OPERATINS DATA REPORT DOCKET NO         50-413 DATE December 13. 1996 GPERATING STATUS                                                                       COMPLETED BY     R.A. Williams TELEPHONE     704-382-5346
OPERATINS DATA REPORT DOCKET NO 50-413 DATE December 13. 1996 GPERATING STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346
: 1. Unit Nase: Catawba 1
: 1. Unit Nase: Catawba 1
: 2. Reporting Period: November 1, 1996-Novesber 30,1996
: 2. Reporting Period: November 1, 1996-Novesber 30,1996
: 3. Licensed Thereal Power (MWt):             3411
: 3. Licensed Thereal Power (MWt):
: 4. Nameplate Rating (Bross NWe):             1305*                                     Notes aNameplate Rating
3411
: 3. Design Electrical Rating (Net MWe):             !!45                                 (Bross NWel calculated as           l
: 4. Nameplate Rating (Bross NWe):
: 6. Maxinus Dependable Capacity (6 toss NWe):       1192                                 1450.000 MVA x .90 power           ;
1305*
: 7. Maximus Dependable Capacity (Net BWe):         1129                                 factor per Page lit,
Notes aNameplate Rating
: 8. If Changes Dccur in capacity Ratings (Itess Nuaber 3 Through 7) Since Last           NURE6-0020.
: 3. Design Electrical Rating (Net MWe):
!!45 (Bross NWel calculated as
: 6. Maxinus Dependable Capacity (6 toss NWe):
1192 1450.000 MVA x.90 power
: 7. Maximus Dependable Capacity (Net BWe):
1129 factor per Page lit,
: 8. If Changes Dccur in capacity Ratings (Itess Nuaber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
Report. Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 10. Reason For Restrictions, if any:
: 10. Reason For Restrictions, if any:
This Month     Yr.-to-Date       Cuaulative
This Month Yr.-to-Date Cuaulative
    !!. Hours In Reporting Period                                                       720.0           8040.0         100153.0
!!. Hours In Reporting Period 720.0 8040.0 100153.0
: 12. husber Of Hours Reactor Was Critical                                           720.0           5246.7         77540.4
: 12. husber Of Hours Reactor Was Critical 720.0 5246.7 77540.4
: 13. Reactor Reserve Shutdown Hours                                                   -           --0--           --0--
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generater On-Line                                                         720.0           5158.2         76246.9
- --0--
: 15. Unit Reserve Shutdown Hours                                                     -           --0--           --0--
--0--
: 16. Gross Thersal Energy Benerated (MWH)                                         2446374       16595385       248545644
: 14. Hours Generater On-Line 720.0 5158.2 76246.9
: 17. Grcss Electrical Energy Generated (MWH)                                       882695         5944117         87846928
: 15. Unit Reserve Shutdown Hours -
: 19. Net Electrical Energy Generated (MWH)                                         838082         5500876         B2625965
--0--
: 19. Unit Service Factor                                                             100.0           64.2             76.1
--0--
: 20. Unit Availability Factor                                                       100.0             64.2             76.1
: 16. Gross Thersal Energy Benerated (MWH) 2446374 16595385 248545644
: 21. Unit Capacity Factor (Using MDC Net)                                             103.1           61.5             72.8
: 17. Grcss Electrical Energy Generated (MWH) 882695 5944117 87846928
: 22. Unit Capacity Factor (Using DER Net)                                           101.7             60.6             72.1
: 19. Net Electrical Energy Generated (MWH) 838082 5500876 B2625965
: 23. Unit Forced Outage Rate                                                           0.0             3.0             7.9
: 19. Unit Service Factor 100.0 64.2 76.1
: 20. Unit Availability Factor 100.0 64.2 76.1
: 21. Unit Capacity Factor (Using MDC Net) 103.1 61.5 72.8
: 22. Unit Capacity Factor (Using DER Net) 101.7 60.6 72.1
: 23. Unit Forced Outage Rate 0.0 3.0 7.9
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh None
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh None
: 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
: 26. Units In Test Status (Prior to Consercial Operation):                                         Forecast       Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERA'i!0N 9612180040 961213 PDR     ADOCK 05000413 R                           PDR
: 26. Units In Test Status (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERA'i!0N 9612180040 961213 PDR ADOCK 05000413 R
PDR


