYARD CONNECTOR REPAIR (1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain)'
1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee Event Report (LER (NUREG-0161))
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same source (Explain) (Explain)
G-Operator Error H-Other
- ~. - -.
~ - -.-
\\
I 4
)
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
Catawba. Unit 2
]
2.
Scheduled next refueling shutdown: March 1997 j
3.
Scheduled restart following refueling: April 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
l 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
i Ifyes, what will these be?
i If no, has reload design and core configuration been reviewed by Safety Review Committee I
regarding unreviewed safety questions?
)
S.
Scheduled date(s) for submitting proposed licensing action and supporting information.
l l
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
1 7.
Number of Fuel assemblies (a) in the core: J_3 j
3 (b) in the spent fuel pool: 124 I
8.
Present licensed fuel pool capacity: 1418 i
Size of requested or planned increase: -
J l
9.
Projected date oflast refueling which can be accommodated by present license capacity:
September 2011 DUKE POWER COMPANY DATE: December 13.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 1
3 DOCKET: 50-414 UNIT: Catawba 2
[
Date: 12/13/96
+
NARRATIVE
SUMMARY
~
i MONTH: November,1996 i
Catawba Unit 2 began the month of November operating at 100% full power. The unit operated at or near l
100% fullpower until 11/14/96 at 1000, when the unit began decreasing power due to "2A" main power -
switchyard connector repair. The unit held at 47% power from 11/14/96 at 1520 to 11/15/96 at 0300 due to j
"2A" main power switchyard connector repair. The unit returned to 100% full power on 11/15/96 at 1453, and operated at or near 100% full power the remainder of the month.
I l
i i
i Prepared by: R. A. Williams Telephone: (704)- 382-5346 i
i