OPERAi!NG DATA REPORT DOCKET NO       50-413 191[T   Catamba i DATE December 13. 1996 COMPLETED BY R.A. Williams TELEPHONE   704-382-5346 MONTH       November,1996
OPERAi!NG DATA REPORT DOCKET NO 50-413 191[T Catamba i DATE December 13. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH November,1996
        ' M1           AVERAGE DAILY POWER LEVEL             PAY.         AVERAGE DAILY POWER LEVEL
' M1 AVERAGE DAILY POWER LEVEL PAY.
                                  '(MWe-Net)                                         (MWe-Net)
AVERAGE DAILY POWER LEVEL
            !                        1062                       17                     !!70                                       i s
'(MWe-Net)
2                        !!42                       18                     !!69                                       )
(MWe-Net) 1062 17
3                       1171                       19                     !!67                                       '
!!70 i
4                        1171                       20                     1168                                       l 5                       1166                       21                     1168                                       l i
s 2
6                        1162                       22                     1171 7                       1157                       23                     !!70 l
!!42 18
8                       !!59                       24                     1168 9                       1171                       25                     !!62                                       .
!!69
10                        !!71                       26                     1165                                       .
)
11                       1171                       27                     1170 l.
3 1171 19
12                       1172                       28                     1172 l
!!67 4
l         13                       !!71                       29                     !!72 l
1171 20 1168 l
i 14 -                     !!69                       30                     1170 l
5 1166 21 1168 l
l          15                       !!71 I
i 6
!          16                       1870 I
1162 22 1171 7
1157 23
!!70 l
8
!!59 24 1168 9
1171 25
!!62 10
!!71 26 1165 11 1171 27 1170 l.
12 1172 28 1172 l
l 13
!!71 29
!!72 l
i l
14 -
!!69 30 1170 l
15
!!71 I
16 1870 I
i i
i i


UNIT SHUTDOWNS AND POWER REDUCTIONS                             DOCKET NO. 50-413 UNIT NAME CKrantsa 1 DATE 12/13/36 REPORT MONTH       November 1996                             COMPLETED BY   K.       A.         Williams TELEPHONE   ( > u s ) - 3 ts 2 - d 3 4 6 (1)                                             (2) (3)             (4)         (5)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
R   MET-                                                                                                 -
50-413 UNIT NAME CKrantsa 1 DATE 12/13/36 REPORT MONTH November 1996 COMPLETED BY K.
E   HOD T                                             A   OF   LICENSE N               Y                                             S   SHUT EVENT     SYS-                                     CAUSE AND CORRECTIVE O               P   DURATION                                   O   DOWN REPORT   TEM COMPONENT                                 ACTION TO
A.
    . DATE       E   HOURS                                     N   R/X   NO.     CODE   CODE                               PREVENT RECURRENCE NO SHUTDOWNS                                   OR     REDUCTION S (1)           (2)                                                                           (3)                                     (4)
Williams TELEPHONE
F Forced     Reason-                                                                       Method:                                 Exhibit G - Instructions S Scheduled   A-Equipment Failure (Explain)                                                 1-Manual                               for Preparation of Data B-Maintenance or test                                                         2-Manual Scram                         Ent y Sneets For Licensee C-Refueling                                                                   3-Automatic Scram                       Event Report (LER)
( > u s ) - 3 ts 2 - d 3 4 6 (1)
D-Regulatory Restriction                                                       4-Other (Explain)                       File (NUREG-0161)
(2)
E-Operator Training & License Examination F-Administrative                                                                                                     (5)
(3)
G-Operator Error                                                                                                      Exhibit I - Same Source H-Other (Explain) (Explain)
(4)
: c.     . _ _ _ _ . _ . _ . _ _ . . . . . _
(5)
___~..._.__.___.__.m__                                         . ..____..__.____.m...       ._
R MET-E HOD T
                .                                                                                                                                        i i
A OF LICENSE N
i MONTHLY REFUELING INFORMATION REOUEST
Y S
: 1.         Facility name:       Catawba. Unit 1                                                                           '
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
: 2.         Scheduled next refueling shutdown: December 1997 l
P DURATION O
l                             3.         Scheduled restart following refueling: January 1998 1-
DOWN REPORT TEM COMPONENT ACTION TO DATE E
}                                         THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF                                               j ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
 
c.
___~..._.__.___.__.m__
..____..__.____.m...
i i
MONTHLY REFUELING INFORMATION REOUEST i
1.
Facility name:
Catawba. Unit 1 2.
Scheduled next refueling shutdown: December 1997 l
l 3.
Scheduled restart following refueling: January 1998 1-
}
THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF j
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
5 i
5 i
i                             4.         Will refueling or resumption of operation thereafter require a technical specification change or i                                         other license amendment?
i 4.
:                                          Ifyes, what will these be?                                                                                     '
Will refueling or resumption of operation thereafter require a technical specification change or i
i                                         If no, has reload design and core configuration been reviewed by Safety Review Committee
other license amendment?
!'                                        regarding unreviewed safety questions?
Ifyes, what will these be?
i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
I.
I.
: 5.         Scheduled date(s) for submitting proposed licensiag action and supporting information.
5.
4
Scheduled date(s) for submitting proposed licensiag action and supporting information.
!                              6.         Important licensing considerations (new or different design or supplier, unreviewed design or                   [
4 6.
performance analysis methods, significant changes in design or new operating procedures).                       :
Important licensing considerations (new or different design or supplier, unreviewed design or
j                             7.         Number of Fuel assemblies                 (a)     in the core: J93                                           I (b)     in the spent fuel pool: #32                                 -
[
;                                8.       Present licensed fuel pool capacity: 1418 y
performance analysis methods, significant changes in design or new operating procedures).
Size of requested or planned increase: -
j 7.
4                              9.         Projected date oflast refueling which can be accommodated by present license capacity:
Number of Fuel assemblies (a) in the core: J93 I
1                                         Scotember 2009 4
(b) in the spent fuel pool: #32 8.
j                               DUKE POWER COMPANY                                             DATE: December 13.1996 Name of
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
y 9.
Projected date oflast refueling which can be accommodated by present license capacity:
4 1
Scotember 2009 4
j DUKE POWER COMPANY DATE: December 13.1996 Name of


==Contact:==
==Contact:==
R. A. Williams                 Phone: (704)- 382-5346 1
R. A. Williams Phone: (704)- 382-5346 1
.I 4
.I 4
i 1
i 1
i
i
        ,                __                                        ,,_..w-_     -_ . . . . ,      . , _ _ _,                                  , _ ,
,,_..w-_


        .                                                                                                            i l
i DOCKET: 50-413 UNIT: Catawba 1 Date: 12/13/96 l
DOCKET: 50-413 UNIT: Catawba 1 Date: 12/13/96 l
l NARRATIVE  
l NARRATIVE  


==SUMMARY==
==SUMMARY==
MONTH: November,1996 Catawba Unit I began the month of November operating at approximately 57% full power due to "I A" main transformer maintenance. The unit returned to 100% full power on 11/01/96 at 1445, and operated at or near 100% full power the remainder of the month.
MONTH: November,1996 Catawba Unit I began the month of November operating at approximately 57% full power due to "I A" main transformer maintenance. The unit returned to 100% full power on 11/01/96 at 1445, and operated at or near 100% full power the remainder of the month.
l l
l Prepared by: R. A. Williams
Prepared by: R. A. Williams
. Telephone: (704)- 382-5346
          . Telephone: (704)- 382-5346 I


                    .-      . .    . . . .      . - - .-.                    -  .- ~     -.- -                    --              . .      - . -
.- ~
5
5
)
)
l OPERATING DATA REPORT                                                                     I l
OPERATING DATA REPORT DOCKET NO 50-414 I
DOCKET NO           50-414                 I DATE Deceeber 13. 1996               !
DATE Deceeber 13. 1996 OPERATIN6 STATUS COMPLETED BY R.A. Willians
                                                                                                                                            ~
~
OPERATIN6 STATUS                                                                                               R.A. Willians COMPLETED BY                                    l c                                                                                                           TELEPHONE     704-382-5346
c TELEPHONE 704-382-5346
: l. Unit Nase: Catawba 2
: l. Unit Nase: Catawba 2
: 2. Reporting Period: November 1, 1996-November 30,1996
: 2. Reporting Period: November 1, 1996-November 30,1996
: 3. Licensed Thereal Power (Mti:                 3411
: 3. Licensed Thereal Power (Mti:
3411
: 4. Naseplate Rating (Bross We):
1305e Notes ~ eNaseplate Rating
~
~
: 4. Naseplate Rating (Bross We):                  1305e                                      Notes ~ eNaseplate Rating
: 5. Design Electrical Rating (Net Hel
: 5. Design Electrical Rating (Net Hel                   !!45                                 (6tess MWe) calculated as
!!45 (6tess MWe) calculated as
: 6. Maxieue Dependable Capacity (Gross MWel             1192                                 1450.000 MA .90 power
: 6. Maxieue Dependable Capacity (Gross MWel 1192 1450.000 MA.90 power
: 7. Maxieue Dependable Capacity (Net Me):               !!29                   .
: 7. Maxieue Dependable Capacity (Net Me):
factor per Page 111,
!!29 factor per Page 111,
: 8. If Changes occur in Capacity Ratings (itses Nueber 3 Through 7) Since Last               HUREB-0020.
: 8. If Changes occur in Capacity Ratings (itses Nueber 3 Through 7) Since Last HUREB-0020.
Report. Give Reasons:
Report. Give Reasons:
: 9. Power Lsvol To Which Restricted, If Any (Net We):
: 9. Power Lsvol To Which Restricted, If Any (Net We):
j         10. Reason For Restrictions, if'any:
j
2 This Month         Yr.-to-Date         Cueulative
: 10. Reason For Restrictions, if'any:
          !!. Hours In Reporting Period                                                           720.0             8040.0           90169.0
2 This Month Yr.-to-Date Cueulative
: 12. Nueber Of Hours Reactor Was Critical                                               720.0             7592.8           71758.9
!!. Hours In Reporting Period 720.0 8040.0 90169.0
        -13. Reactor Reserve Shutdown Hours                                                       -               --0--             --0--
: 12. Nueber Of Hours Reactor Was Critical 720.0 7592.8 71758.9
: 14. Hours Benerator On-Line                                                             720.0             7538.9           70676.6 15.UnitReserveShutdownHours                                                             -               -             --0--
-13. Reactor Reserve Shutdown Hours -
: 16. Gross Thereal Energy Generated ( WH1                                           2411461             25391975       .229808513
--0--
: 17. Gross Electrical Energy Generated (MWH)                                           865900             9069281         81173648
--0--
: 18. Net Electrical Energy Generated (MH)                                               823825           8598405         _76510662           ,
: 14. Hours Benerator On-Line 720.0 7538.9 70676.6 15.UnitReserveShutdownHours -
: 19. Unit Service Factor                                                                 100.0               93.8               78.4'         l
- --0--
: 20. Unit Availability Factor                                                             100.0               93.8             78.4
: 16. Gross Thereal Energy Generated ( WH1 2411461 25391975
: 21. Unit Capacity Factor (Using MDC Net)                                               -101.4               94.7               75.0
.229808513
: 22. Unit Capacity Factor (Using DER Net)                                                 99.9               93.4             74.1           ,
: 17. Gross Electrical Energy Generated (MWH) 865900 9069281 81173648
        '23. Unit Forced Outage Rate                                                                 0.0               6.2                 8.6
: 18. Net Electrical Energy Generated (MH) 823825 8598405
_76510662
: 19. Unit Service Factor 100.0 93.8 78.4'
: 20. Unit Availability Factor 100.0 93.8 78.4
: 21. Unit Capacity Factor (Using MDC Net)
-101.4 94.7 75.0
: 22. Unit Capacity Factor (Using DER Net) 99.9 93.4 74.1
'23. Unit Forced Outage Rate 0.0 6.2 8.6
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling - March 14, 1997 - 45 days
Refueling - March 14, 1997 - 45 days
: 25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
: 25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
: 26. Units In Test Status (Prior to Coseercial Operation):                                                 Forecast         Achieved INITIAL CRITICALITY INITIAL ELECTRICITY
: 26. Units In Test Status (Prior to Coseercial Operation):
,                                    COMERCIAL OPERAi!ON l
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERAi!ON l


.          . . ~ _ . . .       .  .....        .    .- .. ~. . - . . - ~ -             . . . _ . - . - -.                    .- . . . . . -          .- ,
.. ~ _...
4                   .        .
.. ~.. -.. - ~ -
T 4
4 T
OPERAi!NG DATA REPORT 4
4 OPERAi!NG DATA REPORT 4
DOCKET NO             50-4!4 tlNIT _       C?+ aba 2 DATE Dvaber 13. 1996 COMPLETED BY       R.A. Willines TELEPHONE       704-382-5346-MONTH             November. 1996 4
DOCKET NO 50-4!4 tlNIT _
4'
C?+ aba 2 DATE Dvaber 13. 1996 COMPLETED BY R.A. Willines TELEPHONE 704-382-5346-MONTH November. 1996 4
        -E                   AVERA6E DAILY POWER LEVEL                       M         AVERA6E DAILY POWER LEVEL (MWe-Net)                                                     (MWe-Net) i                             1162                             17'                               !!68                                         ;
-E AVERA6E DAILY POWER LEVEL M
2                              1165                             18 -                               1165 i
AVERA6E DAILY POWER LEVEL 4'
3                               1168                             19                                 !!66 4                             1169                             20                                 1167                                       l 3                               !!67                             21                                 !!67                                       <
(MWe-Net)
1                                                                                                                                                           ,
(MWe-Net) i 1162 17'
          -6                               !!62                             22                                 !!69 4
!!68 2
7                              !!56                             23                                 !!63                                       ,
1165 18 -
1165 i
3 1168 19
!!66 4
1169 20 1167 l
3
!!67 21
!!67 1
-6
!!62 22
!!69 7
!!56 23
!!63 4
i 1
i 1
8                               1139                             24                                 1152
8 1139 24 1152 9
,          9                              1160                             25                                 1137 10                               1168                             26                                 1147 4
1160 25 1137 10 1168 26 1147 11 1170 27
11                               1170                             27                                 !!63 i-4 12                               1170                             28                                 1165 i
!!63 4
13 -                             1170                             29                                 1166                                         !
i-4 12 1170 28 1165 i
14                               836                             30                                 1167
13 -
        . 13                               942 4         la                               1161 f
1170 29 1166 14 836 30 1167
f l
. 13 942 4
g        *          ,      . . ,          -.. r. ,..                                    . _ - . - .
la 1161 f
f g
r.


UNIT SHUTDOWNS AND POWER REDUCTIONS                                                             DOCKET NO.                 50-414 UNIT NAME tA1:awna z DATE- 12/13/96 REPORT MONTH                                                       November 1996             COMPLETED BY x. a. william's TELEPHONE. (eve)-Juz-das6 (1)                                   (2)                 (3)                                               (4)     (5)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
* R                 MET-E                 HOD T                                     A                 OF                                       LICENSE N                Y                                  - S                 SHUT                                     EVENT     SYS-                   CAUSE AND CORRECTIVE O               P                DURATION            O                  DOWN                                     REPORT   TEM COMPONENT               ACTION TO
50-414 UNIT NAME tA1:awna z DATE-12/13/96 REPORT MONTH November 1996 COMPLETED BY x.
    . DATE       E                         HOURS     N                 R/X                                       NO.     CODE   CODE             PREVENT RECURRENCE 8-P 96-11-14     F                               --
a.
A                       --
william's TELEPHONE.
EB   ELECON   "2A" MAIN POWER SWITCHYARD CONNECTOR REPAIR (1)           (2)                                                                                                                   (3)                   (4)
(eve)-Juz-das6 (1)
F Forced       Reason:                                                                                                               Method:                   Exhibit G - Instructions S Scheduled   A-Equipment Failure (Explain)'                                                                                         1-Manual                   for Preparation of Data B-Maintenance or test                                                                                                 2-Manual Scram           Ent Event Report (LER W Sneets For Licensee C-Refueling                                                                                                           3-Automatic Scram D-Regulatory Restriction                                                                                               4-Other (Explain)         File (NUREG-0161))
(2)
E-Operator Training & License Examination F-Administrative                                                                                                                           (5)
(3)
G-Operator Error                                                                                                                                Exhibit I - Same source H-Other (Explain) (Explain)
(4)
(5)
R MET-E HOD T
A OF LICENSE S
SHUT EVENT SYS-CAUSE AND CORRECTIVE N
Y O
DOWN REPORT TEM COMPONENT ACTION TO O
P DURATION DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 8-P 96-11-14 F
A EB ELECON "2A" MAIN POWER SWITCHYARD CONNECTOR REPAIR (1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain)'
1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee Event Report (LER (NUREG-0161))
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same source (Explain) (Explain)
G-Operator Error H-Other


_ _ _ .  .      -.        .. .. -      - ~ . - - .           - . . - . .      . -        . ..-            ~ - - .-     - - - . - _ - ,
- ~. - -.
                                                                                                                                            \
~ - -.-
\\
I 4
I 4
                                                                                                                                            )
)
MONTHLY REFUELING INFORMATION REOUEST
MONTHLY REFUELING INFORMATION REOUEST 1.
: 1.     Facility name:       Catawba. Unit 2
Facility name:
                                                                                                                                          ]
Catawba. Unit 2
: 2.     Scheduled next refueling shutdown: March 1997                                                                     j
]
: 3.     Scheduled restart following refueling: April 1997                                                                 ;
2.
l THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF                                               i ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4                                                     >
Scheduled next refueling shutdown: March 1997 j
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
3.
l
Scheduled restart following refueling: April 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i
: 4.     Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
i Ifyes, what will these be?                                                                                       i l
l 4.
If no, has reload design and core configuration been reviewed by Safety Review Committee                         I regarding unreviewed safety questions?                                                                           )
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
l S.     Scheduled date(s) for submitting proposed licensing action and supporting information.                           l l
i Ifyes, what will these be?
: 6.     Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
i If no, has reload design and core configuration been reviewed by Safety Review Committee I
1
regarding unreviewed safety questions?
: 7.     Number of Fuel assemblies           (a)       in the core: J_33                                                j (b)       in the spent fuel pool: 124                                       ;
)
I
S.
: 8. Present licensed fuel pool capacity: 1418                                                                         i Size of requested or planned increase: -                                                                         J l
Scheduled date(s) for submitting proposed licensing action and supporting information.
: 9.     Projected date oflast refueling which can be accommodated by present license capacity:
l l
September 2011 DUKE POWER COMPANY                                   DATE: December 13.1996 Name of
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
1 7.
Number of Fuel assemblies (a) in the core: J_3 j
3 (b) in the spent fuel pool: 124 I
8.
Present licensed fuel pool capacity: 1418 i
Size of requested or planned increase: -
J l
9.
Projected date oflast refueling which can be accommodated by present license capacity:
September 2011 DUKE POWER COMPANY DATE: December 13.1996 Name of


==Contact:==
==Contact:==
R. A. Williams           Phone: (704)- 382-5346 l
R. A. Williams Phone: (704)- 382-5346 1
1


3 DOCKET: 50-414 UNIT: Catawba 2
3 DOCKET: 50-414 UNIT: Catawba 2
[
[
Date: 12/13/96
Date: 12/13/96
                                                                                                                +
+
NARRATIVE  
NARRATIVE  


==SUMMARY==
==SUMMARY==
  ~
  ~
i MONTH: November,1996                                                                                     i Catawba Unit 2 began the month of November operating at 100% full power. The unit operated at or near l
i MONTH: November,1996 i
100% fullpower until 11/14/96 at 1000, when the unit began decreasing power due to "2A" main power -     !
Catawba Unit 2 began the month of November operating at 100% full power. The unit operated at or near l
switchyard connector repair. The unit held at 47% power from 11/14/96 at 1520 to 11/15/96 at 0300 due to j "2A" main power switchyard connector repair. The unit returned to 100% full power on 11/15/96 at 1453,   !
100% fullpower until 11/14/96 at 1000, when the unit began decreasing power due to "2A" main power -
and operated at or near 100% full power the remainder of the month.
switchyard connector repair. The unit held at 47% power from 11/14/96 at 1520 to 11/15/96 at 0300 due to j
"2A" main power switchyard connector repair. The unit returned to 100% full power on 11/15/96 at 1453, and operated at or near 100% full power the remainder of the month.
I l
I l
i i
i i
i Prepared by: R. A. Williams Telephone: (704)- 382-5346 i
i Prepared by: R. A. Williams Telephone: (704)- 382-5346 i
l i}}
i}}

Latest revision as of 11:18, 12 December 2024

Monthly Operating Repts for Nov 1996 for Catawba Nuclear Station Units 1 & 2
ML20132B962
Person / Time
Site: Catawba  
Issue date: 11/30/1996
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20132B958 List:
References
NUDOCS 9612180040
Download: ML20132B962 (10)


Text

OPERATINS DATA REPORT DOCKET NO 50-413 DATE December 13. 1996 GPERATING STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346

1. Unit Nase: Catawba 1
2. Reporting Period: November 1, 1996-Novesber 30,1996
3. Licensed Thereal Power (MWt):

3411

4. Nameplate Rating (Bross NWe):

1305*

Notes aNameplate Rating

3. Design Electrical Rating (Net MWe):

!!45 (Bross NWel calculated as

6. Maxinus Dependable Capacity (6 toss NWe):

1192 1450.000 MVA x.90 power

7. Maximus Dependable Capacity (Net BWe):

1129 factor per Page lit,

8. If Changes Dccur in capacity Ratings (Itess Nuaber 3 Through 7) Since Last NURE6-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, if any:

This Month Yr.-to-Date Cuaulative

!!. Hours In Reporting Period 720.0 8040.0 100153.0

12. husber Of Hours Reactor Was Critical 720.0 5246.7 77540.4
13. Reactor Reserve Shutdown Hours

- --0--

--0--

14. Hours Generater On-Line 720.0 5158.2 76246.9
15. Unit Reserve Shutdown Hours -

--0--

--0--

16. Gross Thersal Energy Benerated (MWH) 2446374 16595385 248545644
17. Grcss Electrical Energy Generated (MWH) 882695 5944117 87846928
19. Net Electrical Energy Generated (MWH) 838082 5500876 B2625965
19. Unit Service Factor 100.0 64.2 76.1
20. Unit Availability Factor 100.0 64.2 76.1
21. Unit Capacity Factor (Using MDC Net) 103.1 61.5 72.8
22. Unit Capacity Factor (Using DER Net) 101.7 60.6 72.1
23. Unit Forced Outage Rate 0.0 3.0 7.9
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh None
25. If Shut Down At End Of Report Period. Estinated Date of Startup:
26. Units In Test Status (Prior to Consercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERA'i!0N 9612180040 961213 PDR ADOCK 05000413 R

PDR

OPERAi!NG DATA REPORT DOCKET NO 50-413 191[T Catamba i DATE December 13. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH November,1996

' M1 AVERAGE DAILY POWER LEVEL PAY.

AVERAGE DAILY POWER LEVEL

'(MWe-Net)

(MWe-Net) 1062 17

!!70 i

s 2

!!42 18

!!69

)

3 1171 19

!!67 4

1171 20 1168 l

5 1166 21 1168 l

i 6

1162 22 1171 7

1157 23

!!70 l

8

!!59 24 1168 9

1171 25

!!62 10

!!71 26 1165 11 1171 27 1170 l.

12 1172 28 1172 l

l 13

!!71 29

!!72 l

i l

14 -

!!69 30 1170 l

15

!!71 I

16 1870 I

i i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-413 UNIT NAME CKrantsa 1 DATE 12/13/36 REPORT MONTH November 1996 COMPLETED BY K.

A.

Williams TELEPHONE

( > u s ) - 3 ts 2 - d 3 4 6 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)

G-Operator Error H-Other

c.

___~..._.__.___.__.m__

..____..__.____.m...

i i

MONTHLY REFUELING INFORMATION REOUEST i

1.

Facility name:

Catawba. Unit 1 2.

Scheduled next refueling shutdown: December 1997 l

l 3.

Scheduled restart following refueling: January 1998 1-

}

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF j

ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

5 i

i 4.

Will refueling or resumption of operation thereafter require a technical specification change or i

other license amendment?

Ifyes, what will these be?

i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

I.

5.

Scheduled date(s) for submitting proposed licensiag action and supporting information.

4 6.

Important licensing considerations (new or different design or supplier, unreviewed design or

[

performance analysis methods, significant changes in design or new operating procedures).

j 7.

Number of Fuel assemblies (a) in the core: J93 I

(b) in the spent fuel pool: #32 8.

Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -

y 9.

Projected date oflast refueling which can be accommodated by present license capacity:

4 1

Scotember 2009 4

j DUKE POWER COMPANY DATE: December 13.1996 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 1

.I 4

i 1

i

,,_..w-_

i DOCKET: 50-413 UNIT: Catawba 1 Date: 12/13/96 l

l NARRATIVE

SUMMARY

MONTH: November,1996 Catawba Unit I began the month of November operating at approximately 57% full power due to "I A" main transformer maintenance. The unit returned to 100% full power on 11/01/96 at 1445, and operated at or near 100% full power the remainder of the month.

l Prepared by: R. A. Williams

. Telephone: (704)- 382-5346

.- ~

5

)

OPERATING DATA REPORT DOCKET NO 50-414 I

DATE Deceeber 13. 1996 OPERATIN6 STATUS COMPLETED BY R.A. Willians

~

c TELEPHONE 704-382-5346

l. Unit Nase: Catawba 2
2. Reporting Period: November 1, 1996-November 30,1996
3. Licensed Thereal Power (Mti:

3411

4. Naseplate Rating (Bross We):

1305e Notes ~ eNaseplate Rating

~

5. Design Electrical Rating (Net Hel

!!45 (6tess MWe) calculated as

6. Maxieue Dependable Capacity (Gross MWel 1192 1450.000 MA.90 power
7. Maxieue Dependable Capacity (Net Me):

!!29 factor per Page 111,

8. If Changes occur in Capacity Ratings (itses Nueber 3 Through 7) Since Last HUREB-0020.

Report. Give Reasons:

9. Power Lsvol To Which Restricted, If Any (Net We):

j

10. Reason For Restrictions, if'any:

2 This Month Yr.-to-Date Cueulative

!!. Hours In Reporting Period 720.0 8040.0 90169.0

12. Nueber Of Hours Reactor Was Critical 720.0 7592.8 71758.9

-13. Reactor Reserve Shutdown Hours -

--0--

--0--

14. Hours Benerator On-Line 720.0 7538.9 70676.6 15.UnitReserveShutdownHours -

- --0--

16. Gross Thereal Energy Generated ( WH1 2411461 25391975

.229808513

17. Gross Electrical Energy Generated (MWH) 865900 9069281 81173648
18. Net Electrical Energy Generated (MH) 823825 8598405

_76510662

19. Unit Service Factor 100.0 93.8 78.4'
20. Unit Availability Factor 100.0 93.8 78.4
21. Unit Capacity Factor (Using MDC Net)

-101.4 94.7 75.0

22. Unit Capacity Factor (Using DER Net) 99.9 93.4 74.1

'23. Unit Forced Outage Rate 0.0 6.2 8.6

24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling - March 14, 1997 - 45 days

25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
26. Units In Test Status (Prior to Coseercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERAi!ON l

.. ~ _...

.. ~.. -.. - ~ -

4 T

4 OPERAi!NG DATA REPORT 4

DOCKET NO 50-4!4 tlNIT _

C?+ aba 2 DATE Dvaber 13. 1996 COMPLETED BY R.A. Willines TELEPHONE 704-382-5346-MONTH November. 1996 4

-E AVERA6E DAILY POWER LEVEL M

AVERA6E DAILY POWER LEVEL 4'

(MWe-Net)

(MWe-Net) i 1162 17'

!!68 2

1165 18 -

1165 i

3 1168 19

!!66 4

1169 20 1167 l

3

!!67 21

!!67 1

-6

!!62 22

!!69 7

!!56 23

!!63 4

i 1

8 1139 24 1152 9

1160 25 1137 10 1168 26 1147 11 1170 27

!!63 4

i-4 12 1170 28 1165 i

13 -

1170 29 1166 14 836 30 1167

. 13 942 4

la 1161 f

f g

r.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-414 UNIT NAME tA1:awna z DATE-12/13/96 REPORT MONTH November 1996 COMPLETED BY x.

a.

william's TELEPHONE.

(eve)-Juz-das6 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE S

SHUT EVENT SYS-CAUSE AND CORRECTIVE N

Y O

DOWN REPORT TEM COMPONENT ACTION TO O

P DURATION DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 8-P 96-11-14 F

A EB ELECON "2A" MAIN POWER SWITCHYARD CONNECTOR REPAIR (1)

(2)

(3)

(4)

F Forced Reason:

Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain)'

1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee Event Report (LER (NUREG-0161))

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same source (Explain) (Explain)

G-Operator Error H-Other

- ~. - -.

~ - -.-

\\

I 4

)

MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name:

Catawba. Unit 2

]

2.

Scheduled next refueling shutdown: March 1997 j

3.

Scheduled restart following refueling: April 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF i

ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

l 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

i Ifyes, what will these be?

i If no, has reload design and core configuration been reviewed by Safety Review Committee I

regarding unreviewed safety questions?

)

S.

Scheduled date(s) for submitting proposed licensing action and supporting information.

l l

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

1 7.

Number of Fuel assemblies (a) in the core: J_3 j

3 (b) in the spent fuel pool: 124 I

8.

Present licensed fuel pool capacity: 1418 i

Size of requested or planned increase: -

J l

9.

Projected date oflast refueling which can be accommodated by present license capacity:

September 2011 DUKE POWER COMPANY DATE: December 13.1996 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 1

3 DOCKET: 50-414 UNIT: Catawba 2

[

Date: 12/13/96

+

NARRATIVE

SUMMARY

~

i MONTH: November,1996 i

Catawba Unit 2 began the month of November operating at 100% full power. The unit operated at or near l

100% fullpower until 11/14/96 at 1000, when the unit began decreasing power due to "2A" main power -

switchyard connector repair. The unit held at 47% power from 11/14/96 at 1520 to 11/15/96 at 0300 due to j

"2A" main power switchyard connector repair. The unit returned to 100% full power on 11/15/96 at 1453, and operated at or near 100% full power the remainder of the month.

I l